1 REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES Addendum No.1 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G November 18, 2016 PREPARED FOR: 204 Grayson Road Virginia Beach, VA Phone: (757)

2 November 18, 2016 TO: Pennoni Associates, Inc. 349 Southport Circle Suite 100 Virginia Beach, Virginia Attn: Mr. Scott Chewning, PE, LEED AP RE: Addendum No.1 Report of Subsurface Exploration and Geotechnical Engineering Services 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G Dear Mr. Chewning: The following is Addendum No. 1 to our report of subsurface exploration and geotechnical engineering services (G E T Project No. VB16-342G) submitted January 6, 2016 for the above referenced project. The purpose of this addendum is to provide additional information regarding infiltration testing for the previously drilled project site at 5th Bay Ocean View in the City of Norfolk, Virginia. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. Respectfully Submitted, G E T Solutions, Inc. Edward Setnicky. Project Geologist Bruce R. Spiro, P.E. Principal Engineer VA Lic. # Copies: (1) Client 204 Grayson Road Virginia Beach, VA Phone: (757) Fax: (757) info@getsolutionsinc.com

3 Addendum No.1 November 18, 2016 Report of Subsurface Exploration and Geotechnical Engineering Services 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G Project and Site Description The project site is located on 5 th Bay Street in the Ocean View section of the City of Norfolk, Virginia and is only slightly developed with 4 residences throughout the specified area. Elevations for the site area range from 4 to 9 MSL based on provided topographic plans. The proposed construction at this site will consist of building several single-family structures. Project specifications are unknown at this time but the structures are expected to be of CMU and structural steel construction. The maximum wall and column loads are not expected to exceed klf and 50 kips, respectively. The finish grades are expected to coincide with current grades, thus cuts and fills are not expected to exceed 1 to 2 feet. New roadways, BMP facilities, and associated infrastructure will be constructed as well. If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. Purpose and Scope of Services The purpose of this study was to obtain information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: 1. Determine pertinent information regarding groundwater and subsurface permeability conditions. (Installation of temporary groundwater monitoring well and infiltration testing). The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. FIELD AND LABORATORY PROCEDURES Field Exploration In order to explore the general subsurface soil types and to aid in developing associated construction design parameters, the following field exploration program was performed at the site: A temporary groundwater monitoring well was installed at the INF-4 boring location for a groundwater level reading. Eleven (11) infiltration tests were performed at locations specified by the client. 1

4 Addendum No.1 November 18, 2016 Report of Subsurface Exploration and Geotechnical Engineering Services 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G One (1) monitoring well was installed to facilitate groundwater sampling. The monitoring well is constructed of 2-inch I.D., Schedule 40 PVC materials. Sections of inch slotted screen were placed in the boreholes with casing threaded to the top. The top of the screen was positioned above the water level. An appropriately graded sand/gravel pack was placed around the screen and extended one to two feet above the top of the screen. A 1- to 2- foot bentonite seal was then placed above the sand/gravel pack and hydrated with potable water. The remainder of the borehole annular space was pumped full of a neat cement grout. The well was then fitted with a PVC slip cap. Eleven (11) infiltration tests were performed at locations specified by the client. A handauger was performed to a depth of 1 foot above the measured groundwater level. Infiltration testing was then conducted within the vadose zone utilizing a Precision Permeameter. The infiltration locations were established by the client and staked in the field by a representative of G E T Solutions, Inc. The approximate locations are shown on the attached Boring Location Plan (Appendix I) Laboratory Testing Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled and transferred to our laboratory for classification and analysis. The soil classification was performed by a Project Geologist in accordance with ASTM D2488. A summary of the soil classification system is provided in Appendix II. Eleven (11) representative soil samples were selected and subjected to natural moisture and #200 sieve wash in order to corroborate the visual classification. These test results are presented on the Summary of Laboratory Results sheet (Appendix III). SITE AND SUBSURFACE CONDITIONS Site Geology The project site lies within a major physiographic province called the Atlantic Coastal Plain. Numerous transgressions and regressions of the Atlantic Ocean have deposited marine, lagoonal, and fluvial (stream lain) sediments. The regional geology is very complex, and generally consists of interbedded layers of varying mixtures of sands, silts and clays. Based on our review of existing geologic and soil boring data, the geologic stratigraphy encountered in our subsurface explorations generally consisted of marine deposited sands and clays. 2

