1 PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA, AHMEDABAD CITY GUJARAT (M) E Mail- 1

2 INTODUCTION Environmental protection and sustainable development have been the cornerstones of the policies and procedures governing the industrial and other developmental activities in India. Ministry of Environment, Forests & Climate Change has taken several policy initiatives and enacted environmental and pollution control legislations to prevent indiscriminate exploitation of natural resources and to promote integration of environmental concerns in developmental projects; one such initiative is the Notification on Environmental Impact Assessment (EIA) of developmental projects issued on under the provisions of Environment (Protection) Act, 1986, amended on & included for certain criteria s of construction projects including new townships, settlement colonies, commercial complexes, hospitals and office complexes to obtain environmental clearance. Further this notification was amended as Environmental Impact Assessment Notification S.O.1533 (E) of 14th September 2006 as amended Notification S.O.3067 (E) dated 1st December 2009 making mandatory for specified categories of developmental projects to obtain Environmental Clearance. As per the notification our project falls under 8(a) B2 category and hence applying for SEAC, Gujarat for Environmental Clearance for proposed Building and Construction Project. DETAIS OF THE PROJECT PROPONENT SR. NO. 1 DESCRIPTION DETAILS Name and Address of the Project 2 Project Designers & Consultant Site: AMC EWS HOUSING PROJECT, F. P. No. 174, T.P. No. 32, Gota, AHMEDABAD CITY WEST Sthapati Designers & Consultant Pvt. Ltd. Ohm Chambers, Station Road, NAVSARI, GUJARAT Phone: Correspondence: Parekh Associates, 2nd Floor, Shree Complex, 1 Azad Society, Ambawadi, Ahmedabad, GUJARAT. (M) (079)

3 3. PROJECT DESCRIPTION ANNEXURE I AREA STATEMENT Net Plot Area Sq. m Built up Area Sq. m Built up Area, FSI Sq. m Balance FSI Sq. m Common Plot Required Sq. m Common Plot Provided Sq. m Type of Building Total Height of Building Nos. of Blocks Nos. of Flats Nos. of Shops G m ( ) 25 Blocks 1488 units 86 units Total Parking Area Proposed Sq. m Open Plot Area Sq. m Area for Thick Plantation Required Sq. m Area for Thick Plantation Provided 1767 Sq. m No. of Trees Planning 441 Nos. 3

4 ANNEXURE II WATER AND WASTEWATER DETAILS Water and Wastewater Details (Operation Phase) Source: Ahmedabad Municipal Corporation Sr. No. 1 Purpose Water Wastewater Consumption Generation (KL/day) (KL/day) Domestic Residential: 1488 units x 5 person x 135 Lit/day = KL/day Commercial 86 units x 3 person x 35 Lit/day= 9.03 KL/day 2 Remarks Other (Greenbelt+ Fire Make up) Total Wastewater will be 80% of the requirement - Mode of Disposal: Domestic wastewater generation will be disposed off through Ahmedabad Municipal Corporation drainage line. 4

5 ANNEXURE IIII SITE MAP 5

6 6

7 7

8 8

9 9

10 ANALYSIS OF THE PROJECT DESCRIPTION: This project is proposed for low income people and based on no profit no loss base government initiate the project and issued grant for the project. This is one of the basic necessities of the common man. It generate direct and indirect income source. Yours Faithfully, For, STHAPATI DESIGNERS & CONSULTANT PVT. LTD. AUTHORISED SIGNATORY 10

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

Online Payment for CTO

Online Payment for CTO Online Payment for CTO Documents to be uploaded for CTO General Product_ Fe e to pay online W Emiss./Disch. Air Emission Documents for CTO-to uplpoad online Print( Air Water ) Documents Details Statement

More information

Environment Impact Assessment (EIA) Notification 2006

Environment Impact Assessment (EIA) Notification 2006 Environment Impact Assessment (EIA) Notification 2006 Information Sources: 1.) Environment Impact Notification 2006; Gazette of India, 14th September, 2006 2.) Green Tapism; Environment Support Group;

More information

Guidelines for preparation of water balance for Building, Construction, Township and Area Development Projects

Guidelines for preparation of water balance for Building, Construction, Township and Area Development Projects Guidelines for preparation of water balance for Building, Construction, Township and Area Development Projects The SEIAA in its 39 th meeting held on 04.07.2012 discussed the matter regarding water balance

