POSTMASBURG SOLAR PV ENERGY FACILITY 2 (PTY) LIMITED

Size: px
Start display at page:

Download "POSTMASBURG SOLAR PV ENERGY FACILITY 2 (PTY) LIMITED"

Transcription

1 (Solar International, 2013) POSTMASBURG SOLAR PV ENERGY FACILITY 2 (PTY) LIMITED Final EIR Technical Layout Development Report, March 2015 Prepared for: Mr D. Holder Cape EAPrac dale@cape eaprac.co.za Contact Person: D. Peinke Atlantic Energy Partners 5th Floor, Hill House Building 43 De Smidt Street, Greenpoint Cape Town, 8000 F: + 27 (0) M: + 27 (0) E: david@atlanticep.com Date: 02 March 2015 Rev 2.0 Page i

2 DOCUMENT HISTORY REVISION HISTORY Revision No Revision Date Author Rev D Peinke APPROVAL FOR RELEASE Name Title Signed C. Stanley Director DISTRIBUTION Name Designation Company D. Holder Consultant Cape EAPrac Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page ii

3 TABLE OF CONTENTS DOCUMENT HISTORY... II TABLE OF CONTENTS... III LIST OF FIGURES... IV LIST OF TABLES... IV ABBREVIATIONS AND ACRONYMS... V 1 INTRODUCTION PROGRESSION OF LAYOUT DESIGN CONCEPTUAL LAYOUT ALTERNATIVES PREFERRED LAYOUT ALTERNATIVE PRELIMINARY SITE DEVELOPMENT PLAN OVERVIEW OF THE SOLAR ENERGY FACILITY SOLAR ARRAY MOUNTING STRUCTURES GRID CONNECTION AND CABLING AUXILIARY BUILDINGS CONSTRUCTION OF ROADS ACCESS ROUTES ASSESSMENT OF COMPETITOR PROJECTS CONCLUSION LIST OF REFERENCES Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page iii

4 LIST OF FIGURES Figure 1: Typical Layout of a Solar PV Energy Facility (The Million Solar Roof Initiative Solar Salvation or Solar Scam? California PV Solar Farms A Bitter Harvest!, 2014)... 1 Figure 2: Alternative 1 Uniform / Conceptual Layout... 3 Figure 3: Alternative 2 Preliminary Layout Area... 3 Figure 4: Alternative 3 Preferred Layout... 4 Figure 5: Alternative 3 Preferred Layout, showing Inverter Station Placements... 5 Figure 6: Preliminary Site Development Plan (SDP)... 6 Figure 7: Cast Concrete Foundation (Solar Power Plant Business, 2013)... 7 Figure 8: Rammed / Driven Steel Pile (SolarPro, 2010)... 8 Figure 9: Ground Screw (pv magazine, 2014)... 8 Figure 10: Site Access Routes, Option 1 (light Blue) and Option 2 (Bright Green) Figure 11: Assessment of Competitors LIST OF TABLES Table 1: Component Areas and % of Total Project Area... 1 Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page iv

5 ABBREVIATIONS AND ACRONYMS AC CPV DC DEA DSR EAP EIA EIR EMP ha IPP kv MV MW MWp OH PV REDz REIPPPP SANRAL SDP SEF SWSA UN Wp WUL Alternating Current Concentrating Photovoltaic Direct Current National Department of Environmental Affairs Draft Scoping Report Environmental Assessment Practitioner Environmental Impact Assessment Environmental Impact Report Environmental Management Plan Hectare Independent Power Producer Kilovolt Medium Voltage Mega Watt Mega Watt Peak (maximum peak power production) Overhead Photovoltaic Renewable Energy Development Zones Renewable Energy Independent Power Producer Procurement Programme South African National Roads Agency Limited Site Development Plan Solar Energy Facility Strategic Water Source Areas United Nations Watt Peak Water Use License Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page v

6 1 INTRODUCTION Postmasburg Solar PV Energy Facility 2 (Pty) Ltd is proposing the establishment of a commercial solar energy facility (SEF) on the Remainder of Farm 436 Kapstewel, located in the ZF Mcgawu District (the old Hay District) of the Northern Cape Province, within the jurisdiction area of the Tsantsabane Local Municipality. The proposed SEF will have a net generating capacity of 75 MW AC with an estimated maximum footprint of ± 225 ha. A preliminary study area of ± 450 ha was assessed by the Environmental Assessment Practitioner (EAP) as part of the Environmental Impact Assessment (EIA) process. The preliminary footprint assessed in the EIA is significantly larger than what is physically required for the proposed SEF development, to ensure that sufficient development space is available after potential environmentally sensitive areas are excluded, through findings and recommendations of specialists. The approximate area that each component of the SEF will occupy is summarised in the table below. TABLE 1: COMPONENT AREAS AND % OF TOTAL PROJECT AREA SEF Component Estimated Area % of Total Area (± 225 ha) PV structures/modules ± 205 ha 91.1 % 19.2 % Internal roads ± ha 8.1 % 1.7 % Auxiliary buildings ± 1 ha 0.4 % 0.1 % Substation ± 0.84 ha ± 0.4 % < 0.1% % of Farm Area ( ha) The technology under consideration is either concentrating photovoltaic modules (CPV) or photovoltaic modules (PV) mounted on either of fixed or tracking structures. Other infrastructure includes inverter stations, internal electrical reticulation, internal roads, an onsite switching station / substation, a 132 kv overhead (OH) transmission line, auxiliary buildings, construction laydown areas and perimeter fencing and security infrastructure. The on site switching station / substation will locate the main power transformer/s that will step up the generated electricity to a suitable voltage level for transmission into the national electricity grid, via the OH line. Auxiliary buildings include, inter alia, a control building, offices, warehouses, a canteen and visitors centre, staff lockers and ablution facilities and gate house and security offices. Figure 1 below depicts a typical layout of a solar PV energy facility. Inverter stations Solar PV array Internal roads FIGURE 1: TYPICAL LAYOUT OF A SOLAR PV ENERGY FACILITY (THE MILLION SOLAR ROOF INITIATIVE SOLAR SALVATION OR SOLAR SCAM? CALIFORNIA PV SOLAR FARMS A BITTER HARVEST!, 2014) Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 1

