NO-DIG TECHNOLOGY AS A PREVENTION FOR ENVIRONMENTALLY HAZARDOUS LANDSLIDES HIGH RIVERBANK STABILISATION AT ERCSI, HUNGARY

Size: px
Start display at page:

Download "NO-DIG TECHNOLOGY AS A PREVENTION FOR ENVIRONMENTALLY HAZARDOUS LANDSLIDES HIGH RIVERBANK STABILISATION AT ERCSI, HUNGARY"

Transcription

1 NO-DIG TECHNOLOGY AS A PREVENTION FOR ENVIRONMENTALLY HAZARDOUS LANDSLIDES HIGH RIVERBANK STABILISATION AT ERCSI, HUNGARY Case study for the 23rd NO-DIG INTERNATIONAL CONFERENCE AND EXHIBITION September 2005 Rotterdam Speaker: Istvan Szemesy, Sycons Ltd., Hungary

2 GENERAL GEOTECHNICAL INFORMATION ON THE LAND-SLIDE ENDANGERED AREAS IN HUNGARY AND THE MAIN REASONS OF THE LANDSLIDES HAPPENED LAST YEARS There were very intensive rainy periods in the years and Large scale landslides occurred on the areas, where clay, silt, loessic and fine / medium sand layers had been settled in different geological periods in a light slope towards a creek or river creating a sandwich-like composite soil structure. Under normal conditions (at average rainfall) the groundwater outflow capacity of the permeable layers in the sandwich-like composite soil structures on these areas is equal or higher than the quantity of the streaming groundwater arrives from the background water collector areas. In this case the whole composite soil structure is in stable, positive balanced condition. In certain cases either the quantity of the streaming groundwater increases suddendly (e.g.: extreme rainfall, damage in the public utility lines, etc.), or the water outflow capacity of the permeable layers decreases dramatically. There is no more positive balance between the quantity of the streaming groundwater and the outflow capacity of the permeable layers. RESULT:..LANDSLIDES.. 2

3 Fig. No 1. Medium water level at Danube, the outflow is free for the streaming groundwater, the riverbank slope is in stable condition Streaming groundwater, free outflow Riverbank slope Danube Non permeable soil layers Permeable soil layers Soil layers settled in a light slope 3

4 Fig.. No. 2. High tide, the permeable layers are in saturated condition, but the outflow is still free for the streaming groundwater Riverbank slope Groundwater arrives from the background collector area Danube, high tide Slope Water saturated permeable soil layers Non permeable layers 4

5 Fig.. No. 3. After high tide. First slide at the riverside occurred by the wave erosion and the loss of passive resistant forces in the completely saturated soil layers (there were no riverside protection structures) There is no more free outflow for the streaming groundwater. Permeable soil layers Danube, middle level First slide in the saturated soil layers Non permeable soil layers 5

6 Fig.. No. 4. Next high tide.. The piezometric pressure increases in the water saturated permeable soil layers because of the limited outflow. Streaming groundwater from the background collector areas Danube Next high tide The first slide occured earlier Non permeable soil layers In the water saturated permeable soil layers the groundwater is under high piezometric pressure 6

7 Fig. No. 5. After quick come down of the second high tide the next slides occur Water saturated permeable soil layers under high piezometric pressure Danube Middle level The earlier first slide Non permeable soil layers The new slides occur after the second high tide 7

8 How could be prevented the dangerous situation, when the quantity of groundwater streaming in the permeable layers exceeds the outflow capacity of these layers? (This is the main reason of the landslides.) There are two possibilities to recreate the positive balance: Drastic minimization of the streaming groundwater in the permeable layers on the slide endangered areas. (Minimize the infiltration on the background collector areas by levelling, grassing of the soil surface, forest plantation, construction and rehabilitation of the surface/subsurface rainwater collector systems, the sewer and freshwater pipelines.) In case of very intensive and long rainy periods these above mentioned measures are not sufficient enough to prevent the landslides. Significant increase in the outflow capacity of the permeable soil layers. The combined application of the above mentioned two possibilities is the real solution!!!!!!! 8

9 Permeability and outflow capacity increase of the semi- permeable layers at land-slide endangered riverbanks by bored long-distance filter collector lines The necessary steps: Detailed geotechnic survey to measure the position, the depth, the thickness of the subsurface soil layers and to detect the subsurface declinations. Taking samples from the subsurface soil layers for laboratory tests (granulometry, permeability, water content, cohesion, internal friction, etc.) Building a network of groundwater control wells. Detailed continuous control of the groundwater level on the area prior laying the filter collector line system. Design of the bored subsurface long-distance filter collector line system. Laying of special self-cleaning filter collector line system by horizontal directional drilling or horizontal thrustboring with reusable steel casing pipes. Monitoring the continuous lowering of the groundwater level. 9

