OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)
|
|
- Damon Gibson
- 6 years ago
- Views:
Transcription
1 OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919) July 31, 2016 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina Attention: Subject: Alixander Zapolski Property Manager Final Ambient Air Sampling Report CVS/Pharmacy Plaza Franklin Street Office Building 6 th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina OLME Project No.: OLME Dear Mrs. Zapolski: OLM Environmental, LLC (OLME) is pleased to present this report summarizing the results of the ambient air sampling obtained during abatement activities at the above-mentioned location. The cleanup included the removal, disposal and replacement of water-damaged suspended ceiling panels, over-sprayed asbestos-containing fireproofing from insulated ductwork and fiberglass drain pipe insulation coated with asbestos-containing black mastic along seams adequate to provide access. As per the Operations and Maintenance (O&M) plan prepared for the property, cleaning was performed adequate to complete these repairs. Because of the amount of asbestos-containing materials (ACM) affected by the work, Zapolski Real Estate, LLC (Zapolski) contracted Demolition and Asbestos Removal, Inc. (DARI) located in Raleigh, North Carolina to perform the work. OLME was also contracted to inspect the work and obtain ambient air sampling to determine the air quality resulting from the work activities. This report summarizes our work observations and the ambient air monitoring result obtained. DARI s crew was onsite July 27, 2016 performing the desired scope of work. OLME representative, Oral McGirt, was also onsite during the work and met with DARI project supervisor, Alejandro H. Arreal, and Zapolski property manager, Dan Ivey to coordinate the work and to establish cleaning procedures to follow. DARI s abatement crew consisted of one licensed supervisor and three workers. Each maintained an asbestos accreditation demonstrating that they were licensed by North Carolina s Health Hazard Control Unit (HHCU) to perform asbestos-related abatement activities. Details of DARI s
2 Final Ambient Air Sampling Report July 31, 2016 CVS/Pharmacy Plaza Page 2 Franklin Street Office Building 6th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina OLME Project No.: OLME abatement crew s accreditation information is detailed in the attached table entitled, Worker Verification Form. Prior to performing any activity that would further disturb or expose the identified asbestos-containing fireproofing exposed by the damages, DARI s crew was required to establish a regulated work area prior to performing the work. Workers installed 6-mil polyethylene sheeting (poly) barriers over doorways and openings to restrict access during the work. 6-mil polyethylene sheeting was placed on the floor to catch any fallen debris. Wet methods and HEPA-equipped vacuum(s) were also required, as per the O&M plan, to control airborne particle during the work. Ambient air sampling was performed to determine the level of airborne particulate generated during the work and to gauge the thoroughness of the cleaning. Sampling was performed inside and outside the regulated work area to gauge the level of airborne particulate generated by the work. Sampling and analyzes of the air sampling obtained were performed by Mr. McGirt, who maintains the appropriate State of North Carolina accreditation for the type of services performed. Details of Mr. McGirt s accreditation information are attached table is entitled, OLME Project Personnel Summary Table. Project Setup and Preparations: Prior to disturbing the identified ACM, DARI s crew 6-mil polyethylene (poly) drop cloths was installed on the floor beneath the water-damaged section of ceiling in order to catch any falling debris during the work. Pre-cleaning of the corridor was also performed to remove visible ACM prior to the start of the work. See the attached Photographs for views of the work preparations and abatement methods. Mr. Arreal, reported that the crew planned to thoroughly saturate the affected materials with water using a Hudson-type sprayer(s). Handtools and a HEPA-equipped vacuum were used throughout the work. He reported that loose and over-sprayed fireproofing was removed from ductwork surfaces adequate to perform the desired repairs. Asbestos-contaminated debris generated during the work was placed inside 6-mil poly waste disposal bag(s) and again be coated with water to minimize fiber release. Once adequately filled, waste was then gooseneck sealed and then placed in a second waste bag and sealed.
