Loads and Resources Methods and Assumptions

Size: px
Start display at page:

Download "Loads and Resources Methods and Assumptions"

Transcription

1 Loads and Resources Methods and Assumptions WECC Staff September North 400 West, Suite 200 Salt Lake City, Utah

2 Loads and Resources Methods and Assumptions ii Contents Purpose... 1 Assessment Process... 1 Subregion and Balancing Authority Maps... 2 Planning Reserve Margins... 3 Demand... 6 Demand-Side Management... 6 Generation... 7 On-Peak Capacity Transactions... 9 Transmission... 9 Transfer Limits Transmission Planning Considerations Transmission Expansion Planning... 14

3 Loads and Resources Methods and Assumptions 1 Purpose The Loads and Resources (LAR) Methods and Assumptions document describes the basic methods and assumptions used by WECC staff when developing the North America Electric Reliability Corporation (NERC) Long-Term Reliability Assessment, the NERC summer and winter assessments, and the WECC Power Supply Assessment. Assessment Process WECC uses a production cost model (PCM) to calculate a supply/demand balance and the associated power transfers among 19 zones. The zones are configured around demand centers and transmission hubs. The subregions (an aggregation of zones) with associated zones and Balancing Authorities (BA) are identified in Table 1. Table 1 - WECC Subregion, Zones, and Balancing Authorities Subregion Zones in Subregion Balancing Authorities in Subregion Northwest Power Pool (NWPP) Rocky Mountain Reserve Group (RMRG) Southwest Reserve Sharing Group (SRSG) Alberta, Balancing Authority of Northern California, British Columbia, Idaho, Montana, Northern Nevada, Pacific Northwest, Southern Nevada, Utah, Western Wyoming Colorado, Eastern Wyoming Arizona, Imperial Irrigation District, New Mexico Alberta Electric System Operator, Avista Corporation, Balancing Authority of Northern California, Bonneville Power Administration - Transmission, British Columbia Hydro and Power Authority, Constellation Energy Control and Dispatch, Idaho Power Company, NaturEner Glacier Wind Energy, NaturEner West Wind, Nevada Power Company, Northwestern Energy, PacifiCorp - East, PacifiCorp - West, Portland General Electric Company, PUD No. 1 of Chelan County, PUD No. 2 of Grant County, PUD No. 1 of Douglas County, Puget Sound Energy, Seattle Department of Lighting, Tacoma Power, Turlock Irrigation District, Western Area Power Administration - Upper Great Plains West Public Service Company of Colorado, Western Area Power Administration- Colorado-Missouri Region Arizona Public Service Company, Arlington Valley, El Paso Electric Company, Gila River Maricopa Arizona, Griffith Energy, Harquahala Generating Maricopa Arizona, Imperial Irrigation District, Public Service Company of New Mexico, Salt River Project, Tucson Electric Power Company, Western Area Power Administration - Lower Colorado Region

4 Loads and Resources Methods and Assumptions 2 Subregion Zones in Subregion Balancing Authorities in Subregion California/ Mexico (CA/MX) Comisión Federal de Electricidad, Los Angeles Department of Water and Power, Northern CA, San Diego, Southern CA California Independent System Operator, Comisión Federal de Electricidad, Los Angeles Department of Water and Power The resource allocation seeks the lowest overall cost, while maintaining resource adequacy within the subregions. Data elements, as collected from the 38 BAs in the Western Interconnection, needed for the PCM to calculate the WECC-wide, and subregional reserve margins include: monthly and annual peak demand and energy forecasts; expected generation availability; annual energy for energy limited resources; coincident hourly shaping data for loads and energy-limited resources; and simplified transmission interconnection that reflects nominal power transfer capability limits. Subregion and Balancing Authority Maps Western Interconnection Subregions (4)

5 Loads and Resources Methods and Assumptions 3 Planning Reserve Margins The seasonal reserve margin calculations in this assessment reflect seasonal ratings for Existing- Certain, Future-Planned, and Conceptual resources. WECC s assessment modeling process does not make a distinction between Energy-Only resources and any other resource. Capabilities for Transmission-Limited resources would be reduced to reflect the transmission limitation but presently WECC does not report any such resources. Demand-Side Management is treated as a reduction to Total Internal Demand. Behind-the-meter generation is excluded from the PCM, as is any associated load. The PCM assumes that there are no transactions with entities external to the Western Interconnection. Demands are modeled as BA-level hourly load shapes that are scaled to reflect the BA-level monthly peak demand and energy load forecasts. Subregion demands reported in this assessment reflect sums of the internal BA demands coincident to the subregion-wide coincident peak demand. Region and subregion Target Reserve Margins are calculated using a building block methodology created by WECC s Loads and Resources Subcommittee. 1 As such, they do not reflect a criteria-based margin-determination process and do not reflect any BA or Load-Serving Entity (LSE) level requirements that may have been established through other processes (e.g., state regulatory authorities). Moreover, they are not intended to supplant any of those requirements. The building block methodology is comprised of four elements: 1. Contingency Reserves An amount of operating reserve sufficient to reduce Area Control Error to zero in 10 minutes following loss of generating capacity, which would result from the most severe single contingency. The BA-level Contingency Reserve is equal to the percent required in BAL-002-WECC-1 2, or approximately 6 percent of Total Internal Demand for all BAs. Contingency Reserves are required to be carried by BAs (individually or through reserve sharing pools) by NERC and WECC Standards. 2. Regulating Reserves The amount of spinning reserves responsive to automatic generation control that is sufficient to provide normal regulating margin. The regulating component of the guideline was calculated using data provided in WECC s annual loads and resources data request responses. The BAs are asked how much regulating reserve they expect to carry during the current year, as either a megawatt value or as a percentage of load. Megawatt responses are converted to a percentage of load by dividing the megawatt value provided by the forecasted peak demand. A "sanity" check is done for all responses and those that 1 The Loads and Resources Subcommittee was consolidated with the Reliability Performance Evaluation Work Group into the Reliability Assessment Work Group in March WECC Standard BAL-002-WECC-1 - Contingency Reserves: Reserve (WECC)&jurisdiction=United States

6 Loads and Resources Methods and Assumptions 4 seemed unreasonably low or high are replaced with the subregional weighted average of reported regulating reserves. This component also includes reserves to balance variations in output from variable resources (such as wind) and may be significant for some BAs. The BAs are required to carry Regulating Reserves by NERC and WECC Standards. 3. Forced Outages Reserves for forced outages, beyond what might be covered by operating reserves in order to cover second contingencies, are calculated using the forced outage data supplied to WECC through the loads and resources (LAR) data request responses. Ten years of data are averaged to calculate both a summer (July) and winter (December) forced outage rate. (The actual calculation is total forced outages divided by total resources reported in the loads and resourced data request responses.) The same forced outage rate is used for all BAs in WECC when calculating the building block margin. Neither NERC nor WECC standards require these reserves. 4. Temperature Adders Using historic temperature data for more than 20 years, the annual maximum and minimum temperature for each BA s area is identified. The data are used to calculate the average maximum (summer) and minimum (winter) temperature and the associated standard deviation. An example of the calculation is provided in Table 2.

