1 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP MDX Work Program #: ETDM #:

2 This Public Hearing is being held in accordance with: Chapter 23 of United States Code 128. Title 40 of the Code of Federal Regulations, Parts 1500 through Title 23 of the Code of Federal Regulations, Part 771. Title 50 of the Code of Federal Regulations, Part 402. Federal Aid Highway Act of 1968, as amended. Americans with Disabilities Act of Title VI of the Civil Rights Act of 1964, as amended. Presidential Executive Order 11990, Protection of Wetlands. May 24, Presidential Executive Order 11988, Floodplain Management and Protection. 2

3 3

4 MDX Work Program Project #: Efficient Transportation Decision Making (ETDM) #:

5 Project Life Cycle 5

6 PD&E Process 6

7 Coordination On-going/Planned Developments Miami-Dade County Florida Department of Transportation ( FDOT) Florida Turnpike Enterprise (FTE) Miami Dade Public Works (MDPW) Miami Dade Transit (MDT) Florida Department of Environmental Protection (FDEP) South Florida Water Management District (SFWMD) Florida Power & Light (FPL) CSX Transportation (CSX) Federal Aviation Administration (FAA) 7

8 Project Description SR 874/ Don Shula Expressway Urban Principal Arterial Expressway Approximately 7.2 miles Posted Speed Limit 55 mph Hurricane Evacuation Route Part of SIS/FIHS New on/off ramp from SR 874 to SW 128 th St Roadway improvements along SW 128 th St from SW 122 nd Ave to SW 137 th Ave 8

9 Purpose and Need 1. Social Demand and Economic Development 2. System Connectivity 3. Capacity 4. Evacuation Route/ Emergency Services 9

10 Purpose and Need Social Demand and Economic Development West Kendall is one of the fastest growing communities in the state t Anticipated growth by 2035: Population: 104% Jobs: 37% Future development in the project vicinity includes: Kendall-Tamiami Executive Airport improvements ZooMiami iexpansion Schools Housing developments DRI s 10

11 Purpose and Need System Connectivity Existing connections to expressway system: SW 152 nd Street (HEFT & SR 874) SW 120 th Street (HEFT) DOWNTOWN MIAMI SR 874 provides a southwest to northeast connection from the HEFT to the Palmetto Expressway/SR 826 The new facility would provide local traffic a more direct route to the centers of employment in the County Downtown Miami Miami International Airport Miami Beach Port of Miami STUDY AREA 11

12 Purpose and Need Capacity Expressways and interchanges in the area are heavily congested The proposed ramps would provide an alternate travel route, relieving congestion 12

13 Evacuation Route/ Emergency services Purpose and Need The lower southeast Florida region has been identified d as one of the most thurricane vulnerable areas in the United States The SR 874/Don Shula Expressway facilitates access to other critical north-south facilities (i.e. SR 826/Palmetto Expressway, US-1, I-95) This project would provide an additional connection to the SR 874 facility and improve the mobility at the Turnpike interchanges decreasing overall evacuation time 13

14 Key Project Components Engineering Environmental Public Involvement 14

15 Community Involvement Public Involvement Coordinated with Key Stakeholders, businesses, etc. Public Meetings held: Agency/Elected Officials i Kick-off Meeting Public Kick-off Meeting Public Alternatives Workshop Ways of engaging the community: Fact sheets Newsletters 15

16 Stakeholder Meetings Public Involvement Have met with the following Owners/Agencies: o Bonita Lakes (HOA) o Venezia Lakes (HOA) o Eagle Lake Office Park o Wynn Building Corporation o J&B Importers o The Flyer o PERA P.E.R.A. (Nixon Smiley & Tamiami Pineland Preserve) o Miami Dade County Public Works and Waste Management o Miami-Dade County Parks, Recreation and Open Spaces 16

17 Project Constraints Tamiami and Nixon Smiley Pineland Preserves Multiple Residential neighborhoods Existing and proposed FP&L Transmission lines & Davis Substation CSX Railroad Proposed Turnpike improvements Kendall Tamiami Executive Airport FAA compliance Engineering Analysis 17