7 It is customary to develop the final / detailed construction layout of the SEF only once an Independent Power Producer (IPP) is awarded a successful bid under the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), after which major contracts are negotiated and final equipment suppliers identified. For the purpose of the EIA, a number of alternatives are assessed and a final layout design presented along with a preliminary Site Development Plan (SDP), in accordance with the minimum requirements prescribed by the Department of Environmental Affairs (DEA). The final layout design and preliminary SDP prepared for the draft Environmental Impact Report (EIR) has taken into account the site constraints identified (biodiversity, visual etc.), the draft environmental management plan (EMP) and recommendations made by the various EIA specialists. Following the award of preferred bidder under REIPPPP, the appointment of major contractors and identification of final equipment suppliers may necessitate slight changes in the placement of plant components and therefore the final SDP. 2 PROGRESSION OF LAYOUT DESIGN Three Alternatives were assessed in finalising the layout design. The following section elaborates on the layout progression to the point of draft EIR submission. 2.1 CONCEPTUAL LAYOUT ALTERNATIVES A conceptual / uniform layout area of ± 450 ha (Alternative 1) was identified during the scoping phase of the EIA for Postmasburg Solar PV Energy Facility 2 Solar Development (the northern portion of cadastral unit RE/436, north of the Manganore Substation). This initial uniform layout did not consider any of the existing infrastructure located on and adjacent to the site (existing access / internal roads, transmission lines, dwelling & reservoirs etc.), nor any potential site constraints / environmental sensitive areas (to be identified by the various specialist studies). It was therefore excluded from the on going environmental process and not assessed further. Figure 2 below depicts Alternative 1 highlighted in blue, over the entire extent of the ± 450 ha study area. The property boundary / cadastral unit of RE/436 is indicated as a red line. The yellow lines indicate existing powerlines to the Manganore Substation, whilst brown lines indicate existing access & farm roads / tracks. In general, the entire 450 ha study area is considered to have a low agriculture potential, with limited carrying capacity, as per the Agriculture Potential specialist report. The usage of this low agricultural potential land is believed to have little effect on food security and the corresponding production of food. Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 2

8 FIGURE 2: ALTERNATIVE 1 UNIFORM / CONCEPTUAL LAYOUT The second alternative considered during the scoping phase of the EIA (Alternative 2) is depicted in Figure 3 below. Alternative 2 constituted a preliminary layout area concentrated to the western part of Alternative 1 above, surrounding the Manganore Substation. Alternative 2 considered existing infrastructure located on the RE/436 as well as adjacent properties. In particular, it took into account preliminary site constraints identified during the scoping phase of the project, with the intention of avoiding hills, potential drainage lines, as well as wooded areas. FIGURE 3: ALTERNATIVE 2 PRELIMINARY LAYOUT AREA Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 3

9 2.2 PREFERRED LAYOUT ALTERNATIVE Following the scoping phase of the EIA, the extent and significance of potential sensitive areas on the site were confirmed via detailed site assessments undertaken by various specialists, and the SEF layout was adjusted to take these confirmed sensitive features into account. Alternative 2 layout was therefore discarded from the on going environmental process, and replaced with a refined layout presented in Figure 4 below as Alternative 3, approximately 225 ha in extent. FIGURE 4: ALTERNATIVE 3 PREFERRED LAYOUT Alternative 3 above is similar to the previous Alternative 2 in that it is concentrated to the western part of the 450ha Alternative 1 study site, near to the Manganore Substation. Alternative 3 layout takes the existing infrastructure located on and adjacent to the site into account, as well as sensitive ecological, visual and heritage/archaeological features confirmed to occur on the site. Therefore a large no go area has been excluded from the PV layout to prevent encroachment onto sensitive features, identified as follows: Large yellow outline, depicting hills / koppies and intervening plains containing deep sands & numerous protected tree species; The Historical farmstead complex, shown in the northern part of the property; Sites D001, D002 & D005, marking sensitive stone cairn & grave sites; Large brown area, depicting visually sensitive areas; and Small drainage line to the south east of the property, reduced from what was originally envisaged for the Alternative 2 layout. The above adjustments aim to achieve the least possible environmental impact, while maintaining the economic viability of the project. The potential impacts (negative and positive) associated with this layout, as well as recommendations / measures focused on the Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 4

10 construction, operation and decommissioning phases of the development, are detailed in this impact assessment report and included in the Environmental Management Programme (EMPr) for implementation. FIGURE 5: ALTERNATIVE 3 PREFERRED LAYOUT, SHOWING INVERTER STATION PLACEMENTS Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 5

11 2.3 PRELIMINARY SITE DEVELOPMENT PLAN FIGURE 6: PRELIMINARY SITE DEVELOPMENT PLAN (SDP) Figure 6 depicts the preliminary SDP developed from Alternative 3. It is based on a specific solar PV technology and tracking mounting structures and therefore may change at a point where contractors and technology suppliers are identified. It presents, however, a realistic layout of what the SEF would look like. Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 6

12 The siting of the proposed laydown area (± 200m x 150m) for the construction period is shown to encroach slightly into the no go area recommended by the visual specialist. Since this laydown area is temporary by nature (during construction), with no permanent structures or buildings (during operation), impact on visual features will be temporary and therefore considered to be of low significance. 3 OVERVIEW OF THE SOLAR ENERGY FACILITY The following section presents an overview of the main components of the solar energy facility layout. 3.1 SOLAR ARRAY Solar PV modules are connected in series to form a string. A number of strings are then wired in parallel to form an array of modules. PV modules are mounted on structures that are either fixed, north facing at a defined angle, or mounted to a single or double axis tracker to optimise electricity yield. The solar arrays for the Postmasburg Solar PV Energy Facility 2 project have been placed in such a way that they do not interfere with sensitive features defined above. 3.2 MOUNTING STRUCTURES Various options exist for mounting structure foundations, which include cast / pre cast concrete, driven / rammed piles, or ground / earth screws mounting systems. FIGURE 7: CAST CONCRETE FOUNDATION (SOLAR POWER PLANT BUSINESS, 2013) The impact on agricultural resources and production of these options are considered to be the same, however concrete is least preferred due the effort required at a decommissioning phase in order to remove the concrete from the soil, and therefore its impact on the environment. The Postmasburg Solar PV Energy Facility 2 project will therefore make the Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 7