7 Loads and Resources Methods and Assumptions 5 Year Table 2 - Temperature Adder Calculation Example Summer Temp Calculation AVG STD z = x x s x = x + z(s) z= Temp = Pr()= Temp Increase MW/Degree MW Increase MW Load % Increase 2.7% The standard deviation was multiplied by a 90 percent probability factor, and added to the average historic temperature to convert from a 1-in-2 temperature (50 percent exceedance) condition to a 1-in- 10 (10 percent exceedance) condition. The 1-in-2 temperature was subtracted from the 1-in-10 temperature to calculate the temperature change associated with the 1-in-10 outlook. The temperature change was then multiplied by the megawatt per degree change supplied by the individual BAs to arrive at a megawatt increase associated with converting from a 1-in-2 temperaturerelated forecast to a 1-in-10 forecast. This megawatt change was divided by the forecast peak demand to create a percentage change to be applied to future demand forecasts to convert from a 1-in-2 forecast to a 1-in-10 forecast. Neither NERC nor WECC standards require these reserves. Table 3 relates the building block elements in a hypothetical total forecasted demand example.

8 Loads and Resources Methods and Assumptions 6 5,600 Table 3 Hypothetical Total Forecast Demand 5,400 1-in-10 Temp Adder 5,200 Contingency Reserve 5,000 Regulating Reserve 4,800 Forced Outage 4,600 4,400 MW 1-in-2 Temp Demand Forecast Demand Total Internal Demands represent BA historical hourly load shapes that have been averaged and scaled by BA-level peak demand and energy load forecasts (1-in-2). The BA-level load shapes are aggregated to create Region and subregion load projections. The Total Internal Demands (firm and non-firm) presented in this assessment reflect extractions of the monthly demands coincident with the WECC Region monthly maximum Total Internal Demands. WECC asks its BAs to submit forecasts with a 50 percent probability of occurrence (1-in-2). The BA-level peak demand and energy load forecasts are based on expected population growth, normalized weather and expected economic conditions. It should be noted that the BA-level forecast submittals to WECC are generally based on the most recently approved forecast and, as such, may reflect a significant time lapse between expected conditions at the time the forecast preparation was initiated and the expected conditions as of the publication of this assessment. This time lag may result in apparent over-forecasts during declining economic conditions and under-forecasts during periods of rapid economic expansion. Demand-Side Management State and other regulatory drivers have led to increases in Demand-Side Management (DSM), energy efficiency, and conservation programs penetration within the WECC subregions. Within some established market structures, DSM has been established as an ancillary service. LSEs within the Region have implemented Demand Response programs and intend to activate the programs when warranted by operating conditions. The programs are generally geared toward

9 Loads and Resources Methods and Assumptions 7 activation on either short notice or, in many cases, no notice and are often a final step before interruption of firm service to customers. It is important to the LSEs and the BAs that the programs perform as expected. LSEs routinely test their programs and program activation processes and procedures to ensure that expected program responses will occur as and when needed. WECC neither tracks nor assesses energy efficiency and conservation programs. WECC does collect monthly dispatchable and controllable demand response (CDR) information for inclusion in assessments but notes that the activation of the CDR is generally at the discretion of the LSE. CDR programs in WECC often have limitations such as having a limited number of times they can be called on and some can only be activated during a declared local emergency. Consequently, an individual LSE may not activate its CDR in response to a request for assistance from an LSE in a different part of the Interconnection and CDR should not be considered as widely sharable. Thus, total Region and even subregion margins may be overstated by an undetermined amount. Generation Resources represented in the WECC assessment model are limited to generation that is available, or is expected to be available, to serve the forecasted load. Any load that is not to be metered by a BA s energy management system is excluded, as is the generation that is serving that load. Hence, distributed generation, such as residential rooftop solar facilities and behind-the-meter generation, is netted against load and not included in this assessment. The expected output to the grid of existing generation is reported for assessments as Existing-Certain capacity and the derated portion of variable resources as calculated by WECC staff is reported as Existing-Other. All future resources are reported as WECC Class Codes 1 through 5 and aligned with the NERC Class Codes of Tier 1 through 3. The correlation of WECC Class Code to NERC Class Code is listed in Table 4. Definition for each class and tier can be found in the most recent LAR Data Collection Manual. 3 Table 4 - Correlation of WECC Class Code to NERC Class Code NERC Class Code Existing- Certain Existing-Other 4 WECC Class Code LAR Data Collection Manual: 4 WECC staff does not believe that the Existing-Other class code applies to resources in the Western Interconnection and Existing-Inoperable resources are excluded from the reporting.

10 Loads and Resources Methods and Assumptions 8 NERC Class Code WECC Class Code 1 T1 2 3 T2 2 3 T3 4 Existing-Inoperable 4-5 Hydro generation in the PCM is constrained by annual energy limits that are based on actual energy production from 2003 for Northwest Hydro generation and from 2002 for California Hydro generation. These two years were selected by WECC s Transmission Expansion Planning Policy Committee (TEPPC) Data Work Group as low water years that would best reflect adverse hydro conditions. Biomass generation is treated as other thermal resource, and is dispatched in merit order. However, the fuel price is set lower than natural gas and should be dispatched before other thermal resources. Variable generation modeling of wind resources is based on curves created using at least five years of actual hourly wind generation data. The data is averaged into six four-hour blocks for each week of the year. Solar resource energy curves were created using up to five years of actual hourly solar generation data. The data is averaged into three-block curves for each week of the year. The variable generation shapes are applied throughout the 10-year study period. This treatment, along with the use of average generation, removes the hourly peaks and valleys in wind and solar generation while maintaining a reasonable representation of variable energy output. Inoperable generation and scheduled maintenance are treated as a reduction in available capacity. Inoperable generation is reported in the LAR data request, and the PCM calculates scheduled maintenance considering seasonal demand peaks to maximize capacity available during the individual subregional peaks, not for the entire Western Interconnection. The majority of the summer outages are scheduled for generation in the winter-peaking Canada and Northwest subregions. Other areas try to have all their units available for the summer peak. The generation owners in the summer-peaking zones usually schedule their maintenance in the fall or spring.

