UK Flaring Policy. UKCS Associated Gas Production, Flaring, and Utilization Rate. Billion Cubic Meters Uitlization Rate. 80 Production 98% Flaring

Size: px
Start display at page:

Download "UK Flaring Policy. UKCS Associated Gas Production, Flaring, and Utilization Rate. Billion Cubic Meters Uitlization Rate. 80 Production 98% Flaring"

Transcription

1 Billion Cubic Meters Uitlization Rate UK Flaring Policy The UK s policy in the upstream oil and gas sectors is to maximize economic benefit to the UK, while taking into account the environmental impact of hydrocarbon development and the need to ensure secure, diverse and sustainable supplies of energy for the UK market. The objectives of the policy are to ensure: Recovery of all economic hydrocarbon reserves; Adequate and competitive provision of pipelines and facilities; Proper account is taken of environmental impacts. In addition, the Department of Trade and Energy (DTI), which is responsible for both policy and regulation of the upstream oil and gas sectors, seeks wherever possible to facilitate communication between operators. This over-arching policy as accompanied by other factors, such as effective flaring regulatory regime, non-discriminatory and transparent access to upstream infrastructure, and liberalized energy markets, enabled the UK to achieve outstanding results in flaring and venting reduction. As illustrated in the figure below, the flaring volumes in the UK Continental Shelf (UKCS), where most of the UK s oil and gas is produced, has been reduced from over 4 bln m 3 in 1980 to about 1.6 bln m 3 in 2005, while the production of associated gas increased almost tenfold. UKCS Associated Gas Production, Flaring, and Utilization Rate 80 Production 98% Flaring 95% 70 Utilization Rate 87% 88% 60 97% 100% 90% 80% 50 70% 40 60% 30 50% % 40% 30% % 1

2 Flaring Regulation Regulatory Body Since the 1970s, Gas flaring and venting is regulated by the Licensing and Consents Unit of the DTI. The DTI requires that the flaring and venting occurring during appraisal, commissioning, and production phases of a development should be kept to the minimum that is technically and economically justified. This policy is implemented by a consent regime, introduced under the Energy Act of 1976, throughout all stages of field development, as described in the following. Consent Regime Design Phase For new developments, the operator is required to submit a Field Development Program to the DTI, which covers, inter alia, the issue of flaring and venting. A Consent from the DTI must be received by the Operator before development can proceed. The DTI expects that where, over the life of the field, the value of the produced gas is greater that the cost of bringing it to a market, the operator will make provision for its processing and transportation. In deciding whether the gas should be brought to market, the DTI will consider the overall costs and benefits; these may not reflect the commercial position of individual operators. If it is not economic to bring the gas to market, or use it on-site as a fuel or for re-injection, the operator must explore other utilization options such as conversion to other fuels, or sale to a neighboring development. Only if none of these options is available, will the DTI permit flaring. In this case, the Operator is challenged to minimize it by implementing best practice at an early stage of the design of the facility, and to continue to improve on this during the subsequent operational phase. In addition to Field Development Program, the operator is required to prepare an Environmental Statement for developments where either the level of oil production is expected to exceed 500 tons/day (~3,750 barrels/day), or the level of gas production to exceed 500,000 m 3 /day. All Environmental Statements are subject to stakeholder consultation and must be made available to environmental authorities and to the public at large. In making its decision the DTI will take into account the Environmental Statement itself and any comments from stakeholders. If the DTI considers that a project would have a significant negative environmental impact, Consent might be refused or conditions to mitigate the adverse effect imposed in the field development Consent. Commissioning Phase An application for Commissioning Consent must be made to the DTI at least two months before start of production, This must address a number of aspects of the project, including the main flaring and venting assumptions and the method of calculation of flaring and venting volumes. 2

3 During the commissioning, the Consent will usually restrict the duration of any flaring and venting to between one and three months, and specify a maximum quantity of gas to be flared and vented based on an auditable program prepared by the operator. During the period of the consent, the operator must submit to the DTI on weekly basis a set of data, including daily rates and cumulative volumes of flaring and venting. Production Phase During production, the DTI controls flaring and venting through annual Consents to flare and Consents to vent. An operator must apply for the flaring and/or venting Consent in Q4 of the preceding year. The Consent includes a forecast of volumes for the following flare and vent categories: Base load flare Flaring from operational or mode changes Emergency shutdown/process trip flare Un-ignited vents (including an estimated annual average composition of vented streams) This forecast is based upon the performance for the current year from January to September. Measuring and Reporting Measuring As of 2005, operators must measure and report flaring and venting volumes on a mass basis. This is a more representative measure of calorific value (and hence energy loss), and is also consistent with other emission reporting such as IPPC 1 and potentially EU ETS 2. Flare reporting guidelines, developed jointly by UKOOA 2 and the DTI, provide a structured approach to flare quantification. It specifies the methodology to be employed for given levels of flaring and venting. For flaring volumes > 15 tons (~17,000 m³) per day, volumes may be estimated through a material balance calculation; for flares > 40 tonnes (~45,000 m³) per day, ultrasonic flow measurement is required. Reporting The operators report the flaring and venting volumes to the DTI in Annual Field Reports. The Reports ensure that operators are carrying out the work as agreed in the Field Development Plan, and highlight any new plans for the coming year. Operators flaring < 40 tons per day only need prepare an abridged data sheet, otherwise a complete pro-forma must be submitted. To measure performance on a consistent basis, the DTI has introduced performance indicators. For flaring and venting, operators must report: Gas Use Efficiency = 1- (vol. of gas flared in 12 months/vol. of gas produced in 12 months) Flare Ratio = volume of gas flared per day/volume of gas produced per day 1 IPPC stands for the Integrated Pollution Prevention and Control Directive issued by the UK Environment Protection Agency 2 UKOOA stands for United Kingdome Offshore Operator Association. 3 EU ETS stands for European Union Emission Trading System 3

