1 Building from the ground up in West Africa The Hatch approach to projects in a developing country

2 2 Agenda 1. Hatch Contribution to West Africa Development 2. Three Recent Projects on Which We Worked 3. Enhancement of Environmental and Social Sustainability 4. Mitigation of Project Risks 5. Recognition of Local Constraints 6. For More Sustainable Projects

3 3 Hatch s Contribution to West Africa Development

4 Our Involvement in West Africa 4 We work in French, English, Arabic and various African dialects (Bambara, Dioula, Mooré); We design mining, metalurgical, industrial, railways, ports, power and water supply projects We assist in permitting, studies, engineering, procurement, construction and commissionning Past and current projects Business development

5 5 Our Step by Step Approach to Projects Concept (FEL1) Pre-feasibility (FEL2) Feasibility (FEL3) Design, procurement and construction (FEL4) Operation and maintenance Establish the scope of the project Confirm the cost of the project Invest in the project Make profits

6 6 Context of Projects in West Africa There is an increased focus for mining projects to address and incorporate social and environmental aspects into financing, engineering, design, procurement and construction. Giving proper attention to these issues during project development and execution, and maximizing opportunities is an ongoing but motivating challenge. When working in remote and extreme environments, projects are faced with specific requirements for engineering and project execution. The challenges are heightened when working in countries with a developing environmental regulatory framework, limited skilled workforce available for recruitment, and minimal infrastructure such as power, roads, and water. Social Environmental Financial

7 7 Three Recent Projects on Which We Worked

8 8 Tasiast Expansion Project Tasiast Mauritanie (TMLSA) is an operating gold mine wholly owned subsidiary of Kinross Gold Corporation The Tasiast expansion project consists of: Expansion of existing open pits into one overall pit Process / infrastructure: mill, Carbon-in-Leach (CIL) process plant, Tailings Storage Facility (TSF) and waste rock dumps Non-process infrastructure: warehouses, mine fleet shop, administration buildings, sewage treatment plants, R/O treatment plants, waste management facility, sea to site pipeline Hatch is the EPCM consultant, and has been working on the project since November 2010.

9 9 Confidential Mine Project in Burkina Faso Mining project in Burkina Faso with associated infrastructure in Côte d Ivoire. The project involves: Development of an open pit mine Process / infrastructure: crushing and screening plant, storage pads, residue stockpile and waste rock dumps Non-process infrastructure: warehouses, mine fleet shop, mine camp, fuel storage facility, explosive shed, administration buildings, laboratory, water treatment facility, loading station, port expansion. Hatch has participated in 2013 and 2014 in the FEL1 and FEL2 definition for material transportation and port infrastructures.

10 10 Koba-Koumbia Bauxite Project Koba-Koumbia, Guinea, project is a potential bauxite mine in exploration by Navasota Resources The Koba-Koumbia project consists of: Open pits recovery of high grade bauxite deposits Transportation by rail to port and marine shipping to costumers Non-process infrastructure: warehouses, mine fleet shop, administration buildings, mining camp complete with water supply, sewage treatment plants, R/O treatment plants Hatch is presently helping evaluating the economical, environmental and social feasibility of the project.

11 11 Enhancement of Environmental and Social Viability

12 Consideration of Flora and Fauna Sensitivities: on Tasiast Challenge Protected Species Identified protected species across the project site. Strategy Tree removal authorized under the EIA permit. Environmental training and management system includes awareness of environmental sensitivities. 12 Ecologically Sensitive Zones (ex. Banc d Arguin National Park) Project facilities are proposed for an area along the coast of Mauritania (running parallel to the park). Project commitment to preserve park. 5 km buffer zone has been established around the park boundary.