10 Fig. No. 6. Typical cross section of the land-slide endangered riverbank at Ercsi/Hungary after the first land-slides. Groundwater level in the control well Saturated permeable layers Groundwater level Non permeable layers Non permeable claystone massivum Danube The positions of the soil layers, the sliding surfaces and the groundwater level according to the geotechnic survey and groundwater monitoring after the slides occured in early

11 Fig. No. 7. Horizontal directional drilling in the lowest permeable soil layer Alignment of the drill rods Alignment of the drill rods (red) The boring head arrives to the surface on the non disturbed area Horizontal directional drilling directed by long range sonde system HDD machine Non permeable claystone massivum Danube Applying the long range sonde direction system it is possible to follow the slope of the permeable layers detected by the detailed geotechnic survey earlier. 11

12 Fig. No. 8. Laying the special self-cleaning filter pipes by backpulling the drill rods Special self-cleaning filter pipe Alignment of the special selfcleaning filter pipe in the lowest permeable soil layer HDD machine Non permeable claystone massivum Danube 12

13 Fig. No. 9. The multi-level special filter line system laid by horizontal directional drilling The self-cleaning filter lines Groundwater collector and control manhole Free outflow to the Danube By the application of this multi-level filter line system on the whole riverbank area - endangered with land-sliding earlier the water saturated permeable layers became pactically dry (except of the lowest permeable layer) and the piezometric pressure in these layers ceased. There are no more reasons for land-slides, the whole area is in a stable position now. 13

14 We will show now a short film report on the riverbank stabilisation works at Ercsi/Hungary. 14

15 15

16 Thanks for your kind attention Questions, remarks? For additional informations please contact us directly: 16

2. PLANNING AND MAKING A SOIL SURVEY

2. PLANNING AND MAKING A SOIL SURVEY Sample all soil horizons over 10 cm in thickness; all samples should represent natural soil horizons or 2.0 The purpose of the soil survey 2. PLANNING AND MAKING A SOIL SURVEY The purpose of making a soil

More information

S1004 The Groundwater Survey by using Resistivity Method and its Application in the Republic of Rwanda

S1004 The Groundwater Survey by using Resistivity Method and its Application in the Republic of Rwanda S1004 The Groundwater Survey by using Resistivity Method and its Application in the Republic of Rwanda K. Nakamura* (NTC International Co., Ltd.), T. Aizawa (Suncoh Consultants Co., Ltd.), S. Matsuda (NTC

More information

SUBSURFACE DAMS. Action Sheet 17. What is this Action Sheet about?

SUBSURFACE DAMS. Action Sheet 17. What is this Action Sheet about? SUBSURFACE DAMS What is this Action Sheet about? Action Sheet 17 In dry sandy areas, riverbeds are dry much of the time. When it rains, the river fills up, but the water flows away, often carrying precious

More information

SITE INVESTIGATION Validation and Interpretation of data

SITE INVESTIGATION Validation and Interpretation of data SITE INVESTIGATION Validation and Interpretation of data Dr. G.Venkatappa Rao The Impact 1 The Need To determine the type of foundation To assess bearing capacity/settlement Location of Ground water table,issues

More information

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology GG22A: GEOSPHERE & HYDROSPHERE Hydrology Definitions Groundwater Subsurface water in soil or rock that is fully saturated. Aquifer Contains enough saturated material to yield significant quantities of

More information

Movement and Storage of Groundwater The Hydrosphere

Movement and Storage of Groundwater The Hydrosphere Movement and Storage of Groundwater The Hydrosphere The water on and in Earth s crust makes up the hydrosphere. About 97 percent of the hydrosphere is contained in the oceans. The water contained by landmasses

More information

The Construction General Permit and Erosion Prevention and Sedimentation Control

The Construction General Permit and Erosion Prevention and Sedimentation Control The Construction General Permit and Erosion Prevention and Sedimentation Control Presented at the Tennessee Gas Association Conference April 23, 2008 More than thirty years ago, two-third of the nation's

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

How to Apply the Virginia Underground Utility Damage Prevention Act to a Jack and Bore Operation: A Case Study. Jessica M. W. Hou, P.E.

