1 1 Lake County WTP Improvements and Capacity Increase OTCO 9 th Annual Water and Wastewater Workshop Nick Pizzi Aqua Serv Rick Douglas Lake County
2 Presentation Agenda Some topics we will cover: Background and impetus for the upgrades A comparison of plant capabilities both before and after the upgrades Engineering considerations of the upgrade Pilot testing Technologies used Operational experiences of the upgraded facilities
3 History of the Bacon Road Plant The WTP went online in 1982 Plant was rated for 6 mgd Surface water treatment plant Lake Erie source Conventional treatment In the mid-2000 s, the WTP exceeded 6 mgd treatment rate on a number of occasions Ohio EPA required that the WTP study the possibility of an upgrade
4 Audit An audit was performed to determine which steps might be required for plant expansion and upgrade This audit: Assessed systems and processes based on ability to operate to at least 9 mgd a 50% increase The audit determined that: Higher rating needed and could be obtained for the filters Higher rating needed and could be obtained for sedimentation process Other upgrades were necessary: 2 raw water pumps needed to be upgraded Chemical feed systems needed some upgrades The need existed to:» Install new polymer feed systems (filter aid, thickener feed)» Improve residuals storage and handling» Improve residuals removal from sedimentation basins
5 Higher Rates for Processes Sedimentation The Ohio EPA did not require pilot-scale testing of sedimentation because Lake County agreed to install tube settlers The existing SOR of 0.46 gpm/ft 2 would be upgraded to 2.0 gpm/ft 2 with the installation Filtration Pilot-scale testing of filter configurations was required Three pilot columns were used for 4 two-week periods Turbidity and particle count data was collected, along with UFRV and head loss data A new configuration was approved at 5.7 gpm/ft 2
6 A brief graphical review of pilot facility The pilot created a way to produce operational data Data was collected that Ohio EPA could use in their determination of which filter configuration and filter rate they might approve
7 Constant Head Tank Settled Water Influent Line 3 Columns 3 Flow meters 4 Turbidimeters
8 Piloting Equipment
9 More Pilot Equipment Calibration of Turbidimeters Constant Head Tank
10 Left to right Column A (being backwashed), Column B, Control column
11 More details Rick with SCADA system Staff Backwashing Column B
12 Ohio EPA Approval Ultimately: Ohio EPA approved for filters: 24 inches of 1.1 mm anthracite, UC of inches of 0.5 mm sand, UC of 1.3 Low profile filter bottoms (IMS caps) 9 mgd with one unit out of service For pretreatment: Tube settlers, rated at 2.0 gpm/ft 2
13 Lake County East Water Treatment Plant aka Bacon Road Water WTP B4 Upgrades Plant Capacity 6 mgd Source : Lake Erie 48 inch intake Intake Capacity 10 mgd Envirex travelling screens Potassium Permanganate feed After Upgrades Plant Capacity 9 mgd Source : Lake Erie 48 inch intake Intake Capacity 10 mgd Envirex travelling screens Potassium Permanganate feed The intake and structures were fine, but raw water pumps were increased VFD s
14 Some of the Bacon Road WTP Raw Water Station Units Raw Water Pumps New VFD Drives Two of the four old raw water pumps There is a VFD controller and two new VFD pump units. The pumps are rated at 2,604 gpm for the two VFD units, and 1,750 and 3,500 gpm for the other two units. Therefore, the firm capacity is 1,750 gpm + 2,604 gpm + 2,604 gpm, or 6,958 gpm (10 mgd).
15 Some of the Bacon Road WTP Raw Water Station Units Travelling Screens Permanganate System Envirex traveling units that are washed free of debris by using water from the pump discharge line 240 gallon day tank and a dual set of peristaltic pumps which feed the KMnO 4 solution down into the screen wells. The range of each pump is rpm, and each will pump a maximum solution feed rate of 250 mls/minute.