3 Final Ambient Air Sampling Report July 31, 2016 CVS/Pharmacy Plaza Page 3 Franklin Street Office Building 6th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina OLME Project No.: OLME Sealed waste was properly labeled and handled truck prior to being removed from the jobsite and later transport to a State-approved landfill and disposed. approved the work. Mr. McGirt inspected the area after cleaning and Personal Protective Equipment: The following summarizes the types of personal protective equipment (PPE) worn by the workers during the work: DESCRIPTION OF WORK Work Area Preparations Regulated Removal/Cleaning Activities Waste Loadout PERSONAL PROTECTIVE EQUIPMENT Half-Face Negative Pressure Respirators Equipped With P-100 Rated HEPA Filters Disposable Suits, Gloves and Safety Glasses Half-Face Negative Pressure Respirators Equipped With P-100 Rated HEPA Filters Disposable Suits, Gloves and Safety Glasses None Air Sampling Collection and Analysis Procedures: The ambient air samples were obtained using the Asbestos Hazard Emergency Response Act (AHERA) sampling and analysis protocol. The ambient air sampling were obtained and analyzed using Phase Contrast Microscopy sampling and analysis procedures. Analysis of the ambient air sampling performed outside the work area and after cleaning were determined to be acceptable for public access, less than 0.01 fiber per cubic centimeter of air (f/cc) for each sample obtained, as per the North Carolina State regulations. Summaries of our air sampling methodology and the Phase Contrast Microscopy Air Sample Data Sheet are attached.
4 Final Ambient Air Sampling Report July 31, 2016 CVS/Pharmacy Plaza Page 4 Franklin Street Office Building 6th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina OLME Project No.: OLME OLME appreciates the opportunity to provide these asbestos-related services. Feel free to contact us if you have any questions concerning this report. Sincerely, OLM Environmental, LLC. Oral L. McGirt Asbestos Projects Manager Attachments: Worker Verification Form OLME Project Personnel Summary Table Photographs Air Monitoring Methodology Phase Contrast Microscopy - Air Sample Data Sheet
5 WORKER VERIFICATION FORM
6 CVS/PHARMACY PLAZA FRANKLIN STREET OFFICE BUILDING 6TH FLOOR MAIN CORRIDOR NEAR SUITE 600 O&M CLEANING FOR PLUMBER ACCESS 137 EAST FRANKLIN STREET CHAPEL HILL, NORTH CAROLINA OLME PROJECT NO.: OLME CONTRACTOR: DARI RALEIGH DIVISION DATE NAME ACCREDITATION NUMBER EXPIRATION Alejandro Hernandez Arreal /27/16 Felipe Vasquez Paredes Jose Juan Corona Martin Paredes
7 OLME PROJECT PERSONNEL
8 CVS/PHARMACY PLAZA FRANKLIN STREET OFFICE BUILDING 6TH FLOOR MAIN CORRIDOR NEAR SUITE 600 O&M CLEANING FOR PLUMBER ACCESS 137 EAST FRANKLIN STREET CHAPEL HILL, NORTH CAROLINA OLME PROJECT NO.: OLME PERSONNEL NAME Air Monitoring Accreditation Number Expiration Date Inspector Accreditation Number Expiration Date Designer Accreditation Number Expiration Date SAM* Accreditation Number Expiration Date Oral L. McGirt
9 PHOTOGRAPHS
10 PHOTOGRAPHS FRANKLIN STREET OFFICE BUILDING 6TH FLOOR MAIN CORRIDOR NEAR SUITE 600 O&M CLEANING FOR PLUMBER ACCESS 137 EAST FRANKLIN STREET CHAPEL HILL, NORTH CAROLINA OLME PROJECT NO.: OLME PHOTO No. 1 View of Work Preparations Installed to Isolate the Work Performed in the Main Corridor Near Suite 600 Entrance PHOTO NO. 2 View of Insulated Ductwork After Removal of Over-Sprayed Fireproofing From Exterior Surface(s) PHOTO No. 3 View of Drain Pipeline in Which Approximately 3-4 Feet of Fiberglass Insulation Sealed With Asbestos-Containing Black Mastic was Removed in Order to Provide Access
11 AIR MONITORING METHODOLOGY
12 AIR MONITORING METHODOLOGY The final ambient air clearance sampling for this project were obtained and analyzed to determine the fiber concentration in each air samples. The samples were analyzed by Phase Contrast Microscopy using the National Institute for Occupational Safety and Health (NIOSH) 7400 Method. This method is essentially similar to the Occupational Safety and Health Administration (OSHA) Reference Method and specifies the procedure for analyzing air samples for asbestos. The 7400 Method counts all fibers that meets the counting criteria and does not distinguish between asbestos and non-asbestos fibers. To distinguish between asbestos and non-asbestos fibers would require analysis by Transmission Electron Microscopy. The concentration of airborne