4 Monitoring and Enforcement The DTI monitors compliance of operators with the rules and guidelines governing the oil and gas industry, as well as with individual Field Development Plans, by scrutinizing the Annual Field Reports and conducting on-site inspections. In case of non-compliance or breach of flaring or venting Consents, the DTI does not issue fines but does impose increasingly severe penalties depending on the magnitude of the infringement, up to revoking an operator s license. Third party access (TPA) to upstream oil and gas infrastructure and downstream gas network Availability of, and access to, upstream processing and transport infrastructure is crucial to maximizing economic recovery of hydrocarbon on the UKCS, and in particular for reducing flaring of associated gas. Upstream pipeline and offshore processing facilities are typically built and owned by individual operators, and used initially to process and transport output from their respective fields. As these fields are depleted, spare capacity progressively becomes available for use by third parties on payment of a negotiated tariff. Furthermore, while reviewing a Field Development Plan, the DTI may request the operator to oversize pipelines beyond the immediate needs of the field in order to create the capacity for to tie-in future developments. This policy has contributed to both flaring reduction and the development of marginal fields that do not contain sufficient reserves to justify their own infrastructure. A voluntary industry Offshore Infrastructure Code of Practice, introduced in 1996, established a framework for TPA to ensure that access is easy and fair, with terms offered on a negotiated, non-discriminatory basis. The Code has been reviewed in consultation with industry and a revised version, published by UKOOA 3 in 2004, has been widely sign up to by UKCS operators. Nevertheless, if requested by a potential user of the infrastructure, the DTI has the power to impose specific pipeline sizes, provision of tie-in connections or tariffs. These powers have, however, not so far been exercised. Transparent and non-discriminatory access to the onshore gas transmission and distribution network, which is owned and operated by a number of private companies, is ensured by the UK regulator of electricity and gas markets - OFGEM. Flare Transfer Pilot Trading Scheme (FTPTS) In an attempt to reduce flaring and venting volumes below the levels approved by the DTI, a voluntary FTPTS was introduced in This joint Industry-Government initiative was instigated by the PILOT taskforce 4 ; it provides a framework for participating operators to 4 PILOT is a joint program involving the Government and the UK oil & gas Industry s operators, contractors, suppliers, and trade unions. The programs is aimed at securing the long-term future of the Industry in the UK and to keep the UK contracting and supplies industry at the leading edge in terms of overall competitiveness. 4

5 trade flaring volumes mainly any unused volume flaring built into the flaring Consent as a contingency. The scheme has proved to be attractive to operators and effective in terms of flaring reduction. Specifically, in 2005 there were 77 participating sites, an increase from 62 in 2000; operators carried-out 10 intra-company and 5 inter-company trades; sites within the scheme flared 270 tons/day (about 112 million m³/year) less than their collective consent of 2,482 tons/day (about 1,029 million m³/year), a saving of almost 11%. FTPTS Summary WHY: To achieve further reductions in gas flaring and venting; To assist the participating operators in gaining experience in target setting prior to possible, future mandatory legislation; To prepare the industry for possible integration into wider emission trading schemes. WHO: The FTPTS is voluntary, with no financial transactions taking place. It is administered by the DTI and is open to all holders of Consent of greater than 6 months. HOW: Participants are not under any obligation to transfer any flare volumes. They set their own voluntary targets, which are lower than the DTI flaring consent, for each asset entered into the scheme. These targets should be realistic but achievable, but also need to be sufficiently stretching to be credible to stakeholders; Companies may only sell unused flare volumes below their voluntary target level. Where flare transfers take place, voluntary asset target of the participating parties are adjusted, namely it would be increased for the Seller and decreased for the Buyer by the transferred amount; Companies may buy unused flare volumes when they expect to exceed their Consent level, but this must be agreed by the DTI. In this case the Seller s Consent is decreased, and the Buyer s Consent increased, by the transferred amount; The Consents issued by the DTI essentially cap the voluntary transfer scheme. The DTI will not increase the total level of flaring covered by Consents issued to operators. 5

UK Goals Short, Medium and Long Term

UK Goals Short, Medium and Long Term METHANE TO MARKETS UK Goals Short, Medium and Long Term Douglas Griffin Head of Measurement UK Department of Trade and Industry Energy Resources & Development Unit Aberdeen, Scotland, UK NEL Study Early

More information

COMMISSION DECISION. of on the application of Article 9(9) of Directive 2009/72/EC to Transmission System Operation in Scotland

COMMISSION DECISION. of on the application of Article 9(9) of Directive 2009/72/EC to Transmission System Operation in Scotland EUROPEAN COMMISSION Brussels, 14.5.2012 C(2012) 3284 final COMMISSION DECISION of 14.5.2012 on the application of Article 9(9) of Directive 2009/72/EC to Transmission System Operation in Scotland EN EN

More information

Gas Natural Fenosa comments to ERGEG Public Consultation on Existing transparency requirements for natural gas

Gas Natural Fenosa comments to ERGEG Public Consultation on Existing transparency requirements for natural gas Gas Natural Fenosa comments to ERGEG Public Consultation on Existing transparency requirements for natural gas Gas Natural Fenosa welcomes the opportunity to respond to ERGEG Public consultation on existing

More information

Unfair practices in distribution

Unfair practices in distribution Unfair practices in distribution Practical experiences of the law pertaining to the prohibition of unfair practices in the distribution of agricultural and food products Dr. Velő Zsuzsanna Bors Edina 17.