16 Bacon Road WTP Treatment Units Rapid Mixers B4 2 units, 1,060 gallons each, DT@ 6 mgd = 30 seconds G value 30 0 sec -1 Rapid Mixers After 2 units, 1,060 gallons each, DT@ 9 mgd = 20 seconds G value 300 sec -1 Note: alum/polymer blend feed point
17 Bacon Road WTP Treatment Units Flocculators B4 2 units, 62,000 gallons each, DT@ 6 mgd = 30 minutes Three compartments / tapered paddle mixing G value 60, 50, 40 sec -1 Flocculators After 2 units, 62,000 gallons each, DT@ 9 mgd = 20 minutes Three compartments / tapered paddle mixing G value 60, 50, 40 sec -1 Note: Activated Carbon feed
18 Bacon Road WTP Treatment Units Sedimentation B4 2 units, 500,000 gals each, 6 mgd = 4 hours 4,500 ft 2 SOR = 0.46 gpm/ft 2 WOR 10,000 gal/day/ft Sedimentation After 2 units, 500,000 gals each, 9 mgd = 2.67 hours Tubes = 2 by 2 and three feet long, so 5,400 ft 3 Design SOR = 0.2 gpm/ft 2 (or 2.33 times slower than the old 0.46 rating) WOR 15,600 gal/day/ft Nominal capacity is about 7 mgd per unit
19 Sedimentation Retrofit process improvements and residuals removal Tubes Weirs Baffle wall Sludge collection system
20 Sedimentation: old vs. new Old Sed Basins side view Basin issues included Incomplete sludge removal / sludge septicity Difficulty in dewatering the basin Conservative SOR Retrofitted Sed Basins side view Problems eliminated: Improved sludge removal mechanism Pump installed for dewatering Tubes installed allowing for higher rating Water enters through ports Siphons Baffle wall Sludge settles on slanted wall Sludge siphons travelled only from end of basin to slanted wall Cable driven sludge collector Scrapers and siphons There are no drains in these basins had to use sump to dewater 20
21 Sedimentation Basin Graphic Inlet ports Slanted wall New sludge lines being installed for sludge removal and basin dewatering New Sludge removal equipment being installed
22 Baffle Wall Installation Inlet ports Support for Tubes Baffle
23 Tube Settlers Weirs Tube cover system allows operators to walk across
24 Sedimentation Basin Operations MRI sludge collectors remove solids more efficiently than original flotation system No more sludge buildup at basin influent slanted wall Sedimentation basins are no longer used for sludge storage Use of the rotary lobe pump with sludge collectors dewaters the basins, eliminating the need to use a sump pump (increased safety) Tube settlers are easily cleaned with a garden hose A Core-Pro tool is used to study the depth of sludge, which provides a profile that we use to program sludge collector timing/run patterns
25 Basin Sludge Sampling
26 Bacon Road WTP Treatment Units Filtration B4 Four filters, 363 ft 2 each rated at 1.5 mgd each This is a 3 gpm/ft 2 filter rate with all units in service Dual-media configuration with torpedo sand and gravel support and Leopold bottoms Configured with 18 inches of 0.9 mm anthracite, and 12 inches of 0.5 mm sand Uniformity Coefficient of 1.7 Filtration After Four filters, 363 ft 2 each rated at 3 mgd each with 1 unit out of service Dual-media configuration with low profile IMS caps which provided additional 7 inches of depth for media Configured with 24 inches 1.1 mm anthracite, and 12 inches 0.5 mm sand Key: Each with a 1.3 uniformity coefficient
27 Filter Construction Issues Filter retrofit activities had to be planned around operations Old conical Wheeler bottom tiles had to be jack-hammered out A 2-inch concrete lip was found around the entire perimeter of each filter bottom Not shown on original prints Another sub-contractor had to come in with diamond bladed saws to remove this lip prior to installation of new IMS caps
28 Filter Construction
29 Filter Construction
30 Filter Configuration Filter # ES Sand ES Anthracite D90 size Anthracite D90/D10 ratio When the new media was installed into the filters, each layer was backwashed repeatedly and scraped to remove fines, and then sampled for lab analysis The table above shows the as built filter configuration for the new dual-media units built in the fall/winter of 2011 Note that filter #2 was scraped slightly more than the other three filters
31 Backwash Capability A pump from the High Service Header supplies the tank - Pump is rated at 500 gpm Filters can also be washed from the Header under emergency Washwater Storage Tank Spent filter backwash Water collected and pumped To lagoon conditions The tank holds 300,000 gallons There are dual-level surface washers designed to scrub the surface and the interface of the filter
32 Current Filter Operations Achieving very good UFRV s With deeper beds, filter inspection via coring is important Solids retention profile helps to determine where solids are being removed, and if backwash is adequate Filter backwash problems when Washwater Storage Tank was O.O.S. for painting
33 Old Residuals System Small catch basin Old sludge pump Took in sludge from sedimentation Had a weir and telescoping valve. Supposed to be used as thickener. Sloped floor. System undersized. Moved sludge from catch basin to the lagoons. No provision for polymer.
