1 Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier Bruce R. Johnson 1 *, Jennifer Phillips 2, Tim Bauer 3, Greg Smith 4, George Smith 5, John Sherlock 6 1 CH2M HILL, Englewood, Colorado 2 CH2M HILL, Phoenix, Arizona 3 CH2M HILL, Corvallis, Oregon 4 CH2M HILL, Tucson, Arizona 5 Evoqua, Waukesha, Wisconsin (formerly Siemens) 6 Pima County Regional Wastewater Reclamation Department * bruce.johnson2@ch2m.com ABSTRACT The Pima County Regional Wastewater Reclamation Department, in Tucson, Arizona, built the new 120 MLD (32 MGD) Agua Nueva Water Reclamation Facility (ANWRF) and started it up in early This facility includes the first large scale Dissolved Air Floatation (DAF) primary clarifiers in the world. DAF primary clarifiers were chosen for their benefits of low cost, small footprint, improved TSS and BOD removal (as compared to no primary treatment). They also eliminated the need for separate solids thickening, and improved oil and grease removal. However, the risk was that there was no full scale implementations in wastewater that could be used to validate the technology. The DAF primary clarifiers at ANWRF treat both the screened raw sewage and the waste activated solids that are combined at the head of each DAF unit. The DAFs have been found to remove between 50% and 75% of the suspended material, depending on chemical addition, and between 30% and 50% of the influent COD, while reliably producing a thickened solids (primary and WAS) approaching 4 percent. Some removal of soluble organics has also been observed, likely a result of a combination of colloidal coagulation and soluble uptake by the cothickened waste activated sludge. Primary DAF clarification at ANWRF has shown performance similar to conventional primary clarification while combining the function of WAS/Primary sludge thickening and grit removal in a single unit process. Actual operation of the DAF clarifiers has met the goals originally envisioned in the design, but with slightly higher effluent TSS values than hoped for. Continuing optimization at the facility appears to be improving overall TSS removal at lower chemical usage rates. KEYWORDS Primary Treatment, DAF, Dissolved Air Floatation, Cothickening INTRODUCTION Pima County Regional Wastewater Reclamation Department (Tucson, AZ) was facing a mandate from the Arizona Department of Environmental Quality (ADEQ) to reduce the amount of total nitrogen and ammonia in system effluent and to pass the whole effluent toxicity test, as well as increase the treatment capacity to handle the County s growing population. To meet this challenge, the County developed and maintained a Regional Optimization Master Plan (ROMP) for wastewater treatment facilities required through the year The ROMP Final Report, published in November 2007, recommended the implementation of a number of capital

2 improvements necessary to achieve regulatory compliance and meet the anticipated capacity requirements for the service area. One of these was the construction of a new facility adjacent to an aging facility that would be decommissioned after the new plant was placed into operation. The County elected to use alternative delivery for the new Agua Nueva Water Reclamation Facility (ANWRF). CH2M HILL was chosen to provide this 120 MLD (32 MGD) facility based upon its design/build/operate (DBO) proposal in November of The facility saw first wastewater in December of Figure 1 shows an aerial view of the facility and the effluent requirements are shown in Table 1. Figure 1: Agua Nueva WRF Aerial View Table 1: Aqua Nueva WRF Effluent Criteria Performance Criteria BOD5 TSS Total Nitrogen NH3 Total Phosphorus Maximum Month Design Limit 30 mg/l 30 mg/l 8 mg N/L (5 mo. Geometric Mean) 1.75 mg N/L 1.0 mg P/L E. Coli 4 of 7 days non-detect E. Coli Single Sample Max < 15 / 100 ml ANWRF PROCESS DESIGN AND SELECTION The raw sewage is screened by 13 mm (1/2 inch) bar racks prior to being pumped to a combined aerated grit/flocculation chamber. Effluent from the flocculation chamber goes to the primary dissolved air flotation (DAF) clarifiers, prior to entering the three pass step-feed 5-Stage Bardenpho bioreactor system. Bioreactor effluent goes to secondary clarifiers and then to a disk filter system prior to disinfection with chloramines. The bioreactor step-feed and DO control system is used to keep a target ammonia concentration in the secondary effluent (nominally 1.5 mg/l) for the chloramination system.

3 Waste solids from the end of the first pass of the bioreactor system are returned to the DAF clarifier feed (ahead of the flocculation tanks) for co-thickening with the primary solids. ANWRF pumps the produced biosolids from the DAF float to the nearby sister plant (Tres Rios WRF, formerly Ina Road WRF) for stabilization and dewatering, thus eliminating the need for a solids stabilization/dewatering system. Figure 2 shows a process flow diagram of the facility. Figure 2: Agua Nueva WRF Process Flow Diagram Selection of Primary DAF Clarification The RFP did not anticipate the inclusion of primary treatment within the proposed treatment train, but neither did it prohibit it. A net present value (NPV) comparison of primary treatment with no primary showed clear benefits. The capital cost was slightly lower with primaries, from the reduced secondary system sizing, and the savings in energy costs as compared to No Primary Treatment were substantial as shown in Table 2. Table 2: Net Present Value Comparison of Primary Treatment 20 Year Energy Savings Capital Cost Total Replacement Costs Final NPV Cost Benefit NPV Primary Clarifier $6.3 $213.1 $206.8 $0.2 $207.0 $7.8 No Primary $0.0 $213.8 $213.8 $1.0 $214.8 Note: Energy costs baseline is the No Primary Option Given this savings it was decided to include primary treatment in our proposal. Consideration was given to conventional primary clarifiers, high rate primary clarifiers, microscreens, and DAF

