1 EA 03-0L2324 Yuba City, California Location Hydraulic Study Report Submitted to: Prepared by: November 2012

2

3

4

5 Table of Contents Executive Summary... iii Acronyms... v 1 General Description Project Description Existing Condition Project History Proposed Bridge Replacement Creek, Stream, and River Crossings Bridge Numbers Geographical References Traffic Traffic Interruptions for Base Flood (Q 100 ) Hydrologic and Hydraulic Data Federal Emergency Management Agency Data Map of Floodplain Estimating Design Discharge Description of Flood Sources Hydraulic Assessment Project Evaluation Risk associated with implementation of the action Impacts on natural and beneficial floodplain values Support of probable incompatible floodplain development Measures to minimize floodplain impacts associated with the action Measures to restore and preserve the natural and beneficial floodplain values impacted by this action Practicability of proposed design to any significant encroachments Practicability of proposed design to any longitudinal encroachments Coordination with Local, State, and Federal Water Resources and Floodplain Management Agencies References Figures Figure 1. Location Map... 4 Figure 2. Vicinity Map... 5 Figure 3. Flood Insurance Rate Map for Marysville... 7 Figure 4. Flood Insurance Rate Map for Yuba City... 8 Tables Table 1. Bridge Hydraulic Summary Photos Photo 1. Railroad Bridge on the left and 5th Street Bridge on the left. Photo taken facing west. Piers shown in the photo are in the Feather River low-flow channel.... C-3 November 2012 i

6 Photo 2. 5th Street Bridge from the eastern embankment area. Photo taken facing southwest.... C-4 Photo 3. The railroad bridge is in the foreground and the 5th Street Bridge is in the background. Piers shown in the photo are in the low-flow channel. Photo taken facing northeast.... C-5 Photo 4. Piers on the eastern side. Photo taken facing northwest. Piers shown in the photo are within the 100-year floodplain.... C-6 Photo 5. Abutment on the eastern end. Photo facing northeast. Photo taken from the railroad bridge.... C-7 Appendices Appendix A Summary of Floodplain Encroachment... A-1 Appendix B General Plans... B-1 Appendix C Project Photographs... C-1 Appendix D HEC-RAS Results... D-1 Appendix D.1 Existing Condition 100-year Design Storm... D-3 Appendix D.2 Proposed Condition 100-year Design Storm... D-5 Appendix D.3 Existing Condition 200-year Design Storm... D-7 Appendix D.4 Proposed Condition 200-year Design Storm... D-9 November 2012 ii

7 Executive Summary This study presents the hydrologic, hydraulic, and floodplain risk assessments for the proposed 5 th Street bridge replacement over the Feather River in the City of Marysville (Yuba County) and Yuba City (Sutter County). The existing bridge shows scour at the piers, is susceptible to seismic liquefaction, and has extremely narrow shoulders. This report discusses floodplain impacts associated with the proposed replacement design. Dokken Engineering is the primary consultant for this project and WRECO is the hydraulic subconsultant responsible for hydraulic and scour analyses. Dokken Engineering prepared the proposed bridge replacement concept. There would be an insignificant change in the water surface elevation in the identified Feather River 100-year base floodplain from the bridge retrofit and replacement alternative. In addition, the bridge soffit elevation is higher than the estimated 100-year water surface elevation; therefore, there would be no traffic interruptions on 5 th Street/Bridge Street due to base flooding. Existing natural and beneficial floodplain values at the Feather River floodplain include open space and outdoor recreation. The proposed Project would not impact those natural and beneficial floodplain values. Environmental impacts as a result of construction activities can be mitigated with Best Management Practices (BMPs) measures. Implementation of BMPs and compliance with requirements from the Project s permit conditions would help to minimize impacts to the floodplain. The Project would be a transverse encroachment and is, therefore, not considered a longitudinal encroachment to the 100-year floodplain. November 2012 iii

8 This page is left intentionally blank. November 2012 iv

9 Acronyms AC Asphalt concrete ACOE Army Corps of Engineers ADT Average daily traffic BMP Best Management Practices Caltrans California Department of Transportation CIDH Cast-in-drilled hole CVFPB Central Valley Flood Protection Board DWR Department of Water Resources FEMA Federal Emergency Management Agency FHWA Federal Highway Administration FIRM Flood Insurance Rate Map FIS Flood Insurance Study HEC-RAS Hydrologic Engineering Center River Analysis System NAVD 88 North American Vertical Datum of 1988 NGVD 29 National Geodetic Vertical Datum of 1929 SPRR Southern Pacific Railroad Bridge TRLIA Three Rivers Levee Improvement Authority USED United States Engineering Datum November 2012 v

10 This page is left intentionally blank. November 2012 vi

11 1 GENERAL DESCRIPTION 1.1 Project Description The purpose of the (hereto known as the Project ) is to rehabilitate or replace the bridge between 5th Street in Marysville (Yuba County) and Bridge Street in Yuba City (Sutter County). The current bridge shows scour at the piers, is susceptible to seismic liquefaction, and has extremely narrow shoulders. The recommended rehabilitation option being proposed at this time is to replace the existing bridge. This report contains hydraulic analysis and bridge scour analysis of the proposed bridge replacement concept in order to provide the Project Team bridge engineers hydraulic data. The bridge crosses the Feather River, which is a principal tributary of the Sacramento River. The Feather River is 80 miles long. The river rises in three separate forks in the Sierra Nevada, which unite as arms of the Lake Oroville reservoir in the foothills 5 miles northeast of the City of Oroville. The combined stream flows generally south across the Sacramento Valley, past Oroville and Yuba City-Marysville, and joins Sacramento River approximately 20 miles north-northwest of Sacramento Existing Condition The existing bridge was constructed in 1958 as part of the December 1955 Flood Damage Replacement Project. The bridge has 22 spans over the Feather River and its floodplain. Two spans each extend over 2nd Street and the west levee. The bridge is supported mainly on hollow pier walls founded on clusters of battered and vertical piles. There is one lane in each direction. The existing bridge has shoulder widths of 1.0 feet on the left and right. The sidewalk/bikeway width is 9.8 feet on the westbound side of the bridge only. The roadway width is approximately 27.8 feet. The total bridge width is 42 feet. The bridge is rated 5 for the National Bridge Inventory Item 113 Scour Critical Bridges per the May 27 th, 2011 Caltrans Bridge Inspection Report. Approximately 23 feet south of the existing 5 th Street bridge is the historic Southern Pacific Railroad (SPRR) Bridge. The existing SPRR Bridge consists of two abutments and 39 piers per the Sacramento Northern Railway Co. record drawings for Railroad Bridge No across Feather River Marysville to Yuba City. The existing SPRR Bridge will remain in-place with no modifications made as part of this Project. The piers of the existing 5 th Street Bridge located within the channel are aligned with the existing SPRR Bridge. The piers of the existing 5 th Street Bridge that are located to the east of the main channel of the Feather River are aligned with every second pier (i.e. every other) of the existing SPRR Bridge piers. November