18 Engineering Analysis 18

19 Engineering Analysis Traffic Analysis Traffic Analysis Years: Opening: 2017 Interim: 2027 Design: 2037 Determined traffic improvements/ impacts on local roads Preparation of an Interchange Justification Report (IJR) FDOT review (FIHS/ SIS facility) 19

20 Engineering Analysis PARAMETERS ALTERNATIVES 20

21 Engineering Analysis Alternative Corridor A (SW 128 th Street) Provides new on/off ramps from SR 874 to SW 128 th Street New ramps come down to ground level just east of SW122 nd Avenue Requires widening of SW 128 th Street from 2 to 4 lanes Avoids impacts to Pineland preserves Minimizes right-of-way impacts 21

22 Engineering Analysis Alternative Corridor C (SW 136 th Street) Provides new ramps from SR 874 to SW 136 th St New ramps come down to ground level just east of SW 127 th Ave Direct impacts to Tamiami Pineland Preserve Direct impacts to CSX R/W and FP&L Transmission lines Significant public opposition from abutting residences 22

23 Engineering Analysis Alternative Corridor F (SW 128 th Street/SW 136 th Street) Provides two one way ramps (entrance at SW 136 th St, exit at SW 128 th St) Direct impacts to Tamiami Pineland Preserve Direct impacts to CSX R/W and FP&L Transmission lines 23

24 Engineering Analysis Preferred Alternative Corridor A (SW 128 th Street) from SR 874 to SW 122 nd Avenue Two 2-lane on/off ramps to SR 874 (Don Shula Expressway) New ramps come down to ground level just east of the SW 122 nd Avenue. 12 foot frontage road east of SW 122 nd Avenue will provide access to abutting businesses. 24

25 Engineering Analysis Preferred Alternative Corridor A (SW 128 th Street) from SW 122 nd Avenue to SW 137 th Avenue Widens SW 128 th Street from two to four lanes from SW 122 nd Avenue to SW 137 th Avenue Provides 6 ft sidewalk on the north side and a 10 ft shared use path on the south side. Requires intersection improvements at the intersections of SW 128 th Street with SW 122 nd Avenue, SW 127 th Avenue and SW 137 th Avenue. 25

26 Engineering Analysis Preferred Alternative Corridor A - Right of Way Impacts 26

27 Environmental Analysis Direct Effects Natural Issues Threatened/ Endangered Species Minimal Impacts Wetlands No involvement Water Quality Minimal Impacts Physical Issues Noise Minimal Impacts No noise walls required Contamination Only low risk sites located in the area Air Quality No Impacts Socio-Economic / Cultural Issues Historical No involvement Archaeological No involvement 4(f) Sites No Impacts Socio- Economic Positive Impacts Relocation - No impacts Indirect & Cumulative Effects May increase exposure to noise, litter and traffic for the Nixon Smiley Pineland Preserve 27

28 Environmental Analysis Socio-Economic i Impacts SR 874 Ramp Connector to SW 128 th Street Comparative Study Study evaluated 6 different expressway ramps within Miami-Dade and Broward County with similar conditions to the proposed project Inclusion of the ramp will have a beneficial impact due to increase accessibility to the expressway SR 874 RAMP CONNECTOR TO SW 128 th STREET COMPARATIVE STUDY APRIL 5, 2011 PREPARED BY: BERMELLO AJAMIL & PARTNERS, INC. 28

29 Project Documents Draft Project Development Summary Report Draft State Environmental Impact Report Draft Endangered Species Biological Assessment Draft Contamination Evaluation Screening Report Draft Noise Study Report Draft Cultural Resource Assessment Survey Draft Interchange Justification Report Draft Wetland Technical Memorandum 29

30 Schedule & Cost Schedule Next Steps Final Design: , Right-of-Way: , Construction: Preliminary Construction Cost Approximate construction cost: $108 Million 30

31 Engineering Analysis Preferred Alternative Corridor A 31

32 Written Statements, 7:00 p.m. Ms. Tere C. Garcia MDX Public Information Officer William M. Lehman MDX Building 3790 NW 21 st Street Miami, FL (786)

33 For additional information please contact: Ms. Tere C. Garcia Public Information Officer Phone: (305) Cell: (786) Fax: (305)

34 Your COMMENTS and CONCERNS are solicited tonight! 34

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Florida Department of Transportation District Four KICK-OFF MEETING I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Palm Beach County, Florida Financial Project ID No.: 435516-1-22-02