More information

(A) Cases recommended by SEAC for Prior Environmental Clearance

(A) Cases recommended by SEAC for Prior Environmental Clearance Minutes of the 33 rd SEIAA Meeting held on 10 th May, 2010 The 33 rd meeting of the State Level Environment Impact Assessment Authority was convened on 10 th May, 2010 at 3.00 P M at the Authority's office

More information

Table 1 Population in MBMC

Table 1 Population in MBMC EXECUTIVE SUMMARY 1.1 Existing status of physical infrastructure Mira Bhayandar which is part of Thane district is located at the northern threshold of greater Mumbai between 18 2'N 20 20'N latitude and

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to

More information

MARKET OVERVIEW FOR GREEN BUILDINGS

MARKET OVERVIEW FOR GREEN BUILDINGS PRESENTATION ON GREEN BUILDING NORMS AND COST IMPACT (AS PER GRIHA ) MARKET OVERVIEW FOR GREEN BUILDINGS GREEN BUILDING FOOT PRINT IN INDIA 1. Both IGBC and GRIHA provide green building certification in

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Performance of Bio-medical Waste Treatment Facilities in Central Zone

Performance of Bio-medical Waste Treatment Facilities in Central Zone BIO-MEDICAL WASTE MANAGEMENT Performance of Bio-medical Waste Treatment Facilities in Central Zone In central zone, eighteen Common Bio-medical Waste Treatment Facilities (CBWTFs) have been established.

More information

Date of Application. Details of Applicant & Premises (where power supply is required): (Please mark where applicable)

Date of Application. Details of Applicant & Premises (where power supply is required): (Please mark where applicable) (Form A-1) Application Form New Connection/ Load enhancement/ Load reduction/ Reconnection (Agriculture)/ Change of Name/ Shifting/ Temporary Supply/ Conversion of Service/ Change of consumer category

More information

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Executive Summary

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON 09.08.2016 Ecological Impact of Mining *334. SHRI JANARDAN SINGH SIGRIWAL state:

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR BEACH RESORT PROJECT AT SAGARTIRATH VILLAGE, DIST. SINDHUDURG, MAHARASHTRA

ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR BEACH RESORT PROJECT AT SAGARTIRATH VILLAGE, DIST. SINDHUDURG, MAHARASHTRA Beach Resort, Sindhudurg, Maharashtra EIA REPORT ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR BEACH RESORT PROJECT AT SAGARTIRATH VILLAGE, DIST. SINDHUDURG, MAHARASHTRA Prepared by: SENES Consultants India

More information

MOTHER DAIRY. A Unit of Gujarat Co-operative Milk Marketing Federation Limited MDG/PUR/HSG/ENQ/BOILER SERVICE DATE: 23/5/2015

MOTHER DAIRY. A Unit of Gujarat Co-operative Milk Marketing Federation Limited MDG/PUR/HSG/ENQ/BOILER SERVICE DATE: 23/5/2015 MDG/PUR/HSG/ENQ/BOILER SERVICE DATE: 23/5/2015 To, Dear Sir, Subject: Enquiry for Boiler Cleaning & Passing of Boiler and its IBR related parts during Boiler Annual Inspection for the year 2015-16. We

More information

India Water and Wastewater Report

India Water and Wastewater Report India Water and Wastewater Report Industry Report India Water and Wastewater Overview Water and wastewater management in India has emerged as an issue relatively recent priority at the national, state,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg. No. 10-42/2009-IA.III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003. I i I I I Dated: 22 nd September, 2009. To MIs.

More information

The Changes in Industrial Operations

The Changes in Industrial Operations The Finnish Environment 469 INTERNATIONAL COOPERATION Marianne Lindström, Elise Sahivirta and Jaana Pennanen The Changes in Industrial Operations FINNISH ENVIRONMENT INSTITUTE The Finnish Environment

More information

Implementation Status of Myanmar for the Basel Convention

Implementation Status of Myanmar for the Basel Convention Implementation Status of Myanmar for the Basel Convention Workshop 2016 of the Asian Network for Prevention of Illegal Transboundary Movements of Hazardous Wastes Dr. Tin Aung Win Assistant Director Environmental

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 S. N. Conditions Remarks 2 The Ministry of Environment and Forests has

More information

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from  METS is not the copyright owner. Disclaimer This unofficial translation of Ministerial Decision No 421/1998 was downloaded from www.mets-oman.com. METS is not the copyright owner. METS is not responsible for the content of this document.