5 Addendum No.1 November 18, 2016 Report of Subsurface Exploration and Geotechnical Engineering Services 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G Groundwater Information The groundwater level was recorded at the infiltration locations as observed through the relative wetness of the recovered soil samples during the testing operations. The initial groundwater table was generally determined to occur at an approximate depth of 2.5 to 3 feet below current grades at the infiltration locations at the time of our site reconnaissance. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater level may not be indicative of the static groundwater level. In addition, groundwater readings were taken at the temporary groundwater monitoring well installed as well as an older well location from prior work. At the time of this reporting the groundwater wells remained in place for future monitoring. The groundwater information associated with the wells is displayed below in Table I and Appendix IV. Table I Groundwater Monitoring Well Readings Boring No. Initial Groundwater Reading (ft)* 24-hour Groundwater Reading (ft)* INF **B * Depth below existing site grades **Existing well from prior project work. Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, side walks, etc.). In the project s area, seasonal groundwater fluctuations of 2 feet are common; however, greater fluctuations have been documented. We recommend that the contractor determine the actual groundwater table levels at the time of the construction to determine groundwater impact on the construction procedures, if necessary. EVALUATION AND RECOMMENDATIONS Our recommendations are based on the previously discussed project information, our interpretation of the soil test borings, our laboratory testing and our observations during our site reconnaissance. If the proposed construction should vary from what was described, we request the opportunity to review our recommendations and make any necessary changes. 3

6 Addendum No.1 November 18, 2016 Report of Subsurface Exploration and Geotechnical Engineering Services 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G Soil Permeability Eleven (11) infiltration tests were performed within specified locations and within vicinity of the temporary monitoring well location. A hand-auger was performed adjacent to the well or in specified locations to a depth of 1 foot above the estimated groundwater level or measured 24-hour groundwater level. The boreholes were prepared utilizing an auger to remove soil clippings from the base. Infiltration testing was then conducted within the vadose zone utilizing a Precision Permeameter and the following testing procedures. A support stand was assembled and placed adjacent to the borehole. This stand holds a calibrated reservoir (130 ml) and a cable used to raise and lower the water control unit (WCU). The WCU establishes a constant water head within the borehole during testing by use of a precision valve and float assembly. The WCU was attached to the flow reservoir with a 2-meter (6.6 foot) braided PVC hose and then lowered by cable into the borehole to the test depth elevation. As required by the Glover solution, the WCU was suspended above the bottom of the borehole at an elevation of approximately 5 times the borehole diameter. The shut-off valve was then opened allowing water to pass through the WCU to fill the borehole to the constant water level elevation. The absorption rate slowed as the soil voids became filled and an equilibrium developed as a wetting bulb developed around the borehole. Water was continuously added until the flow rate stabilized. The reservoir was then re-filled in order to begin testing. During testing, as the water drained into the borehole and surrounding soils, the water level within the calibrated reservoir was recorded as well as the elapsed time during each interval. The test was continued until relatively consistent flow rates were documented. During testing the quick release connections and shutoff valve were monitored to ensure that no leakage occurred. The flow rate (Q), height of the constant water level (H), and borehole diameter (D) were used to calculate Ks utilizing the Glover Solution. Based on the field testing and corroborated with laboratory testing results (published values compared to classification results), the hydraulic conductivity of the soils is listed on the following page in Table II and is presented on the Hydraulic Conductivity Worksheets (Appendix IV), included with this report. 4

7 Addendum No.1 November 18, 2016 Report of Subsurface Exploration and Geotechnical Engineering Services 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G Table II - Infiltration Test Results Boring ID Boring depth (ft)* Water depth (ft)* Ksat Value (cm/sec) Ksat Class USCS Classification INF x 10^-2 Very High SP INF x 10^-3 High SP INF x 10^-3 High SP INF x 10^-3 High SP INF x 10^-2 Very High SP INF x 10^-2 Very High SP INF x 10^-2 Very High SP INF x 10^-3 High SP INF x 10^-2 Very High SP INF x 10^-3 High SP INF x 10^-3 High SP *Depth below existing site grades The infiltration test results provided in this report are the result of infiltration testing at the locations and elevations indicated in Table II. Varying site conditions, including soil composition, soil density, stratum depth, and stratum thickness should be expected throughout the site. As such, the infiltration test results indicated in Table II should not be assumed for all locations and depths across the project site. 5

8 Addendum No.1 November 18, 2016 Report of Subsurface Exploration and Geotechnical Engineering Services 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client, and their consultants for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. This report has been prepared for the exclusive use of the client and their designated agents for the specific application to the 5 th Bay Ocean View project in Norfolk, Virginia. 6

9 APPENDICES I. BORING LOCATION PLAN II. III. IV. SOIL CLASSIFICATION SYSTEM LABORATORY TEST RESULTS HYDRAULIC CONDUCTIVITY WORKSHEETS

10 APPENDIX I BORING LOCATION PLAN

11 5 th Bay Street Boring Location Plan PROJECT: 5 th Bay Ocean View Addendum No.1 PROJECT LOCATION: Norfolk, Virginia PROJECT NO: VB15-342G CLIENT: Pennoni Associates DATE: 11/4/2016 PLOT BY: E.Setnicky

12 5 th Bay Street Boring Location Plan PROJECT: 5 th Bay Ocean View Addendum No.1 PROJECT LOCATION: Norfolk, Virginia PROJECT NO: VB15-342G CLIENT: Pennoni Associates DATE: 11/4/2016 PLOT BY: E.Setnicky

