1 Report to shareholders 16 July 2012 Intrepid Mines Limited ASX and TSX : IAU Inquiries regarding this report and Company business may be directed to: Brad Gordon Managing Director Chief Executive Officer, Brisbane, Australia (office) (mobile) bgordon@intrepidmines.com or Greg Taylor Investor Relations Toronto, Canada (office) (mobile) gtaylor@intrepidmines.com Intrepid Mines Limited abn Level Upper Edward Street Spring Hill Qld 4004 T: W: Tujuh Bukit, Indonesia Project Update Near-surface gold-silver oxide resource; ydevelopment potential rapidly advancing; ythe in-fill and definition drilling programme to convert Inferred Resource to Indicated Resource has been completed; yresource update scheduled late August 2012; yengineering study due March 2013 quarter. Tumpangpitu copper-gold porphyry yon-going deep drilling continues to return high grade copper and gold intersections, including: 227m at 1.24% copper and 1.54g/t gold; 222m at 0.37% copper and 0.33g/t gold; 480m at 0.50% copper and 0.35g/t gold; 404m at 0.68% copper and 0.64g/t gold; and, 505m at 0.37% copper and 0.24g/t gold. ythird porphyry resource update scheduled September 2012; yinitial Preliminary Economic Assessment scheduled March 2013 quarter. 16 July 2012: Intrepid Mines Limited (ASX,TSX: IAU) ( Intrepid or the Company ) is pleased to provide an update on recent developments and plans at its copper-gold-silver project, Tujuh Bukit, (80% economic interest) in Indonesia (the Project ). Brad Gordon, Intrepid s CEO, said, As we have promised our loyal shareholders all along, we remain extremely active in advancing this world class project and we have been rewarded by very positive results on several fronts. These latest drill results on the main Tumpangpitu porphyry have enabled us to define a new high grade zone on the eastern edges of the target area. However, the depth potential of this resource is still to be thoroughly tested. Meanwhile, we are advancing the smaller, but not insignificant, oxide project as quickly as we can, with a view based on peer company valuations, that this project alone justifies our current share market capitalisation.

2 Page 2 Introduction: Tujuh Bukit is located on the island of Java in Indonesia, and covers 11,621 hectares under two IUPs, which is the form of exploration/mining title introduced under the 2009 Indonesian Mining Law. Intrepid has acquired an 80% economic interest in the Project through a joint venture agreement with Indonesian company PT Indo Multi Niaga ( PT IMN ). Tujuh Bukit comprises several mineral prospects, of which the Tumpangpitu Prospect, in the south east portion of the Project area, continues to be the major focus for exploration activity. There are five zones of known near surface gold-silver oxide mineralisation and deeper sulphide copper-gold mineralisation within Tumpangpitu. Tumpangpitu is one of five copper-gold porphyry resource areas identified by the Company which make up the multiporphyry system at Tujuh Bukit. The main Tumpangpitu porphyry resource area currently measures a surface area of approximately 3.4 kilometres ( km ) by 2.8km and contains an Inferred resource (prepared by independent consultants H&S Consulting Pty Ltd. in accordance with the JORC Code and NI ), estimated at 1.7 billion tonnes at 0.41% copper ( Cu ) and 0.46g/t gold ( Au ), at a cut-off grade of 0.2% Cu for 15 billion pounds of contained copper and 25 million ounces of contained gold. Project expenditure, solely funded by the Company to date in compliance with the joint venture agreement, is US$95 million. Development plan Gold-silver Oxide Project: Intrepid continues to advance its gold-silver Oxide Project area with plans to advance it towards production as an open pit, heap leach mine, as soon as possible, subject primarily to permitting. In-fill and definition drilling has recently been completed on the oxide resource area, which consists of three mineralised zones generally located above the Tumpangpitu porphyry. This near surface resource has been estimated at 130Mt at 0.55g/t Au and 18g/t silver ( Ag ) for 2.4 million ounces of contained gold and 80 million ounces of contained silver, at a cut-off grade of 0.2g/t Au (see Intrepid news release of 14 December, 2010). An updated Mineral Resource Estimate on the Oxide Project is scheduled to be completed in late August This is to be followed by an Engineering Study, which is being prepared by AMEC and due during the March 2013 quarter. A Preliminary Economic Assessment (PEA) was released in April 2011, prepared by Kappes Cassiday and Associates (KCA), of Reno, Nevada, based upon column leach and other metallurgical tests performed at their laboratory. That report estimated annual gold equivalent production from an open pit oxide mine of 143,000 ounces at a cash cost (net of silver credits) of US$376 per ounce at a capital cost to first production of US$204 million. KCA are also involved in assisting AMEC with additional metallurgical testing and engineering activities during this current phase of the project s development. Project drill activity There are currently eight drill rigs operating at Tujuh Bukit, including one which has just concluded in-fill drilling on the oxide resource, as well as five undertaking extension drilling on the main Tumpangpitu porphyry resource, and two more at Salakan. It is expected that the total number of drills will be reduced to six, when the fleet will be supplemented with the deep drill, which has a capability of drilling up to 2,000 metres and will be the largest, helicopter-moveable, drill rig in the world. Latest Tumpangpitu drilling results: Assay results from deep drill holes GTD , GTD , GTD , GTD , GTD and GTD (see tables and map below), in the on-going drilling program at the Tumpangpitu copper-gold porphyry within the Project continue to return high grade copper and gold intersections. This drilling has also enabled the Company to begin to define (a second / another ) high grade coppergold zone on the eastern side of the main resource area. GTD is located on section 11,620N (see Fig. 9), approximately 160m north of GTD , (see drill collar map) which contains weak mineralisation and further helps define the eastern extents of mineralisation. There is no drilling grid north of GTD GTD is located on section 10,660N (see Fig. 4), approximately 160m due south of hole GTD (689m at 1% Cu and 0.85g/t Au; see Intrepid announcement of 27 February 2012), in-filling between holes GTD and GTD (563.7m at 0.2% Cu and 0.33g/t Au and 598.9m at 0.7% Cu and 0.52g/t Au respectively; see Intrepid announcement of 16 August 2011). The hole failed in bad ground and ended in mineralisation. GTD provides further definition of a high grade copper and gold zone on the eastern side of the 1.7 billion tonne ( Bt ) resources announced in December 2011 (1.7Bt at 0.41% Cu and 0.46g/t Au; see Intrepid announcement of 7 December 2011). Report to Shareholders