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

NORTH I-75 MASTER PLAN Summary Report

NORTH I-75 MASTER PLAN Summary Report NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties,

More information

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY) I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY) TO WEST OF SR 435 (KIRKMAN ROAD) ORANGE COUNTY, FLORIDA Financial Project

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4G From: Date: Subject: Staff May 16, 2008 Council Meeting Intergovernmental Coordination and Review Log The

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

Concept, Feasibility & Mobility Studies. Southport Connector Expressway Concept, Feasibility & Mobility Studies Southport Connector Expressway Project Background FDOT Alternative Corridor Evaluation (ACE) Study Advanced Notification Package distributed September 2012 ETDM

More information

ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2

ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2 ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2 Lake / Orange County Connector (US 27 to SR 429) Feasibility/Project Development & Environment Study February 12, 2019 Title VI Compliance This meeting, project,

More information

Project Study Area. Presentation. July 8, 2008

Project Study Area. Presentation. July 8, 2008 Florida Department of Transportation Presentation for for the the South Side Community Plan #4 at at the the South South Shore Shore Regional Regional Library, Library, 15816 15816 Beth Beth Shields Shields

More information

How Should MPO s Engage in Setting Freight Priorities?

How Should MPO s Engage in Setting Freight Priorities? How Should MPO s Engage in Setting Freight Priorities? Presented to MPOAC Freight Subcommittee Presented by Michael Williamson, Cambridge Systematics, Inc. October 29, 2015 Key Questions 2 How do MPOs

More information

Florida Gas Transmission 24-Inch Pipeline Hydrostatic Test

Florida Gas Transmission 24-Inch Pipeline Hydrostatic Test Florida Gas Transmission 24-Inch Pipeline Hydrostatic Test From the SR 826/Palmetto Expressway Interchange with NW 122 nd Street/W 68 th Street to the Golden Glades Interchange Miami-Dade County Today

More information

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL JOINT MEETING OCTOBER 12, 2018 Future Corridors Auburndale Winter Haven ILC (CSX Rwy) Tampa Airport

More information

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P NOVEMBER 13, 2017 PRE QUALIFICATIONS R.J. Behar & Company, Inc. (RJB) has overseen in excess of $1 billion in construction projects throughout the state of Florida. Our team is fully qualified in the following

More information

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum To: Marlon Bizerra, PE From: Thirulokesh Krishnan Email: thirulokesh.krishnan@atkinsglobal.com Phone: 210.321.2019 Date: Nov 25, 2014 Ref: cc: Kim Warren, Doug Reed, PE Subject: SR 60 Grade Separation

More information

1.4 Analysis of Alignment Alternatives

1.4 Analysis of Alignment Alternatives Parkway is 20.94 miles, with 8.16 miles in Orange County, 7.37 miles in Lake County and 5.41 miles in Seminole County. SR 46 Reconstruction and Realignment, which would begin at the SR 46/US 441 interchange

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

Final Air Quality Report

Final Air Quality Report Florida Department of Transportation - District VII County Line Road (C.R. 578) Project Development and Environment Study From U.S. 19 (S.R. 55) to U.S. 41 (S.R. 45) Work Program Item Segment Number: 257298

More information

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study CENTRAL FLORIDA EXPRESSWAY AUTHORITY SR 408 Eastern Extension PD&E Study WHAT IS A PD&E? Process used to evaluate - o Engineering Alternatives o Environmental Impacts and Social, Cultural and Economic

More information

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W District One CMNAA Central Manatee Network Alternatives Analysis December 12, 2017 5:00 pm - 7:00 pm First Baptist Church 1306 Manatee Ave. W, Bradenton, FL 34205 Central Manatee Network Alternatives Analysis

More information

2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM 2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project Outstanding

More information

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014 SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014 Purpose and Need Enhancing Economic Competitiveness Improving Emergency Evacuation Capabilities

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

State Route 8 Bridge Replacement Project

State Route 8 Bridge Replacement Project OPEN HOUSE PUBLIC INVOLVEMENT MEETING Celebration Church 688 Dan Street, Akron, Ohio Tuesday, July 14, 2015 5:00 PM to 7:00 PM State Route 8 Bridge Replacement Project Existing Bridge Future Bridges: Steel

