1 West County Treatment Plant Noise and Odor Control Project Update June 29, 2004

2 West County Meeting Purpose 1. Brief history of odor and noise control project 2. Describe odor and noise control systems installed 3. Review odor control follow-up testing 4. Take questions from residents

3 History of Odor and Noise Control 1. Plant odor study in August Public Meetings throughout the study process 3. Community odor surveys Sept.-Dec MSD Board approval of $1.9 million project in Noise survey in Dec Initiatives

4 History of Odor and Noise Control Project at West County (cont.) 6. Design complete in Nov Construction started in early Noise control added to project with change order of $343, Construction complete in Aug Odor testing completed in Sept and community surveys finished in May 2004

5 Primary Findings of Year 2000 Odor Study Primary odor sources were identified as Influent screen and grit building Grit tanks and grit room Influent channels to activated sludge process Activated sludge process

6 West County WTP Odor Sources Grit Building Aeration Basins (5%) & Channels (7%) Grit Tanks & Channels (4%) Screen Building (80%)

7 Primary Findings of Noise Study Primary noise sources were identified as the existing blower building, RAS building, diffused air piping and site transformer Noise control would be required for new odor control fans proposed, as well Noise reduction goal for plant were 3-5 dba near residences (requires reducing major individual sources by 10 dba)

8 Odor Control Systems Installed at the West County WWTP.

9 Existing West County WTP Odor Control Improvements Aeration Basin Biofilter Screen Building & Carbon Adsorber Conversion to Fine Bubble Aeration Grit Facilities Containment Aeration Basin Influent Channel Exhaust fan for grit tanks

10 Carbon Adsorber for Screen Bldg. 14,000 cubic feet per minute of air treated from lower level of screen room

11 Cover All Influent Channels and Grit Tanks

12 Treat Air from Covered Grit Tanks with Activated Sludge Diffusion Basins converted to fine bubble diffusers to save energy and reduce odors Odors are absorbed and oxidized

13 Cover Aeration Basin Influent Channels and Treat Air 5,900 cfm modular biofilter to treat air from under the covers All influent channels covered and air ducted to biofilter A biological process to treat odors

14 Noise Control Systems Installed at the West County WWTP are

15 Additions to West County WTP Noise Control Improvements New Sound Attenuating Louvers at RAS Building New Noise Silencer and barrier for the Aeration Basin Biofilter 17 Noise enclosure for odor control fan New Noise Abatement louvers and barrier for the Blower Building New Screen Building Noise Control for the roof top fans

16 Noise control for Biofilter Fan Sound barrier walls on 3 sides of fan Silencer on the exhaust duct

17 Aeration Blower Building Noise Control Sound attenuating louvers installed on outside Noise barrier wall Full enclosure for the new exhaust fan that pulls air from the grit tanks to the aeration blowers

18 Noise Control for Fans on Roof of Screen Building

19 Results of Follow-up Odor Testing Plant odor testing completed in May, 2003 verified significant improvements in odor emissions after odor control Carbon adsorber, biofilter and activated sludge diffusion odor control systems performed excellently Community odor surveys conducted in September, 2003 and again in May, 2004 revealed goals attained in reducing frequency and intensity of odors in residential areas

20 West County WTP Hydrogen Sulfide Emissions Pounds per day Hydrogen Sulfide Before After Hydrogen Sulfide Emissions are reduced by 97% as a result of odor control project

21 West County WTP Odor Emissions OER (cfm*dt) 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 0 Odor Emission Rate Before After Odor emissions are reduced by 87% as as result of the odor control project

22 Summary of Follow-up Community Six surveys conducted at 12 monitoring stations after odor control showed one faint odor from WCWTP one time Before odor control, plant odors detected 20% of time and were sometimes annoying intensity Odor Survey

23 Odor Dispersion Modeling Models used to predict odor levels and the frequency they may occur in community before odor control Models were used to plan odor control project to achieve goals Now. models are used to show improvements and concurrence with community odor survey results

24 Note peak DT is 200 at plant boundary Peak Odors (DT) Before Odor Control

25 Note DT reduced to 20 at plant boundary Peak Odor Levels (DT) After Odor Control

26 Note frequency greater than 500 at boundary Frequency of Occurrence Per Year Before Odor Control

27 Note frequency less than 50 at plant boundary Frequency of Occurrence Per Year After Odor Control

28 Results of Follow-up Noise Testing Noise emissions from individual sources reduced by dba Noise from plant at nearby residences reduced by 6 dba Plant inaudible relative to all other ambient noises, with possible exception of a resident adjacent to transformer Noise consultant concluded plant site is acceptably quiet

29 Summary of Meeting MSD is pleased with results of odor and noise control system performance testing MSD wants to continue being a good neighbor and solving nuisances What do you think of odor and noise situation now?