3 GTD is located on section 10,500N (see Fig. 3), approximately 160m south of GTD and 80m east of GTD (429m at 0.53% Cu and 0.38g/t Au; see Intrepid announcement of 13 January 2011). GTD provides further definition of the high grade eastern portion of the deposit in this area. GTD is located on section 10,660N (see Fig. 4) and 240m west of GTD The hole provides further geological information and helps constrain mineralisation within the porphyry. GTD is located on section 11,220N (see Fig. 7) and provides valuable infill information on the geology and continuity of mineralisation in the central portion of the deposit. GTD is located on section 11,620N (see Fig. 9), 80m east of GTD (230m at 0.35% Cu and 0.47g/t Au; see Intrepid announcement of 16 August 2011). The hole provides valuable in-fill information on the geology and continuity of mineralisation in the north-eastern portion of the deposit. Development Plan Porphyry projects These latest drilling results from Tumpangpitu will be incorporated into a third updated porphyry Mineral Resource Estimate, scheduled for release in September At the same time, the Company s technical team is continuing to prepare a Preliminary Economic Assessment ( PEA ) of the Tumpangpitu porphyry resource, which is due during the March 2013 quarter. AMEC has been engaged as the primary engineering consultant and will be responsible for the report preparation. Follow-up drilling is expected to commence at porphyry targets around Katak and Candrian once initial drilling is completed at Salakan. (See Intrepid releases of 22 March 2010 and 30 May 2011) Other Study Activities: Additional activities supporting the Oxide Project Engineering Study and the Porphyry Project Preliminary Economic Assessment include project area environmental and socio-economic baseline surveys, potential port location assessments, field geotechnical assessments for facility locations and more detailed metallurgical testwork programs. Assisting AMEC in the preparation of the Oxide Project Engineering Study is Australian Mine Design and Development Pty Ltd (AMDAD) and Golder Associates, who are responsible for the Oxide Project mine engineering and geotechnical assessments respectively. H&S Consulting, who have had an extensive association with the project, will continue to provide independent resource assessment services. PT Hatfield Indonesia have been engaged to progress the project s environmental, social and health impact assessment (ESHIA) activities which will culminate in the preparation and submission of the project AMDAL, the Indonesian equivalent of an environment impact statement. The timing of the AMDAL submission will be closely linked with the forestry rezoning and project permitting activities. Meanwhile, deep drilling at Tumpangpitu, which has penetrated approximately 1,000m from surface, has not yet delineated the limit of mineralisation at depth. A deep drill capable of penetrating approximately 2,000m is currently being built and is expected to start drilling on the Project in October On-going drilling at the Salakan prospect in the northern portion of Tujuh Bukit has intercepted copper and gold mineralisation but has not yet delivered the significant results that had been anticipated. This round of drilling, utilizing two of the eight drills currently on site, is expected to conclude in August 2012, after which time the Company will provide a further update. Report to Shareholders Page 3

4 Figure 1: Project location map. Figure 2: Drillhole collars location map. Page 4 Report to Shareholders

5 Hole ID From (m) To (m) Interval (m) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) As (ppm) GTD EOH m , , , * 1, GTD EOH 673.5m , including GTD EOH m , GTD EOH m , , , including 606 1, GTD EOH m , including * GTD EOH m , * 1, * Intercept includes internal waste (>2 either <0.2% Cu or <0.2 g/t Au) Hole ID Northing Easting RL Azimuth Dip GTD GTD GTD GTD GTD GTD All surveys are with DGPS.; Grid WGS84 Zone 50 Report to Shareholders Page 5

