1 PRE FEASIBILITY REPORT FOR Mining of Riverbed Sand From Darakeswar River Area : 8.09 Ha ( 20 Acres ) AT Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus,, P.O & P.S. Indus Dist. Bankura, State: - West Bengal Prepared By: Chandi Charan Porel ( Lessee ) Vill: Ala, P.O. & P.S. Dhaniakhali, Dt. Hooghly, Pin :

2 1. EXECUTIVE SUMMARY The project is to extract Riverbed Sand from Darakeswar River at Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus,, P.O & P.S. Indus, Dist. Bankura,, State: - West Bengal Spread over an area of 20 Acres ( 8.09 ha.), The project is proposed by Chandi Charan Porel S/O Late Tarapada Porel. Brief Outline: Mining Lease Area ( Ha ) 20 Acres ( 8.09 ha.) Location of Mines (Centre) with Co-ordinates): Latitude : N to E Longitude: E to E Location Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P), JL: 112, Village: Kunjapur, Block : Indus,, P.O & P.S. Indus, Dist. Bankura,, GIS Co-ordinates: Central Axis of the Mines Latitude : N Longitude: E River / Canel / Khal Darakeswar River Topography Topo Sheet No : 73 M / 12, Plain Minerals of Mines Riverbed Sand Total Mineable Reserves Cum / Cft Life of the Mines Life long as yearly deposition is continued Proposed production of Mines Cum / Cft / Yearly Drilling / Blasting No, Opencast only manual mining Water Demand 1.5 KLD Source of Water River water / village tube well Ultimate depth of Mining 1 mtrs. Average Man Power Per Day 25 ( Direct ) Solid Waste including residual riverbed materials NIL Nearest Railway Station Goghat : 15 Km (S), Arambag : 18 Km (SE) Nearest State Highway / National Highway SH 2 : 7.5 Km.(S), SH Km (E), NH 16 : 35 Km (SW) Nearest Airport Kolkata : 88 Km (E) Protected / Reserved Forest Jangal Mahal Elephant Corridor : 28 Km (W), Dhamkura Scrab Forest : 37 Km (SW), Beliator Forest Rang : 42 Km (NW) * approximate aerial distances

3 LOCATION ON TOPO SHEET LOCATION

4 2. INTRODUCTION: 2.1 Identification of Project and Project Proponent: Sri Chandi Charan Porel is the Lessee of the proposed Mines. The details are given below: S. No. Item Details 1. Name of the Applicant Chandi Charan Porel 2. Name & Address of Applicant Chandi Charan Porel ( Lessee ) Vill: Ala, P.O. & P.S. Dhaniakhali, 3. Number of Lease held by the lessee No other 4. Name of Mines Dt. Hooghly, Pin : Mineral Riverbed Sand 6. Area 20 Acres ( 8.09 ha.) Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P), JL: 112, Village: Kunjapur, Block : Indus,, P.O & P.S. Indus, Dist. Bankura,, 7. Period of Lease ( Yrs ) 5 Years ( up to 01/ ) 8. Status of Mines Running Mines but presently production is stopped as per NGT Order. 2.2 Brief description of the nature of the project The proposed project is for riverbed mine from above mentioned plots sustainably and scientifically. Mining will be opencast and manual as per mining rules keeping all the nearby plots unaffected. Following geo-scientific methods are proposed to carry out the activity: Mining will be confined to extraction of sand in its existing form, from their allotted plots only. Mining of sand from their allotted plot (s) will be restricted to a maximum depth of 1 m from the surface. No drilling and blasting will be done. Approximately Cum ( Cft) riverbed sand will be extracted yearly. No mining activity will be undertaken during the monsoon season. In order to avoid environmental pollution or any accidental hazards, the mining activity will be restricted to daytime only. The operation will remain manual, using tools like shovel, spade, sieve etc.