12 1.2 Project History The 5 th Street Bridge was constructed in There is a history of Pier 4 having footing exposure issues. In 1997, the California Department of Transportation (Caltrans) had an Underwater Investigation performed, which discovered that the full depth of the pile cap and tremie seal of the upstream nose of Pier 4 were exposed. The pile cap and tremie seal at the upstream end were undermined. The Underwater Investigation recommended that the Local Agency in charge of maintenance of the structure protect the upstream end of Pier 4 from scour by placing some type of scour protection. This work had not been performed as of July This structure received a Condition State of 2 ( scour exists at the bridge site and if left unchecked could adversely impact the structural integrity of the bridge ) for the Element Level Inspection 361 Scour SMART flag (Caltrans, 2003). From the 2003 Bridge Inspection Report, the National Bridge Inventory Item 113 code was changed from 6 to 4. The previously appointed Code 6 is defined by the Federal Highway Administration (FHWA) as Scour calculation/evaluation has not been made. (FHWA, 2001) Code 4 for corresponds to the description that Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations. (FHWA, 2001) Results of a scour review performed by the Caltrans Division of Structure Maintenance and Investigations Ratings Branch on 7/1/03 indicated that this structure is not scour critical under stream loading, but may be seismically vulnerable. In the Bridge Investigation Report in 2003, it was recommended that the Local Agency check for seismic instability of this structure resulting from permanent pile exposure. It was also recommended that the Area Bridge Maintenance Engineer monitor the amount of pile exposure on a regular biennial basis. There were 3 major floods that have caused failures on the levees near Marysville and Yuba City. These floods occurred in 1955, 1986, and The levees were not overtopped. In each case, sand boils had been observed at the toe (or outside of the toe) of the levee before failure Proposed Bridge Replacement The proposed bridge replacement would replace the existing 42 feet wide 22 span bridge with an 84 feet wide bridge. The proposed bridge would be 10 spans and supported on three column bents. Each pier section would have 3 columns. The proposed bridge will be located approximately 90 feet (along center of channel) from the existing SPRR Bridge, which is farther upstream than the existing 5 th Street Bridge. The proposed pier sections are not specifically aligned with the piers of the existing SPRR Bridge. See Appendix B for the General Plan layout sheets. 1.3 Creek, Stream, and River Crossings The Project site crosses the Feather River at 5 th Street (Marysville) and Bridge Street (Yuba City). November

13 At the Project site, the Feather River is a very wide trapezoidal shape channel between levees. The main channel is under proposed Spans 2 and 3. The remaining spans are over the floodplain, which consists of grass fields and parking lots. 1.4 Bridge Numbers The State Bridge Number is 18C-0012 for the Feather River crossing. 1.5 Geographical References United States Geological Survey topographic quadrangles were used to locate the Project. The bridge is in the Yuba City, CA Quadrangle. WRECO utilized As-Built record drawings, Federal Emergency Management Agency (FEMA) documents, and an existing Hydrologic Engineering Center River Analysis System (HEC-RAS) model as vertical references for the Project. The vertical control for the As-Built record drawings are based on the United States Engineering Datum (USED). The vertical control for the FEMA documents and the HEC-RAS model are based on the National Geodetic Vertical Datum of 1929 (NGVD 29). Elevations from the As-Built record drawing were converted to the NGVD 29 datum by adding 3 feet. The proposed Project plans use the North American Vertical Datum of 1988 (NAVD 88). To convert the proposed data (NAVD 88) to be compatible with the HEC-RAS data (NGVD 29), a value of 2.28 feet was subtracted from the proposed design elevations. 1.6 Traffic The average daily traffic (ADT) in 1981 was 29,000. In 2001 the ADT was 35,000. The ADT in 2013 is predicted to be between 40,000 and 46, Traffic Interruptions for Base Flood (Q 100 ) The base flood is that flood which has a one percent chance of occurrence in any given year (100-year flood). Potential flooding conditions for the proposed Project were evaluated based on the 100-year floodplains depicted on FEMA Flood Insurance Rate Maps (FIRMs). Based on available data, traffic interruptions due to the base flood would not be present at the Project site because the 100-year base flood is contained in the Feather River channel. In addition, the roadway elevation at the bridge is higher than the 100-year and 200-year water surface elevations at the Feather River crossing, which would eliminate traffic delays on the 5th Street Bridge due to base flooding. November

14 Project Site Figure 1. Location Map Source: United States Geological Survey November

15 Yuba River Project Site: 5 th Street/Bridge Street Feather River Figure 2. Vicinity Map Source: United States Geological Survey November

16 This page is left intentionally blank. November

17 2 HYDROLOGIC AND HYDRAULIC DATA 2.1 Federal Emergency Management Agency Data FEMA FIRMs for the Project site are shown, following, as Figure 3 for the City of Marysville and Figure 4 for the City of Yuba City. 2.2 Map of Floodplain Based on the FEMA FIRMs for the Project area, the 100-year floodplain is contained in the reach of the Feather River in the Project area. Levees on the Feather River protect the areas adjacent to the river from the 100-year flood. See Figure 3 and 4 below. Project Site Figure 3. Flood Insurance Rate Map for Marysville Source: Federal Emergency Management Agency November