Odor Control Products

Odor Control Products Adsorbers Scrubbers Biofilters Accessories Chemical Storage Tanks www.endurocomposites.com Welcome to Enduro. This catalog provides an overview to Enduro s product lines for odor control. In the following

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

Evaluation Of Aeration Control

Evaluation Of Aeration Control Evaluation Of Aeration Control Randal Samstag - Carollo Engineers Carol Nelson and Curtis Steinke King County DNRP PNCWA ANNUAL CONFERENCE 24 Outline Introduction Aeration control Why is it important?

More information

An Efficient Aeration Strategy Sits on a Three-Legged Stool

An Efficient Aeration Strategy Sits on a Three-Legged Stool October 13, 2016 An Efficient Aeration Strategy Sits on a Three-Legged Stool A Case Study of Brookfield, WI by Wendy Raisbeck Outline Aeration Efficiency Stool Existing Conditions and Project Goals Aeration

More information

Performance Validation of a Shell Media Biological Odor Control System

Performance Validation of a Shell Media Biological Odor Control System F W R J Performance Validation of a Shell Media Biological Odor Control System Gayle Van Durme, Sock-Hoon Kohis, and Alan K. Gay range County Utilities (OCU) conducted pilot testing of a new biofilter

More information

Odor Dispersion Modeling, Priority Odor Sources, and Recommended Improvements. May 25, 2012

Odor Dispersion Modeling, Priority Odor Sources, and Recommended Improvements. May 25, 2012 Odor Dispersion Modeling, Priority Odor Sources, and Recommended Improvements May 25, 2012 Agenda Background Information Sampling and Monitoring Odor Modeling Background Existing System Results Control

More information

Engineers have used air dispersion modeling

Engineers have used air dispersion modeling FWRJ Odor Control at Wastewater Treatment Plants: A Significant Shift in Odor Objectives Philip Wolstenholme Engineers have used air dispersion modeling for many years to determine off-site odor impacts

More information

DESIGN, CONSTRUCTION, INSTALLATION, AND OPERATION OF A COMPACT BIO-OXIDATION SYSTEM TO MANAGE ODORS AT THE CITY OF WILSONVILLE WWTP

DESIGN, CONSTRUCTION, INSTALLATION, AND OPERATION OF A COMPACT BIO-OXIDATION SYSTEM TO MANAGE ODORS AT THE CITY OF WILSONVILLE WWTP DESIGN, CONSTRUCTION, INSTALLATION, AND OPERATION OF A COMPACT BIO-OXIDATION SYSTEM TO MANAGE ODORS AT THE CITY OF WILSONVILLE WWTP Jim Boswell*, Paul John*, Karl Mundorff*, and Baron Adams* Bob Deithorn**,

More information

Heritage Hunt Pump Station Replacement Project 60% Design Update

Heritage Hunt Pump Station Replacement Project 60% Design Update Heritage Hunt Pump Station Replacement Project 60% Design Update Community Meeting #3 March 7, 2017 SA Project Manager: George W. DiCarlo, P.E., CCM Program Mgmt. Consultant: Rummel, Klepper & Kahl, Inc.

More information

~~~~ WWTP Master Plan Project

~~~~ WWTP Master Plan Project ~~~~ WWTP Master Plan Project City Council - April 7, 2014 WWTP History and Issues Constructed in 1994 Aging mechanical equipment - Frequent equipment failures - Resulted in TCEQ permit violations - High

More information

Comparison of Methods Used to Measure Odour at Wastewater Treatment Plant Fencelines

Comparison of Methods Used to Measure Odour at Wastewater Treatment Plant Fencelines Comparison of Methods Used to Measure Odour at Wastewater Treatment Plant Fencelines Jay R. Witherspoon and Jennifer L. Barnes CH2M HILL, Inc. 777 108 th Avenue NE, Suite 800 Bellevue, WA, USA 98004-5118

More information

Slimming Down for Whole Plant Odor Control

Slimming Down for Whole Plant Odor Control Slimming Down for Whole Plant Odor Control Neil A. Webster, P.E. 1, Bruce Koetter, P.E. 1, Philip Wagoner 2 1 Webster Environmental Associates, Inc. 2 Englewood Water District ABSTRACT Englewood, Florida

More information

Aeration Blower Requirements. Tom Jenkins 06/15/2016

Aeration Blower Requirements. Tom Jenkins 06/15/2016 Aeration Blower Requirements Tom Jenkins 06/15/2016 Aeration blowers receive a lot of attention from design engineers, suppliers, and end users. That is understandable since blowers account for more than