5 2.3 Scope of the project and its Importance: Sand is used in almost any type of construction activity. Thus in correct times, where the focus of the governments is on improvement of basic infrastructure, both in rural and urban areas, there is a constant need for ensuing regular supply of these inputs. The production of sand will benefit to the state in the form of royalty. Apart from this project operation will provide employment directly and indirectly to the people residing in vicinity, thus improving the Socio-economic status of the area. 2.4 Employment Generation Due to the proposed sand mining there will be direct demand of 25 workers for the mining. There will be also indirect employment in transportation and handling. 3.0 PROJECT DESCRIPTION: 3.1 Type of project including interlinked and interdependent projects, if any This is an independent sand mining project. The proposed project is for the extraction of sand from the allotted plot(s) manually which will be used for any type of construction project / jobs. Other types of industries like steel, cement, red bricks etc are also linked with sand. Because in any types of construction jobs steel, cement, red bricks are equally required with sand. Taking into consideration, location of the project, this project does not pose any major adverse impact from the environmental point of view. 3.2 Location (map showing general location and project site) with coordinates. The mining lease area over 8.09 Ha (20 Acres) is located in survey of India Topo Sheet No. 73 M / 12, with co-ordinates Latitude : N to E, Longitude: E to E at Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus, P.O & P.S. Indus, Dist. Bankura,, West Bengal. The proposed project activity will be carried out in the allotted plot(s). 3.3 Size or magnitude of operation The proposed mine has lease agreement over an area of 8.09 Ha (20 Acres ). As per EIA notification 2006 it is a Category B2 mines. Approximately Cum ( Cft) riverbed sand will be extracted yearly Total Reserve of the area is estimated as cum ~ Cft of sand. The life of mine is unlimited since the sand will be 100 % of the reserve yearly.

6 3.4 Project description with process details The proposed project is to sand mining from plot(s) under lease, sustainably and scientifically. Mining will be opencast and manual along the plot(s) keeping the nearby plot(s) unaffected. Following geo-scientific methods are proposed to carry out the activity: i. Mining will be confined to extraction of sand in its existing form, from their allotted plots only without involving any blasting. ii. Mining of sand from their allotted plot (s) will be restricted to a maximum depth of 1 m from the existing riverbed level. iii. Mining of sand from their allotted plot (s) will be restricted to 2 m above the ground water table in the area. iv. There will be no intersection in the mines. Thus no alteration of natural drainage pattern of the area is envisaged. v. During transportation the trucks will be covered and vehicles having PUC certificate. vi. Mining will not be done during the monsoon season. Regular health check-up will be done of the workers and safeguards like sprinkling of medicines/vaccination etc. against disease vectors will be undertaken. vii. Workers will be provided with drinking water and sanitation. viii. There are no civil structures within 15 m of the proposed excavation area. ix. No drilling and blasting is proposed. x. In order to avoid environmental pollution or any accidental hazards, the mining activity will be restricted to daytime only. xi. The operation will remain manual, using tools like shovel, spade, sieve etc. xii. Approximately Cum ( Cft) riverbed sand will be extracted yearly Method of developing as well as removal of allsorts of barriers from waterway of the River, before and After monsoon: The sand deposited as river bed material will be collected in its existing form with the help of Backhoe -Dumper Combination and as well as collection using boat and nets. Manual labour would be used to remove debris, boulders, rocks and any other barriers from waterway.

7 3.4.2 Method of Mining: i) Mining will be confined to extraction of sand in its existing form, from their allotted plots only without involving any blasting. ii) Mining of sand from their allotted plot (s) will be restricted to a maximum depth of 1 m from the existing riverbed level. iii) Mining of sand from their allotted plot (s) will be restricted to 2 m above the ground water table in the area. iv) There will be no intersection in the mines. Thus no alteration of natural drainage pattern of the area is envisaged. v) No drilling and blasting is proposed vi) In order to avoid environmental pollution or any accidental hazards, the mining activity will be restricted to daytime only. vii) The operation will remain manual, using tools like shovel, spade, sieve etc. 3.5 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product(s), Mode of Transport of Raw Material and Finished Product: Since it is a mining project so raw materials will not be required for this project. The operation involves extraction of riverbed sand in its existing form. Here, the mined sand will be used as raw material for construction jobs. During transportation the trucks will be covered and vehicles having PUC certificate. Approximately Cum ( Cft) riverbed sand will be extracted yearly. 3.5A Plan of Restoration of Embankment / bank line damaged due to transportation of extracted riverbed materials: The approach road has been developed with proper slop using bolder. Pilling with wooden bally has also been made around the riverbed entry points Use of Minerals: The proposed project is for the extraction of sand from the allotted plot(s) manually which will be used for any type of construction project / jobs. Other types of industries like steel, cement, red bricks etc are also linked with sand. Because in any types of construction jobs steel, cement, red bricks are equally required with sand. Taking into consideration, location of the project, this project does not pose any major adverse impact from the environmental point of view.