More information

LAW OF MONGOLIA ON ENERGY CHAPTER ONE GENERAL PROVISIONS. Article 1. The Purpose of the Law

LAW OF MONGOLIA ON ENERGY CHAPTER ONE GENERAL PROVISIONS. Article 1. The Purpose of the Law LAW OF MONGOLIA ON ENERGY CHAPTER ONE GENERAL PROVISIONS Article 1. The Purpose of the Law 1.1. The purpose of this law is to regulate matters relating to energy generation, transmission, distribution,

More information

Questionnaire EUFJE Conference 2014, Budapest 17/18 October 2014

Questionnaire EUFJE Conference 2014, Budapest 17/18 October 2014 Questionnaire EUFJE Conference 2014, Budapest 17/18 October 2014 Impact Assessments Preventive Measures against Significant Environmental Impacts in the 21 st Century Introduction Environmental Impact

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

Re-use of waste Recycling of waste Recovery of waste Use of waste as source of energy Incineration without energy recovery

Re-use of waste Recycling of waste Recovery of waste Use of waste as source of energy Incineration without energy recovery 2.9 THE FRAMEWORK DIRECTIVE ON WASTE Official Title: Council Directive 75/442/EEC on waste, as amended by Council Directive 91/156/EEC. 2.9.1 INTRODUCTION Page 1 The Framework Directive on Waste establishes

More information

NERC Reliability Functional Model

NERC Reliability Functional Model NERC Reliability Functional Model Function Definitions and Responsible Entities Version 3 Approved by Standing Committees: Operating Committee: December 6, 2006 Planning Committee: December 6, 2006 Standards

More information

GLOSSARY C O N T E N T S PAGE. Group Procurement Strategy

GLOSSARY C O N T E N T S PAGE. Group Procurement Strategy C O N T E N T S PAGE 1 Executive Summary 3 2 Scope of this Strategy 3 3 Procurement Principles 4 4 Route To Market 6 5 Procurement Governance 8 6 Procurement Plan 2018/19 8 GLOSSARY EU European Union ICT

More information

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures Seminar on African Electrical Interconnection Module 7 - Market Operational Structures Module 7 - Market Operational Structures Contents 1) Power Market Principles 2) Major Operational Issues 3) Transmission

More information

Stewardship. Expectations. SE-01 Joint Venture Hub Strategy Implementation Guide

Stewardship. Expectations. SE-01 Joint Venture Hub Strategy Implementation Guide Stewardship Expectations SE-01 Joint Venture Hub Strategy Implementation Guide March 2017 2 SE-01 Joint Venture Hub Strategy Implementation Guide 1. Objectives The objectives of this Stewardship Expectation

More information

Narodne novine Official Gazette of the Republic of Croatia issue no. 68 of 27 July 2001 page 2174

Narodne novine Official Gazette of the Republic of Croatia issue no. 68 of 27 July 2001 page 2174 TRANSLATION Narodne novine Official Gazette of the Republic of Croatia issue no. 68 of 27 July 2001 page 2174 Pursuant to Article 88 of the Constitution of the Republic of Croatia, herewith I pass the

More information

A PRACTICAL GUIDE FOR HOW AN ADVERTISER CAN PREPARE FOR GDPR JANUARY 2018

A PRACTICAL GUIDE FOR HOW AN ADVERTISER CAN PREPARE FOR GDPR JANUARY 2018 A PRACTICAL GUIDE FOR HOW AN ADVERTISER CAN PREPARE FOR GDPR JANUARY 2018 1 PURPOSE OF THIS DOCUMENT 2 This document is to be used as a guide for advertisers on how they should work with their agencies,

More information

Regulatory Compliance and Enforcement Framework

Regulatory Compliance and Enforcement Framework Contents 1. About us... 3 1.1 Our Mission and Values... 3 2. Relevant Legislation and Obligations... 4 3. Approach to Regulatory Compliance and Enforcement... 4 3.1 Our Approach... 4 3.2 Working with Stakeholders...

More information

OFT issues guidance on competition law and its application to public bodies

OFT issues guidance on competition law and its application to public bodies Briefing 12/10 March 2012 OFT issues guidance on competition law and its application to public bodies To: All contacts in England, Wales, Scotland and Northern Ireland Key issues Guidance on competition

More information

LEGISLATIVE CONSENT MEMORANDUM AGRICULTURE BILL

LEGISLATIVE CONSENT MEMORANDUM AGRICULTURE BILL LEGISLATIVE CONSENT MEMORANDUM AGRICULTURE BILL Introduction 1. The Agriculture Bill was introduced into the House of Commons on 12 September 2018. It gives the UK Government broad powers to provide support

More information

Advisory Committee on Enforcement

Advisory Committee on Enforcement E WIPO/ACE/9/20 ORIGINAL: ENGLISH DATE: DECEMBER 20, 2013 Advisory Committee on Enforcement Ninth Session Geneva, March 3 to 5, 2014 PREVENTIVE ACTIONS BEING DEVELOPED BY THE EUROPEAN COMMISSION TO COMPLEMENT

More information

THE TETRA PAK CASE: ARE LOYALTY REBATES TREATED DIFFERENTLY BY THE CHINESE ANTITRUST REGULATOR?