More information

City of New Ulm Wastewater Treatment Facility Improvements Class A Bio-solids Production

City of New Ulm Wastewater Treatment Facility Improvements Class A Bio-solids Production City of New Ulm Wastewater Treatment Facility Improvements Class A Bio-solids Production By Mitchell Swanson, Environmental Design Engineer Bolton & Menk, Inc. Background With a population of approximately

More information

442 CHELTENHAM ROAD KEYSBOROUGH. Noise Control Considerations. Prepared for Bridport Property Group Level 1, 170 Bridport Street, Albert Park VIC 3206

442 CHELTENHAM ROAD KEYSBOROUGH. Noise Control Considerations. Prepared for Bridport Property Group Level 1, 170 Bridport Street, Albert Park VIC 3206 442 CHELTENHAM ROAD KEYSBOROUGH Noise Control Considerations Prepared for Bridport Property Group Level 1, 170 Bridport Street, Albert Park VIC 3206 Ref. 11649-1ng.docx 22 December 2014 TABLE OF CONTENTS

More information

The Latest in Odor Control Issues and Solutions

The Latest in Odor Control Issues and Solutions The Latest in Odor Control Issues and Solutions FWEA Air Quality Seminar Feb 2017 Philip Wolstenholme, P.E. 1 Agenda Vapor Phase Technologies Comparison of Technologies Collect before Treating Dispersion

More information

EVALUATION OF ODOR EMISSIONS AND THEIR CONTROL AT THE CHIQUITA WATER RECLAMATION PLANT, AND SAN JUAN AND ORTEGA LIFT STATIONS

EVALUATION OF ODOR EMISSIONS AND THEIR CONTROL AT THE CHIQUITA WATER RECLAMATION PLANT, AND SAN JUAN AND ORTEGA LIFT STATIONS EVALUATION OF ODOR EMISSIONS AND THEIR CONTROL AT THE CHIQUITA WATER RECLAMATION PLANT, AND SAN JUAN AND ORTEGA LIFT STATIONS Prepared for: RANCHO MISSION VIEJO 28811 Ortega Highway San Juan Capistrano,

More information

Capturing the Right Quantity of Foul Air for Treatment: Odor Control Theory, Application, and North Carolina Case Studies

Capturing the Right Quantity of Foul Air for Treatment: Odor Control Theory, Application, and North Carolina Case Studies Raleigh, NC Capturing the Right Quantity of Foul Air for Treatment: Odor Control Theory, Application, and North Carolina Case Studies November 2016 Common Wastewater Conveyance and Treatment Facility Odor

More information

A COMPARISON OF ODOR AND HYDROGEN SULFIDE EMISSIONS FROM TWO METROPOLITAN WASTEWATER TREATMENT PLANTS

A COMPARISON OF ODOR AND HYDROGEN SULFIDE EMISSIONS FROM TWO METROPOLITAN WASTEWATER TREATMENT PLANTS A COMPARISON OF ODOR AND HYDROGEN SULFIDE EMISSIONS FROM TWO METROPOLITAN WASTEWATER TREATMENT PLANTS Chester M. Morton, P.E., BCEE, Phyllis Diosey QEP, Richard J. Pope, P.E., BCEE, Malcolm Pirnie, Inc.

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. OPTIMIZING WASTEWATER PLANT EFFICIENCY WEAT/AWWA Summer Seminar San Antonio June 23, 2017 Stan Williams, PE 2015 HDR, Inc., all rights reserved. WHY IS ENERGY EFFICIENCY

More information

9 October Town of Medway 155 Village Street Medway, MA Chair, Medway Board of Selectmen

9 October Town of Medway 155 Village Street Medway, MA Chair, Medway Board of Selectmen Town of Medway 155 Village Street Medway, MA 02053 Attention: Subject: John Foresto Chair, Medway Board of Selectmen Acoustical Consulting Services Application Review for Two 100 MWe Combustion Turbine

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

City of Leadwood Wastewater System Engineering Report

City of Leadwood Wastewater System Engineering Report City of Leadwood Wastewater System Engineering Report DRAFT H2O C Engneering www.h2oc.com 877-22-WATER Background The purpose of this report is to describe the City of Leadwood s wastewater system (System

More information

NTMWD REGIONAL WASTEWATER SYSTEM

NTMWD REGIONAL WASTEWATER SYSTEM Regional Service Through Unity Meeting our Region s Needs Today and Tomorrow NTMWD REGIONAL WASTEWATER SYSTEM Tour of South Mesquite Regional Wastewater Treatment Plant November 28, 2017 REGIONAL WASTEWATER