fibers in an air sample is controlled by several parameters, including total number of fibers counted on the filter, total number of fields counted, filter area, monitoring time and flow rate. The total number of fibers and fields counted in a sample are governed by the counting rules of the 7400 Method. The filter area is a constant and the monitoring time is a known factor controlled by the sampler. Several high flow electric pumps were utilized to obtain area monitoring. Documentation of the calibration of the pumps was performed before and after monitoring using a secondary standard (a rotometer), which in turn is calibrated every six months using a primary standard. Area samples were generally collected by pulling air at a rate of 10.0 liters per minute (lpm) through a 25-millimeter diameter mixed cellulose ester filter (pore size 0.8 micrometer). Some filter cassettes were analyzed as box blanks. One cassette from every box of fifty was analyzed without having been opened to determine the suitability of that particular box of cassettes for air monitoring. Monitoring was performed for a period of sufficient duration for the limit of qualification to be less than 0.01 f/cc for area sampling. Samples with fiber concentrations below the quantification limit were reported as below (<) the quantification limit.
13 PHASE CONTRAST MICROSCOPY AIR SAMPLE DATA SHEET
14 OLME Job No.: OLME Collection Date: 07/27/16 Project Name: CVS/Pharmacy Plaza Analysis Date: 07/27/16 Contractor: DARI - Raleigh Analyst Name: Oral L. McGirt NC Air Monitor No Franklin Street Office Building 6 th Floor Main Corridor O&M Cleanup for Plumber Access for Assessment and Planned Repairs 137 E. Franklin Street Chapel Hill, North Carolina Project Activity: O&M Work Small-Scale Asbestos Abatement and Ceiling Panel Replacement LAB ID No. Job ID. No. General Location Flow Rate (L/M) Start Time Stop Time Total Time (mins.) Volume (Liters) No. of Fibers No. of Fields Conc. DL CVS-01 6 th Floor Elevator Lobby CVS CVS-03 6 th Floor Main Corridor Near Entrance Doorway 6 th Floor Main Corridor Near Suite 600 Entrance CVS-04 Field Blank Clean CVS-05 Lab Blank Clean --- Samples were analyzed by methods as detailed in Issue 2 of Revision 3 of NIOSH s Method Oral L. McGirt Collector s Signature Oral L. McGirt Analyst s Signature Gary P. Alexander Reviewer/SAM No Note: Air Sampling Data was provided to the SAM for review and approval. L/M = liters per minute DL = Detection Limit SAM = Supervising Air Monitor
OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)
OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 10, 2015 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701
More informationOctober 1, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted,
October 1, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 Dear Ted, Enclosed please find the Roosevelt Elementary School East Side Asbestos Removal and O & M Final
More informationSeptember 29, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted,
September 29, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 Dear Ted, Enclosed please find the Homecroft Elementary School West Side Asbestos Removal and O & M Final
More informationAsbestos Abatement Standard Procedures Indoor Environment Group, Inc.
The following work procedures are specified on all full containment asbestos abatement projects that we design. A. Preliminary Air Sampling: Many buildings contain background fiber levels prior to, or
More informationVERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f:
VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA 02189 www.vertexeng.com p: 781.952.6000 f: 781.335.3543 EZRA BAKER ELEMENTARY SCHOOL/GYMNASIUM ASBESTOS ABATEMENT WORK PLAN ASBESTOS CONTAINING
More informationDUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM
DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement
More informationSeptember 30, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,
September 30, 2014 Providing Trusted Health and Safety Solutions Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Parkway Montessori School
More informationIndustrial Hygiene Survey
Industrial Hygiene Survey Zapolski Real Estate, LLC. 501 Washington Street Durham, NC 27701 Prepared by: The EI Group, Inc. 2101 Gateway Centre Blvd. Morrisville, NC 27560 Original Report Date: September
More informationINSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC.