8 3.6.2 Mineral Beneficiation: There will be no mineral beneficiation only to the extent of manual screening only if required. 3.7 Availability of water its source, energy/ power requirement and source Water Requirement: The water will be required only for drinking purposes. It is projected that not more than 25 laborers will be required for the proposed project. The total water requirement will be 1.5 KLD. Which will be met by River water / village tube well Power Requirement: All the activities will be carried out manually. The operation will be done in day time; hence there is no power requirement for the project at site Quantity of wastes including residual extracted materials left to be generated (liquid and solid) and scheme for their management/ disposal: Solid Waste Generation & its Disposal : The entire mineral extracted is saleable / useable. There will be no residual extracted materials left to be generated. The laborers from nearby villages will be hired to carry out work in day time only, hence there will be negligible waste generation, if any Liquide Effluent No liquid effluents will be generated at site except domestic about 1.2 Kl. 4. SITE ANALYSIS 4.1 Suitability for extraction taking into consideration general profile river stream, annual deposition factor and replenishment: The sand will be extracted from riverbed except monsoon season. The sand extracted from riverbed before monsoon are normally 100% during monsoon. 4.2 Connectivity: Nearest Railway Station Nearest railway station is Goghat about 15 Km (S) and Arambag, about 18 Km (SE) from the site.

9 4.2.2 Nearest Airport Nearest Airport is Kolkata about 88 km from the site Nearest Highway SH 2 : 7.5 Km.(S), SH Km (E), NH 16 : 35 Km (SW) from site. 4.3 Land form, land use and land ownership Land Form: The land is Darakeswar Riverbed Balughat. Land Use: Balughat Land Ownership: Govt. of West Bengal 4.4 Topography The proposed sand mine lease area is largely flat and plain. The maximum and minimum elevation of the area is 170 to 180 m amsl. The land profile nearby area comprises of thick covering of alluvial soil of clay texture which varies from sandy loam to loam soil which is medium alkaline, water soluble salt, calcarius up to few depth, moderately well drained moderate water holding capacity slope range 4-10%. 4.5 Existing land use pattern There is no forest land in the proposed mine lease area. The surface runoff water from some dry small nala periphery of the area finally connected to the River. The existing land use pattern of the nearby area is mostly agriculture. Presently land use of the lease area is Balughat. 4.6 Soil The soil type is sandy soil. The soil type of area is clayey loam. ph ranges from neutral to slight alkaline with all general characteristic of Indo Gangetic plain viz alluvial in nature, low conductivity and less carbon content. 4.7 Rainfall & Climatic conditions (District Bankura ) The oppressive dry summer is the characteristic of the district. The temperature may rise to 47 0 C in May and June. Temperature Range: The rainy season, also hot and highly humid, starts from the 15 th June and last up to September. Most of the rainfall occurs in July & August. Average Rainfall: 1341 mm. Winter starts for November and is very pleasant. It lasts up to February. Temperature Range: C. Maximum wind speeds is ~ 14 Km/hr. Predominant wind direction is SW & NE.

10 5. PLANNING : 5.1 Mining Plan The proposed project is to sand mine from plot(s) sustainably and scientifically. The riverbed sand will be excavated from the plot(s) as per mining rules and will be transported through covered trucks only. Mining will be done by Opencast Manual method keeping nearby plot(s) unaffected. Maximum depth of mining will be 1 m as per the prevailing rules. 5.2 Compliance of stipulation to safeguard hydro-morphological condition of rivers / Sl. No. cannels / khals: Stipulations Mention actual distance (m/km) Mention status of compliance (Yes/No) Remarks 1 Distance of centerline of mining area from the nearest dams (reservoirs) and barrages measured along flow direction shall not be less than 3 km and that for check dams, pick up barrages, weirs, anicuts shall not be less than 1 km. No Dam / Barrages, Check Dam, pick up barrages, weirs, anicuts with in 3 Km YES NA 2 Distance of nearest boundary of mining area measured along flow direction from centerline of bridges, regulators, sluices, water intake structures, jetties and end point of bank protection works located at upstream or downstream of the mining area shall not be less than 300 metre. Road Bridge 6 Km (SE) Others - Nil YES NA 3 Countryside boundary of mining area lying more or less parallel to bank line shall be at a distance not less than 100 metre from the existing bank line (not embankment) or one third of the distance between bank lines (not embankment), whichever is less, provided such distance shall never be less than 30 metre. 4 Depth of mining shall not be undertaken below 3 metre of existing bed level or prevailing low water level, whichever is less. 100 mtrs YES NA 1 mtrs. YES NA