4 clarification. A comparison of treatment technologies is presented below in Table 3. This evaluation gave clear indication that DAF clarification had significant advantages for the ANWRF. However, the innovative nature of the concept required CH2M HILL to perform an in depth analysis of the concept. This included bench testing of DAF with various influent additives, and pilot testing at a wastewater treatment plant. Table 3: Comparison of Primary Treatment Technologies PRIMARY ADVANTAGES DISADVANTAGES TREATMENT Primary Clarification Conventional technology Larger footprint and odor control costs High Rate Primary Clarification Small footprint High chemical costs, and changes primary phosphorus removal to chemical based Microscreens Low cost and small footprint Unproven technology, and lower solids removal efficiencies DAF Clarification Low cost, small footprint, improved TSS and BOD removal, eliminates need for solids thickening, improved oil and grease removal No full scale clarification implementation on screened effluent, but numerous installations of WAS thickening of primary solids Figure 3 shows the results of the bench testing, which clearly showed the benefits of supplementing the primary feed with a flocculant. Of interest in that screening was the superior performance of waste activated sludge (WAS), added in proportion to typical primary influent concentrations. The use of WAS as a flocculant provided a further benefit where it would be possible to co-thicken the WAS and primary sludge in a single unit, additionally, the flocculation chamber combined with aerated grit combines the functions of grit removal into the DAF clarification process. Figure 3: Performance of DAF Clarification Bench Testing with Various Additives (based on Raw TSS)

5 Pilot testing was also done as part of the proof-of-concept and found similar results where it was found that TSS removal ranged between 58% and 85% depending on the influent conditioning with combinations of WAS, ferric chloride, and/or polymer. Full Scale Primary DAF Clarification At Agua Nueva WRF, screened raw sewage is combined with the WAS from biological treatment in a combined aerated grit chamber/flocculation chamber. Ferric chloride and/or polymer can be added if needed. The effluent from each flocculation chamber is directly connected to a rectangular DAF unit. Underflow (primary effluent) is then directed to the bioreactor. Float (cothickened WAS and primary solids) is scraped to a solids storage tank prior to being pumped to the Tres Rios WRF. Heavy solids that settle in the DAF s are raked and periodically flushed to the solids holding tank. The DAF system consists of six 20 foot wide x 60 foot long x 16 foot deep DAF clarifiers. At the average plant flow of 120 MLD (32 MGD), the DAF hydraulic loading rate is 4,444 gpd/ft 2. The clarifiers are fully covered for odor control reasons. At the head of each clarifier is a 20 ft x 20 ft combined flocculation/aerated grit removal tank. Figure 3 is an aerial view of the DAF system with the associated odor control system to the left, and the head of the facility to the right. Figure 3: ANWRF DAF Primary Clarification System ANWRF started receiving wastewater on December 17, The startup of the DAFs was done in stages as the team learned about this new primary treatment process. There have been five distinct periods of DAF operation. The DAF effluent performance is shown in Figure 4, along with the plant influent flow rates as the plant was brought into service. Figure 5 shows the removals of TSS and COD. Figure 5 shows two TSS removal curves, one is the curve based on the raw sewage TSS concentration, and the other is the TSS removal including an estimate of the TSS added by the WAS return to the DAF influent. The COD removals are based on the raw sewage COD.

6 Figure 4: ANWRF DAF Effluent Performance Figure 5: ANWRF DAF Removals

7 1. No WAS, Settling Only. During initial startup, the team was focused on growing biomass in the bioreactor system, so there was no WAS produced, and the actual DAF mechanism was not run. The DAFs were operated as very highly loaded primary clarifiers during this phase, and only settled solids. 2. WAS & Floatation. In the second period, WAS was blended with the primary influent, and the DAF floatation system was started. There were some initial difficulties with the floatation system that were resolved during this period. However, it was found that the WAS only option did not have very high TSS or COD removal efficiencies. 3. Cationic. Polymer addition (cationic) was started during this period to improve the TSS and COD removal. This improved removals significantly, but the overall removal was still not near the target effluent TSS value of approximately 120 mg/l. There was no attempt to optimize polymer addition during this period because it was known that ferric chloride addition would soon be started to achieve the plant effluent phosphorus removal goals. 4. Ferric & Anionic. During this period a combination of ferric chloride and anionic polymer was added to the DAF feed (with the WAS). Ferric chloride addition (15 mg FeCl3/L) was begun to achieve the plant effluent total phosphorus goal of 1 mg P/L. Cationic polymers are not effective with ferric chloride, so the polymer was switched to an anionic polymer (1 mg/l dosage) as well. This switch improved TSS removal to above 65 percent based on the raw sewage and above 75 percent when the WAS contribution is considered. COD removals averaged over 50% during this period. This period also included the acceptance test period of the startup (April 27 th through May 13 th, 2014) 5. Cationics. The effluent TP goal is only a contractual requirement, and not actually required by the effluent permit. It was therefore decided to halt ferric chloride addition, and focus the efforts of the operations team on the optimization of the DAFs without iron addition during this period. The team has been testing different cationic polymers during this period, at various dosages, thus the DAF effluent performance has been variable during this operating period. The need to add chemicals to achieve the DAF treatment performance goals was not expected based on pilot testing at other locations. During the startup of the DAFs, one possible reason for this performance issue came to light. It was felt that the mixing in the flocculation tank may not have been optimum, and that baffling could improve contact between the primary influent and the WAS/polymer. Computational Fluid Dynamic (CFD) modeling was done to check the flow patterns in the flocculation tank as installed, and then retrofitted with an influent baffle system (Figure 6). A significant improvement in the flow patterns can be seen in the right hand illustration with the influent baffles installed. The baffles developed during the CFD modeling effort were recently installed. Preliminary results indicated a large improvement in performance, but there is not yet adequate data to present.