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONSDALE WASTEWATER TREATMENT FACILITY EXPANSION,

More information

Duffin Creek Water Pollution Control Plant Odour Control

Duffin Creek Water Pollution Control Plant Odour Control Duffin Creek Water Pollution Control Plant Odour Control Duffin Creek Water Pollution Control Plant Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in

More information

Air Lift Pumps (Grit Pump) ST-027

Air Lift Pumps (Grit Pump) ST-027 Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration

More information

HAZOP Checklist for Sewage Treatment Plant

HAZOP Checklist for Sewage Treatment Plant HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur

More information

Questions from Heritage Hunt Grounds Committee Received on 7/7/16

Questions from Heritage Hunt Grounds Committee Received on 7/7/16 Questions from Heritage Hunt Grounds Committee Received on 7/7/16 1. What specific areas are going to be dug up? Portions of the northeast side of the property will require some level of disturbance for

More information

Technical Bulletin 132. Diffused Air Mixing Requirement. by:

Technical Bulletin 132. Diffused Air Mixing Requirement. by: Technical Bulletin 132 Diffused Air Mixing Requirement by: Environmental Dynamics International Published: 6/2005 DISCLAIMER Technical Bulletins are presented as a service by Environmental Dynamics International

More information

Energy Efficiency Modifications. Small Blowers D.O. Control and VFD s. Joe Cantwell Focus on Energy Kris August Kiel Wastewater Utility

Energy Efficiency Modifications. Small Blowers D.O. Control and VFD s. Joe Cantwell Focus on Energy Kris August Kiel Wastewater Utility Energy Efficiency Modifications Small Blowers D.O. Control and VFD s Joe Cantwell Focus on Energy Kris August Kiel Wastewater Utility Click icon Kiel to add pic ture Kiel Wastewater Utility Treatment Facility

More information

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,

More information

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E.

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Topics Covered Background Challenges and Priorities UV and Filters High Flows Evaluation Aeration Evaluation Aeration Basins

More information

Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities

Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities Prepared for: Energy Saving Opportunities for Wastewater Treatment Facilities: Energy Efficiency and CHP Workshop May 19

More information

Oxnard Wastewater Treatment Plant

Oxnard Wastewater Treatment Plant December 12, 2015 & December 16, 2015 Oxnard Wastewater Treatment Plant 6001 SOUTH PERKINS ROAD OXNARD, CALIFORNIA Overview: Oxnard Wastewater Treatment Plant: The City of Oxnard (City) Wastewater Treatment

More information

Town of North Castle, NY Sewer District No. 2 WWTP

Town of North Castle, NY Sewer District No. 2 WWTP Town of North Castle, NY Sewer District No. 2 WWTP Robert Butterworth, PE, BCEE Project Principal Jan Salzman, PE, BCEE Project Manager March 9, 2016 Presentation Overview Purpose and Scope of Study Background

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

Northern Access 2016 Project Pendleton Compressor Station. Docket Number CP15-115

Northern Access 2016 Project Pendleton Compressor Station. Docket Number CP15-115 Northern Access 2016 Project Pendleton Compressor Station Docket Number CP15-115 Northern Access 2016 Project $451 million project to expand the natural gas infrastructure of 2 National Fuel Gas Company

More information

Energy Savers: Air-Source Heat Pumps

Energy Savers: Air-Source Heat Pumps 1 of 5 4/25/2009 8:55 AM U.S. Department of Energy - Energy Efficiency and Renewable Energy Energy Savers Air-Source Heat Pumps An air-source heat pump can provide efficient heating and cooling for your

More information

I NEED A NUISANCE ODOR PREVENTION PLAN SHOULD I BE AFRAID?

I NEED A NUISANCE ODOR PREVENTION PLAN SHOULD I BE AFRAID? I NEED A NUISANCE ODOR PREVENTION PLAN SHOULD I BE AFRAID? Mark A. Perkins, P.E. Perkins Engineering Consultants, Inc. 6001 Interstate 20 West, Suite 219 Arlington, Texas 76017 mperkins@perkinsconsultants.com

More information

Waste Water Discharge. Licence Application. for. Portrane Donabate Rush Lusk Agglomeration.