18 Project Site Figure 4. Flood Insurance Rate Map for Yuba City Source: Federal Emergency Management Agency 2.3 Estimating Design Discharge The drainage area at the Project site is approximately 4,000 square miles. Per the Frequency-Discharge, Drainage Area Curve from FEMA s Flood Insurance Study (FIS) for the City of Marysville, the 100-year design discharge is approximately 150,000 cubic feet per second at the Project site (FEMA, 2011). Design discharge from the MBK Engineers hydraulic model included hydrologic data based on a study by the United States Army Corps of Engineers for the Lower Feather River Floodplain Mapping Study in 2005 (MBK Engineers, 2006). At the Project site, the 100-year design discharge is 165,000 cfs and the 200-year design discharge is 192,000 cfs. 2.4 Description of Flood Sources The climatology of Marysville is not a significant factor in its flood problems. The climate is mild without extreme temperature variations with mean annual precipitation approximately 20.6 inches. Most of the annual precipitation in Marysville occurs between October and April with maximum storm intensities between December and March. A large portion of the annual precipitation occurs as snowmelt accumulates (FEMA, 2011). According to Central Valley Flood Protection Board, major high water events on the Feather River can occur between November 1 st and April 15 th from rain and snowmelt. Rain floods generally could occur between October and March and snowmelt floods generally could occur between April and June. However, in area of the Project, high November

19 water events usually occur due to the result of a warm, heavy storm event coupled with the melting of snow pack in lower elevations. Minor flooding in Marysville can also originate from heavy rain or from ponding within the levee systems due to deficiencies in the city storm drain system (FEMA, 2011). Nine major floods on the Feather and Yuba Rivers have been documented since 1900 (1904, 1907, 1909, 1928, 1937, 1950, 1955, 1963, and 1964). The levee system sustained severe damage in the flood of 1955 with water going through the levees. The 1955 and 1964 floods are estimated as having a 200-year recurrence frequency on the Feather River, while the recurrence frequency on the Yuba River at Marysville was a 140-year in 1955 and a160-year in 1964 (FEMA, 2011). The Feather River is part of the Sacramento River Flood Control Project. Levees were incorporated in the Sacramento River Flood Control Project in These levees protect areas adjacent to the rivers from the estimated 100-year storm event, including the Project area. Lake Oroville on the Feather River, located upstream of the Project, is a major flood control structure to control total flows under the Sacramento River Flood Control Project. Lake Oroville is expected to contain the 100-year storm event and decrease downstream discharges in a 500-year storm event on the Feather River. New Bullards Bar Reservoir and Englebright Reservoir on the Yuba River, along with Oroville Dam on the Feather River, make up a coordinated three-dam system providing controls for the flow of the Feather and Yuba Rivers (FEMA, 1981). Levees adjacent to Feather River help to contain the flood waters within the levee system. There are no identified floodplains in the Project area, outside of the levee walls, because the levees provide protection from the 100-year storm event. It is important to note that the levees do not provide full protection nor do they completely eliminate the risk of flooding. The levees on either side of the Feather River, in the Project area, are accredited by FEMA as providing adequate protection for a 100-year storm event and the areas behind the levees are shown as such on the FEMA FIRMs for Yuba County, CA and Incorporated Areas (2011) and the City of Yuba City, California Sutter County (1984). The Marysville Levee Commission adopted the height of 81.2 feet (NAVD) as the official design elevation for levees based on historical flood events reaching that elevation (FEMA, 2011). After the construction of the Oroville Dam in 1964, only two major flood events have occurred in this area. In the winter of 1986, there was a failure of the left (southern) levee of the Yuba River just across from the City of Marysville inundating the communities of Olivehurst and Linda. In 1997, the Feather River levee broke north of the confluence of the Feather and Bear Rivers (south of the Project area), resulting in large areas of flooding. After these flood events, levee improvements were conducted to strengthen the levees in the area (FEMA, 2011). In 2000, the Department of Water Resources (DWR) and the Army Corps of Engineers (ACOE) reevaluated the levee systems for the Feather, Yuba, and Bear Rivers. In 2003, DWR, ACOE, and local government agencies identified freeboard deficiencies on the Bear River levee and November

20 geotechnical issues with the Yuba River levee. They did not identify deficiencies with the Feather River levee (MBK Engineers, 2005). The Three Rivers Levee Improvement Authority (TRLIA) was created in 2004 through a joint powers agency agreement between the County of Yuba and Reclamation District 784 to finance and construct levee improvements surrounding the South Yuba County Area. Four work phases were identified with the goal of achieving the 200-year storm event protection. The four work phase projects are not in the Project vicinity. Phase 4 proposes to strengthen the levees along Feather River between Bear and Yuba Rivers, south of the Project (TRLIA, 2007). 2.5 Hydraulic Assessment MBK Engineers provided a copy of the Feather River HEC-RAS model as a basis for the hydraulic model for this Project. The model represents the Feather River and its tributaries from major reservoirs within the watershed basin to its confluence with the Sacramento River (2006). The Project is located between the Jack-Simmerly Slough tributary - Yuba River. The Jack-Simmerly Slough tributary - Yuba River Reach was isolated from the original model. The data from the original MBK Engineers model was used as the basis for the model used for this analysis. Additional river survey information was also added into the isolated reach model. The existing SPRR Bridge was updated to more accurately reflect the as-built design, and was included in both the existing and proposed hydraulic models. The peak design flows, water surface elevations, and average channel flow velocities for the location 2 feet upstream of the bridge and 100 feet upstream of the bridge are shown in Table 1. Bridge Hydraulic Summary and corresponding cross-sections have been provided in Appendix D of this report. Based on the hydraulic analyses, WRECO concluded that the proposed bridge could pass 1) the 100-year design storm under FHWA criteria and, for the most part, meet the Central Valley Flood Protection Board criteria of passing and 2) the 200-year design storm with adequate freeboard. The easterly abutment and approximately 25 feet of the soffit of the most easterly span clears the 200-year design water surface elevation and is 0.60 feet below the 3 feet of freeboard criteria. Per the proposed condition hydraulic model, the proposed bridge has little to no impact on the hydraulics at the existing SPRR Bridge during the design events. November