11 Loads and Resources Methods and Assumptions 9 On-Peak Capacity Transactions WECC s assessment process is based on system-wide modeling that aggregates BA-based load and resource forecasts by geographic subregions with conservatively assumed power transfer capability limits between the zones. The PCM calculates transfers between the zones based on assumed dispatch criteria. This modeling approach excludes a representation of contractual commitments by individual entities and assures that capacity margins reflect potential forecast conditions that are independent of variable contractual transfer assumptions. Resources that are physically located in one BA area but are owned by an entity or entities located in another BA s geographic footprint, are modeled as remote resources. These resources are modeled with transmission links between the resource zone and the owner s zone that are limited to the owner s share of the resource. This treatment allows the owner of the resource, and only the owner, to count the resource for margin calculations. Transfers with other regional councils, such as the Midwest Reliability Organization and the Southwest Power Pool, are not included in this assessment as this would require an assumption regarding the amount of surplus or deficit generation in those councils. Transmission For modeling purposes, the Western Interconnection is separated into 19 load area zones. These zones are used in a simplified transmission model to calculate potential transfers between zones. The simplified model reflects transfer capabilities between the 19 zones used in the studies, wheeling costs, and loss factors. The wheeling costs for each path are used to calculate the transfer costs for any imports into a zone. The wheeling costs range from $0.00 to $6.48 per megawatt-hour. Since the LAR data request specifies that line losses be included in all demand forecasts, a loss factor of zero (0) percent is used in the model. Note that neither the wheeling cost nor the loss factor impedes the model from importing surplus resources to meet load. There are nine regional transmission planning groups that cover the Canadian and U.S. portions of the Western Interconnection. One of the responsibilities of the WECC Regional Planning Coordination Group (RPCG) is to assist in coordinating the regional transmission plans. Information on the RPCG and the regional planning groups can be found on the WECC website. 5 It should be noted that generally the transmission planning groups themselves do not have a responsibility regarding implementation of transmission plans in their respective areas. That responsibility is left to the individual planning group member and its appropriate oversight entity (e.g., state utility commission). State/provincial oversight activities vary widely within the West. In conjunction with commission oversight activities, individual entities may prepare long-term transmission plans on a regular basis. For example, the Arizona 5 RPCG webpage:

12 Loads and Resources Methods and Assumptions 10 Corporation Commission collects entity-level biennial transmission plans and published a biennial transmission assessment report. WECC s TPL-001-WECC-CRT-2.1 System Performance Regional Criteria, requirement WR 3.2 addresses reactive power and voltage stability margins. It specifies that voltage stability is required for an area modeled at a minimum of 105 percent of the reference load level for system normal conditions and for single contingencies. For multiple contingencies, post-transient voltage stability is required with the area modeled at a minimum of percent of the reference load level. For this criterion, the reference load level is the maximum established planned load limit for the area under study. Summary guidelines as to how the analysis should be conducted are presented in a Summary of WSCC Voltage Stability Assessment Methodology document. The Western Interconnection is a large and geographically diverse area with significant distances between several generation areas and load areas. The transmission interconnections between these geographically dispersed areas are generally voltage stability-limited, not thermally limited. The System Performance Criterion cited above also addresses transmission system operating limit determination for these interconnections. Many load centers in the West are largely served from remote generation resources through voltage stability-limited transmission interconnections. Consequently, most load within the Interconnection may be considered to be reactive power-limited. LSEs typically address reactive power issues through the installation of local controllable compensation, strengthening interconnections with high-voltage transmission system, and maintaining local must-run generation to provide local voltage support. WECC does not perform studies to identify reactive power-limited areas in the Bulk-Power System. However, Transmission Planners and Planning Coordinators within the Western Interconnection have an obligation under WECC-TPL Regional Criteria to identify dynamic and static reactive power-limited areas. WECC s voltage stability-margin process is centered on meeting certain voltage dip criteria based on certain equipment outage and peak demand assumptions. Consequently, the process indirectly establishes voltage stability margins that Transmission Planners and LSEs are expected to apply when planning transmission and distribution facility additions. Section II of the California Independent System Operator s annual transmission plan provides excellent examples of the application of the WECC Regional Business Practice and associated NERC Reliability Standards in the transmission planning arena. In response to the September 8, 2011 Southwest outage, WECC has created the September 8, 2011 Southwest Response page 6 on its website. The High Level Summary of September 8, 2011 Pacific Outage Survey Results is available on this site. The survey is a white paper that summarizes the current planning and operating practices of entities within the Western Interconnection, identified planning 6 September 8, 2011 Outage Event Response webpage:

13 Loads and Resources Methods and Assumptions 11 gaps, and proposed best practices to address these issues. Many of the short-term issues concerning reliable transmission operations are addressed here. In addition, updates on WECC/NERC/FERC recommended process improvements are posted along with summaries of activities that individual WECC entities are implementing in response to these recommendations. Transfer Limits These diagrams represent the seasonal capacity limits between zones. The colors of the zones in the diagrams also identify the aggregated subregions.

14 Loads and Resources Methods and Assumptions 12 Table 5 - Summer Transfer Limits British Columbia Alberta MRO Pacific Northwest Montana Idaho 0 Wyoming Northern California Northern Nevada Utah Southern California 2300 Southern LADWP Nevada San Diego BANC IID Arizona Colorado New Mex ico SPP Mex ico Legend For each pair of numbers, the top or left number is the transfer capability (MW) in the direction of the arrow. The bottom or right number is the transfer capability in the opposite direction of the arrow.

15 Loads and Resources Methods and Assumptions 13 Table 6 - Winter Transfer Limits British Columbia Alberta MRO Pacific Northwest Montana Idaho 0 Wyoming Northern California Northern Nevada Utah Southern California LADWP 3823 Southern 3883 Nevada San Diego BANC IID Arizona Colorado New Mex ico SPP Mex ico Legend For each pair of numbers, the top or left number is the transfer capability (MW) in the direction of the arrow. The bottom or right number is the transfer capability in the opposite direction of the arrow.

16 Loads and Resources Methods and Assumptions 14 Transmission Planning Considerations WECC is not a Transmission Planner (TP) or Transmission Operator (TOP) and does not perform seasonal planning studies. However, TPs and TOPs throughout the region perform studies that analyze the effect on their systems from element outages in their footprints and neighboring areas. These studies are performed for various seasons (summer, winter, spring, and fall), under various load levels (shoulder peak, light and heavy load, etc.), and incorporate all transmission elements that have been deemed to impact the Bulk-Power System, regardless of voltage size. Peak Reliability, the Reliability Coordinator (RC) for the Western Interconnection (excluding Alberta) has developed a Seasonal System Operating Limit (SOL) Coordination Process that provides TOPs, subregional study groups, and the RC processes to follow when coordinating and implementing seasonal operating studies and establishing seasonal SOLs. Details of this process are outlined in the Peak Reliability document: Peak RC Seasonal SOL Coordination Process. 7 Peak Reliability, has developed the Coordinated Outage System (COS) tool and made it available for entities to distribute planned resource outage information. This tool is used to coordinate maintenance-related transmission outages throughout the Western Interconnection to minimize impacts to reliable operation of the Western grid. Transmission Expansion Planning WECC entities, recognizing the need for a regional approach to transmission expansion planning, organized TEPPC to provide transmission expansion planning coordination and leadership across the Western Interconnection. TEPPC works in close coordination with subregional planning groups, transmission operators, and others to facilitate regional economic transmission expansion planning. The functions performed by TEPPC complement, but do not replace the responsibilities of WECC members and stakeholders regarding the planning and development of specific projects. Each year TEPPC develops a study program that details the transmission system expansion studies it will perform. The program is based on study requests received during TEPPC s open season request window (November 1 st January 31 st ). Any interested party can submit a study request to TEPPC for consideration. Analysis and studies performed by TEPPC focus on plans with Interconnection-wide implications and include a high-level assessment of transmission congestion and operational impacts. Results from TEPPC s studies provide useful insight into transmission expansion needs within the Western Interconnection. TEPPC s Biennial Report, and other documents produced by TEPPC are located on the TEP webpage. 8 7 Peak Reliability Library: 8 TEP website:

GridView Review 2026 Common Case Version 2.0

GridView Review 2026 Common Case Version 2.0 GridView Review 2026 Common Case Version 2.0 Colby Johnson Staff Engineer December 14, 2017 2 Overview GridView Review What is it/what does it do? Inputs and Outputs 2026 Common Case Version 2.0 Changes

More information

Inadvertent Interchange Accounting Training Document

Inadvertent Interchange Accounting Training Document Inadvertent Interchange Accounting Training Document Training Document Subsections A. Introduction B. Definitions C. Interchange Accounting D. Inadvertent Interchange Energy Accounting Practices E. Interchange

More information

Northwest Power Pool Processes

Northwest Power Pool Processes Northwest Power Pool Processes Background The Northwest Power Pool membership (NWPP) was founded in 1941 to promote efficient production of electrical energy. The NWPP is the geographic area encompassed

More information

Utility Scale Integration of Wind and Solar Power

Utility Scale Integration of Wind and Solar Power Utility Scale Integration of Wind and Solar Power Charles Reinhold WestConnect Project Manager Southwest Renewable Energy Conference Flagstaff, AZ Presentation Overview WestConnect Background Area Control

More information

MOD-001-1a Available Transfer Capability Implementation Document

MOD-001-1a Available Transfer Capability Implementation Document Available Transfer Capability Implementation Document For NERC MOD-001-2a Page 1 of 18 1.0 Purpose The California Independent System Operator Corporation (ISO), as a Transmission Service Provider 1 and

More information

WECC Guideline 2019 Base Case Compilation Schedule Date: January 16, 2018

WECC Guideline 2019 Base Case Compilation Schedule Date: January 16, 2018 WECC Guideline 2019 Base Case Compilation Schedule Date: January 16, 2018 Introduction The Data Subcommittee compiles eleven steady state and dynamic base cases (base cases) to meet WECC s requirements

More information

Northern Tier Transmission Group Stakeholder Meeting Boise, Idaho July 22, 2009

Northern Tier Transmission Group Stakeholder Meeting Boise, Idaho July 22, 2009 Joint Initiative Update Northern Tier Transmission Group Stakeholder Meeting Boise, Idaho July 22, 2009 1 Northern Tier Transmission Group Membership Participating Utilities Deseret Power Electric Cooperative

More information

Organized Markets in WECC. Status Update and Implications for Planning 2/1/18

Organized Markets in WECC. Status Update and Implications for Planning 2/1/18 Organized Markets in WECC Status Update and Implications for Planning 2/1/18 Agenda Regional Markets Update Regional Market Activity EIM CAISO Mountain West Peak Reliability / PJM Implications for 2018

More information

2016 Summer Reliability Assessment

2016 Summer Reliability Assessment Table of Contents Preface... 3 Overview... 5 FRCC... 6 MISO... 7 MRO-Manitoba Hydro... 8 MRO-SaskPower... 9 NPCC-Martimes... 10 NPCC-New England... 11 NPCC-Ontario... 13 NPCC- Québec... 14 PJM... 15 SERC...

More information

Western Electricity Coordinating Council Regional Planning Project Review Loads and Resources Working Group

Western Electricity Coordinating Council Regional Planning Project Review Loads and Resources Working Group Western Electricity Coordinating Council Regional Planning Project Review Loads and Resources Working Group Demand Analysis of 215 Scenarios To Explore the Range of Need for a Canada/Pacific Northwest

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Chapter 2. Direct Testimony of Joseph P. Hoerner and Shayleah J.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Chapter 2. Direct Testimony of Joseph P. Hoerner and Shayleah J. Investigation No. -0-0 Exhibit No. Witnesses: Joseph P. Hoerner and Shayleah J. LaBray BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP Chapter Direct Testimony of Joseph P.

More information

NWPP Market Assessment and Coordination Initiative

NWPP Market Assessment and Coordination Initiative NWPP Market Assessment and Coordination Initiative ColumbiaGrid Board of Directors Meeting October 17, 2012 Patrick Damiano, Vice President, Development Activities Leading Up to the Launch of the Market

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF A COMMISSION ) INVESTIGATION INTO THE FEASIBILITY ) OF PUBLIC SERVICE COMPANY OF NEW ) MEXICO BECOMING A MEMBER OF THE ) Case No. 17-00261-UT

More information

NORTHERN TIER TRANSMISSION GROUP (NTTG) BIENNIAL TRANSMISSION PLAN. DRAFT SUMMARY REPORT - January 2013

NORTHERN TIER TRANSMISSION GROUP (NTTG) BIENNIAL TRANSMISSION PLAN. DRAFT SUMMARY REPORT - January 2013 NORTHERN TIER TRANSMISSION GROUP (NTTG) 2012-2013 BIENNIAL TRANSMISSION PLAN DRAFT SUMMARY REPORT - January 2013 Executive Summary: This report summarizes the findings of power flow studies to determine:

More information

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL (NERC)

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL (NERC) NORTHWEST POWER POOL Reliability through Cooperation 2006 2 NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL (NERC) NERC is a not-for-profit company formed as a result of the Northeast blackout in 1965 to promote

More information

Comments of Powerex Corp. on Draft Regional Resource Adequacy Framework Proposal Submitted by Company Date Submitted

Comments of Powerex Corp. on Draft Regional Resource Adequacy Framework Proposal Submitted by Company Date Submitted Comments of Powerex Corp. on Draft Regional Resource Adequacy Framework Proposal Submitted by Company Date Submitted Mike Benn 604.891.6074 Powerex Corp. January 11, 2017 Powerex appreciates the opportunity

More information

Overview of Issues at the Western Electricity Coordinating Council (WECC)

Overview of Issues at the Western Electricity Coordinating Council (WECC) energy strategies Overview of Issues at the Western Electricity Coordinating Council (WECC) Focusing on those Issues Impacting Independent Generators Presented to The California Independent Energy Producers

More information

Seasonal Assessments and Modeling of Sub-100 kv Elements (Southwest Outage Recommendations 5, 6, 7 and NERC2) May 7, 2014