34 Residuals Improvements Rotary Lobe Pump Double disc pumps Used for sludge transference and for basin dewatering 35 gpm each at 30 head Polymer system provided
35 New Thickeners 44,000 gallons each designed for % solids
36 Residuals Improvements Inside of Thickener Sludge Removal pumps Rake arm concentrates sludge to middle-bottom area of unit Thickened sludge sent to the lagoons
37 Sludge Thickener Ops Secchi in 13 feet of water Secchi
38 Typical Bacon Road Sludge Output For a daily flow of 2.7 MGD, and 30 mg/l Coagulant, 3 mg/l PAC, and 10 mg/l SS: Dry solids produced, S = (8.34Q) (0.44Al + SS + A) S = (8.34 X 2.7)((0.44 x (30 mg/l x 0.45) )) S = (22.52)( ) = X = pounds per day That s about 78 Tons dry solids per year
39 Residuals Operations Diaphragm Pumps If solids are too thin, pumps will lose efficiency because air chamber fills with liquid Thickeners Good idea to use a secchi disk for observing clarity/depth in thickener Polymer Feeder Must ensure that there is sufficient room for polymer aging Operator involvement and education is important Operators like to speak in terms of mg/l, but need to learn concept of lbs polymer / dry ton solids
40 Residuals Operations Polymer Use Anionic polymer is used Comes in 40 pound bags granular from must be aged made up to about 0.2 to 0.25% If WTP produces 78 tons of dry solids per year, and polymer use is 3.5 pounds per dry ton: 78 tons X 3.5 lbs / ton = 273 pounds of polymer per year, or about 7 bags
41 NPDES West Lagoon East Lagoon Rotary sludge pumps Thickeners Old dewatering discharge pipe from basins SFBW Sludge pumps and sludge well with mixer Sedimentation basin sludge
42 Sludge lagoon
43 Polymer Feed Improvements Filter aid Sludge thickening Operational goal: use if sed basin ntu >2.5, or if filter effluent turbidity is increasing. Design: 3.5 lbs per ton dry solids. Hot water tank provided.
44 Acknowledgements Thanks to Rick Martin and Randy Rothlisberger of Lake County Utilities Thanks to Dave Cornwell and Gerry Wright of EE&T Any Questions?
Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado
JUST ADD WATER Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado Thomas M. Getting, P.E., DEE, Filtration Product Manager John Geibel, P.E., Chief Engineer Michael
More informationFilter Self-Assessment. Example Report
Filter Self-Assessment Example Report Purpose EPA's Interim Enhanced Surface Water Treatment Rule (IESWTR) and Long Term 1 Enhanced Surface Water Treatment Rule (LT1ESWTR) may require certain water systems
More informationCONTRAFAST. High-Rate Thickening Clarifier
CONTRAFAST High-Rate Thickening Clarifier CONTRAFAST High-Rate Thickening Clarifier The CONTRAFAST high-rate thickening clarifier utilizes a combination of internal and external solids recirculation and
More informationBackup Generators Bacon Road Water Treatment Plant Case Study
Backup Generators Bacon Road Water Treatment Plant Case Study Joe Borzyn, PE, LC - AECOM Timothy McCann, PE - AECOM 1 Agenda Bacon Road WTP Background Project Background Generator Alternatives Final Selection
More informationFilter Inspection and Optimization Case Studies
Filter Inspection and Optimization Case Studies Marvin Gnagy, P.E., President PMG Consulting, Inc. OTCO Class 3&4 Workshop August 5, 2015 Agenda Filtration inspection and maintenance basics Filter performance
More informationTrident. Package Water Treatment System
Trident Package Treatment System The Trident Package Treatment System When Microfloc products first introduced the Trident technology, it represented a significant advancement in water and wastewater treatment
More informationGreen River Filtration Facility Plant Overview
Green River Filtration Facility Plant Overview PNWS-AWWA Conference Bellevue, WA Gary Fox & Hilary Lorenz April 29, 2015 2 IN THE BEGINNING 3 PILOT PLANT OWNED AND OPERATED BY TACOMA WATER STAFF ALL THAT
More informationRapid Sand Filtration: Laboratory Analysis and Profiling
Rapid Sand Filtration: Laboratory Analysis and Profiling Rachel Easter & Rachael Osborne Water Bacteriologist-Chemist Division of Water Supply & Treatment City of Dayton Background Water Bacteriologist-Chemist
More informationUtility Partner Data Report
Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Nicholasville, Kentucky
More informationWater Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting
Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017 Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only
More informationReady, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson
Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson January 25, 2011 Presentation Outline Background Process Overview Start-Up
More informationTampa Bay Water (TBW) is a regional
FWRJ Enhanced Residuals Treatment Helps Tampa Bay Water Regional Surface Water Treatment Plant Achieve Total Recycling Tony Pevec and Richard D. Moore Tampa Bay Water (TBW) is a regional water supply authority
More informationSeparations Overview TDRL Seminar
Separations Overview TDRL Seminar Presented by: Infilco Degremont North American Footprint 5 companies 471 employees ANDERSON DUNDAS, ON 60 EMPLOYEES DEGREMONT LTD MONTREAL, QC 27 EMPLOYEES WPT SALT LAKE
More informationLowering The Total Cost Of Operation
Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,
More informationHow Far Can You Push Your Filters? Optimization Lessons
How Far Can You Push Your Filters? Optimization Lessons Marvin Gnagy, P.E. President PMG Consulting, Inc. 51 st OTCO Water Workshop March 6, 2013 Agenda Two recent filter optimization projects Initial
More informationHetch Hetchy Treatability at the Sunol Valley Water Treatment Plant
Operated by the San Francisco Public Utilities Commission Hetch Hetchy Treatability at the Sunol Valley Water Treatment Plant Annual Technology Transfer Workshop November 13, 2013 Enio Sebastiani, P.E.,
More informationApproaches to Filter Condition Assessment and Optimization
2014 NC AWWA-WEA Conference Winston Salem, NC Approaches to Filter Condition Assessment and Optimization Vinod Korategere, P.E. Principal Engineer, Brown and Caldwell Barry Parsons Water Supply Division
More informationBenchmarking Case Studies for Water and Wastewater Facilities
Benchmarking Case Studies for Water and Wastewater Facilities Marvin Gnagy, P.E., President PMG Consulting, Inc. OTCO Procrastinator's Workshop December 11, 2012 Agenda Benchmarking and best practices
More informationBenchmarking, Metrics Assessments, and Gap Analyses for Water and Wastewater
Benchmarking, Metrics Assessments, and Gap Analyses for Water and Wastewater Marvin Gnagy, P.E., President PMG Consulting, Inc. OTCO Procrastinator's Workshop December 10, 2015 Agenda Benchmarking and
More informationProviding Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP
Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure
More informationGovernment Center Water Treatment Plant Kamphaeng Phet Province, Thailand
Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand 1. Background information Kamphaeng Phet is a province in the lower north of Thailand. The Ping River (main tributary of the Chao
More informationValve Nest Filter with Time Clock Control Installation and Operation Manual
Valve Nest Filter with Time Clock Control Installation and Operation Manual Effective 5/24/12 Effective 5/24/12 Table of Contents Operating Data. 1 Pre-Installation Data... 2 Filter Parameters Installation
More informationfor CSO Treatment December 2002, the city of Toledo, Ohio, signed a consent decree with the U.S. Environmental
16 August 2007 WWDmag.com WATER & WASTES DIGEST EDITOR SFOCUS A Compact Solution for CSO Treatment By K. Scott Henderson A look at the largest high-rate clarification system for CSO treatment in North
More informationNakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand
Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand 1. Background Information Nakhon Sawan is located about 250 km north of Bangkok and marks the point of confluence of two of major Thai rivers,
More informationIron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY
Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment Village of Bolivar, NY Fe/Mn Removal/Village of Bolivar, NY Presentation Outline Fe/Mn Overview Treatment Options Village of Bolivar Challenge
More informationRectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft.