6 Figure 3. Figure 4. Page 6 Report to Shareholders

7 Figure 5. Figure 6. Report to Shareholders Page 7

8 Figure 7. Figure 8. Page 8 Report to Shareholders

9 Figure 9. Forward-looking statements This announcement contains certain forward-looking statements, relating to, but not limited to Intrepid s expectations, intentions, plans and beliefs. Forward-looking information can often be identified by forward-looking words such as anticipate, believe, expect, goal, plan, intend, estimate, may and will or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future outcomes, or statements about future events or performance. Forward-looking information may include reserve and resource estimates, estimates of future production, unit costs, costs of capital projects, and timing of commencement of operations and is based on current expectations that involve a number of business risks and uncertainties. Factors that could cause actual results to differ materially from any forwardlooking statement include, but are not limited to, failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from those expressed or implied. Shareholders and potential investors are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Intrepid undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law. Statements relating to gold resource estimates are expressions of judgment, based on knowledge and experience and may require revision based on actual production experience. Such estimates are necessarily imprecise and depend to some extent on statistical inferences and other assumptions, such as gold prices, cut-off grades and operating costs, which may prove to be inaccurate. Report to Shareholders Page 9

10 Competent Person and Qualified Person The information in this report that relates to exploration results at Tujuh Bukit is based on information compiled by or under the supervision of Gary Snow, who is a fellow of The Australasian Institute of Mining and Metallurgy as well as the Australian Institute of Geoscientists. Gary Snow is employed by Intrepid Mines Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and is a Qualified Person as defined in the Canadian National Instrument (standards of Disclosure for Mineral Projects). Gary Snow consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this announcement that relates to Mineral Resources is based on information compiled by or under the supervision of Robert Spiers, who is a member of the Australian Institute of Geoscientists. Mr Spiers has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Robert Spiers is an independent consultant to Intrepid Mines Limited and a full time employee of H&S Consultants Pty Ltd (formerly Hellman & Schofield Pty Ltd). He consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Forestry Activities The Indonesian Forestry Law restricts non forestry activities within protected forests and prohibits mining using an open pit method in protected forest areas. The area of the Porphyry copper-gold resource estimate, and the Zone A, Zone B and Zone C oxide resource estimate areas fall within a protected forest area. Intrepid s Alliance partner, PT IMN, is working with relevant Indonesian authorities regarding a potential review of forest land status. There is no assurance that the forestry reclassification will take place in this instance. PT IMN received an extension of the Forestry Exploration Permit dated 7 July 2014, which allows for exploration activities within forestry areas. Sample Analysis Intrepid exercises a strict chain of sample custody in its drilling program at Tujuh Bukit. Joint Venture personnel remove core from the drill rig and deliver it to a project geologist who logs the core and marks the core into two metre sample intervals. Intrepid and Joint Venture personnel supervise the immediate splitting, sawing and bagging of samples, and packaging of groups of samples for dispatch to the laboratory. The remainder of the split core remains on site. Samples are securely packaged, batched, and then transported under supervision to Intertek s laboratory facility in Jakarta. At the laboratory, the samples are prepared by crushing and pulverizing and a 30 gram charge is assayed for gold by conventional fire assay and/or atomic absorption methods. Multi-element ICP analysis is carried out using a multi-acid digestion process. All samples that contain silver and/or copper, lead, and zinc values that exceed the upper detection limits for ICP are re-analysed by conventional atomic absorption methods to determine the absolute values of these metals. Directors Colin G. Jackson (Chairman) Brad A. Gordon (Managing Director) Ian McMaster (Deputy Chairman) Laurence W. Curtis (Non-executive Director) Robert J. McDonald (Non-executive Director) Alan Roberts (Non-executive Director) Adrianto Machribie (Non-executive Director) Nyla Bacon (Company Secretary) Stock Exchange Listing ASX and TSX symbol: IAU Substantial Shareholders Taurus Funds Management 9.0% Acorn Capital 8.0% Van Eck Associates 6.9% Issued Capital 525,885,308 shares 4,710,972 unlisted options 4,014,632 unlisted share rights Shareholder Enquiries Matters related to shares held, change of address and tax file numbers should be directed to: Computershare Investor Services GPO Box 2975, Melbourne, Victoria 3001, Australia Telephone: Page 10 Report to Shareholders

(TSX: AUQ) (NYSE: AUQ)

(TSX: AUQ) (NYSE: AUQ) AuRico Gold Announces a New Gold-Copper Porphyry Discovery at the Kemess Project; Initial Resource Estimate Expected in Early 2015 Hole KH-14-04 intersects 768 metres of 0.442 g/t Au and 0.392% Cu Toronto:

More information

CONTINUITY OF COPPER MOLYBDENUM MINERALISATION DEMONSTRATED BY DRILLING RESULTS BETWEEN THE NAYAM AND MISILI PROSPECTS, SIMUKU

CONTINUITY OF COPPER MOLYBDENUM MINERALISATION DEMONSTRATED BY DRILLING RESULTS BETWEEN THE NAYAM AND MISILI PROSPECTS, SIMUKU ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

Drilling indicates strike continuity of gold-silver mineralisation at the Ban Houayxai deposit, Laos

Drilling indicates strike continuity of gold-silver mineralisation at the Ban Houayxai deposit, Laos ASX ANNOUNCEMENT 15 June 2007 ACN 011 065 160 ABN 17 011 065 160 Level 2, 99 Melbourne St PO Box 3468, South Brisbane, Qld 4101 Telephone (07) 3846 1811 Facsimile (07) 3846 4899 Drilling indicates strike

More information

For personal use only

For personal use only Bulletin Resources is the 100% owner of the Nicolson s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource

More information

For personal use only

For personal use only ABN 79 106 879 690 30 August 2016 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (11 pages by email) Updated Internal Scoping Study Delivers Positive Results (ASX: AUK) The Directors

More information

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics NEWS RELEASE TSX: NCU Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics September 24, 2018 - Nevada Copper Corp. (TSX: NCU) ("Nevada Copper" or the Company ) is pleased

More information

FIRST GOLD ORE DISPATCHED FROM ULYSSES

FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis Minerals Limited (ASX: GMD) ASX Announcement 14 November 2016 FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis poised for first cash-flow as first parcel of ore departs for Paddington gold plant

More information

Investor Update. June 2016

Investor Update. June 2016 Investor Update June 2016 Next Steps: 2015 Work Programme Is this the time?! 500%? Introducing Impact Minerals (ASX:IPT) Capital Structure Listed on ASX November 2006 Shares on Issue Options/Warrants Convertible

More information

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors

More information

NEWS RELEASE. Foran Finds Elevated Precious Metal Values at Depth

NEWS RELEASE. Foran Finds Elevated Precious Metal Values at Depth NEWS RELEASE Foran Finds Elevated Precious Metal Values at Depth Exceptional thicknesses and base metal grades also encountered at McIlvenna Bay Vancouver, BC (April 25, 2018) - Foran Mining Corporation

More information

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 (0)7 3117 2000 F: +61 (0)7 3846

More information

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months ASX ANNOUNCEMENT Wednesday 18 th May 2016 CMP to Purchase Additional Stake in Productora for US$1.5 Million Sprott Loan to be Reduced and Extended by 12 Months Hot Chili Limited (ASX Code: HCH) is pleased

More information

For personal use only

For personal use only 21 November 2011 Kentor Gold (ASX: KGL) is an Australian-based, emerging midadvanced tier gold company with projects in Australia and the Kyrgyz Republic. Formed in 1998 and listed on the ASX in 2005,

More information

Accelerated Exploration

Accelerated Exploration Mandalay Resources Corporation Increases Mineral Resources and Replaces Reserves in Augusta East & West Lodes and Accelerates Drilling at its Costerfield Gold-Antimony Mine, Australia TORONTO, ON, April

More information

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan

More information

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET May 30 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET First Gold poured from Dalgaranga

More information

Champion Bear Announces Drilling Results from Plomp Farm West Gold project

Champion Bear Announces Drilling Results from Plomp Farm West Gold project Champion Bear Announces Drilling Results from Plomp Farm West Gold project Drill Hole PF18-98 records multiple intersections including 1.0 m at 3.65 Au, combined 6.0 m equal to or greater than 1.0 Au,

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

Great Western Scoping Study Update & Onsite Gold Processing

Great Western Scoping Study Update & Onsite Gold Processing ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its

More information

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process

More information

280,000 ounces of gold in near-surface Inferred Resource at Cargo, NSW.

280,000 ounces of gold in near-surface Inferred Resource at Cargo, NSW. GOLDEN CROSS RESOURCES LTD ABN 65 063 075 178 ASX Announcement 21 May 2012 22 Edgeworth David Ave Hornsby NSW 2077 Phone (02) 9472 3500 Fax (02) 9482 8488 280,000 ounces of gold in near-surface Inferred

More information

FILO MINING REPORTS 61% INCREASE IN RESOURCE TONNES AT FILO DEL SOL PROJECT

FILO MINING REPORTS 61% INCREASE IN RESOURCE TONNES AT FILO DEL SOL PROJECT FILO MINING REPORTS 61% INCREASE IN RESOURCE TONNES AT FILO DEL SOL PROJECT August 21, 2017: Filo Mining Corp (TSXV, Nasdaq First North: FIL) ("Filo Mining" or the Company ) is pleased to announce a significant

