1 50th Street Extension Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 280,000 2,000,000 11/12 Future - 2,280,000 Extension of 50th Street from Travis Street east to Armstrong Street (Texas Highway 208). This project includes the acquisition of property and the construction of approximately 4,000 linear feet of 50 foot wide paved roadway with curb and gutter. It will provide for stormwater drainage, pedestrian access, and vehicular access to and from the Coliseum and Fairgrounds, the Spur Arena, and Lincoln Middle School and better connectivity for neighborhoods on the northern most limits of San Angelo Voter approved 1/2 cent sales tax project. Estimated Proiect Cost: 100, ,000 2,000,000 2,280,000 Project Schedule: : completion date June 1, 2007 to begin August 1,2007 Completion: January 1, Voter approved 1/2 cent sales tax Subproject Name / Location Notes:
2 CORS (Continuously Operating Reference Station) Responsible Division: Public Works / Engineering Services Project Manager: Ron Lewis Years 50,000 11/12 Future - 50,000 A Continuouly Operating Reference Station (CaRS) provides Global Positioning System (GPS) carrier phase and code range measurements in support of 3-dimensional positioning for survey and other GIS collection activities of the organization. Estimated Proiect Cost: 50,000 50,000 : Notes:
3 Mast Arm Assemblies Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 11/12 125,000 Future 1,125,000 1,500,000 and install new mast arm assemblies in place of the pedestrian pole assemblies (mostly downtown) and span wire installations. Replacing the currently installations will improve visibility and safety of pedestrian and vehicular traffic. Estimated Proiect Cost: 1,500,000 1,500,000 Project Schedule: : Subproject Name / Location ~ Possible Source TIRZ
4 Non-Communitive Controllers Responsible Division: Public Works/Traffic Operations Project Manager: Ricky Dickson Years 31,000 11/12 Future - 31,000 Description The replacement of various controllers at isolated intersections. These controllers are currently not compatible with the remote access software that we have in place. New controllers would reduce maintenance time and calls by allowing fo remote access. Estimated Proiect Cost: 31,000 31,000 : Subproiects: Subproject Name I Location Controllers (18) Master Controllers (3) 23,400 7, Basis for Estimate
5 Replacement of Controllers and MMUs Responsible Division: Public Works/Traffic Operations Project Manager: Ricky Dickson Years 120,000 11/12 Future 120,000 The area has intersections needing new controllers, as well as, MMUs. There are 66 controllers and 60 MMUs that must be replaced. The controllers and MMUs need replacing due to the lack of compatibility with the remote accessing software. There is also an issue with age and no factory maintenance associated with these MMUs. These are all on the closed loop systems - new controllers needed to maintain coordination and improve progression. New MMUs monitor for signal indication conflicts to insure safety. 120, ,000 : Sherwood Way 31,000 Bryant Blvd 33,000 Knickerbocker 20,000 Downtown 36,000 Notes:
6 Replace Downtown Pedestrian Heads Responsible Division: Public Works/Traffic Operations Project Manager: Ricky Dickson Years 26,000 11/12 Future - 26,000 Replacing old Pedestrian (PED) Signal Heads in the Downtown area. 106 PED Heads each costing totals 25,211. The intersections needing replacement are the intersections south of College Ave; west of Main S1.; north of Concho Ave.; and east of Randolph S1. The downtown PED signal heads are all over 20 years of age. Reduced maintenace cost since LED lamps provide electrical cost savings and only one head is used for both indications. Supporting planning documentls): 26,000 26,000 Project Schedule: :
7 Replace School Zone and Crosswalk Equipment Responsible Division: Public Works / Traffic Operations Project Manager: Ricky Dickson Years 20,000 15,000 11/12 5,000 Future - 80,000 Replace Crosswalk Signs with the Bright Yellow Green High Reflectivity. Replace or update Time Clocks with new clocks that also can be sent time and date information via radio or pager signal. Install Heat Tape for crosswalks or paint more frequently. Supporting planning document(s ): Estimated Proiect Cost: 80,000 80,000 : Subproiects: ~ Source - Crosswalk Guard and Equipment Revenues collected by Tom Green County Fee.