Seasonal Assessments and Modeling of Sub-100 kv Elements (Southwest Outage Recommendations 5, 6, 7 and NERC2) May 7, 2014 Seasonal Assessments and Modeling of Sub-100 kv Elements (Southwest Outage Recommendations 5, 6, 7 and NERC2) May 7, 2014 Background In April 2012, the Federal Energy Regulatory Commission (FERC) and the

More information

2005 Integrated Electricity Plan. Resource Options Workshop #2 Planning Criteria March 09, 2005

2005 Integrated Electricity Plan. Resource Options Workshop #2 Planning Criteria March 09, 2005 2005 Integrated Electricity Plan Resource Options Workshop #2 Planning Criteria March 09, 2005 Agenda for Presentation Introduction Review industry reliability standards and regulatory Generation Reliability

More information

Mid-C Seminar July 16 th, 2014

Mid-C Seminar July 16 th, 2014 NWPP Members Market Assessment and Coordination Initiative Mid-C Seminar July 16 th, 2014 Dan Williams, LC Chair, Portland General Electric Slides not reviewed or approved by MC Members 1 Agenda History

More information

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool 2016 Probabilistic Assessment December 5, 2016 Southwest Power Pool Table of Contents 1. Summary...2 a. SPP Planning Coordinator Footprint...2 b. Seasonal Capacity Totals... Error! Bookmark not defined.

More information

Transmission Planning Protocol of Western Electricity Coordinating Council s Transmission Expansion Planning Policy Committee

Transmission Planning Protocol of Western Electricity Coordinating Council s Transmission Expansion Planning Policy Committee D R A F T Transmission Planning Protocol of Western Electricity Coordinating Council s Transmission Expansion Planning Policy Committee 1 Purpose and Objectives This Protocol governs the transmission planning

More information

Table of Contents. To provide a methodology for determining the System Operating Limits (SOL) for the Planning Horizon at the California ISO.

Table of Contents. To provide a methodology for determining the System Operating Limits (SOL) for the Planning Horizon at the California ISO. Table of Contents Purpose... 1 Applicable Reliability Standard(s)... 1 Applicability to California ISO... 1 SOLs and IROLs... 1 Study Methodology... 2 Supporting Information... 6 Responsibilities... 6

More information

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development www.fourcornerswind.org Photo courtesy of Avangrid Renewables, LLC UNDERSTANDING REGIONAL ELECTRICITY

More information

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions... 8 Load... 8 Fuel Prices... 9 Resources... 9 Pacific

More information

California ISO Summer Loads and Resources Operations Assessment April 10, Grid Assets California ISO Version 3.0.

California ISO Summer Loads and Resources Operations Assessment April 10, Grid Assets California ISO Version 3.0. California Independent System Operator Corporation 2006 Summer Loads and Resources Operations Assessment April 10, 2006 Grid Assets Version 3.0 Table of Contents I. Executive Summary...2 Table 1 2006 ISO

More information

Seasonal Planning Process Revision Project Update February 15, Vic Howell Manager, Operations Engineering Support

Seasonal Planning Process Revision Project Update February 15, Vic Howell Manager, Operations Engineering Support Seasonal Planning Process Revision Project Update February 15, 2018 Vic Howell Manager, Operations Engineering Support Webinar Objectives Review the background for the project Review project objectives

More information

Transfer Capability Methodology. for the Near-Term. Transmission Planning Horizon

Transfer Capability Methodology. for the Near-Term. Transmission Planning Horizon Transfer Capability Methodology for the Near-Term Transmission Planning FAC-013-2 Version 2.2 June 30, 2018 Table of Contents 1 PURPOSE... 3 2 DEFINITION... 3 3 APPLICABILITY... 3 4 TRANSFER CAPABILITY

More information

Winter Reliability Assessment

Winter Reliability Assessment 216 217 Winter Reliability Assessment Table of Contents Preface 3 Key Findings 5 FRCC 9 MISO 1 MRO-Manitoba Hydro 11 MRO-SaskPower 12 NPCC-Maritimes 13 NPCC-New England 14 NPCC-Ontario 16 NPCC-Québec 17

More information

WECC Guideline 2016 Base Case Compilation Schedule Date: TSS Approved Meeting 170

WECC Guideline 2016 Base Case Compilation Schedule Date: TSS Approved Meeting 170 WECC Guideline 2016 Base Case Compilation Schedule Date: TSS Approved Meeting 170 Introduction The System Review Work Group (SRWG) compiles eleven steady state and dynamic base cases (base cases) to meet

More information

Regional Transmission Resources

Regional Transmission Resources APPENDIX E Regional Transmission Resources Contents 1. The Pacific Northwest Transmission System... E-2 2. PSE Transmission Efforts... E-6 3. BPA Transmission Efforts... E-7 4. Regional Transmission Efforts...

More information

Open Access Transmission Tariff ATTACHMENT K

Open Access Transmission Tariff ATTACHMENT K ATTACHMENT K PART I Introduction The Transmission Provider s (herein referred to as Tacoma Power) local transmission planning process will include open planning meetings that Tacoma Power will conduct

More information

COLUMBIAGRID 2018 SYSTEM ASSESSMENT DRAFT STUDY PLAN

COLUMBIAGRID 2018 SYSTEM ASSESSMENT DRAFT STUDY PLAN COLUMBIAGRID 2018 SYSTEM ASSESSMENT DRAFT STUDY PLAN January 11, 2018 ColumbiaGrid 8338 NE Alderwood Road, Suite 140 Portland, OR 97220 www.columbiagrid.org (503) 943-4940 8338 NE Alderwood Road, Suite

More information

California Grid Operations: Current Conditions and Future Needs

California Grid Operations: Current Conditions and Future Needs California Grid Operations: Current Conditions and Future Needs Jim Detmers Vice President, Operations Global Climate & Energy Project November 1, 2007 STANFORD UNIVERSITY Our objective today is identify

More information

(This page is intentionally'

(This page is intentionally' FORTISBC INC 2012-13 REVENUE REQUIREMENTS AND REVIEW OF ISP EXHIBIT C9-17 (This page is intentionally' left blank.) to ensure the reliability of the bulk power system The North American Electric Reliability

More information

Transmission and Renewable Energy

Transmission and Renewable Energy Transmission and Renewable Energy Yale Conference on the Environment Presented by Richard Sedano February 28, 2015 The Regulatory Assistance Project 50 State Street, Suite 3 Montpelier, VT 05602 Phone:

More information

REGIONAL TRANSMISSION RESOURCES

REGIONAL TRANSMISSION RESOURCES REGIONAL TRANSMISSION RESOURCES Contents I-2. OVERVIEW I-3. THE PACIFIC NORTHWEST TRANSMISSION SYSTEM Regional Constraints PSE Westside Transmission Constraints I-7. PSE TRANSMISSION EFFORTS Puget Sound

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO PROCEEDING NO. A- E IN THE MATTER OF THE APPLICATION OF BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, LP FOR () APPROVAL OF ITS 0 ELECTRIC

More information

Anchor Data Set (ADS) Definition, Benefits, Implementation and Management Ver. 6-Aug 15 th DRAFT Proposal only

Anchor Data Set (ADS) Definition, Benefits, Implementation and Management Ver. 6-Aug 15 th DRAFT Proposal only Anchor Data Set (ADS) Definition, Benefits, Implementation and Management Ver. 6-Aug 15 th 2016 DRAFT Proposal only Formal stakeholder review will begin August 24 th and remain open through September 12

More information

Full Network Model Expansion Second Revised Straw Proposal

Full Network Model Expansion Second Revised Straw Proposal October 30, 2013 Table of Contents 1 Changes from 9/11/2013 revised straw proposal... 3 2 Executive summary... 3 3 Introduction and purpose... 5 4 Plan for stakeholder engagement... 8 5 Scope of initiative...