More information

ROMANG ISLAND INDONESIA

ROMANG ISLAND INDONESIA ROMANG ISLAND INDONESIA AN EMERGING WORLD CLASS MULTI-COMMODITY RESOURCE Disclaimer This presentation contains forward-looking statements as defined or implied at common law and within the meaning of the

More information

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project ASX ANNOUNCEMENT 16th October 2015 Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project Hot Chili and its partner in the Productora Project, Compañía Minera del Pacífico S.A. (CMP)

More information

KANMANTOO BROWNFIELDS EXPORATION DRILLING RESULTS

KANMANTOO BROWNFIELDS EXPORATION DRILLING RESULTS Wednesday, 4 June 2010 KANMANTOO BROWNFIELDS EXPORATION DRILLING RESULTS (ASX:HGO) advises that recent exploration drilling to the south of ML6345 at the Kanmantoo Copper/Gold Project has intersected new

More information

Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year

Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year Drilling commences at San Agustín with 11,200 metres (116 holes) completed to date Toronto, Ontario

More information

Significant Platinum Results at Owendale Project NSW: Additional High Primary Platinum Assays

Significant Platinum Results at Owendale Project NSW: Additional High Primary Platinum Assays 18th November, 2013 Significant Platinum Results at Owendale Project NSW: Additional High Primary Platinum Assays ASX Release: PGM Highlights Reverse Circulation (RC) drilling program comprising 21 drill

More information

Thalanga Operations Ore Reserve and Mineral Resource Statement

Thalanga Operations Ore Reserve and Mineral Resource Statement Thalanga Operations Ore Reserve and Mineral Resource Statement Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq. (%) West 45 (1) Proved 101 0.3 2.0 4.6 0.3 38 8.4 Probable

More information

Re : Completion of the Barnes Hill drill-out

Re : Completion of the Barnes Hill drill-out 30 March 2010 The Manager Company Announcements Office Australian Securities Exchange By e-lodgement (ASX code: MFC) Dear Sir/Madam Re : Completion of the Barnes Hill drill-out The following comprises

More information

New drill results add to resource database at Barnes Hill and Tasmanian Government sets Development Proposal guidelines

New drill results add to resource database at Barnes Hill and Tasmanian Government sets Development Proposal guidelines March 9, 2010 New drill results add to resource database at Barnes Hill and Tasmanian Government sets Development Proposal guidelines ASX Release: PRW Assay results released today on a further 112 holes

More information

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes;

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes; 24 th July 2009 June December 2009 Quarterly Report Report 2008 Highlights Wa Project Scoping studies on the Julie West gold vein were completed with the following outcomes; 250,000 tonnes @ 4.9g/t gold

More information

For personal use only

For personal use only ASX Code: MRP MacPhersons Resources Ltd ABN 98 139 357 967 ACN 139 357 967 Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@mrpresources.com.au

More information

6 June 2017 Georgian Mining Corporation Further Drill Results from Kvemo Bolnisi East s Gold Zone 2 Target

6 June 2017 Georgian Mining Corporation Further Drill Results from Kvemo Bolnisi East s Gold Zone 2 Target 6 June 2017 Georgian Mining Corporation Further Drill Results from Kvemo Bolnisi East s Gold Zone 2 Target Georgian Mining Corporation ('GEO') is pleased to announce the final set of drill results from

More information

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate VANADIUM CONCEPT STUDY UNDERWAY High Purity Vanadium Pentoxide, Titanium Dioxide and Iron Oxide ASX:

More information

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Awak Mas DFS Optimisation - Metallurgical Breakthrough 10 October 2017 Awak Mas DFS Optimisation - Metallurgical Breakthrough Whole of Ore leach testwork delivers improved metallurgical recoveries. Gold recoveries range from 92% - 98% vs previous flotation-leach

More information

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results 31 January 2007 ASX ANNOUNCEMENT. Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results The Company is pleased to announce results of infill drilling at the Mt Thirsty Cobalt Nickel Project, strategically

More information

West African Resources commences deep diamond drilling targeting high-grade primary zone with +400m holes

West African Resources commences deep diamond drilling targeting high-grade primary zone with +400m holes ACN 121 539 375 Principal Office: Unit 14, 531 Hay Street Subiaco WA 6008 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com

More information

QUARTERLY REPORT 30 September 2008 Twin Hills Silver Mine

QUARTERLY REPORT 30 September 2008 Twin Hills Silver Mine MACMIN SILVER LTD (A.B.N. 53 056 776 160) QUARTERLY REPORT 30 September Twin Hills Silver Mine SUMMARY Mining Silver leaching and powder production decreased slightly with approximately 109,000oz of silver

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

SCOPING STUDY UNDERWAY

SCOPING STUDY UNDERWAY Australia s largest Vanadium in magnetite deposit delivering the highest grade Vanadium concentrates for leach processing into high purity vanadium pentoxide, titanium dioxide and iron oxide products SCOPING