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1 P. G. D. E. M. (Semester - I) Examination - 2009 ENVIRONMENTAL MANAGEMENT TECHNIQUES - I (1) Answer any four questions. (3) Use of calculator

More information

Status Note: DMIC Project. 1. Activation Area (22.5 sq.km) in Dholera Special Investment Region (DSIR), Gujarat:

Status Note: DMIC Project. 1. Activation Area (22.5 sq.km) in Dholera Special Investment Region (DSIR), Gujarat: Annexure-II Status Note: DMIC Project 1. Activation Area (22.5 sq.km) in Dholera Special Investment Region (DSIR), Gujarat: Preliminary Engineering works for various trunk infrastructure components is

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

THE FOREST (CONSERVATION) AMENDMENT BILL, 2017

THE FOREST (CONSERVATION) AMENDMENT BILL, 2017 AS INTRODUCED IN LOK SABHA Bill No. 139 of 2017 5 THE FOREST (CONSERVATION) AMENDMENT BILL, 2017 By SHRI SUKHBIR SINGH JAUNAPURIA, M.P. A BILL further to amend the Forest (Conservation) Act, 1980. BE it

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

Commercial Buildings. Ministry of Power Government of India

Commercial Buildings. Ministry of Power Government of India Energy Efficiency Initiatives in Commercial Buildings Bureau Of Energy Efficiency Bureau Of Energy Efficiency Ministry of Power Government of India Need for Building Energy Efficient Cities in India? In

More information

The applicant shall have establishment at Surat/Mumbai or within a radius of 250 km from surat to other maintenance service.

The applicant shall have establishment at Surat/Mumbai or within a radius of 250 km from surat to other maintenance service. NOTICE FOR PRE-QUALIFICATION OF CONTRACTORS FOR LIFTS Bank OF BARODA invites application (as per Annexure I) for Pre qualification from firms/ Contractors of repute for the undergoing Project of BOB office

More information

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra.

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra. PUBLIC CONSULTATION PUBLIC HEARING According to EIA Notification 2006 and its subsequent amendments, the proposed project comes under the project activity of 7 (c) & (a), Industrial estates /parks, complexes/area

More information

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK ENVIRONMENTAL AUDIT REPORT [STATEMENT] ON CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK HOULI BAGAN, RANIHATI AMTA ROAD, HOWRAH Prepared by: FOUNDRY CLUSTER DEVELOPMENT

More information

STATE BANK OF INDIA OFFICE ADMINISTRATION DEPARTMENT, 2 ND FLOOR, STATE BANK BHAVAN, CORPORATE CENTRE, NARIMAN POINT, MUMBAI

STATE BANK OF INDIA OFFICE ADMINISTRATION DEPARTMENT, 2 ND FLOOR, STATE BANK BHAVAN, CORPORATE CENTRE, NARIMAN POINT, MUMBAI STATE BANK OF INDIA OFFICE ADMINISTRATION DEPARTMENT, 2 ND FLOOR, STATE BANK BHAVAN, CORPORATE CENTRE, NARIMAN POINT, MUMBAI 400 021 PREQUALIFICATION OF AGENCIES/ COMPANIES/ CATERERS FOR CATERING SERVICES

More information

6. In case BOE not submitted at the time of Direct Import Payment, BOE to be submitted within 15 days from the date of transaction.

6. In case BOE not submitted at the time of Direct Import Payment, BOE to be submitted within 15 days from the date of transaction. Direct Import Payment Sr. No. 1. 2. 3. 4. 5. Particular of Documents Request Letter Commercial Invoice Copy of Transport Documents (BL/LR/TR/AWB etc.) Original exchange control copy of Bill of Entry (BOE).

More information

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form Part A - General information Please read the attached guidance before filling in the form Country Macedonia Sector WATER Project submission Date Project title 28 February 2003 Project Code MA-2 WASTEWATER

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

Aquila RO Systems Private Limited

Aquila RO Systems Private Limited +91-8046054185 Aquila RO Systems Private Limited https://www.indiamart.com/aquilarosystems/ We are a well-established manufacturer and service provider of a wide array of RO Plant 500 LPH,Industrial RO

More information

LEGAL AND REGULATORY FRAMEWORK FOR RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN SLOVAK REPUBLIC

LEGAL AND REGULATORY FRAMEWORK FOR RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN SLOVAK REPUBLIC LEGAL AND REGULATORY FRAMEWORK FOR RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN SLOVAK REPUBLIC ABSTRACT /DGLVODY.RQHþQê-DQD%XUFORYi Nuclear Regulatory Authority of the Slovak Republic Trnava Slovak