21 Table 1. Bridge Hydraulic Summary Hydraulic Summary at 2 ft From Upstream Bridge Face Water Surface Elevation Average Channel Velocity Water Surface Elevation At 100 ft From Upstream Bridge Face Deck Elevation at Upstream Bridge Face 1 Soffit Elevation at Upstream Bridge Face 2 Design Alternative Design Storm Peak Flow (year) (cfs) (ft) (ft/s) (ft) (ft) (ft) Existing , Proposed Replacement , Existing , Proposed Replacement , Notes: 1 Deck elevations for the Existing and Proposed Replacement are at the lowest deck elevation of the bridge 2 Soffit elevations for the Existing and Proposed Replacement are at the lowest soffit elevation of the bridge 3 All the elevations listed in Table 1 are in NGVD 29. A factor of 2.28 feet shall be added to convert to the proposed design datum, which is NAVD 88. The hydraulic assessment is further detailed in the WRECO Bridge Design Hydraulic Study Report. November

22 This page is left intentionally blank. November

23 3 PROJECT EVALUATION The existing bridge is within the 100-year base floodplain associated with the Feather River. The proposed work would occur within the base floodplain. 3.1 Risk associated with implementation of the action The FHWA defines a significant encroachment as a highway encroachment and any direct support of likely base floodplain development that would involve one or more of the following construction or flood related impacts: 1) a significant potential for interruption or termination of a transportation facility which is needed for emergency vehicles or provides a community s only evacuation route; 2) a significant risk; or 3) a significant adverse impact on the natural and beneficial floodplain values (1994). 1. The Project does not have a significant potential for interruption or termination of a transportation facility which is needed for emergency vehicles or provides a community s only evacuation route. The proposed bridge will be no more susceptible to interruption than the Highway 20 bridge. The 5 th Street Bridge is the preferred and fastest emergency route from Yuba City to Rideout Hospital. The Project would significantly increase the reliability of 5 th Street due to addition of lanes. Traffic interruption for both the 100-year and 200-year events is not anticipated since the water surface elevation would be below the bridge deck. 2. The level of risk associated with the Project is low. Damage to the roadway from the 100-year event is not anticipated. The proposed work would not raise the water surface elevation in the floodplains by a significant amount. The encroachment on the floodplain would be minimal since the increase in water surface elevation in the floodplains would be minimal, as indicated by the HEC- RAS models; see Table 1. Bridge Hydraulic Summary. The proposed work would raise the water surface elevation in the floodplains by 0.01 feet. This change in water surface elevation would be insignificant. 3. Existing natural and beneficial floodplain values associated with the Feather River floodplain within or adjacent to the Project include open space and outdoor recreation. The proposed Project would not have a significant adverse impact on the natural and beneficial floodplain values. The risk associated with the Project is, therefore, minimal. 3.2 Impacts on natural and beneficial floodplain values Natural and beneficial floodplain values shall include, but are not limited to: fish, wildlife, plants, open space, natural beauty, scientific study, outdoor recreation, agriculture, aquaculture, forestry, natural moderation of floods, water quality maintenance, and groundwater recharge. November

24 The piers of the existing bridge are within the 100-year base floodplain. Natural and beneficial floodplain values associated with the base floodplain include fish, wildlife, plants, open space, and outdoor recreation. The area immediately north of the bridge is a group of soccer fields. Measures to restore and preserve the natural and beneficial floodplain values are discussed in Section Support of probable incompatible floodplain development As defined by FHWA, the support of incompatible base floodplain development encourages, allows, serves, or otherwise facilitates incompatible base floodplain development, such as commercial development or urban growth. The Project would not encourage, allow, serve, or otherwise facilitate additional or incompatible base floodplain development. The floodplain encroachments would not be significant encroachments (as defined by FHWA in 23 CFR (q) of the Federal- Aid Policy Guide) because: 1. The Project does not have a significant potential for interruption or termination of a transportation facility which is needed for emergency vehicles or provides a community s only evacuation route. 2. The Project does not pose significant flooding risks. 3. The Project does not have impacts to natural and beneficial floodplain values. The approach roadways would conform to Shasta Street on the west end and to J Street on the east end. Therefore, the Project would not support incompatible base floodplain development. 3.4 Measures to minimize floodplain impacts associated with the action The Project would encroach onto the Feather River floodplains since the improvements would include the removal of the existing bridge and the installation of the new bridge. The effects on the water surface elevation would be minor. The Project would increase the 100-year water surface elevation by 0.01 feet. The Project would not adversely impact the Feather River floodplains. Appropriate Best Management Practices (BMPs) would be implemented to minimize storm water impacts. 3.5 Measures to restore and preserve the natural and beneficial floodplain values impacted by this action Natural and beneficial floodplain values within or adjacent to the Project include fish, wildlife, plants, open space, and outdoor recreation (see Section 3.2). There would be no November