Waste Water Discharge. Licence Application. for. Portrane Donabate Rush Lusk Agglomeration. Waste Water Discharge Licence Application for Portrane Donabate Rush Lusk Agglomeration. Attachment A1: Non-Technical Summary. WWDL_Application Portrane Donabate Rush Lusk: Section A1 Non Technical Summary

More information

Composting Success at Spotsylvania County, Virginia

Composting Success at Spotsylvania County, Virginia Composting Success at Spotsylvania County, Virginia Tim Jenkins Spotsylvania County Acknowlegements: Todd Williams, CH2M 1 2015_WWGST_RRR_PPT_Template_01.pptx Spotsylvania County, Virginia Population =

More information

CH4 Biogas: Napoleon Biogas Case Study April 4, 2017 Odor Management Workshop

CH4 Biogas: Napoleon Biogas Case Study April 4, 2017 Odor Management Workshop CH4 Biogas: Napoleon Biogas Case Study April 4, 2017 Odor Management Workshop Facility Case Study CH4 Biogas Introduction Napoleon Biogas Plant Overview Odor Issue Summary Control Systems Monitoring Lessons

More information

Wastewater Treatment Plant Energy Reduction With High Efficiency Aerators

Wastewater Treatment Plant Energy Reduction With High Efficiency Aerators Wastewater Treatment Plant Energy Reduction With High Efficiency Aerators Copyright 2011, Saudi Aramco. All rights reserved. Rabea Manakhah, David Evans Saudi Aramco Utilities Department Roger Gyger m2t

More information

2. Blowers for the old STP tanks

2. Blowers for the old STP tanks The frustration over project noise is understandable and justified. Construction of the new sewer treatment plant is an ongoing construction project, and significant noises are generated. Lower Frederick

More information

3) Din Daeng WWTP. Outline of the Project. Appendix 2-9

3) Din Daeng WWTP. Outline of the Project. Appendix 2-9 3) Din Daeng WWTP Outline of the Project 1. Start of operation 2004 2. Treatment area: 37 km 2 3. Served population: 1,080,000 persons 4. Treatment process: Activated Sludge with Nutrient, (Nitrogen and

More information

ODOR CONTROL STUDY INTERIM SUMMARY FINDINGS (for public distribution) UNIVERSITY AREA JOINT AUTHORITY STATE COLLEGE, PA

ODOR CONTROL STUDY INTERIM SUMMARY FINDINGS (for public distribution) UNIVERSITY AREA JOINT AUTHORITY STATE COLLEGE, PA ODOR CONTROL STUDY INTERIM SUMMARY FINDINGS (for public distribution) UNIVERSITY AREA JOINT AUTHORITY STATE COLLEGE, PA INTRODUCTION The Spring Creek Pollution Control Facility (SCPCF) located at 1576

More information

By way of background, Earl reviewed the bigger picture of the work underway at the plant.

By way of background, Earl reviewed the bigger picture of the work underway at the plant. Ann Arbor Wastewater Treatment Plant Meeting Summary Public Meeting: Odor Control Study June 15, 2006 Attendees Thirteen members of the public (representing 10 Ann Arbor and Ann Arbor Township households)

More information

NEC Acostix. Sound Attenuation Calculations and Design Software. General Information

NEC Acostix. Sound Attenuation Calculations and Design Software. General Information NEC Acostix Sound Attenuation Calculations and Design Software General Information NEC Acostix TM is an Excel-Based programmable sheets to help engineers and manufacturers design acoustic enclosures, rectangular

More information

Aerator for Sewer Odor and Corrosion Control

Aerator for Sewer Odor and Corrosion Control Aerator for Sewer Odor and Corrosion Control MUNICIPAL SYSTEMS Sewer Force Main Discharge Sewer Wet Wells & Storage Tanks Irrigation Ponds We build tough products for tough environments A NEW SOLUTION

More information

Waste Sludge Reactivation and Recycling Project

Waste Sludge Reactivation and Recycling Project Waste Sludge Reactivation and Recycling Project For Wilderness Lakes RV Resort, Menifee, CA Equity Lifestyle Properties Inc. 701 E Pratt St, Ste 2043, MD 21202, USA 2 BDP - Biological Double-Efficiency

More information

Aerator for Sewer Odor and Corrosion Control

Aerator for Sewer Odor and Corrosion Control Aerator for Sewer Odor and Corrosion Control MUNICIPAL SYSTEMS Sewer Force Main Discharge Sewer Wet Wells & Storage Tanks Irrigation Ponds Wastewater Treatment Tanks We build tough products for tough environments

More information

AIR POLLUTION AND ENVIRONMENTAL CONSULTANCY

AIR POLLUTION AND ENVIRONMENTAL CONSULTANCY APPENDIX 5.5.2 ODOUR IMPACT OF EMISSIONS FROM THE WASTEWATER TREATMENT PLANT ---------- NEWMARKET CO-OPERATIVE CREAMERIES LTD. SCARTEEN LWR, NEWMARKET CO. CORK ---------- AIR POLLUTION AND ENVIRONMENTAL