8 Figure 6: CFD Modeling Results of the Flocculation Tank Without (left) and With (right) Baffles Soluble COD Removal The blending of WAS with the raw sewage under aerobic conditions also reduces the soluble COD (scod) in the primary effluent. It is thought that this is done through two mechanisms. First is the coagulation of colloidal COD. The second is through the actual biological uptake of truly soluble COD by the biomass under aerobic conditions, i.e. storage of truly soluble COD as fat within the biomass. This biological mechanism is well documented in wet weather biological contact and in A-Stage treatment in two stage activated sludge systems. The removal of scod was documented in both the pilot test and seen at the expected levels in the full scale treatment. The design was based on approximately 25 percent soluble COD removal across the primary DAFs. Figure 7 shows the actual scod removal for the entire operating period. The line in Figure 7 is a 14 day running average of the scod removal. It can be seen that it was generally increasing during the period of the test. This is attributed to an increasing amount of WAS being returned to the DAF as the flows to the plant increased. It is not immediately apparent what the balance of colloidal removal and truly soluble removal is across the DAFs.

9 Figure 7: ANWRF Primary DAF scod Removal Thickening Performance The DAF float is easily able to achieve the design goals of greater than 1.5% solids. The solids from ANWRF are pumped to the Tres Rios WRF approximately 5 miles away, so it is important to keep the solids concentration from going too high, which would overpressure the sludge line. The DAF float actually is produced between 3 and 4 percent solids, which is diluted down to approximately 2 percent by opening the lower heavy solids gates for a set period. This control approach has been very successful at maintaining the sludge concentration within the desired solids range as shown in Figure 8. Figure 8 shows the on-line sludge concentration results during the AT period.

10 Figure 8: Sludge Concentration Produced by ANWRF CONCLUSIONS The first ever large scale use of DAF clarification technology for primary treatment of wastewater has successfully been started up at the 120 MLD (32 MGD) Agua Nueva WRF in Tucson, Arizona. The primary DAF clarification has shown performance similar to conventional primary clarification while combining the function of WAS/Primary sludge thickening and grit removal in a single unit process. Actual operation of the DAF clarifiers has met the goals originally envisioned in the design, but with slightly higher effluent TSS values than hoped for. Continuing optimization at the facility appears to be improving overall TSS removal at lower chemical usage rates. A number of issues have been addressed during the startup of the DAFs, and there is currently an on-going optimization effort related to flocculation and chemical addition to determine the most beneficial operating parameters.

Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity

Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity CSWEA 2013 Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity Don Esping, Denny Parker, Jose Jimenez, Fenghua Yang, Tim Bate, Steve Arant May 16 2013 Milwaukee MSD South

More information

Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity

Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity OWEA 2013 Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity Don Esping, Denny Parker, Jose Jimenez, Fenghua Yang, Tim Bate, Steve Arant June 19 2013 Outline Background/Goals

More information

CARBON DIVERSION: BIOLOGICAL ENHANCED PRIMARY TREATMENT Captivator

CARBON DIVERSION: BIOLOGICAL ENHANCED PRIMARY TREATMENT Captivator CARBON DIVERSION: BIOLOGICAL ENHANCED PRIMARY TREATMENT Captivator September 2016 WEFTEC SPEAKER Nathan Antonneau, P.E. Business Development for New Technologies Western US & Canada BS & MS in Civil /

More information

231 Mobile Session LIFT Innovative Advanced Primary Treatment for the Utility of the Future

231 Mobile Session LIFT Innovative Advanced Primary Treatment for the Utility of the Future 231 Mobile Session LIFT Innovative Advanced Primary Treatment for the Utility of the Future Jim Fitzpatrick Ravi George Onder Caliskaner Clarification alternatives Settling Based Filtration Based Flotation

More information

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of Greater Chicago Today s Goals Discuss project background Provide

More information

PATHOGEN AND NUTRIENT REMOVAL DURING WASTEWATER TREATMENT AT A 21 ST CENTURY WASTEWATER TREATMENT PLANT

PATHOGEN AND NUTRIENT REMOVAL DURING WASTEWATER TREATMENT AT A 21 ST CENTURY WASTEWATER TREATMENT PLANT PATHOGEN AND NUTRIENT REMOVAL DURING WASTEWATER TREATMENT AT A 21 ST CENTURY WASTEWATER TREATMENT PLANT Abstract Schmitz, B., 1 Gerba, C., 1 and Pepper, I. 1 1 The University of Arizona Corresponding Author

More information

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT Matthew Valade, P.E. July 25, 2014 Barboe.pptx Presentation Outline Project Background Why Dewater Croton Residuals Offsite?