13 APPENDIX II SOIL CLASSIFICATION SYSTEM

14 Virginia Beach Williamsburg 204 Grayson Road 1592 Penniman Rd. Suite E Virginia Beach, VA Williamsburg, Virginia (757) (757) Elizabeth City 504 East Elizabeth St. Suite 2 Elizabeth City, NC (252) Relative Density Consistency Very Loose 4 blows/ft. or less Very Soft 2 blows/ft. or less Loose 5 to 10 blows/ft. Soft 3 to 4 blows/ft. Medium Dense 11 to 30 blows/ft. Medium Stiff 5 to 8 blows/ft. Dense 31 to 50 blows/ft. Stiff 9 to 15 blows/ft. Very Dense 51 blows/ft. or more Very Stiff 16 to 30 blows/ft. Hard 31 blows/ft. or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse 1 to 3 inch diameter Medium 1 / 2 to 1 inch diameter Fine 1 / 4 to 1 / 2 inch diameter Sand Coarse 2.00 mm to 1 / 4 inch (diameter of pencil lead) Silt GW - Well-graded Gravel Medium Fine Coarse Grained Soils GP - Poorly graded Gravel GW-GM - Well-graded Gravel w/silt 0.42 to 2.00 mm (diameter of broom straw) to 0.42 mm (diameter of human hair) to mm (cannot see particles) CL - Lean Clay CL-ML - Silty Clay ML - Silt GW-GC - Well-graded Gravel w/clay OL - Organic Clay/Silt GP-GM - Poorly graded Gravel w/silt Liquid Limit 50% or greater Less than 5 percent GW, GP, SW,SP GP-GC - Poorly graded Gravel w/clay CH - Fat Clay More than 12 percent GM, GC, SM, SC GM - Silty Gravel MH - Elastic Silt 5 to 12 percent GC - Clayey Gravel OH - Organic Clay/Silt GC-GM - Silty, Clayey Gravel SW - Well-graded Sand SP - Poorly graded Sand SW-SM - Well-graded Sand w/silt SW-SC - Well-graded Sand w/clay SP-SM - Poorly graded Sand w/silt SP-SC - Poorly graded Sand w/clay SM - Silty Sand SC - Clayey Sand SC-SM - Silty, Clayey Sand CLASSIFICATION SYSTEM FOR SOIL EXPLORATION NON COHESIVE SOILS (SILT, SAND, GRAVEL and Combinations) Standard Penetration Test (SPT), N-value Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D The soil samples were obtained with a standard 1.4 I.D., 2 O.D., 30 long split-spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. CLASSIFICATION SYMBOLS (ASTM D 2487 and D 2488) More than 50% retained on No. 200 sieve Fine-Grained Soils 50% or more passes the No. 200 sieve Highly Organic Soils PT - Peat COHESIVE SOILS (CLAY, SILT and Combinations) Relative Proportions Descriptive Term Percent Trace 0-5 Few 5-10 Little Some Mostly Strata Changes In the column Description on the boring log, the horizontal lines represent approximate strata changes. Groundwater Readings Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, side walks, etc.). Depending on percentage of fines (fraction smaller than No. 200 sieve size), coarse-grained soils are classified as follows: Borderline cases requiring dual symbols Plasticity Chart Page 1 of 1 GET Revision 9/25/2008

15 APPENDIX III LABORATORY TEST DATA

16 GET Solutions, Inc. SUMMARY OF LABORATORY RESULTS PAGE 1 OF 1 CLIENT Pennoni Associates PROJECT NUMBER VB15-342G PROJECT NAME 5th Bay Ocean View PROJECT LOCATION Norfolk, Virginia Borehole Depth Liquid Limit Plastic Limit Plasticity Index Maximum Size (mm) %<#200 Sieve Classification Water Content (%) Dry Density (pcf) Saturation (%) Void Ratio (1) GET - LABORATORY TEST SUMMARY - GET_STANDARD_DATATEMPLATE(1).GDT - 11/18/16 08:45 - G:\GINT\PROJECTS\VB15\VB15-342G 5TH BAY OCEAN VIEW.GPJ INF SP 2.4 INF SP 22.2 INF SP 8.0 INF SP 7.1 INF SP 5.9 INF SP 15.8 INF SP 12.9 INF SP 5.3 INF SP 19.4 INF SP 22.8 INF SP 18.3