More information

RESULTS OF ECOSYSTEMS PLUS INJECTION IN SECONDARY AERATION LAGOONS

RESULTS OF ECOSYSTEMS PLUS INJECTION IN SECONDARY AERATION LAGOONS RESULTS OF ECOSYSTEMS PLUS INJECTION IN SECONDARY AERATION LAGOONS GLOBAL FOOD MANUFACTURER (SEPTEMBER 6-22 2006) PRIMARY PROJECT OBJECTIVES: Demonstrate ESP 's ability to increase the transfer of dissolved

More information

No-Holds-Barred Match: RBC vs. MBR

No-Holds-Barred Match: RBC vs. MBR No-Holds-Barred Match: RBC vs. MBR Northeast Onsite Wastewater Short Course & Exhibition April 6 th, 2016 Erin K. Moore, PE Services provided in NY as T&B Engineering, PC Overview Evaluation target Historic

More information

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

Technical Bulletin 169. Design of Diffused Aeration System. by:

Technical Bulletin 169. Design of Diffused Aeration System. by: Technical Bulletin 169 Design of Diffused Aeration System by: Environmental Dynamics International Published: 10/2018 DISCLAIMER Environmental Dynamics International, headquartered in Columbia, Missouri,

More information

UC Press Building 2120 Berkeley Way Berkeley, CA

UC Press Building 2120 Berkeley Way Berkeley, CA CONSTRUCTION NOISE REDUCTION PROGRAM FOR: UC Press Building 2120 Berkeley Way Berkeley, CA RGD Project #: 17-057 PREPARED FOR: Berkeley Way, LLC 1958A University Ave. Berkeley, CA 94704 PREPARED BY: Harold

More information

Odour Impact Assessment for a Proposed Wastewater Treatment Plant

Odour Impact Assessment for a Proposed Wastewater Treatment Plant Odour Impact Assessment for a Proposed Wastewater Treatment Plant Talbotville, Township of Southwold, Ontario Prepared for: 1873828 Ontario Limited 94 Curtis Street St. Thomas, Ontario N5P 1J2 Site Name:

More information

COMPARISON OF BIOFILTER RESIDENCE TIME

COMPARISON OF BIOFILTER RESIDENCE TIME Paper No. 984053 An ASAE Meeting Presentation COMPARISON OF BIOFILTER RESIDENCE TIME By R. E. Nicolai Research Fellow Biosystems and Agricultural Engineering Dept. University of Minnesota St. Paul, Minnesota,

More information

Chapter 5 Existing Wastewater Facilities

Chapter 5 Existing Wastewater Facilities Chapter 5 Existing Wastewater Facilities \\7348101\TOC.doc CHAPTER 5 Existing Wastewater Facilities 5.1 INTRODUCTION Lacey s wastewater utility serves over 21,000 acres (33 square miles) of residential

More information

Law enforcement on proactive protection of noise and vibration pollution for

Law enforcement on proactive protection of noise and vibration pollution for Law enforcement on proactive protection of noise and vibration pollution for residential in Thailand Thalearngsak Petchsuwan Director of Air Quality and Noise Management Bureau Pollution Control Department

More information

LEED for Homes Approved ID Request:

LEED for Homes Approved ID Request: LEED for Homes Approved ID Request: Introduction The following is an Innovative Design Request (IDR) that has been approved for broader use in for the LEED for Homes program. This credit should not be

More information

OPERATI LATRINES. Standard Range Types

OPERATI LATRINES. Standard Range Types OPERATI LATRINES Standard Range Types Purpose This building provides lavatory facilities for the troops and trainers who are using the range. The document covers all standard types used on SRP Range Facilities.

More information

NOISE CONTROL PRODUCTS AND SOLUTIONS Oil and Gas Operations

NOISE CONTROL PRODUCTS AND SOLUTIONS Oil and Gas Operations NOISE CONTROL PRODUCTS AND SOLUTIONS Oil and Gas Operations Environmental noise is a growing concern for communities due to the expansion of oil and gas operations into noise sensitive municipalities,

More information

Outline. Introduction Case Studies. Anoxic Zone Mixing Channel Mixing. Theory and Criteria. Mixing Theory Design Criteria.