8 Replace Traffic Signal Heads and LEOs Responsible Division: Public Works/Traffic Operations Project Manager: Ricky Dickson Years 28,000 11/12 Future - 28,000 Replace regular signal heads with LED signals. The signal heads with LED lamps are longer lasting and reduce electrical costs. ROW /Easements/Land 28,000 28,000 : Subproject Name 1 Location Save on Electricity _N_ot_e_s:
9 Specialty Signs Replacement and Installation Responsible Division: Public Works / Traffic Operations Project Manager: Ricky Dickson Years 20,000 11/12 Future - 20,000 Replace old specialty signs (San Angelo Stadium, Coliseum, Ft. Concho, etc.) with new ones. Update inventory and list of locations of these signs by block number and street name. 20,000 20,000 : Subproiects: Basis for Estimate Notes: Sources from affected Departments
10 Street Reconstruction Program Responsible Division: Public Works Project Manager: Clinton Bailey Years - 2,810,000 3,990,000 11/12 Future 20,200,000 27,000,000 Reconstruction of roadways throughout San Angelo. Street segments will be identified and prioritized annually. Field survey work will be completed and construction documents developed on an ongoing basis. Individual projects are listed in the subprojects section below and include Sunset Drive - Knickerbocker Rd. south to Railroad. Estimated Proiect Cost: 6,800,000 6,800,000 Project Schedule: Two projects will be bid out in 2007 with an estimated cost 3.4M each. Subproiects: Grape Creek Rd - 29th SUo Chadbourne St, 795,000 Garfield - Houston Harte Freeway to Fields SI. 548,000 Bell Belaire 51. to Concho River Bridge 256,000 Country Club Rd. - Grand Canal Rd. to City 657,000 Grand Canal Rd. - US 277 to Country Club Rd. 324,000 _N~ot_es_:
11 Stormwater Improvements Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 11/12 Future 47,000,000 47,000,000 Descriotion: Freese and Nichols Engineering compiled a list of over 50 areas throughout San Angelo where stormwater drainage was contributing to flooding conditions. The remediation of 25 drainage problem areas throughout the City of San Angelo is estimated to cost approximately 47,000,000 in 2007 dollars. PW staff, along with engineers from Freese and Nichols, is working with local developers and engineers to complete a Stormwater Ordiancne and Manual. The next step will be for Public Works staff to propose a Stormwater Utility for the City Council's consideration. This is the financing method that the state has provided to municipalities by which they can assess a fee from both commercial and residental propoerty owners to cover the costs of improvements to remediate drainage problems and maintain the necessary systems and structures. Master Drainage Plan (Freese and Nichols ) Estimated Proiect Cost: 47,000,000 47,000,000 Project Schedule: Future stormwater utility fee Subproject Name / Location
12 Sidewalk Program Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 500,000 11/12 500,000 Future - 2,500,000 The City of San Angelo has a completed Pedestrian and Bike Trail Plan. This plan provides a listing of sidewalks and trails throughout the community that can be constructed over the next several years. Much of this construction can be accomplished in conjunction with the Street Improvement Program, Street Realignment projects, Parks and Recreation facility improvements, and allowing developers the opportunity to construct in new developments and infill projects. Presently, the Planning Department is drafting a Sidewalk Ordinance for City Council consideration. San Angelo Bicycle and Pedestrian Plan - MPO Project Schedule: : 2004 Voter Approved 1/2 cent sales tax, Street 09/1 0 Basis for Estimate
13 Replace Street Name Markers Responsible Division: Public Works/Traffic Operation Project Manager: Ricky Dickson Years 15, /12 Future - 65,000 Replace 6" signs with 9" green signs with reflective white lettering. The replacement signs will increase visibility with bigger lettering and better night vision. Replace old and faded Overhead Steeet Name Markers at Signalized Intersections. Supporting planning document(s\: 65,000 65,000 : Subproiects: Notes:
14 Replace Poles with Breakaway Poles Responsible Division: Public Works / Traffic Operations Project Manager: Ricky Dickson Years 30,000 11/12 Future - 30,000 Install Superior Public Water System signs located on roads and highways entering San Angelo and replace old poles with breakaway design poles. There are 1,200 poles in the TxDOT ROW they have requested to be replaced. Supporting planning documenhs): ROWIEasementslLand 30,000 30,000 Project Schedule: : FundinQ Subproiects: Subproject Name I Location _N_ot_es_:
15 Replace Paint Striping Machine Responsible Division: Public Works / Traffic Operations Project Manager: Ricky Dickson Years 50,000 11/12 Future - 50,000 Current striper is unreliable and is a two man operation. The striper has to have a dedicated vehicle. This is a dangerous operation due to the wide turning radius while striping. 50,000 50,000 : Sources Subproiects: Notes:
16 Non-NEMA Cabinets Responsible Division: Public Works/Traffic Operations Project Manager: Ricky Dickson Years 48,000 11/12 Future - 48 Replace outdated Non-NEMA Cabinets. Eight NEMA Cabinets at 6,000 a piece totaling 48,000. Intersections to be replaced are: Main St. & Baptist Memorial; 2nd St. & Oakes St.; Bell St. & Rio Concho Dr.; Pecos St. & Taylor St.; 2 SU Crosswalks; Johnson St. & Dena Dr.; & Verizon Crosswalk on Johnson St. Parts for non-nema Cabinets are not readily available from manufactures and we are running out of stocked replacement parts. Supporting olanning document(s): 48,000 48,000 : General Fund FY06-07
17 New Warranted Traffic Signals Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 125,000 11/12 125,000 Future 625,000 and installation of new traffic signals as traffic warrants are met and development encourages. 625, ,000 : Southwest Drive and Southland Blvd 125,000 Sherwood Way at Wal-Mart Development 125,000 Knickerbocker Rd and Bentwood Drive 125,000 Future Development - Restricted Undesignated 125,000 Future Development - Restricted Undesignated 125,000 09/1 0
18 Grape Creek Road Reconstruction Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 600,000 11/12 Future - 600,000 Reconstruction of Grape Creek Road from 43rd st. to 50th St. adjacent to the Coliseum, Fairgrounds and the Spur Arena entrance. Supporting planning documentls): Voter approved 1/2 cent sales tax project. Estimated Proiect Cost: ROW /Easem ents/la nd 600, ,000 : completion date June 1, 2007 to begin August 1, 2007 Completion: January 1, /2 cent sales tax Notes:
19 ADA Ramp Program Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 100,000 11/12 100,000 Future - 500,000 The City of San Angelo is required to have an ADA Transition Plan to be in compliance with Federal and State laws. One very visible aspect of the ADA Transition Plan is construction of ADA ramps at intersections throughout our community. Our preliminary plan is to design and construct ADA ramps when we are making improvements to streets and roadways. These costs may be included in a Street Reconstruction project or in conjunction with installation or improvements to a signalized intersection. opportunities for making progress toward complying with the ADA Transition Plan include Street Realignment projects, Congestion Management, sidewalk projects, and requiring developers to construct ADA ramps in new developments and infill projects. Supporting planning document(s ): Estimated Proiect Cost: 500, ,000 : Street Reconstruction Program, TIRZ, New Traffic Signal Installation, CDBG, 1/2 Cent Sales Tax Projects 09/1 0 Notes:
2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions
2016/2017 Organizational Chart Effective 7/1/2016 ed 29 FTE Positions ed 1 Part-Time Position ed 4 Intern Positions Ricardo Sandoval Administrative Secretary (1) Transportation/Land Development Project
More informationPinellas County Capital Improvement Program, FY FY2016 Project Summary Report
Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost
More informationTRANSPORTATION. Governmental Projects
TRANSPORTATION Governmental Projects Function: Activity: Category: Transportation Road & Street Facilities Arterial Roads Project No: 1618 Title: 118th Avenue Expressway Cost Center: 841418 Department:
More informationCHAPTER 5: TRANSPORTATION
CHAPTER 5: TRANSPORTATION GOAL 12: TRANSPORTATION BACKGROUND SUMMARY INTRODUCTION Albany s location and transportation facilities provide excellent advantages for commerce and economic development. Albany
More informationDale Mabry Pedestrian Overpass Technical Feasibility Analysis. March 2017
Dale Mabry Pedestrian Overpass Technical Feasibility Analysis March 2017 Overview Two Part Study: 1. Feasibility of Alternatives for a Pedestrian Overpass Across Dale Mabry Hwy Near I 275 2. Walk/Bike
More informationENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner.