More information

Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010

Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010 Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP by: William Leaf Adrienne Menniti Bruce Johnson CH2M HILL, Inc. Clint Dolsby Tracy Crane City of Meridian October 26, 21

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Sustainable Struvite Control Using Residual Gas from Digester Gas Cleaning Process

Sustainable Struvite Control Using Residual Gas from Digester Gas Cleaning Process WERF Targeted Collaborative Research (TCR) Sustainable Struvite Control Using Residual Gas from Digester Gas Cleaning Process November 13, 2014 Jing Luo, PhD, PE Manager, Sustainability and Energy Management

More information

A Battle to Be the Best: A Comparison of Two Powerful Sidestream Treatment Technologies: Post Aerobic Digestion and Anammox

A Battle to Be the Best: A Comparison of Two Powerful Sidestream Treatment Technologies: Post Aerobic Digestion and Anammox A Battle to Be the Best: A Comparison of Two Powerful Treatment Technologies: Post Aerobic Digestion and Anammox David Oerke/CH2M Tom Johnson/CH2M Bruce Johnson/CH2M Heidi Bauer/CH2M Steve Graziano/CH2M

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Wastewater Treatment. Where does wastewater go when it leaves your house? Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

NEWEA 2015 Annual Conference Session 16

NEWEA 2015 Annual Conference Session 16 NEWEA 2015 Annual Conference Session 16 Meeting North Attleborough, MA s 0.1 mg/l Phosphorus Limit with Bio-P and Cloth Media Filters January 27, 2015 Sue Guswa, P.E., Tighe & Bond Merrill Hastings, Town

More information

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant Proposal by Russia to delete hot sub-spot 18.4 LAND 14/2009, Document 6/3/Rev.1 ATTACHMENT 1. Hot sub-spot name South-West Wastewater Treatment Plant 2. Location Block 2, 123, Volkhonskoye shosse, St.

More information

Flocculation Flotation Pretreatment Improves Operation of MBR Installed to Treat Snack Food Manufacturing Wastewater

Flocculation Flotation Pretreatment Improves Operation of MBR Installed to Treat Snack Food Manufacturing Wastewater Flocculation Flotation Pretreatment Improves Operation of MBR Installed to Treat Snack Food Manufacturing Wastewater *Miroslav Colic 1, Jack Hogan 1, Ariel Lechter 1 1 Clean Water Technology Inc. *To whom

More information

Application of the AGF (Anoxic Gas Flotation) Process

Application of the AGF (Anoxic Gas Flotation) Process Application of the AGF (Anoxic Gas Flotation) Process Dennis A. Burke Environmental Energy Company, 6007 Hill Road NE, Olympia, WA 98516 USA (E-mail: dennis@makingenergy.com http//www.makingenergy.com)

More information

FURTHER EXPANDED FLOWS AND LOADS R3 INDUSTRIAL WWTP PROCESS ENGINEERING EVALUATION

FURTHER EXPANDED FLOWS AND LOADS R3 INDUSTRIAL WWTP PROCESS ENGINEERING EVALUATION FURTHER EXPANDED FLOWS AND LOADS R3 INDUSTRIAL WWTP PROCESS ENGINEERING EVALUATION Prepared For: HyLife Foods Neepawa, Manitoba, Canada Prepared By: Pharmer Engineering 1998 West Judith Lane Boise, ID

More information

Pima County Receives A+ for ROMP Upgrades

Pima County Receives A+ for ROMP Upgrades Pima County Receives A+ for ROMP Upgrades 2015 Arizona WateReuse Symposium Jerry Bish PE, BCEE July 27, 2015 1 Pima County, Arizona Regional Water Reclamation Department Serves Nearly 1,000,000 Customers

More information

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE Keith C. Dayton Department of Utilities Stafford County, Virginia P. O. Box 339 Stafford,

More information

Settled Sewage. Tap Water. CaO. Pond Effluents 23 M 95 M

Settled Sewage. Tap Water. CaO. Pond Effluents 23 M 95 M Algae Removal from Wastewater Treatment Pond Effluent by Dissolved-Air Flotation Dr. Yakup Nurdogan CDM, 11811 N.E. 1 st Street Bellevue, WA 98005 425-519-8375 nurdogany@cdm.com September 14, 2009 Presentation

More information

City of Portsmouth Wastewater Division. Wastewater Facilities and Programs. City Council Briefing and Public Input Session