THE TETRA PAK CASE: ARE LOYALTY REBATES TREATED DIFFERENTLY BY THE CHINESE ANTITRUST REGULATOR? THE TETRA PAK CASE: ARE LOYALTY REBATES TREATED DIFFERENTLY BY THE CHINESE ANTITRUST REGULATOR? 1 BY MICHAEL HAN, ANDREW SKUDDER & DAVID BOYLE 1 I. INTRODUCTION On November 16, 2016, the State Administration

More information

Good practices in business regulation

Good practices in business regulation Doing Business 16 What is changing in Doing Business? Good practices in business regulation have evolved since the Doing Business indicators were first developed in 3. Some changes have come, for example,

More information

Chapter Seven: Respect for Human Rights in Franchising and Licensing Relationships

Chapter Seven: Respect for Human Rights in Franchising and Licensing Relationships 93 Chapter Seven: Respect for Human Rights in Franchising and Licensing Relationships Overview Brief overview of franchising and licensing relationships Licensing and franchising contracts have similarities,

More information

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS Energy Week, Vaasa, Finland, 16.03.2016 Ioanna Mersinia, Attorney in Law (LL.M.) Contents EU Energy Law / 3 rd Energy Package (2009):

More information

Denmark. EUFJE Conference 2014, Budapest 17/18 October Danish report by High Court Judge Karsten Bo Knudsen

Denmark. EUFJE Conference 2014, Budapest 17/18 October Danish report by High Court Judge Karsten Bo Knudsen EUFJE Conference 2014, Budapest 17/18 October 2014 Danish report by High Court Judge Karsten Bo Knudsen Impact Assessments Preventive Measures against Significant Environmental Impacts in the 21 st Century

More information

The Role of the AERS in the liberalized electricity market and basic aspects of the market

The Role of the AERS in the liberalized electricity market and basic aspects of the market The Role of the AERS in the liberalized electricity market and basic aspects of the market Nikola Radovanović Lead Lawyer Energy Agency of the Republic of Serbia Belgrade, May 10 th, 2013. 1 Content Role

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Professional diploma in procurement and supply Unit: PD4 - Supply chain diligence Exam series: May 2016 Each element of a question carries equal weighting

More information

The Anti-monopoly Commission of the State Council. Anti-monopoly Guideline on Abuse of Intellectual Property Rights.

The Anti-monopoly Commission of the State Council. Anti-monopoly Guideline on Abuse of Intellectual Property Rights. The Anti-monopoly Commission of the State Council Anti-monopoly Guideline on Abuse of Intellectual Property Rights (Exposure Draft) (December 31, 2015) Preamble Anti-monopoly and intellectual property

More information

Demand Side Engagement Strategy. Version 2.0 Effective Date: 08/02/18

Demand Side Engagement Strategy. Version 2.0 Effective Date: 08/02/18 Demand Side Engagement Strategy Version 2.0 Effective Date: 08/02/18 Document management Version control Date Version Description Author 16/07/2013 0.1 Initial Draft. Y. Jayathilaka 23/07/2013 0.2 Revised

More information

Service Standards for Western Power Corporation s South West Interconnected System

Service Standards for Western Power Corporation s South West Interconnected System Service Standards for Western Power Corporation s South West Interconnected System Report prepared for Economic Regulation Authority Western Australia Contents 1 Executive summary 3 2 Introduction 7 2.1

More information

Introduction to RRG Drafting Team Proposal

Introduction to RRG Drafting Team Proposal November 17, 2003 Introduction to RRG Drafting Team Proposal SUMMARY This introduction will review the overall task the RRG drafting team took on, set out the overall guiding principles it used, and describe

More information

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas Two Years of TPA in Italy: Snam Rete Gas experience Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas Carlo Malacarne Managing Director Operations - Snam Rete Gas

More information

Electricity Law (Draft) 2013, Pyidaungsu Hluttaw Law No. ( - ) 1375 M.E, Month, Day 2013, Month, Day

Electricity Law (Draft) 2013, Pyidaungsu Hluttaw Law No. ( - ) 1375 M.E, Month, Day 2013, Month, Day The Pyidaungsu Hluttaw hereby enacts this law. 1. This law shall be called the Electricity Law. Electricity Law (Draft) 2013, Pyidaungsu Hluttaw Law No. ( - ) 1375 M.E, ----- Month, ------ Day 2013, -----

More information

OFG1093 Finance Manager

OFG1093 Finance Manager OFG1093 Finance Manager About us Ofgem is Great Britain s gas and electricity regulator. Our goal is to protect energy customers interests, now and in the future. We make sure competition encourages great

More information

Buyer-Driven Vertical Restraints

Buyer-Driven Vertical Restraints Buyer-Driven Vertical Restraints Paul W. Dobson Loughborough University Presented to Pros and Cons of Vertical Restraints Conference Stockholm 7 November 2008 1 Introduction Traditional emphasis on seller-led

