SPE Abstract. Introduction

Size: px
Start display at page:

Download "SPE Abstract. Introduction"

Transcription

1 SPE Succesful Application of Metal PCP Rechnology to Maximize Oil Recovery in SAGD Process R. Arystanbay, SPE, W. Bae, SPE, Huy X. Nguyen, SPE, Sejong University; S. Ryou, SPE, W. Lee, T. Jang, SPE, Korean National Oil Corporation Caspian Branch Copyright 2011, Society of Petroleum Engineers This paper was prepared for presentation at the SPE Heavy Oil Conference and Exhibition held in Kuwait City, Kuwait, December This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright. Abstract Enhanced oil recovery methods (EOR) methods such as Steam Assisted Gravity Drainage (SAGD), Cyclic Steam Stimulation (CSS), steam drive, solvent and electric heating allow production of highly viscous crude oil at elevated operating temperatures (>160 C). The choice of artificial lift technique is critical to overall well performance. Therefore it has been a challenge to find a reliable artificial lift pumping system for heavy oil thermal recovery. Available options such as beam pumps and electrical submersible pumps (ESP), which are well proven in the petroleum industry, are not particularly well suited for thermal production. Progressing Cavity Pumps (PCP), with elastomeric stator, are economic to run and have performed well in heavy oil cold production. Since their elastomers are limited in temperature (<160 C), a metal PCP technology has been developed through numerous research works to meet the high temperature requirement of SAGD and other thermal recovery processes. This paper describes the successful application of KUDU PCM Vulcain TM metal PCP systems for SAGD process in Athabasca reservoir, beginning from We made analysis on production optimization in SAGD well pairs equipped with the PCM Vulcain, which consists of a hydroformed metal stator and matching rotor utilizing special metallurgy to resist wear and maximize run life. In particular, the production with metal PCP in these wells reached the value of 200 m3/d at pump intake temperature of 200 C, performing volumetric efficiency of 82%. In general, the field results have demonstrated that the strong resistance of metal PCPs to chemical and mechanical degradation makes them a good alternative for the cold production of heavy and extra heavy oil with relatively high bottomhole temperatures and high aromatic, CO2 or H2S concentrations. This paper can be a guide for special heavy oil hot production PCP technologies to be spread and applied for EOR projects widely in the world. Introduction A huge quantity of heavy oil and bitumen resources has been discovered worldwide. According to Chen s research (2009), the proved reserves of heavy oil are estimated more than 1.8 trillion barrels in Venezuela, 1.74 trillion barrels in Alberta, Canada, and 20 to 25 billion barrels on the North Slope of Alaska. Among the estimated 170 billion barrels recoverable reserves of Canadian oil sands, 20% can be recovered by mining techniques where the reservoir depth is 90 meters or less. The remaining 80% of the resource has to be recovered in-situ (in place). The existing recovery methods involve cold/chops production or thermal activation - whether steam, such as SAGD, CSS or steam drive; electrical heating, like electro thermal dynamic stripping process (ET DSP); or combustion, such as toe-to-heel air injection (THAI); or solvent injection, mainly vapor extraction (VAPEX). Combination of those processes can be used as well, and several research projects may bring other innovative solutions in the nearest future. Key to any thermal recovery process is artificial lift, which is required due to the very high density and viscosity of crude and relatively low reservoir pressures. The main challenge with hot pumping is the rather high temperatures often required (up to 260 C for SAGD and 350 C for CSS). The dominant pumping technologies available are beam pumps, electric submersible pumps, and progressing cavity pumps. However all these pumps have their peculiar limitations for hot production. While

2 2 SPE beam pumps offer high temperature service, they are limited in the flowrate they can deliver. On the other hand, ESPs can handle high volumes of low viscosity fluids, but are still limited in terms of maximum operating temperature. Conventional PCPs also suffer due to the limitation in operating temperature of elastomer. Through research work conducted by PCM and Total, metal PCP technology has been developed using hydroforming technology to meet the high temperature requirements of SAGD and other thermal recovery processes. This paper describes the application of metal PCP systems for SAGD process in Athabasca reservoir. The production analysis was made in SAGD well pairs equipped with PCM Vulcain at the B field, located in Alberta, Canada (note we call the field B, since its name is confidential). The metal PC Pumps were installed to enhance and optimize production instead of the previous artificial lift systems, employed in several well pairs. Conventional and metal PCP Progressing cavity pumps, invented and patented by Rene Moineau, have found numerous applications in many industries as a means to efficient transfer, transport and/or lift fluids of a diverse nature. The use o PCPs as an artificial lift method for oil wells has gained increasing acceptance since their first commercial use in heavy oil applications in the 1980 s, and they have now become the lift method of choice in numerous oil field developments worldwide. PCPs are very simple in design and operation. The pump is composed of two basic parts: the stator and the rotor. The stator has a dual helical profile, and the rotor, rotating inside the stator, has a single helical profile designed to match the stator profile. The rotor rotation movement creates progressing cavities from bottom displacing the fluid through each successive cavity and consequently the pumping action. PCPs are non-pulsating positive displacement pumps and will deliver a constant flowrate for a given rpm of the rotor. The conventional PCP has the stator with the helical profile made of elastomer and glued to an external metallic tube (Fig. 1a). The rotor fits the stator with negative clearance. The metal PCP has the stator fully metallic and hence able to handle very high temperature (Fig. 1b). The stator is composed by 3 elements of 9 ft long welded together. The rotor fits the stator with positive clearance. Both are specially coated for high temperature and wear resistance, but the rotor serves as a sacrificial element. Although the metal PCP does not have the same interference fit between the rotor and stator as a conventional PCP, the efficiency is still adequate as the fit can be precisely adjusted using the patented hydroforming process used for manufacturing. It is also important to note that the absence of any elastomer material can provide the metal PCPs with an operational and run life advantage in applications where the downhole fluid environment causes severe swelling and/or degradation of the various pump elastomers that are available. The metal PCPs are tested with water to ensure volumetric efficiency; friction and dynamic torque are all within specification. The main advantages of the metal PCP include: - Easy flowrate control (proportional to rpm) - Easy to install (similar to conventional PCP) - High operating temperature range (up to 350 C) - Acceptable for high or low viscosities - Production with low bottomhole pressure - Non shearing and no formation of emulsions - Easy initial start-up at higher viscosities Figure 1. The conventional (a) and metal (b) PCP systems. (a) (b)