More information

For personal use only. Cummins Range Rare Earths Project

For personal use only. Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

For personal use only

For personal use only 2 May 2018 ASX Announcement METALLURGICAL TESTWORK CONFIRMS WILUNA TRANSITIONAL RESERVES AMENABLE TO PROCESSING THROUGH THE EXISTING WILUNA CIL PLANT Highlights Expansion PFS published in Aug 17 includes

More information

JULY 21, 2003 ESTIMATE OF TONNAGES AND GRADES OF FAR NORTH DEPOSIT INCREASED BY RE-CALCULATION OF INDEPENDENT RESOURCE ESTIMATE

JULY 21, 2003 ESTIMATE OF TONNAGES AND GRADES OF FAR NORTH DEPOSIT INCREASED BY RE-CALCULATION OF INDEPENDENT RESOURCE ESTIMATE August 25, 2003 JULY 21, 2003 ESTIMATE OF TONNAGES AND GRADES OF FAR NORTH DEPOSIT INCREASED BY RE-CALCULATION OF INDEPENDENT RESOURCE ESTIMATE ULAANBAATAR, MONGOLIA Ivanhoe Mines Chairman Robert Friedland

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017 Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation July, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to the

More information

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES 7 November 2008 UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES Highlights Broken Hill Ore Reserves increase life of mine to 9 years at conservative price assumptions Substantial Resource base

More information

Wetar Expansion Update September 2015

Wetar Expansion Update September 2015 For ASX Market Release: 15 September 2015 Wetar Expansion Update September 2015 HIGHLIGHTS Mining and earthworks associated with the 25,000 tonne per annum copper cathode expansion project are well advanced

More information

Fortuna provides update on the Lindero gold Project in Argentina

Fortuna provides update on the Lindero gold Project in Argentina Fortuna provides update on the Lindero gold Project in Argentina Vancouver, March 22, 2017-- Fortuna Silver Mines Inc. (NYSE: FSM) (TSX: FVI) is pleased to present an update of preliminary results of the

More information

121 MINING INVESTMENT CONFERENCE HONG KONG

121 MINING INVESTMENT CONFERENCE HONG KONG ASX / MEDIA RELEASE 23 April 2018 121 MINING INVESTMENT CONFERENCE HONG KONG St George Mining Limited (ASX: SGQ) ( St George or the Company ) is participating at the 121 Mining Investment Conference in

More information

ASX:MEI COBALT COBALT COBALT!

ASX:MEI COBALT COBALT COBALT! ASX:MEI COBALT COBALT COBALT! Disclaimer The material in this presentation has been prepared by Meteoric Resources and is general background information about Meteoric s activities current as at the date

More information

ASX Announcement FURTHER DRILLING WARRANTED AT SIMUKU TO PROGRESS TO FEASIBILITY COMPLETION OF CONCEPTUAL MINING STUDY

ASX Announcement FURTHER DRILLING WARRANTED AT SIMUKU TO PROGRESS TO FEASIBILITY COMPLETION OF CONCEPTUAL MINING STUDY ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

For personal use only

For personal use only December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

Sierra Metals Exploration Update Call

Sierra Metals Exploration Update Call Sierra Metals Exploration Update Call October 5, 2017 TSX SMT NYSE AMERICAN: SMTS BVL SMT Forward Looking Statements Disclaimer Certain statements in this presentation constitute forward-looking information

More information

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserves Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq.

More information

Bryah Secures Option over Historic Manganese Mine

Bryah Secures Option over Historic Manganese Mine ASX Announcement 7 May 2018 Bryah Secures Option over Historic Manganese Mine HIGHLIGHTS Bryah Resources secures exclusive 1 year option to purchase Mining Lease covering the historical Horseshoe South

More information

INVESTOR PRESENTATION. March 2019

INVESTOR PRESENTATION. March 2019 INVESTOR PRESENTATION March 2019 Bryah Resources Limited A Western Australian mineral exploration company established with the purpose of exploring for and developing manganese and copper-gold resources

More information

DALGARANGA PRE-FEASIBILITY UPDATE

DALGARANGA PRE-FEASIBILITY UPDATE January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated

More information

For personal use only

For personal use only January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated

More information

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT NEWS RELEASE APRIL 7, 2014 PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT VANCOUVER, CANADA. Sarama Resources Ltd. ( Sarama or the Company ) is pleased to

More information

Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project

Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project Latest intersections point to increase in current 1Moz resource Highlights ASX ANNOUNCEMENT

More information

For personal use only

For personal use only Mutiny makes substantial metallurgical performance gains Forecast copper recoveries increased from 58.5% to 64% in the oxide zone and copper concentrate grade increased from 21.5% Cu to 35% Cu Forecast