Units and Conversion Factors 1 cubic foot of water weighs 62.3832 lb 1 gallon of water weighs 8.34 lb 1 liter of water weighs 1,000 gm 1 mg/l = 1 part per million (ppm) 1% = 10,000 ppm ft 2 = square feet
More informationWASTE WATER TREATMENT SYSTEM
WASTE WATER TREATMENT SYSTEM Manual Coarse and Mechanical Fine Screens: We manufacture high quality screens that are widely used for removing suspended particles from the waste water. These screens are
More informationInnovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings
Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Robert T. Shoaf, P.E., BCEE AECOM (Columbus, Ohio) Scott Hoover, Plant Superintendent Napoleon,
More informationCE 370. Filtration. Overview of the Process Location in the Treatment Plant
CE 370 Filtration 1 Overview of the Process Location in the Treatment Plant After the water has been settled, some fine solids/flocs may still be in suspension, therefore, removal of these fine solids
More informationAlternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine
Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine Charles Murphy, Alpha Natural Resources, Logan County, West Virginia, USA Christopher Bennett,
More informationNEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE
NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE Keith C. Dayton Department of Utilities Stafford County, Virginia P. O. Box 339 Stafford,
More informationDisinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility
SOUTH GRANVILLE WATER & SEWER AUTHORITY Disinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility Presentation to the SGWASA Board December 12, 2017
More informationImproving WTP Performance Tools to Help Achieve Optimization
Improving WTP Performance Tools to Help Achieve Optimization Partnership for Safe Water 2015 Water System Optimization Conference; Hershey, PA Michael W. Grimm, P.E. Aquamize, LLC October 29, 2015 1 Today
More informationThe city of Venice hired Camp
Concentrate Post-Treatment For Hydrogen Sulfide And Dissolved Oxygen Vipin Pangasa, Laura Andrews, and William Green The city of Venice hired Camp Dresser & McKee, Inc., to design an effective concentrate
More informationComparing the Leopold Clari-DAF System to Upflow Contact Clarification
JUST ADD WATER Comparing the Leopold Clari-DAF System to Upflow Contact Clarification James E. Farmerie Product Manager The F. B. Leopold Co., Inc. 227 South Division Street Zelienople, Pennsylvania 16063
More informationCity of Enderby Water Treatment Plant
City of Enderby Water Treatment Plant The City of Enderby is located in the beautiful NorthOkanagan with a population of 3200 residents. The central location between Vernon and Salmon Arm allows easy access
More informationWaste Water Treatment Equipment
APEC PUMP ENTERPRISE CORP. Waste Water Treatment Equipment APEC Separator APEC Separator Compared with a sedimentation basin, the APEC separator offers a 90% saving in terms of surface area. This means
More informationThe High-Capacity. Inclined Plate. Settler System
The High-Capacity Inclined Plate Settler System P a M R I P L A T E S E T T L E R S The Golden Water Treatment Plant, Colorado This facility in scenic Golden handles several million gallons more per day
More informationPERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)
FFR MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DISTRICT PERMIT TO OPERATE 24580 SILVER CLOUD CT., MONTEREY, CA 93940 TELEPHONE (831) 647-9411 FAX (831) 647-8501 15018 OPERATION UNDER THIS PERMIT MUST BE
More informationSubmerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.
Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community Richard Stratton, PE HDR Engineering, Inc. Main Points of this Presentation Membranes can provide 4 times the
More informationCEE 371 Water and Wastewater Systems
Updated: 21 November 2009 CEE 371 Water and Wastewater Systems Print version Lecture #18 Drinking Water Treatment: Granular Media Filtration Reading: Chapter 7, pp.217-225 David Reckhow CEE 371 L#18 1
More informationFuzzy Filter: The Right Path for Graton Community Services District
WWD Article Application in Action: Water Reuse Fuzzy Filter: The Right Path for Graton Community Services District First Lagoon Effluent Filtration with Compressible Media Filter for Water Reuse Application
More informationFilter Surveillance PSW Rocky Mountain Summit April 5, Advanced Process Control and Optimization
Filter Surveillance PSW Rocky Mountain Summit April 5, 2016 Advanced Process Control and Optimization Partnership for Safe Water Partnership for Safe Water mission: To improve the quality of drinking water
More informationOvercoming Challenges to Achieve Optimization at the Crown Water Treatment Plant. Barbara Martin AWWA Mark Petrie Cleveland Water
Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant Barbara Martin AWWA Mark Petrie Cleveland Water Outline Partnership for Safe Water Background Program Phases Crown Water
More informationTiffin Water Treatment Plant. Comprehensive Facility Plan (Audit)
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Tiffin Water Treatment Plant Comprehensive Facility Plan (Audit) May 2016 Jim Welty Aqua Ohio Jill Marie P.E. Rich Atoulikian P.E.