13 Protection of Cultural Heritage on Tasiast 13 A number of cultural heritage and archaeological sites have been identified across the mine area, and along the seawater intake pipeline route. The potential also exists to encounter undiscovered cultural heritage or archaeological resources (Chance Finds) when conducting construction activities such as excavating and site clearing. Archaeological sites are a finite and irreplaceable resource and all direct impacts are of long term duration. Procedures are developed and implemented during construction activities

14 Protection of Land Use in Burkina Faso 14 In the project, we select the preferred option for infrastructure to: Minimize economic displacement of land users: farmers, breeders, plants and fruits gatherers, etc. Ensure land replacement when occupied for industrial development purpose: replacement for land titles owners, longtime users without land title (often women) and tenants Ensure access to alternative land with similar soil quality and resources availability (water, pasture, access roads, etc.) Maintain consultation with project affected people before land occupation and to research of alternatives

15 15 Mitigation of Project Risks

16 16 Project Execution to minimize the impacts Throughout the project execution phase, management will be required for a wide range of aspects and issues, including but not limited to: Protection of the existing environment: wildlife, wildlife habitat, water resources, marine environment, cultural and archeological resources. Management of environmental issues: waste management, storage and handling of hazardous materials, maintenance of air and water quality, mitigation of noise and blast vibrations. Development of local communities: stakeholders engagement and relation, population re-settlement, site rehabilitation, local workforce and procurement.

17 17 Stakeholder Engagement state of the art Invest adequate resources (staff and budget) in stakeholder engagement Avoid narrowed consultation with community leaders Identify all the stakeholders including vulnerable groups or people (women, youth and migrants) Conduct separate meeting with each group Use appropriate consultation tools and adapt to local languages and usages Limit commitments to feasible projects/activities to manage expectations Tailor project design and corporate social responsibility initiatives on consultations outcomes

18 Air Quality Protection in desert areas 18 Dust and Sand Challenge Disturbed sand is easily dispersed by the wind during construction Strategy Driving only on designated routes (no offroad driving). Adhering to speed limits. Watering of roads, where practical. Site selection for camps and office buildings considers prevailing wind patterns and upstream emitters. Inductions help to appropriately prepare workers for living under desert conditions.

19 Water Management in developing regions 19 Water Management Challenge Precious resource especially in arid climate region and lack of groundwater resources in the vicinity of the project. Strategy Conservation is a priority. Drinking water requirements: Plastic water bottles are used for drinking water. Health and sanitation challenges with distributing re-usable water bottles: lack of re-fill stations, personal hygiene, how to wash bottles, prevalence of dust. Reviewing options to improve distribution of drinking water to construction workers.

20 20 Recognition of Local Constraints

21 Site Specific Conditions and cultural differences 21 Training is required for cultural sensitivity and cultural preparedness, so that ex-pats both respect the local customs, but also understand and are not offended by cultural differences. Mobilization of construction workforces should focus on this type of training. Key cultural differences impacting project execution: Schedule, Women in the workforce, Women in management roles On a case-by-case basis, projects may consider whether it is appropriate to offer information sessions on ex-pat cultures.

22 22 Challenges of Local Employment There are limited skills, training, and capacity within the local workforce to meet construction needs. Projects have high standards and expectations (international best practices) for health and safety, quality, engineering, environmental protection, etc. If expectations from the management team are not managed, this can create tension where locals are seen as under performing. Allowances are required in construction budget and schedule to provide on-the-job support and training as required.

23 Local Workforce Management Plan Establish Local Hiring Policy In urban centers (where & how) Through community relations Determine how skilled staff are hired; Standards, targets, requirements Recruitment Policy head hunters, agencies, private firms, etc. Workforce Evaluation Process ensuring transparency and accountability Apprenticeship Program setting standards for all contractors Employment conditions must be consistent and well defined Category of workers Senior Managers Exploration Mining Operation Operating Periods 1 st to 5 th year 6 th to 10 th year th to 15 th year 33% 20% 60% 80% 90% Managers 50% 30% 80% 90% 100% Qualified workers Unskilled workers Ex. Guinea National Employment Plan 66% 40% 80% 95% 100% 100% 100% 100% 100% 100%

24 24 Local Procurement of Goods and Services Identify appropriate work packages that can be sourced locally; Opportunities register Perform pre-screening of local groups: locally owned and operated, tax-paying entity, adequate degree of training Establish transparent and fair pre-screening process Steering Committee for pre-qualification process: technical expert, community relations, procurement, etc. Provide support to local contractors to insure standardized work results (remove barriers such as literacy, improve accessibility)