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

Aeon Metals Limited HIGHLIGHTS

Aeon Metals Limited HIGHLIGHTS ASX Announcement 15 February 2017 WALFORD CREEK PRELIMINARY ECONOMIC ASSESSMENT Early start up Copper-Zinc-Cobalt project indicated for Vardy Zone 2017 drill program focused on significant mine life extension

More information

For personal use only

For personal use only Laconia Resources Limited ACN 137 984 297 Level 1, 41-43 Ord Street West PerthWA 6005 T: +61 8 9486 1599 E: info@laconia.com.au ASX/Media Release 14 March 2012 Clarification of use of Zinc Equivalents

More information

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE Wednesday, 20 February 2013 SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE The Kanmantoo Copper Mine s Indicative Life of Mine (LOM) anticipated to extend to

More information

Duluth Metals Highlights Twin Metal s Nickel Position with 4.7 Billion Measured and Indicated Pounds and 4.2 Billion Inferred Pounds

Duluth Metals Highlights Twin Metal s Nickel Position with 4.7 Billion Measured and Indicated Pounds and 4.2 Billion Inferred Pounds Duluth Metals Highlights Twin Metal s Nickel Position with 4.7 Billion Measured and Indicated Pounds and 4.2 Billion Inferred Pounds Duluth Metals has 60% ownership interest in Twin Metals Minnesota LLC

More information

Molybdenum- The New Battery Metal 2018

Molybdenum- The New Battery Metal 2018 Molybdenum- The New Battery Metal 2018 Why Hammer Why Molybdenum? 2018 Molybdenum has been one of the best price performing metals traded on the London Metals Exchange (LME) up 62.5% in the first 4 months

More information

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017 Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation October, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to

More information

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE 28 December 2011 BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE Highlights The Ore Reserve has been established and a new Life of Mine plan for Southern Operations has been developed with economic

More information

For personal use only

For personal use only NEWS RELEASE DECEMBER 20, 2013 NEW HIGH-GRADE COPPER PROSPECT SECURED IN CHILE Guayacán copper-gold prospect returns surface channel samples grading up to 4.13% Cu Key Points: Option secured over prospective

More information

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT OXIDE COPPER STUDY UNDERWAY AT 8 HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT 20 AUGUST 2015 ASX Code: HOR Management Mr Neil Marston Managing Director/Company Secretary Mr Michael Fotios Non-Executive

More information

PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE

PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE 4 December 2013 HÄGGÅN URANIUM PROJECT SCOPING STUDY REMODELLED AT LOWER THROUGHPUT RATES PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE

More information

Prieska Zinc-Copper Project Advanced-Stage Metallurgical Tests Achieve Impressive Recoveries to Saleable Product

Prieska Zinc-Copper Project Advanced-Stage Metallurgical Tests Achieve Impressive Recoveries to Saleable Product ASX/JSE RELEASE: 12 June 2018 Prieska Zinc-Copper Project Advanced-Stage Metallurgical Tests Achieve Impressive Recoveries to Saleable Product Advanced-stage metallurgical testing of Prieska Project Deep

More information

STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS

STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS ASX RELEASE 30th January 2014 STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS Uranium developer Toro Energy Limited (ASX: TOE) (Toro) today announced the completion of an independent Mining

More information

For personal use only

For personal use only The Manager Company s Announcements Australian Securities Exchange Highlights Corazon Exploration Up-date Drilling continues at the nickel-copper sulphide EL Deposit at the Lynn Lake Project, Canada ASX

More information

Mt Ida Magnetite Project Phase 1 Drilling Program Complete

Mt Ida Magnetite Project Phase 1 Drilling Program Complete Jupiter Mines Limited Mt Ida Magnetite Project Phase 1 Drilling Program Complete JUPITER MINES LIMITED ABN 51 105 991 740 ASX Release 14 December 2010 JUPITER MINES LTD Level 2, 72 Kings Park Rd West Perth

More information

KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015

KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015 KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015 STRATEGY ENHANCING SHAREHOLDER VALUE THREE PILLARS FOR ENHANCING SHAREHOLDER

More information

for the three months ended 31 march 2017 One Asia and Provident working closely to advance the Pani Project Board changes

for the three months ended 31 march 2017 One Asia and Provident working closely to advance the Pani Project Board changes quarterly report for the three months ended 31 march 2017 Awak Mas Preparations are underway for the proposed spin-out and ASX listing New Resource: 1.74 Moz (9 May 2017) AMDAL and Environmental Permit

More information

OCEANIC IRON ORE CORP. Ste Burrard Street Vancouver, BC V7X 1L3 Tel: Fax:

OCEANIC IRON ORE CORP. Ste Burrard Street Vancouver, BC V7X 1L3 Tel: Fax: OCEANIC IRON ORE CORP. Ste. 3083 595 Burrard Street Vancouver, BC V7X 1L3 Tel: 604 566 9080 Fax: 604 566 9081 December 16, 2011 TSX Venture Exchange: FEO OTCQX : FEOVF PRESS RELEASE OCEANIC ANNOUNCES ASSAY