ENGINEERING DEPARTMENT MISSION STATEMENT: Provide engineering and public improvements in the most economical manner. The Engineering Department performs the following services to maintain and improve the
More information2017 Highway Safety Improvement Program Call
2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public
More information4/23/2014 Item #10D Page 1
MEETING DATE: April 23, 2014 PREPARED BY: Masih Maher DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Engineering/PW CITY MANAGER: Gus Vina SUBJECT: STREET IMPROVEMENT STANDARDS RECOMMENDATION: Direct staff to
More informationCHAPTER 8 TRANSPORTATION ELEMENT
CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized
More informationPalm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax
Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Engineering Sales Tax Projects Bridges $ 43.4 m (27) Roads (Resurfacing) $ 77.6 m (121) Roads (Restriping) $
More informationFor Public Input Period
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,
More informationENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT ADMINISTRATION Engineering Services/ Traffic and Transportation Engineering Services/ Stormwater Engineering Services/ Utilities Engineering Technical Services Engineering Field
More informationSouth Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More information(1) San Diego Unified Port District
Attachment A (1) San Diego Unified Port District CEQA and NOTICE COASTAL OF APPROVAL DETERMINATIONS San Diego Unified Port District Document No._ 64310 Office of the District Clerk Pii«d JAN 0 4 2016 Proiect:
More informationENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT Additional information about the Engineering Department may be obtained by calling Tim Bailey, P.E., Director of Engineering, at (919) 469-4030, through email at tim.bailey@townofcary.org
More informationLynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945
I-441-001 Thank you for your comments about the importance of the Latvian Center to the Latvian community. Following the Draft EIS, the Sound Transit Board directed Sound Transit to develop a Preferred
More informationconnections 2040 the waco metropolitan transportation plan amendment 1
connections 2040 the waco metropolitan transportation plan amendment 1 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted June 23, 2016 amendment
More informationOCT 2012 DPW. Peak Metrics Report Out D E N V E R PERFORMANCE
OCT 2012 DW D E N V E R Mission Level Overview Strategies and Tactics D E N V E R resent Future The Department of ublic Works aims to deliver high quality, cost effective, efficient, safe services involving
More informationPUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE
PUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE TJERNE PLACE CHAIN LAKE ROAD TO WOODS CREEK ROAD This project involves extending Tjerne Place from Chain Lake Road to Woods Creek
More informationCity of Gainesville Public Works Department Strategic Plan FY15-FY19
City of Gainesville Public Works Department Strategic Plan FY15-FY19 PUBLIC WORKS STRATEGIC PLAN FY15-FY19 This plan aligns the Public Works efforts with the City Commission goals and objectives. It outlines
More informationSidewalk Regulations. Table of Contents
Sidewalk Regulations Table of Contents Section 1. Purpose and Intent... 2 Section 2. Pedestrian Sidewalk, Driveway Apron and Curb and Guttering Requirements... 2 Section 3. Sidewalk Provision Criteria...
