1 Please cite as : hen. S., jordjević S., Leandro J. and Savić. (2007). The urban inundation odel with bidirectional The urban inundation odel with bidirectional flow interaction between 2 overland surface and 1 sewer networks Le odèle d'inondation urbain avec interaction des flux bidirectionels entre 2 surfaces éergées et 1 réseaux d'égout lbert S. hen, Slobodan jordjević, Jorge Leandro, ragan. Savić entre for Water Systes, University of xeter Harrison uilding, North Park Road, xeter, X4 4Q, United Kingdo RÉ SUMÉ et article développe un odèle nuérique intégrant surface et égouts pour l'étude des processus de ruisselleent en ilieu urbain. Les courbes précipitations ruisselleent et les conditions d'écouleent dans les réseaux de drainage sont basées sur le odèle 1. Les écouleents en surfaces sont déterines par le odèle 2. ien que les deux odèles soient résolus par des algorithes différents et a des échelles différentes, la connection est possible, par l'interédiaire des bouches d'égouts. Les effluents et influents au travers de ces dernières sont déterines par les équations correspondant aux déversoirs et orifices. fin de garantir un interfaçage adéquats, un soin particulier est consacre a la synchronisation teporelle entre les odèles. STRT n integrated nuerical odel is developed in the study for siulating the runoff processes in urban areas. 1 odel is used for calculating the rainfall-runoff hydrographs and the flow conditions in drainage networks. 2 odel is eployed for routing flow on overland surface. oth odels are solved by different nuerical schees and using different tie steps with the flow through anholes adopted as odel connections. The effluents and influents via anholes are deterined by the weir or the orifice equations. Tiing synchronisation between both odels is taken into account to guarantee suitable odel linkages. KYWORS adaptive tie step, coupled odels, tiing synchronisation, urban flood 1. INTROUTION In urban areas, the stor sewer networks are coonly built for conveying runoffs caused by pluvial rainfall. Therefore, the condition of stor sewer syste is highly related to its perforance with respect to sewer flooding. Many odels have been developed for assessing the hydraulic perforance of drainage networks. The Stor Water Manageent Model (SWMM) developed by the U.S. nvironental Protection gency (Rossan et al. 2005) is coonly used not only for hydraulic evaluation but also for water quality odelling in sewage systes (Ha et al. 2003). ecause SWMM is a freeware, its hydraulic engine is widely used in coercial software, including P SWMM (oputational Hydraulics Int. 2002), XP SWMM (XP Software Inc. 2002) and MIK SWMM (HI Software 2002). In addition, various other software packages that use other hydraulic solvers, such as MOUS (HI Software 2003) and Infoworks-S (Wallingford Software Ltd. 2006), exist. Most of those odels use the water stage-volue curve to deterine the flood depth caused by anhole surcharge, but cannot properly siulate the water oveent on the ground surface. Hence, the dual drainage concept has been often introduced to describe the flow interactions between the above ground and below ground systes (jordjević et al. 1999; Nasello and Tucciarelli 2005). Natural flow paths and retention basins are regarded as the ajor drainage syste for routing the surface flow, while sewer pipes, anholes and inlets are considered as the inor drainage syste for conveying the sub-surface flow. oth drainage systes are odelled by 1 hydraulic odels and linked through anholes and inlets to reflect the bi-directional interactions between subsurface and surface networks (olle et al. 2006; Mark et al. 2004; Schitt et al. 2005). When the ajor drainage syste capacity is insufficient to handle the runoff caused by pluvial events, the overland flow occurs. The 1 odelling approaches are usually liited to circustances where overland flows are confined to predeterined flow paths, while the 2 overland flow odels should be eployed to siulate the oveent of surface runoff caused by large surcharges (arr and Sith 2006; hen et al. 2005; ey and Kaioka 2006; Horritt and ates 2002).