More information

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director Cash flow from gold sales New project developments Exploration success The information in this presentation that relates to

More information

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD November 3 rd 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD Construction work at Gascoyne s 100%

More information

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details ASX Code: MRP Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@macphersonsreward.com.au ABN 98 139 357 967 ASX ANNOUNCEMENT 28 July

More information

Saracen Mineral Holdings Limited ACN

Saracen Mineral Holdings Limited ACN Saracen Mineral Holdings Limited ACN 009 215 347 ASX Release 25 September 2012 2012 Mineral Resources and Ore Reserves Corporate Details: As at 30 June 2012 ASX codes: Ordinary shares: SAR 30 June 2013

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel: 930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 648-4218 www.sabinagoldsilver.com April 22, 2014 SBB NR 14-05 SBB TSX SABINA GOLD & SILVER REPORTS SIGNIFICANT

More information

Nueva Esperanza Project Teterita Mineral Resource Upgrade

Nueva Esperanza Project Teterita Mineral Resource Upgrade ABN 42 000 837 472 18 April 2012 The Manager, Company Announcements Office Australian Securities Exchange Via ASX Online [5 pages] Nueva Esperanza Project Teterita Mineral Resource Upgrade Kingsgate Consolidated

More information

Columbus Copper Provides Update

Columbus Copper Provides Update Columbus Copper Corporation 1090 Hamilton Street Vancouver, B.C. V6B 2R9 Phone: (604) 634-0970 Fax: (604) 634-0971 Toll Free: 1 888 818-1364 info@columbusgroup.com www.columbusgroup.com NEWS RELEASE Columbus

More information

For personal use only

For personal use only 12 July 2011 ASX RELEASE (ASX: SRQ) Exploration and resource update of the Mt Muro epithermal gold and silver project Resources Limited (SRQ) is pleased to present the following exploration update on the

More information

INTEGRA RESOURCES COMMENCES METALLURGICAL TESTWORK PROGRAM AT THE DELAMAR GOLD-SILVER PROJECT

INTEGRA RESOURCES COMMENCES METALLURGICAL TESTWORK PROGRAM AT THE DELAMAR GOLD-SILVER PROJECT 1050 400 Burrard Street Vancouver, British Columbia, Canada V6C 3A6 Email: chris@integraresources.com FOR IMMEDIATE RELEASE September 6, 2018 TSXV:ITR ; OTCQX: IRRZF www.integraresources.com INTEGRA RESOURCES

More information

NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA

NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA February 1, 2006 NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA ULAANBAATAR, MONGOLIA John Macken, President of

More information

For personal use only

For personal use only Mt Ruby DSO Project Acquired High Grade DSO Project in Queensland Mining planned to commence in Q4, 2013 Infrastructure accessible and ready ACN 146 455 576 ASX Release 8 February 2013 Suite 2, 12 Parliament

More information

The global Mineral Resource estimate now stands at Mt grading at 1.19 g/t Au for 1,328,500 contained gold ounces.

The global Mineral Resource estimate now stands at Mt grading at 1.19 g/t Au for 1,328,500 contained gold ounces. 15 December 2011 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Dear Sir/Madam Via Electronic

More information

SIGNIFICANT GOLD AND BASE METALS INTERCEPTS AT CONDOBOLIN Four prospects drilled, four lodes intersected

SIGNIFICANT GOLD AND BASE METALS INTERCEPTS AT CONDOBOLIN Four prospects drilled, four lodes intersected Clancy Exploration Limited 3 Corporation Place Orange NSW 2800 Australia Phone: (02) 6361 1285 Fax: (02) 6361 1202 www.clancyexploration.com info@clancyexploration.com ASX / MEDIA ANNOUNCEMENT 23 March

More information

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 12 NOVEMBER 2018 Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 Prominent Hill underground Ore Reserve increased to 40Mt @ 1.7% copper equivalent i with a 50% increase in Proved

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018 ASX ANNOUNCEMENT 31 JANUARY 2019 ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018 OVERVIEW Horseshoe Metals Limited (ASX: HOR) ( Horseshoe or the Company ), through its wholly owned subsidiary,

More information

Intrepid Mines Limited ACTIVITIES REPORT OVERVIEW. All dollar values are United States Dollars unless otherwise stated.

Intrepid Mines Limited ACTIVITIES REPORT OVERVIEW. All dollar values are United States Dollars unless otherwise stated. Intrepid Mines Limited ACTIVITIES REPORT Q4 THREE MONTHS TO 31 DECEMBER This report on the mining production, development and exploration activities for the quarter ended 31 December is provided as required

More information

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 ASX RELEASE 18 AUGUST 2010 Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 Key Points: Mining approvals granted for Stage 1 of the Nullagine Iron Ore JV

More information