25 25 The Result: More Sustainable Projects

26 Rigorous Planning and Training, training and training 26 Concept (FEL1) Pre-feasibility (FEL2) Feasibility (FEL3) Design, procurement and construction (FEL4) Operation and maintenance Marketability and key risks Strategic environmental and regulatory advise Regulatory management plan Baseline environmental study Community engagement plan and consultation Environmental and social impact assessment Permits, approvals and licences Construction environmental management plan Resettlement and training plan Mitigation and compensation plans Operation environmental management plan Monitoring and follow-up

27 Our Differenciator The Value We Offer 27 U Strategic advisory role to adjust project scope and implementation strategy to financing and legislative constraints Project alignment with client s corporate & sustainable development (SD) strategy Value Hatch Advantage Sustainable Development (SD) Strategy complying with IFC standards Social acceptance, Environmental with Financial sustainability Environmental and social Impact Assessment (ESIA), permits, local employment and procurement Specialized technical studies and design, stakeholder commitment, design criteria Field work, data collection and analysis, sampling and monitoring, infrastructure design

28 28 Thank You Marie-Christine Patoine, M.A.Sc, P.Eng Hatch Environmental Services Group +1 (514)

We have a Local Content Plan now what?

We have a Local Content Plan now what? We have a Local Content Plan now what? An EPCM Perspective 2 Agenda What we already know Local Content Plan - A Case Study We have a local content plan now what? Continuous improvement Key Messages What

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT Environmental and Social Impact Assessment (ESIA) December 2017 Malingunde Graphite Project, Lilongwe District, Malawi Purpose of this document This document provides information

More information

EBRD Environmental and Social Action Plan

EBRD Environmental and Social Action Plan PR 1 Assessment and Management of Environmental and Social Impacts and Issues 1.1 to establish PIU and dedicate a responsible person (head of PIU) for coordination between the various departments so as

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

1 Environmental and Social Action Plan

1 Environmental and Social Action Plan 1 and Social Plan The table below constitutes the ESAP. It identifies the required actions during pre-construction, construction and operation of the project. of the actions is the responsibility of Koridori

More information

70 019oz 30 % 0.19Moz LTIFR 0.0. $19.1 million 32% $988/oz 11 % $1.14 million. MALARIA IncIDence RATE. 48 Randgold Resources ANNUAL REPORT 2017

70 019oz 30 % 0.19Moz LTIFR 0.0. $19.1 million 32% $988/oz 11 % $1.14 million. MALARIA IncIDence RATE. 48 Randgold Resources ANNUAL REPORT 2017 MORILA gold mine PRODuceD 70 09oz 30 % ToTAL cash cost $988/oz % LTIFR 0.0 PROFIT FROM MINING ACTIVITY $9. million 3% TOTAL RESERveS 0.9Moz MALARIA IncIDence RATE TO % DIRecT CONTRIBUTION TO COMMunITY

More information

Operations Mine Site, Tote Road and Railway

Operations Mine Site, Tote Road and Railway Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,

More information

Curriculum Vita NICHOLAS CARL STEVEN BRITISH MARRIED

Curriculum Vita NICHOLAS CARL STEVEN BRITISH MARRIED Curriculum Vita Family name: NICHOLAS First names: CARL STEVEN Date of birth: 5 TH AUGUST 1972 Nationality: BRITISH Civil status: MARRIED Profile An experienced environmental and social manager and Chartered

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Syvash Wind Farm Environmental and Social Action Plan (ESAP)

Syvash Wind Farm Environmental and Social Action Plan (ESAP) General Environmental, Social Governance (ESG) management 1. Ensure Compliance with National legislation and attain all relevant National Permits, including EIA permit for the Project and associated infrastructure

More information

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN Taking into account the findings of the ESDD, an Environmental and Social Plan (ESAP) has been developed

More information

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina

More information

Chapter 13 Management and Implementation

Chapter 13 Management and Implementation Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

Amulsar Gold Mine Project Environmental and Social Impact Assessment, Chapter 6 6 CONTENTS

Amulsar Gold Mine Project Environmental and Social Impact Assessment, Chapter 6 6 CONTENTS 6 CONTENTS 6.17 CULTURAL HERITAGE... 6.17.2 6.17.1 Project Activities Affecting Cultural Heritage... 6.17.2 6.17.2 Impact Prediction Methodology... 6.17.4 6.17.3 Predicted Magnitude of Potential Impacts...