October 22, 2012 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Battle Creek Magnet Portable #19 Ceiling Tile Removal Final Report, IEA Project
More informationWork Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928
ABATEMENT WORK PLAN FOR EMERGENCY ASBESTOS ABATEMENT PROJECT CONSENTINO MIDDLE SCHOOL 685 WASHINGTON STREET HAVERHILL, MASSACHUSETTS Work Plan dated February 17, 2016 Prepared by Axiom Partners, Inc. Stephen
More informationAsbestos Abatement Air Monitoring Report
Olney Elementary School 5301 N. Water Street Philadelphia, Pennsylvania Asbestos Abatement Air Monitoring Report AUGUST 16, 2018 PREPARED FOR: School District of Philadelphia 440 North Broad Street, Room
More informationFinal Visual Inspection and Air Monitoring Report Asbestos Abatement Activities 804 Chipeta Road Montrose, Colorado.
Final Visual Inspection and Air Monitoring Report Asbestos Abatement Activities 804 Chipeta Road Montrose, Colorado November 21, 2016 Final Visual Inspection and Air Monitoring Report Asbestos Abatement
More informationIf you have any questions or require further assistance, please do not hesitate to contact me at
April 9, 2013 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Prosperity Heights Elementary Room 0104 Chalkboard/Tackboard Removal Final Report,
More informationSECTION ASBESTOS CONTAINING MATERIALS REMEDIATION
SECTION 13280 ASBESTOS CONTAINING MATERIALS REMEDIATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Furnishing all labor, materials, equipment, and transportation necessary for properly and safely removing,
More informationT. Harris Environmental Management Inc.
T. Harris Environmental Management Inc. Environmental Consultants 93 Skyway Avenue, Suite 101 Toronto, Ontario M9W 6N6 Tel. (416) 679-8914 Fax. (416) 679-8915 1-888-ASK-THEM, York University 4700 Keel
More informationChapter 10 Air Sampling and Analysis
Air Sampling and Analysis This chapter is designed to provide inspectors general information concerning the equipment, methods and procedures involved in air monitoring and air sample analysis. Although
More informationProject Monitoring & Air Sampling
Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected
More informationAsbestos Abatement Air Monitoring Report
Thomas Mifflin Elementary School 3624 Conrad Street Philadelphia, Pennsylvania Asbestos Abatement Air Monitoring Report AUGUST 15, 2018 PREPARED FOR: School District of Philadelphia 440 North Broad Street,
More informationINSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC.
October 19, 2015 Providing Trusted Health and Safety Solutions Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Humboldt Senior High Gymnasium
More informationSeptember 26, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,
September 26, 2012 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Bruce Vento Elementary Summer 2012 Asbestos Removal Final Report, IEA Project
More informationIn general, the management plan development process consisted of:
NWASCO SCHOOL DISTRICT #21 ASBESTOS MANAGEMENT PLAN PART I: GENERAL PROVISIONS OF THE MANAGEMENT PLAN 1.0 INTRODUCTION This Asbestos Management Plan was developed in accordance with the United States Department
More informationThese procedures are to be followed by all persons required to perform the following work:
These procedures are to be followed by all persons required to perform the following work: Entry into any ceiling space above which an asbestos-containing fireproofing or thermal insulation is present.
More informationA. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.
April 2012, rev. 00 02 8213 Asbestos Abatement 1. General 1.01 Summary of Work A. Contractor 1.02 Definitions 1. The Contractor shall provide removal and proper disposal of asbestos containing materials.