2 Please cite as : hen. S., jordjević S., Leandro J. and Savić. (2007). The urban inundation odel with bidirectional 2. MTHOOLOY In this study, flows in drainage pipes and over the ground surface were routed by the 1 sewer network odel SIPSON (jordjević et al. 2005) and the 2 overland flow odel UIM (hen et al. 2005), respectively. oth odels use different nuerical schees and tie steps with the discharge through anholes adopted as odel linkages. The drainage runoff and surcharge effluents were calculated by SIPSON for every tie step and treated as point sinks and sources, correspondingly, in the UIM odel within the sae tie interval. ischarges are deterined by weir or orifice equations by taking account of the hydraulic heads at anholes and ground surface SIPSON SIPSON consists of two coponents, the hydrological and the hydraulic odels. The hydrological odel, MUS (Radojković and Maksiović 1984), was developed for coputing rainfall-runoff hydrographs for sub-catchents to be used as inputs for anholes in the hydraulic odel. The hydraulic odel is used to analyse the dynaic flow behaviour in 1 drainage networks. It siultaneously solves continuity equations for network nodes, energy equations for nodes and pipe/channel ends, the coplete Saint Venant equations for flow in conduits and streets, and equations for other link types (pups, weirs, etc.) UIM UIM siulates flow oveents on the ground surface. The 2 non-inertia flow equations, which are a siplified for of the Saint Venant equations, are adopted in the odel. The conveyance reduction factor based on the building coverage ratio and the storage volue of underground structures are considered in UIM to reflect the influences caused by buildings on flow oveents. Like any other 2 odels, the coputing of overland flow is tie-consuing when the proposed odel is applied to cases with assive nuber of grids. onsequently, the adaptive tie step is introduced to speed up the siulations. The tie step in the 2 odel is adjusted autoatically based on the ourant criterion (Hunter et al. 2005; Yu and Lane 2006) such that larger tie steps could be chosen whenever the nuerical stability is satisfied. The tie step used in SIPSON is generally larger than the ones used for UIM. The default and upper bound of tie steps in UIM are the sae in SIPSON, i.e., t t 0 1d. y the end of coputation for each tie step, the ourant condition is checked based on the latest calculated water depth and velocities for setting the next tie step: x t 1 (1) gd u t 1 gd y v where, is the index of the tie step; t is the estiated tie step length [s] used in UIM for 1 th step; 1 d h z is the water depth [] of the coputing grid at th step; u and v are velocity coponents [/s] along x and y directions, respectively. Theoretically, qs. (1) and (2) should be verified grid by grid for having the best value over the entire doain, nevertheless, the global axiu values d 2 d _ ax, u 2 d _ ax, and v2 d _ ax are deeed to be satisfactory and are used for saving the coputing effort Model linkage Two distinct odels are cobined for siulating the flow dynaics in sewer networks and on overland surface. The odels are executed individually and linked by exchanging inforation obtained at proper locations and ties for appropriate linkages. In this study, the grids containing anholes are considered as the locations where interactions occur. The tie step used in SIPSON is also regarded as the tiing for odel linkage Interacting discharge The bidirectional interacting discharge is calculated according to the water level difference between sewer network and overland surface. The upstrea and downstrea levels for deterining discharge are defined as hu ax hh, h2 d and h in hh, h2 d, respectively, where h h is the hydraulic head [] at anhole and h is the water surface elevation [] on the overland grid. The ground levels acquired fro sewer network dataset usually differ fro the values extracted fro the digital terrain odel (TM). oth values are correct because they represent different attributes of the syste. The ground level z h top [] used in sewer odel reflects the point value on the top of a anhole, whereas, the grid elevation z [] in the overland flow odel stand for the average level of the topography within a grid. Inconsistency between two datasets is often present when the anhole is located at local peak or depression inside the grid as shown in igure 1. z Physical terrain z htop z htop Physical terrain z (2) Surface rid Surface rid igure 1 Inconsistency between top elevation of anhole and averaged grid elevation The crest elevation zcrest ax{ zh, z2 } top d [] is, therefore, defined for coputing the discharge between both odels. Three types of linkages are considered for applying different discharge equations. ree weir linkage

3 Please cite as : hen. S., jordjević S., Leandro J. and Savić. (2007). The urban inundation odel with bidirectional The free weir equation is adopted when the crest elevation z crest is between the values of the upstrea water level and the downstrea water level h, as shown in igure 2. The discharge is calculated by using q. (3). Q sign h h c w g h z (3) 3 2 h w 2 U crest where, Q is the interacting discharge [ 3 /s], whose positive value eant surcharge flow fro sewer toward overland and negative value eant drainage flow fro surface into sewer; c w is the weir discharge coefficient; w is the weir crest width []; and g is the gravitational acceleration [/s 2 ]. h h igure 2 ree weir linkages Suberged weir linkage The suberged weir equation is used (igure 3) when both water levels at anhole and overland grid are greater than the crest elevation and the upstrea water depth above the crest, hu zcrest, is less than h / w, where h is the anhole area [ 2 ]. q. (4) is eployed for deterining the interacting discharge. 1 2 Q sign h h c w g h z h h (4) h w 2 U crest U h h igure 3 Suberged weir h / w or orifice h / w linkages U h Orifice linkage The anhole is considered fully suberged (igure 3), when the upstrea water depth above the crest hu zcrest is greater than h / w for the suberged weir linkages. The orifice equation is used for calculating the interacting discharge. 1 2 Q sign h h c g h h (5) h o h 2 U where, c o is the orifice discharge coefficient Tiing synchronisation The flow dynaics in drainage networks and overland surface are solved by two separate odels using different tie steps. The tiing synchronisation becoe an iportant issue for connecting both odels appropriately, in particular because variable tie steps are used. The exact values in both odels are exchanged at the sae tie, as shown in igure 4, to prevent unnecessary errors being introduced to odel counication. The estiated tie step t, by 1 using qs. (1) and (2), is restricted to q. (6) for atching the next synchronisation tiing. t 2 ax ( d ), synl d i di (6) 1 where, t is the tie step size [s] used for 1 th step; T 1 syn l is tie of the previous ( l th ) synchronisation [s]; t i1 is the total length of tie steps [s] after steps of calculations in UIM; ( T ) i syn t l 1d t i1 is the tie left i [s] before next ( l 1 th ) synchronisation. t 0 t T synl t 1d Synchronised syn l 1 t T Synchronised U h t t t i1 i Synchronised Unsynchronised 3. PPLITION igure 4 Synchronized and unsynchronized tiing between 1 and 2 odels Two exaples are presented: the artificial study area that was eployed to analyse and discuss the detailed flow interactions and odel application to the real world case study. The intention was to test whether the proposed odel can effectively and siultaneously describe the bidirectional flow interactions and the surface runoff oveents Idealised case study The idealised artificial case was used to deonstrate the ability of the proposed odel to siulate bidirectional interactions between the sewer network and overland surface. The 1500 x study area shown in igure 5 consisted of three inclined planes. Surface slopes were 0.002, and in x-direction and in y-direction. Ten anholes and ten pipes were installed for draining the surface runoff and the sub-catchents (shown in igure 5).