13 most use of either driven / rammed piles, or ground / earth screws mounting systems, and only in certain instances resort to concrete foundations should geotechnical studies necessitate this. FIGURE 8: RAMMED / DRIVEN STEEL PILE (SOLARPRO, 2010) FIGURE 9: GROUND SCREW (PV MAGAZINE, 2014) Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 8

14 3.3 GRID CONNECTION AND CABLING It is proposed to connect the SEF directly to the Manganore Substation located in the southwestern corner of the available 225 ha area. The SEF substation will be approximately 120m x 70m in size and feature a step up transformer/s to transmit electricity via a 132 kv OH single circuit line directly to Manganore. The OH power line is envisaged to be ± 500m 1km in length, a maximum height of 32m and occupy a servitude width of between 31m 40m. A 75 MW AC installation will require specific electrical components to meet the national grid code requirements in order to generate and supply electricity into the national grid. The conversion from DC (modules) to AC is achieved by means of inverter stations. A single inverter station is connected to a number of solar arrays, are will be placed along the internal service roads for ease of access. A number of inverter stations will be installed for the SEF (up to maximum of ± 60), each of which is connected to the on site / facility substation. Final placement of the inverter stations and on site / facility substation will need to take ground conditions into consideration. Interconnecting electrical cabling will be trenched where practical, and follow internal access roads to the greatest extent. Sensitive areas will consequently be avoided as far as possible, or alternatively, cables will be fastened aboveground to the mounting structures so as to avoid excessive excavation works and clearing of vegetation. 3.4 AUXILIARY BUILDINGS The auxiliary buildings will comprise of the following as a minimum: Control Building / Centre (± 31m x 8m); Office (± 22m x 11m); 2 x Warehouses (each ± 50m x 20m); Canteen & Visitors Centre (± 30m x 10m); Staff Lockers & Ablution (± 22m x 11m); and Gate house / security offices (± 6m x 6m) The total area occupied is approximately ha, excluding the facility substation. 3.5 CONSTRUCTION OF ROADS The internal road network of the SEF will be gravelled roads, 4 5m in width, around the solar array periphery. Roads located in between the solar modules will be un surfaced tracks to be used for maintenance and cleaning of solar PV panels. With reference to the Postmasburg Solar PV Energy Facility 2 Transport and Traffic plan, it is noted that internal access roads do not cross any drainage lines. Precautionary measures must be taken to mitigate the risk of ground disturbances where access roads will be constructed. Special attention will need to be given to drainage, water flow and erosion by applying appropriate building methods. Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 9

15 4 ACCESS ROUTES Two access routes are being considered for the Postmasburg Solar PV Energy Facility 2 project, both off the R325 to the development. Furthermore, both these road access options are aligned along existing farm access roads: Road access Option 1 (light blue): crosses Portion 4 of Farm 436 parallel to the 132kV powerline from the west (± 3200m in length to the PV facility security checkpoint); Road Access Option 2 (bright green): crosses Portions 2 and 5 of Farm 436 (the old mine land), entering the property from the south (± 6980m in length to the PV facility security checkpoint). Both the abovementioned access road options are considered to be viable, from environmental and technical viewpoints, and the selection of the preferred alignment will largely be subject to consent from the relevant landowners / caretakers. The required access road would be gravel and approximately 5m in width. FIGURE 10: SITE ACCESS ROUTES, OPTION 1 (LIGHT BLUE) AND OPTION 2 (BRIGHT GREEN) Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 10

16 5 ASSESSMENT OF COMPETITOR PROJECTS Various other solar projects are being developed or proposed in the broader vicinity of Postmasburg, including the Bid Window 1 Lesedi and Bid Window 2 Jasper Solar PV Energy Facilities. The competitor projects neither impact on the layout design of the SEF, nor the proposed routing of the 132 kv OH line to the Manganore Substation. The competitor projects are concentrated closer to the Olien MTS, and are identified as follows: 50 MW Solar CSP, Ample Solar Groenwater (Pty) Limited (± 22km); 300 MW Solar PV, Kyfontein Power Plant Project Company (± 36km); 75 MW Solar PV, Intikon Energy Pty Ltd (LESEDI) (± 33km); 3 MW Solar PV, AE AMD Renewable Energy Pty Ltd (± 35km). FIGURE 11: ASSESSMENT OF COMPETITORS 6 CONCLUSION The preferred layout alternative site (Alternative 3) has been developed and selected based on key criteria identified above, including inter alia, terrain / slope, accessibility, assessment of alternatives, proximity to the Manganore Substation as well as consideration of sensitive areas to minimize ecological, visual and archaeological impacts. Specialists were engaged and have completed detailed assessments that have been included in final EIR. Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 11

17 7 LIST OF REFERENCES pv magazine. (2014, September 3). 100 MW solar PV project underway in Pakistan. Retrieved from magazine.com/news/details/beitrag/100 mw solar pv projectunderway in pakistan_ /#axzz3pauwtq77 Solar International. (2013, January 17). Trina Solar Supplies 61MW Of Solar PV Modules For Green Tower Project In Brandenburg. Retrieved from Trina Solar supplies 61MW of solar PV modulesfor Green Tower project in Brandenburg.php Solar Power Plant Business. (2013, December 07). Abandoned Farmland Serves as Solar Site. Retrieved from SolarPro. (2010, June/July). Ground Mounted PV: Page 6 of 9. Retrieved from installation/ground mountedpv/page/0/5 The Million Solar Roof Initiative Solar Salvation or Solar Scam? California PV Solar Farms A Bitter Harvest! (2014, January). Retrieved from GO Solar CALIFORNIA: Rev 2.0 Final EIR Technical Layout Development Report, March 2015 Page 12

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial

More information

August. RE Capital 11 (Pty) Ltd. Solar farm development. August. Scoping Engineering Report