3 SPE KUDU PCM Vulcain offers three models of the metal PCP capable to cover a wide range of flow rates for heavy oil production: 400MET1000, 550MET750, and 1000MET500. The first number is for the maximum rate in m3/d at zero head at 500 rpm, while the second number gives the nominal head capacity in meters of water equivalent. The pumps are rated to 350 C. SAGD operation and PCP performance To date the majority of active in-situ operations have used SAGD for their recovery methods. The steam assisted gravity drainage process is an effective method for heavy oil and bitumen production utilizing two parallel horizontal wells, one above the other. The top well is steam injector and the bottom one is the oil collector. When steam is continually injected in the top well, a steam chamber forms in reservoir and grows upward to the surroundings displacing heated oil following gravity mechanism drain into producer (Fig. 2). Key factors to promote the use of SAGD are: - reservoir characteristics vertical permeability has to allow for steam chamber growth and flow to the producing well; sufficient cap rock to sustain bottom hole pressure needed to promote flow of bitumen; - steam oil ratio, meaning less energy spent per barrel produced; - recovery factor, leaving minimal quantity of oil in the reservoir when the well is abandoned. Figure 2. The SAGD recovery process. The B field is a shallow (about 300m TVD) low pressure oil sand field located in Athabasca oil sands of Alberta, Canada. The crude oil API is 8 with viscosity about 2 million cp at initial reservoir temperature of 12 C. The virgin reservoir pressure is 1500 kpa, around 5 Darcy permeability, 35% porosity, and 80% oil saturation (Tab. 1). Primary recovery from the B field is steam assisted gravity drainage. The horizontal wells were drilled together, an injector-producer well pair, with about 7 m of vertical spacing. The field has several well pairs under SAGD employed predominantly with 400MET1000, producing crude from McMurray formation. The typical well completion is shown in Figure 3a, b. (b) (a) Figure 3. The typical completion for SAGD well for ESP (a) and metal PCP (b).

4 4 SPE Table 1. Reservoir properties in McMurray formation. Reservoir pressure, kpa 1500 Depth to top of reservoir, m 200 Reservoir thickness, m 30 Vertical permeability (Kv), Darcy 5 Permeability ratio (Kh/Kv) 2,5 Porosity 0,35 Oil saturation 0,8 Oil viscosity Reservoir temperature, C 12 Steam quality 0,95 Steam injection pressure,kpa 1900 Steam injection rate, m3/d (continuous) 700 Steam trap control, C 5 Injector-Producer spacing, m 7 water injection temp., C 235 SAGD Well pairs spacing,m 150 The production from SAGD at the B field started in 2006 with a pilot well pair initially equipped with beam pump, which was replaced later with a metal PCP. In the next year additional well pairs were drilled and equipped with ESPs. However at that time the efficiency of ESP in several wells had decreased due to often failures and they were converted to metal PCP. Currently all the wells are equipped with metal PCPs (Fig. 4). The overall field production is below expectations, due to overestimations of reservoir quality and production rate, producing about 600 m3/d instead of expected 1500 m3/d (Fig. 5). Figure 4. PCM Vulcain TM well pairs. Figure 5. Overall field production. The first metal PCP was run in Pad E well P4 in 2006 with 150 rpm. Initial volumetric efficiency was about 90%. During this start-up period of the SAGD well pair, downhole temperature was below 100 C. The lowest intake pressure at the pump was seen at 650 kpa (g). With the increase of pressure communication between injector and producer, pump intake pressure gradually increased to 1200 kpa (g), as well as the pump speed increased from 150 to 300 rpm. The bottomhole temperature rose to 180 C. After 6 months following the start-up, the production dropped to 50%, and it was decided to increase pump speed to 350 rpm. The fluctuating production increase for two months was followed by dramatic decrease, showing the volumetric efficiency of 30%. Since the operating pump speed was maximal due to possible vibration problems, it was considered to change pump to stronger model. Thus in the end of 2007 the 400MET100 metal pump was changed to 550MET750. Well production improved significantly up to 80 m3/d at 200 rpm, with 70% of pump efficiency. About six months later the well production dropped as the pump efficiency decreased. Therefore the pump speed was increased to 300 rpm. Accordingly crude production increased to previous level, while volumetric efficiency decreased to 50% (Fig. 6). Being the pilot well to test metal PCP, the performance of these pumps has exceeded expectations.

5 SPE Figure 6. Pad E P4 well production chart. Figure 7. Pump efficiency at Pad B P3 well. Another 40MET1000 metal PCP was employed in Pad B well P3. This PCP started production in 2007 and pump speed was quickly ramped up to 180 rpm and then gradually to 230 rpm, and later on to 380 rpm. Pump volumetric efficiency initially was considerably high at about 85%, but dropped to 60% and 47% with rpm increase respectively. Liquid flowrate reached 160 m3/d. About four months after ten days turnaround, the pump speed increased to 390 and 400 rpm, and the efficiency stabilized at about 55%. The bottomhole temperature reached the level of 180 C with a pump intake pressure of around 980 kpa (g). The liquid production made 190 m3/d at highest point (Fig. 7). The field trial of the first metal PCP in a low pressure SAGD operation has demonstrated that a PC Pump can successfully initiate the start-up of a SAGD well pair even at relatively low bottomhole temperature, what is a challenge for ESP due to high viscosity. Unlike to other SAGD projects, the B field wells are directly converted to pumping after the steam circulation. Using PC Pumps we may not to worry about keeping the well at hot temperature. It can cool down without compromising the start-up. The conversion to PC Pump allowed removing the need for live well interventions, saving time and reducing risks. Moreover, PCPs are very easy to control and flowrate can be set by adjusting only the rod speed at the variable frequency drive (VFD). This allows for a very precise control of the well behavior and makes well performance optimization possible. Pump sub-cool and reservoir sub-cool can be optimized with great accuracy so that bitumen production is maximized. Metal PCPs at the B oil field have demonstrated a very good performance with low pump intake sub-cool. However the volumetric efficiency of the metal PC Pump is challenging. Indeed it was confirmed that this efficiency could be significantly affected by the head applied to the pump, due to positive clearance necessary in this technology and its increase with wear. The metal PCP in P4 well performed an overall gradual efficiency decrease with time corresponding to normal wear. At the same time, the PC Pump in P3 well showed initially a very high efficiency, but dropped dramatically in a month, but with further stable production. Nevertheless, it should be mentioned that metal PCP production was higher compared to previous lift system, namely ESP (Fig. 8). After these perspective results, total number of fourteen metal PC Pumps were installed at the B field. Figure 8. The advantages of PCM Vulcain TM metal PCP over ESP.