More information

Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project

Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project Date: May 2015 Version: Final Version Appendix D: Environmental and Social Plan (ESAP) No. PR1 Assessment and Management

More information

ACACIA MINE OPERATION GÖKIRMAK COPPER MINE Executive Summary 2017

ACACIA MINE OPERATION GÖKIRMAK COPPER MINE Executive Summary 2017 ACACIA MINE OPERATION GÖKIRMAK COPPER MINE Executive Summary 2017 Document Name ACACIA-2017-E&S-GBP-ES Disclosure Date 29.09.2017 Prepared By Environment & Social Department EXECUTIVE SUMMARY Acacia Maden

More information

Grassy Mountain Gold Project Environmental Evaluation - Draft Outline

Grassy Mountain Gold Project Environmental Evaluation - Draft Outline Grassy Mountain Gold Project Environmental Evaluation - Draft Outline EXECUTIVE SUMMARY Brief description of the Applicant s proposed project and concise presentation of the results of the environmental

More information

Merian Gold Project. Environmental and Social Impact Assessment Public Meetings - August 2011

Merian Gold Project. Environmental and Social Impact Assessment Public Meetings - August 2011 Merian Gold Project Environmental and Social Impact Assessment Public Meetings - August 2011 Welcome & Introductions Purpose of Public Meeting: Inform interested groups about the Project Describe Merian

More information

TABLE OF CONTENTS. Page

TABLE OF CONTENTS. Page TABLE OF CONTENTS Page 1 PROJECT INTRODUCTION... 1-1 1.1 PROJECT BACKGROUND... 1-2 1.2 PROJECT PROPONENT... 1-2 1.3 PROJECT OVERVIEW... 1-3 1.4 PROJECT REGULATORY APPROVAL PROCESS... 1-4 1.4.1 Existing

More information

Source of requirement EBRD. - Each six months during construction - Annually during operation. Best practice EBRD PR 1

Source of requirement EBRD. - Each six months during construction - Annually during operation. Best practice EBRD PR 1 0 Submit report to the Bank on environmental, social, health and safety performance, including status of each ESAP element and other agreed activities. EBRD - Each six months during construction - Annually

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Environmental and Social Impact Assessment for Guinea Bauxite Mining, West Africa

Environmental and Social Impact Assessment for Guinea Bauxite Mining, West Africa Environmental and Social Impact Assessment for Guinea Bauxite Mining, West Africa Assignment Description SustainRisk was contracted in 2016 to prepare a comprehensive Environmental and Social Impact Assessment

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Environmental and Social Action Plan

Environmental and Social Action Plan Environmental and Social Plan Abbreviations AESR CESMP CWMP E&S EBRD EIA EP EPC (Contractor) ESAP ESMS EU IFC OHS OESMP PR PS RAP SEP SVO SPV O&M Contractor Annual Environmental and Social Report Beo Čista

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

SMARA Reclamation Standards Review

SMARA Reclamation Standards Review SMARA Reclamation Standards Review Focused Discussion SMARA Section 3704.1 - Performance Standards for Reclamation and Section 2711 Extraction of Minerals Essential to Well-Being of the State and the Needs

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact.

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact. Lapis Elite Consulting Services Text for Profile on Website Overview Lapis Elite Consulting Services provides a broad range of consultancy and professional services, including management consulting, organisational

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

EF10 Site Environmental Audit - 1 / 8

EF10 Site Environmental Audit - 1 / 8 EF10 Site Environmental Audit Site... Date... Internal/external audits 1. Have all corrective actions raised at previous audits been implemented (EF07)? O O O 2. Have actions taken been monitored to confirm

More information

Whabouchi Project: designed to account for both environmental, social and economic concerns

Whabouchi Project: designed to account for both environmental, social and economic concerns Whabouchi Project: designed to account for both environmental, social and economic concerns October 8, 2015 Simon Thibault Director Environmental and Social Responsibility Project Timeline from Now On