City of Portsmouth Wastewater Division. Wastewater Facilities and Programs. City Council Briefing and Public Input Session City of Portsmouth Wastewater Division Wastewater Facilities and Programs City Council Briefing and Public Input Session Briefing #2 June 11, 2012 November 8, 2011 Topics for Discussion Introduction Regulatory

More information

Conceptual Design for a Future Wastewater Treatment Plant

Conceptual Design for a Future Wastewater Treatment Plant Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table

More information

Wastewater Treatment Processes

Wastewater Treatment Processes Wastewater Treatment Processes CEL212 Environmental Engineering (2 nd Semester 2010-2011) Dr. Arun Kumar (arunku@civil.iitd.ac.in) Department of Civil Engineering Indian Institute of Technology (Delhi)

More information

BOD5 REMOVALS VIA BIOLOGICAL CONTACT AND BALLASTED CLARIFICATION FOR WET WEATHER M. COTTON; D. HOLLIMAN; B. FINCHER, R. DIMASSIMO (KRUGER, INC.

BOD5 REMOVALS VIA BIOLOGICAL CONTACT AND BALLASTED CLARIFICATION FOR WET WEATHER M. COTTON; D. HOLLIMAN; B. FINCHER, R. DIMASSIMO (KRUGER, INC. BOD REMOVALS VIA BIOLOGICAL CONTACT AND BALLASTED CLARIFICATION FOR WET WEATHER M. COTTON; D. HOLLIMAN; B. FINCHER, R. DIMASSIMO (KRUGER, INC.) Bench-scale testing was conducted to quantify the effectiveness

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Appendix D JWPCP Background and NDN

Appendix D JWPCP Background and NDN Appendix D JWPCP Background and NDN JWPCP Background JWPCP Water Quality Primary Clarifiers HPO Reactors Final Clarifiers Unit Influent Primary Effluent Secondary Effluent BOD mg/l 460 240

More information

BIOLOGICAL WASTEWATER BASICS

BIOLOGICAL WASTEWATER BASICS BIOLOGICAL WASTEWATER BASICS PRESENTATION GOALS EXPLAIN DIFFERENT TYPES OF WASTEWATER EXPLAIN THE DIFFERENT BIOLOGICAL SYSTEMS AND HOW THEY FUNCTION. COMPARE AND CONTRAST AEROBIC AND ANAEROBIC SYSTEMS

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

Wastewater treatment objecives

Wastewater treatment objecives Wastewater treatment objecives Removal of suspended and floatable materials Degradation of biodegradable organics Removal of nutrients Elimination of priority pollutants Elimination of pathogenic organisms

More information

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Facultative Lagoon System Designed for 1.5 MGD Discharging 1.15-1.35

More information

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater OWEA State Conference June 20, 2012 Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater Presenters Bill Donohue NEORSD Bob Hrusovsky MWH Don Esping BC Easterly Plant

More information

THE COMAG SYSTEM FOR ENHANCED PRIMARY AND TERTIARY TREATMENT

THE COMAG SYSTEM FOR ENHANCED PRIMARY AND TERTIARY TREATMENT 2.2 MGD TERTIARY CLARIFIER USING THE COMAG SYSTEM THE COMAG SYSTEM FOR ENHANCED PRIMARY AND TERTIARY TREATMENT SETTLES FLOC UP TO 30 TIMES FASTER THAN CONVENTIONAL TREATMENTS WHILE EXTENDING EQUIPMENT

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

The State of Enhanced High- Rate Treatment in Ohio

The State of Enhanced High- Rate Treatment in Ohio CMF Media Schreiber The State of Enhanced High- Rate Treatment in Ohio WWETCO Tony Yee, PE Project Manager MSDGC 29 June 2017 Jared Hutchins, PE Engineering Manager Black & Veatch What is EHRT? Settling-Based

More information

Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF

Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF Thor Young, GHD With Contributions from Vince Maillard, Rip Copithorn, Kristi Perri, and Jeff Sturdevant, GHD Dimitrios

More information

ENHANCED BIOLOGICAL PHOSPHORUS REMOVAL WITHIN MEMBRANE BIOREACTORS. 255 Consumers Road Toronto, ON, Canada, M2J 5B6

ENHANCED BIOLOGICAL PHOSPHORUS REMOVAL WITHIN MEMBRANE BIOREACTORS. 255 Consumers Road Toronto, ON, Canada, M2J 5B6 ENHANCED BIOLOGICAL PHOSPHORUS REMOVAL WITHIN MEMBRANE BIOREACTORS G. Crawford 1,2, G. Daigger 1, and Z. Erdal 1 1 CH2M HILL 2 CH2M HILL 255 Consumers Road Toronto, ON, Canada, M2J 5B6 ABSTRACT Several

More information

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The

More information

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT ABSTRACT C. Yang*, L. Zhou**, W. Luo***, and L. Johnson**** *Corstar International Corp. 111

More information

Thickening and Dewatering Optimization Matt Van Horne, PE Hazen and Sawyer July 14, 2016

Thickening and Dewatering Optimization Matt Van Horne, PE Hazen and Sawyer July 14, 2016 Thickening and Dewatering Optimization Matt Van Horne, PE Hazen and Sawyer July 14, 2016 Agenda Equipment Specific Modifications Chemicals Feeding Cleaning and Maintenance Pretreatment 2 1 Optimization