4 Please cite as : hen. S., jordjević S., Leandro J. and Savić. (2007). The urban inundation odel with bidirectional 1 had the lowest elevations of the ground surface and the drainage syste, and was connected to the outlet. 3 was located in a local depression 0.4 below the elevation of the exit point. subcatchent levation anhole pipe igure 5 levation, drainage network and sub-catchents of idealised case The design rainfall intensity for the drainage syste was 10 /h. six-hour rainfall event was applied herein for siulation. The rainfall intensity started fro zero and increased to 20/h in the first hour, kept constant for four hours, and decreased to zero in the sixth hour. The duration of nuerical experient was 12 hours to siulate the receding process of surface inundation. The rainfall-runoff hydrographs were calculated by MUS and iposed as inflows at anholes. igure 6-(a) reveals that anholes becae surcharged when the inflow discharge had exceeded the design capacities of pipes and the hydraulic head had reached the surface elevation. The surcharged flow spread along the ground surface toward lower elevations and caused surface inundation as displayed in igure 6-(b). The overflow between sub-catchents occurred when the flood extent reached the lowest exit point of the sub-catchent boundary as shown in igure 6-(c). The surface runoff kept oving on overland until it reached a downstrea anhole where the hydraulic head was below the surface elevation and the drainage capacity was available. fter the rainfall stopped, the flows in sewer pipes began decreasing such that the flood extent was reduced as a consequence of the surface runoff had returned to the sewer syste. (a) T = 0.75 h (b) T = 2.00 h (c) T = 5.50 h 3.2. Keighley case study (d) T = h igure 6 Siulation results of idealised case The Stockbridge region in Keighley (radford, UK) shown in igure 7-(a) was chosen for practical application. The region between the River ire in the south and the Leeds and Liverpool anal in the north is a flood prone area. The northeast part next to the anal is residential area with dense buildings. The rest of the region is green lands with a pond situated next to the River ire. The ajor stor drainage syste passes along the roads in residential area, as highlighted in igures 7-(b-e),. The fluvial flooding fro the River ire was the ajor factor that led to inundation in the region. Nevertheless, the analysis was focused on the consequence of a pluvial event in this study. n extree rainfall was assued in the upstrea catchents and within the region. The resulting runoff was too large for the drainage syste capacity. The TM with buildings was obtained fro the LiR data, and resapled as 2 x 2 grid resolution for overland flow siulation. The tie steps ranged fro 0.5s to 5s with an average 0.732s which eant that the adaptive tie steps saved around 31% of coputing effort copared to using the unifor iniu step size in UIM. The flow surcharged fro s, and oved along the surface toward lower lying areas. Not only the preidentified pond was filled but also two other inor depressions were inundated. The water was trapped in the ponds and flood extent kept increasing due to the lack of drainage inlets inside ponds. The flow surcharged fro anholes,, and was confined by the buildings and oved along the streets until it reached downstrea anholes where the drainage capacity was available. Part of the water was detained in local depressions next to the buildings near. The siulation results clearly indicated the potential inundation area caused by pluvial rainfall although there was no overbank flooding fro the channels.