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

AmulFed Dairy. A Unit of Gujarat Co-operative Milk Marketing Federation Limited REQUEST FOR QUOTATION (RFQ) AFD: PUR: HSG: AMC Boiler 31 May 2016

AmulFed Dairy. A Unit of Gujarat Co-operative Milk Marketing Federation Limited REQUEST FOR QUOTATION (RFQ) AFD: PUR: HSG: AMC Boiler 31 May 2016 REQUEST FOR QUOTATION (RFQ) AFD: PUR: HSG: AMC Boiler 31 May 2016 Dear Sir, SUB: Enquiry for Boiler Cleaning & Passing of Boiler and its IBR related parts during Boiler Annual Inspection for the year 2016-17

More information

District Date and Time Venue News Paper Notice. Gujarat

District Date and Time Venue News Paper Notice. Gujarat 8. PUBLIC HEARING 8. Public Hearing Details As per the Terms of Reference condition no.30, Public Hearings have been conducted in 7 districts through which proposed pipeline passes; namely Bharuch, Surat,

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 1546.2 Australian/New Zealand Standard On-site domestic wastewater treatment units Part 2: Waterless composting toilets This Joint Australian/New Zealand Standard was prepared by Joint Technical

More information

ISO/IEC 27001:2005 BASED INFORMATION SECURITY MANAGEMENT SYSTEM INFORMATION SECURITY MANAGEMENT SYSTEM MANUAL

ISO/IEC 27001:2005 BASED INFORMATION SECURITY MANAGEMENT SYSTEM INFORMATION SECURITY MANAGEMENT SYSTEM MANUAL ISO/IEC 27001:2005 BASED INFORMATION SECURITY MANAGEMENT SYSTEM INFORMATION SECURITY MANAGEMENT SYSTEM MANUAL Date of Release of current version: Oct 25, 2010 Mynd Solutions Pvt. Ltd. 280, Udyog Vihar,

More information

Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad. Construction of Helipad Building at V. S. Hospital, Ahmedabad

Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad. Construction of Helipad Building at V. S. Hospital, Ahmedabad Birla Vishvakarma Mahavidyalaya Engineering College, V. V. Nagar 388120 A Report on Industrial/Site Visit Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad Construction of Helipad Building at V. S. Hospital,

More information

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

Auto Sales Invoice From Sales Order - 1.0

Auto Sales Invoice From Sales Order - 1.0 Auto Sales Invoice From Sales Order - 1.0 Alpha Automation Pvt. Ltd. Head Office 336-Madhva Plaza, Opp. SBI Bank, Nr. Lal Bunglow, JAMNAGAR Gujarat (India) Phone No. : +91-288-2660530/31, +91-9099908115,

More information

FAMILY AND COMMUNITY SUPPORT SERVICES ACT

FAMILY AND COMMUNITY SUPPORT SERVICES ACT Province of Alberta FAMILY AND COMMUNITY SUPPORT SERVICES ACT Revised Statutes of Alberta 2000 Current as of January 1, 2002 Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PETROCHEMICAL PLANTS C A G Citizen consumer and civic Action Group 1. What are the pollution problems associated with petrochemical plants? Petrochemical plants

More information

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form Country FYR Macedonia Sector Water Project submission Date Project title 13.June.2005

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat-393001

More information

Formal situation of wastewater treatment in separate stations in Poland

Formal situation of wastewater treatment in separate stations in Poland VillageWaters Project meeting Formal situation of wastewater treatment in separate stations in Poland Andrzej Eymontt Institute of Life Sciences and Technology in Falenty Mandatory law in force concerning

More information

Building over or close to a public sewer

Building over or close to a public sewer Building over or close to a public sewer Place holder image thameswater.co.uk/developerservices Building over or close to a public sewer Did you know Thames Water is legally responsible for more than 100,000

More information

CE(Dist)/D-III/Req. of Land/ Date: Circular

CE(Dist)/D-III/Req. of Land/ Date: Circular (A Govt. of Maharashtra Undertaking) CIN : U40109MH20055GC153645 OFFICE OF CHIEF ENGINEER (DISTRIBUTION) Plot No.G 9, PRAKASHGAD, Prof. Anant kanekar Marg, BANDRA (E), MUMBAI 400 051 Phone: (022)26472131/26474211