25 significant impacts to the natural and beneficial floodplain values. Environmental impacts would be a result of construction activities and can be minimized with measures such as re-vegetation, appropriate BMPs, or other requirements as part of the Project s environmental and permitting conditions. Permits or approvals would be required from ACOE, California Department of Fish and Game, United States Fish and Wildlife Service, National Oceanic and Atmospheric Administration Fisheries, California Regional Water Quality Control Board, and the Central Valley Flood Protection Board. 3.6 Practicability of proposed design to any significant encroachments As defined by FHWA, risk shall mean the consequences associated with the probability of flooding attributable to an encroachment. It shall include the potential for property loss and hazard to life during the service life of the bridge and roadway. The risks associated with the action are not significant. In the existing condition, the 100-year base floodplain does not extend beyond the Feather River and is contained within the levee system. The increase in water surface elevation associated with the replacement of piles and pile caps would not be significant enough to overtop the levee nor would the water surface elevation reach the soffit of the bridge. Improvement measures, such as flood walls, are being proposed along the east bank at the bridge to offer additional flood protection. 3.7 Practicability of proposed design to any longitudinal encroachments As defined by FHWA, a longitudinal encroachment is an action within the limits of the base floodplain that is longitudinal to the normal direction of the floodplain. A longitudinal encroachment is [a]n encroachment that is parallel to the direction of flow. Example: A highway that runs along the edge of a river is, usually considered a longitudinal encroachment. The requirement for consideration of avoidance alternatives must be included in a Location Hydraulic Study by including an evaluation and a discussion of practicability of alternatives to any significant encroachment or any support of incompatible floodplain development. The Project would be perpendicular to the direction of the Feather River flow (a transverse encroachment) and is, therefore, not considered a longitudinal encroachment to the 100-year floodplain. Therefore, alternatives have not been considered. November

26 3.8 Coordination with Local, State, and Federal Water Resources and Floodplain Management Agencies The Cities of Marysville and Yuba City and the Counties of Sutter and Yuba and FEMA should review this report to determine if a floodplain map revision is necessary, due to the potential encroachment on the regulatory floodway. November

27 4 REFERENCES California Department of Transportation. (2007). Structure Maintenance and Investigations: Local Agency Bridge List: Sutter County: City of Yuba City. California Department of Transportation. Structure Maintenance and Investigations. (2011). Bridge Inspection Report. Feather River Bridge, 18C0012, Fifth Street/Bridge Street between Marysville and Yuba City. Received from Dokken Engineering on March 26, California Department of Transportation. Structure Maintenance and Investigations. (2005). Bridge Inspection Report. Feather River Bridge, 18C0012, Fifth Street/Bridge Street between Marysville and Yuba City. Saved to PDF on October 31, Received from TRC Inc. on August 31, California Department of Transportation. Structure Maintenance and Investigations. (July 2003). Bridge Inspection Report. Feather River Bridge, 18C0012, Fifth Street/Bridge Street between Marysville and Yuba City. Saved to PDF on July 21, Received from TRC Inc. on August 31, California Department of Transportation. Structure Maintenance and Investigations. (2001). Bridge Inspection Report. Feather River BOH Bridge, , SR SUT YC in Yuba City. Saved to PDF on November 29, Received from TRC Inc. on September 4, Dokken Engineering. (January 9, 2012). DRAFT Feasibility Study Report 5 th Street Bridge over the Feather River. Environmental Protection Agency. (1977). Floodplain Management, Executive Order No F.R Federal Emergency Management Agency. (November 2010). The NFIP and Levees Systems Frequently Asked Questions. < (Last Accessed: January 18, 2012) Federal Emergency Management Agency. (1984). FIRM: Flood Insurance Rate Map. City of Yuba City, California, Sutter County. Community Panel Number B. (Effective Date: March 23, 1984). Federal Emergency Management Agency. (2011). FIRM: Flood Insurance Rate Map. Yuba County, California and Incorporated Areas. Map Number 06115C0340D. (Effective Date: February 18, 2011). Federal Emergency Management Agency. (2011). Flood Insurance Study. Yuba County, California, and Incorporated Areas. Community Numbers: , , , and Unincoporated Areas. Flood Insurance Study Number: 06115CV000A (Effective Date: February 18, 2011). November

28 Federal Highway Administration. (1994). Federal-Aid Policy Guide, Transmittal 12, 23 CFR 650 A. Gerwick, Ben C. Inc. (1956). Railroad Bridge No Across Feather River Marysville to Yuba City (Project Plans). MBK Engineers. (2007). HEC RAS 2006 Existing Condition. Existing2006.prj. MBK Engineers. (2006). Hydraulic and Hydrologic Documentation for FEMA Certification of the Three River s Levee Improvement Authority Project. Stirling, S. (SM&I Hydraulics ). (2006). Bridge Scour Evaluation Plan of Action. Feather River Bridge, Published by California Department of Transportation, Division of Maintenance: BIRIS. Three Rivers Levee Improvement Authority (TRLIA). (2007). Project Status Report. (Submitted to The Reclamation Board for the April 20, 2007, meeting). < (Last Accessed: January 18, 2012) United States Geological Survey. (2012). Peak Streamflow for the Nation. USGS Feather R A Yuba City CA. < (Last Accessed: January 18, 2012). United States Geological Survey. (2001). California: Seamless U.S.G.S. Topographic Maps (CDROM, Version 2.6.8, Part Number: ). National Geographic Holdings, Inc. Wood Rodgers. (2004). Preliminary Seismic Vulnerability Study. November

29 Appendix A Summary of Floodplain Encroachment November 2012 A

30 November 2012 A

31

32 This page is left intentionally blank. November 2012 A

33 Appendix B General Plans Note: All elevations on the following sheets are NAVD 88. November 2012 B

34 November 2012 B

35 November 2012 B

36 November 2012 B

37 November 2012 B

38 November 2012 B

39 November 2012 B

40 November 2012 B

41 November 2012 B

42 November 2012 B

43 Appendix C Project Photographs November 2012 C

44 November 2012 C

45 Photo 1. Railroad Bridge on the left and 5th Street Bridge on the right. Photo taken facing west. Piers shown in the photo are in the Feather River low-flow channel. November 2012 C

46 Photo 2. 5th Street Bridge from the eastern embankment area. Photo taken facing southwest. November 2012 C

47 Photo 3. The railroad bridge is in the foreground and the 5th Street Bridge is in the background. Piers shown in the photo are in the low-flow channel. Photo taken facing northeast. November 2012 C

48 Photo 4. Piers on the eastern side. Photo taken facing northwest. Piers shown in the photo are within the 100-year floodplain. November 2012 C