Outline. Introduction Case Studies. Anoxic Zone Mixing Channel Mixing. Theory and Criteria. Mixing Theory Design Criteria. Outline Introduction Case Studies Anoxic Zone Mixing Channel Mixing Theory and Criteria Mixing Theory Design Criteria Recommendations Where Do We Mix at WWTPs? Introduction Flow Equalization Tanks Headworks

More information

Lycoming County Water and Sewer Authority WWTP Mechanical Thickened Aerobic Digester Case Study

Lycoming County Water and Sewer Authority WWTP Mechanical Thickened Aerobic Digester Case Study Lycoming County Water and Sewer Authority WWTP Mechanical Thickened Aerobic Digester Case Study Bryen Woo, P.E., Ovivo Aeration/Aerobic Digestion Product Manager Duane Martzall, Lycoming County Water and

More information

Kinetics Noise Control

Kinetics Noise Control Kinetics Noise Control Vibron Products Group Noise Control Products and Systems for HVAC, Industrial and Environmental Applications www.kineticsnoise.com/vibronproducts/ Commercial (HVAC) & Industrial

More information

POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS. Water & Wastewater Treatment Solutions

POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS. Water & Wastewater Treatment Solutions POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS Water & Wastewater Treatment Solutions Water & Wastewater Treatment Solutions Gardner Denver understands the complex needs and challenges of the water and wastewater

More information

Odour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions. Presented by: Wayne Wong, M.A.Sc, EIT

Odour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions. Presented by: Wayne Wong, M.A.Sc, EIT Odour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions Presented by: Wayne Wong, M.A.Sc, EIT Project Team 2 Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. Ted Steele,

More information

Energy Efficiency in Wastewater Treatment

Energy Efficiency in Wastewater Treatment Energy Efficiency in Wastewater Treatment October 09, 2012 3pm Eastern Moderators: Joel Rogers, Center on Wisconsin Strategy (COWS) James Irwin, Center on Wisconsin Strategy (COWS) Agenda Welcome Introduction

More information

3.3 NOISE Existing Setting Thresholds of Significance

3.3 NOISE Existing Setting Thresholds of Significance 3.3 NOISE 3.3.1 Existing Setting Noise is generally defined as unwanted or objectionable sound. Sound levels are expressed as decibels (db). The A-weighted noise level has been developed to correspond

More information

EchoWater Project. Contractor Open House. January 14, Vick Kyotani Program Manager. Sacramento Regional County Sanitation District

EchoWater Project. Contractor Open House. January 14, Vick Kyotani Program Manager. Sacramento Regional County Sanitation District EchoWater Project Contractor Open House January 14, 2014 Vick Kyotani Program Manager Agenda Welcome, Introductions and Purpose of the Meeting (Ruben) Overview of EchoWater Project (Vick) Project Details

More information

CAFO Air Emissions and Enforcement. Susan O Keefe STAPPA/ALAPCO National Meeting May 5, 2003

CAFO Air Emissions and Enforcement. Susan O Keefe STAPPA/ALAPCO National Meeting May 5, 2003 CAFO Air Emissions and Enforcement Susan O Keefe STAPPA/ALAPCO National Meeting May 5, 2003 Industry Consolidation Industry Consolidation Then. 1977: 850,000 pork farms 1988: 7% of pork from producers

More information

American Water College 2010

American Water College 2010 Vocabulary Activated Sludge (Part 1) Activated Sludge Sludge particles produced in raw or settled wastewater (primary effluent) by the growth of organisms (including zoogleal bacteria) in aeration tanks

More information

MRI Wastewater Inclined Plate Settlers Performance Advantages

MRI Wastewater Inclined Plate Settlers Performance Advantages MRI Wastewater Inclined Plate Settlers Performance Advantages Suitable for municipal or industrial applications, performance advantages include: Smaller basin footprint than open clarifiers Significantly

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM DATE: April 24, 29 TO: Boise Public Works Commission FROM: Matt Hightree, civil engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This report contains

More information

Odor Control: working in your neighborhood to protect public health and the environment

Odor Control: working in your neighborhood to protect public health and the environment Odor Control: working in your neighborhood to protect public health and the environment The Woonsocket Regional Wastewater Commission (WRWC) protects public health and the environment by treating 8 to

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment Ministère de l Environnement AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 0515-95GJJP Issue Date: May 20, 2014 Krebsz Electroplating Ltd. 227 Avenue

More information

Equipment Noise Sources

Equipment Noise Sources MECHANICAL AND ELECTRICAL EQUIPMENT NOISE CONTROL Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Equipment Noise Sources Chillers Pumps Cooling towers Exhaust fans Air-handling units (fans)

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

BIOLOGICAL WASTEWATER BASICS

BIOLOGICAL WASTEWATER BASICS BIOLOGICAL WASTEWATER BASICS PRESENTATION GOALS EXPLAIN DIFFERENT TYPES OF WASTEWATER EXPLAIN THE DIFFERENT BIOLOGICAL SYSTEMS AND HOW THEY FUNCTION. COMPARE AND CONTRAST AEROBIC AND ANAEROBIC SYSTEMS