6 6 SPE Summary The metal PC Pumps had produced for over than 15 months with total gross flowrates varying from 50 to 250 m3/day at speeds ranging from 150 to 400 rpm. The bottomhole temperatures had ranged from 100 C to 200 C. While the operating conditions varied significantly, an exceptional improvement in SOR (9 pre-lift to 2.8 post-lift) is associated with production optimization using the metal PCP. Also it is worth of mentioning that the B field had installed 14 metal PC Pumps with no failures (Fig. 9). The production forecast based on the metal PCP production performance and further SAGD operations shows the gradual increase of daily flowrate over 500m3. The overall field cumulative production is also predicted to reach 2,000 m3/d (Fig. 10). Figure 9. Metal PCP non-stop operating period. Figure 10. Production forecast for the B field. Conclusion To conclude, we can say that after more than 15 months operation, where the wells were steam injected at various operating speeds, pump loads, and fluid flowrates, the metal PCP has proven its versatility and influenced to improve well cash inflow. The high temperature package handled the wide range of viscosities, from low to high intake and differential pressures. Speed adjustment enabled to fit production and well capability as downhole conditions varied. References 1. Lea, J.F., Anderson, P.D., Anderson, D.G. Optimization of progressive cavity pumps systems in the development of Clearwater heavy oil reservoir, Journal of Canadian Petroleum technology, JCPT Beauquin, J.L., Boireau, C., Lemay, L., Seince, L., Development status of a metal progressing cavity pump for heavy oil and hot production wells. Paper SPE presented at the SPE International Thermal operations and Heavy oil symposium, Calgary, Alberta, 1-3 November. 3. Beauquin, J.L., Ndinemenu F., Chalier, G., Lemay L., Seince, L., Damnjanovic, A., World s first metal PCP SAGD field test shows promising artificial lift technology for heavy-oil hot production: Joslyn field case. Paper SPE presented at the SPE Annual Technical Conference and Exhibition, Anaheim, California, November. 4. Guerra E., Sanchez A., Matthews C., Field implementation experience with metal PCP technology in Cuban heavy oil fields. Paper SPE presented at the SPE Production and Operations Symposium, Oklahoma City, Oklahoma, 4-8 April. 5. Rae M., Seince L., Mitskopoulos, M., All metal progressing cavity pumps deployed in SAGD. Paper WHOC presented at the World Heavy Oil Congress, Edmonton, Alberta.

PCM Vulcain. High Temperature Package. Artificial lift for enhanced oil recovery

PCM Vulcain. High Temperature Package. Artificial lift for enhanced oil recovery PCM Vulcain High Temperature Package Artificial lift for enhanced oil recovery Unlocking unconventional reserves It is estimated that half of the world s known oil reserves are difficult-to-extract unconventional

More information

Quiet above ground, the extreme subsurface environment of thermal operations spurs evolution in artificial-lift technology for thermal developments

Quiet above ground, the extreme subsurface environment of thermal operations spurs evolution in artificial-lift technology for thermal developments PHOTO: Cenovus Energy Subsurface temperatures and pressures in SAGD development are very hard on the pumping equipment that brings unconventional oil to the surface. Hot and Quiet above ground, the extreme

More information

Effects of Well Placement using Multi- Segmented Wells in a Full Field Thermal Model for SAGD: Athabasca Oil Sands

Effects of Well Placement using Multi- Segmented Wells in a Full Field Thermal Model for SAGD: Athabasca Oil Sands PAPER 2008-464 Effects of Well Placement using Multi- Segmented Wells in a Full Field Thermal Model for SAGD: Athabasca Oil Sands F. AKRAM Schlumberger Canada Limited This paper has been selected for presentation

More information

Thermal Recovery Status and Development Prospect for Heavy Oil in China

Thermal Recovery Status and Development Prospect for Heavy Oil in China UNITAR Centre for Heavy Crude and Tar Sands 1998 1 No.1998.198 Thermal Recovery Status and Development Prospect for Heavy Oil in China Liu Wenzhang Research Institute of Petroleum Exploration and Development,

More information

Beyond CSS, SAGD and VAPEX. Zhangxin Chen

Beyond CSS, SAGD and VAPEX. Zhangxin Chen Beyond CSS, SAGD and VAPEX Heavy Oil and Oil Sands Reservoir Modeling Zhangxin Chen University of Calgary, NSERC/AERI/CMG Chair Professor Participants Synergia Polygen Ltd Outline Why? Importance of the

More information

A PROTOCOL TO EVALUATE CAPROCK INTEGRITY FOR THERMAL HEAVY OIL AND BITUMEN RECOVERY OPERATIONS

A PROTOCOL TO EVALUATE CAPROCK INTEGRITY FOR THERMAL HEAVY OIL AND BITUMEN RECOVERY OPERATIONS SCA2014-032 1/6 A PROTOCOL TO EVALUATE CAPROCK INTEGRITY FOR THERMAL HEAVY OIL AND BITUMEN RECOVERY OPERATIONS U. Romanova 1, M. Piwowar and T. Ma Weatherford Laboratories Canada, Calgary, Alberta, Canada

More information

Cartography of oil reserves and recovery factors of petroleum reservoirs - IOR/EOR methods to increase ultimate recovery

Cartography of oil reserves and recovery factors of petroleum reservoirs - IOR/EOR methods to increase ultimate recovery Cartography of oil reserves and recovery factors of petroleum reservoirs - IOR/EOR methods to increase ultimate recovery G. Renard R. Vially - J-F. Argillier Proved Oil Reserves (2009) Total with oil sands

More information

Artificial Lift Technique (VI Semester)

Artificial Lift Technique (VI Semester) Artificial Lift Technique (VI Semester) Q.1. What do you mean by artificial lift technique in Petroleum industry? Answer. Artificial lift is a means of overcoming bottomhole pressure so that a well can

More information

A Comparison Study between the Newly Developed Vertical Wells Steam Assisted Gravity Drainage and the Conventional SAGD Process

A Comparison Study between the Newly Developed Vertical Wells Steam Assisted Gravity Drainage and the Conventional SAGD Process Engineering, 217, 9, 575-59 http://www.scirp.org/journal/eng ISSN Online: 1947-394X ISSN Print: 1947-3931 A Comparison Study between the Newly Developed Vertical Wells Steam Assisted Gravity Drainage and

More information

Screening of Major Chemical Reactions in In-Situ Combustion Process for Bitumen Production from Oil Sands Reservoirs

Screening of Major Chemical Reactions in In-Situ Combustion Process for Bitumen Production from Oil Sands Reservoirs International Journal of Petroleum and Petrochemical Engineering (IJPPE) Volume 3, Issue 4, 217, PP 82-92 ISSN 2454-798 (Online) DOI: http://dx.doi.org/1.2431/2454-798.348 www.arcjournals.org Screening

More information

Experiences and Best Practices in the use of PCP in Orinoco Oil Belt - Ayacucho Division, San Tome Area, Venezuela.