How to Apply the Virginia Underground Utility Damage Prevention Act to a Jack and Bore Operation: A Case Study. Jessica M. W. Hou, P.E. How to Apply the Virginia Underground Utility Damage Prevention Act to a Jack and Bore Operation: A Case Study Jessica M. W. Hou, P.E., BCEE Agenda What is a jack and bore? What is does the Underground

More information

General Groundwater Concepts

General Groundwater Concepts General Groundwater Concepts Hydrologic Cycle All water on the surface of the earth and underground are part of the hydrologic cycle (Figure 1), driven by natural processes that constantly transform water

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

Pump Station Excavation

Pump Station Excavation Pump Station Excavation SPONSORED BY THE KIEWIT CORPORATION A capstone project for the The Department of Civil & Environmental Engineering in The Ira A. Fulton College of Engineering and Technology Brigham

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures Arbeitsausschuß "Ufereinfassungen" der Hafentechnischen Gesellschaft e.v. Recommendations of the Committee for Waterfront Structures Harbours and Waterways 9., completely revised Edition TABLE OF CONTENTS

More information

Construction. Analysis. Hydrographs

Construction. Analysis. Hydrographs Construction And Analysis Of Hydrographs Hydrographs Special graphs that show a changes in a river s discharge over a period of time, usually in relation to a rainfall event. River Discharge Is the amount

More information

Geotechnical aspects on design and construction of stabilization ponds

Geotechnical aspects on design and construction of stabilization ponds Water Resources Management III 31 Geotechnical aspects on design and construction of stabilization ponds R. Flores Berrones & X. Li Mexican Institute of Water Technology Abstract A geotechnical methodology

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

Feasibility Study of Subsurface Seawater Intakes West Basin Municipal Water District s Proposed El Segundo Desalination Facility

Feasibility Study of Subsurface Seawater Intakes West Basin Municipal Water District s Proposed El Segundo Desalination Facility Feasibility Study of Subsurface Seawater Intakes West Basin Municipal Water District s Proposed El Segundo Desalination Facility November 16, 2015 Bureau of Reclamation Project No. R14AP00173 1 Outline

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

6-5 Analysis of water storage state by the subsurface dam

6-5 Analysis of water storage state by the subsurface dam 6-5 Analysis of water storage state by the subsurface dam From the results of the study and the observation described above, an analysis of the water storage mechanism by the subsurface dam was carried

More information

Topic: Site Formation

Topic: Site Formation Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed

More information

Nowadays, horizontal directional drilling rigs are. Complex crossings made easy

Nowadays, horizontal directional drilling rigs are. Complex crossings made easy Dr. Hans Joachim Bayer, TRACTO TECHNIK GmbH & Co. KG, Germany, discusses the benefits of horizontal directional drilling, in particular the use of mega rigs. Complex crossings made easy Nowadays, horizontal

More information

Geotechnical Construction Observation Report White Point Landslide Dewatering Drains City of Los Angeles San Pedro District Los Angeles, California

Geotechnical Construction Observation Report White Point Landslide Dewatering Drains City of Los Angeles San Pedro District Los Angeles, California Geotechnical Construction Observation Report White Point Landslide Dewatering Drains City of Los Angeles San Pedro District Los Angeles, California July 2, 2014 Submitted To: Mr. Christopher F. Johnson,

More information

Hydrosphere: Water Distribution

Hydrosphere: Water Distribution Hydrosphere: Water Distribution 1.Think About It Why is it that the water in your bottle could have been drunk by George Washington? 2. The Hydrosphere: An Overview The hydrosphere is ALL the water on/in/over

More information

Paraprofessional Training Session 1

Paraprofessional Training Session 1 Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor

More information

Introduction to Groundwater

Introduction to Groundwater Introduction to Groundwater Unit Essential Questions: How does the Earth cycle its water through its major reservoirs? How does society s use of resources affect water quality? Presentation Objectives:

More information

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA)

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-9 GEOTECHNICAL

More information

Edithvale and Bonbeach Level Crossing Removal Project

Edithvale and Bonbeach Level Crossing Removal Project Edithvale and Bonbeach Level Crossing Removal Project Passive subsurface horizontal drain Peer Review Kim Chan Work undertaken and general comments Scope of my review in relation to the Edithvale project:

More information

Trenchless Technology

Trenchless Technology TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology

More information

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS.