More information

Approved by Standing Committees Approved by Board of Trustees

Approved by Standing Committees Approved by Board of Trustees Reliability Functional Model Function Definitions and Responsible Entities Prepared by the Functional Model Working Group Version 4 Approved by Standing Committees Approved by Board of Trustees August

More information

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context Insert then choose Picture select your picture. Right click your picture and Send to back. 26 th January 2015

More information

GENERAL DATA PROTECTION REGULATION REPORT

GENERAL DATA PROTECTION REGULATION REPORT GENERAL DATA PROTECTION REGULATION REPORT 2016 Report -General Data Protection Regulation BACKGROUND P.4 ECIJA SOLUTIONS P.15 MAIN DEVELOPMENTS P.7 FAQS P.16 MEASURES AND TERMS P.12 Privacy and Data Protection

More information

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions Title Procurement Policy Associated Policies Charging and Remissions REVIEWED: NEXT REVIEW: 1. Policy statement 1.1 This policy (Policy) sets out the rules by which The Brooke Weston Trust (the Trust)

More information

Remedies to the adverse effects of. Myriam Vander Stichele SOMO

Remedies to the adverse effects of. Myriam Vander Stichele SOMO Remedies to the adverse effects of buyer power Myriam Vander Stichele SOMO Having adverse effects of buyer power being recognised Diverse picture in EU, incl. private label sales Not all (competition)

More information

SesSIon july Environment Agency. Tackling diffuse water pollution in England

SesSIon july Environment Agency. Tackling diffuse water pollution in England Report by the Comptroller and Auditor General HC 188 SesSIon 2010 2011 8 july 2010 Environment Agency Tackling diffuse water pollution in England 4 Summary Tackling diffuse water pollution in England Summary

More information

Greenstone Annual Communication on Progress 7 th February th February 2018

Greenstone Annual Communication on Progress 7 th February th February 2018 Greenstone Annual Communication on Progress 7 th February 2017 6 th February 2018 Introduction February 2018 I am pleased to confirm that Greenstone + Ltd reaffirms its support of the Ten Principles of

More information

Legal and Institutional Aspects of PES Schemes

Legal and Institutional Aspects of PES Schemes Legal and Institutional Aspects of PES Schemes Maryanne Grieg-Gran (summarising Thomas Greiber Fostering PES projects in Central and Eastern Europe and the CIS Dec 6-10 2006 International Academy for Nature

More information

Alberta s Tool for Regulating Flaring

Alberta s Tool for Regulating Flaring Alberta s Tool for Regulating Flaring The Alberta Energy and Utilities Board regulates flaring and venting in Alberta s upstream petroleum industry with Guide 60 Upstream Petroleum Industry Flaring Guide.

More information

SUPPLY CHAIN CODE OF PRACTICE COMPLIANCE 2014 SURVEY REPORT. Streamlining processes and increasing value for the oil and gas industry

SUPPLY CHAIN CODE OF PRACTICE COMPLIANCE 2014 SURVEY REPORT. Streamlining processes and increasing value for the oil and gas industry SUPPLY CHAIN CODE OF PRACTICE COMPLIANCE 214 SURVEY REPORT Streamlining processes and increasing value for the oil and gas industry Introduction The Supply Chain Code of Practice (SCCoP) is a set of best

More information

CODE MODIFICATION PROPOSAL No xxxx <Disposal of Dynevor Arms LNG Storage Facility> Version x.x Date: 04/11/2008. Non Urgent

CODE MODIFICATION PROPOSAL No xxxx <Disposal of Dynevor Arms LNG Storage Facility> Version x.x Date: 04/11/2008. Non Urgent CODE MODIFICATION PROPOSAL No xxxx Version x.x Date: 04/11/2008 Proposed Implementation Date: [1/2/2009] Urgency: Non Urgent 1 The Modification Proposal

More information

Information Guide: Carbon Reduction Legislation. Issue 24

Information Guide: Carbon Reduction Legislation. Issue 24 Information Guide: Carbon Reduction Legislation Issue 24 Information Guide: Carbon Reduction Legislation This is an independent guide produced by Mitsubishi Electric to enhance the knowledge of its customers

More information

Integrated regulation experiences of IPPC in England and Wales

Integrated regulation experiences of IPPC in England and Wales Integrated regulation experiences of IPPC in England and Wales J. Gray 1, T. James 1 & J. Dickson 2 1 Environment Agency, Bristol, UK and 2 Atkins Environmental Sustainable Solutions, Bristol, UK Water

More information

Illinois State Institute for Regulatory Policy Studies Conference

Illinois State Institute for Regulatory Policy Studies Conference Illinois State Institute for Regulatory Policy Studies Conference Rob Berntsen 10/20/2011 Overview MISO RTOs What We Do FERC Order 1000 MISO s View of FERC Order 1000 MISO s Planning Process MVPs Benefits

More information

TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY

TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY TABLE OF CONTENTS 1. PURPOSE...2 2. OBJECTIVE...2 3. BACKGROUND...2 3.1 REGULATORY INTERFACE AND COMMUNICATION CHANNELS...2

More information

Hydro takes over Vale s aluminium business in transforming transaction

Hydro takes over Vale s aluminium business in transforming transaction Hydro takes over Vale s aluminium business in transforming transaction Svein Richard Brandtzæg, President and CEO Bank of America Merrill Lynch Global Metals & Mining Conference May 12, 2010 (1) Cautionary