More information

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

DRAFT AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida

More information

Central Manatee Network Alternatives Analysis

Central Manatee Network Alternatives Analysis District One CMNAA Central Manatee Network Alternatives Analysis Central Manatee Network Alternatives Analysis The Florida Department of Transportation (FDOT) is conducting the Central Manatee Network

More information

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence APPENDIX 21 1 Methodology Letter of Understanding (MLOU) and Agency Correspondence Question 21 Transportation This document reflects the transportation study methodology to be utilized in preparing responses

More information

SR 50 PD&E Study

SR 50 PD&E Study SR50 Project Development & Environment Study Public Hearing November 1, 2011 SR 50 PD&E Study 427056-1-22-01 1 Purpose of the Public Hearing Afford persons the opportunity to express their views about

More information

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

Chapter 2 Transportation Element Goals, Objectives and Policies

Chapter 2 Transportation Element Goals, Objectives and Policies Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective

More information

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS OVERVIEW SOUTH SUBURBAN INAUGURAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT The proposed, (SSA) will require

More information

US 27 Transportation Alternatives Study

US 27 Transportation Alternatives Study US 27 Transportation Alternatives Study Prepared for: Florida Department of Transportation Systems Planning Office October 2012 Technical Memorandum: Alternative Options and Policy Implications Prepared

More information

I-10 CONNECT. Public Meeting #1

I-10 CONNECT. Public Meeting #1 I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

M E M O R A N D U M. To: Council Members AGENDA ITEM 7

M E M O R A N D U M. To: Council Members AGENDA ITEM 7 M E M O R A N D U M To: Council Members AGENDA ITEM 7 From: Date: Staff October 20, 2017 Joint Council Meeting Subject: U.S. Highway 27 Multi-Modal Corridor Project Update Thomas J. Lanahan, Deputy Executive

More information

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination 4-65 Interstate 73 FEIS: I-95 to the Myrtle Beach Region 4-66 Comment noted. The use of existing roadways was considered during alternative development (refer to Chapter 2, Section 2.1, page 2-1 and the

More information

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE FLORIDA INTRASTATE HIGHWAY SYSTEM Topic No.: 525-030-250-f Office: Systems Planning Effective Date: May 16, 2002 DEVELOPMENT OF THE FLORIDA

More information

Section 7 Environmental Constraints

Section 7 Environmental Constraints Section 7 Environmental Constraints i Yakima Valley Metropolitan and Regional Transportation Plan Public Comment DRAFT 1/27/2016 Environmental Constraints Analysis A programmatic-level review of potential

More information

Table of Contents. Introduction 1. E1 Purpose and Need 1. E2 Alternatives Development Approach 7. E3 Tier I Alternatives 9. E4 Tier II Alternatives 13

Table of Contents. Introduction 1. E1 Purpose and Need 1. E2 Alternatives Development Approach 7. E3 Tier I Alternatives 9. E4 Tier II Alternatives 13 Table of Contents Introduction 1 E1 Purpose and Need 1 E1.1 Study Area 1 E1.2 Land Use and Zoning 3 E1.3 Demographics 3 E1.4 Transportation Facilities and Transit Services 5 E1.5 Mobility Constraints 5

More information

North I-75 Master Plan Summary

North I-75 Master Plan Summary North I-75 Master Plan Summary Florida Section ITE Annual Meeting November 3, 2017 The I-75 Relief Task Force Established by Secretary Boxold in October 2015 with broad membership Overarching goals Provide

More information

3.1.3 Horizontal and Vertical Alignments Intersections and Signalization Conditions Access Management Classification...

3.1.3 Horizontal and Vertical Alignments Intersections and Signalization Conditions Access Management Classification... US 27 MULTIMODAL PLANNING AND CONCEPTUAL ENGINEERING (PACE) STUDY FM Number 428662-1-12-01 FINAL REPORT December 2012 Florida Department of Transportation District Four Prepared by: VOLUME 1 TABLE OF CONTENTS

More information

DRAFT PRELIMINARY ENGINEERING REPORT

DRAFT PRELIMINARY ENGINEERING REPORT DRAFT PRELIMINARY ENGINEERING REPORT US 27/ SR 25 / OKEECHOBEE PD&E STUDY Financial Management Number: 423251-1-22-01 Federal Aid Project Number: 0301056P ETDM Number: 9891 County: Miami-Dade Florida Department

More information

LOOP 9 SOUTHEAST WELCOME TO THE LOOP 9 CORRIDOR/FEASIBILITY STUDY. Presentation 6:30 p.m. to 7:00 p.m.