August. RE Capital 11 (Pty) Ltd. Solar farm development. August. Scoping Engineering Report RE Capital 11 (Pty) Ltd. Solar farm development. August August Engineering overview and summary pertaining to environmental aspects of the RE Capital 11 (Pty) Ltd. Solar Development. Compiled by Solek

More information

Annex B2.3. Background Information Document

Annex B2.3. Background Information Document Annex B2.3 Background Information Document Background Goldfields South Deep Mine, in partnership with Enel Green Power, proposes to design, construct, and operate 2x20MW Solar PV plants on Mine owned property

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION I 1. INTRODUCTION EXECUTIVE SUMMARY Mulilo Renewable Energy (Pty) Ltd (later referred to as Mulilo) has identified two alternative sites for the establishment of a 10MW photovoltaic (PV) power generation

More information

Boesmanland Solar Farm

Boesmanland Solar Farm October 8 Boesmanland Solar Farm 2012 Engineering overview and summary pertaining to environmental aspects of the Boesmanland Solar Farm. Compiled by Emma van der Merwe of Solek (Renewable Energy Engineers)

More information

BOLAND ENVIRONMENTAL CONSULTANTS CC

BOLAND ENVIRONMENTAL CONSULTANTS CC BOLAND ENVIRONMENTAL CONSULTANTS CC y ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Proposed Photo-Voltaic Solar Power Plant On Farm Nuwerus, No. 450 Portion 6, Worcester DEA REF. NO: 12/12/20/2019 BACKGROUND

More information

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL BACKGROUND INFORMATION DOCUMENT April 2014 (2 nd Edition) Project developer: South Africa Mainstream

More information

SOCIAL IMPACT ASSESSMENT FOR

SOCIAL IMPACT ASSESSMENT FOR SOCIAL IMPACT ASSESSMENT FOR BOITSHOKO SOLAR (RF) (PTY) LTD ENERGY FACILITY NORTHERN CAPE PROVINCE April 2016 Prepared for Boitshoko Solar (RF) (Pty) Ltd By Leandri Kruger EXECUTIVE SUMMARY INTRODUCTION

More information

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5 CONTENTS 2. PROJECT DESCRIPTION 2-2 2.1 NEED FOR THE PROJECT 2 2 2.2 ABOUT THE PROPONENT 2 4 2.3 SITE SELECTION 2 4 2.4 OVERVIEW OF THE PROJECT 2 5 Figure 2.1: Provisional wind profile for the Jeffrey

More information

NERSA Public Hearing Dyason s Klip 1 (Pty) Ltd

NERSA Public Hearing Dyason s Klip 1 (Pty) Ltd Scatec Solar ASA NERSA Public Hearing Dyason s Klip 1 (Pty) Ltd Presented by Jan Fourie Business Development Manager September 2015 Project Company-General Information Dyason s Klip 1 (Pty) Ltd (formerly

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,

More information

SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure

SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure Abstract ID: 409 Authors: Marshall Mabin (1), Paul Lochner

More information

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE 1 MAY 2012 DEA REF. NO. 12/12/20/2501 NEAS REF. NO. DEAT/EIA/0000611/2011 EXECUTIVE

More information

6. CONCLUSIONS AND RECOMMENDATIONS

6. CONCLUSIONS AND RECOMMENDATIONS Environmental Impact Assessment Report: Proposed third 400 kv Transmission line between Poseidon and Grassridge, Eastern Cape and Extension to Grassridge 6. CONCLUSIONS AND RECOMMENDATIONS This Environmental

More information

Photovoltaic Power Generation Facility, Prieska EXECUTIVE SUMMARY

Photovoltaic Power Generation Facility, Prieska EXECUTIVE SUMMARY ii EXECUTIVE SUMMARY Introduction Mulilo Renewable Energy (Pty) Ltd, the applicant, intends to develop a 20 mega watt solar farm in Prieska. The context within which this development is proposed is the

More information

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT PURPOSE OF THIS DOCUMENT The purpose of this Background Information

More information

Nxuba Wind Farm NERSA PUBLIC HEARINGS. 10 September 2015

Nxuba Wind Farm NERSA PUBLIC HEARINGS. 10 September 2015 Nxuba Wind Farm NERSA PUBLIC HEARINGS 10 September 2015 1 Nxuba Wind Farm has been appointed as a Preferred Bidder in the Fourth Round of the Department of Energy s (DoE) Renewable Energy IPP Procurement

More information

Background Information Document and Invitation to Comment

Background Information Document and Invitation to Comment Background Information Document and Invitation to Comment Environmental Impact Assessment for the Proposed Drennan Photovoltaic (PV) Solar Power Plant, Cradock, Eastern Cape Province Scoping/EIA DEA Ref

More information

New York Community Solar Facility Decommissioning Plan

New York Community Solar Facility Decommissioning Plan New York Community Solar Facility Decommissioning Plan July 2017 Prepared For: Town of Dryden, NY Delaware River Solar 33 Irving Place, Suite 1090 New York, NY 10003 Table of Contents Page 1. Introduction

More information

Draft Scoping Report. Delivering sustainable solutions in a more competitive world

Draft Scoping Report. Delivering sustainable solutions in a more competitive world Draft Scoping Report Proposed 90 MW Drennan Photovoltaic (PV) Power Facility, Eastern Cape Solaire Direct Southern Africa (Pty) Ltd DEA Ref: 14/12/16/3/3/2/359 November 2012 www.erm.com Delivering sustainable

More information

DRAFT EIA REPORT. DEA Reference number: 14/12/16/3/3/2/1033. February Prepared for: juwi Renewable Energies (PTY) Ltd

DRAFT EIA REPORT. DEA Reference number: 14/12/16/3/3/2/1033. February Prepared for: juwi Renewable Energies (PTY) Ltd Scoping and Environmental Impact Assessment for the Proposed Development of a 100 MW Solar Photovoltaic Facility (SKEERHOK PV 1) on the farm Smutshoek 395, Portion 0, north-east of Kenhardt, Northern Cape

More information

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality 1 INTRODUCTION Majuba Power Station is located near Amersfoort in the Mpumalanga Province and falls within the Pixley Ka Seme Local Municipality (Figure 1.1) which falls within the Gert Sibande District