More informationUniversity of Virginia Master Planning Committee November 17 th Charlottesville Albemarle Metropolitan Planning Organization
University of Virginia Master Planning Committee November 17 th 2010 Charlottesville Albemarle Metropolitan Planning Organization 1 Who are we? What is an MPO A Metropolitan Planning Organization is a
More informationProject Initiation Form
Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination
More informationWelcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.
Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?
More informationTraffic. Community Planning and Development. Traffic Administration Traffic Engineering. Paint and Signs
Community Planning and Development Administration 101-7710 Transportation Planning 101-7720 Engineering Paint and Signs 141-7750 Communications 101-7740 Data 141-7760 Signals 141-7770 Safety and Signals
More informationProject Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial
Planning Commission Staff Report Planning Commission Hearing November 14, 2016 Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Request: A request to develop a 15,996 square foot
More informationBylaw 3847, 2016 Adopted Mar 21, 2016 SCHEDULE G - REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING
Bylaw 3847, 2016 Adopted Mar 21, 2016 SCHEDULE G - REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING City of Cranbrook -Subdivision and Development Servicing Bylaw 3633,
More informationRevenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA Our Mission: To provide a supplemental financial mechanism for the revitalization of Crystal City, Potomac Yard, and Pentagon
More informationFuller /Fuller Heights Road Improvements
Transportation Fuller /Fuller Heights Road Improvements Total Cost - $4.4M Description This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of
More informationPERMITTED USES: Within the MX Mixed Use District the following uses are permitted:
6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major
More informationWELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017
WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule
More informationI-10 KENDALL EXTENSION. Open House
I-10 KENDALL EXTENSION Open House The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT
More informationConceptual Design Report
Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE
More informationCapital Facilities Element
Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,
More informationNovember 28, Patrick Duffy, P.E. Director of Planning and Zoning Middletown Township 3 Municipal Way Langhorne, PA 19047
WWW.TRAFFICPD.COM Patrick Duffy, P.E. Director of Planning and Zoning Middletown Township 3 Municipal Way Langhorne, PA 19047 RE: Stone Farm Preliminary/Final Land Development Plan Review TPD# MTTO.00021
More informationEXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.
EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.00 SECTION I PURPOSE This document describes the scope of work and the
More informationEmerging Mobility Services and Technologies
Emerging Mobility Services and Technologies Draft Report Evaluation Results and Recommendations SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY June 11, 2018 Emerging Mobility Services and Technologies 2
More informationDRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis
Draft Carbon Monoxide (CO) Traffic Air Quality Analysis North Houston Highway Improvement Project From US 59/I-69 at Spur 527 To I-45 at Beltway 8 North Harris County TxDOT Houston District CSJ: 0912-00-146
More informationTransportation Facility Inventory
CHAPTER 3 Transportation Element Section 3.1 Introduction Movement of people, goods, and services within and through the Town is an integral part of everyday life for the citizens of Hull. Decisions made
More informationCRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA Our Mission: To provide a supplemental financial mechanism for the revitalization of Crystal City, Potomac Yard, and Pentagon
More informationIX. STRATEGIC PLAN ELEMENT
IX. STRATEGIC PLAN ELEMENT The Strategic Plan Element provides the action and implementation plan for the New Brunswick Master Plan. New Brunswick is a fully developed, older urban area in central New