5 Please cite as : hen. S., jordjević S., Leandro J. and Savić. (2007). The urban inundation odel with bidirectional Leeds & Liverpool anal (b) Siulation result at T = 30 in (c) Siulation result at T = 40 in Pond River ire (a) Stockbridge region in Keighley (d) Siulation result at T = 50 in (e) Siulation result at T = 120 in igure 7 Study area and siulation results of an extree rainfall event in the Stockbridge region (sewer pipes shown in yellow, various shades of blue indicate different water depths) 4. ISUSSION N ONLUSIONS The initial rainfall-runoff processes, including fro rainfall to surface runoff, fro surface runoff to drainage inlets, fro inlets to gullies, and fro gullies to ajor anholes, were siplified and calculated by using hydrological odel in the study. In other words, it was assued that the surface runoff was collected and conveyed directly to ajor anholes. onsequently, the overflows occurring at the ost upstrea anholes in both study cases were due to the concentrated runoff and the insufficient capacities of sewer pipes such that the surface runoff could not enter the drainage syste. Those overflows were actually excess runoff rather than surcharges. The surcharged runoff was not allowed to return to the sewer syste until it reached a ajor anhole. The assuption was ade due to lack of detailed inlet inforation and siplifications of the initial rainfall-runoff processes. In reality, the surface runoff in urban area is collected by distributed inlets and conveyed to ajor anhole via gullies. Therefore, if the inlets were taken into account in the Stockbridge case, the flood water in local depressions next to buildings could be drained and returned to the sewer syste. y taking the sewerage flow coponent and the overland runoff coponent into account, the proposed odel siulates the coplex flow processes on overland surface of pluvial flooding cases better than the approach that uses 1 odel only. Presented results illustrate several issues inherent to coupled 1-2 odelling of urban flooding. Linkages between the two odels should be forulated carefully by taking care of the physical situation and by ensuring appropriate tie synchronisation. dequate spatial resolution is iportant, both in ters of the nuber of inlets taken into account (1 odel) and the surface grid size (2 odel). oarse resolution ay cause unrealistic results such as ponds not being drained or the influence of buildings not represented accurately, whereas too detailed resolution ay ake the siulation unacceptably slow. ased on a range of case studies, further research will focus on addressing these issues and on the objective coparison between results obtained by the presented 1-2 approach and different 1-1 odels. 5. KNOWLMNTS The work is supported by the PSR s prograe lood Risk Manageent Research onsortiu: (Work Package 6.1): rant R/S76304/01. LIST O RRNS olle,., euynck,., Willes, P., outeligier, R., osch, M. S., Verwey,., and erlaont, J. (2006) Hydraulic odelling of the twodirectional interaction between sewer and river systes. In: 7UM&4WSU Intl. onf., Melbourne. arr, R. S., and Sith,. P. (2006) Linking of 2 and Pipe hydraulic odels at fine spatial scales. In: 7UM&4WSU Intl. onf., Melbourne. hen,. S., Hsu, M. H., hen, T. S., and hang, T. J. (2005) n integrated inundation odel for highly developed urban areas Wat. Sci. & Tech., 51(2), oputational Hydraulics Int. (2002). Introduction for PSWMM uelph. ey,. K., and Kaioka, S. (2006) n integrated odeling approach to predict flooding on urban basin. In: 7UM&4WSU Intl. onf., Melbourne. HI Software. (2002). MIK SWMM - the new generation SWMM. Hørshol. HI Software. (2003). MOUS Pipe low, Reference Manual, Hørshol. jordjević, S., Prodanović,., and Maksiović,. (1999) n approach to stiulation of dual drainage Wat. Sci. & Tech., 39(9), jordjević, S., Prodanović,., Maksiović, Č., Ivetić, M., and Savić,. (2005) SIPSON - Siulation of interaction between pipe flow and surface overland flow in networks Wat. Sci. & Tech., 52(5), Ha, S. R., Park, S. Y., and Park,. H. (2003) stiation of urban runoff and water quality using reote sensing and artificial intelligence Wat. Sci. & Tech., 47(7-8), Horritt, M. S., and ates, P.. (2002) valuation of 1 and 2 nuerical odels for predicting river flood inundation J. Hydrol., 268(1-4),

6 Please cite as : hen. S., jordjević S., Leandro J. and Savić. (2007). The urban inundation odel with bidirectional Hunter, N. M., Horritt, M. S., ates, P.., Wilson, M.., and Werner, M... (2005) n adaptive tie step solution for raster-based storage cell odelling of floodplain inundation dv. Wat. Res., 28(9), Mark, O., Weesakul, S., piruanekul,., roonnet, S.., and jordjević, S. (2004) Potential and liitations of 1 odelling of urban flooding J. Hydrol., 299(3-4), Nasello,., and Tucciarelli, T. (2005) ual ultilevel urban drainage odel J. Hydraul. ng., 131(9), Radojković, M., and Maksiović, Č. (1984) evelopent, testing and application of elgrade urban drainage odel. In: 3rd IU, öteborg, Rossan, L.., ickinson, R.., Schade, T., han,., urgess,. H., and Huber, W.. (2005) SWMM5: The USP s newest tool for urban drainage analysis. In: 10th IU, openhagen. Schitt, T.., Thoas, M., and ttrich, N. (2005) ssessent of urban flooding by dual drainage siulation odel RisUrSi Wat. Sci. & Tech., 52(5), Wallingford Software Ltd. (2006). InfoWorks S - Siulation ngine. XP Software Inc. (2002). XP-SWMM Technical escription, Portland. Yu,., and Lane, S. N. (2006) Urban fluvial flood odelling using a two-diensional diffusion-wave treatent, part 1: esh resolution effects Hydrol Process, 20(7),

ADVANCES IN MODELLING THERMAL BRIDGES IN BUILDING ENVELOPES

ADVANCES IN MODELLING THERMAL BRIDGES IN BUILDING ENVELOPES ADVANCES IN MODELLING THERMAL BRIDGES IN BUILDING ENVELOPES Stephen Carpenter Enerodal Engineering Liited Kitchener, ON, Canada scarpenter@enerodal.co ABSTRACT This paper describes recent techniques developed

More information

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection DRAFT Technical Memorandum Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility Hydraulic Modeling Software Selection Prepared for: City of Newport Public Works Department 70 Halsey Street Newport,

More information

Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area

Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Kenji KAWAIKE* and Hajime NAKAGAWA* *Disaster Prevention Research Institute, Kyoto University (Received:

More information

Definition of Optimization Problem for Electromagnetic Linear Actuator

Definition of Optimization Problem for Electromagnetic Linear Actuator Excerpt fro the Proceedings of the COMSOL Conference 2009 Milan Definition of Optiiation Proble for Electroagnetic Linear Actuator P. Piskur*, W. Tarnowski, K. Just Kosalin University of Technology, Poland

More information

Comparison of 1D-1D and 1D-2D urban flood models

Comparison of 1D-1D and 1D-2D urban flood models 15 th International Conference on Environmental Science and Technology Rhodes, Greece, 31 August to 2 September 217 Comparison of and urban flood models Kourtis I. M. 1, *, Bellos V. 1, Tsihrintzis V.