LOOP 9 SOUTHEAST WELCOME TO THE LOOP 9 CORRIDOR/FEASIBILITY STUDY. Presentation 6:30 p.m. to 7:00 p.m. 1 WELCOME TO THE LOOP 9 CORRIDOR/FEASIBILITY STUDY PUBLIC MEETINGS Open House 5:30 p.m. to 6:30 p.m. Presentation 6:30 p.m. to 7:00 p.m. Open House 7:00 p.m. to 8:00 p.m. Tuesday, September 24, 2013 Thursday,

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida Alico Road Connector Study Lee County Department of Transportation Lee County, Florida Prepared by July 2009 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Project Description and Purpose...

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

FROM THE CHAIR By: Michael Dorweiler, AICP 2007 Chairman for the Tampa Bay Applications Group DATES TO REMEMBER

FROM THE CHAIR By: Michael Dorweiler, AICP 2007 Chairman for the Tampa Bay Applications Group DATES TO REMEMBER An Open Forum for Transportation-Related Issues TAMPA BAY APPLICATIONS GROUP February 2007 DATES TO REMEMBER Meeting dates for Tampa Bay Applications Group Year 2007 February 22 May 17 August 23 November

More information

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1 Miami-Dade Transit Alice N. Bravo, P.E. Director Miami-Dade Transit 1 Miami-Dade Transit MDT is the largest transit agency in the State of Florida, and one of the largest departments within Miami-Dade

More information

MEDIAN OPENINGS AND ACCESS MANAGEMENT

MEDIAN OPENINGS AND ACCESS MANAGEMENT Approved: Effective: February 20, 2013 Office: Systems Planning Topic No.: 625-010-021-h Department of Transportation PURPOSE: MEDIAN OPENINGS AND ACCESS MANAGEMENT This procedure provides direction on

More information

2050 VISION WORKSHOP

2050 VISION WORKSHOP I-75 PD&E Studies Project Development & Environment Studies From Moccasin Wallow Road to North of Fletcher Avenue Manatee and Hillsborough Counties 2050 VISION WORKSHOP Florida Department of Transportation

More information

NEPA and Design Public Hearings

NEPA and Design Public Hearings NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg

More information

A Presentation to: Project Advisory Group Meeting #7

A Presentation to: Project Advisory Group Meeting #7 A Presentation to: Project Advisory Group Meeting #7 June 10, 2015 Agenda Introductions Action items from last PAG meeting (March 25, 2015) Public involvement update April Public Meetings Elected Official

More information

MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia May 8,

MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia May 8, MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia 24148 May 8, 2018 MEETING OVERVIEW AND OBJECTIVES Introduce study

More information

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED S SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION The Virginia Department of Transportation (VDOT), in cooperation with the Federal Highway Administration (FHWA), is studying alternatives to meet transportation

More information

Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology

Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology The Pinellas County Metropolitan Planning Organization s 2035 Long Range

More information

CHAPTER 8 TRANSPORTATION ELEMENT

CHAPTER 8 TRANSPORTATION ELEMENT CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized

More information

Background Study Goals and Objectives

Background Study Goals and Objectives Professional Services CONSULTANT Contract Advertisement Number 19614 FM # 437949-1-22-01 City of Hialeah Freight Mobility Implementation Plan Scope of Services Background Florida s Freight Mobility and

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR

More information

Willmar Wye Public Open House #4 and Public Hearing

Willmar Wye Public Open House #4 and Public Hearing Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff

More information

Working with Transportation Concurrency Exception Areas

Working with Transportation Concurrency Exception Areas Working with Transportation Concurrency Exception Areas September 2006 Presented by the Florida Department of Transportation Working with Transportation Concurrency Exception Areas Volume 1, September