More information

DIRECTIVE (EU) 2018/958 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE (EU) 2018/958 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL 9.7.2018 Official Journal of the European Union L 173/25 DIRECTIVE (EU) 2018/958 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 28 June 2018 on a proportionality test before adoption of new regulation

More information

Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission

Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission May 13, 2015 AGENDA 1. Review EU energy legislation 2. United States structural

More information

Council of the European Union Brussels, 4 February 2019 (OR. en)

Council of the European Union Brussels, 4 February 2019 (OR. en) Council of the European Union Brussels, 4 February 2019 (OR. en) Interinstitutional File: 2017/0294(COD) 5874/19 ER 43 COEST 21 CODEC 239 NOTE From: To: No. Cion doc.: 14204/17 Subject: General Secretariat

More information

The General Data Protection Regulation: What does it mean for you?

The General Data Protection Regulation: What does it mean for you? The General Data Protection Regulation: What does it mean for you? We are here to help The changes being introduced in the EU General Data Protection Regulation 2016 (GDPR) will be the biggest shake-up

More information

Decommissioning Delivery Programme

Decommissioning Delivery Programme Decommissioning Delivery Programme Contents 1. Foreword 3 2. Executive summary 4 3. Decommissioning Delivery Programme elements 6 3.1 Element 1: Cost certainty and reduction 7 3.2 Element 2: Delivery capability

More information

Brexit: implications for the energy market

Brexit: implications for the energy market Agenda Advancing economics in business Brexit: implications for the energy market The outcome of the UK s EU referendum on 23 June 2016 had an immediate effect on the financial markets in the EU and beyond.

More information

2015 CPSU/CSA POLICY CONFERENCE GOVERNMENT PROCUREMENT

2015 CPSU/CSA POLICY CONFERENCE GOVERNMENT PROCUREMENT 2015 CPSU/CSA POLICY CONFERENCE GOVERNMENT PROCUREMENT Government Procurement Policy 1. Introduction 1.1 The Western Australian Government spends billions of dollars every year on the acquisition of goods

More information

SECTION 17 CONTRACT PROCEDURE RULES

SECTION 17 CONTRACT PROCEDURE RULES Glossary of terms:- 17.1.1 "Tender" means a sealed bid or proposal to supply or receive goods, materials or services or for the execution of works. 17.1.2 "Contract" means any contract including a Purchase

More information

COMMISSION RECOMMENDATION. of XXX

COMMISSION RECOMMENDATION. of XXX EUROPEAN COMMISSION Brussels, XXX C(2014) 267 /3 COMMISSION RECOMMENDATION of XXX on minimum principles for the exploration and production of hydrocarbons (such as shale gas) using high volume hydraulic

More information

ISDA s response to the CEER consultation on the introduction of a European-wide Energy wholesale trading passport

ISDA s response to the CEER consultation on the introduction of a European-wide Energy wholesale trading passport June 20th 2011 ISDA s response to the CEER consultation on the introduction of a European-wide Energy wholesale trading passport Introduction On behalf of its members, the International Swaps and Derivatives

More information

1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review:

1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review: 1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review: encourage generators and suppliers to balance their own positions before gate closure, thus reducing the call

More information

Union of the Electricity Industry - EURELECTRIC comments to the ERGEG discussion paper Roadmap for a competitive single gas market in Europe

Union of the Electricity Industry - EURELECTRIC comments to the ERGEG discussion paper Roadmap for a competitive single gas market in Europe Union of the Electricity Industry - EURELECTRIC comments to the ERGEG discussion paper Roadmap for a competitive single gas market in Europe January 2006 Union of the Electricity Industry - EURELECTRIC

More information

Municipal Cable Franchise Transfer Toolkit

Municipal Cable Franchise Transfer Toolkit Municipal Cable Franchise Transfer Toolkit By Gail Karish and Joseph Van Eaton A cable operator generally cannot transfer control of its business or transfer its cable franchise without the prior approval

More information

Legal barriers to CCS

Legal barriers to CCS Legal barriers to CCS Mette Karine Gravdahl Agerup Assistant Director General Norwegian Bali, 19 March 2009 The world needs energy Global energy demand will increase by 55% by 2030 84% of global energy

More information

Methane Action Plan. saskatchewan.ca

Methane Action Plan. saskatchewan.ca Methane Action Plan Methane Action Plan: Introduction On December 4, 2017, the Government of Saskatchewan released Prairie Resilience: A Made-in-Saskatchewan Climate Change Strategy. This comprehensive

More information

COMMISSION RECOMMENDATION

COMMISSION RECOMMENDATION L 39/72 Official Journal of the European Union 8.2.2014 RECOMMENDATIONS COMMISSION RECOMMENDATION of 22 January 2014 on minimum principles for the exploration and production of hydrocarbons (such as shale

More information

Key Points of the New EU Directive on Environmental Impact Assessment

Key Points of the New EU Directive on Environmental Impact Assessment Key Points of the New EU Directive on Environmental Impact Assessment EIA Legal Analysis Justice and Environment 2015 a Udolni 33, 602 00, Brno, CZ e info@justiceandenvironment.org t/f 36 1 3228462 / 36