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Experimental Investigation Of Flow-Interactions Between Above And Below Ground Drainage Systems Through A Manhole

Experimental Investigation Of Flow-Interactions Between Above And Below Ground Drainage Systems Through A Manhole City University of New York (CUNY) CUNY Academic Works International Conference on Hydroinformatics 8-1-2014 Experimental Investigation Of Flow-Interactions Between Above And Below Ground Drainage Systems

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Y E L L O W FUT U R E S LTD. Design Concept for Stormwater Drainage for KI Grand Baie Residences. August 2016

Y E L L O W FUT U R E S LTD. Design Concept for Stormwater Drainage for KI Grand Baie Residences. August 2016 Y E L L O W FUT U R E S LTD Design Concept for Storwater Drainage for KI Grand Baie Residences August 2016 7 Réy Ollier Street, Beau Bassin, MAURITIUS Tel: (230) 466-2777 Fax: (230) 467-7984 E-ail: adinistration@sjpce.co

More information

Dynamic Inundation Mapping for Emergency Planning and Disaster Response

Dynamic Inundation Mapping for Emergency Planning and Disaster Response Dynamic Inundation Mapping for Emergency Planning and Disaster Response Ross Gordon, LEED AP October 29, 2008 Presentation Overview Introduce MIKE FLOOD Rice / TMC Case Study Emergency Planning Disaster

More information

CFD modelling of wind effect on rectangular settling tanks of water treatment plants

CFD modelling of wind effect on rectangular settling tanks of water treatment plants European Water 58: 61-67, 2017. 2017 E.W. Publications CFD odelling of wind effect on rectangular settling tanks of water treatent plants A. Gkesouli * and A. Staou Laboratory of Applied Hydraulics, School

More information

Cyclones as PM 10 and PM 2.5 emission measurement classifiers

Cyclones as PM 10 and PM 2.5 emission measurement classifiers Air Pollution XVIII 395 Cyclones as PM 10 and PM.5 eission easureent classifiers J. Heerka, M. Braniš & P.Vybíral Faculty of Mechanical Engineering, Czech Technical University in Prague, Czech Republic

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Modelling a Combined Sewage and Stormwater Flood Detention Basin

Modelling a Combined Sewage and Stormwater Flood Detention Basin Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip

More information

Two-Stage Quenching Method with the Use of Oils at Optimal Temperature

Two-Stage Quenching Method with the Use of Oils at Optimal Temperature Proceedings of the 4th WSEAS Int. onf. on HEAT TRANSFER, THERMAL ENGINEERING and ENVIRONMENT, Elounda, Greece, August 1-3, 006 (pp1-5) Two-Stage Quenching Method with the Use of Oils at Optial Teperature

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 3, 2010

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 3, 2010 Analysis and Design of Underpass RCC Bridge Mohankar.R.H 1, Ronghe.G.N 2 1 Lecturer, Civil Engineering Dept., G.H Raisoni College of Engineering, Nagpur, India. 2 Professor, Applied Mechanics Dept., Visvesvaraya

More information

Optimization of the Logistics of a Courier Business

Optimization of the Logistics of a Courier Business Applied Matheatical Sciences, Vol. 3, 2009, no. 36, 1755-1761 Optiization of the Logistics of a Courier Business Khalid Moussaid Universit Hasan II_Ain Chock, Faculte des Sciences de Casa khoussaid@fsac.ac.a.

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Analysis and Simulation of Drainage Capacity of Urban Pipe Network

Analysis and Simulation of Drainage Capacity of Urban Pipe Network Research Journal of Applied Sciences, Engineering and Technology 6(3): 387-392, 2013 ISSN: 2040-7459; e-issn: 2040-7467 Maxwell Scientific Organization, 2013 Submitted: July 17, 2012 Accepted: August 28,

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Developing Measures of Public Transport Schedule Coordination Quality

Developing Measures of Public Transport Schedule Coordination Quality Developing Measures of Public Transport Schedule Coordination Quality Graha Currie 1, Leigh Broley 2 1 Professor and Chair of Public Transport, Institute of Transport Studies, Monash University, VIC, Australia

More information

RETROFIT OF WATER NETWORKS IN PROCESS PLANTS

RETROFIT OF WATER NETWORKS IN PROCESS PLANTS RETROFIT OF WATER NETWORKS IN PROCESS PLANTS D. C. Faria and M. J. Bagajewicz* School of Cheical Engineering and Material Science, University of Oklahoa 100 East Boyd Street, T-335 Noran, OK 73019-0628

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

2. DEFINITIONS. American Association of State Highway and Transportation Officials. 2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:

More information

Optimal placement of warehouse cross aisles in a picker-to-part warehouse with class-based storage

Optimal placement of warehouse cross aisles in a picker-to-part warehouse with class-based storage Optial placeent of warehouse cross aisles in a picker-to-part warehouse with class-based storage Paul Berglund and Rajan Batta Departent of Industrial and Systes Engineering, 438 Bell Hall University at

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS Project Name: Project Number: Reviewed By: Date: Telephone: Email: Address all items marked with an X Minimum Submittal Requirements 1. Conceptual Review

More information

Water Resources Management Plan

Water Resources Management Plan P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have

More information

URBAN FLOODING: HEC-HMS

URBAN FLOODING: HEC-HMS 1.0 Introduction URBAN FLOODING: HEC-HMS -Sunil Kumar, Director, NWA All major ancient civilisations were developed in the river valleys because river served as source of water, food, transportation and

More information

Scheduling Algorithms for Multiprogramming in a Hard Realtime Environment

Scheduling Algorithms for Multiprogramming in a Hard Realtime Environment Scheduling Algoriths for Multiprograing in a Hard Realtie Environent C. Liu and J. Layland Journal of the ACM, 20(1):46--61, January 1973. 2 Contents 1. Introduction and Background 2. The Environent 3.