More informationDipti Shah, Town of Gilbert Tuesday, January 25, 2011
Dipti Shah, Town of Gilbert Tuesday, January 25, 2011 Background Treatment Plant Water Treatment Process Filter types Experiments Results Review Historical BAF /Non- BAF data Conclusion Recommendation
More informationRECORD DRAWINGS NOTE: alt32 ARCHITECTURE DESIGN 310 OLD VINE STREET, SUITE 300 LEXINGTON, KY 40507
CIVIL MECHANICAL STRUCTURAL CALHOUN, KENTUCKY 2013 EXISTING RAW WATER INTAKE & PUMP STATION ELECTRICAL NEW WATER TREATMENT PLANT CALHOUN, KENTUCKY NEW WATER TREATMENT PLANT McLEAN COUNTY REGIONAL WATER
More informationATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l
ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:
More informationWorld Pulp & Paper THE INTERNATIONAL REVIEW FOR THE PULP AND PAPER INDUSTRY
World Pulp & Paper THE INTERNATIONAL REVIEW FOR THE PULP AND PAPER INDUSTRY 2014 MIXING & INJECTION TECHNOLOGY Mixing innovation delivers value By Brian Duffy, Tim Nahley, David sirois and Ruben Manzanares,
More informationOhio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements
April 20, 2016 City of Delaware Water Plant Improvements 1 NW District Fall Meeting April 20, 2016 Delaware Water Plant Project Overview Converted 6.0 MGD Lime Softening Plant to 7.2 MGD Ultrafiltration
More informationAquaABF Automatic Backwash Filter. Your Water & Wastewater Specialists
AquaABF Your Water & Wastewater Specialists AquaABF Features The AquaABF (Automatic Backwash Filter) is a continuous rapid-rate downflow filter. This type of granular media gravity filter has been used
More informationGeorgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018
Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures
More informationENVIRONMENTAL ENGINEERING-I
ENVIRONMENTAL ENGINEERING-I Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati
More informationRinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study
Rinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study AWWA 2014 Fall Conference Lei Hong, Ph.D., P.E. Lale Guven, Environmental Engineer October 23, 2014 Presentation
More informationAIR SCOUR DEMONSTRATES FILTER PERFORMANCE AND ECONOMIC BENEFITS IN QUEEN LANE WATER TREATMENT PLANT
AIR SCOUR DEMONSTRATES FILTER PERFORMANCE AND ECONOMIC BENEFITS IN QUEEN LANE WATER TREATMENT PLANT Jamie Shambaugh, Lori Kappen (GF) Jerry Kuziw, Shiju Kuriakose, Kate Guest, Ya-Chi Tsao (PWD) Acknowledgement
More informationEducation on Common Household Sewage Treatment Systems Found In Allen County, OH
Education on Common Household Sewage Treatment Systems Found In Allen County, OH The Allen County Public Health Environmental Health Division would like to provide you with diagrams of some common, discontinued
More informationThere is no sludge treatment process at NWTP. Sludge generated from sedimentation and backwashing is drained directly to the Khan River.
Namkhan Water Treatment Plant Luang Prabang City, Lao PDR 1. Background information Luang Prabang is a touristic city situated in northern part of Lao PDR and was declared a World Heritage City by UNESCO
More informationTITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 626. PUBLIC WATER SUPPLY CONSTRUCTION STANDARDS SUBCHAPTER 9. TREATMENT
TITLE 5. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 66. PUBLIC WATER SUPPLY CONSTRUCTION STANDARDS SUBCHAPTER 9. TREATMENT 5:66-9-. Pretreatment (a) Provide pre-sedimentation basins for package and slow
More informationFUNDAMENTALS OF GRANULAR MEDIA FILTRATION. Gordon Williams, PhD, PE East Bay Municipal Utility District
FUNDAMENTALS OF GRANULAR MEDIA FILTRATION Gordon Williams, PhD, PE East Bay Municipal Utility District 1 OVERVIEW Filtration basics Filtration theory Filter media selection and design Monitoring and Troubleshooting
More informationMONTHLY OPERATION REPORT (MOR)--ALL WATER SYSTEMS
KENTUCKY DIVISION OF WATER DRINKING WATER BRANCH Revised //0 MONTHLY OPERATION REPORT (MOR)--ALL WATER SYSTEMS MONTH & YEAR OF: DEP Form 0--Revised 0/00 PLANT NAME: PWS NAME: PLANT CLASS: DIST. CLASS:
More informationPilot Testing and Evaluation of Three Filtration Technologies for the Eugene / Springfield Wastewater Treatment Plant
Pilot Testing and Evaluation of Three Filtration Technologies for the Eugene / Springfield Wastewater Treatment Plant 2009 PNCWA Annual Conference Boise, ID September 15, 2009 By: Bill Bennett and Yan
More informationClient: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006
Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: 13649553 Issue Date: October 23, 2006 Subject: WWTP Condition Assessment Auburn Plant 1. Grit Removal:
More informationFacility & Operations Field Division
Facility & Operations Field Division Mission Statement: To regularly inspect utility facilities and review plant operating practices to ensure regulated utility service providers deliver safe, reliable
More informationExpanding Capacity and Treatment. Treatment Plant
Dublin Road Water Plant Treatment Capacity Increase Project Expanding Capacity and Treatment at an 80 MGD Surface Water Treatment Plant Enoch Nicholson, P.E. S. Dean Ramsey, P.E. CH2M HILL Mark Eppich,
More informationHOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN
HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins
More informationW O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W
Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF
More informationAlgae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.
Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Facultative Lagoon System Designed for 1.5 MGD Discharging 1.15-1.35
More informationSYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION
SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION Alex Yavich, Ph.D., P.E. Optimization Solutions Environmental, LLC WATERCON 2012 Optimization Solutions Environmental, LLC Water Treatment
More informationPublic Utilities Department City of Bossier City, Louisiana
Public Utilities Department City of Bossier City, Louisiana Water System Improvement Plan April 16, 2008 Contents Section 1 Project Definition, Purpose and Scope 1.1 Project Definitions...1-1 1.2 Planning
More informationProcess Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014
Process Treatment Selection and Design for the City of Piqua s New WTP Jeff Macomber, P.E. One Water Conference August 28, 2014 Agenda Project Background Water Treatment Goals Process Treatment Alternative
More informationConstruction of Rapid Sand Filters i) Media
Filtration Process The flow of clarified water through a bed of granular media Purpose is to remove any particulate matter left over after flocculation and sedimentation Process operates based on 2 principles
More informationSide by Side Piloting of Process Alternatives Yields Direct Performance Comparison
OBG PRESENTS: OBG PRESENTS: Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison LORI W. REID, P.E. New York State AWWA Spring Meeting, April 26, 2017 Outline Background Project
More informationIntroduction document of KHN package water treatment. plant (flocculation sedimentation and filtration)
Introduction document of KHN package water treatment plant (flocculation sedimentation and filtration) The package water treatment plant (flocculation sedimentation and filtration) is a water treatment
More informationWater Treatment. Water Treatment. Water Treatment. Water Treatment. CIVL 1101 Introduction to Filtration 1/15
CIVL 1101 Introduction to 1/15 Water treatment describes those industrial-scale processes used to make water more acceptable for a desired end-use. These can include use for drinking water, industry, medical
More informationHIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE
City of Newark, Ohio HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE 22, 2011 High Rate Treatment Tanks/UV Wet Weather Screen Building JC2/Wet Weather Pump Station Wet Weather Control
More informationA Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs
A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs CPE Participants U.S. EPA: Alison Dugan, Tom Waters, Rich Lieberman, Craig Patterson, Val Bosscher Process Applications, Inc.: Larry
More informationLeopold Desalination Pretreatment Systems
Leopold Desalination Pretreatment Systems Reliable Protection from Membrane-Fouling, Performance-Inhibiting Seawater Contaminants Why Leopold for Your Desalination Pretreatment Solution? Leopold desalination
More informationFAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY
FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three
More informationLiquid Stream Fundamentals: Grit Removal
FACT SHEET Liquid Stream Fundamentals: Grit Removal Grit removal is an essential component of the wastewater treatment process. Not only does the removal of grit help protect downstream equipment from
More informationSettled Sewage. Tap Water. CaO. Pond Effluents 23 M 95 M
Algae Removal from Wastewater Treatment Pond Effluent by Dissolved-Air Flotation Dr. Yakup Nurdogan CDM, 11811 N.E. 1 st Street Bellevue, WA 98005 425-519-8375 nurdogany@cdm.com September 14, 2009 Presentation
More informationCompressible Media Filter (Schreiber Fuzzy Filter)
Compressible Media Filter (Schreiber Fuzzy Filter) Ayman Shawwa, Ph.D., P.E., BCEE, PMP Presentation Outline Compressible Media Filtration Technology Fuzzy Filter for Tertiary Phosphorus Removal Fuzzy
More informationTHIS POLICY DOES NOT HAVE THE FORCE OF LAW
THIS POLICY DOES NOT HAVE THE FORCE OF LAW GUIDELINES FOR TREATMENT PROCESS Division: DDAGW RATINGS AT PRECIPITATIVE (e.g.,lime) Number: ENG-02-001 SOFTENING GROUND WATER Category: Final TREATMENT PLANTS
More informationrim-flo secondary Clarifier with Tow-Bro unitube sludge removal system
rim-flo secondary Clarifier with Tow-Bro unitube sludge removal system Flow distribution of mixed liquor is uniform around the basin circumference, density flow pattern is away from the effluent weir,
More informationIntegrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant
Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant City of Columbus Division of Water: Matt Steele CH2M HILL: Enoch Nicholson DRWP Source Water and Treatment DRWP Overview Current
More informationSMCSD Headworks, Primary and Secondary Treatment Pre-Design
Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto, Dennis Gellerman Steve Clary
More informationConditional Backwash Control with In-Filter Media And Turbidity Monitoring - An Optimization Tool for Gravity Filters.