More information

Boardman to Hemingway Transmission Line Project

Boardman to Hemingway Transmission Line Project Transmission Line Project Purpose and Need Meeting Summary South Advisory Area July 8, 2009 Four Rivers Cultural Center 676 SW 5th Avenue Ontario, OR 97914 Table of Contents Introduction... 3 Welcome and

More information

Organized Markets in WECC 4/18/18

Organized Markets in WECC 4/18/18 Organized Markets in WECC 4/18/18 Agenda Regional Markets Update Regional Market Activity EIM CAISO Mountain West Peak Reliability / PJM Implications for Resource Planning Resource adequacy Resource selection

More information

WECC Guideline 2018 Base Case Compilation Schedule Date: DRAFT

WECC Guideline 2018 Base Case Compilation Schedule Date: DRAFT WECC Guideline 2018 Base Case Compilation Schedule Date: DRAFT Introduction The Data Subcommittee compiles eleven steady state and dynamic base cases (base cases) to meet WECC s requirements to compile

More information

Platte River Power Authority. Ten-Year Transmission Plan ( )

Platte River Power Authority. Ten-Year Transmission Plan ( ) Platte River Power Authority Ten-Year Transmission Plan (2015-2024) Prepared by PRPA System Planning December 31, 2014 Table of Contents I. Executive Summary II. III. IV. Scope Assumptions Criteria V.

More information

Dynamic Transfers Dynamic Transfers for Renewable Energy in the Western Interconnection

Dynamic Transfers Dynamic Transfers for Renewable Energy in the Western Interconnection Dynamic Transfers for Renewable Energy in the Western Interconnection Western Renewable Energy Zones Initiative - Phase III Authors Kevin Coffee Jim McIntosh Kyle Hoffman Jamie Nagel June 2013 Prepared

More information

2010 Summer Reliability Assessment. the reliability of the. May 2010

2010 Summer Reliability Assessment. the reliability of the. May 2010 2010 Summer Reliability Assessment to ensure the reliability of the bulk power system May 2010 116-390 Village Blvd., Princeton, NJ 08540 609.452.8060 609.452.9550 fax www.nerc.com NERC s Mission The North

More information

Joint Initiative Update Joint Initiative = 3 regional transmission planning groups Columbia Grid Northern Tier Transmission Group WestConnect Constitu

Joint Initiative Update Joint Initiative = 3 regional transmission planning groups Columbia Grid Northern Tier Transmission Group WestConnect Constitu Acknowledgements Joint Initiative Update Joint Initiative = 3 regional transmission planning groups Columbia Grid Northern Tier Transmission Group WestConnect Constitutes much of the transmission in the

More information

DRAFT STUDY PLAN FOR 2018

DRAFT STUDY PLAN FOR 2018 DRAFT STUDY PLAN FOR 2018 Introduction The Ten-year transmission planning process is intended to facilitate a timely, coordinated and transparent process that fosters the development of electric infrastructure

More information

SPSC 2011 and 2012 Study Requests to WECC/TEPPC: Update for January 2013

SPSC 2011 and 2012 Study Requests to WECC/TEPPC: Update for January 2013 SPSC 2011 and 2012 Study Requests to WECC/TEPPC: Update for January 2013 # SPSC Request & Description TEPPC Case Study Program application 1 1. Reference Case: Utility IRPs and Plans (10- year) 2 2A. Scenario

More information

2018 Summer Reliability Assessment

2018 Summer Reliability Assessment Table of Contents Preface... 3 About this Report... 5 Key Findings... 6 Resource Adequacy... 7 Operational Challenges Impacting ERCOT... 9 Assessing At-Risk Capacity... 9 Operational Challenges Impacting

More information

Pacific Northwest Power Supply Adequacy Assessment for 2019 Final Report

Pacific Northwest Power Supply Adequacy Assessment for 2019 Final Report Pacific Northwest Power Supply Adequacy Assessment for 2019 Final Report May 7, 2014 Council Document Number 2014-04 1 Executive Summary The Pacific Northwest s power supply is expected to be close to

More information

U.S. DEPARTMENT OF ENERGY. Draft National Corridor Designations: Key Findings and Conclusions. April 26, 2007

U.S. DEPARTMENT OF ENERGY. Draft National Corridor Designations: Key Findings and Conclusions. April 26, 2007 RCC Meeting May 23, 2007 Agenda Item 8.1 U.S. DEPARTMENT OF ENERGY Draft National Corridor Designations: Key Findings and Conclusions April 26, 2007 Designation of a National Corridor: Represents a determination

More information

STATE OF THE INTERCONNECTION DIGEST

STATE OF THE INTERCONNECTION DIGEST SUMMER 217 STATE OF THE INTERCONNECTION DIGEST The State of the Interconnection is a snapshot of evolving trends in the Western Interconnection. Beginning in 217, the Western Electricity Coordinating Council

More information

2006 Long-Term Reliability Assessment. The Reliability of the Bulk Power Systems In North America

2006 Long-Term Reliability Assessment. The Reliability of the Bulk Power Systems In North America 2006 Long-Term Reliability Assessment The Reliability of the Bulk Power Systems In North America North American Electric Reliability Council October 2006 TABLE OF CONTENTS TABLE OF CONTENTS INTRODUCTION...4

More information

2005 Integrated Electricity Plan. Provincial IEP Committee Meeting #2 Planning Criteria February 22/23, 2005

2005 Integrated Electricity Plan. Provincial IEP Committee Meeting #2 Planning Criteria February 22/23, 2005 2005 Integrated Electricity Plan Provincial IEP Committee Meeting #2 Planning Criteria February 22/23, 2005 2005 IEP Objectives Means Objectives Ends (Fundamental) Objectives Agenda Items No net imports

More information

2012 Grid of the Future Symposium METHODOLOGY OF COMPUTING SIMULTANEOUS VARIABLE TRANSFER LIMITS ON MULTIPLE PATHS

2012 Grid of the Future Symposium METHODOLOGY OF COMPUTING SIMULTANEOUS VARIABLE TRANSFER LIMITS ON MULTIPLE PATHS 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium METHODOLOGY OF COMPUTING SIMULTANEOUS VARIABLE TRANSFER LIMITS ON MULTIPLE PATHS RAMU