49 Photo 5. Abutment on the eastern end. Photo facing northeast. Photo taken from the railroad bridge. November 2012 C

50 November 2012 C

51 Appendix D HEC-RAS Results Appendix D.1 Existing Condition 100-year Design Storm Appendix D.2 Proposed Condition 100-year Design Storm Appendix D.3 Existing Condition 200-year Design Storm Appendix D.4 Proposed Condition 200-year Design Storm November 2012 D

52 November 2012 D

53 Appendix D.1 Existing Condition 100-year Design Storm November 2012 D

54 This page is left intentionally blank. November 2012 D

55 Appendix D.2 Proposed Condition 100-year Design Storm November 2012 D

56 This page is left intentionally blank. November 2012 D

57 Appendix D.3 Existing Condition 200-year Design Storm November 2012 D

58 This page is left intentionally blank. November 2012 D

59 Appendix D.4 Proposed Condition 200-year Design Storm November 2012 D

60 This page is left intentionally blank. November 2012 D

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location

More information

Location Hydraulic Study Alisal Creek Bridge at Hartnell Road State Bridge Number 44C0110 County Bridge Number 209

Location Hydraulic Study Alisal Creek Bridge at Hartnell Road State Bridge Number 44C0110 County Bridge Number 209 Alisal Creek Bridge at Hartnell Road State Bridge Number 44C0110 County Bridge Number 209 Prepared for Monterey County RMA February 2017 10680 White Rock Road, Suite 100 Rancho Cordova, CA 95670-6165 Table

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

DRAFT LOCATION HYDRAULIC REPORT

DRAFT LOCATION HYDRAULIC REPORT DRAFT LOCATION HYDRAULIC REPORT West Bay Parkway (CR 388) Segment 2 From SR 79 to SR 77 in Bay County FPID No. 424464-1-22-01 Florida Department of Transportation District Three 1074 Highway 90 East Chipley,

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

In order to comply, the following must be analyzed: The practicability of alternatives to any longitudinal encroachments

In order to comply, the following must be analyzed: The practicability of alternatives to any longitudinal encroachments PHYSICAL ENVIRONMENT 3.9 Hydrology and Floodplains 3.9.1 Regulatory Setting Executive Order 11988 (Floodplain Management) directs all federal agencies to refrain from conducting, supporting, or allowing

More information

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY LEVEE DISTRICT NO. 1 OF SUTTER COUNTY STAR BEND SETBACK LEVEE AND HABITAT ENHANCEMENT PROJECT BASIS OF DESIGN FEBRUARY 2009 Prepared By: TABLE OF CONTENTS QUALITY CONTROL CERTIFICATION... iv 1.0 INTRODUCTION...

More information

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP Page 2 FEMA Floodplain Mapping Flood Elevations at WWTP Existing Flood Control Facilities The City of Davis WWTP is located immediately north of the Willow Slough Bypass and west of the Yolo Bypass (see

More information

Appendix K Civil Engineering

Appendix K Civil Engineering Appendix K Civil Engineering Fargo-Moorhead Metropolitan Area Flood Risk Management Final Feasibility Report and Environmental Impact Statement Prepared by: U.S. Army Corps of Engineers St. Paul District

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

c. Effects of the Project on Public Health, Safety and the Environment

c. Effects of the Project on Public Health, Safety and the Environment INTRODUCTION a. Description of Proposed Activity This report is for the hydrologic and hydraulic analysis for the structure located at Sta.100+80.67 on S.R. 0978 in North Fayette Township, Allegheny County,

More information

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

Technical Memorandum No River Geometry

Technical Memorandum No River Geometry Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.5 River Geometry Task: Collection and Analysis of River Geometry Data To: PRWFPA Staff Working Group Prepared by: J. Schaaf

More information

APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM

APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM To: File Memo From: Matt Redington, P.E. Project: Watertown South Connector CC: Date: March 6, 2007; revised

More information

Marysville Levee Commission

Marysville Levee Commission Marysville Levee Commission Outline CVFPP Goals & Objectives Highlights of Draft Feather River RFMP Integration between Flood Protection, Agriculture and Wildlife and Floodplain Uses Proposed Projects

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

YUBA COUNTY, CALIFORNIA AND INCORPORATED AREAS

YUBA COUNTY, CALIFORNIA AND INCORPORATED AREAS YUBA COUNTY, CALIFORNIA AND INCORPORATED AREAS COMMUNITY COMMUNITY NAME NUMBER MARYSVILLE, CITY OF 060428 WHEATLAND, CITY OF 060460 YUBA COUNTY 060427 (UNINCORPARED AREAS) Federal Emergency Management

More information

CHAPTER 3 FLOOD RELATED STUDIES

CHAPTER 3 FLOOD RELATED STUDIES CHAPTER 3 FLOOD RELATED STUDIES Although the area has experienced regular flooding there have been few formal flood studies until more recently. There are a number of water quality studies in the basins.

More information

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No Urban Study Rocky Branch Watershed Columbia, South Carolina Prepared for: City of Columbia 1136 Washington Street Columbia, SC 29217 Prepared by: AMEC Environment & Infrastructure, Inc. 720 Gracern Road

More information

COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE

COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE K.2.1 General Requirements The design and construction of slope protection works may be required for several types

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

Yuba County IRWMP 2015 UPDATE APPENDIX 10-1 General Plan Relation to IRWMP

Yuba County IRWMP 2015 UPDATE APPENDIX 10-1 General Plan Relation to IRWMP APPENDIX 10-1 General Plan Relation to IRWMP 1 of 13 Community Development Element Goal CD11: Quality of Life and Local Advantages Provide a high quality of life and take advantage of the County s economic

More information

acquiring, managing, and disposing of federal lands and facilities;

acquiring, managing, and disposing of federal lands and facilities; 2.2.1 HYDROLOGY AND FLOODPLAIN This section discusses and analyzes the surface hydrology and water quality characteristics of the project. The information provided in this section is based on the Preliminary