More information

Energy White Paper 2007 Meeting the Energy Challenge

Energy White Paper 2007 Meeting the Energy Challenge British Institute of Energy Economics 25 September 2007 Energy White Paper 2007 Vicky Pryce Director General, Economics, BERR Joint Head of the Government Economic Service Our key long term challenges

More information

Electricity Authority Work Programme. 1 July June June 2017

Electricity Authority Work Programme. 1 July June June 2017 Work Programme 1 July 2017 30 June 2018 30 June 2017 Contents Executive summary... 3 Introduction and purpose... 4 Programme A: Evolving technologies and business models... 7 Programme B: Consumer choice

More information

EIB Procurement Policy

EIB Procurement Policy EIB Procurement Policy José Luis Alfaro, Head of Procurement 1 Presentation outline 1. General Principles 1.1 Introduction 1.2 Structure of the Guide to Procurement 1.3 Key points 2. Operations Outside

More information

Introduction. The findings. The wider context ANTITRUST

Introduction. The findings. The wider context ANTITRUST The Energy Sector Inquiry: conclusions and way forward ( 1 ) Eleonora WÄKTARE, Kristóf KOVÁCS and Alexander GEE, Directorate-General for Competition, unit B-1 Introduction On 10 January 2007, after an

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 9.11.2004 COM(2004) 745 final REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT ON INCENTIVES FOR EMAS REGISTERED ORGANISATIONS {SEC(2004)1375}

More information

Energy Regulation in Great Britain

Energy Regulation in Great Britain INOGATE ITS Project Energy Regulation in Great Britain Alena Aliakseyeva, Office of Gas and Electricity Markets Capacity building for the Regulatory Authorities of the INOGATE Partner Countries Vienna

More information

Financing Renewable Energy Projects. Part I: Government Subsidies

Financing Renewable Energy Projects. Part I: Government Subsidies Financing Renewable Energy Projects Part I: Government Subsidies Part I: Government Subsidies Goals of Government Subsidies Renewable Portfolio Standards and Renewable Energy Certificates Illinois Renewable

More information

Connoisseur Solutions Project Procurement Management

Connoisseur Solutions Project Procurement Management Project Procurement Management Project Procurement Management Processes necessary to purchase or acquire products, services or results needed from outside the project team. Procurement Management Processes

More information

(Legislative acts) DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement

(Legislative acts) DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement 6.5.2014 L 133/1 I (Legislative acts) DIRECTIVES DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement (Text with EEA relevance)

More information

June Auditor regulation and oversight plan This report is for:

June Auditor regulation and oversight plan This report is for: June 2018 Auditor regulation and oversight plan 2018-2021 This report is for: Auditors People who prepare financial statements Directors of FMC reporting entities. This copyright work is licensed under

More information

Infrastructure Code of Practice

Infrastructure Code of Practice Infrastructure Code of Practice The non-statutory Code of Practice on Access to Upstream Oil and Gas Infrastructure on the UK Continental Shelf (also known as the Infrastructure Code of Practice ) was

More information

MULTI-TERRITORY LICENSING OF MUSIC ONLINE DG Competition s Online Commerce Roundtable. BEUC Statement

MULTI-TERRITORY LICENSING OF MUSIC ONLINE DG Competition s Online Commerce Roundtable. BEUC Statement eue MULTI-TERRITORY LICENSING OF MUSIC ONLINE DG Competition s Online Commerce Roundtable BEUC Statement Contact: Kostas Rossoglou legal-eco@beuc.eu Ref.: X/048/2009-03/07/09 Summary BEUC strongly supports

More information

Removing barriers to LNG and to gas storage product innovation

Removing barriers to LNG and to gas storage product innovation Removing barriers to LNG and to gas storage product innovation Rocío Prieto, LNG TF co-chair Ed Freeman, GST TF co-chair Madrid Forum, 6 October 2016 Removing barriers to LNG in European gas Objective

More information

TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO

TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO Address: Dërvish Rozhaja Str., No. 12, 10000 Prishtina, Kosovo Tel: 038 247 615 ext. 101, Fax: 038 247 620, E-mail: info@ero-ks.org,

More information

REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS

REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS Official translation REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS Article 1. Purpose of the Law This

More information

5 solutions to solve your BREXIT related customs issues

5 solutions to solve your BREXIT related customs issues 5 solutions to solve your BREXIT related customs issues You are concerned by Brexit if... You sell goods or provide services in the United Kingdom or in the European Union. You buy goods or use a service

More information

Regulation for Scheme Owners requesting acceptance by ACCREDIA of new Conformity Assessment Schemes and their revisions

Regulation for Scheme Owners requesting acceptance by ACCREDIA of new Conformity Assessment Schemes and their revisions Title Reference Regulation for Scheme Owners requesting acceptance by ACCREDIA of new Conformity Assessment Schemes and their revisions RG-19 Revision 00 Date 10-10-2017 NOTE: The present document represents

More information

Introduction to Carbon Markets. Ankara, 5 September 2016

Introduction to Carbon Markets. Ankara, 5 September 2016 Introduction to Carbon Markets Ankara, 5 September 2016 What is a Carbon Market? Carbon market exists to address an environmental goal: Reducing greenhouse gas emissions and tackling climate change in

More information

Thus, let s focus on 35% 30% 25% 20% 15% 10%

Thus, let s focus on 35% 30% 25% 20% 15% 10% International Telecommunication Union ROLES OF REGULATORS CRC, MONGOLIA July 2003 Eun-JuKim Senior Advisor for the Asia & Pacific ITU eun-ju.kim@itu.intint Agenda Trends of regulators: Different scenarios