More information

Proposed Timahoe North Solar Farm

Proposed Timahoe North Solar Farm Proposed Timahoe North Solar Farm Project Background Solar Energy Explained On the 27th April 2017, Bord na Móna and ESB announced a co-development agreement to develop solar Solar energy is the solar

More information

Cape Environmental Assessment Practitioners (Pty) Ltd

Cape Environmental Assessment Practitioners (Pty) Ltd Cape Environmental Assessment Practitioners (Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 5 Progress Street, George Facsimile: (044) 874 0432 PO Box 2070, George 6530 Web: www.cape-eaprac.co.za

More information

BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL

BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL DEA ref: 14/12/16/3/3/1/619 MOTIVATION FOR AMENDMENT OF ENVIRONMENTAL AUTHORISATION March 2014 Prepared for: Navosync (Pty) Ltd Suite 103 Dixon Street, Cape

More information

7 Project Description

7 Project Description 7 Project Description 7.1 Project Promoter The CEB (Green energy) Co. Ltd. is a private company fully owned by the Central Electricity Board incorporated on 11 October 2016 to promote the generation of

More information

Cape Environmental Assessment Practitioners(Pty) Ltd

Cape Environmental Assessment Practitioners(Pty) Ltd Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 Facsimile: (044) 874 0432 17 Progress Street, George Web: www.cape-eaprac.co.za PO Box 2070, George,

More information

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014. EXECUTIVE SUMMARY E1 Introduction The proponent is SOLAR FIELD LTD, a consortium between 1. Dhamma Energy, a company based in Spain, specialised in photovoltaic projects 2. Harel Mallac & Co. Ltd, a company

More information

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality 1 INTRODUCTION Hendrina Power Station is located at Pullenshope (near Hendrina) in the Mpumalanga Province and falls within the Steve Tshwete Local Municipality (Figure 1.1) which falls within the Nkangala

More information

Soetwater Wind Farm NERSA PUBLIC HEARINGS. 09 September 2015

Soetwater Wind Farm NERSA PUBLIC HEARINGS. 09 September 2015 Soetwater Wind Farm NERSA PUBLIC HEARINGS 09 September 2015 1 Soetwater Wind Farm has been appointed as a Preferred Bidder in the Fourth Round of the Department of Energy s (DoE) Renewable Energy IPP Procurement

More information

Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS

Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS This amendment Solar Energy is hereby added to the Montcalm Township Zoning Ordinance to state as follows: A. INTENT AND PURPOSE This section is

More information

*Illustration only. Mynydd y Gwrhyd Solar Farm Design and Access Statement. Reference: E05419

*Illustration only. Mynydd y Gwrhyd Solar Farm Design and Access Statement. Reference: E05419 *Illustration only Mynydd y Gwrhyd Solar Farm Design and Access Statement Reference: E05419 Version 3 January 2019 CONTENTS Contents i 1.1 PURPOSE OF THIS STATEMENT... 2 1.2 GENERAL DESIGN PRINCIPLES...

More information

Linfairn Wind Farm Addendum Chapter A3: Project Description

Linfairn Wind Farm Addendum Chapter A3: Project Description A3. PROJECT DESCRIPTION 3.1 Introduction This chapter provides a description of the changes to the Project since the ES was published. An outline Construction Environmental Management Plan (CEMP) is included

More information

City of Rome, NY Site Plan Review Application Checklist Consult Chapter 80 of the City of Rome Code of Ordinances.

City of Rome, NY Site Plan Review Application Checklist Consult Chapter 80 of the City of Rome Code of Ordinances. City of Rome, NY Site Plan Review Application Checklist Consult Chapter 80 of the City of Rome Code of Ordinances. *Note: For specific information regarding development within the Griffiss Business Redevelopment

More information

ANKERLIG POWER STATION CONVERSION AND TRANSMISSION INTEGRATION PROJECT

ANKERLIG POWER STATION CONVERSION AND TRANSMISSION INTEGRATION PROJECT ANKERLIG POWER STATION CONVERSION AND TRANSMISSION INTEGRATION PROJECT VISUAL ASSESSMENT - INPUT FOR SCOPING REPORT AND TRANSMISSION POWER LINE ALTERNATIVE SELECTION Produced for: Eskom Holdings Limited

More information

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations TOWN OF MARBLEHEAD FIRE DEPARTMENT Marblehead Fire Department Installation Guidelines for Photovoltaic/Solar installations July 1, 2015 Updated December 2015 MARBLEHEAD FIRE DEPARTMENT Standard Operating

More information

Guideline for Fire Safety. Elements of Solar. Photovoltaic Systems

Guideline for Fire Safety. Elements of Solar. Photovoltaic Systems Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 This document was developed by the Orange County Fire Chiefs Association, Orange County Fire Marshal Committee. It is based

More information

White Rock Wind Farm Project update Community Consultative Committee 3 August 2017

White Rock Wind Farm Project update Community Consultative Committee 3 August 2017 White Rock Wind Farm Project update Community Consultative Committee 3 August 2017 1 Content 1. Project overview 2. Indicative timeline 3. Alternative powerline connection 4. Transportation of turbine

More information

Guidelines for Solar Photovoltaic Installation

Guidelines for Solar Photovoltaic Installation WEST COVINA FIRE DEPARTMENT Fire Prevention Bureau 1435 W. Puente Ave. West Covina, CA 91790 (626) 338-8800 Guidelines for Solar Photovoltaic Installation PURPOSE SCOPE TABLE OF CONTENTS..2..2 REQUIREMENTS..2

More information

1. Description of and Rationale for Proposed Change

1. Description of and Rationale for Proposed Change Suite 500, 4342 Queen Street Niagara Falls, Ontario, Canada L2E 7J7 Tel. 905 374 5200 Fax: 905 374 1157 www.hatch.ca Nick Colella 2 St. Clair Avenue West Floor 12A Toronto, ON M4V 1L5 Dear Mr. Colella:

More information

Copyright 2013 CSIR 2013 PG 0

Copyright 2013 CSIR 2013 PG 0 Copyright 2013 CSIR 2013 PG 0 Scoping and Environmental Impact Assessment for the Proposed Development of a 100 MW Solar Photovoltaic Facility (SKEERHOK PV 1) on the farm Smutshoek 395, Portion 0, north-east