More information

TASI01079 Request for Quotation (RFQ) Process Water Tank Repair

TASI01079 Request for Quotation (RFQ) Process Water Tank Repair TASI01079 Request for Quotation (RFQ) Process Water Tank Repair Section 1 - Objectives of RFQ, Scope of Work and Pricing: TASIAST MAURITANIE LIMITED S.A. (TMLSA) has issued this RFQ in order to solicit

More information

Chapter 13 Management and Monitoring

Chapter 13 Management and Monitoring Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2

More information

GEORGIA URBAN ENERGY LTD

GEORGIA URBAN ENERGY LTD GEORGIA URBAN ENERGY LTD PARAVANI HYDROPOWER PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL AND SOCIAL ACTION PLAN Prepared by SRF Gamma Tbilisi, 2011 Paravani Hydropower Project

More information

September 2016 ID Competency Statement Type

September 2016 ID Competency Statement Type September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for

More information

Yeelirrie Uranium Project. Environmental Management

Yeelirrie Uranium Project. Environmental Management Yeelirrie Uranium Project Environmental Management Yeelirrie Uranium Project Yeelirrie is one of Australia s largest undeveloped uranium deposits. The deposit is located approximately 660 km north east

More information

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID)

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID) ENVIRONMENTAL IMPACT ASSESSEMENT (EIA) FOR THE PROPOSED GOLD (Au) EXPLORATION AND MINING PROJECT AT RANDEGI DISTRICT, BIRNIN GWARI L.G.A OF KADUNA STATE BY SANDCRETE ENGINEERING NIG. LTD Background Information

More information

Required Actions. Perform monitoring as described in the EMP.

Required Actions. Perform monitoring as described in the EMP. ENVIRONMENTAL AND SOCIAL ACTION PLAN in 1 Impact and Risk Assessment Recent environmental and social baseline data at an appropriate level of detail Perform monitoring as described in the EMP. Per EMP

More information

African Barrick Gold. Buzwagi Site Overview. November 2014

African Barrick Gold. Buzwagi Site Overview. November 2014 African Barrick Gold Buzwagi Site Overview November 2014 Contents 1. Introduction 2. Life of Mine 3. Processing Operations 4. Business Improvement Initiatives 5. Stakeholders 2 Agenda 1. Induction 2. Presentation

More information

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE As a member of the International Council on Mining and Metals (ICMM), Anglo American is required to adhere to the ICMM

More information

Imperial s Sarnia Products Pipeline

Imperial s Sarnia Products Pipeline Imperial s Sarnia Products Pipeline Waterdown to Finch Project Community Information Session Imperial s Waterdown to Finch Project Important infrastructure to the Greater Toronto and Hamilton Area (GTHA).

More information

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017 COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017 As a member of the International Counsel on Mining and Metals (ICMM), Anglo American adheres to the ICMM Assurance

More information

KINROSS GOLD CORPORATION Tasiast analyst & investor tour: Developing a world-class mine

KINROSS GOLD CORPORATION Tasiast analyst & investor tour: Developing a world-class mine October 3-4 2017 KINROSS GOLD CORPORATION Tasiast analyst & investor tour: Developing a world-class mine 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of

More information

GATSUURT GOLD MINE : ENVIRONMENTAL AND SOCIAL ACTION PLAN

GATSUURT GOLD MINE : ENVIRONMENTAL AND SOCIAL ACTION PLAN GATSUURT GOLD MINE : ENVIRONMENTAL AND SOCIAL ACTION PLAN DRAFT FOR DISCLOSURE PURPOSES. FINAL ESAP TO BE AGREED POST DISCLOSURE AND PRIOR TO FINANCING DECISION (Liabil/ PR1 Assessment and Management of

More information

Environmental and Social Review Summary. Dakar Port, DP World Container Terminal Modernization and Operation

Environmental and Social Review Summary. Dakar Port, DP World Container Terminal Modernization and Operation Environmental and Social Review Summary Dakar Port, DP World Container Terminal Modernization and Operation This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed in

More information

COCOA LIFE COTE D IVOIRE NEEDS ASSESSMENT. Executive summary

COCOA LIFE COTE D IVOIRE NEEDS ASSESSMENT. Executive summary COCOA LIFE COTE D IVOIRE NEEDS ASSESSMENT Executive summary April 2015 1. The purpose of the needs assessment A needs assessment is carried out for each Cocoa Life origin in the early stages of program