More informationLedges East Master Owners Association. Architectural Guidelines for the Community-Wide Areas
Ledges East Master Owners Association Architectural Guidelines All improvements proposed or required to be constructed in Community-Wide Areas (whether located in Commercial Areas or Residential Areas)
More informationMaintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013
Maintenance, Construction & Secondary Roads Terry Gibson, PE Chief Engineer February 20, 2013 State versus local responsibility Division structure Allocations Flexibility in funding Implications of not
More informationExhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate
0.0 Separation of work Types and Cost Estimate Exhibit A Scope of Work 0.1 Prepare scope of work and cost estimate for MnDOT efforts relating to all items numbered less than 20.0. 0.2 Prepare scope of
More informationStrategic Plan Update Plan Update May 24, 2018
1 Strategic Plan Update 2018-2022 Plan Update May 24, 2018 Town of Brownsburg Strategic Plan In April 2014, the Town Council motioned to adopt the Town of Brownsburg s first ever strategic plan. 2 Purpose
More informationPAJARO COMMUNITY PLAN PRINCIPAL FINDINGS Draft
PAJARO COMMUNITY PLAN PRINCIPAL FINDINGS Draft 7-2-02 Community Vision Pajaro s future vision is a healthy balanced community in context with agricultural uses and the culturally diverse character of the
More informationMEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates
MEMORANDUM #4 DATE: November 4, 2015 TO: FROM: SUBJECT: Warrenton TSP Project Management Team Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates Warrenton Transportation System Plan Update
More information2. Guiding Principles, Objectives, and Policies
2. Guiding Principles, Objectives, and Policies INTRODUCTION The guiding principles for the 2040 MTP Update establish the vision and key focus areas for this planning effort. They combine the guidance
More informationWinters Parking Committee Downtown Parking Report Recommendations
Winters Parking Committee Downtown Parking Report Recommendations Topic Lead Entity Recommendations Management Body Downtown Property Owners and Businesses Establish a management body (i.e. BID) to serve
More informationFinal Air Quality Report
Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle
More informationDESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project
More informationDEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA
DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA This report was prepared to present development information (Utility availability, Development Regulations, Flood Plain information,
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: Traffic congestion in the Corpus Christi Metropolitan area is not as much a function of population growth as the function of the increase in single occupant trips. Using census data, the
More informationTransportation and Utilities
4 Section 4 Transportation and Utilities 4.0 Introduction Transportation and utility systems are essential to accommodate and support development proposed in the Future Land Use Map. The following pages
More informationENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT CITY OF PARKLAND CITYWIDE MOBILITY UPDATE OCTOBER 21, 2015 CITYWIDE MOBILITY UPDATE Introduction and Purpose Provide update on the recommended projects from the Citywide Mobility
More informationAPPENDIX E: Capital Programs and Descriptions
APPENDIX E: Capital s and Descriptions Number Name Description 1007 Debt Service -General Administers the servicing of Pinellas County public debt. 1008 Reserves Oversees the management and allocation
More informationGULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL
GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL OCTOBER 2014 Cover photographs courtesy of Top left - Mike Bates TABLE OF CONTENTS MISSION... 1 INTRODUCTION... 1 VISION STATEMENT... 1 BACKGROUND... 2
More informationECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY FY 2016
ECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY 2012 - FY 2016 Project Number Total Funds Appropriated Project Completion Date Annual Operating Cost 30-09 Conference Center Equipment
More informationWelcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.