Experiences and Best Practices in the use of PCP in Orinoco Oil Belt - Ayacucho Division, San Tome Area, Venezuela. WHOC12-365 Experiences and Best Practices in the use of PCP in Orinoco Oil Belt - Ayacucho Division, San Tome Area, Venezuela. R. FIGUERA, V. PEÑA, M. RAMOS. Petróleos de Venezuela, S.A. This paper has

More information

Feasibility Research of Steam-Assisted-Gravity-Drainage Process in Bohai Offshore Heavy Oil Reservoirs

Feasibility Research of Steam-Assisted-Gravity-Drainage Process in Bohai Offshore Heavy Oil Reservoirs Copyright 2013 Tech Science Press SL, vol.9, no.3, pp.197-205, 2013 Feasibility Research of Steam-Assisted-Gravity-Drainage Process in Bohai Offshore Heavy Oil Reservoirs Xiaohu Dong 1, Huiqing Liu 1,

More information

Technological Enhancement of PC Pumps for Heavy Oil Production. Courtney Ward P.Eng.

Technological Enhancement of PC Pumps for Heavy Oil Production. Courtney Ward P.Eng. Technological Enhancement of PC Pumps for Heavy Oil Production Courtney Ward P.Eng. April 28, 2008 Development and Test Area * Lloydminster 1 History Initial PC Pump Installations Initial install occurred

More information

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation ERCB offices Calgary February 2013 Advisory This document contains forward-looking

More information

Toe-To-Heel Air Injection (THAI TM ) Process

Toe-To-Heel Air Injection (THAI TM ) Process Toe-To-Heel Air Injection (THAI TM ) Process A pseudo-gravity stable displacement in-situ combustion process operating over short reservoir distance. It has a proven record of producing partially upgraded

More information

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency -

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Nov-29, 2017 JAPEX (Japan Petroleum Exploration Co., Ltd) Canada Oil Sands Project Dept. Tanetomo (Tom) Izumi Japan

More information

KUDU PCP. Positive displacement pump with a helical rotor spinning inside a fixed stator

KUDU PCP. Positive displacement pump with a helical rotor spinning inside a fixed stator Positive displacement pump with a helical rotor spinning inside a fixed stator APPLICATIONS Heavy, medium, and light oil wells Dewatering coalbed methane and conventional gas wells High-water-cut and sand-cut

More information

Heavy Oil : Current Status and Recovery Methods M.Helmy Sayyouh Cairo University

Heavy Oil : Current Status and Recovery Methods M.Helmy Sayyouh Cairo University Heavy Oil : Current Status and Recovery Methods M.Helmy Sayyouh Cairo University 12/12/2017 Dr. Helmy Sayyouh 1 Topics of Discussion - Introduction - Heavy Oil and Tar Sand Deposits - Current Thermal Recovery

More information

Thermal Recovery of Bitumen

Thermal Recovery of Bitumen Thermal Recovery of Bitumen February 23, 2007 Presented by Neil Edmunds, VP EOR Thermal Recovery of Bitumen 2 1. SAGD as a mechanism (instead of a process) 2. How a Steam/Oil Ratio is Determined 3. Optimizing

More information

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation AER Office Calgary March 2014 Advisory This document contains forward-looking information

More information

Recovery Process - Cold Heavy Oil

Recovery Process - Cold Heavy Oil Recovery Process - Cold Heavy Oil CHOPS (Cold Heavy Oil Production with Sand) CHOPS is a heavy oil recovery technique where the reservoir sand is deliberately produced to improve reservoir performance.

More information

AN OVERVIEW OF THE LOW AND HIGH TEMPERATURE WATER-OIL RELATIVE PERMEABILITY FOR OIL SANDS FROM DIFFERENT FORMATIONS IN WESTERN CANADA

AN OVERVIEW OF THE LOW AND HIGH TEMPERATURE WATER-OIL RELATIVE PERMEABILITY FOR OIL SANDS FROM DIFFERENT FORMATIONS IN WESTERN CANADA SCA2014-066 1/6 AN OVERVIEW OF THE LOW AND HIGH TEMPERATURE WATER-OIL RELATIVE PERMEABILITY FOR OIL SANDS FROM DIFFERENT FORMATIONS IN WESTERN CANADA U. Romanova 1, M. Piwowar and T. Ma Weatherford Laboratories

More information

Enabling Unconventional Resources

Enabling Unconventional Resources Enabling Unconventional Resources 8 th U.S. - China Oil and Gas Industry Forum San Francisco, California U.S.A. September 9-11, 2007 ROLE OF UNCONVENTIONAL Increasing contribution by unconventional resources

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe Additional support provided by AIME Society of Petroleum Engineers Distinguished Lecturer

More information

AFTP. Technologies Applicable to Heavy Oil / Bitumen

AFTP. Technologies Applicable to Heavy Oil / Bitumen AFTP Technologies Applicable to Heavy Oil / Bitumen Field - Production/extraction level Midstream - Transportation Level Valorisation - Upgrading level AFTP-Oct-2007 FIELD LEVEL production / extraction

More information

The Canadian Oil Sands in the Context of the Global Energy Demand

The Canadian Oil Sands in the Context of the Global Energy Demand Extended Abstract for 17 th Convocation of the International Council of Academies of Engineering and Technological Sciences (CAETS), Tokyo, Japan, October 2007. The Canadian Oil Sands in the Context of

More information

Steam Injection. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

Steam Injection. Dr. Helmy Sayyouh Petroleum Engineering Cairo University Steam Injection Dr. Helmy Sayyouh Petroleum Engineering Cairo University 1 Increasing Temperature Lowers Viscosity... Fig. 11-1 2 Single-Parameter Viscosity Correlation Fig. 11-5 Two-parameter correlation

More information

Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir

Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir LARICINA ENERGY Steve Brand P. Eng. WHOC15-280 Organized by: Outline Project overview 1D experience and knowledge gained Early cycle

More information

PERP Program Unconventional Heavy Oils New Report Alert

PERP Program Unconventional Heavy Oils New Report Alert PERP Program Unconventional Heavy Oils New Report Alert December 2005 Nexant s ChemSystems Process Evaluation/Research Planning program has published a new report, Unconventional Heavy Oils (04/05S9).