More information

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE City of Newark, Ohio HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE 22, 2011 High Rate Treatment Tanks/UV Wet Weather Screen Building JC2/Wet Weather Pump Station Wet Weather Control

More information

Table of Contents. Section 8 Detailed Description of Recommended Treatment Alternative

Table of Contents. Section 8 Detailed Description of Recommended Treatment Alternative Table of Contents... 8-1 List of Tables 8.1 Description of Treatment Alternatives...8-1 8.1.1 Flow-Split Options Investigated...8-1 8.2 New Water Reclamation Campus...8-2 8.2.1 New WRC Treatment...8-2

More information

2015 Spring Conference

2015 Spring Conference 2015 Spring Conference Meeting Strict Summer Permit Requirements on Day One: Start-up of the Western Wake Regional Water Reclamation Facility Chris White, PE April 13, 2015 Acknowledgements Town of Cary

More information

WINNIPEG SEWAGE TREATMENT PROGRAM --- SEWPCC --- Process Selection Report presentation

WINNIPEG SEWAGE TREATMENT PROGRAM --- SEWPCC --- Process Selection Report presentation WINNIPEG SEWAGE TREATMENT PROGRAM --- SEWPCC --- Process Selection Report presentation January 24th 2011 - Winnipeg Purpose of the meeting 2 immediate purposes : Explain the recommandation of the PSR to

More information

OPTIMIZATION STUDY OF THE ST. MARY'S WASTEWATER TREATMENT PLANT

OPTIMIZATION STUDY OF THE ST. MARY'S WASTEWATER TREATMENT PLANT XCG File No.: 3-167-09-02 October 26, 2016 OPTIMIZATION STUDY OF THE ST. MARY'S WASTEWATER TREATMENT PLANT Prepared for: B.M. ROSS & ASSOCIATES LIMITED 62 North Street Goderich, Ontario N7A 2T4 Prepared

More information

Pilot Testing Reveals Alternative Methods to Meet Wisconsin s Low Level Phosphorus Limits

Pilot Testing Reveals Alternative Methods to Meet Wisconsin s Low Level Phosphorus Limits Pilot Testing Reveals Alternative Methods to Meet Wisconsin s Low Level Phosphorus Limits Rachel M. Lee 1*, Jane M. Carlson 1, Jeremy Bril 2, Jeremy Cramer 3, Jeff Harenda 4 1 Strand Associates, Inc.,

More information

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor J. Komorita 1, P. Burke 2, B. Youker 2, and G. Crawford 2 1 King County, 2 CH2M HILL ABSTRACT Many Membrane Bioreactor (MBR)

More information

Industrial Wastewater Pretreatment Challenges at a Beef Processing Facility

Industrial Wastewater Pretreatment Challenges at a Beef Processing Facility Industrial Wastewater Pretreatment Challenges at a Beef Processing Facility October 21, 2010 Larry Collins JBS Green Bay, Inc. JBS Green Bay, Inc. JBS Green Bay Operations Formerly Packerland Packing,

More information

Primary filtration and primary effluent

Primary filtration and primary effluent FWRJ New Solution for Primary Wastewater Treatment: Cloth Media Filtration John D. Dyson Primary filtration and primary effluent cloth media filtration are both emerging technologies in wastewater treatment.

More information

Kristin Waller, PE and Ned Talbot, PE WaterJAM September 13, 2017

Kristin Waller, PE and Ned Talbot, PE WaterJAM September 13, 2017 OBG PRESENTS: OBG PRESENTS: DON'T SETTLE FOR CONVENTIONAL: Emerging Alternative Primary Treatment Technologies Kristin Waller, PE and Ned Talbot, PE WaterJAM September 13, 2017 AGENDA Intro to Alternative

More information

NEW SOLUTION FOR PRIMARY WASTEWATER TREATMENT; CLOTH MEDIA FILTRATION

NEW SOLUTION FOR PRIMARY WASTEWATER TREATMENT; CLOTH MEDIA FILTRATION NEW SOLUTION FOR PRIMARY WASTEWATER TREATMENT; CLOTH MEDIA FILTRATION Introduction John D. Dyson*, Aqua Aerobic Systems, Inc. 636 N. Alpine Rd, Loves Park, IL jdyson@aqua-aerobic.com Primary and Primary

More information

MEETING COLUMBUS S TREATMENT LIMITS

MEETING COLUMBUS S TREATMENT LIMITS MEETING COLUMBUS S TREATMENT LIMITS EVEN WHEN WET WEATHER CHANGES THEM Improving Quality of Life AGENDA CEPT Background CEPT Preliminary Testing CEPT Design and Construction CEPT NPDES Permit Modification

More information

A H. Marcela Velázquez-Carrillo Consultant to Mountain Systems Inc. on the application of Proficy for Water Treatment

A H. Marcela Velázquez-Carrillo Consultant to Mountain Systems Inc. on the application of Proficy for Water Treatment WASTEWATER TREATMENT IINORMATIION TECHNOLOGY SUEZ, parent company of United Water ONDEO, is one of the largest water and wastewater treatment firms in the world. On January 5 th, 1998, United Water Milwaukee

More information

Case Study. Biological Help for the Human Race. Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia.