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS. TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS. Author: Frank B. Stevens Pr. Eng, BSc (Civil), HonFIMESA, FSAICE Technical Representative for Herrenknecht AG (Utility Tunnelling). stevens.frank@herrenknecht.de

More information

Appendix D. Erosion Management Sub- Plan

Appendix D. Erosion Management Sub- Plan Appendix D Erosion Management Sub- Plan DRENNAN SOLAR ENERGY FACILITY EROSION MANAGEMENT PLAN PRODUCED FOR ERM ON BEHALF OF SOLAIREDIRECT BY Simon.Todd@3foxes.co.za JUNE 2013 PURPOSE The purpose of the

More information

Geoenvironmental impact assessment of a landfill for solid chemical wastes

Geoenvironmental impact assessment of a landfill for solid chemical wastes ALOJZY SZYMAŃSKI, ZBIGNIEW LECHOWICZ, KAZIMIERZ GARBULEWSKI Department of Geotechnical Engineering, Warsaw Agricultural University SGGW, Poland Geoenvironmental impact assessment of a landfill for solid

More information

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

GeoEng2000 An International Conference on Geotechnical & Geological Engineering GeoEng2000 An International Conference on Geotechnical & Geological Engineering 19-24 November 2000 Melbourne Exhibition and Convention Centre Melbourne, Australia Barrettes : A versatile foundation for

More information

Trenchless Pipeline Crossings

Trenchless Pipeline Crossings Trenchless Pipeline Crossings Overview Where we started Horizontal Directional Drilling 1960 s Evolution of the process Where we are today HDD Microtunneling Direct Pipe Crossing Process Where we re going

More information

Chapter A-10 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (NATIONAL STARCH AREA)

Chapter A-10 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (NATIONAL STARCH AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-10 GEOTECHNICAL

More information

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS PERMEABLE PAVEMENTS (SUDS) This leaflet highlights the basic requirements for laying Ibstock clay pavers to form a permeable pavement. Ibstock clay pavers are intended for domestic use only i.e. patios

More information

ECO MESH PIPE. ECO-Mesh Inc.

ECO MESH PIPE. ECO-Mesh Inc. ECO MESH PIPE ECO-Mesh Inc. http://www.eco-mesh.com ECO MESH PIPE - Manufacturing ECO Mesh Pipe is Made of Extruded Plastic Shape of ECO Mesh Pipe Square Mesh Pipe Arched Mesh Pipe Mesh Drainage Pipe v

More information

Inflow pipe. Drain. Drain

Inflow pipe. Drain. Drain Inflow pipe Screened overflow Drain Foul flush diverter Screened intake Manhole cover Maximum water level Seal Inspection cover Possible local drainage through screen Drain Bottom sloped Screened outlet

More information

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Prepared for: City of Bellingham Public Works Department Environmental Resource Division 210 Lottie St.

More information

Desalination Intake Approaches: Open Ocean Intake vs Subsurface. Monterey Bay Water Works Association

Desalination Intake Approaches: Open Ocean Intake vs Subsurface. Monterey Bay Water Works Association Desalination Intake Approaches: Open Ocean Intake vs Subsurface Monterey Bay Water Works Association 16 October 2008 Todd Reynolds, PE Michael Maley, PE, PG, CHg Presentation Outline Introduction to Desalination

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

GROUND WATER RECHARGE

GROUND WATER RECHARGE ST 3.4 GROUND WATER RECHARGE Version : April 2009 Published by : Foundation Connect International Autors : Henk Holtslag & John de Wolf Disclaimer This manual (ST 3.4) is part of the main manual, named

More information

Scheduling Maintenance for Dry Ponds

Scheduling Maintenance for Dry Ponds Visual Inspection for Sedimentation Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes. 1.1 Excavation - General Excavation is the removal of all material (including ice, water, etc.) required for the construction of foundations or substructures as indicated on the drawings or as determined

More information

Instructions for installation the GRAF EcoBloc Inspect flex

Instructions for installation the GRAF EcoBloc Inspect flex Instructions for installation the GRAF EcoBloc Inspect flex GRAF EcoBloc Inspect flex Order-Nr. 402005 The points described in these instructions must be observed under all circumstances. All warranty

More information

Development of the Countermeasure against Roadbed Degradation under Ballastless Tracks for Existing Lines

Development of the Countermeasure against Roadbed Degradation under Ballastless Tracks for Existing Lines Challenge H: For an even safer and more secure railway Development of the Countermeasure against Roadbed Degradation under Ballastless Tracks for Existing Lines Katsumi MURAMOTO, Takahisa NAKAMURA Track