More information

Ancillary Services Matrix

Ancillary Services Matrix Ancillary Services Matrix ERCOT Primary frequency response is not an Ancillary Service Market Product. All online Generation Resources must have their turbine governors in service and unblocked. is deployed

More information

Reduced Network Modeling of WECC as a Market Design Prototype

Reduced Network Modeling of WECC as a Market Design Prototype PAPER 2011GM0942 1 Reduced Network Modeling of WECC as a Market Design Prototype James E. Price, Member, IEEE, and John Goodin Abstract California s administration, legislature, and energy regulators have

More information

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals Loss of Load Expectation (LOLE) Fundamentals March 13, 2014 Last material update: 03/12/2014 LOLE Agenda 2 Loss of Load Expectation (LOLE) Fundamentals Sections LOLE Background LOLE Study Connections to

More information

Energy Imbalance Market Overview

Energy Imbalance Market Overview Energy Imbalance Market Overview Presentation to: Portland General Electric EIM OATT Stakeholder Meeting David Timson Account Manager CAISO Strategic Alliances October 14, 2016 Topics for Discussion ISO

More information

2012 Grid of the Future Symposium. Innovations in Bulk Power System Reliability Assessment: A North American View

2012 Grid of the Future Symposium. Innovations in Bulk Power System Reliability Assessment: A North American View 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium Innovations in Bulk Power System Reliability Assessment: A North American View M.G.

More information

the most promising locations for new renewables in the Imperial CREZ.

the most promising locations for new renewables in the Imperial CREZ. March 3, 2016 Imperial Irrigation District (IID) appreciates the opportunity to comment on the California Independent System Operator (CAISO) presentation during its 2/18/16 Stakeholder meeting discussing

More information

NORTHWESTERN ENERGY 2018 ELECTRICITY RESOURCE PROCUREMENT PLAN STRAWMAN 1

NORTHWESTERN ENERGY 2018 ELECTRICITY RESOURCE PROCUREMENT PLAN STRAWMAN 1 NORTHWESTERN ENERGY 2018 ELECTRICITY RESOURCE PROCUREMENT PLAN CHAPTER 1. EXECUTIVE SUMMARY STRAWMAN 1 1. Load Service Requirements a. Peaking Capacity (Planning Reserve Margin) b. Dispatchable Capacity

More information

Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation. Observations and Information Sharing

Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation. Observations and Information Sharing Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation Observations and Information Sharing Date: June, 2015 Prepared by: AESO Table of Contents Executive Summary...

More information

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report ERCOT Public 2016 LTRA Probabilistic Reliability Assessment Final Report November 21, 2016 Contents Summary... 1 Software Model Description... 3 Demand Modeling... 3 Controllable Capacity Demand Response

More information

SPP at a Glance. Located in Little Rock. Approximately 600 employees

SPP at a Glance. Located in Little Rock. Approximately 600 employees SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment

More information

2017 Summer Reliability Assessment

2017 Summer Reliability Assessment 2017 Summer Reliability Assessment Table of Contents Preface 3 About This Report 5 Key Findings 6 FRCC 17 MISO 18 MRO-Manitoba Hydro 19 MRO-SaskPower 20 NPCC-Maritimes 21 NPCC-New England 22 NPCC-New York

More information

2017 Study Program PC02: High Wind

2017 Study Program PC02: High Wind 2017 Study Program PC02: High Wind Bhavana Katyal 2 PC02: Modeling Logic Production Cost Model Scope Scope Key Questions Assumptions Increased Wind Generation Results Generation Mix/ Curtailment Dump Energy

More information

The RMATS footprint covers the States of Colorado, Idaho, Montana, Utah and Wyoming.

The RMATS footprint covers the States of Colorado, Idaho, Montana, Utah and Wyoming. On August 22, 2003, Wyoming Governor Dave Freudenthal and Utah Governor Michael Leavitt announced the formation of the Rocky Mountain Area Transmission Study (RMATS). They did so because the electric power

More information

Planning Coordinator and/or Transmission Planner TRANSMISSION SYSTEM PLANNING GUIDELINES

Planning Coordinator and/or Transmission Planner TRANSMISSION SYSTEM PLANNING GUIDELINES Planning Coordinator and/or Transmission Planner TRANSMISSION SYSTEM PLANNING GUIDELINES Effective Date: September 11, 2017 Revision History Date Version Description June 6, 1998 0.0 Initial LGEE document

More information

Functional Entity Roles and Responsibilities

Functional Entity Roles and Responsibilities Functional Entity Roles and Responsibilities NWPP MC Phase 3 Operations Integration Work Group 9/28/2014 Page 1 of 13 Table of Contents 1. Purpose... 3 2. Roles and Responsibilities of Functional Entities...

More information

2011 IRP Public Input Meeting. December 15, Pacific Power Rocky Mountain Power PacifiCorp Energy

2011 IRP Public Input Meeting. December 15, Pacific Power Rocky Mountain Power PacifiCorp Energy 2011 IRP Public Input Meeting December 15, 2010 Pacific Power Rocky Mountain Power PacifiCorp Energy Agenda 2011 IRP schedule update and next steps Resource portfolio development status Supply Side Resources

More information

Overview of Major US Wind Integration Studies and Experience

Overview of Major US Wind Integration Studies and Experience Overview of Major US Wind Integration Studies and Experience Presented at NCSL Midwest Wind Policy Institute Ann Arbor, MI June 14-15, 2007 J. Charles Smith Executive Director UWIG Outline of Topics Building

More information

Tucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE

Tucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE Tucson Electric Power 2017 Integrated Resource Plan Southern Arizona Regional Solar Partnership Jeff Yockey, PE May 2017 Integrated Resource Plan (IRP) Overview Just a Plan Additional steps for specific

More information

POTENTIAL MARKET CHANGES IN THE WESTERN INTERCONNECTION

POTENTIAL MARKET CHANGES IN THE WESTERN INTERCONNECTION POTENTIAL MARKET CHANGES IN THE WESTERN INTERCONNECTION A View from Peak s Pike Caitlin Liotiris November 7, 2017 State of Play in the Western Interconnection Group of utilities located mostly in Colorado

More information

Eastside Needs Assessment Report Transmission System King County Executive Summary December 2013

Eastside Needs Assessment Report Transmission System King County Executive Summary December 2013 Attachment 4 - Needs Assessment Eastside Needs Assessment Report Transmission System King County Executive Summary December 2013 PO BOX 97034, EST06W Bellevue, WA 98004 1-800-548-2614 Attachment 4 - Needs

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu, Engineer Transmission Contracts December 9, 2010 Content Attachment K Review Primary Contacts Economic Studies Process PSE Planning