More information

Air Injection: Heavy Oil Field Potential and Simulation. E.Druganova, IPNG, L.Surguchev, IRIS/IPNG, R.Ibatulin, TatNIPIneft

Air Injection: Heavy Oil Field Potential and Simulation. E.Druganova, IPNG, L.Surguchev, IRIS/IPNG, R.Ibatulin, TatNIPIneft Air Injection: Heavy Oil Field Potential and Simulation E.Druganova, IPNG, L.Surguchev, IRIS/IPNG, R.Ibatulin, TatNIPIneft 18.10.2010 In Situ Combustion Classic Schematic 7-9% of the contacted oil is consumed

More information

Seal Main HCSS Pilot Subsurface Review

Seal Main HCSS Pilot Subsurface Review Seal Main HCSS Pilot Subsurface Review Subsurface Agenda 1. Background 2. Geology 3. Drilling and Completions 4. Artificial Lift 5. Well Instrumentation 6. 4D Seismic 7. Scheme Performance 8. Future Plans

More information

INVESTIGATION ON THE EFFECT OF THE RESERVOIR VARIABLES AND OPERATIONAL PARAMETERS ON SAGD PERFORMANCE

INVESTIGATION ON THE EFFECT OF THE RESERVOIR VARIABLES AND OPERATIONAL PARAMETERS ON SAGD PERFORMANCE INVESTIGATION ON THE EFFECT OF THE RESERVOIR VARIABLES AND OPERATIONAL PARAMETERS ON SAGD PERFORMANCE a Hashemi Kiasari, H.; b Sedaee Sola 1, B.; a Naderifar, A. a Petroleum Engineering Department, AmirKabir

More information

Alberta Energy Regulator Suite 1000, Street SW Calgary, Alberta T2P 0R4 Attention: Steve Thomas, P.Eng., Section Leader In-Situ Oil Sands

Alberta Energy Regulator Suite 1000, Street SW Calgary, Alberta T2P 0R4 Attention: Steve Thomas, P.Eng., Section Leader In-Situ Oil Sands East Tower, 5 th Ave Place Suite 800, 425-1 st Street S.W. Calgary, Alberta T2P 3L8 Tel: 403-750-0810 Fax: 403-263-0767 www.laricinaenergy.com August 7, 2013 Alberta Energy Regulator Suite 1000, 250 5

More information

History Matching Field Results from a SAGD / Light Hydrocarbon Process (SAGD+ TM )

History Matching Field Results from a SAGD / Light Hydrocarbon Process (SAGD+ TM ) WHOC12-442 History Matching Field Results from a SAGD / Light Hydrocarbon Process (SAGD+ TM ) E.C. LAU, M.D. JOHNSON, T. LAU Connacher Oil & Gas Limited This paper has been selected for presentation and/or

More information

For contact information, please visit our website:

For contact information, please visit our website: Weatherford s Integrated Laboratory Services (ILS) effectively combines the experience and expertise of leaders in the oil and gas service industry by integrating their considerable abilities under one

More information

Pressure Communication

Pressure Communication Pressure Communication Industry, government collaborate on gas over bitumen R&D BY DEBORAH JAREMKO Slant drilling has helped push bitumen development, but more advances are needed 44 Oilweek February 2006

More information

Kuwait EPF. Early Production Facilities MARCOM-AGC

Kuwait EPF. Early Production Facilities MARCOM-AGC Kuwait EPF Early Production Facilities MARCOM-AGC 1 Enhanced Oil Recovery Techniques Water Flooding Cold Heavy Oil Production with Sand (CHOPS) processing plant Steam Flooding Surface Treatment Pumping

More information

OPERATIONAL AND RESERVOIR PARAMETERS INFLUENCING THE EFFICIENCY OF STEAM-ASSISTED GRAVITY DRAINAGE (SAGD) PROCESS IN FRACTURED RESERVOIRS

OPERATIONAL AND RESERVOIR PARAMETERS INFLUENCING THE EFFICIENCY OF STEAM-ASSISTED GRAVITY DRAINAGE (SAGD) PROCESS IN FRACTURED RESERVOIRS OPERATIONAL AND RESERVOIR PARAMETERS INFLUENCING THE EFFICIENCY OF STEAM-ASSISTED GRAVITY DRAINAGE (SAGD) PROCESS IN FRACTURED RESERVOIRS a Fatemi, S. M. 1 ; b Kharrat, R. a Department of Chemical & Petroleum

More information

Natural Gas Use in Alberta s Oil Sands Industry. Outline

Natural Gas Use in Alberta s Oil Sands Industry. Outline Natural Gas Use in Alberta s Oil Sands Industry CERI North American Natural Gas Conference March 1, 2004 1 Outline Oil Sands Industry Overview Bitumen and Synthetic Crude Oil Supply Projections Oil Sands

More information

Proxy Model Based on Butler s SAGD Theory

Proxy Model Based on Butler s SAGD Theory Proxy Model Based on Butler s SAGD Theory Vahid Dehdari and Clayton V. Deutsch Oil sand reservoirs play an important role in the economy of Canada. There are huge reserves in these reservoirs. Due to the

More information

A New Control Technology for Progressing Cavity Pumps

A New Control Technology for Progressing Cavity Pumps A New Control Technology for Progressing Cavity Pumps Abstract This paper will cover a new control technology for progressing cavity pumps that was designed to meet the challenge of operating progressing

More information

Enhanced Oil Recovery : Approaches and Recovery Methods

Enhanced Oil Recovery : Approaches and Recovery Methods Enhanced Oil Recovery : Approaches and Recovery Methods King Saud University Riyadh - 2007 11/29/2017 Dr.Helmy Sayyouh 1 Webster defines - - 'to enhance' is to increase, to make or become larger, to advance,

More information

Oil Recovery Enhancement: Approaches, Methods, Project Design and Current Status, Application to Egyptian Oil Fields

Oil Recovery Enhancement: Approaches, Methods, Project Design and Current Status, Application to Egyptian Oil Fields Oil Recovery Enhancement: Approaches, Methods, Project Design and Current Status, Application to Egyptian Oil Fields 1/29/2018 PPEC GROUP 1 Webster defines - - 'to enhance' is to increase, to make or become

More information

Successfully Producing Unconventional Wells Using Modern Automation Combined with Progressive Cavity Pumps

Successfully Producing Unconventional Wells Using Modern Automation Combined with Progressive Cavity Pumps 2019 Artificial Lift Strategies for Unconventional Wells Workshop Cox Convention Center, February 11-14, 2019 Successfully Producing Unconventional Wells Using Modern Automation Combined with Progressive

More information

Heavy Oil Systems Experience and expertise to enhance productivity

Heavy Oil Systems Experience and expertise to enhance productivity Heavy Oil Systems Experience and expertise to enhance productivity In the emerging and rapidly growing market of heavy oil extraction, production using conventional techniques can be difficult and costly.