More information

Presented by: Thomas Hatton

Presented by: Thomas Hatton Presented by: Thomas Hatton 1 What is Vapor Intrusion? Methods of Correction Building Investigation Designing Effective Systems VI Mitigation in Existing Buildings VI Mitigation in Construction of New

More information

Wastewater Facility Plan City of Marshall, Minnesota

Wastewater Facility Plan City of Marshall, Minnesota Wastewater Facility Plan City of Marshall, Minnesota Public Hearing March 14, 2017 Bolton & Menk, Inc. Project No. T22.108560 Glossary of General Terms & Abbreviations MPCA - Minnesota Pollution Control

More information

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet WHY IS THE CITY OF OREGON DOING THIS PROJECT? Along with other communities across the country,

More information

GALVESTON COUNTY MUD 12 SUMMARY OF OPERATIONS - GENERAL FUND 31-Aug MONTHS YTD REVENUES: WATER AND SEWER AND LATE FEES 1,284,332

GALVESTON COUNTY MUD 12 SUMMARY OF OPERATIONS - GENERAL FUND 31-Aug MONTHS YTD REVENUES: WATER AND SEWER AND LATE FEES 1,284,332 31-Aug-18 11 MONTHS YTD WATER AND SEWER AND LATE FEES 1,284,332 M & O TAXES 468,968 OTHER REVENUES 24,575 INTEREST REVENUE 8,975 TOTAL REVENUES 1,786,850 WATER OPERATIONS 271,035 SEWER OPERATIONS 349,622

More information

Kinetics Noise Control

Kinetics Noise Control Kinetics Noise Control Acoustical Curtain Systems www.kineticsnoise.com Acoustical Curtain Systems Kinetics Noise Control s acoustical curtain systems are custom engineered to your application for acoustic

More information

CLR Process. Vertical Loop Configuration

CLR Process. Vertical Loop Configuration CLR Process Vertical Loop Configuration Vertical Configuration System Flexibility Parallel Operation Raw wastewater and return activated sludge are introduced at a single point in each standard CLR basin.

More information

IAC Acoustics Moduline Noise Control Enclosures. Mark Simnick

IAC Acoustics Moduline Noise Control Enclosures. Mark Simnick IAC Acoustics Moduline Noise Control Enclosures by Mark Simnick Mid-South Product Sales Manager IAC Acoustics, A Division of Sound Seal 401 Airport Road North Aurora, IL 60542 Mobile: (630) 235-2566 Office:

More information

Waste Water Treatment Plant. BNR Upgrade & Grit Removal Project

Waste Water Treatment Plant. BNR Upgrade & Grit Removal Project Waste Water Treatment Plant BNR Upgrade & Grit Removal Project Main Reasons for the Biological Nutrient Removal (BNR) Project Aeration Upgrade PADEP Bay Strategy Aeration Upgrade Current Aeration System

More information

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889 August 9, 2012 File: 160960699 NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING

More information

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City has the oldest wastewater system in Gaza Strip; it consists of some of 280 kilometers

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

Odor Threshold Emission Factors for Common WWTP Processes

Odor Threshold Emission Factors for Common WWTP Processes Odor Threshold Emission Factors for Common WWTP Processes Authored by: Michael A. McGinley, P.E. St. Croix Sensory, Inc. And Charles M. McGinley, P.E. St. Croix Sensory, Inc. Presented at Water Environment

More information

Equipment Noise Sources

Equipment Noise Sources MECHANICAL AND ELECTRICAL* EQUIPMENT NOISE CONTROL Three elements of concern: source path receiver *the electrical part may be premature, but that s OK Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik

More information

Module 17: The Activated Sludge Process - Part III Answer Key

Module 17: The Activated Sludge Process - Part III Answer Key Module 17: The Activated Sludge Process - Part III Answer Key What other differences can you see between Complete Mix and Step Aeration? One of the features that make Complete Mix Aeration different from

More information

Ditches for Energy Efficiency and Improved Nitrogen Removal

Ditches for Energy Efficiency and Improved Nitrogen Removal Upgrade of the Big Gulch WWTP Oxidation Ditches for Energy Efficiency and Improved Nitrogen Removal Thomas G. Authors: Thomas E. Coleman, dtec Systems Bridges, Mukilteo Water & Wastewater District Bend,

More information

currently referenced throughout the

currently referenced throughout the STANDARD WORK SPECIFICATIONS: HOME ENERGY UPGRADES FOR EXISTING MANUFACTURED HOMES Page 1 of 4 General Comments 1. The work specifications for manufactured housing should be the same as the specifications