17 APPENDIX IV HYDRAULIC CONDUCTIVITY WORKSHEETS

18 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-1 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/9/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 1:15:00 PM 3, :15:04 PM 0:00: , E-02 1, , :15:09 PM 0:00: , E-02 1, , :15:13 PM 0:00: , E-02 1, , :15:18 PM 0:00: , E-02 1, , :15:22 PM 0:00: , E-02 1, , :15:27 PM 0:00: , E-02 1, , :15:32 PM 0:00: , E-02 1, , :15:36 PM 0:00: , E-02 1, , :15:41 PM 0:00: , E-02 1, , :15:46 PM 0:00: , E-02 1, , :15:51 PM 0:00: , E-02 1, :15:56 PM 0:00: , E-02 1, :16:01 PM 0:00: , E-02 1, :16:06 PM 0:00: , E-02 1, :16:11 PM 0:00: , E-02 1, :16:16 PM 0:00: , E-02 1, Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E-02 1, USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 12:50:00 PM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

19 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-2 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/9/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 12:15:00 PM 3, :15:10 PM 0:00: , E , :15:19 PM 0:00: , E , :15:29 PM 0:00: , E , :15:39 PM 0:00: , E , :15:49 PM 0:00: , E , :15:59 PM 0:00: , E , :16:10 PM 0:00: , E , :16:20 PM 0:00: , E , :16:30 PM 0:00: , E , :16:40 PM 0:00: , E , :16:51 PM 0:00: , E :17:01 PM 0:00: , E :17:11 PM 0:00: , E :17:21 PM 0:00: , E :17:32 PM 0:00: , E :17:42 PM 0:00: , E Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E USDA Txt./USCS Class: SP Water Table Depth...: 3.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 11:45:00 AM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

20 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-3 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/9/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 11:00:00 AM 3, :00:04 AM 0:00: , E-02 1, , :00:10 AM 0:00: , E-02 1, , :00:16 AM 0:00: , E-02 1, , :00:49 AM 0:00: E , :01:27 AM 0:00: E , :02:02 AM 0:00: E , :02:38 AM 0:00: E , :03:13 AM 0:00: E , :03:51 AM 0:00: E , :04:27 AM 0:00: E , :05:03 AM 0:00: E :05:40 AM 0:00: E :06:17 AM 0:00: E :06:55 AM 0:00: E :07:32 AM 0:00: E :08:10 AM 0:00: E Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E USDA Txt./USCS Class: SP Water Table Depth...: 3.0 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 11:00:00 AM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

21 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-4 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/9/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 12:25:00 PM 3, :25:10 PM 0:00: , E , :25:22 PM 0:00: , E , :25:35 PM 0:00: E , :25:49 PM 0:00: E , :26:03 PM 0:00: E , :26:17 PM 0:00: E , :26:32 PM 0:00: E , :26:47 PM 0:00: E , :27:02 PM 0:00: E , :27:18 PM 0:00: E , :27:34 PM 0:00: E :27:51 PM 0:00: E :28:08 PM 0:00: E :28:22 PM 0:00: E :28:38 PM 0:00: E :28:54 PM 0:00: E Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 11:50:00 AM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

22 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-5 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/9/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 10:15:00 AM 3, :15:05 AM 0:00: , E-02 1, , :15:10 AM 0:00: , E-02 1, , :15:15 AM 0:00: , E-02 1, , :15:20 AM 0:00: , E-02 1, , :15:26 AM 0:00: , E-02 1, , :15:31 AM 0:00: , E-02 1, , :15:36 AM 0:00: , E-02 1, , :15:42 AM 0:00: , E-02 1, , :15:47 AM 0:00: , E-02 1, , :15:53 AM 0:00: , E-02 1, , :15:59 AM 0:00: , E-02 1, :16:05 AM 0:00: , E-02 1, :16:11 AM 0:00: , E-02 1, :16:16 AM 0:00: , E-02 1, :16:23 AM 0:00: , E :16:29 AM 0:00: , E-02 1, Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E-02 1, USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 3:30:00 PM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

23 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-6 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/9/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 3:15:00 PM 3, :15:05 PM 0:00: , E-02 1, , :15:10 PM 0:00: , E-02 1, , :15:16 PM 0:00: , E-02 1, , :15:25 PM 0:00: , E , :15:33 PM 0:00: , E , :15:42 PM 0:00: , E , :15:51 PM 0:00: , E , :16:00 PM 0:00: , E , :16:09 PM 0:00: , E , :16:18 PM 0:00: , E , :16:28 PM 0:00: , E :16:37 PM 0:00: , E :16:46 PM 0:00: , E :16:55 PM 0:00: , E :17:04 PM 0:00: , E :17:14 PM 0:00: , E Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 2:50:00 PM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

24 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-7 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/10/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 10:15:00 AM 3, :15:05 AM 0:00: , E-02 1, , :15:10 AM 0:00: , E-02 1, , :15:15 AM 0:00: , E-02 1, , :15:20 AM 0:00: , E-02 1, , :15:26 AM 0:00: , E-02 1, , :15:31 AM 0:00: , E-02 1, , :15:36 AM 0:00: , E-02 1, , :15:42 AM 0:00: , E-02 1, , :15:47 AM 0:00: , E-02 1, , :15:53 AM 0:00: , E-02 1, , :15:59 AM 0:00: , E-02 1, :16:05 AM 0:00: , E-02 1, :16:11 AM 0:00: , E-02 1, :16:16 AM 0:00: , E-02 1, :16:23 AM 0:00: , E :16:29 AM 0:00: , E-02 1, Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E-02 1, USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 9:40:00 AM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