More information

A Comparative Field-Scale Simulation Study on Feasibility of SAGD and ES-SAGD Processes in Naturally Fractured Bitumen Reservoirs

A Comparative Field-Scale Simulation Study on Feasibility of SAGD and ES-SAGD Processes in Naturally Fractured Bitumen Reservoirs Energy and Environment Research; Vol. 3, No. 1; 2013 ISSN 1927-0569 E-ISSN 1927-0577 Published by Canadian Center of Science and Education A Comparative Field-Scale Simulation Study on Feasibility of SAGD

More information

BP Alaska Heavy Oil Production from the Ugnu Fluvial-Deltaic Reservoir*

BP Alaska Heavy Oil Production from the Ugnu Fluvial-Deltaic Reservoir* BP Alaska Heavy Oil Production from the Ugnu Fluvial-Deltaic Reservoir* Josef Chmielowski 1 Search and Discovery Article #80289 (2013)** Posted May 27, 2013 *Adapted from oral presentation given at 2013

More information

Canada s oil sands the in situ producers perspective

Canada s oil sands the in situ producers perspective Canada s oil sands the in situ producers perspective February 11, 2010 By: Chris Bloomer (Presented by: Gerald W. Bruce, IOSA member) IOSA Member Petrobank Who is IOSA? In situ Oil Sands Alliance Independent

More information

Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland County, Montana

Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland County, Montana Montana Tech Library Digital Commons @ Montana Tech Petroleum Engineering Faculty Scholarship 9-2013 Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland

More information

Development of a Solar-ESP Based Wellhead System for Remote Wellhead Operations in Marginal Oilfields

Development of a Solar-ESP Based Wellhead System for Remote Wellhead Operations in Marginal Oilfields SPE-187029-MS Development of a Solar-ESP Based Wellhead System for Remote Wellhead Operations in Marginal Oilfields Francis Enejo Idachaba, Covenant University Ota; Esther Wokoma, Shell Petroleum Development

More information

A Numerical Analysis of the Single-Well Steam Assisted Gravity Drainage Process (SW-SAGD) 1

A Numerical Analysis of the Single-Well Steam Assisted Gravity Drainage Process (SW-SAGD) 1 A Numerical Analysis of the Single-Well Steam Assisted Gravity Drainage Process (SW-SAGD) 1 K. T. Elliot and A. R. Kovscek Department of Petroleum Engineering, Stanford UniversityÑU.S.A. Abstract Steam

More information

Evaluation of Recovery Technology for the Grosmont Carbonate Reservoir

Evaluation of Recovery Technology for the Grosmont Carbonate Reservoir CIPC Paper 2009-067 Evaluation of Recovery Technology for the Grosmont Carbonate Reservoir Qi Jiang Jian-Yang Yuan Jen Russel-Houston Bruce Thornton Andrew Squires Osum Oil Sands Corp. Outline Geology

More information

Overview Presentation

Overview Presentation Alberta BoostWell Deployment December 2016 Overview Presentation We Bring Low Cost Barrels www.salamandersolutions.com 5/22/2018 Salamander Heaters: A Technology Whose Time has Arrived Heavy Oil: Challenges

More information

Groundwater Supply Development at Canadian Natural Resources Limited s In Situ Oil Sands Operations

Groundwater Supply Development at Canadian Natural Resources Limited s In Situ Oil Sands Operations THE PREMIUM VALUE DEFINED GROWTH INDEPENDENT Groundwater Supply Development at Canadian Natural Resources Limited s In Situ Oil Sands Operations Overview, Challenges and Lessons Learned Dave Edwards, P.Geol.

More information

Artificial Lift Optimization & Well Cleanout Technology

Artificial Lift Optimization & Well Cleanout Technology Artificial Lift Optimization & Well Cleanout Technology CJS The Company & its Business Model CJS Private Western Canadian company; head office in Calgary; Lloydminster service center Offers alternative

More information

RDS Aberdeen. Thursday, May-05-11

RDS Aberdeen. Thursday, May-05-11 Heavy Oil Presentation for RDS Aberdeen Thursday, May-05-11 Heavy Oil Presentation for RDS Aberdeen Conclusions Overview of Heavy Oil Growth Reserves Growth in Heavy Oil What is applicable to North Sea

More information

Using Horizontal Wells

Using Horizontal Wells Using Horizontal Wells for Chemical EOR: Field Cases E. Delamaide IFP Technologies (Canada) Inc., Calgary, Canada E-mail: eric.delamaide@ifp-canada.com Primary production of heavy oil in general only achieves

More information

Upgrading with a soft touch

Upgrading with a soft touch Upgrading with a soft touch Canadian Heavy Oil Conference 4 November 2014 Agenda Heavy Oil Industry the market & its challenges Upgrading in Canada Fractal Systems JetShear Technology Commercializing JetShear

More information

UNIVERSITY OF CALGARY. Comparison of CSS and SAGD in Cold Lake. Farshid Shayganpour A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES

UNIVERSITY OF CALGARY. Comparison of CSS and SAGD in Cold Lake. Farshid Shayganpour A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES UNIVERSITY OF CALGARY Comparison of CSS and SAGD in Cold Lake By Farshid Shayganpour A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTERS

More information

Small Nuclear Steam Generators for Alberta's Bitumen Resources

Small Nuclear Steam Generators for Alberta's Bitumen Resources Small Nuclear Steam Generators for Alberta's Bitumen Resources Dr. Ian J. Potter, Alberta Research Council Dr. Harold F. McFarlane, Idaho National Laboratory Western Focus Seminar 30th Annual Conference

More information

GROUSE GROUSE IN SITU OIL SANDS PROJECT. Proposed Development Plan. Plain Language Project Summary

GROUSE GROUSE IN SITU OIL SANDS PROJECT. Proposed Development Plan. Plain Language Project Summary GROUSE Proposed Development Plan GROUSE IN SITU OIL SANDS PROJECT Plain Language Project Summary ABOUT CANADIAN NATURAL WHO WE ARE Canadian Natural Resources Limited (Canadian Natural) is a senior independent

More information

Cold Lake expansion project

Cold Lake expansion project Cold expansion project Initial project description Plain language summary March 2016 Our commitment Imperial Oil Limited s success depends on our ability to maintain an open dialogue with, and ongoing

More information

WESTERN ENERGY PRODUCTS & SERVICES (WEPS) SWELLABLE PACKERS

WESTERN ENERGY PRODUCTS & SERVICES (WEPS) SWELLABLE PACKERS WESTERN ENERGY PRODUCTS & SERVICES (WEPS) SWELLABLE PACKERS Table of Contents Concept Design WEPS Advantages Testing and QA WEPS Swellable Packer Oil Swell Rubber Element Water Swell Rubber Element Robust

More information

Research and Practice on Gas Channeling Controlling by Combined Stimulation for Multi-Thermal Fluids Huff and Puff

Research and Practice on Gas Channeling Controlling by Combined Stimulation for Multi-Thermal Fluids Huff and Puff Advances in Petroleum Exploration and Development Vol. 13, No. 1, 217, pp. 1-8 DOI:1.3968/988 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Research and Practice on Gas

More information

Reservoir Engineering

Reservoir Engineering Reservoir Engineering How much oil is in place? How much oil is recoverable? How can I maximize oil recovery? Under economic constraints Origin of Petroleum Where are the resources? Traps Dome trap Fault

More information

UniFlo AFD INFLOW CONTROL SCREEN

UniFlo AFD INFLOW CONTROL SCREEN UniFlo AFD INFLOW CONTROL SCREEN W W W. S U P E R I O R E N E R G Y. C O M UniFlo AFD INFLOW CONTROL SCREEN Situation Long horizontal wells are common for oil production, because they increase efficiency.