More information

3 PROJECT DESCRIPTION

3 PROJECT DESCRIPTION 3 PROJECT DESCRIPTION EGP has proposed the development of a 40MW solar photovoltaic (PV) power plant to supply power to the Gold Field South Deep Gold Mine. Photovoltaic Solar Panel technology is being

More information

INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT

INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT REPORT APPENDIX B6: ISSUES AND RESPONSES REPORT VERSION 3 November

More information

Cape Environmental Assessment Practitioners (Pty) Ltd

Cape Environmental Assessment Practitioners (Pty) Ltd Cape Environmental Assessment Practitioners (Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 1 st Floor Eagles View Building Facsimile: (044) 874 0432 5 Progress Street, George Web: www.cape-eaprac.co.za

More information

EIGHT POINT WIND ENERGY CENTER

EIGHT POINT WIND ENERGY CENTER EIGHT POINT WIND ENERGY CENTER Case No. 16 F 0062 1001.11 Exhibit 11 Preliminary Design Drawings Contents Exhibit 11: Preliminary Design Drawings... 1 11(a) Site Plan... 1 11(b) Construction Operations

More information

APPLICATION FOR A GENERATOR AND A SUPPLY CONNECTION AT THE SAME POINT OF SUPPLY TO THE ESKOM NETWORK. Revision September 13 July 2016

APPLICATION FOR A GENERATOR AND A SUPPLY CONNECTION AT THE SAME POINT OF SUPPLY TO THE ESKOM NETWORK. Revision September 13 July 2016 E Ph APPLICATION FOR A GENERATOR AND A SUPPLY CONNECTION AT THE SAME POINT OF SUPPLY TO THE ESKOM NETWORK Revision 08 01September 13 July 2016 Introduction (This form should be completed if the generator

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD . EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD STANDARD #H-005 EFFECTIVE 08-20-2009 About the Guideline This guideline was developed with safety as the principal objective. The solar photovoltaic

More information

Proposed Local Law No. 1 for 2018 BE IT ENACTED BY THE TOWN BOARD OF THE TOWN OF BERNE, NEW YORK AS FOLLOWS:

Proposed Local Law No. 1 for 2018 BE IT ENACTED BY THE TOWN BOARD OF THE TOWN OF BERNE, NEW YORK AS FOLLOWS: Proposed Local Law No. 1 for 2018 BE IT ENACTED BY THE TOWN BOARD OF THE TOWN OF BERNE, NEW YORK AS FOLLOWS: SECTION 1. Title. This local law may be cited as the Town of Berne Small Scale Solar Energy

More information

The Project will consist of the following key components: PV solar panels/modules (arranged in arrays); DC-AC current inverters and transformers;

The Project will consist of the following key components: PV solar panels/modules (arranged in arrays); DC-AC current inverters and transformers; 1 INTRODUCTION 1.1 OVERVIEW Solaire Direct Southern Africa (Pty) Ltd, hereafter referred to as Solaire Direct, appointed Environmental Resources Management Southern Africa (Pty) Ltd, hereafter referred

More information

Canadian Solar Developers Ltd.

Canadian Solar Developers Ltd. Canadian Solar Developers Ltd. Type of Document Draft Report Project Name Proposed Ground Mount Solar Facility L.P #5 8338 Scotchmere Drive, Strathroy, ON OPA FIT Program: FIT-FL67GB5 Project Number V00002250-00

More information

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS GENERAL INFORMATION ABOUT SOLAR PHOTOVOLTAIC SYSTEMS...2 RESOURCES...3 GENERAL 3 1.0 MARKING...5 1.1 MAIN

More information

INTRODUCTION PROJECT DESCRIPTION

INTRODUCTION PROJECT DESCRIPTION JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by

More information

Background Information Document

Background Information Document Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Richards Bay: ERM Ref Number: 0320839 Purpose of this Background

More information

NOTICE OF PREPARATION AND SCOPING MEETING

NOTICE OF PREPARATION AND SCOPING MEETING April 9, 2013 NOTICE OF PREPARATION AND SCOPING MEETING SUBJECT: Notice of preparation of a Draft Environmental Impact Report (DEIR) for the California Flats Solar Project. The County of Monterey will

More information

The following buildings/facilities are included in the design of this Project:

The following buildings/facilities are included in the design of this Project: 2 PROJECT DESCRIPTION 2.1 PROJECT LOCATION AND EXISTING LAND USE The project site is located approximately 3.5 km south of the existing Mamathwane Station, adjacent to the Mamathwane Mine which forms part

More information

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane.

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane. 17. SERVICES 17.1 Introduction 17.1.1 WSP Development Limited has been appointed by CALA Homes to investigate and appraise the availability of services to serve a proposed mix-use development of approximately

More information

Rykove Solar Project Non-Technical Summary

Rykove Solar Project Non-Technical Summary Rykove Solar Project Non-Technical Summary 16 July 2018 1 Introduction This document provides a non-technical overview of the proposed development plans of private company Grin Agro Servis to construct

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest What s Inside? Answers to On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern Ontario Land issues Routing Project approval process Health

More information

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 This chapter provides details regarding the scope of the proposed Gourikwa Power Station and Transmission Integration

More information

Local Vendor Opportunities. Gannawarra Solar Farm. Engineering Intelligence

Local Vendor Opportunities. Gannawarra Solar Farm. Engineering Intelligence Local Vendor Gannawarra Solar Farm Engineering Intelligence Community Focused The Project RCR is fully committed to supporting the local community when delivering infrastructure projects in regional areas.