More information

12 DRAINAGE General Administrative Requirements Standards

12 DRAINAGE General Administrative Requirements Standards 12 DRAINAGE 12.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with drainage, including culverts, bridge hydraulics, roadway ditches, and closed storm

More information

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida LOCATION HYDRAULICS REPORT SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: FLORIDA DEPARTMENT OF

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

Section H Project Description Narrative

Section H Project Description Narrative Section H Project Description Narrative Permit No. Pennsylvania Department of Transportation, Engineering District 2-0, 1924 Daisy Street Extension, P.O. Box 342, Clearfield, PA 16830 S.R. 2004, Section

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

SWAP Risk Informed Methods for Stormwater Assessment and Prioritization

SWAP Risk Informed Methods for Stormwater Assessment and Prioritization SWAP Risk Informed Methods for Stormwater Assessment and Prioritization Sara Hillegas Woida, Hydraulic Engineer US Army Corps of Engineers, Pittsburgh Thomas Maier, Biologist/Planner US Army Corps of Engineers,

More information

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat S.R. 4007, Section 14B PADEP Environmental Assessment Form Description of Aquatic Habitat Cresheim Creek is the only water resource that exists within the project area. No jurisdictional wetlands were

More information

APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models

APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models Introduction Technical Report on Airport Drainage Appendix J-3:

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION TH 36/STH 64 St. Croix River Crossing 2005 Water Resources Preliminary Design Report APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION within the project area. Other methods of attaining this reduction

More information

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists Addendum No. 3 (North Sacramento Streams) to the Environmental Impact Report on the North Sacramento Streams, Sacramento River East Levee, Lower American River, and Related Flood Improvements Project Prepared

More information

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers DRAINAGE REPORT Project Name: PG&E Gas Operations Technical Training Center Winters, CA Date: February 4, 2015 Prepared by: BKF Engineers Client: Pacific Gas & Electric Company This report has been prepared

More information

Case Study 15. Moonlight Crossing Concrete Box Vented Ford

Case Study 15. Moonlight Crossing Concrete Box Vented Ford Appendix A Case Study 15 Case Study 15. Moonlight Crossing Concrete Box Vented Ford Location Northeastern California. Plumas National Forest. On Lights Creek, 8 miles north of Taylorsville, CA., Forest

More information

APPENDIX M MITIGATION STRATEGY For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY

APPENDIX M MITIGATION STRATEGY For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY APPENDIX M MITIGATION STRATEGY For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY October 2018 Page intentionally left blank Table of Contents: 1.0 Introduction... 5 1.1 Study Area... 5 1.2

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Hydrology and Flooding

Hydrology and Flooding Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.

More information

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS Utilities electric stormwater wastewater water 700 Wood St. PO Box 580 Fort Collins, CO 80522 970.221.6700 970.221.6619 fax 970.224.6003 TDD utilities@fcgov.com fcgov.com/utilities TECHNICAL GUIDANCE and

More information

Technical Memorandum Channel Capacity Report 2018 Restoration Year

Technical Memorandum Channel Capacity Report 2018 Restoration Year Technical Memorandum Channel Capacity Report 2018 Restoration Year 1 Table of Contents 2 1.0 Executive Summary... ES-1 3 4 2.0 Introduction... 1 5 2.1 Objective... 2 6 2.2 CCAG Roles and Responsibilities...

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

FEMA/USACE Coordination Plan

FEMA/USACE Coordination Plan FEMA/USACE Coordination Plan Project: Fargo-Moorhead Metropolitan Feasibility Study ND Diversion Channel with upstream staging Federal Plan (Authorized WRRDA 2014) Project Design: Project Reach: U.S. Army

More information

A Hydrologic Study of the. Ryerson Creek Watershed

A Hydrologic Study of the. Ryerson Creek Watershed A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information

- Site Location and Conditions. A. Project Location. B. Existing Conditions

- Site Location and Conditions. A. Project Location. B. Existing Conditions H&H Report - Site Location and Conditions Page 1 of 2 A. Project Location 1. Site Identification District County Mu nicipali ty 06 Bucks Hilltown (Twp) Site MINSI TRAIL S.R. 4019 Section 60M Segment 0050

More information

DRAINAGE SUBMITTAL CHECKLIST

DRAINAGE SUBMITTAL CHECKLIST Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following

More information

FLOODPLAIN PERMIT APPLICATION File No.

FLOODPLAIN PERMIT APPLICATION File No. Fairbanks North Star Borough Department of Community Planning 907 Terminal Street/P.O. Box 71267 Fairbanks, Alaska 99707-1267 (907) 459-1260 Fax: (907) 205-5169 planning@fnsb.us FLOODPLAIN PERMIT APPLICATION

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado

More information

GEOMETRIC DESIGN STANDARDS FOR LOCAL 3R PROJECTS

GEOMETRIC DESIGN STANDARDS FOR LOCAL 3R PROJECTS Local Assistance Procedures Manual EXHIBIT 11-A Geometric Design Standards for Local 3R Projects EXHIBIT 11-A GEOMETRIC DESIGN STANDARDS FOR LOCAL 3R PROJECTS GEOMETRIC DESIGN STANDARDS FOR LOCAL 3R PROJECTS

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County.

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County. Hydrologic and Hydraulic Report For S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek Silver Spring Township Cumberland County August 13, 2003 Prepared For Pennsylvania

More information

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company James P. Hyland Page 1 ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING Kansas City Terminal Railway Company James P. Hyland, P.E. Senior Bridge Engineer TranSystems Corporation James P. Hyland Page 2

More information

Chapter 6 Erosion & Stormwater Study Team

Chapter 6 Erosion & Stormwater Study Team Chapter 6 Erosion & Stormwater Study Team Objective How do we stabilize the Las Vegas Wash environment to most effectively reduce erosion and enhance wetlands? Introduction The Las Vegas Wash (Wash) has

More information

Sacramento and San Joaquin river basins: Procedures for hydrologic analysis September 9, 2008

Sacramento and San Joaquin river basins: Procedures for hydrologic analysis September 9, 2008 Sacramento and San Joaquin river basins: Procedures for hydrologic analysis September 9, 2008 David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779 Fx. 916.447.8780

More information

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Dead River Prepared By AECOM Brian A.