Case Study. Biological Help for the Human Race. Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia. Case Study BiOWiSH Aqua Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia BiOWiSH Aqua Executive Summary The main objective of the study was to quantify the cost savings of using

More information

Proprietary AquaTron technology incorporates three (3) innovative features that increase its efficiency and reduces cost:

Proprietary AquaTron technology incorporates three (3) innovative features that increase its efficiency and reduces cost: THE AQUATRON The Technology The AquaTron is the result of over twenty years of research, development, testing and practical experience. Using the principles of the activated sludge biological process,

More information

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program DISCUSSION PAPER Capital Regional District Core Area Wastewater Management Program Macaulay/McLoughlin Point Wastewater Treatment Plant Discussion Paper Liquid Process Alternatives Evaluation 034-DP-1

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

R&D on Wastewater Treatment Technology with Rotating Biological Contactors

R&D on Wastewater Treatment Technology with Rotating Biological Contactors 1999D.4.1.4 R&D on Wastewater Treatment Technology with Rotating Biological Contactors 1. Introduction and Experiment Overview Wastewater treatment facilities at refineries should be selected and installed

More information

General Approaches and Recent Developments in Handling Wet Weather Flows in WWTPs. Julian Sandino PhD, PE, BCEE, IWA Fellow

General Approaches and Recent Developments in Handling Wet Weather Flows in WWTPs. Julian Sandino PhD, PE, BCEE, IWA Fellow General Approaches and Recent Developments in Handling Wet Weather Flows in WWTPs Julian Sandino PhD, PE, BCEE, IWA Fellow October 2012 1 Improving Wet Weather Flow Management at WWTPs Flows resulting

More information

PHOSPHORUS REMOVAL: TREATMENT

PHOSPHORUS REMOVAL: TREATMENT PHOSPHORUS REMOVAL: TREATMENT TECHNOLOGIES AND CAPABILITIES Jane Madden, PE, BCEE Senior Vice President CAWPCA Fall Workshop November 14, 2014 Agenda Phosphorus Removal Overview Phosphorus Regulations

More information

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia. Case Study BiOWiSH Aqua Municipal Wastewater Bathurst Waste Water Treatment Works Australia BiOWiSH Aqua Executive Summary The main objective of the validation was to quantify cost savings in using BiOWiSH.

More information

Pima County Regional Optimization Master Plan

Pima County Regional Optimization Master Plan Pima County Regional Optimization Master Plan Proposed extent of screen enclosure Existing and Expanded Ina Road WPCF Approximately 160 acres Sports Park Michael Gritzuk, P.E., Director Edward Curley,

More information

The NEORSD Demonstration of a Cost-Effective Solution

The NEORSD Demonstration of a Cost-Effective Solution 2015 OWEA Technical Conference Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective Solution June 24, 2015 Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective

More information

ETHANOL DOSING OPTIMISATION IN BIOREACTOR. Blake Schneider. Blake Schneider, Duty Operator, Thakshila Balasuriya, Process Engineer, City of Gold Coast

ETHANOL DOSING OPTIMISATION IN BIOREACTOR. Blake Schneider. Blake Schneider, Duty Operator, Thakshila Balasuriya, Process Engineer, City of Gold Coast ETHANOL DOSING OPTIMISATION IN BIOREACTOR Paper Presented by: Blake Schneider Authors: Blake Schneider, Duty Operator, Thakshila Balasuriya, Process Engineer, City of Gold Coast 39th Annual WIOA Queensland

More information

INFRASTRUCTURE & OPERATION

INFRASTRUCTURE & OPERATION SECTION C: INFRASTRUCTURE & OPERATION Advice on completing this section is provided in the accompanying Guidance Note. C.1 Operational Information Requirements Provide a description of the plant, process

More information

ACTIFLO Process. For Wet Weather and Wastewater Treatment WATER TECHNOLOGIES

ACTIFLO Process. For Wet Weather and Wastewater Treatment WATER TECHNOLOGIES ACTIFLO Process For Wet Weather and Wastewater Treatment WATER TECHNOLOGIES ACTIFLO Microsand Ballasted Clarification Process Actiflo is a high rate, compact process developed by Veolia Water Technologies.