11 5.3 Population projection There is no permanent influx of the population anticipated, as the workers will be hired locally from nearby villages. Unemployment is very pervasive in the study area. The project will provide employment to around 25 people directly and persons indirectly in the project. It is expected that a large part of the investment in this project will trickle down to the local population. Hence there will be an overall improvement of socio-economic status of the people of surrounding areas. 5.4 Land use planning The land of the mine lease area is Balughat and there will be no change in land use after operation. The ultimate land use of the mine lease area will not change. Extracted mineral will be used in construction jobs, the workers will be hired locally and temporarily, no housing facility will be required. 5.5 Amenities/facilities to workers Temporary rest shelters, drinking water, first aid and sanitary facility will be made available to the mine workers. 6.0 PROPOSED INFRASTRUCTURE 6.1 Mining area (Processing Area) No processing area is proposed as the extracted sand will be directly loaded in to trucks.. The lease area is spread over 20 Acres (8.09 ha) in Mouza &Village: Kunjapur, Block : Indus, P.O & P.S. Indus, Dist. Bankura 6.2 Residential area (Non Processing Area) Not more than 25 workers will be needed for the project that will be hired from nearby villages, thus no housing facility is required. 6.3 Green Belt Compensating Plantation will be done in consultation with local body. If Govt. land is allotted then green belt will be developed on that land and soil binding grasses like Agave nector, Saccharum officinarum (Munja), Cassia tora (Charata), Opuntiaficus indica, Aloe vera (Gheekwar), Argemone maxicana, Euphorbia hirta will be planted.

12 6.4 Connectivity There is direct connectivity through village road up to the mine site. The area is well connected to SH 2 : 7.5 Km.(S), SH-7 : 8.6 Km (E), NH 16 : 35 Km (SW) from site. 6.5 Drinking Water Management In order to meet the drinking water requirement for site workers, River water / village tube well will be used. 6.6 Sewerage System Since the waste water from the mine will be only due to domestic usage which will be minimal thus no sewerage system is proposed at the mine site. 6.7 Toilet Facility Toilet facilities will be provided to the worker at the river bank. 6.8 Industrial Waste Management Since the workings are open cast, which is on a riverbed sand almost the entire excavation will be sold out hence, no waste management plan is required at the surface. 6.9 Solid Waste management No solid waste generation is expected from the mining operation Power Requirement & Supply/ Source All the activities will be carried out manually. The operation will be restricted to day time only; hence there is no power requirement for the project at site. 7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN 7.1 Policy to be adopted (Central/State) in respect of the project affected persons including home oustees, land oustees and landless labourers (a brief outline to be given). The lease area is a Balughat and as such no person is going to be displaced. There will be no compulsory land acquisition for this project and as such no R & R is required. This project is expected to provide a great relief to such local people by providing them with employment opportunities. Further, an effort will be made to stimulate a local rural economy (in consultation with the leader of these rural areas) so that the economic benefits of this project can be derived by people who are not directly employed on this project.

13 8.0 PROJECT SCHEDULE & COST ESTIMATES The project will be started with in one month from the date the area is lease out. It will run during day time only. The total cost of project would be approx Rs lakhs for 5 years. 9.0 ANALYSIS OF PROPOSAL: Overall the project will have positive and long term impact on environment. The project will also bring positive changes in terms of socio economic development by way of generating direct and indirect employment opportunities for the people of vicinity. Also the project will bring economic benefit to the state in terms of revenue generation. Apart from the financial benefits, this project will have a great positive social impact especially in this effected region, where the local population, in the nearby villages is still dependent on seasonal rice cultivation for their livelihood. This project can be a boon for the local population by providing them sustainable employment opportunity for their subsistence. Further, from the environmental point of view, this project will have minimal impact, as the project envisages opencast quarrying operations using manual methods & that too in an area which is remote and is surrounded by wasteland. Also there will be no conflict of interests for resources between the lessee and the local population.

1. EXECUTIVE SUMMARY. Brief outline stating name of river bed, proposed project area, location, method of mining, period etc. to be mentioned.

1. EXECUTIVE SUMMARY. Brief outline stating name of river bed, proposed project area, location, method of mining, period etc. to be mentioned. Pre-Feasibility Report for Mining of River Sand in the Kangsabati River at Mouza Rerapal, J.L. No.132, Plot 1. EXECUTIVE SUMMARY Brief outline stating name of river bed, proposed project area, location,

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8. PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi,

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

Pre- Feasibility Report

Pre- Feasibility Report 1. EXECUTIVE SUMMARY Application of mining for soil used in Brick Kiln -M/S M D Bricks Field from Khasra/Gata Nos 1229,1233,1161,1044, -2.292 Hectare at Village-Katka Manapur,Tehsil-Sadar,District- Pratapgarh,Uttar

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Consultant-Ascenso Enviro Pvt. Ltd. Page 19 of 31 1.0 EXECUTIVE SUMMARY S.No. Information Details 1. Project name Sand Mining Project at Hatidah Ghat on River Ganga, District Patna,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

2. INTRODUCTION 2.1 Identification of Project and Project Proponent

2. INTRODUCTION 2.1 Identification of Project and Project Proponent PRE - FEASIBILITY REPORT 1. EXECUTIVE SUMMARY M/s J K S Mining Services private Limited through its Director Sri Jay Kumar Singh S/o Shivpal Singh R/o Gadhi, Mawaiya, District Fatehpur, Uttar Pradesh is

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

Grey Granite (Paradiso) Mine

Grey Granite (Paradiso) Mine Grey Granite (Paradiso) Mine PROJECT PROPONENT M/s. Karunai Granites Private Limited., Jagadevipalayam Village & Post, Krishnagiri Taluk, Krishnagiri District 635 203. Extent : 11.59.0 Hectares S.F. No.