More information

Environmental Assessment Program Improvements

Environmental Assessment Program Improvements Ministry of the Environment and Climate Change Environmental Assessment Program Improvements Ontario Association for Impact Assessment October 17, 2017 Purpose and Overview Share actions that the ministry

More information

MURPHY DRAIN CATCHMENT

MURPHY DRAIN CATCHMENT The RVCA produces individual reports for 16 catchments in the Lower Rideau subwatershed. Using data collected and analysed by the RVCA through its watershed monitoring and land cover classification programs,

More information

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: DESCRIPTION OF PROJECT: ESTIMATED VALUE: ADDRESS SUBDIVISION BLOCK: LOT: ZONING: PROPERTY INFORMATION

More information

BANK OF INDIA PUNE ZONAL OFFICE CORPORATE SERVICES DEPT., 1162/6 Shivaji Nagar, University Road, Pune

BANK OF INDIA PUNE ZONAL OFFICE CORPORATE SERVICES DEPT., 1162/6 Shivaji Nagar, University Road, Pune BANK OF INDIA PUNE ZONAL OFFICE CORPORATE SERVICES DEPT., 1162/6 Shivaji Nagar, University Road, Pune- 411005 NOTICE FOR PREQUALIFICATION OF ARCHITECTURAL CONSULTANCY FIRM BANK OF INDIA invites applications

More information

NABH-PA (BB) PRE-ASSESSMENT GUIDELINES AND FORMS FOR BLOOD BANKS/ BLOOD CENTRES. Issue No. 1 Issue Date: 04/ 08 Page 1 of 10

NABH-PA (BB) PRE-ASSESSMENT GUIDELINES AND FORMS FOR BLOOD BANKS/ BLOOD CENTRES. Issue No. 1 Issue Date: 04/ 08 Page 1 of 10 NABH-PA (BB) PRE-ASSESSMENT GUIDELINES AND FORMS FOR BLOOD BANKS/ BLOOD CENTRES Issue No. 1 Issue Date: 04/ 08 Page 1 of 10 CONTENTS Sl. Title Page Nos. Content 2 1. Guide to use Pre-Assessment Forms &

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

TENDER FOR SUPPLY, PROVIDING & FIXING HEAVY DUTY PVC FLOORING FOR M/S BALMER LAWRIE & CO LTD 21, NETAJI SUBHASH ROAD KOLKATA

TENDER FOR SUPPLY, PROVIDING & FIXING HEAVY DUTY PVC FLOORING FOR M/S BALMER LAWRIE & CO LTD 21, NETAJI SUBHASH ROAD KOLKATA TENDER FOR SUPPLY, PROVIDING & FIXING HEAVY DUTY PVC FLOORING FOR M/S BALMER LAWRIE & CO LTD AT 21, NETAJI SUBHASH ROAD KOLKATA 700 001 TENDER REFERENCE ADMIN / 12 CORRSP TENDER NO: - 11/2015-2016 DATED

More information

NOTICE FOR EMPANELMENT OF CONTRACTORS

NOTICE FOR EMPANELMENT OF CONTRACTORS NOTICE FOR EMPANELMENT OF CONTRACTORS Bank of Baroda invites applications (as per Annexure A) for Empanelment in various categories from Mumbai based firms/contractors of repute for the maintenance and

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.) Montcalm County Department of Building Safety 211 W Main / Box 368 / Stanton, Michigan 48888 Phone 989-831-7394 * FAX 989-831-7392 mkalka@montcalm.us APPLICATION FOR BUILDING PERMIT AND PLAN EXAMINATION

More information

Nothing Should Go Waste

Nothing Should Go Waste Nothing Should Go Waste Mailhem Engineers Pvt. Ltd. Keywords: Biogas, Pune Municipal Corporation, Biomethanation, Power Generation, UASB, Waste to Energy, Renewable energy Ab s t r a c t Waste to Energy

More information

Urban development in Zurich: towards a green city? By Urs Egger, member of municipal parliament 8 September 2015

Urban development in Zurich: towards a green city? By Urs Egger, member of municipal parliament 8 September 2015 Urban development in Zurich: towards a green city? By Urs Egger, member of municipal parliament 8 September 2015 Overview 1. Spatial planning system in the canton of Zurich 2. Experience in the city of

More information

***** Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.s. Building; Bangalore , Date: 23 rd September 2013.

***** Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.s. Building; Bangalore , Date: 23 rd September 2013. / To, No. SEIAA: 26: IND: 2012 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA STATE (Constituted by Ministry of Environment & Forests, Government of India) Department of Ecology and Environment

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED