1 Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO. CONDITIONS COMPLIANCE STATUS i. Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided and particulate matter shall be controlled within 50mg/Nm3 by installing adequate air pollution control system e.g bag house to raw mill/ Kiln and ESP to clinker cooler. Bag filters shall be provided to crushing plant, Raw mill Hopper, Coal Mill Hopper, Coal Mill, blending silo,cement mill, Cement Mill silo, Cement Mill hopper etc to control air emissions less than 50 mg/nm3. Complied Installed online Continuous Monitoring Systems for 4 Stacks attached to the Raw mill/kiln Bag House, Cooler ESP, Coal Mill Bag Filter, Cement Mill Bag Filter and are connected to APPCB server. 2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Photos showing online monitoring system are presented in Annexure-I Adequate air pollution control systems are proved as detailed below to maintain SPM well within the prescribed limits. Raw mill & Kilns : Reverse Air Bag House (RABH) Clinker Coolers : Electro Static Precipitator (ESP) Coal mill & Cement mills : Bag Filters Limestone dump hopper : Water spray system High Efficiency Pulsejet type Bag Filters have been installed in the Crushing plant, Raw mill Hoppers, Coal Mill Hoppers, Blending Silo, Cement Mill hoppers, Cement Silos and in all belt conveyor transfer 1

2 towers to control the particulate emission less than 50 mg/nm3. ii. iii. iv. Secondary fugitive emissions shall be controlled and should be within the prescribed limits & regularly monitored. Guidelines /Code of practice issued by the CPCB in this regard shall be followed. The Company shall install adequate dust collection and extraction system to control fugitive dust emissions due to raw material handling (unloading, conveying, transporting, stacking), Vehicular movement, bagging & Packing areas etc. Closed conveyors shall be used for transportation for raw material and silos should be used for the storage of cement, clinker etc. The covered sheds for raw material storage, bag filter at material transfer points, water sprinkling in internal roads etc, shall be provided. Lime stone from lime stone mines shall be transported by closed trucks to cement plant.water spray system shall be provided all around the coal stockpiles and dust suppression system around the coal conveyor system. Asphalting /Concreting of roads & water spray all around the coal stockpiles shall be carried out to control fugitive emissions. We have taken necessary APC measures to control the fugitive emissions within the prescribed limits and being monitored regularly. High efficiency Bag Filters have been installed in all transfer points and Storage silos for effective control of fugitive emission. We have installed adequate high efficiency Pulsejet Type Bag filters to control fugitive dust emissions in all the material handling systems. All the raw material conveyors are covered and silos have been installed for storage of raw meal, clinker and cement. Covered sheds are provided for raw material storage. Limestone from the mines will be transported by closed trucks. Water spray system and necessary dust suppression system are provided in Coal stockpiles and coal conveying systems. Concrete road are laid within plant premises to control fugitive emissions. Regular water spray is being done to control fugitive dust emissions. 2

3 v. Total water requirement from SriSailem Right Bank Canal (SRBC) shall not exceed 1180m3/day.No ground water shall be used as proposed.all the wastewater shall be recycled/reused in the process, dust suppression, green belt development.domestic effluent shall be treated in sewage treatment plant (STP).No wastewater shall be discharged outside the factory premises and Zero discharge shall be adopted. vi. vii. Prior permission for the drawl of 1180 m3/day from Sri Salem Right Canal (SRBC) shall be obtained from the concerned Department. All the cement dust collected from pollution control devices viz ESP,Bag house, Bag filter etc shall be recycled and reutilized in the process in cement manufacturing.stp sludge will be used as manure for the green belt development. Hazardous waste viz spent oil from gear box & automatic batteries etc shall be properly stored in a designated area and sold to authorised recyclers / reprocessors. Being Dry process is used for manufacturing Cement, hence there is no generation of process wastewater. Return water from cooling system is routed back to collection tank and recycled back into system. Domestic wastewater is treated in Sewage Treatment Plant (STP) and it is being used for greenbelt maintenance completely. Permission for the drawal of 3200 m3/day from SRBC / GNSS Flood flow Canal has been obtained from the Irrigation & C.A.D (PW - Reforms) Department,Government of Andhra Pradesh vide G.O.Ms.No.71 dated Being Dust collected from APC Equipments viz ESP, Bag house, Bag filter etc are being recycled and reutilized in the process in cement manufacturing. STP sludge will be used as manure for the green belt development. Hazardous wastes like Used oil from gear box collected in drums and stored in a designated area. viii An effort shall be made to use of high calorific Provision is made for utilization of high calorific hazardous waste 3

4 ix hazardous waste in the cement kiln & necessary provisions should be made accordingly.efforts shall also be made to use fly ash maximum in maxima Pozzolona Portland Cement, PPC. As proposed in EIA/EMP,green belt shall be developed in at least 133 acres (33%) out of total 400 acres land available to control fugitive emissions in consultation with the local DFO as per the CPCB guidelines. in the cement kiln. Fly ash is being utilized for manufacturing PCC Adequate greenbelt is being developed. 15,000 no s saplings in an area of 20.5 ha are planted in the financial year x xi Recommendation of the State Forest Department regarding impact of proposed plant on surrounding reserve forests viz. Ramathirtham R.F (9.2 Km),Ramathirtam Ext.R.F(7.1 Km), Rangepuram Block -A R.F (9.0 Km),Rangapara, Block -B R.F (8.5 Km) and Ramavaram R.F(9.0 Km) shall be obtained & implemented.further,conservation Plan for the conservation of wild fauna in consultation with State Forest Department shall be prepared and implemented. All the recommendations of the CREP guidelines for Cement Plants shall be strictly followed. B. GENERAL CONDITIONS: i The project authority must adhere to the stipulations made by A.P State Pollution Control Board (APPCB) & State Government. 95 Acres plantation has been completed with no s saplings and we proposed to plant no s in the year Being complied. Standards stipulated by Andhra Pradesh Pollution Control Board (APPCB) are being followed. 4

5 ii iii. iv. No further expansion or modification of the plant shall No further expansion or modification of the plant will be carried be carried out without prior approval of this Ministry. out without prior approval of the Ministry. The gaseous & particulate matter emissions from Necessary APC equipments like High Efficiency Bag filters and ESP various units shall conform to the standards prescribed have been installed to limit the Particulate Emission below 50 by the A.P Pollution Control Board. At no time the mg/nm3 as per the prescribed standards. Continuous Stack particulate emissions from the Cement Plant shall Monitoring for particulate emissions will be carried out as per the exceed 50 mg/nm3. Continuous monitoring for recommendations of the CREP guidelines & dates will be particulate emissions shall be carried out as per the submitted to the APPCB and CPCB regularly. recommendations of the CREP guidelines & data shall be submitted to the APPCB and CPCB regularly. Interlocking Interlocking facility is provided in the Pollution Control Equipment facility shall be provided in the pollution control so that in the event of the Pollution Control Equipment not equipment so that in the event of the pollution control working, the respective unit(s) will be shutdown automatically. equipment not working, the respective unit(s) shall be shutdown automatically. At least four ambient air quality monitoring stations Four nos. of High Volume Samplers for PM10, SOx, NOx have been shall be established in the downward direction as well installed. Ambient Air Quality including Ambient Noise levels are as where maximum ground level concentration of SPM, not exceeding the prescribed limits as stipulated under EPA & by SO2 & NOx are anticipated in consultation with APPCB. the State Authorities. Data on ambient air quality and stack One ambient air quality monitoring station shall be emissions are being submitted to the Ministry including the installed in downward direction. Ambient air quality Regional Office once in six months & to APPCB monthly. including ambient noise levels must not exceed the standards stipulated under EPA or by the State Authorities. Data on ambient air quality & stack Stacks emission and Ambient Air Quality Monitoring Data from emissions shall be regularly submitted to this Ministry October-14 to March-2015 is enclosed as Annexure-II. including its Regional Office at Bangalore once in six months & APPCB quarterly. 5

6 v. Industrial waste water shall be properly collected treated so as to conform to the standards prescribed under GSR 422(E) dated 19th May,1933 and 31st December,1993 or as amended from time to time.the treated waste water shall be utilized for plantation purpose. vi. The overall noise levels in and around the plant area shall be kept well within the standards (85 dba) by providing noise control measures including acoustic hoods. Silencer enclosures etc. On all sources of noise generation.the ambient noise levels shall conform to the standards prescribed under Environmental (Protection Act 1935 Rules 1980 viz 75 dba( day time ) vii. viii. and 70 dba night time. Proper Housekeeping & Adequate occupational health programmes must be taken up. Occupational Health Surveillance Programme shall be done on a regular basis & records maintained.the Programme must include lung function & sputum analysis test once in six months. Proper rainwater harvesting measures shall be adopted & mine pit water shall be used for the various activities at the site. Being The treated waste water from STP is utilized for gardening at cement plant and colony. 'Zero' discharge of effluent to outside the premises. The Noise levels are being monitored at various working locations and is always below 85 db(a). To control high noise levels acoustic enclosure are provided at various locations. Ambient noise levels are well within the prescribed standards under EPA. Proper Housekeeping & adequate occupational health programmes are being taken up. Three manual floor sweeping mechanise are being used for housekeeping. Occupational Health Surveillance Programme will be done on a regular basis & records will be maintained.the Programme will include lung function & sputum analysis test once in six months. Six rain water harvesting structures are developed in around the plant. All the storm water to be connected to structures. 6

7 ix. The company shall undertake eco - development measures including community welfare measures in the project. Necessary eco-development measures including community welfare measures are being undertaken regularly. x. The project proponent shall also comply with all the environmental protection measures and safeguards recommended in the EIA/EMP xi. A separate environmental management cell with full fledged laboratory facilities to carry out various management & monitoring functions shall be set up xii. under the control of Senior Executive. Adequate funds shall be earmarked towards the total cost & recurring cost/annum for implementing environment pollution control measures shall be judiciously used to implement the conditions stipulated by the Ministry of Environment & Forests as well as the State Government. An implementation schedule to implement all the conditions stipulated herein shall be submitted to this Ministry & its Regional Office at Bangalore.The funds so provided shall not be diverted for any other purposes. A separate Environment Management Cell is already established under the control of the Unit Head. The funds earmarked for environmental protection is not diverted for any other purposes. xiii. The Regional office of this Ministry at Bangalore /CPCB/APPCB shall monitor the stipulated conditions. A six monthly compliance report and the monitored data along with statiscal interpretation should be submitted A six monthly compliance report and the monitored data along with statistical report are being submitted to the Ministry at Bangalore / CPCB/APPCB regularly. Last six months half yearly EC compliance (April-14 to September-14) report submitted vide our letter 7

8 xiv xv. to them regularly. no. SJCL/ENV/14-15 dated The Project Authorities should inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work. The Project Proponent shall inform the public that the project has been accorded Environmental Clearance by the Ministry and copies of the Clearance Letter are available with the A.P Pollution Control Board & may also be seen at website of the Ministry of Environment & Forests at http/envfor.nic.in.this shall be advertised within seven days from the date of issue of the clearance letter at least in two local newspapers that are widely circulated in the region of which one shall be in vernacular language of locality concerned & a copy of the same should be forwarded to the Regional Office. 8

9 Annexure I Cooler Stack Coal Mill Stack Cement Mill Stack Kiln Stack 9

10 Stack emission monitoring data (SPM in mg/nm3) Annexure II Stack Name Oct-14 Nov-14 Dec-14 Jan-15 Feb-14 March-14 Kiln Stack Coal Mill Stack Cooler Stack Cement Mill Stack Lime Stone Crusher Stack Ambient Air Quality Monitoring Data PM10 ( Oct-14 Nov-14 Dec-14 Jan-15 Feb-14 March-14 Cement Plant Main Gate Near Colony Near RO Plant Near Packing Plant PM2.5 Oct-14 Nov-14 Dec-14 Jan-15 Feb-14 March-14 Cement Plant Main Gate Near Colony Near RO Plant Near Packing Plant

11 SO2 Oct-14 Nov-14 Dec-14 Jan-15 Feb-14 March-14 Cement Plant Main Gate Near Colony Near RO Plant Near Packing Plant NOx Oct-14 Nov-14 Dec-14 Jan-15 Feb-14 March-14 Cement Plant Main Gate Near Colony Near RO Plant Near Packing Plant

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct 2016 to March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/472/2010- IA II (I) dated 11 th September,

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Compliance Report of EC : Compliance Status

Compliance Report of EC : Compliance Status Report of EC : S. i. Permission/recommendation shall be obtained from State Forest Department regarding Banni area, which is declared as a protected forest land ii. iii iv v GPCB vide letter no. GPCB/Unit-I/FT-

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 S. N. Conditions Remarks 2 The Ministry of Environment and Forests has

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) JAYPEE REWA PLANT (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.) 2012 2013 SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Rewa Plant (A unit of Jaiprakash Associates

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

Ministry of Environment and Forests   Telefax : 011: M/s Posco India Private Limited F. No. J-11011/285/2007- IA II (I) Government of India Ministry of Environment and Forests Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : tchand2003@yahoo.co.uk Telefax : 011: 24363963

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.) Half yearly compliance report for the period July 2016 to Dec 2016 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry s

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010 SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010 A Specific Conditions Compliances status (i) (ii) (iii)

More information

Executive Summary in English

Executive Summary in English for Proposed Cement Plant with a capacity of Clinker 3 MTPA, Cement 7 MTPA (0.70 MTPA OPC, 3.50 MTPA PSC & 2.80 MTPA PPC) at Bhimnagar village, Sedam taluka, Gulbarga district, Karnataka in English Project

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd.

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Half yearly Environment Compliance Report in respect of stipulated conditions while issuing Environmental Clearance Rashtriya Ispat Nigam Limited -

More information

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline

More information

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M. MAJHIGAWAN LIMESTONE MINE Mine Lease area 362.68 ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

ACC Limited CHAIBASA CEMENT WORKS

ACC Limited CHAIBASA CEMENT WORKS ACC Limited CHAIBASA CEMENT WORKS ENVIRONMENTAL STATEMENT (FINANCIAL YEAR ENDING MARCH 31st, 2016) PREPARED BY ACC Limited CHAIBASA CEMENT WORKS P.O. JHINKAPNI -833 215 DIST. WEST SINGHBHUM, JHARKHAND

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh 1.0 Project Description 1.1 Background Jaiprakash Associates Limited (JAL) formerly known as Jaypee Cement Limited is the well diversified conglomerate of Jaypee Group. Its cement division has 3 modern,

More information

Orient Cement Ltd. 2

Orient Cement Ltd. 2 2 CONTENTS List of Tables 3 List of Figures 3 Form V 4 1. INTRODUCTION 11 2. LOCATION 11 3. RAW MATERIALS AND PRODUCTS 11 3.1 Raw materials 12 3.2 Products 12 3.3 Fuels and Power 13 4. PROCESS DESCRIPTION

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Telefax : 011: Dated 1 st November, 2011

Telefax : 011: Dated 1 st November, 2011 Drilling of Development Well (17 Nos.) and Exploratory Well (14 Nos.) at Tengakhat Kathaloni Dikom Area, District Dibrugarh, Assam by M/s Oil India Limited Environmental Clearance reg. ***********************

More information

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process Environment Audit Statement FORM V (See rule 14 of The Environment Protection Act, 1986) Environmental Audit Report for the financial year ending the 31st March 2017. PART A General Information Name of

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg. No. 10-42/2009-IA.III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003. I i I I I Dated: 22 nd September, 2009. To MIs.

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

The Ramco Cements Limited RR Nagar. P.M.RAMASUBRAMANIAN GM Process & QC Sr. Manager - Process S.V.Veeraraghavan Asst.

The Ramco Cements Limited RR Nagar. P.M.RAMASUBRAMANIAN GM Process & QC Sr. Manager - Process S.V.Veeraraghavan Asst. The Ramco Cements Limited RR Nagar P.M.RAMASUBRAMANIAN GM Process & QC V.SURESH Sr. Manager - Process S.V.Veeraraghavan Asst.Manager-Electrical Salient Futures of Ramasamy Raja Nagar Unit A flagship company

More information

INDUSTRIAL ACCESSORIES COMPANY

INDUSTRIAL ACCESSORIES COMPANY INDUSTRIAL ACCESSORIES COMPANY Industrial Accessories Company is an industrial design/build and original equipment manufacturer of baghouses, flue gas desulfurization, heavy metal mitigating sorbent injection

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

Six Monthly Compliance Report. Environmental Clearance Period: April' September' 2017

Six Monthly Compliance Report. Environmental Clearance Period: April' September' 2017 Six Monthly Compliance Report Of Environmental Clearance Period: April' 2017- September' 2017 Of 1320 (2x660) MW Jaypee Nigrie Super Thermal Power Plant & 4.0 MTPA Jaypee Nigrie Cement Grinding Unit At

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

AMBUJA CEMENTS LIMITED

AMBUJA CEMENTS LIMITED Page 1 of I II FORM V (See Rule 14) Environmental Statement for the Financial Year Ending on 31 st March 17 Name & Address of the Owner/Occupier of the Industry PART A Industry Category Primary ( STC Code)

More information

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona Prepared by: CB&I Environmental & Infrastructure, Inc. Pittsburgh,

More information

Anil Agarwal Environment Training Institute. Cleaner Fly Ash Brick Production

Anil Agarwal Environment Training Institute. Cleaner Fly Ash Brick Production Anil Agarwal Environment Training Institute Cleaner Fly Ash Brick Production Why Utilization Necessary A principle by-product of coal burning plants, is an industrial waste product containing large amount

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A

ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A Page 1 of 9 ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A 1. Name and address of the Owner / Occupier of the

More information

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Environmental Leadership Program Inspection Form Portable Asphalt Facility Environmental Leadership Program Inspection Form Portable Asphalt Facility Company Name -Name & Location of Facility: Date of Inspection: FID Number Name of Inspector: Names of Inspection Participants:

More information

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

Spillage and Material Handling Systems. By Hugros Inc.

Spillage and Material Handling Systems. By Hugros Inc. Spillage and Material Handling Systems By Hugros Inc. Our Profile is a technology solution provider for industries for all their requirements to keep a safer and green work environment. We offer engineering

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

2 NECESSITY OF THE PROPOSED PROJECT

2 NECESSITY OF THE PROPOSED PROJECT Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS

EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS This form is to be completed for each cement manufacturing plant. State/Federal regulations which may apply to

More information

SUBPART OOO Check-OFF FORM July 11, 2005

SUBPART OOO Check-OFF FORM July 11, 2005 520 LAFAYETTE ROAD NO., ST. PAUL, MN 55155-4194 NSPS FORM NSPS-OOO SUBPART OOO Check-OFF FORM July 11, 2005 I. Introduction An owner or operator may fill in this form in replacement of a highlighted copy

More information

SINGHAL ENTERPRISES PRIVATE LIMITED

SINGHAL ENTERPRISES PRIVATE LIMITED SINGHAL ENTERPRISES PRIVATE LIMITED (INTEGRATED MINI STEEL & POWER PLANTS) Taraimal Village, Gharghoda Mandal, Raigarh District, Chattisgarh State. 1.0 INTRODUCTION SINGHAL ENTERPRISES PRIVATE LIMITED

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

EFFECTIVENESS OF ENVIRONMENTAL POLLUTION CONTROL MEASURES IMPLEMENTED IN STONE CRUSHING SITES LOCATED AT KADUWELA MUNICIPALITY, SRI LANKA. Sri Lanka.

EFFECTIVENESS OF ENVIRONMENTAL POLLUTION CONTROL MEASURES IMPLEMENTED IN STONE CRUSHING SITES LOCATED AT KADUWELA MUNICIPALITY, SRI LANKA. Sri Lanka. EFFECTIVENESS OF ENVIRONMENTAL POLLUTION CONTROL MEASURES IMPLEMENTED IN STONE CRUSHING SITES LOCATED AT KADUWELA MUNICIPALITY, SRI LANKA A.P.Weerakkody a, T.K.Weerasinghe b*,n.s.gamage a, R.P.P. M. Dilrukshi

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS

ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS E.1. Emissions to Atmosphere...2 E.2. Emissions to Surface Waters...6 E.3. Emissions to Sewer...8 E.4. Emissions to Ground...8 E.5. Noise Emissions...8 E -

More information

EXECUTIVE SUMMARY TABLE - 1

EXECUTIVE SUMMARY TABLE - 1 EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Dwarkesh Energy Limited (DEL) proposes to set up a 1320 MW (2 x 660 MW) Super Critical Coal Based Thermal Power Plant at Villages Torniya, Chhippipura

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

PUBLIC SERVICE COMPANY OF OKLAHOMA (PSO)

PUBLIC SERVICE COMPANY OF OKLAHOMA (PSO) PUBLIC SERVICE COMPANY OF OKLAHOMA (PSO) NORTHEASTERN POWER STATION ANNUAL CCR FUGITIVE DUST CONTROL REPORT Prepared By: Public Service Co. of Oklahoma 7300 East Highway 88 Oologah, OK 74053 and American

More information

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA New Environment Norms Issues and Challenges By: Sanjeev Kumar Kassi Director (TETD), CEA INSTALLED CAPACITY (MW) AS ON 29-02-2016 Type Capacity Share (%) Hydro 42703.42 14.79% Thermal 201360.04 69.76%

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Statement of Basis. for Ash Grove Cement Company, Inc.

Statement of Basis. for Ash Grove Cement Company, Inc. Statement of Basis for Ash Grove Cement Company, Inc. Original Air Operating Permit was issued May 15, 2004 Significant Modification 1 issued 5/17/07 Administrative Amendment 1 Issued 7/13/07 Administrative

More information

Page# The Top soil generation is very less and it is being simultaneously utilized.

Page# The Top soil generation is very less and it is being simultaneously utilized. Page# 1 Name of Project : Belkapahar Mine of Wolkem Industries Ltd. Project Code: 226/336/-2005 Clearance Letter No. : J-11015/23/2004-IA.II (M) dated 31.03.2005 Period of Compliance Report : October,

More information

CLEANER PRODUCTION OPPURTUNITIES CEMENT MANUFACTURING SECTOR

CLEANER PRODUCTION OPPURTUNITIES CEMENT MANUFACTURING SECTOR CLEANER PRODUCTION OPPURTUNITIES IN CEMENT MANUFACTURING SECTOR 1 P a g e Indian Scenario of Cement Manu nufacturing Industries: The Indian cement industry is the 2nd largest market after China accounting

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran.

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran. No. SEIAA/ 2309 To STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road,

More information