25 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-8 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/10/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 11:25:00 AM 3, :25:09 AM 0:00: , E , :25:18 AM 0:00: , E , :25:28 AM 0:00: , E , :25:38 AM 0:00: , E , :25:48 AM 0:00: , E , :25:58 AM 0:00: , E , :26:07 AM 0:00: , E , :26:17 AM 0:00: , E , :26:27 AM 0:00: , E , :26:37 AM 0:00: , E , :26:47 AM 0:00: , E :26:57 AM 0:00: , E :27:07 AM 0:00: , E :27:17 AM 0:00: , E :27:27 AM 0:00: , E :27:37 AM 0:00: , E Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 11:05:00 AM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

26 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-9 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/10/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 10:50:00 AM 3, :50:05 AM 0:00: , E-02 1, , :50:10 AM 0:00: , E-02 1, , :50:15 AM 0:00: , E-02 1, , :50:20 AM 0:00: , E-02 1, , :50:25 AM 0:00: , E-02 1, , :50:31 AM 0:00: , E-02 1, , :50:36 AM 0:00: , E-02 1, , :50:41 AM 0:00: , E-02 1, , :50:47 AM 0:00: , E-02 1, , :50:52 AM 0:00: , E-02 1, , :50:58 AM 0:00: , E-02 1, :51:04 AM 0:00: , E-02 1, :51:10 AM 0:00: , E-02 1, :51:15 AM 0:00: , E-02 1, :51:22 AM 0:00: , E :51:28 AM 0:00: , E-02 1, Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E-02 1, USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 10:25:00 AM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

27 Constant-Head Borehole Permeameter Test Analytical Method: Glover Solution Project Name...: 5th Bay Ocean View Project No...: VB15-342G Terminology and Solution (R. E. Glover Solution) * Boring No...: INF-10 Proj. Location : Norfolk, Virginia Ksat B : (Coefficient of Base Tmp. T B (ºC) 14 Investigators...: Edward Setnicky Date : 11/9/16 Q: Rate of flow of water from the borehole Boring Depth...: 5.2 (m, cm, ft, in) WCU Base Ht. h: 15.0 cm H: Constant height of water in the borehole Boring Diameter..: 8.3 cm WCU Susp. Ht. S: 6.4 cm r: Radius of the cylindrical borehole Boring Radius r...: 4.15 cm Const. Wtr. Ht. H: 21.4 cm V: Dyn. Visc. of Tmp. T C/Dyn. Visc. of T B Soil/Water Tmp. T: 26 C H/r **... : 5.2 Ksat = Q[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Basic Glover Solu.] Dyn. T C.: kg/m s Dyn. T B ºC.: kg/m s Ksat B = QV[sinh -1 (H/r) - (r 2 /H 2 +1).5 + r/h]/(2πh 2 ) [Tmp. Correction] VOLUME Volume Out TIME Interval Elapsed Time Flow Rate Q Ksat B Equivalent Values (ml) (ml) (h:mm:ss A/P) (hr:min:sec) (min) (ml/min) (cm/min) (cm/sec) (cm/day) (in/hr) (ft/day) 3,200 1:57:00 PM 3, :57:05 PM 0:00: , E-02 1, , :57:10 PM 0:00: , E-02 1, , :57:15 PM 0:00: , E-02 1, , :57:23 PM 0:00: , E , :57:30 PM 0:00: , E , :57:38 PM 0:00: , E , :57:45 PM 0:00: , E , :57:53 PM 0:00: , E , :58:00 PM 0:00: , E , :58:08 PM 0:00: , E , :58:16 PM 0:00: , E :58:25 PM 0:00: , E :58:33 PM 0:00: , E :58:41 PM 0:00: , E :58:49 PM 0:00: , E :58:57 PM 0:00: , E Natural Moisture...: - Consistency...: loose Field-Estimated Ksat: E USDA Txt./USCS Class: SP Water Table Depth...: 2.5 Notes: Estimated field Ksat is determined by averaging and/or rounding of test results for the final three or four stabilized values and analyzing the graph. Struct./% Pass. #200.: - Init. Saturation Time.: 1:36:00 PM * Glover, R. E. l953. Flow from a test-hole located above groundwater level, pp. 69-7l. in: Theory and Problems of Water Percolation. (C. N. Zanger. ed.). USBR. The condition for this solution exists when the distance from the bottom of the borehole to the water table or an impervious layer is at least twice the depth of the water in the well. ** H/r>5 to >10 Johnson Permeameter, LLC Revised 11/29/13

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES. Proposed Soundside Boardwalk Expansion Duck, North Carolina

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES. Proposed Soundside Boardwalk Expansion Duck, North Carolina REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Proposed Soundside Boardwalk Expansion Duck, North Carolina G E T PROJECT NO: EC10-260G November 17, 2010 Prepared for VHB, Inc.

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES E. Ocean View Ave. Parcel Feasibility Study Norfolk, Virginia G E T Project No: VB17-1G April 2, 2017 PREPARED FOR: 204 Grayson Road

More information

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon.

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon. December 5, 2012 Mrs. Jenny Herman Maryland Department of the Environment Oil Control Program 1800 Washington Boulevard Baltimore, Maryland 212301719 Re: Additional Monitoring Well Installation Report

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,

More information

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC DRAINAGE STUDY PHASE ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE C IMPROVEMENTS ` FOR: LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC APPENDIX A J-.000 Prepared by: Savannah, GA Charleston, SC Myrtle

More information

All tests from the new Cells 3 and 4 passed the licence requirements. Please provide approval to begin using the new Cell 3 and Cell 4.

All tests from the new Cells 3 and 4 passed the licence requirements. Please provide approval to begin using the new Cell 3 and Cell 4. Dey, Asit (SD) From: Sent: To: Cc: Subject: Attachments: Brett McCormac August-21-18 11:24 AM Dey, Asit (SD) 'RM of Pipestone'; Genaille, Dee (MR) RM of Pipestone - Reston Lagoon 18-08-17

More information

Florida s Leading Engineering Source

Florida s Leading Engineering Source Since 1988 Florida s Leading Engineering Source Environmental Geotechnical Construction Materials Testing Threshold and Special Inspections Plan Review & Code Compliance Mr. Ron Ridenour Hanson Professional

More information

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by SOIL SURVEY REPORT (Revised March 6, 2013) New Hospital Connector Road GDOT Project No. CSSTP-0006-00(276), PI No. 0006276 Duluth, Gwinnett County, Georgia WILLMER ENGINEERING INC. Willmer Project No.

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

Thi_ Qar University College of Engineering/Civil Engineering Department. Highway Lectures. Fourth Class. Part #2: - Subgrade Soil

Thi_ Qar University College of Engineering/Civil Engineering Department. Highway Lectures. Fourth Class. Part #2: - Subgrade Soil Thi_ Qar University College of Engineering/Civil Engineering Department Highway Lectures Fourth Class Part #2: - Subgrade Soil Lecture #2 Soil Classification DAS, Chapter 4, Engineering Classification

More information

SECTION 500 STRUCTURES

SECTION 500 STRUCTURES SECTION 500 STRUCTURES 500.1 GENERAL This section defines the various construction items that are associated with the completion of a concrete, steel, timber, or masonry unit structures, or a combination

More information

SOIL MECHANICS Assignment #4: Soil Permeability.

SOIL MECHANICS Assignment #4: Soil Permeability. Geotechnical Engineering Research Laboratory One University Avenue Lowell, Massachusetts 01854 Edward L. Hajduk, D.Eng, PE Lecturer PA105D Tel: (978) 94-2621 Fax: (978) 94-052 e-mail: Edward_Hajduk@uml.edu

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

PROJECT NO A. ISSUED: February 29, 2016

PROJECT NO A. ISSUED: February 29, 2016 INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Proposed Retaining Wall 44ARW-1 Interstate 235 between N.W. 50th Street and Interstate 44 Oklahoma City, Oklahoma May 8, 2014 Terracon Project No. 03145071 Prepared for:

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study Leakes Mill Park Phase 2 Goochland County, Virginia F&R Project No. 60S-0585 Prepared For: Dewberry 4085 Lake Brook Drive, Suite 200 Richmond, Virginia 23060 Prepared By: Froehling

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 203 to 210 Drainage Structure Pipe Jacking Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC

More information

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No. Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A July 2009

GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A July 2009 GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A. 73523 July 2009 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB West Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 20 Terracon Project No. 735021A Prepared for: TranSystems North Charleston, South

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Elizabeth City, North Carolina G E T Project No: EC14-188G May 30, 2014 PREPARED FOR: 106 Capital Trace, Unit E Elizabeth City,

More information

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Public Safety Complex Wetland Date of Addendum:

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

November 13, Eckas Water 1514 Ambrosia Court Fort Collins, Colorado Attn: Mr. Wayne Eckas

November 13, Eckas Water 1514 Ambrosia Court Fort Collins, Colorado Attn: Mr. Wayne Eckas November 13, 2018 Eckas Water 1514 Ambrosia Court Fort Collins, Colorado 80526 Attn: Mr. Wayne Eckas (wayne@eckaswater.com) Re: Geotechnical Subsurface Exploration Walker Recharge Pipeline Project Morgan

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo

More information

GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD

GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD to KYLE CANYON ROAD Package 2 E.A. 73627 January 212 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION

More information

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama July 24, 2014 Terracon Project No. E1145095 Prepared for: The City Of Hoover Hoover, Alabama Prepared by: Terracon