More information

Architectural Technology & Construction Management

Architectural Technology & Construction Management Architectural Technology & Construction Management Drain and sewer TCU 2016 Sewer plan Drain water (page 18-21) Waste water (page 3-6) Rain water (page 14-16) Above pages refer to Guidelines for Design

More information

Project UR1335: Corridors of Freedom Sewer Upgrades: Turffontein

Project UR1335: Corridors of Freedom Sewer Upgrades: Turffontein Project UR1335: Corridors of Freedom Sewer Upgrades: Turffontein FEBRUARY 2018 Prepared by: Abaziyo Consulting Engineers cc P O. Box 5672 Halfway House 1685 Tel. (011) 542 9950/1/2/3/4 Fax. (011) 542 9955

More information

Background. AEM Tier 2 Worksheet Farmstead Water Supply Evaluation. AEM Principle: Glossary

Background. AEM Tier 2 Worksheet Farmstead Water Supply Evaluation. AEM Principle: Glossary AEM Tier 2 Worksheet Glossary Casing: Steel or plastic pipe installed while drilling a well, to prevent collapse of the well bore hole and the entrance of contaminants, and to allow placement of a pump

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Managed Aquifer Recharge Trial

Managed Aquifer Recharge Trial Managed Aquifer Recharge Trial Why are we doing it? The water levels in the Makauri Aquifer are declining. The aquifer is a much needed source of water for irrigating crops - it s an estimated $20m value

More information

SEEPAGE FLOW-STABILITY ANALYSIS OF THE RIVERBANK OF SAIGON RIVER DUE TO RIVER WATER LEVEL FLUCTUATION

SEEPAGE FLOW-STABILITY ANALYSIS OF THE RIVERBANK OF SAIGON RIVER DUE TO RIVER WATER LEVEL FLUCTUATION Geotech., Const. Mat. and Env., ISSN:2186-2982(P), 2186-2990(O), Japan SEEPAGE FLOW-STABILITY ANALYSIS OF THE RIVERBANK OF SAIGON RIVER DUE TO RIVER WATER LEVEL FLUCTUATION A. Oya 1, H.H. Bui 2, N. Hiraoka

More information

FINAL REPORT TABLE OF CONTENTS

FINAL REPORT TABLE OF CONTENTS FINAL REPORT TABLE OF CONTENTS VOLUME 5 of 5 : APPENDIX Chapter 15 Appendix Geotechnical Investigation 15.1 Borehole Log ------------------------------------------------------------------- A15-1 15.2 Slope

More information

AQUIFERS OF THE SAN ANTONIO RIVER BASIN

AQUIFERS OF THE SAN ANTONIO RIVER BASIN AQUIFERS OF THE SAN ANTONIO RIVER BASIN OBJECTIVES Explain what an aquifer is Identify the major aquifers located in the San Antonio River Basin Explain the difference between porosity and permeability

More information

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS, Zerihun Alemayehu GROUNDWATER Groundwater takes 0.6% of the total water in the hydrosphere 0.31% of the total water in the hydrosphere has depth less than

More information

TBM rescue projects using shafts and ground freezing

TBM rescue projects using shafts and ground freezing TBM rescue projects using shafts and ground freezing Dipl.-Ing. Michael Löffler, Dipl.-Ing. Helmut Haß (CDM Consult GmbH, Germany) Dipl.-Ing. Thomas Ahlbrecht (Deilmann-Haniel Shaft Sinking GmbH, Germany)

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e.

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e. No Dig Technology Introduction: No-Dig Technology is the art and science of installing, repairing or renewing underground pipes, ducts and cables using techniques that minimizes / eliminates the need for

More information

Pipe Ramming with HDD. Presentation Outline

Pipe Ramming with HDD. Presentation Outline EXAMINING PIPE RAMMING DESIGN- A FORENSIC ANALYSIS OF A HIGH RISK PROJECT Kimberlie Staheli, Ph.D., P.E. Staheli Trenchless Consultants Seattle, WA, USA Presentation Outline Pipe Ramming State of the Art

More information

Awesome Aquifers A DEMONSTRATION. THE GROUNDWATER FOUNDATION

Awesome Aquifers A DEMONSTRATION. THE GROUNDWATER FOUNDATION Awesome Aquifers A DEMONSTRATION THE GROUNDWATER FOUNDATION www.groundwater.org Groundwater is water found underground in the spaces and cracks between rocks, sand, soil and clay. Groundwater is stored

More information

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject 56 THE TRENCHLESS TREND Pipeline shore crossings are often one of the most Costs and risks involved will change with every site, and every complex and technically challenging elements of any project. subsea

More information

What do you mean we can t do HDD?