More information

IFAS Nutrient Removal Enhancement Retrofit of an Existing Contact / Stabilization Treatment Process at Neptune Beach, FL

IFAS Nutrient Removal Enhancement Retrofit of an Existing Contact / Stabilization Treatment Process at Neptune Beach, FL IFAS Nutrient Removal Enhancement Retrofit of an Existing Contact / Stabilization Treatment Process at Neptune Beach, FL John E. Olson, P.E. 1* ; Todd A. Schwingle, P.E. 1* ; Mark F. Greenwood 2* ; Amy

More information

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic. PHASED ACTIVATED SLUDGE SYSTEM PHASED ACTIVATED SLUDGE SYSTEM Aqua-Aerobic Systems has led the industry in time-managed, biological technology since 1984. In 2004, Aqua-Aerobic applied its expertise in

More information

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,

More information

Carbon Redirection and its Role in Energy Optimization at Water Resource Recovery Facilities

Carbon Redirection and its Role in Energy Optimization at Water Resource Recovery Facilities Carbon Redirection and its Role in Energy Optimization at Water Resource Recovery Facilities Samuel Jeyanayagam, PhD, PE, BCEE, WEF Fellow Joint Energy Conference NYSAWWA & NYWEA Albany, NY 16 November

More information

Waste water treatment

Waste water treatment Waste water treatment Responsible water management means the treatment and disposal of the generated waste water, for which suitable and effective wastewater treatment plants and systems are needed. Based

More information

Chapter 5: Treatment Assessment Future Condition

Chapter 5: Treatment Assessment Future Condition 2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2016 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2016 Annual Report Table of Contents Wastewater Treatment Plant

More information

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7 th Biennial Meeting of the Lake Erie Millennium Network Status of Lake Erie Management Needs & Research Questions

More information

COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS

COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS ABSTRACT COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS Mr. Flemming G. Wessman 1 and Mr. Chandler H. Johnson 1 AnoxKaldnes, Inc., 58 Weybosset

More information

BIOSOLIDS Pasteurization: A NEW APPROACH IN CHERAW, S.C.

BIOSOLIDS Pasteurization: A NEW APPROACH IN CHERAW, S.C. BIOSOLIDS Pasteurization: A NEW APPROACH IN CHERAW, S.C. Guy E. Slagle, Jr., P. E. Hayes, Seay, Mattern & Mattern, Inc. 181 East Evans St. Florence, South Carolina, 29506 J. Ted Morris Public Utility Director

More information

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018 Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures

More information

Feel free to contact me should you require any additional information regarding the report. I can be reached at

Feel free to contact me should you require any additional information regarding the report. I can be reached at February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating

More information

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage

More information

Operating Experience with Ostara Struvite Harvesting Process

Operating Experience with Ostara Struvite Harvesting Process Operating Experience with Ostara Struvite Harvesting Process Authors: Steve Reusser 1, Alan Grooms 1, Aaron Dose 1, Ahren Britton 2, Ram Prasad 2 1. Madison Metropolitan Sewerage District 2. Ostara Nutrient

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

LEMNA BIOLOGICAL TREATMENT PROCESS LEMTEC TM TECHNOLOGIES, INC.

LEMNA BIOLOGICAL TREATMENT PROCESS LEMTEC TM TECHNOLOGIES, INC. LEMNA TECHNOLOGIES, INC. I n n o v a t i v e W a s t e w a t e r T r e a t m e n t S o l u t i o n s LEMTEC TM BIOLOGICAL TREATMENT PROCESS LEMNA For more than 20 years, Lemna has been the world leader

More information

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three

More information

Managing the Largest Extended Wet Weather Event on Record at TRA CRWS

Managing the Largest Extended Wet Weather Event on Record at TRA CRWS Managing the Largest Extended Wet Weather Event on Record at TRA CRWS April 21, 2016 Julia J. Hunt Trinity River Authority of Texas David R. Jackson, P.E., BCEE Freese and Nichols, Inc. TRA CRWS Treatment

More information

The Municipality of North Grenville

The Municipality of North Grenville A solution is required to increase the peak flow capacity of the Kemptville WPCP, a conventional activated sludge process, within a small footprint while maintaining good effluent quality. Location: Kemptville

More information

THE ROLE OF ACTIVATED SLUDGE SOLIDS IN AN ACTIFLO SYSTEM. Chen-An Lien and Andrew P. Kruzic

THE ROLE OF ACTIVATED SLUDGE SOLIDS IN AN ACTIFLO SYSTEM. Chen-An Lien and Andrew P. Kruzic THE ROLE OF ACTIVATED SLUDGE SOLIDS IN AN ACTIFLO SYSTEM Chen-An Lien and Andrew P. Kruzic ABSTRACT Civil and Environmental Engineering Department, University of Texas at Arlington Arlington, Texas 76011,

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage disposals,

More information

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...

More information

Wastewater Treatment clarifier

Wastewater Treatment clarifier Wastewater Treatment Pretreatment During pretreatment, items would normally be removed that would hinder the further processes of treatment. Items commonly removed include roots, rags, cans, or other large

More information

PILOT SCALE TESTS OF A UNIQUE APPROACH FOR BNR UPGRADE OF A SHORT SRT HIGH PURITY OXYGEN SYSTEM AT PIMA COUNTY, AZ

PILOT SCALE TESTS OF A UNIQUE APPROACH FOR BNR UPGRADE OF A SHORT SRT HIGH PURITY OXYGEN SYSTEM AT PIMA COUNTY, AZ PILOT SCALE TESTS OF A UNIQUE APPROACH FOR BNR UPGRADE OF A SHORT SRT HIGH PURITY OXYGEN SYSTEM AT PIMA COUNTY, AZ ABSTRACT Ron Riska,: Pima County Wastewater Management Division Joseph A. Husband, P.E.,

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power