More information

UNITED STATES DEPARTMENT OF EDUCATION

UNITED STATES DEPARTMENT OF EDUCATION UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF CAREER, TECHNICAL, AND ADULT EDUCATION PROGRAM MEMORANDUM OCTAE 15-3 TO: FROM: SUBJECT: State Directors of Adult Education State Directors of Career and

More information

TA SIAST. A responsible mining operator in Mauritania

TA SIAST. A responsible mining operator in Mauritania TA SIAST A responsible mining operator in Mauritania THE TASIAST MINE HOW GOLD IS PRODUCED AT THE TASIAST MINE? The Tasiast mine, located in the north-western region of Inchiri in Mauritania, 300 kilometers

More information

Practical Action/Justine Williams. Technical Analyst - Humanitarian Energy Practical Action UK Recruitment Pack

Practical Action/Justine Williams. Technical Analyst - Humanitarian Energy Practical Action UK Recruitment Pack Practical Action/Justine Williams Technical Analyst - Humanitarian Energy Practical Action UK Recruitment Pack 1 Technical Analyst - Humanitarian Energy Role Renewable Energy Access for Refugee Camps Our

More information

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries IGF Geneva 2016 MPF-SDG Comparative Analysis Perrine Toledano CCSI, Head: Extractive Industries SDG and MPF: Can they connect? The Sustainable Development Goals (SDGs) form the post-2015 global development

More information

BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA)

BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) HSE specialists, environmental engineers, design engineers, project managers and senior project managers involved in conceptual design, Front-End

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Ilovica Project - Early Consultation with Stakeholders. September 2015

Ilovica Project - Early Consultation with Stakeholders. September 2015 Ilovica Project - Early Consultation with Stakeholders Objectives of the meeting A brief description of the Project Present the existing environmental and social conditions (before the project) Listen

More information

Draft Environmental and Social Action Plan (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs

Draft Environmental and Social Action Plan (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs Draft Action (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs No Action Risks, Project preparation, permits and licences I.1 Preparation of Organization for, including inter alia:

More information

DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)

DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP) KRUMOVGRAD GOLD MINE PROJECT, BULGARIA DUNDEE PRECIOUS METALS December 2014 Wardell Armstrong International Third Floor, 46 Chancery Lane, London, WC2A 1JE, United Kingdom Telephone: +44 (0) 20 7242 3243

More information

Draft Code of Construction Practice

Draft Code of Construction Practice Draft Code of Construction Practice This factsheet outlines how it is expected the nominated undertaker will manage the effects of the construction of the Proposed Scheme on communities and the environment

More information

Principles, standards, the mitigation hierarchy and no net loss. 06 November, Sebastian Winkler Forest Trends

Principles, standards, the mitigation hierarchy and no net loss. 06 November, Sebastian Winkler Forest Trends Principles, standards, the mitigation hierarchy and no net loss 06 November, 2013 Sebastian Winkler Forest Trends Definition Contents (i) Why BBOP & Why Principles (ii) The Standard (iii) Mitigation hierarchy

More information

The Vale Voice. Working together for a sustainable future

The Vale Voice. Working together for a sustainable future The Vale Voice Working together for a sustainable future This is the first in a series of newsletters created to keep you informed about Vale s proposed potash mine the Kronau Project. We are committed

More information

KINROSS 2013 CORPORATE RESPONSIBILITY REPORT 2013 DATA TABLES 2013 DATA TABLES

KINROSS 2013 CORPORATE RESPONSIBILITY REPORT 2013 DATA TABLES 2013 DATA TABLES 2013 DATA TABLES 2013 DATA TABLES 125 Aggregate Corporate Performance Data 1,2,3 Ore Processed (Tonnes) 150,251,000 145,445,000 126,912,000 106,674,000 92,646,000 Attributable Gold Production (Gold equivalent

More information

ENVIRONMENT INDUCTION. Section 5

ENVIRONMENT INDUCTION. Section 5 ENVIRONMENT INDUCTION Section 5 1 Overview Environmental Legal Obligations Environment Policy Environmental Commitment InSitu Recovery (ISR) Mining Low Environmental Impact Monitoring and Reporting Environmental

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

EIS TABLE OF CONTENTS

EIS TABLE OF CONTENTS EIS TABLE OF CONTENTS GLOSSARY OF TERMS... GL-1 Glossary and Abbreviations... GL-1 Units... GL-14 EXECUTIVE SUMMARY... ES-1 INTRODUCTION... ES-1 PROJECT PROPONENTS... ES-1 LOCATION... ES-1 PROJECT DESCRIPTION...