More information

CITY OF ORONO HENNEPIN COUNTY, MINNESOTA

CITY OF ORONO HENNEPIN COUNTY, MINNESOTA CITY OF ORONO HENNEPIN COUNTY, MINNESOTA AN ORDINANCE NO. 119, THIRD SERIES AMENDING ORONO MUNICIPAL CODE CHAPTER 78, THE ORONO ZONING CODE, BY ADDING SECTION 78-1379 ALTERNATIVE ENERGY SYSTEMS THE CITY

More information

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION 4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach

More information

Inveraray to Crossaig Overhead Line Reinforcement

Inveraray to Crossaig Overhead Line Reinforcement About Scottish Hydro Electric (SHE) Transmission plc Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the electricity networks in

More information

2015 INNOVATION AWARD DESIGN AND DEVELOPMENT OF A GROUND-BREAKING, AUSTRALIAN PILE SYSTEM FOR MOREE SOLAR FARM.

2015 INNOVATION AWARD DESIGN AND DEVELOPMENT OF A GROUND-BREAKING, AUSTRALIAN PILE SYSTEM FOR MOREE SOLAR FARM. 2015 INNOVATION AWARD DESIGN AND DEVELOPMENT OF A GROUND-BREAKING, AUSTRALIAN PILE SYSTEM FOR MOREE SOLAR FARM. OVERVIEW Fotowatio Renewable Ventures (FRV) is a world leading solar company with an active

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017

More information

LOCAL LAW #4 OF 2018 OF THE TOWN OF TYRE TOWN OF TYRE SOLAR ENERGY LAW

LOCAL LAW #4 OF 2018 OF THE TOWN OF TYRE TOWN OF TYRE SOLAR ENERGY LAW LOCAL LAW #4 OF 2018 OF THE TOWN OF TYRE TOWN OF TYRE SOLAR ENERGY LAW Section 1. Authority This article is enacted pursuant to the authority granted by Section 10(1)(i) of the Municipal Home Rule Law,

More information

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red.

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red. Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red. Index Sec. 10-23. Solar Energy Systems Article 9. Use Matrix

More information

6. Project Description

6. Project Description 6. Project Description As previously noted, the Project will supply electricity from the 500 kv system to the 230 kv system in order to replace the loss of the Pickering NGS (see Section 1.1 for the need

More information

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction 2.7 Generic Mitigation Measures 2.7.1 Avifauna CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction Vehicles and machinery can impact on natural vegetation

More information

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 City of Santa Monica TABLE OF CONTENTS GENERAL INFORMATION ABOUT SOLAR PHOTOVOLTAIC SYSTEMS... 2 RESOURCES... 3 GENERAL 3 1.0

More information

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,

More information

Background Information Document

Background Information Document Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Richards Bay: ERM Ref Number: 0320839 Purpose of this Background

More information

Renewable Energy. Innovative Engineering Solutions

Renewable Energy. Innovative Engineering Solutions Renewable Innovative Engineering Solutions Renewable Today Our Expertise There are many drivers for change in the power sector. One indication of this is the rapid growth of renewable energy. Around $40

More information

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA BACKGROUND INFORMATION DOCUMENT SRK Project 364470/42G June 2007

More information

Renewable Energy Approval Documents Cochrane Solar Project Executive Summary January 25, 2013

Renewable Energy Approval Documents Cochrane Solar Project Executive Summary January 25, 2013 Renewable Energy Approval Documents Cochrane Solar Project Executive Summary January 25, 2013 Cochrane Solar Project Executive Summary Northland Power Inc. Cochrane Solar Project January 25, 2013 Executive

More information

ORKNEY SOLAR FARM, NORTH WEST PROVINCE

ORKNEY SOLAR FARM, NORTH WEST PROVINCE ORKNEY SOLAR FARM, NORTH WEST PROVINCE ENVIRONMENTAL MANAGEMENT PROGRAMME DEA REFERENCE: 14/12/16/3/3/2/954 February 2017 Prepared for Genesis Orkney Solar (Pty) Ltd Unit B10, c/o Century Plaza & Heron

More information

4 PROJECT ALTERNATIVES

4 PROJECT ALTERNATIVES 4 PROJECT ALTERNATIVES As per the EIA Regulations published in Government Notice R543 of 18 June 2010 in terms of Section 24 (5) of the National Environmental Management Act (Act No. 107 of 1998), feasible

More information

COUNTY COUNCIL OF BALTIMORE COUNTY, MARYLAND Legislative Session 2017, Legislative Day No. 11. Bill No

COUNTY COUNCIL OF BALTIMORE COUNTY, MARYLAND Legislative Session 2017, Legislative Day No. 11. Bill No COUNTY COUNCIL OF BALTIMORE COUNTY, MARYLAND Legislative Session 0, Legislative Day No. Bill No. - Mrs. Vicki Almond, Councilwoman By the County Council, June, 0 AN ACT concerning Solar Facilities A BILL

More information

D-1. SOUTH PEACE EAST AND WEST SOP PROJECTS PATRICK HENN, DEVELOPMENT MANAGER PRRD Board of Directors Meeting, April

D-1. SOUTH PEACE EAST AND WEST SOP PROJECTS PATRICK HENN, DEVELOPMENT MANAGER PRRD Board of Directors Meeting, April SOUTH PEACE EAST AND WEST SOP PROJECTS PATRICK HENN, DEVELOPMENT MANAGER PRRD Board of Directors Meeting, April 28 2016 Renewable Energy Systems (RES) In Canada for more than 12 years Family-owned company

More information

PORTIONS 14, 15 & 18 OF THE FARM RONDE VALLEY NO 187 DIVISION GEORGE

PORTIONS 14, 15 & 18 OF THE FARM RONDE VALLEY NO 187 DIVISION GEORGE PORTIONS 14, 15 & 18 OF THE FARM RONDE VALLEY NO 187 SUBDIVISION AND CONSOLIDATION CLIENT: DERBYHOUSE LIMTED PREPARED BY: MARIKE VREKEN URBAN AND ENVIRONMENTAL PLANNERS FEBRUARY 2014 CONTENTS (I) TABLE

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22447-D01-2017 Vauxhall Solar Power Plant July 4, 2017 Alberta Utilities Commission Decision 22447-D01-2017 Vauxhall Solar Power Plant Proceeding 22447 Application 22447-A001 July 4, 2017 Published

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT PROPOSED CONSTRUCTION OF 400/132KV MARANG B SUBSTATION AND ±2KM, 400kv POWER LINE LOOPING IN AND OUT FROM THE BIGHORN-MARANG OR MEDUPI MARANG 400KV POWERLINES WITHIN RUSTENBURG