More information

BIM-based Damage Assessment and Scheduling for Post-Earthquake Building Rehabilitation

BIM-based Damage Assessment and Scheduling for Post-Earthquake Building Rehabilitation BIM-based Daage Assessent and Scheduling for Post-Earthquake Building Rehabilitation C. Georgiou & S. Christodoulou Departent of Civil and Environental Engineering, University of Cyprus, Nicosia, Cyprus

More information

MODELING LIQUID METAL CORROSION IN A FERRITIC STEEL PbLi SYSTEM WITH AND WITHOUT A MAGNETIC FIELD

MODELING LIQUID METAL CORROSION IN A FERRITIC STEEL PbLi SYSTEM WITH AND WITHOUT A MAGNETIC FIELD MODELING LIQUID METAL CORROSION IN A FERRITIC STEEL PbLi SYSTEM WITH AND WITHOUT A MAGNETIC FIELD SMOLENTSEV Sergey, SAEIDI Sheida, ABDOU Mohaed Fusion Science and Technology Center, UCLA, USA E-ail: sergey@fusion.ucla.edu

More information

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

ANALYSIS AND PLANNING OF REGIONAL DEVELOPMENT - CONTEXTUAL VARIABLES TO DEVELOP A MODEL FOR MONITORING FINANCIAL INDICATORS AT REGIONAL LEVEL.

ANALYSIS AND PLANNING OF REGIONAL DEVELOPMENT - CONTEXTUAL VARIABLES TO DEVELOP A MODEL FOR MONITORING FINANCIAL INDICATORS AT REGIONAL LEVEL. Annals of the Constantin Brâncuşi University of Târgu Jiu, Econoy Series, Issue 6/2013 ANALYSIS AND PLANNING OF REGIONAL DEVELOPMENT - CONTEXTUAL VARIABLES TO DEVELOP A MODEL FOR MONITORING FINANCIAL INDICATORS

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

4.1 General Methodology and Data Base Development

4.1 General Methodology and Data Base Development Chapter 4 METHODOLOGY 4.1 General and Data Base Development This report project utilized several computer software models and analysis techniques to create the numeric data on which decisions for this

More information

Artificial Neural Network Based Modeling and Control of Bioreactor

Artificial Neural Network Based Modeling and Control of Bioreactor Artificial Neural Network Based Modeling and Control of Bioreactor Ballekallu Chinna Eeranna* Subba Rao**,G. Prabhaker Reddy** *Dept.of petroleu Engineering, Lords institute of engineering and Technology

More information

STORM DRAINS AND IRRIGATION

STORM DRAINS AND IRRIGATION TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.

More information

Two-Phase Modeling of Gravity Drainage of Bitumen from Tar Sand Using In-Situ RF Electrical Heating

Two-Phase Modeling of Gravity Drainage of Bitumen from Tar Sand Using In-Situ RF Electrical Heating Excerpt fro the Proceedings of the COMSOL Conference 008 Boston To-Phase Modeling of Gravity Drainage of Bituen fro Tar Sand Using In-Situ RF Electrical Heating Arin Hassanzadeh*, Pyrophase Inc. *14 S.

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Storm Sewer Design - Introduction

Storm Sewer Design - Introduction Class 4 [1] Storm Sewer Design - Introduction As urban drainage can not be expected to accommodate all rainfall events, the first step in the design procedure is to select an appropriate design storm.

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed

More information

Research on Earthwork Allocation Problem Based on Linear Programming Mathematical Algorithm Xinyu Yang, Weisan Wu

Research on Earthwork Allocation Problem Based on Linear Programming Mathematical Algorithm Xinyu Yang, Weisan Wu 209 2nd International Conference on Coputer Science and Advanced Materials (CSAM 209) Research on Earthwork Allocation Proble Based on Linear Prograing Matheatical Algorith Xinyu Yang, eisan u College

More information

Scheduling Slack Time in Fixed Priority Pre-emptive Systems

Scheduling Slack Time in Fixed Priority Pre-emptive Systems Scheduling Slack Tie in Fixed Priority Pre-eptive Systes R.I.Davis, K.W.Tindell, A.Burns Departent of Coputer Science, University of York, England. Abstract This paper addresses the proble of jointly scheduling

More information

Fatigue Damage and Cracking

Fatigue Damage and Cracking Fatigue Daage and Cracking Figure 9.9 During high-cycle fatigue the tension cycle produces a tiny plastic zone which is folded forward during copression During low-cycle fatigue the plastic zone is large

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

SOUTHEAST TEXAS CONTINUING EDUCATION

SOUTHEAST TEXAS CONTINUING EDUCATION EXAM No. 118 FLOOD - RUNOFF ANALYSIS 1. Information gained from flood - runoff analysis includes which one: A. Stage, discharge, volume. B. Measure depth, volume. C. Velocity, depth, storm occurrence.