More information

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida UPDATED FINAL REPORT NOISE STUDY REPORT for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY Orange, Lake, and Seminole Counties, Florida Financial Project ID: 238275 1 22 01 and 240200 1 22 01

More information

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009 POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report ADOPTED June 18, 2009 TABLE OF CONTENTS CHAPTER 1 Introduction and Prior Planning Effort...Page 1-1 CHAPTER 2 Population and Employment

More information

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting LA 23 NOGC Railway Relocation PE/NEPA Project Public Meeting LA 23 New Orleans & Gulf Coast Railway (NOGC) Relocation Preliminary Engineering (PE) / National Environmental Policy Act (NEPA) Project RPC/FRA

More information

SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects. Project Review with Metropolitan/ Transportation Planning Organizations

SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects. Project Review with Metropolitan/ Transportation Planning Organizations SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects Project Review with Metropolitan/ Transportation Planning Organizations March/April 2017 Outline Purpose of and Planning for Florida

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region D R A F T SECTION 4(f) EVALUATION INTERSTATE 73 From I-95 to the Myrtle Beach Region INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 USC 303 requires that prior to the use

More information

Florida Department of Transportation

Florida Department of Transportation Florida Department of Transportation Major Projects Report District 6 September 2018 Table of Contents Table of Contents Project Development and Environment (PD&E) Study Phase S.R 9A/I-95 from U.S. 1 to

More information

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates MEMORANDUM #4 DATE: November 4, 2015 TO: FROM: SUBJECT: Warrenton TSP Project Management Team Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates Warrenton Transportation System Plan Update

More information

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT GULF COAST PARKWAY PD&E STUDY from US 98 to US 231 with a connection to US 98 in Springfield Gulf County and Bay County, Florida FINANCIAL PROJECT ID NUMBER:

More information

Florida Department of Transportation

Florida Department of Transportation Florida Department of Transportation Major Projects Report District 6 April 2018 Table of Contents Table of Contents Project Development and Environment (PD&E) Study Phase S.R. 9A/I-95 from U.S. 1 to Broward

More information

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012 I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation

More information

Overview of Prior Studies

Overview of Prior Studies FLORIDA DEPARTMENT OF TRANSPORTATION PORT OF MIAMI TUNNEL STUDY Overview of Prior Studies This summary was provided on July 29, 2003 by Jeff V. Easley, PE, Vice President of Reynolds, Smith and Hills as

More information

Florida Department of Transportation

Florida Department of Transportation Florida Department of Transportation Major Projects Report District 6 December 2018 Table of Contents Table of Contents Project Development and Environment (PD&E) Study Phase S.R 9A/I-95 from U.S. 1 to

More information

HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION

HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION 2035 Long Range Transportation Plan Needs Assessment Segment Summary: Prepared for: Hillsborough County Metropolitan Planning Organization P.O. Box

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM 1. GENERAL INFORMATION County: Miami-Dade Project Name: SR 826/Palmetto Expressway PD&E Study Project

More information

Florida Department of Transportation

Florida Department of Transportation Florida Department of Transportation Major Projects Update Report District 6 September 2017 Table of Contents Table of Contents Project Development and Environment (PD&E) Study Phase S.R. 9A/I-95 from

More information

Preparation of an Environmental Impact Statement for High Capacity Transit

Preparation of an Environmental Impact Statement for High Capacity Transit This document is scheduled to be published in the Federal Register on 11/19/2013 and available online at http://federalregister.gov/a/2013-27583, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 2: State Road 400 (SR 400) / Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road) Orange County (75280), Florida

More information

Governor s Transportation Task Force. MEGAPROJECT NEEDS RPC Freight Roundtable Executive Director: Walter Brooks

Governor s Transportation Task Force. MEGAPROJECT NEEDS RPC Freight Roundtable Executive Director: Walter Brooks Governor s Transportation Task Force MEGAPROJECT NEEDS RPC Freight Roundtable Executive Director: Walter Brooks April 26, 2017 RPC Transportation Investments 2010-2015 Transit, $253.6M (20.3%) Safety &

More information

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.:

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.: MDX PROCUREMENT/CONTRACT NO.: RFP-14-03 MDX WORK PROGRAM NO.: 83628.030 MDX PROJECT/SERVICE TITLE: DESIGN-BUILD SERVICES FOR SR 836 OPERATIONAL, CAPACITY AND EXHIBIT A DESIGN-BUILD SCOPE OF SERVICES REVISED

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 4: State Road 400 (SR 400)/Interstate 4 (I-4) from East of SR 15-600/US 17-92 (Seminole/Volusia County Line) to ½ Mile East of SR 472 Volusia County (79110),

More information

Engineering Assessment Process: Keys to a Solid Engineer s Report

Engineering Assessment Process: Keys to a Solid Engineer s Report Engineering Assessment Process: Keys to a Solid Engineer s Report 89th Annual Purdue Road School March 26, 2003 Brad Steckler, P.E. Brad L. Steckler, P.E. Manager of Engineering Assessment Indiana Department

More information

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives CHAPTER 5 TRANSPORTATION Introduction The transportation system forms the backbone of the community. I-74 provides the community with connections to larger metropolitan areas such as Indianapolis and Cincinnati.

More information

MID FLORIDA LOGISTICS PARK

MID FLORIDA LOGISTICS PARK MID FLORIDA Logistics Park MID FLORIDA LOGISTICS PARK APOPKA, FL Developed By:...Central Florida s Premier Logistics Park Table of Contents Development Overview Property Specifications Why Mid Florida

More information

Project Evaluation Criteria

Project Evaluation Criteria Project Evaluation Criteria Goals and Objectives were developed to guide Envision 35 Long Range Transportation Plan (LRTP) Update. These guiding principles were based on the requirements included in the

More information

LA 23 NOGC Railway Relocation PE/NEPA Project

LA 23 NOGC Railway Relocation PE/NEPA Project LA 23 NOGC Railway Relocation PE/NEPA Project LA 23/New Orleans & Gulf Coast Railway Relocation Preliminary Engineering (PE) / National Environmental Policy Act (NEPA) Project Kevin Keller, PE HDR Engineering,

More information

FASTLANE Grant Project US-69 through Calera. Oklahoma Traffic Engineering Association 2017 Fall Meeting

FASTLANE Grant Project US-69 through Calera. Oklahoma Traffic Engineering Association 2017 Fall Meeting FASTLANE Grant Project US-69 through Calera Oklahoma Traffic Engineering Association 2017 Fall Meeting October 17, 2017 US-69 through Calera Project Location Town of Calera City of Durant Project Location

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines Public Works Department Traffic Impact Analysis Guidelines Revised: August 2015 TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE... 3 EXEMPTIONS... 3 SCOPING... 4 METHODOLOGY... 5 STUDY AREA... 6 STUDY SCENARIOS...

More information

Lubbock Outer Route Feasibility Study Report Executive Summary

Lubbock Outer Route Feasibility Study Report Executive Summary Lubbock Outer Route Feasibility Study Report Executive Summary Prepared for: Texas Department of Transportation Lubbock District Prepared by: MACTEC Engineering and Consulting, Inc. 6701 Aberdeen, Suite

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 3: State Road 400 (SR 400)/Interstate 4 (I-4) from One Mile East of SR 434 to East of SR 15-600/US 17-92 Seminole County (77160), Florida July 2016 Air

More information

vi Figures viii Summary S.1

vi Figures viii Summary S.1 Contents Contents iii Tables vi Figures viii Summary S.1 Chapter 1: Purpose and Need Project History A.1 Project Description A.2 Project Purpose A.5 Transportation Need A.6 Highway Capacity and Congestion

More information

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.) Regional Transportation Technical Advisory Committee (RTTAC) Transportation System Management & Operations (TSM&O) Subcommittee Meeting Agenda June 23, 2015 1:30 PM FDOT District Four Headquarters Auditorium

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2014-00083-1 Date: December 22, 2014 Comments Due: January 16, 2015 TO WHOM

More information

Derry-Londonderry I-93 Exit 4A Public Officials/Information Meeting

Derry-Londonderry I-93 Exit 4A Public Officials/Information Meeting Derry-Londonderry 13065 - I-93 Exit 4A Public Officials/Information Meeting May 24, 2018 Purpose of Meeting To present the five build alternatives To present the evaluation matrix To answer questions and

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information