1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement
More informationTexas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements
Texas Department of Transportation Book 2 Technical Provisions Grand Parkway Project Work Breakdown Structure Requirements Table 1 represents the minimum levels of the WBS that all schedule information
More informationKathleen Marie Lacey, Chief Comprehensive Planner Boise City Planning and Development Services Department. State Street Memorandum of Understanding
MEMORANDUM TO: FROM: Mayor and Boise City Council Kathleen Marie Lacey, Chief Comprehensive Planner Boise City Planning and Development Services Department DATE: September 9, 2005 RE: State Street Memorandum
More informationClinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting
Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 December 2, 2014 Stakeholder s Meeting Purpose of Stakeholder Meeting Discuss the project and why it s happening Describe the process
More informationFROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND
More informationImplementing an Asset and Pavement Management System in Alexandria, VA. Craig Schorling, GISP Business Development Manager, Transmap Corporation
Implementing an Asset and Pavement Management System in Alexandria, VA Craig Schorling, GISP Business Development Manager, Transmap Corporation Alexandria Statistics Located on the Western bank of the
More informationFinal Report 2014 Addendum
Final Report 2014 Addendum Supplemental ADA Transition Plan Inventory of Public ROW Facilities Prepared by: August 2014 Table of Contents Executive Summary...1 Introduction...2 Inventory Methodology...2
More information5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description
Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon TEXAS FLOODPLAIN MANAGEMENT ASSOCIATION April 27, 2017 PROJECT LOCATION PROJECT VICINITY MAP Lumpkin Road Overall Description
More informationSTAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program
STAFF REPORT DATE: November 14, 2017 TO: Bryan Montgomery, City Manager Approved and Forwarded to the City Council FROM: SUBJECT: Kevin Rohani, P.E. Public Works Director/City Engineer FY 2017/18 First
More information2017 Transportation and Storm Drainage Projects
2017 Transportation and Storm Drainage Projects Request for Qualifications Pre-Submittal Meeting: Welcome and Introductions Sign-in sheet Meeting Agenda Provide overview of solicitation and selection process
More informationCHAPTER 3 SCOPE SUMMARY
CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the
More informationCHAPTER 2. VISION, GOALS AND MTP FRAMEWORK
CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK MTP VISION In order to create a framework for the 2040 Metropolitan Transportation Plan (MTP), a vision statement was drafted by the Vision/Goals Committee and
More informationRiverton City s 2013 Strategic Plan Report Card
Riverton City s 2013 Strategic Plan Report Card Priority: Economic Development Facilitate Balanced Economic Development with an emphasis on: 1. Development of the Western Commercial District (WCD) Economic
More informationPromote fiscally responsible asset management of existing and proposed new infrastructure.
10.0 Infrastructure Goals Promote fiscally responsible asset management of existing and proposed new infrastructure. Promote all sources of water as a valuable resource through the conservation of water,
More information5.0 PRELIMINARY ENVIRONMENTAL REVIEW
5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors
More informationPinellas County. Staff Report. Subject: Unincorporated Area (Municipal Services Taxing Unit) Paving Program Report.
Pinellas County 315 Court Street, 5th Floor Assembly Room Clearwater, Florida 33756 Staff Report File #: 15-804, Version: 1 Agenda Date: 11/24/2015 Subject: Unincorporated Area (Municipal Services Taxing
More information4 May 14, 2014 Public Hearing
4 May 14, 2014 Public Hearing APPLICANT: MID ATLANTIC COMMERCIAL PROPERTIES PROPERTY OWNER: 336 CEDAR ROAD LLC STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Gas Station with Convenience Store)
More informationCapital Improvement Summary by Fund
Capital Improvement Summary by Fund Central Services Fund Desciption F Y 2017 F Y 2018 F Y 2019 F Y 2020 F Y 2021 Total 2017-2021 Cost Revenues: Pay as you Go 1,000,000 1,000,000 Vehicle Leases - 1,250,000
More informationPublic Works Department Five Year Capital Improvement Plan FY PROPOSED
Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted
More informationAPPENDIX E: Capital Programs and Descriptions
APPENDIX E: Capital s and Descriptions Pinellas County Number Name Description 1007 Debt Service -General Administers the servicing of Pinellas County public debt. 1008 Reserves Oversees the management
More informationPlacerville, a Unique Historical Past Forging into a Golden Future
Placerville, a Unique Historical Past Forging into a Golden Future City Manager s Report June 24, 2014 City Council Meeting Prepared by: Nathan Stong, City Engineer Item #: Subject: Adopt a Resolution:
More informationRoadway Intersection Inventory and Remote Sensing
Veneziano 1 Roadway Intersection Inventory and Remote Sensing David Veneziano Center for Transportation Research and Education Iowa State University ABSTRACT The application of remote sensing to the collection
More informationHonorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development
Office of the City Manager To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Eric Angstadt, Director, Planning and Development Subject: RECOMMENDATION
More informationBoster, Kobayashi & Associates NEVIN Q. SAMS, P.E., T.E., P.T.O.E.