More information

Soil Survey Summary Report

Soil Survey Summary Report Soil Survey Summary Report Benton Boulevard Extension Pooler, Chatham County, Georgia February, 206 Terracon Project No. ES5553 Prepared for: McGee Partners, Inc. Atlanta, Georgia Prepared by: Terracon

More information

AECOM tel 558 North Main Street fax Oshkosh, Wisconsin 54901

AECOM tel 558 North Main Street fax Oshkosh, Wisconsin 54901 920.2.0270 tel 8 North Main Street 920.2.021 fax Oshkosh, Wisconsin 4901 May 8, 2012 Mr. James Rabe P.E., CPESC Civil Engineer II City of Oshkosh 21 Church Avenue Oshkosh, WI 490 Subject: Subsurface Exploration

More information

Appendix C Geotechnical Soil Testing Data

Appendix C Geotechnical Soil Testing Data Appendix C Geotechnical Soil Testing Data rjmmmrorr Table C-1 Laboratory Soil Testing Results Groundwater Assessment Report UMore Mining Area Dakota County, Minnesota Sample Particle Size Particle Size

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Fax GEOTEK EGIEERIG & TESTIG SERVICES, IC. 909 East 0 th Street orth Sioux Falls, South Dakota 0 0-- Fax 0--0 South Dakota State University Facilities and Services Admistration 0, PO Box 0 Brookgs, South Dakota

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline

More information

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE 4 3 2 1 D D C C B B A A 4 3 2 1 Thrust Restraint Design Equations and Soil Parameters These equations and soil

More information

Monitoring Well Installation Report

Monitoring Well Installation Report Monitoring Well Installation Report Xcel Energy February 1, 2016, Morgan County, Colorado Xcel Energy Monitoring Well Installation Report Table of Contents 1.0 Introduction... 1 2.0 Background Information...

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study 12930 Warwick Blvd. Prepared For: 712 Gum Rock Court 23606 Prepared By: Froehling & Robertson, Inc. Greenbrier Commerce Park 833 Professional Place, W. Chesapeake, Virginia

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

LABORATORY COMPACTION CHARACTERISTICS AND MOISTURE-DENSITY RELATIONSHIP OF SUBGRADE, EMBANKMENT SOILS, AND BACKFILL MATERIAL

LABORATORY COMPACTION CHARACTERISTICS AND MOISTURE-DENSITY RELATIONSHIP OF SUBGRADE, EMBANKMENT SOILS, AND BACKFILL MATERIAL Test Procedure for LABORATORY COMPACTION CHARACTERISTICS AND MOISTURE-DENSITY RELATIONSHIP OF SUBGRADE, EMBANKMENT SOILS, AND BACKFILL MATERIAL Texas Department of Transportation TxDOT Designation: Tex-114-E

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Proposed Metal Building Recycling Drop-Off Facility 590 Interstate Highway 45 North Huntsville, Texas December 28, 2010 Terracon Project No. 97105093 Prepared for: Jones & Carter, Inc. The Woodlands, Texas

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Proposed Prairie Lane HDD Cores D7-A and D7-B Wayne County, Ohio February 14, 2015 Terracon Project No. N4149328 Prepared for: Project Consulting Services, Inc. Prepared by: Terracon

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

3. FIELD INVESTIGATION PROGRAM

3. FIELD INVESTIGATION PROGRAM Department of Public Works U.S. Army Corps of Engineers Phase 1B Geotechnical Investigation Geotechnical Data Report 3.3 FIELD METHODS AND PROCEDURES 3. FIELD INVESTIGATION PROGRAM The borings were advanced

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Report of Geotechnical Exploration Addie s Corner Entry Bridge and Lake Areas 8799 Immokalee Road Naples, Collier County, Florida October 26, 2016

More information

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Gates Road Valve Site Sunoco Pennsylvania Pipeline

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio 1915 North 12 th Street Toledo, OH 43604-5305 T 419-324-2222 F 419-241-1808 www.ttlassoc.com August 3, 2018 TTL Project No. 1706701 Mr. Vito Melilli Coastal Engineer KS Associates, Inc. 260 Burns Road,

More information

PROJECT INFORMATION...

PROJECT INFORMATION... TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 PROJECT AUTHORIZATION... 1 PROJECT DESCRIPTION... 1 PURPOSE AND SCOPE OF SERVICES... 1 SITE AND SUBSURFACE CONDITIONS... 3 SITE LOCATION AND DESCRIPTION...

More information

GEOTECHNICAL REPORT B-1942

GEOTECHNICAL REPORT B-1942 GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT

More information

You also requested information regarding a sieve analysis at each boring locations. The test results are attached.