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Geeti And Moram Project at Khasra No.-10,11,12,13,101, 102,122, 126, 127,128,129,130,131, 167,568,570,571,572,

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Stone And Moram Project at Khsara No.-144,145,146,147, 148,150, 309, 310, 311,312,313,314,315,316,317,318,320,399,403,404,405,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MINING PROJECT LOCATED AT TIKKA/ MOHAL SACHUHI, MAUJA JANGAL RAJGIR TEHSIL SUJANPUR, DISTRICT HAMIRPUR IN KHASRA NO 6, 7, 8 AND 9 MEASURING 04-84-35 HACTARES (126 03 KANALS) FOR

More information

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017 ENVIRONMENTAL MANAGEMENT PLAN OF PHASIGUDA SAND QUARRY OVER AN AREA OF 12.842 ACRE / 5.196 HA IN VILLAGE PHASIGUDA OF DIGAPAHANDI TAHASIL OF GANJAM DISTRICT OF ODISHA. For Sri Kalu Charan Behera Village

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 0 EXECUTIVE SUMMARY The proposed project of 343.98 Ha area is of river bed Sone sand (Silica sand) mining and falls under Category- A, as per EIA Notification 2006 & amendments

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT 2017 PRE-FEASIBILTY REPORT (Towards Getting EC) Under violation OF SAI BABA-1 MANGANESE MINE (8.045 Ha & 0.611 Ha), Sy. No. 9 of Kothakarra (V) Sy. No. 117/2 of Budarayavalasa, Merakamudidam (M), VIZIANAGARAM

More information

is the lessee for the RBM for an area of ha (37.06 acre) along River Virma in Gata No.

is the lessee for the RBM for an area of ha (37.06 acre) along River Virma in Gata No. PRE - FEASIBILITY REPORT 1. EXECUTIVE SUMMARY M/s Thakur Construction Company of Sri Samar Singh Tomar S/o Sri Sangram Singh Tomar R/O Ward 16, Civil Line, Kalika Nagar, Babai Road, Hoshangabad, Madhya

More information

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha. PRE FEASIBILITY REPORT For SILICA SAND MINE At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh 11.797 ha. Project Proponent Sri Yashpal Mendon 1 st Floor Mineral House, Hampankatta, Mangalore

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

1/1, Index INDEX ANY, SHOULD

1/1, Index INDEX ANY, SHOULD River Sand (Minor Mineral) Mining Project for River Yamuna in Gata No. 1/1, Production (9, 47,368 TPA), M.L Area 52.63 ha, near village: Index 1 2 INDEX EXECUTIVE SUMMARY... 2 INTRODUCTION OF THE OBJECT/

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

(I) Basic Information:

(I) Basic Information: (I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR AMJHAR LATERITE DEPOSIT M. L. Area 4.897 ha. In Village - Amjhar Tehsil - Amarpatan, District- Satna State - Madhya Pradesh Proposed Capacity 32256 TPA Lessee - Shri Vikram Singh

More information

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga

More information

EnvironmEntal management Plan

EnvironmEntal management Plan EnvironmEntal management Plan FOR BORAGAM SAND QUARRY Lease Area: 5.018 Ha. / 12.40 Acres of Sri Padman Kumar Bisoi S/o- Motising Bisoi At/ Po- Kerla, Tahasil Kodinga, Dist. Nabarangpur, Odisha Prepared

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report

More information

ENVIRONMENTAL MANAGEMENT

ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING BLACK TRAP MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 15/01/2016 TO REKHABEN YOGESHKUMAR JOSHI

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

M/s. Bharat Clays Private Limited Pre-Feasibility Report

M/s. Bharat Clays Private Limited Pre-Feasibility Report 1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta

More information

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS)

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 20 PRE-FEASIBILITY REPORT OF GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 1. EXECUTIVE SUMMARY: The project is for mining of Ghodach soapstone & Dolomite Mine M.L. No. 69/2010 Near

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information