More information

Telephone Lake project

Telephone Lake project Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations

More information

URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI

URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI OUTLINE Introduction History of Mining in Malawi Operations

More information

North Carolina WIOA Leadership Resources. North Carolina Professional Development Series. WIOA Partners

North Carolina WIOA Leadership Resources. North Carolina Professional Development Series. WIOA Partners North Carolina WIOA Leadership Resources North Carolina Professional Development Series WIOA Partners Who are the required WIOA Partners? 1. Programs authorized under WIOA Title I I. Adults; II. Dislocated

More information

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT APPENDIX

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

Performance Requirements

Performance Requirements Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing

More information

Kintyre uranium project. Environmental management

Kintyre uranium project. Environmental management Kintyre uranium project Environmental management Kintyre uranium project Kintyre is an advanced-stage exploration project located in the remote East Pilbara region of Western Australia, approximately 80km

More information

Stakeholder Engagement

Stakeholder Engagement / Lonmin Plc Supplementary Report 07 Stakeholder Engagement This report provides further information regarding Lonmin s stakeholder engagement initiatives and supplements the 07 Sustainable Development

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background Terms of Reference for a Cumulative Impacts Assessment in Baganuur Coal Mine in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014

More information

WHAT IS THE SMALL MINE CONCEPT AND THE MAJOR ISSUES?

WHAT IS THE SMALL MINE CONCEPT AND THE MAJOR ISSUES? WHAT IS THE SMALL MINE CONCEPT? BASIS OF STUDY WHAT ARE THE FEATURES OF THIS CONCEPT COMPARED TO ECHO BAY S ORIGINAL CONCEPT? WHAT ARE ISSUES RELATED TO REOPENING THE AJ? THE AJ MINE PRODUCTION RATE MINING

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction Additional Financing for Third East West Highway Improvement Project EXECUTIVE

More information

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall.

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water

More information

GREATER RHODE ISLAND WORKFORCE DEVELOPMENT BOARD

GREATER RHODE ISLAND WORKFORCE DEVELOPMENT BOARD 1 GREATER RHODE ISLAND WORKFORCE DEVELOPMENT BOARD REQUEST FOR INFORMATION (RFI) FOR: ONE STOP OPERATOR SERVICES OR ONE STOP OPERATOR SERVICES AND PROVIDER OF ADULT AND DISLOCATED WORKER PROGRAMS AND SERVICES

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

EAGLE S NEST PROJECT

EAGLE S NEST PROJECT A Federal/Provincial Environmental Impact Statement/Environmental Assessment Report Draft Copy December 20, 2013 VOLUME 1 EXECUTIVE SUMMARY PAGE EXECUTIVE SUMMARY... 1-1 1 INTRODUCTION... 1-1 1.1 PROJECT

More information

Document Owner: Head of Group HR Services

Document Owner: Head of Group HR Services Version No Revision Date Reason for Revision 001 March 2016 Initial Version Directorate: Property & Development Division Variable Reports To: Team Leader Grade: Apprentice Rate Job Evaluation Number Responsible

More information

CRUCEA NORTH WIND POWER PLANT

CRUCEA NORTH WIND POWER PLANT ENVIRONMENTAL AND SOCIAL ACTION PLAN CRUCEA NORTH WIND POWER PLANT Draft for public comment September 2013 ENVIRONMENTAL AND SOCIAL ACTION PLAN The European Bank for Reconstruction and Development (EBRD),

More information

SNTGN TRANSGAZ SA MEDIAS. ESAP BRUA Version 3 1

SNTGN TRANSGAZ SA MEDIAS. ESAP BRUA Version 3 1 SNTGN TRANSGAZ SA MEDIAS ROMANIAN SECTION OF THE BULGARIA-ROMANIA-HUNGARY-AUSTRIA NATURAL GAS TRANSMISSION CORRIDOR (BRUA PIPELINE PROJECT) DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN No. (Liab/Benefits)