More information

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 HYDROLOGIC & HYDRAULIC STUDY REPORT OCTOBER 2007 Prepared For: Prepared By:

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632 Study Partners The Nature Conservancy Cosumnes River Preserve 13501 Franklin Boulevard Galt CA 95632 East Bay Municipal Utility District 1 Winemaker Way, Unit K Lodi CA 95240 Sacramento County Water Agency

More information

BLACK HAWK COUNTY, IOWA AND INCORPORATED AREAS

BLACK HAWK COUNTY, IOWA AND INCORPORATED AREAS VOLUME 2 OF 3 BLACK HAWK COUNTY, IOWA AND INCORPORATED AREAS COMMUNITY NAME BLACK HAWK COUNTY, UNINCORPORATED AREAS COMMUNITY NUMBER 190535 CEDAR FALLS, CITY OF 190017 DUNKERTON, CITY OF 190018 ELK RUN

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Drainage Criteria Manual Review

Drainage Criteria Manual Review City of Colorado Springs Stormwater Management Assessment and Standards Development Drainage Criteria Manual Review March 8, 2013 Springsgov.com/City Agencies/Stormwater/Stormwater Engineering/ Stormwater

More information

SAFETY AND NOISE 9. Safety and Noise

SAFETY AND NOISE 9. Safety and Noise SAFETY AND NOISE 9 9 Safety and Noise Safety is a basic human need and is required for a community to thrive. The goals and policies in this element are designed to protect and enhance public health and

More information

Friant Dam and Millerton Reservoir

Friant Dam and Millerton Reservoir San Joaquin River Restoration Program Floodplain Management Association Presentation SJRRP Update Continued: Impacts from Subsidence April 18, 2013 1 Friant Dam and Millerton Reservoir Completed in 1942

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: APRIL 19, 2017 PERIODIC

More information

Distributed Storage Alternative Screening Analysis February 17, 2015

Distributed Storage Alternative Screening Analysis February 17, 2015 Distributed Storage Alternative Screening Analysis February 17, 2015 Executive Summary The Distributed Storage Alternative (DSA) was conceptualized during the public comment and alternative screening process

More information

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS GENERAL The Hydrologic and Hydraulic information presented in this appendix is provided as a supplement to the Dallas Floodway Extension General Re-evaluation

More information

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID #

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID # VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID # 380510086 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY 8 JUNE 2012 FINAL RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE:

More information

Scour Analysis and Countermeasure Design

Scour Analysis and Countermeasure Design Scour Analysis and Countermeasure Design for UNION STREET RAILROAD BRIDGE (Trail Connection Project) Key No. 11085 ODOT, Region 2 Local Agency On-Call ATA 23456 WOC 1 City of Salem, Urban Development HDR

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term

More information

Dry Creek Flood Control Improvement Project

Dry Creek Flood Control Improvement Project Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)

More information

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact

More information

APPENDIX III Hydrologic and Hydraulic Evaluations

APPENDIX III Hydrologic and Hydraulic Evaluations APPENDI III Hydrologic and Hydraulic Evaluations Hydrologic and Hydraulic Analysis Related to Compliance Requirements South Fly Ash Pond, Boiler Slag Pond and Clearwater Pond Kyger Creek Power Plant, Gallia

More information

Draft Location Hydraulic Report

Draft Location Hydraulic Report Project Development & Environment Study I-75 (SR 93A) From Moccasin Wallow Road (CR 6) to South of US Highway 301 (SR 43) Draft Location Hydraulic Report WPI Segment No.: 419235-2 Manatee & Hillsborough

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Levee Improvement District No. 19 System Review Phase 1 Fort Bend County, Texas

Levee Improvement District No. 19 System Review Phase 1 Fort Bend County, Texas Levee Improvement District No. 19 Fort Bend County, Texas Prepared for: Fort Bend County Levee Improvement District No. 19 202 Century Square Blvd. Sugar Land, Texas 77478 Submitted by: Aptim Environmental

More information

Coal Combustion Residuals Unit Structural Stability Assessment

Coal Combustion Residuals Unit Structural Stability Assessment Coal Combustion Residuals Unit Structural Stability Assessment Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C1500035.00

More information

SUMMARY OF BACKGROUND INFORMATION REVIEWED

SUMMARY OF BACKGROUND INFORMATION REVIEWED TO: FROM: Mark Lobermeier, PE Ismael Martinez, PE Brad Woznak, PE, PH, CFM Tim Diedrich, PE DATE: RE: Kinni Corridor Plan - Hydrologic & Hydraulic Analysis Summary SEH No. RIVER 138553 14.00 This draft

More information

SEWRPC Staff Memorandum

SEWRPC Staff Memorandum SEWRPC Staff Memorandum EVALUATION OF PROPOSED STORMWATER QUANTITY MANAGEMENT FOR THE DES PLAINES RIVER WATERSHED PORTION OF THE PROPOSED FOXCONN DEVELOPMENT IN THE VILLAGE OF MOUNT PLEASANT June, 2018

More information

Chapter 6 DOCUMENTATION OF HYDRAULIC STUDIES SOUTH DAKOTA DRAINAGE MANUAL

Chapter 6 DOCUMENTATION OF HYDRAULIC STUDIES SOUTH DAKOTA DRAINAGE MANUAL Chapter 6 DOCUMENTATION OF HYDRAULIC STUDIES SOUTH DAKOTA DRAINAGE MANUAL October 2011 Table of Contents Section Page 6.1 INTRODUCTION...6-1 6.1.1 General...6-1 6.1.2 Purpose...6-1 6.1.3 Objectives...6-2

More information

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES April 28, 2016 Table of Contents 3.1 Introduction... 2 3.1.1 Purpose of Chapter 3... 2 3.1.2 Policy vs. Design

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of

More information