More information

Enhancing SAGD Bitumen Production Through Conductive, Convective and Radiant Heating

Enhancing SAGD Bitumen Production Through Conductive, Convective and Radiant Heating Enhancing SAGD Bitumen Production Through Conductive, Convective and Radiant Heating Rudy Strobl*, Statoil Canada Ltd., Calgary, Alberta rudstr@statoil.com Bryce Jablonski, Statoil Canada Ltd., Calgary,

More information

Oil Shale, 2013, Vol. 30, No. 1, pp. 1 5 ISSN X doi: /oil DOES OIL SHALE HAVE A SIGNIFICANT FUTURE?

Oil Shale, 2013, Vol. 30, No. 1, pp. 1 5 ISSN X doi: /oil DOES OIL SHALE HAVE A SIGNIFICANT FUTURE? Oil Shale, 2013, Vol. 30, No. 1, pp. 1 5 ISSN 0208-189X doi: 10.3176/oil.2013.1.01 2013 Estonian Academy Publishers EDITOR S PAGE DOES OIL SHALE HAVE A SIGNIFICANT FUTURE? Modern civilization and, in particular,

More information

Numerical Simulation Study of Field Scale SAGD and ES-SAGD Processes Investigating the Effect of Relative Permeabilities

Numerical Simulation Study of Field Scale SAGD and ES-SAGD Processes Investigating the Effect of Relative Permeabilities Energy and Environment Research; Vol. 3, No. ; 3 ISSN 97-59 E-ISSN 97-577 Published by Canadian Center of Science and Education Numerical Simulation Study of Field Scale SAGD and ES-SAGD Processes Investigating

More information

Evaluation of Western Kentucky s Heavy Oil and Bitumen Resources

Evaluation of Western Kentucky s Heavy Oil and Bitumen Resources 2014 Eastern Unconventional Oil and Gas Symposium - November 5-7, 2014 in Lexington, Kentucky, USA http://www.euogs.org Evaluation of Western Kentucky s Heavy Oil and Bitumen Resources 2014 Eastern Unconventional

More information

Reservoir Development Plans

Reservoir Development Plans C H A P T E R 1 Reservoir Development Plans Numerous publications have been dedicated to reservoir development planning and integrated reservoir management (Babadagli et al., 2008; Bibars and Hanafy, 2004;

More information

EVALUATE HORIZONTAL WELL PRODUCTION PERFORMANCE IN HEAVY OIL RESERVOIRS

EVALUATE HORIZONTAL WELL PRODUCTION PERFORMANCE IN HEAVY OIL RESERVOIRS EVALUATE HORIZONTAL WELL PRODUCTION PERFORMANCE IN HEAVY OIL RESERVOIRS Hisham Kh. Ben Mahmud 1, Ian H. Sheng 2 and Mian U. Shafiq 1 1 Department of Petroleum Engineering, Curtin University, Sarawak, Malaysia

More information

Operating Conditions Optimization of Steam Injection in Enhanced Oil Recovery Using Duelist Algorithm

Operating Conditions Optimization of Steam Injection in Enhanced Oil Recovery Using Duelist Algorithm Operating Conditions Optimization of Steam Injection in Enhanced Oil Recovery Using Duelist Algorithm Totok R. Biyanto, Sonny Irawan, Hiskia J. Ginting, Matradji, Ya umar, A. I. Fitri 1 Abstract Steam

More information

UNIVERSITY OF CALGARY. Oil Recovery Strategies for Thin Heavy Oil Reservoirs. Wei Zhao A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES

UNIVERSITY OF CALGARY. Oil Recovery Strategies for Thin Heavy Oil Reservoirs. Wei Zhao A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES UNIVERSITY OF CALGARY Oil Recovery Strategies for Thin Heavy Oil Reservoirs by Wei Zhao A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF

More information

JAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline

JAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline Thermal In-Situ Scheme Progress Report JAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline 1. Introduction Project Background, Activity Summary

More information

Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids

Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids INL/EXT-5-533 Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids X. Xie K. K. Bloomfield G. L. Mines G. M. Shook July 25 The INL is a U.S. Department of Energy National Laboratory

More information

Influence of Clay Content on Surfactant- Polymer Flooding For an Egyptian Oil Field. Prof. Atef Abdelhady, British University in Egypt

Influence of Clay Content on Surfactant- Polymer Flooding For an Egyptian Oil Field. Prof. Atef Abdelhady, British University in Egypt Influence of Clay Content on Surfactant- Polymer Flooding For an Egyptian Oil Field Prof. Atef Abdelhady, British University in Egypt Presentation Outline Background. Surfactant- Polymer Flooding Overview

More information

Examining Reservoir Water Retention During SAGD. Thursday January 31 st, 2013

Examining Reservoir Water Retention During SAGD. Thursday January 31 st, 2013 Examining Reservoir Water Retention During SAGD Thursday January 31 st, 2013 Forward-looking information and advisories This presentation contains "forward-looking information" within the meaning of applicable

More information

HILDA LAKE SAGD PILOT PERFORMANCE SUMMARY 2004 AEUB PRESENTATION BLACKROCK VENTURES INC

HILDA LAKE SAGD PILOT PERFORMANCE SUMMARY 2004 AEUB PRESENTATION BLACKROCK VENTURES INC HILDA LAKE SAGD PILOT PERFORMANCE SUMMARY 2004 AEUB PRESENTATION BLACKROCK VENTURES INC FEBRUARY, 2004 HILDA LAKE SAGD PILOT PERFORMANCE SUMMARY 2003-2004 PRESENTATION OUTLINE PRODUCTION SUMMARY P1 AND

More information

Seal Main HCSS Pilot Approval Annual Performance Presentation

Seal Main HCSS Pilot Approval Annual Performance Presentation Seal Main HCSS Pilot Approval 11377 Annual Performance Presentation 11-Feb-2015 Agenda Introductions Seal Main Horizontal Cyclic Steam Stimulation (HCSS) Pilot Subsurface Surface Harmon Valley South HCSS

More information

Enhanced Recovery of Heavy Oil in the Niger Delta: Nelson and Mcneil Model a Key Option for In-Situ Combustion Application

Enhanced Recovery of Heavy Oil in the Niger Delta: Nelson and Mcneil Model a Key Option for In-Situ Combustion Application Advances in Petroleum Exploration and Development Vol. 14, No. 2, 2017, pp. 27-33 DOI:10.3968/10009 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Enhanced Recovery of

More information

A five-step method for optimizing perforating design and placement to engineer more profitable completions

A five-step method for optimizing perforating design and placement to engineer more profitable completions A five-step method for optimizing perforating design and placement to engineer more profitable completions 1 Data capture 5 Monitoring 2 Data analysis 4 High-efficiency field execution 3 Perforating design

More information

Polish Oil & Gas Institute RAM Biochemicals, Inc.