More information

Meeting climate change requirements if there s no Brexit deal

Meeting climate change requirements if there s no Brexit deal Meeting climate change requirements if there s no Brexit deal Summary How climate change regulations, emissions trading, ecodesign and energy labelling would be affected if the UK leaves the EU with no

More information

WORKING PAPER ON NATURAL RESOURCES AND CONCESSIONS IN THE CONTEXT OF THE MAI

WORKING PAPER ON NATURAL RESOURCES AND CONCESSIONS IN THE CONTEXT OF THE MAI Unclassified DAFFE/MAI/ST/RD(97)2/FINAL Organisation for Economic Co-operation and Development 12 January 2000 Organisation de Coopération et de Développement Economiques Negotiating Group on the Multilateral

More information

Role of AERS in natural gas sector reform in Serbia

Role of AERS in natural gas sector reform in Serbia ENERGY AGENCY OF THE REPUBLIC OF SERBIA Role of AERS in natural gas sector reform in Serbia Petar Maksimović Secretary General 16 th MEETING OF THE UNECE GAS CENTRE TASK FORCE GROUP ON THE IMPLEMENTATION

More information

Burying CO 2 The New EU Directive on Geological Storage of CO 2 from a Norwegian Perspective. Laetitia Birkeland Legal adviser The Bellona Foundation

Burying CO 2 The New EU Directive on Geological Storage of CO 2 from a Norwegian Perspective. Laetitia Birkeland Legal adviser The Bellona Foundation Burying CO 2 The New EU Directive on Geological Storage of CO 2 from a Norwegian Perspective Laetitia Birkeland Legal adviser The Bellona Foundation Oslo, January 2009 2 Acknowledgements This paper was

More information

Framework for Action for the management of small drinking water supplies

Framework for Action for the management of small drinking water supplies Framework for Action for the management of small drinking water supplies Environment Europe Direct is a service to help you find answers to your questions about the European Union Freephone number (*):

More information

COMMENTS ON ERGEG POSITION PAPER ON SMART GRIDS

COMMENTS ON ERGEG POSITION PAPER ON SMART GRIDS COMMENTS ON ERGEG POSITION PAPER ON SMART GRIDS INTRODUCTION EDP Distribuição, Energia, SA, referred to as EDPD in the remaining of this document, welcomes the position paper on Smart Grids by the ERGEG

More information

COMMISSION STAFF WORKING DOCUMENT

COMMISSION STAFF WORKING DOCUMENT EUROPEAN COMMISSION Brussels, 8.11.2017 SWD(2017) 368 final COMMISSION STAFF WORKING DOCUMENT Assessing the amendments to Directive 2009/73/EC setting out rules for gas pipelines connecting the European

More information

CUSC Amendment Proposal Form CAP: 162

CUSC Amendment Proposal Form CAP: 162 CUSC Amendment Proposal Form CAP: 162 Title of Amendment Proposal: Transmission Access - Entry Overrun Description of the Proposed Amendment (mandatory by proposer): Creation of a commercial mechanism

More information

Explanatory Note on the ELIA LFC Block Operational Agreement Disclaimer

Explanatory Note on the ELIA LFC Block Operational Agreement Disclaimer Explanatory Note on the ELIA LFC Block Operational Agreement Disclaimer This document, provided by ELIA, is the explanatory note for the draft for stakeholder consultation of the ELIA proposal for the

More information

6808/17 GDLC/ld 1 DGB 1B

6808/17 GDLC/ld 1 DGB 1B Council of the European Union Brussels, 1 March 2017 (OR. en) 6808/17 AGRI 99 AGRILEG 53 NOTE From: To: Subject: General Secretariat of the Council Delegations Better functioning of the Food Supply Chain:

More information

Get ready. A Guide to the General Data Protection Regulation (GDPR) elavon.ie

Get ready. A Guide to the General Data Protection Regulation (GDPR) elavon.ie Get ready A Guide to the General Data Protection Regulation (GDPR) elavon.ie The General Data Protection Regulation (GDPR) will regulate the privacy and handling of the personal data of individuals in

More information

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation Market Monitoring Presented by: Dr. Robert Sinclair Presented to: Georgian Energy Policy Delegation April 30, 2012 Kentucky Public Service Commission Potomac Economics Potomac Economics is a leading provider

More information

8.1. GENERAL RULES OF CAPACITY BOOKING

8.1. GENERAL RULES OF CAPACITY BOOKING 8.1. GENERAL RULES OF CAPACITY BOOKING (a) Pursuant to the provisions of the Gas Supply Act and the Implementation Decree the free capacities of the natural gas network may and shall be offered to network

More information

GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION. 1. Introduction

GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION. 1. Introduction GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION 1. Introduction We, Network Rail Infrastructure Limited ( Network Rail ), object to the above Bill being promoted by Strathclyde Passenger Transport

More information

At Law, we are a team of dedicated legal advisors with extensive experience and specialist skills in various areas.

At Law, we are a team of dedicated legal advisors with extensive experience and specialist skills in various areas. Law at EY At Law, we are a team of dedicated legal advisors with extensive experience and specialist skills in various areas. Law at EY We provide legal services independently or in close collaboration

More information