American Water Works Association New York Section Saraotoga Springs, NY April 2016 Conditional Backwash Control with In-Filter Media And Turbidity Monitoring - An Optimization Tool for Gravity Filters
More informationImprovement of Drinking Water Plant Treatment
Improvement of Drinking Water Plant Treatment A. ZOUBOULIS 1, *, G. TRASKAS 1 AND P. SAMARAS 2 1 Department of Chemistry, Division of Chemical Technology Aristotle University, Thessaloniki GR-541 24, Greece
More informationElsham Water Treatment Works (WTW) is located approximately 10km east of Scunthorpe in North Lincolnshire
Elsham WTW upgrade to increase output and improve performance of non-potable WTW to meet forecast industrial growth on the south Humber Bank by Stewart Bell Elsham Water Treatment Works (WTW) is located
More informationAD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal
AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal Technical Bulletin 2004-02 rev0707 Q: What is the AdEdge AD26 System? A: The AD26 system is a pre-engineered, packaged treatment system specifically
More information6.5 Filtration General
6.5 Filtration 6.5.1 General Turbidity and algae are removed from raw waters by screens, gravel filters and slow sand or rapid gravity filters. The difference between slow and rapid sand filtration is
More informationRECTILINEAR FLOW EFFLUENT TANK WALL LAUNDER. LAUNDER INFLUENT D. Peripheral-Feed Settling Tank, Spiral Flow EFFLUENT DISTRIBUTION WELL INFLUENT
7.17 SEDIMENTATION PARTIAL LIST OF SUPPLIERS Degremont-Cottrell Inc.; Dorr-Oliver Inc.; FMC Corp.; Dravo Corp.; Sybron Corp.; Edens Equipment Co.; Eimco Process Equipment; Envirex; General Filter Co.;
More informationbiologically active filtration
biologically active filtration FOR TASTE AND ODOR CONTROL AT LAKE MANATEE WATER TREATMENT PLANT BY MIKE NIXON, EI, ENGINEER INTERN, MCKIM & CREED PHIL LOCKE, PE, SENIOR PROJECT MANAGER, MCKIM & CREED KATIE
More informationTITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 626. PUBLIC WATER SUPPLY CONSTRUCTION STANDARDS
TITLE 5. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 66. PUBLIC WATER SUPPLY CONSTRUCTION STANDARDS RULEMAKING ACTION: PERMANENT final adoption RULES: Subchapter 9. Treatment 5:66-9- [AMENDED] 5:66-9-8
More informationUnderstanding Pretreatment. WesTech Engineering, Inc. Salt Lake City, Utah, USA
Understanding Pretreatment WesTech Engineering, Inc. Salt Lake City, Utah, USA Industrial Water Usage Water is required in almost every industry For: Cooling Boiler feed Process Drinking Cleaning In 2005
More informationProject 1 Treatment Cost. Project 1 Treatment Cost. Project 1 Treatment Cost. Project 1 Treatment Cost. Project 1 Treatment Cost
CIVL 111 Water Treatment - Yearly OM Problems 1/ The objective of this project is to utilize, within given constraints, a prototype water filter system to design a full-scale system. The effectiveness
More informationWater Treatment Overview. Gabe Sasser December 2016
Water Treatment Overview Gabe Sasser December 2016 Topics of Discussion Source Water Information Treatment Plants (History and Capacity) Water Quality Water Treatment Process Distribution System Conservation
More informationThickening and Dewatering Optimization Matt Van Horne, PE Hazen and Sawyer July 14, 2016
Thickening and Dewatering Optimization Matt Van Horne, PE Hazen and Sawyer July 14, 2016 Agenda Equipment Specific Modifications Chemicals Feeding Cleaning and Maintenance Pretreatment 2 1 Optimization
More informationU. S. Army Corps of Filtration System Performance Checklist
U. S. Army Corps of Filtration System Performance Checklist Installation Name Site Name / I.D. Evaluation Team Site Visit Date This checklist is designed to facilitate the performance evaluation of a filtration
More informationNorth Carolina State University
Turbidity Control in Pumped Water Systems Richard A. McLaughlin Soil Science Department rich_mclaughlin@ncsu.edu North Carolina State University Typical Chemical Treatment System (CTS) Situations Sediment
More informationVALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING Question Bank CE2354 - ENVIRONMENTAL ENGINEERING - II Prepared By: Year: 3rd year Semester: 6th Semester R.THENMOZHI / A.P.Civil J.SHANMUGAPRIYA
More information