More informationNORTH DAKOTA DEPARTMENT OF TRANSPORTATION REQUEST FOR PROPOSAL ASBESTOS AIR MONITORING SERVICES
NORTH DAKOTA DEPARTMENT OF TRANSPORTATION REQUEST FOR PROPOSAL ASBESTOS AIR MONITORING SERVICES September 12, 2008 INTRODUCTION North Dakota Department of Transportation (NDDOT) is seeking an asbestos
More informationBASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION
Procedure No.: IH-6 Page: 1 of 16 Preparer: Owner: Approver: RECORD OF REVISIONS Date Details of Change 11/02/01 Added a Record of Revisions table. 08/14/08 Review of entire procedure. Deleted 4.3.3 and
More informationCLASS I AND II ABATEMENT PROJECT SUBMITTALS
5.1 Pre-Work Submittals CLASS I AND II ABATEMENT PROJECT SUBMITTALS Abatement contractors shall submit the following in a bound notebook to AU or our designated representative at the mandatory pre-construction
More informationTYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204 & 206 WINDSOR, ONTARIO. Issued: March 15 th, 2010
Environmental Consultants 931 Commissioners Rd East, Suite 100 London, Ontario N5Z 3H9 Tel: (519) 685-9048 Fax: (519) 685-1042 TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204
More informationSeptember 27, Ted Sherman Saint Paul Public Schools 360 Colborne Street St. Paul, MN Dear Ted:
September 27, 2007 Ted Sherman Saint Paul Public Schools 360 Colborne Street St. Paul, MN 55102 Dear Ted: Enclosed please find two (2) copies of the Hazel Park Middle School Summer 2007 Asbestos Removal,
More informationOccupational Exposure Assessment Report: Airborne Asbestos Fibers
June 13, 2016 Occupational Exposure Assessment Report: Airborne Asbestos Fibers VAV Repair Stevenson Hall 1801 E. Cotati Avenue Rohnert Park CA 94928 Prepared for: Craig Dawson 1801 E. Cotati Avenue Rohnert
More informationAsbestos Management Program
ENVIRONMENTAL HEALTH & SAFETY Reed College 3203 Southeast woodstock boulevard Portland, Oregon 97202-8199 Asbestos Management Program Effective Date: 6/16/2009 Revision Dates or Last Date: 2/2016 I. Purpose...
More informationMay 1 st, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7
May 1 st, 2018 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and TEM
More informationAsbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager
Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related
More informationSeptember 11, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7
September 11, 2017 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and
More informationAsbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials
Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials Revised November 21, 2013 Application Code of Practice Where asbestos is present or believed to be present in a workplace
More informationAIR MONITORING REPORT
AIR MONITORING REPORT Boiler Room Tunnel Hayden Heights Elementary School 1863 Clear Avenue St. Paul, MN 55119 September 29, 2005 Nova Client No.: STPAU006/Project No: H05-1309 AIR MONITORING REPORT Boiler
More informationNAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control
NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards
More information40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL
69 Bridge Street Dedham, MA 02026 Phone 781.251.0040 Fax 781.251.0901 40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT for INDIAN HEAD ELEMENTARY SCHOOL 726 Indian Head Street Hanson,
More informationEmergency Asbestos Abatement Project Monitoring September 21, 2013 Peebles Elementary School Bourne, Massachusetts
Emergency Asbestos Abatement Project Monitoring September 21, 2013 Peebles Elementary School Bourne, Massachusetts Bourne Public Schools Bourne, Massachusetts February 5, 2014 Fuss & O Neill EnviroScience,
More informationATTACHMENT A RFP # BH ASBESTOS ABATEMENT REQUIREMENTS
1. DESCRIPTION OF WORK: ATTACHMENT A RFP # 024-0-2016BH ASBESTOS ABATEMENT REQUIREMENTS The work includes pre-cleaning, repair and/or removal and disposal of friable and non-friable asbestos containing
More informationDUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM
DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 2 Definitions 2 Responsibilities 3 Hazard
More informationNo dry drains/traps were found, eliminating a potentially concern for odors.