More information

Regional Transmission Planning in the West. State-Federal RPS Collaborative Webinar Hosted by Clean Energy States Alliance October 5, 2011

Regional Transmission Planning in the West. State-Federal RPS Collaborative Webinar Hosted by Clean Energy States Alliance October 5, 2011 Regional Transmission Planning in the West State-Federal RPS Collaborative Webinar Hosted by Clean Energy States Alliance October 5, 2011 CEG State-Federal RPS Collaborative With funding from the Energy

More information

2016 SOL Methodology Revision Stakeholder Update November 29, Vic Howell Manager, Operations Engineering Support

2016 SOL Methodology Revision Stakeholder Update November 29, Vic Howell Manager, Operations Engineering Support 2016 SOL Methodology Revision Stakeholder Update November 29, 2016 Vic Howell Manager, Operations Engineering Support Webinar Objectives Recap accomplishments to date Provide a high level overview of draft

More information

Reliability Guideline

Reliability Guideline Reliability Guideline Modeling Distributed Energy Resources in Dynamic Load Models December 2016 NERC Report Title Report Date I Table of Contents Preface... iii Preamble... iv Purpose...1 Discussion of

More information

Adequate Summer Electricity Supplies Projected

Adequate Summer Electricity Supplies Projected Adequate Summer Electricity Supplies Projected Summer 2017 Reliability Assessment Overview The comprehensive reliability assessment conducted by the Northeast Power Coordinating Council, Inc. (NPCC) projects

More information

2016 Fall Reliability Conference MRO

2016 Fall Reliability Conference MRO 2016 Fall Reliability Conference MRO CAISO s Coordination, Tracking, and Monitoring Distributed Energy Resources Amber Motley; Manager, Short Term Forecasting November 2 nd, 2016 California ISO Overview

More information

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017 Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA March 21, 2017 Contents 1 Background...3 2 National and Regional Criteria and Guides...4 2.1 2.1 NERC Transmission Planning Standards...4 2.2

More information

Full Network Model Expansion Draft Final Proposal

Full Network Model Expansion Draft Final Proposal December 30, 2013 Table of Contents 1 Changes from 10/30/2013 second revised straw proposal... 4 2 Executive summary... 6 3 Introduction and purpose... 8 4 Plan for stakeholder engagement... 11 5 Scope

More information

January 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND:

January 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND: Henry Lorenzen Chair Oregon Bill Bradbury Oregon Guy Norman Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Jennifer Anders Montana Tim Baker Montana January 3, 2018 MEMORANDUM

More information

Production Cost Modeling for High Levels of Photovoltaics Penetration

Production Cost Modeling for High Levels of Photovoltaics Penetration National Renewable Energy Laboratory Innovation for Our Energy Future A national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Production Cost Modeling for

More information

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes) Background On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes) The CAISO s deliverability study methodology for resource adequacy purposes was discussed extensively in the CPUC

More information

2017/2018 Winter Reliability Assessment

2017/2018 Winter Reliability Assessment Version Date 2017/2018 Winter Reliability Assessment Errata 1.0 11/20/2017 Initial Version 1 Released Changes Received After Initial Release 1.1 12/08/2017 Added new findings regarding Aliso Canyon and

More information

2018/2019 Winter Reliability Assessment

2018/2019 Winter Reliability Assessment Table of Contents Preface... 3 About this Report... 4 Key Findings... 5 Internal Demand... 9 Regional Assessments Dashboards... 10 FRCC... 11 MISO... 12 MRO-Manitoba Hydro... 13 MRO-SaskPower... 14 NPCC-Maritimes...

More information

BES Notification Guideline

BES Notification Guideline BES Notification Guideline Guideline for Reviewing Self-Determined Notifications February 2014 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 Table of Contents Preface... iii Disclaimer...

More information

Review of Data Change Management Processes for RTCA and Planning Models (Recommendation 16) March, 2017

Review of Data Change Management Processes for RTCA and Planning Models (Recommendation 16) March, 2017 Review of Data Change Management Processes for RTCA and Planning Models (Recommendation 16) March, 2017 Background In April 2012, the Federal Energy Regulatory Commission (FERC) and the North American

More information

2011 Probabilistic Assessment. 11JAN12 Interregional Coordination

2011 Probabilistic Assessment. 11JAN12 Interregional Coordination The 2011 Probabilistic Assessment was a pilot study performed by SPP at NERC s request to voluntarily conduct an assessment to determine reliability indices using probabilistic methods. The majority of

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination of Ancillary Service Standards... 4 8.2.2 Time-Frame for Revising Ancillary Service

More information

NTTG Annual Interregional Information

NTTG Annual Interregional Information NTTG Annual Interregional Information Annual Interregional Coordination Meeting Folsom, CA February 22, 2018 NTTG Organization and Planning Process Overview Presented by Sharon Helms, NTTG Program Manager

More information

Western Interconnection Regional Advisory Body

Western Interconnection Regional Advisory Body Western Interconnection Regional Advisory Body January 24, 2008 Alberta Arizona British Columbia California Colorado Mexico Montana Idaho Nebraska Nevada New Mexico Oregon South Dakota Utah Washington

More information

2015 Operational Practices Survey Questions

2015 Operational Practices Survey Questions 2015 Operational Practices Survey Questions This document of survey questions has been provided as a courtesy. It is not the actual survey, which will be completed electronically and only by a designated

More information

Idaho Power s Transmission System. Greg Travis Nov. 8, 2018

Idaho Power s Transmission System. Greg Travis Nov. 8, 2018 Idaho Power s Transmission System Greg Travis Nov. 8, 2018 Presentation Outline Acronyms and definitions Energy Imbalance Market (EIM) Idaho Power s transmission system Path 14 ID-NW Open discussion Acronyms

More information

Jan Strack and Huang Lin March 14, 2017

Jan Strack and Huang Lin March 14, 2017 SDG&E Request for Economic Planning Study of the Renewable Energy Express Transmission Project as part of CAISO s 2017-2018 Transmission Planning Process (TPP) Jan Strack (jstrack@semprautilities.com)

More information

Common Case Process. Jon Jensen Staff Engineer System Adequacy Planning

Common Case Process. Jon Jensen Staff Engineer System Adequacy Planning Common Case Process Jon Jensen Staff Engineer System Adequacy Planning 2 Introduction: 2026 Common Case What is it? Year 10 focused Production Cost/Economic Dispatch (SCED) Model (GridView); 8760 hours

More information

2011 WIND LIMIT STUDY

2011 WIND LIMIT STUDY 2011 WIND LIMIT STUDY PREPARED FOR THE PUBLIC SERVICE COMPANY OF COLORADO 2011 ELECTRIC RESOURCE PLAN OCTOBER 31, 2011 TABLE OF CONTENTS SECTION 1 STUDY OBJECTIVE... 5 SECTION 2 SUMMARY... 5 SECTION 3

More information