You also requested information regarding a sieve analysis at each boring locations. The test results are attached. FORENSICS CONSULTANTS ENVIRONMENTAL GEOTECHNICAL MATERIALS October 4, 2016 Washington County Public Works 11660 Myeron Road Stillwater, MN 55082 Attn: Mr. Marc Briese Re: Additional Borings CSAH 22 (70

More information

SECTION 6. ROAD CONSTRUCTION STANDARDS

SECTION 6. ROAD CONSTRUCTION STANDARDS SECTION 6. ROAD CONSTRUCTION STANDARDS Construction of new roads or reconstruction of existing roads proposed for dedication to the County shall conform to the standards set forth in this section. Roads

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Parking Lot Evaluation & Physical Plant Additions Rogers State University Claremore, Oklahoma May 20, 2015 Terracon Project No. 04155080 Prepared for: Rogers State University

More information

Draft Geotechnical Engineering Services

Draft Geotechnical Engineering Services May 20, 2011 Draft Geotechnical Engineering Services Proposed Weir Wall at Stockbridge Stormwater Management Facility Prince William County, Virginia 19955 Highland Vista Drive, Suite 170 Ashburn, VA 20147

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

September 3, 2013 Via

September 3, 2013 Via September 3, 2013 Via email: sadler@adeq.state.ar.us Mr. Bill Sadler, PG Geology Supervisor Solid Waste Management Division Arkansas Department of Environmental Quality 5301 Northshore Drive North Little

More information

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G Geotechnical Investigation Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No. 40-3264G Laboratory CBR Tests Laboratory CBR tests were performed on samples

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

REPORT OF GEOTECHNICAL EXPLORATION PUBLIC WORKS SITE SAVANNAH, GEORGIA FOR CHATHAM CO. DEPT. OF PUBLIC WORKS & PARK SERVICES

REPORT OF GEOTECHNICAL EXPLORATION PUBLIC WORKS SITE SAVANNAH, GEORGIA FOR CHATHAM CO. DEPT. OF PUBLIC WORKS & PARK SERVICES REPORT OF GEOTECHNICAL EXPLORATION PUBLIC WORKS SITE SAVANNAH, GEORGIA FOR CHATHAM CO. DEPT. OF PUBLIC WORKS & PARK SERVICES MAY 5, 2009 ECS PROJECT NO. 23:2081 i. - -- ~", " -. _., I ~~ ECS SOUTHEAST,

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Skiatook City Substation Skiatook, Oklahoma October 05, 2017 Terracon Project No. 04175204 Prepared for: GRDA Tulsa, Oklahoma Prepared by: Terracon Consultants, Inc. Tulsa,

More information

The following sections provide the approved standard infiltration testing specifications.

The following sections provide the approved standard infiltration testing specifications. APPENDIX F.2 INFILTRATION TESTING To properly size and locate stormwater management facilities, it is necessary to characterize the soil infiltration conditions at the location of the proposed facility.

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Rodgers Chapel Expansion 502 James B. Hunt Drive Mount Olive, North Carolina August 26, 2016 Project No. 72165063 Prepared for: University of Mount Olive Mount Olive, North

More information

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geo-Test Geotechnical Engineering Services Report No. 1-718 for Reach 26.3 Tank Site Geo-Test Job No. 1-718, Addendum No. 1

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

GEOTECHNICAL SUBSURFACE DATA REPORT

GEOTECHNICAL SUBSURFACE DATA REPORT GEOTECHNICAL SUBSURFACE DATA REPORT SC-41 REPLACEMENT BRIDGE OVER MAIDEN DOWN SWAMP MARION COUNTY, SOUTH CAROLINA PREPARED FOR Mr. Joshua Meetze, E.I.T. RPG-2 GDS South Carolina Department of Transportation

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

May 3, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A Washington, D.C

May 3, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A Washington, D.C 1250 West Century Avenue Mailing Address: P.O. Box 5601 Bismarck, ND 58506-5601 (701) 530-1600 May 3, 2018 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A

More information

Excavation for Natural Gas Mains and Services

Excavation for Natural Gas Mains and Services Excavation for Natural Gas Mains and Services Trench Padding & Backfilling Requirements for Mains General Install mains with a minimum of 36 of cover. Exceptions may be made within state and federal codes

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

Subsurface Investigation and Geotechnical Analysis Target Outparcel Midlothian Turnpike Richmond, Virginia. Client: Interface Properties

Subsurface Investigation and Geotechnical Analysis Target Outparcel Midlothian Turnpike Richmond, Virginia. Client: Interface Properties Subsurface Investigation and Geotechnical Analysis Target Outparcel 11309 Midlothian Turnpike Richmond, Virginia Client: Interface Properties December 5, 2017 December 5, 2017 The Heritage Group, LLC Attn:

More information

November 2007 DRAFT Appendix E: Soil Testing Criteria

November 2007 DRAFT Appendix E: Soil Testing Criteria November 2007 DRAFT Appendix E: Soil Testing Criteria Stormwater management design is dependent upon the changes that occur between pre and postdevelopment conditions. The impacts are assessed based on

More information

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062. GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016

More information