January 5, 2017 Ms. Alix Zapolski Zapolski Real Estate, LLC. 501 Washington Street Durham, NC 27701 Re: Limited Indoor Air Quality Assessment Women s Restroom 137 E. Franklin Street, Chapel Hill, NC UNC
More informationTSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions
MANAGEMENT PLANNER INITIAL Asbestos Training Course Federal Edition Training Services International www.training.com What management planning qualifications exist? How do I become certified to perform
More informationINTRODUCTION TO THE PROGRAM
INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order, so that employees will see the relationships between the various groups of information
More informationDIVISION 02 EXISTING CONDITIONS 2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017
2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017 02 00 00. EXISTING CONDITIONS 02 30 00. SUBSURFACE INVESTIGATION.1 Architect/Engineer RESPONSIBILITIES: The Architect/Engineer
More informationLIMITED ASBESTOS INSPECTION REPORT
LIMITED ASBESTOS INSPECTION REPORT Conducted for: Woodbridge Township Education Association 34 Green Street Woodbridge, New Jersey 07095 Conducted at: Indiana Avenue School 256 Indiana Avenue Iselin, New
More informationFACILITY ASBESTOS MANAGEMENT PLAN
WASHINGTON ADVENTIST UNIVERSITY DEPARTMENT OF PUBLIC SAFETY DIVISION FACILITY ASBESTOS MANAGEMENT PLAN TAKOMA PARK CAMPUS REVIEWED and APPROVED BY: Patrick Farley WAU- V.P. of Finance Steven Lapham WAU-Executive
More informationMarch 29 th, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7
March 29 th, 2017 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and TEM
More information40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT
69 Bridge Street Dedham, MA 02026 Phone 781.251.0040 Fax 781.251.0901 40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT for WHITMAN MIDDLE SCHOOL 100 Corthell Avenue Whitman, MA 02382 Initial
More informationSeptember 19, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,
September 19, 2012 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Wellstone Elementary West Penthouse Glovebag Abatement Final Report, IEA
More informationWork Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts
1) Introduction Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts Triumvirate Environmental Inc. (TEI) shall perform
More informationGENERIC ASBESTOS OPERATION AND MAINTENANCE (O&M) PLAN
Environmental Sciences Corporation 25 Years of Environmental Excellence National Environmental Assessment, Compliance, Industrial Hygiene, UST/AST, Construction Management and Engineering Services GENERIC
More informationModule 3: Asbestos. 15 th Annual OSC Readiness Training Program.
Module 3: Asbestos 15 th Annual OSC Readiness Training Program www.oscreadiness.org Module Overview Asbestos Overview of asbestos Federal and State laws regulating asbestos Building Demolition Abatement
More informationAPPENDIX D1. ASBESTOS NESHAP 40 CFR 61 Subpart M PRE CAA90 40 CFR PART 61 NESHAP
APPENDIX D1 ASBESTOS NESHAP 40 CFR 61 Subpart M PRE CAA90 40 CFR PART 61 NESHAP REGULATION STATUS ASBESTOS NESHAP (40 CFR 61 SUBPART M) On 06 Apr 73, EPA issued the initial NESHAP for asbestos after determining
More informationProject 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080
PART 1 GENERAL 1.0 Instructions To Bidders Hazardous Materials Contractors are responsible for the information as provided in the City of Vancouver Invitation to Tender including all available documents,
More informationBRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02
BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:
More informationAdv. 3.2: Asbestos Abatement Rev
ADVISORY NO. 3.2: ASBESTOS ABATEMENT TERMINOLOGY AND DEFINITIONS Abatement: Procedures to control fiber release from asbestos-containing materials, i.e., removal, encapsulation, or enclosure. Air Lock:
More informationProject 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080
PART 1 GENERAL 1.0 Instructions To Bidders Hazardous Materials Contractors are responsible for the information as provided in the Invitation to Tender including all available documents, meeting minutes,
More informationPROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL
PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL At 130 Liberty Street New York, New York Lower Manhattan Development Corporation
More information"ASBESTOS AWARENESS IN THE WORKPLACE"
MAJOR PROGRAM POINTS "ASBESTOS AWARENESS IN THE WORKPLACE" Training For THE OSHA ASBESTOS STANDARD Quality Safety and Health Products, for Today...and Tomorrow Outline of Major Points Covered in the "Asbestos
More informationROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina Phone: Fax:
ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina 28210 Phone: 704.968.4111 Fax: 704.553.9458 March 27, 2015 Mr. Barry Blevins Harnett County General Services 103 East Ivey
More informationSection Asbestos Removal
Section Cover Page Section 02 82 33 2017-10-01 Use this Section to specify removal of materials containing asbestos, as listed below. Always use in conjunction with Section 02 82 01 - Asbestos Control
More informationAsbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22
Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAddendum No. 2. (i) Issued January 23, 2018 REQUEST FOR PROPSALS FOR GENERAL CONTRACTOR. SHSU CJC AHU Replacement. RFP No.
Addendum No. 2 (i) Issued January 23, 2018 REQUEST FOR PROPSALS FOR GENERAL CONTRACTOR SHSU CJC AHU Replacement RFP No.: 753-17-95553H Notice to All Respondents: The following is Addendum No. 2 to the
More informationRowan University Asbestos Management Program
Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos
More informationIdaho Solid Waste Association
Idaho Solid Waste Association Idaho Snow: Debris from Collapsed Buildings EPA Asbestos Requirements for Demolishing a Building John Pavitt U.S. Environmental Protection Agency Region 10, Alaska Operations
More informationWESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101
WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 Issued 6/1/95 Revised 11/08/2004; 3/6/06 Please direct any questions or comments about the applicability of this document to Luigi
More information1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:
125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite
More informationAddendum Number One. USC Preston College Bathroom and Flooring Renovations Part II Project Number: H SG
Compass 5 Partners, LLC Date of Issue: 03/31/14 Addendum Number One Project: USC Preston College Bathroom and Flooring Renovations Part II Project Number: H27-6068-SG TO: ALL BIDDERS OF RECORD This addendum
More informationASBESTOS SCIENCE TECHNOLOGIES, INC.
ASBESTOS SCIENCE TECHNOLOGIES, INC. P.O. Box 505 Bangor, CA 95914 Phone (530) 518-0934 Email - astinc17@yahoo.com Report for Trinity Valley Elem. School Willow Creek, Ca. Mold Report - Rooms 12 through
More informationAsbestos Management Program April 27, 2017
Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the
More informationNAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control
NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 30 APR 2018 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards
More informationASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:
ASBESTOS SURVEY Old Detective s Building Wadesboro, NC PREPARED FOR: Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Date of Inspection September 28, 2016 Date of Report October
More informationAsbestos Exposure. COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England
Asbestos Exposure Safety and Health Regulations for Construction Standard 29 CFR Part 1926.1101 Presented by: Allied Insurance Brokers, Inc. 2010 Zywave, Inc. All Rights Reserved. Asbestos Exposure: Agenda
More informationHART ENVIRONMENTAL RESOURCES
HART ENVIRONMENTAL RESOURCES 262 Hedge Dr. Springfield, OH 45504 (937) 325-8777 (937) 324-0288 FAX ASBESTOS INSPECTION REPORT 143 N. Marion St. Dayton, OH 45417 PREPARED FOR: Mr. Dennis Zimmer Montgomery
More informationUniversity of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES
University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES Project Description: Date Work Conducted: Completed by: (Name and Dept) NOTIFICATION/AWARENESS: 1.
More informationAssessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)
ASBESTOS INSPECTION REPORT 1816 PRINCE STREET Georgetown, South Carolina Asbestos Inspections, LLC Project # 2017-48 Performed in general accordance with SCDHEC regulation 61-86.1 along with OSHA regulation
More informationBID SHEET EAST AND WEST TECHNOLOGY ASBESTOS ABATEMENT
Renovations Asbestos Abatement BID SHEET EAST AND WEST TECHNOLOGY ASBESTOS ABATEMENT Asbestos Material Quantity Unit Price Bid Price Mud Compound Insulation 795 each Floor Tile 10,560 sf Lab Counter Tops
More informationRutgers Environmental Health and Safety (REHS)
Rutgers Environmental Health and Safety (REHS) Program Name: Asbestos Management Program Responsible Executive: Executive Director of REHS Adopted: Reviewed/Revised: August 2, 2018 1. Program Statement
More informationASBESTOS ABATEMENT PROJECT COMPLETION REPORT
ASBESTOS ABATEMENT PROJECT COMPLETION REPORT Windows and Door Replacement Program Falstaff Community Centre 50 Falstaff Avenue Toronto, Ontario M6L 2C7 Presented to: City of Toronto, Parks, Forestry &
More informationAUBURN UNIVERSITY RISK MANAGEMENT & SAFETY
AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY ASBESTOS CONTROL PROGRAM September 22, 2006 Table of Contents 1.0 Introduction... 4 2.0 Purpose and Applicability... 4 3.0 Roles and Responsibilities... 5 3.1
More informationLimited Asbestos Demolition Survey
Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600
More informationRESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY. Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574
RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574 Performed at: Summit/Cruft Building 2111 Main Street Bethlehem,
More informationASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON
ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON May 23, 2007 Prepared for: Mr. Ron Smith GSA 400-15 th Street SW
More informationCHAPTER 22 ASBESTOS A. INTRODUCTION... 1 B. DEFINITIONS... 2 C. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 3 D. HAZARD IDENTIFICATION...