More information

Mining & Metals - EPCM

Mining & Metals - EPCM www.beca.com Mining & Metals - EPCM We make things happen. Problem-solvers with a passion for transforming our world. Beca Mining & Metals Beca is a leading provider in the mining and metals market across

More information

Environmental Design Criteria for Project Engineering

Environmental Design Criteria for Project Engineering Environmental Design Criteria for Project Engineering Argentina Mining, Salta, September 2018 Simon Catchpole, February 2016 An Environmental Risk Model In the EA phase, the environmental professionals

More information

Kintyre uranium project. Environmental management

Kintyre uranium project. Environmental management Kintyre uranium project Environmental management Kintyre uranium project Kintyre is an advanced-stage exploration project located in the remote East Pilbara region of Western Australia, approximately 80km

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

Socio-Environmental Impacts of Mining Social Impact Key Issues

Socio-Environmental Impacts of Mining Social Impact Key Issues MEA 2006 V 1.0 08/2006 Socio-Environmental Impacts of Mining Social Impact Key Issues David Brereton Social Impact Key Issues What are social impacts? The term social impacts refers to the effects positive

More information

External Publication of Job Posting

External Publication of Job Posting External Publication of Job Posting 50379409 Job Posting Title Director Human Resources Management Start Date 04.04.2018 End Date 14.05.2018 Reference Code BDCP2018040412 Job Title Director Human Resources

More information

Human resources policies and employee documentation Guidance note

Human resources policies and employee documentation Guidance note EBRD Performance Requirement 2 Labour and working conditions Human resources policies and employee documentation Guidance note This document contains references to good practices; it is not a compliance

More information

Request for Proposal. Research Consultant. RELEASE DATE» September 2018

Request for Proposal. Research Consultant. RELEASE DATE» September 2018 Request for Proposal Research Consultant RELEASE DATE» September 2018 1 Table of Contents Introduction... 2 About PetroLMI... 2 Project Background, Objectives and Scope... 2 Consultant Selection Process...

More information

Mining & Communities

Mining & Communities Mining & Communities Supporting human rights-based development in the context of industrial mining in Guinea Abridged version of the Practical guide for civil society organizations and local authorities

More information

Chapter 14 Overall Project Assessment

Chapter 14 Overall Project Assessment Chapter 14 Overall Project Assessment TABLE OF CONTENTS 14 OVERALL PROJECT ASSESSMENT... 14-1 14.1 Introduction... 14-1 14.2 Development of the ESIA... 14-1 14.2.1 Adopted Process... 14-1 14.2.2 Challenges

More information

MMRP for Metro Red/Purple Line Core Capacity Improvements Project

MMRP for Metro Red/Purple Line Core Capacity Improvements Project MMRP for This (MMRP) contains mitigation measures for the Red/Purple Line Core Capacity Improvements Project, which will be approved by the Los Angeles County politan Transportation Authority () Board

More information

The Halifax Harbour Solutions Project Provision of Sewage Treatment

The Halifax Harbour Solutions Project Provision of Sewage Treatment The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised

More information

Environmental and social sustainability services

Environmental and social sustainability services Environmental and social sustainability services Protecting our planet and your bottom line Environmental & social sustainability PRECISE. PROVEN. PERFORMANCE. 1 Environmental & social sustainability Environmental

More information

Environmental and Social Impact Assessment in Countries with Limited Regulatory Frameworks: Lessons from the Democratic Republic of the Congo

Environmental and Social Impact Assessment in Countries with Limited Regulatory Frameworks: Lessons from the Democratic Republic of the Congo Environmental and Social Impact Assessment in Countries with Limited Regulatory Frameworks: Lessons from the Democratic Republic of the Congo Benoit Vanwelde, Taea Calcut, and Hannah Young Environmental

More information

TRANSPORT and INFRASTRUCTURE

TRANSPORT and INFRASTRUCTURE The Resource Management Act allows district and regional plans and policy statements to enable people and communities to provide for their economic, cultural and social well being (that is part of the

More information