Polish Oil & Gas Institute RAM Biochemicals, Inc. MEOR Spells MORE OIL Polish Oil & Gas Institute RAM Biochemicals, Inc. WELCOME TO Praxis Interactive Technology Workshop 9 th Global Edition MEOR Spells MORE OIL A Systematic Approach to Microbial Enhanced

More information

Determination of Oil and Water Compositions of Oil/Water Emulsions Using Low Field NMR Relaxometry

Determination of Oil and Water Compositions of Oil/Water Emulsions Using Low Field NMR Relaxometry PAPER -95 Determination of Oil and Water Compositions of Oil/Water Emulsions Using Low Field NMR Relaxometry K. Mirotchnik, K. Allsopp Tomographic Imaging and Porous Media Laboratory A. Kantzas University

More information

UNIVERSITY OF CALGARY. Simulation Study of Steam-Solvent Phase Behaviour in Solvent Aided SAGD Process and Its. Effect on Oil Recovery.

UNIVERSITY OF CALGARY. Simulation Study of Steam-Solvent Phase Behaviour in Solvent Aided SAGD Process and Its. Effect on Oil Recovery. UNIVERSITY OF CALGARY Simulation Study of Steam-Solvent Phase Behaviour in Solvent Aided SAGD Process and Its Effect on Oil Recovery by Dongqi Ji A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES IN

More information

Thermal Methods. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

Thermal Methods. Dr. Helmy Sayyouh Petroleum Engineering Cairo University Thermal Methods Dr. Helmy Sayyouh Petroleum Engineering Cairo University Thermal Properties of Reservoir Rock and Fluids 2 Steam injection and in situ combustion require knowledge of certain properties

More information

Effect of Fracture Spacing on VAPEX Performance in Heavy Oil Fracture Systems

Effect of Fracture Spacing on VAPEX Performance in Heavy Oil Fracture Systems Iran. J. Chem. Chem. Eng. Vol. 27, No.1, 28 Effect of Fracture Spacing on VAPEX Performance in Heavy Oil Fracture Systems Azin, Reza* + Department of Chemical Engineering, Persian Gulf University, Bushehr

More information

ISSN , Volume 08, No. 02

ISSN , Volume 08, No. 02 www.cafetinnova.org Indexed in Scopus Compendex and Geobase Elsevier, Chemical Abstract Services-USA, Geo-Ref Information Services-USA, List B of Scientific Journals, Poland, Directory of Research Journals

More information

Mature Fields: Key Factors for Successful EOR Projects*

Mature Fields: Key Factors for Successful EOR Projects* Mature Fields: Key Factors for Successful EOR Projects* Hector F. San Martin 1 and J. Raul Ortiz 2 Abstract Reference Cited ENHANCED OIL RECOVERY Growing Production and Reserves Key Factors for Success

More information

Introduction to Artificial Lift

Introduction to Artificial Lift Introduction to Artificial Lift March 2013 What are your Artificial Lift challenges? Gassy oil Heavy/viscous oil Sandy oil High water cut Dewatering gas wells Deep Hot Low fluid levels Offshore Uncertainty

More information

Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco

Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco SPE 152151 Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco Copyright 2012, Society of Petroleum Engineers This paper was

More information

CAPROCK INTEGRITY FOCUS Analyzing How To Utilize Technical Testing Methodologies To Ensure Caprock Integrity. Tuesday, May 24 th, 2011

CAPROCK INTEGRITY FOCUS Analyzing How To Utilize Technical Testing Methodologies To Ensure Caprock Integrity. Tuesday, May 24 th, 2011 CAPROCK INTEGRITY FOCUS Analyzing How To Utilize Technical Testing Methodologies To Ensure Caprock Integrity Tuesday, May 24 th, 2011 Forward-Looking Information and Advisories This presentation contains

More information

Glossary l. Btu British thermal unit; the amount of heat needed to raise the temperature of 1 pound of water 10 F at or near 39.

Glossary l. Btu British thermal unit; the amount of heat needed to raise the temperature of 1 pound of water 10 F at or near 39. Glossary Glossary l Accelerated depreciation Any of a number of forms of depreciation which allow the writeoff of capital investments more rapidly than straight Iine depreciation. Straight Iine depreciation

More information

CONDENSATION INDUCED WATER HAMMER

CONDENSATION INDUCED WATER HAMMER CONDENSATION INDUCED WATER HAMMER RISKS AND ISSUES ASSOCIATED WITH SAGD OPERATIONS Jeff Dancey, P. Eng. Baker Engineering and Risk Consultants, Inc. OUTLINE CONDENSATION INDUCED WATER HAMMER (CIWH) - EXPLANATION

More information

Selection of the Optimum Production Scenario for One of Iranian Offshore Oil Reservoirs

Selection of the Optimum Production Scenario for One of Iranian Offshore Oil Reservoirs Selection of the Optimum Production Scenario for One of Iranian Offshore Oil Reservoirs M. Allahayri *, M.Abbasi ** and A.Sanati * * M.Sc. in Petroleum Engineering, Faculty Staff of Azad University of

More information

of Reservoir Temperature as a Favorable Factor for Application of In Situ Combustion

of Reservoir Temperature as a Favorable Factor for Application of In Situ Combustion of Reservoir Temperature as a Favorable Factor for Application of In Situ Combustion (Focus on Heavy Oil Reservoirs) Alex Turta, A T EOR Consulting Inc., Calgary, Canada Ashok Singhal, Premier Reservoir

More information

Method and apparatus for producing tar sand deposits containing conductive layers having little or no vertical communication

Method and apparatus for producing tar sand deposits containing conductive layers having little or no vertical communication United States Patent: 5,060,726 ( 8 of 76 ) United States Patent 5,060,726 Glandt, et al. October 29, 1991 Method and apparatus for producing tar sand deposits containing conductive layers having little

More information

Feasibility of CO 2 Flooding Higher Viscosity Oils, Field Results, and Screening. Presented by: Richard Baker, December 7, 2012

Feasibility of CO 2 Flooding Higher Viscosity Oils, Field Results, and Screening. Presented by: Richard Baker, December 7, 2012 Feasibility of CO 2 Flooding Higher Viscosity Oils, Field Results, and Screening Presented by: Richard Baker, December 7, 2012 Steve s Challenge; Population of CO 2 Flooded Oils: Gravities and Viscosities

More information

Application of HSPs to the Kraken Field. SPE EuALF

Application of HSPs to the Kraken Field. SPE EuALF Application of HSPs to the Kraken Field SPE EuALF June 2018 Adam Downie Outline Kraken overview Why HSPs were selected Hydraulic design and completion interface First Oil Pump performance prediction vs

More information

Telephone Lake project

Telephone Lake project Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations

More information