More information

Pluvial flooding and efficiency of urban drainage

Pluvial flooding and efficiency of urban drainage The 9 th International Conference on Urban Drainage Modelling Belgrade, 3-7 September 2012 Pluvial flooding and efficiency of urban drainage Anna Palla 1, Francesca Franza 2, Ilaria Gnecco 1, Giuseppe

More information

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period

Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period TIENFUAN KERH, JASON J. D. YEI and YU-MIN WANG Department of Civil Engineering National Pingtung University

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Simulation of a Queuing System Case Study: Call Center Service in Organization A. Rutcharin Kullachart, Kasetsart University, Thailand

Simulation of a Queuing System Case Study: Call Center Service in Organization A. Rutcharin Kullachart, Kasetsart University, Thailand Siulation of a Queuing Syste Case Study: Call Center Service in Organization A. Rutcharin Kullachart, Kasetsart University, Thailand Asian Conference on Psychology and Behavioral Sciences 2015 Official

More information

Chapter 1 An overview of animal breeding programs

Chapter 1 An overview of animal breeding programs Chapter 1 An overview of anial breeding progras Julius van der Werf INTRODUCTION... 1 IMPORTANT FACTORS IN BREEDING PROGRAMS... 2 BREEDING STRATEGIES... 3 STRUCTURE OF BREEDING PROGRAMS... 5 INTRODUCTION

More information

Application of the Multiscale Finite Element Method to the numerical modeling of regional land subsidence

Application of the Multiscale Finite Element Method to the numerical modeling of regional land subsidence 2th International Congress on Modelling and Siulation, Adelaide, Australia, 1 6 Deceber 213 www.ssanz.org.au/odsi213 Application of the Multiscale Finite Eleent Method to the nuerical odeling of regional

More information

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond. Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts

More information

The USLE-M and Modeling Erosion Within Catchments

The USLE-M and Modeling Erosion Within Catchments This paper was peer-reviewed for scientific content. Pages 924-928. In: D.E. Stott, R.H. Mohtar and G.C. Steinhardt (eds). 200. Sustaining the Global Far. Selected papers fro the 0th International Soil

More information

Drainability of Granular Bases for Highway Pavements

Drainability of Granular Bases for Highway Pavements TRANSPORTATION RESEARCH RECORD 1434 23 Drainability of Granular Bases for Highway Paveents BRUCE M. McENROE The best easure of the drainability of a granular base is the iniu degree of saturation that

More information

Modeling the Release, Spreading, and Burning of LNG, LPG, and Gasoline on Water. David W. Johnson and John B. Cornwell

Modeling the Release, Spreading, and Burning of LNG, LPG, and Gasoline on Water. David W. Johnson and John B. Cornwell Modeling the Release, Spreading, and Burning of LNG, LPG, and on Water David W. Johnson and John B. Cornwell Printed in Journal of Hazardous Materials Vol. 140, Issue 3: pp. 535-540 February 0, 007 Quest

More information

Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program

Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program JEROME DUBOIS JEAN-LOUIS BOILLAT Laboratory of Hydraulic Constructions, LCH, Swiss Federal Institute

More information

Economical heat production and distribution

Economical heat production and distribution Econoical heat oduction and distribution JOZE TORKAR, DARKO GORICANEC*, JURIJ KROPE* El-tec Mule, d.o.o. Pot na Lisice 7, 4260 Bled, *Faculty of Cheistry and Cheical Engineering University of Maribor Setanova

More information

Recent development and application of a rapid flood spreading method

Recent development and application of a rapid flood spreading method Flood Risk Management: Research and Practice Samuels et al. (eds) 2009 Taylor & Francis Group, London, ISBN 978-0-415-48507-4 Recent development and application of a rapid flood spreading method Julien

More information

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS v. 11.0 WMS 11.0 Tutorial Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS Objectives Learn how to use several Hydraulic Toolbox calculators

More information

Katayoun Rahbar, Mohammad R. Vedady Moghadam, and Sanjib Kumar Panda. Abstract. Index Terms I. INTRODUCTION

Katayoun Rahbar, Mohammad R. Vedady Moghadam, and Sanjib Kumar Panda. Abstract. Index Terms I. INTRODUCTION Real-tie Shared Energy Storage Manageent for Renewable Energy Integration in Sart Grid Katayoun Rahbar, Mohaad R. Vedady Moghada, and Sanjib Kuar Panda Abstract arxiv:176.62v1 [cs.sy] 2 Jun 217 Energy

More information

Hydrotechnical Design Guidelines for Stream Crossings

Hydrotechnical Design Guidelines for Stream Crossings Hydrotechnical Design Guidelines for Stream Crossings Introduction Design of stream crossings and other in-stream highway facilities requires estimation of design highwater elevation and mean channel velocity.

More information

Data Hiding Method for QR Code Based on Watermark by comparing DCT with DWT Domain

Data Hiding Method for QR Code Based on Watermark by comparing DCT with DWT Domain International Conference on Coputer and Counication Technologies (ICCCT'212) May 26-27, 212 Phuket Data Hiding Method for Based on Waterark by coparing DCT with DWT Doain Suppat Rungraungsilp, Mahasak

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

La Riereta Catchment Sant Boi de Llobregat

La Riereta Catchment Sant Boi de Llobregat La Riereta Catchment Sant Boi de Llobregat Final Report Team 2 Enrique Amaya (COL) Lilian Yamamoto (BRA) Martín Pez (ARG) Sergio Esquivel (MEX) Instructor: José Macor Summary Contents 1. Introduction...