Boster, Kobayashi & Associates 59 Rickenbacker Circle Office: (925) 447-6495 P.O. Box 2049 Fax: (925) 447-6589 Livermore, CA 94551-2049 NEVIN Q. SAMS, P.E., T.E., P.T.O.E. Curriculum Vitae EDUCATION: B.S.
More informationBerkshire Region TIP Project Data Form
BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing
More informationCRA FY 2014/2015 Proposed Budget and Work Plan Presentation. City Commission Workshop September 9, 2014
CRA FY 2014/2015 Proposed Budget and Work Plan Presentation City Commission Workshop September 9, 2014 Muse House & Harvel House Renovations NW 5 th Avenue Atlantic Avenue Tree Grate Improvements After
More informationCapital Improvement Plan (CIP) Adopted Oct. 17, 2016
2017-2021 Capital Improvement Plan (CIP) Adopted Oct. 17, 2016 Fiscal Year 2017 Adopted Capital Improvement Plan Table of Contents Page Description CIP Project Category Start Timeline N/A 1 Introduction
More informationASPK G1801. The following is a status of ongoing road work in the City of Asbury Park. Items in bold indicate the most recent updates.
MEMORANDUM TO: CC: Michael N. Capabianco, Asbury Park City Manager Mayor John Moor and City Council Members Cindy Dye, City Clerk William McClave, Superintendent of Public Works Frederick Reffetto, Esq.,
More informationAPPENDIX E: Capital Programs and Descriptions
APPENDIX E: Capital s and Descriptions Pinellas County Number Name Description 1007 Debt Service -General Administers the servicing of Pinellas County public debt. 1008 Reserves Oversees the management
More informationTOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06
TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE 4567 Route 9 North, 2 nd Floor Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 414-3243 Howell, NJ 07731-0580 Web: www.twp.howell.nj.us
More informationCPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL
CPC-2014-3808-GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL Pursuant to Los Angeles Municipal Code Section 12.32 G, the T Tentative Classification shall
More information3.6 Construction Methods
Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required
More informationSUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$18.04 12X18:$22.14 24X36:$319.80 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as
More informationHighway Construction Program
Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,
More informationCMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W
District One CMNAA Central Manatee Network Alternatives Analysis December 12, 2017 5:00 pm - 7:00 pm First Baptist Church 1306 Manatee Ave. W, Bradenton, FL 34205 Central Manatee Network Alternatives Analysis
More informationINVITATION TO BID FOR CONSTRUCTION OF A MID-BLOCK PEDESTRIAN CROSSING Gateway85 Gwinnett CID May 25, 2018
INVITATION TO BID FOR CONSTRUCTION OF A MID-BLOCK PEDESTRIAN CROSSING Gateway85 Gwinnett CID Bid Due to the CID by: June 8, 2018, 2:00 PM EDT Background: The Gateway85 Community Improvement District (CID)
More informationAppendix VI-A-3 Infrastructure Inventory
Pennsylvania State System of Higher Education Facilities Manual Appendix VI-A-3 Infrastructure Inventory Form Format and Definitions Figure Column Headings Infrastructure means the communications, utility,
More informationCurb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6
: Curb Ramps 1 [ 4.7.3] Only measure the width of the ramp section of the curb ramp (labeled ramp to the right). The ramp section of a curb ramp is also known as the ramp run. If the curb ramp has flared
More informationSummary of transportation-related goals and objectives from existing regional plans
SMTC 2050 Long Range Transportation Plan Appendix A: Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Summary of transportation-related
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form
More information