More information

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash Specifications Request for Quotation (RFQ) RFQ Title RFQ Number Level 1 Essential Energy Works for the Warialda Truck Wash GWY_1819_Q03 Issue Date 21st December 2018 This document contains the specification

More information

BACKGROUND INFORMATION DOCUMENT:

BACKGROUND INFORMATION DOCUMENT: BACKGROUND INFORMATION DOCUMENT: APPLICATION FOR A MINING RIGHT MMAKAU COAL (PTY) LTD SCHURVEKOP 227 IS, BETHAL, MPUMALANGA 1. INTRODUCTION Mmakau Coal (Pty) Ltd intends to submit an application for a

More information

White Rock Wind Farm Project Update for Community Consultative Committee 4th February 2016

White Rock Wind Farm Project Update for Community Consultative Committee 4th February 2016 White Rock Wind Farm Project Update for Community Consultative Committee 4th February 2016 1 Content 1. Project Status 2. Early Works 3. Modification Application 4. Expected Program 5. Project Organisation

More information

11 CONCLUSIONS, RECOMMENDATIONS AND WAY FORWARD Need for the project 11-1

11 CONCLUSIONS, RECOMMENDATIONS AND WAY FORWARD Need for the project 11-1 11 CONCLUSIONS, RECOMMENDATIONS AND WAY FORWARD 11-1 11.1 Need for the project 11-1 11.2 Alternatives 11-1 11.2.1 Site alternative 11-1 11.2.2 Generation alternatives 11-2 11.2.3 Modes of transport during

More information

PROPOSED ALLDAYS SOLAR FACILITY - PHASE 1, LIMPOPO PROVINCE. DEA Ref No: 14/12/16/3/3/2/329

PROPOSED ALLDAYS SOLAR FACILITY - PHASE 1, LIMPOPO PROVINCE. DEA Ref No: 14/12/16/3/3/2/329 PROPOSED ALLDAYS SOLAR FACILITY - PHASE 1, LIMPOPO PROVINCE DEA Ref No: 14/12/16/3/3/2/329 CONSTRUCTION & OPERATION DRAFT ENVIRONMENTAL MANAGEMENT PROGRAMME Submitted as part of the Draft Environmental

More information

CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE

CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE April 22, 2008 SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE April 22, 2008 TABLE OF CONTENTS 1.0 MARKING...3 1.1 MAIN SERVICE DISCONNECT...3

More information

REQUEST FOR PROPOSALS for

REQUEST FOR PROPOSALS for REQUEST FOR PROPOSALS for Ground Mounted & Rooftop Solar Photovoltaic System Issued by Pearlstone Conference & Retreat Center Issued: June 25, 2018 Table of Contents I. Overview... 3 Intent... 3 Proposal

More information

DRAFT BASIC ASSESSMENT REPORT FOR PUBLIC REVIEW 15 MARCH APRIL 2018 VOLUME 1: (MAIN REPORT & APPENDIX A to D)

DRAFT BASIC ASSESSMENT REPORT FOR PUBLIC REVIEW 15 MARCH APRIL 2018 VOLUME 1: (MAIN REPORT & APPENDIX A to D) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE LULAMISA-DIEPSLOOT EAST-BLUE HILLS-CROWTHORNE 88 kv POWER LINE AND ASSOCIATED SUBSTATIONS NEAR MIDRAND IN GAUTENG PROVINCE DRAFT BASIC

More information

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project Mohawk College Hamilton, ON Fennell Campus Wind Project H336493-0000-07-124-0001 Rev. C September 24, 2010 Project Report Mohawk College Fennell Campus Wind Project September 24, 2010 Table of Contents

More information

SOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS

SOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS Chapter XI SOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS 1. Purpose Rev. 06-07-17; Ord. 752 A. The purpose of this Chapter is to maintain the City s attractiveness, protect the safety of the people, and

More information

Assessor s Parcels for Project Site Assessor s Parcel Number (APN): 879-110-001 Legal Description: Northeast ¼ of Section 15, Township 7 South, Range 21 East Tentative NOP Agency Mailing List California

More information

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017 FALL 2017 PROJECT OVERVIEW EDF EN Canada is proposing to develop, construct, and operate the Cypress Wind Power Project with 243.6 megawatts (MW) of generating capacity. The Project is south of Dunmore,

More information

Big Thunder Wind Park

Big Thunder Wind Park Construction Plan Report DRAFT Prepared by: M.K. Ince and Associates Ltd. May 18, 2010 TABLE OF CONTENTS BIG THUNDER WIND PARK... 1 1 PROJECT OVERVIEW... 1 1.1 PROJECT SCHEDULE... 2 2 CONSTRUCTION ACTIVITIES...

More information

Kendal /Kusile to Zeus Environmental Monitoring Report

Kendal /Kusile to Zeus Environmental Monitoring Report MONTHLY ENVIRONMENTAL MONITORING REPORT Power Lines from Kendal/Kusile to Zeus Substation Bravo Integration Project Bravo 4: Construction of two 400 kv lines DEA Ref # 12/12/20/1095 Report Prepared for:

More information

1. INTRODUCTION Motivation for the Proposed Project

1. INTRODUCTION Motivation for the Proposed Project 1. INTRODUCTION 1.1. Motivation for the Proposed Project The motivation for the establishment of a new substation and the associated Transmission line infrastructure is dictated by the rapid economic and

More information

Introduction to Photovoltaic (PV) Facilities

Introduction to Photovoltaic (PV) Facilities Introduction to Photovoltaic (PV) Facilities Hunterdon County Planning Board TYPES OF SOLAR PANEL DEVELOPMENTS Fixed Tilt Ground Mount Arrays Usually: Ground based PV facilities Typically utilize open

More information

Contents. 1 Introduction Background Aim of this document The Network in Dumfries and Galloway Asset Replacement...

Contents. 1 Introduction Background Aim of this document The Network in Dumfries and Galloway Asset Replacement... Contents 1 Introduction... 2 2 Background... 2 3 Aim of this document... 3 4 The Network in Dumfries and Galloway... 3 5 Asset Replacement... 5 6 Connection of Renewable Generation... 6 7 Interconnector

More information