CHAPTER 22 ASBESTOS A. INTRODUCTION... 1 B. DEFINITIONS... 2 C. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 3 D. HAZARD IDENTIFICATION... 7 E. HAZARD CONTROL... 8 1. Restrictions on Purchase and New
More information3. Asbestos Handling Program
1.0 Introduction 3. Asbestos Handling Program This program will establish guidelines and procedures in the operations and maintenance of asbestos containing materials at PLU to protect all employees, contractors,
More informationUI Procedures for Asbestos Management
UI Procedures for Asbestos Management The University of Iowa Rev.10/22/08, 10/15/09 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CEMP-RT Engineer Pamphlet 1110-1-23 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design ASBESTOS ABATEMENT AIR MONITORING STANDARD SCOPE OF WORK EP 1110-1-23
More informationThames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.
Thames Valley District School Board PROCEDURE Title ASBESTOS PROCEDURES Procedure No. 2005a Department ORGANIZATIONAL SUPPORT SERVICES (HUMAN RESOURCES) Reference(s) Policy: Health and Safety - Occupational
More informationASBESTOS SCIENCE TECHNOLOGIES, INC.
ASBESTOS SCIENCE TECHNOLOGIES, INC. P.O. Box 505 Bangor, CA 95914 Phone (530) 518-0934 Email - astinc17@yahoo.com Report for Hoopa Valley Elementary School 11500 State Highway 96 Hoopa, Ca. 95546 Mold
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationRoseville OFFICE* 1911 Douglas Blvd, ste * Roseville, CA Phone (916) * Fax (916) *
Roseville OFFICE* 1911 Douglas Blvd, ste 85-349* Roseville, CA 95661 Phone (916) 628-0050 * Fax (916) 781-6837 * www.hazmanage.com Camino Union Elementary School District Maintenance Building Demolition
More informationREGULATION STANDARDS OF PERFORMANCE FOR ASBESTOS PROJECTS
REGULATION 61-86.1 STANDARDS OF PERFORMANCE FOR ASBESTOS PROJECTS Effective June 28, 2002 Bureau of Air Quality SC Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 (803)
More informationAsbestos Awareness Program
Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes
More informationAHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843)
AHERA/NESHAP ASBESTOS INSPECTION REPORT CLIENT: City of Florence 324 West Evans Street Florence, SC 29501-3430 (843) 665-3173 LOCATION: 558 N. Alexander Street Florence, SC 29501 DATE OF INSPECTION: September
More informationBP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8
BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8 1. Purpose This policy assists in protecting USPL workers from exposure to lead and to gain compliance with state and federal regulations.
More informationBARR & CLARK Independent Environmental Testing Asbestos Lead Mold Phase I ASBESTOS REMOVAL SPECIFICATIONS
BARR & CLARK Independent Environmental Testing Asbestos Lead Mold Phase I ASBESTOS REMOVAL SPECIFICATIONS OF 5 BUILDINGS 1400 E. MISSION BOULEVARD POMONA, CA PROJECT NO. 3009860 JUNE 23, 2017 Prepared
More informationASBESTOS OPERATIONS & MAINTENANCE PROGRAM
NEW MEXICO MILITARY INSTITUTE 101 WEST COLLEGE BOULEVARD ROSWELL, NM 88201 ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Pursuant to Asbestos standards OSHA: 29CFR1926.1101 Construction; & 1910.1001 General
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More information