More information

THE TREATMENT OF CONCENTRATED LOADS IN MASONRY DESIGN CODES

THE TREATMENT OF CONCENTRATED LOADS IN MASONRY DESIGN CODES 10 th Canadian Masonry Syposiu, Banff, Alberta, June 8 12, 2005 THE TREATMENT OF CONCENTRATED LOADS IN MASONRY DESIGN CODES Noran Bright 1 and John Roberts 2 1 Visiting Professor, Kingston University,

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

PART 3 STORM WATER TECHNICAL MANUAL

PART 3 STORM WATER TECHNICAL MANUAL PART 3 STORM WATER TECHNICAL MANUAL A. INTRODUCTION The Storm Water Technical Manual contains requirements for land development and construction activities, as well as design criteria and guidelines for

More information

Applicant information Fields in this section are self-explanatory.

Applicant information Fields in this section are self-explanatory. For FY2009-0 Highway Safety Progra (HSP), the previous application for and the B/C spreadsheet were cobined into one spreadsheet to facilitate the electronic transission of application data. Applicants

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

Insights from editing the ARR Urban Book. Peter J Coombes

Insights from editing the ARR Urban Book. Peter J Coombes Insights from editing the ARR Urban Book Peter J Coombes Motivation for revision of ARR Many practices and data in ARR 1987 are outdated More rainfall and streamflow data Improved understanding of climate

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

Improving the Search Performance of Genetic Algorithm to Solve Assembly Line Balancing Problem

Improving the Search Performance of Genetic Algorithm to Solve Assembly Line Balancing Problem International Journal of Business and Manageent Invention (IJBMI) ISSN (Online): 2319 8028, ISSN (Print): 2319 801X Volue 7 Issue 4 Ver. II April. 2018 PP 28-35 Iproving the Search Perforance of Genetic

More information

Sizing oxidation pond treatment systems (6-2)

Sizing oxidation pond treatment systems (6-2) Sizing oidation pond treatent systes (6-2) Oidation treatent systes coprise two or ore sealed ponds in a series. One of the ost coon reasons for the poor perforance of effluent pond treatent systes is

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

The Importance of Pits in Overland Flow Modelling

The Importance of Pits in Overland Flow Modelling The Importance of Pits in Overland Flow Modelling PRESENTERS: David Whyte David Stone October 2018 Overview 01 Introduction 02 Pit Types and Data 03 Overland Flow Modelling 04 05 06 Case Study and sensitivity

More information

Determination of Flow Stress Constants by Oxley s Theory

Determination of Flow Stress Constants by Oxley s Theory Deterination of Flow Stress Constants by Oxley s Theory Prakash Naik 1, Ankit Naik 2 1 Mechanical Engineering Departent, UTU, Bardoli. 2 Mechanical Engineering Departent, JHD, Palsana. Abstract Flow stress

More information

Archive of SID. System design and optimization of a water-lithium bromide double-effect absorption system

Archive of SID.   System design and optimization of a water-lithium bromide double-effect absorption system 1 st International Conference on Heating, Ventilating and Air Conditioning May, 2009, Tehran, Iran Syste design and optiization of a water-lithiu broide double-effect absorption syste B Borzou 1, FSadeghpour

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Chapter 7 : Conclusions and recommendations

Chapter 7 : Conclusions and recommendations Chapter 7 : Conclusions and recommendations 7.1 Conclusions The main goal of this research was to investigate the modelling and rainfall data requirements for the design of combined sewer systems and the

More information

Combined Influence of Stack Height and Exit Velocity on Dispersion of Pollutants Caused by Helwan Cement Factory (Study using AERMOD Model)

Combined Influence of Stack Height and Exit Velocity on Dispersion of Pollutants Caused by Helwan Cement Factory (Study using AERMOD Model) International Journal of Coputer Applications (0975 8887) olue 2 No.9, July 205 Cobined Influence of Stack Height and Exit elocity on Dispersion of Pollutants Caused by Helwan Ceent Factory (Study using

More information

KNOWLEDGE BASED MANUFACTURINE SYSTEM

KNOWLEDGE BASED MANUFACTURINE SYSTEM KNOWLEDGE BASED MANUFACTURINE SYSTEM Gideon Halevi^ and Kesheng Wang^ ^Technion - Israel Institute of Technology; Technion City 200, ISRAEL. ^Departent of Production and Quality Engineering, NTNU, N-7491,

More information

CLIMATE AND HYDROLOGIC CHANGE ASSESSMENT FOR GEORGIA

CLIMATE AND HYDROLOGIC CHANGE ASSESSMENT FOR GEORGIA Lake Lanier 15MW Norcross Morgan Falls 16.8 MW Atlanta Whitesburg 82 MW West Point Bartletts Ferry 173 MW Goat Rock 26.3 MW Oliver 6 MW N. Highlands 29.6 MW Colubus W. George 168 MW Andrews 36 MW Woodruff

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Comparison of three flood runoff models in the Shonai River basin, Japan

Comparison of three flood runoff models in the Shonai River basin, Japan Comparison of three flood runoff models in the Shonai River basin, Japan TOSHIHARU KOJIMA Division of Fluvial and Marine Disasters, Disaster Prevention Research Institute, Kyoto University, Gokasho, Uji,

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental

More information