What do you mean we can t do HDD? Clark Public Utilities Salmon Creek Crossing What do you mean we can t do HDD? Presented by Matt Hickey, PE Murray, Smith & Associates, Inc. and Russ Knutson, PE Clark Public Utilities Project Team Clark

More information

INNOVATIVE USES OF ENGINEERED SOILS AND FUNCTIONAL LANDSCAPES IN STORMWATER MANAGEMENT AND LAND PLANNING

INNOVATIVE USES OF ENGINEERED SOILS AND FUNCTIONAL LANDSCAPES IN STORMWATER MANAGEMENT AND LAND PLANNING INNOVATIVE USES OF ENGINEERED SOILS AND FUNCTIONAL LANDSCAPES IN STORMWATER MANAGEMENT AND LAND PLANNING Wayne E. King, Sr. AUTHOR: CEO, ERTH Products, LLC. 402 Line Creek Drive, Peachtree City, GA 30269.

More information

3.5 Geometric Road Design

3.5 Geometric Road Design 3.5 Geometric Road Design The purpose of road design is to produce specifications for road construction by determining the optimum road geometry that will accommodate the design vehicle configuration for

More information

Effective Stress Design For Floodwalls on Deep Foundations

Effective Stress Design For Floodwalls on Deep Foundations Effective Stress Design For Floodwalls on Deep Foundations Glen Bellew, PE Geotechnical Engineer USACE-Kansas City 23 April 2015 Contributors James Mehnert, PE USACE-Kansas City Paul Axtell, PE, D.GE Dan

More information

Take Me to the Other Side:

Take Me to the Other Side: Take Me to the Other Side: The Importance of Trenchless Crossings in Routing Water Supply Transmission Brooke Barry, E.I.T., Mark Havekost, P.E. 2014 HDR, all rights reserved. PURPOSE: Develop an additional

More information

Temporal Variation of Sedimentation on Paved and Unpaved Forest Roads in Belgrad Forest, Istanbul

Temporal Variation of Sedimentation on Paved and Unpaved Forest Roads in Belgrad Forest, Istanbul Temporal Variation of Sedimentation on Paved and Unpaved Forest Roads in Belgrad Forest, Istanbul Murat DEMIR Ender MAKINECI Merve KARTALOGLU Istanbul University, Faculty of Forestry Istanbul-TURKEY http://www.orman.istanbul.edu.tr/

More information

Site Investigation MUHAMMAD AZRIL HEZMI

Site Investigation MUHAMMAD AZRIL HEZMI Site Investigation MUHAMMAD AZRIL HEZMI Definition Essential part of the preliminary design workon any important structure in order to provide adequateand reliable geotechnical informationand site condition,

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

TURNER VALLEY GAS PLANT SITE PROTECTION AND REMEDIATION Mike McCrank, P.Eng. Project Engineer, Stantec Consulting Ltd., Calgary, Alberta, Canada

TURNER VALLEY GAS PLANT SITE PROTECTION AND REMEDIATION Mike McCrank, P.Eng. Project Engineer, Stantec Consulting Ltd., Calgary, Alberta, Canada TURNER VALLEY GAS PLANT SITE PROTECTION AND REMEDIATION Mike McCrank, P.Eng. Project Engineer, Stantec Consulting Ltd., Calgary, Alberta, Canada INTRODUCTION The Historic Turner Valley Gas Plant is located

More information

BL ENGLAND & RELIABILITY PIPELINE PROJECT. September 27, 2013

BL ENGLAND & RELIABILITY PIPELINE PROJECT. September 27, 2013 BL ENGLAND & RELIABILITY PIPELINE PROJECT September 27, 2013 PRESENTATION OUTLINE Utility Service in New Jersey South Jersey Gas overview Project background Existing system infrastructure Reliability considerations

More information

ASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION

ASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION ASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION Rolando P. Orense 1, Yukio Morita 2 and Masanori Ide 3 ABSTRACT This paper outlines the mitigation measures performed to

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

ALMEDA TUNNEL PAST, PRESENT AND FUTURE

ALMEDA TUNNEL PAST, PRESENT AND FUTURE ALMEDA TUNNEL PAST, PRESENT AND FUTURE Ravi Kaleyatodi, P.E., CPM Senior Assistant Director, City of Houston Ravi.kaleyatodi@cityofhouston.net Paul C. Wallick, P.E., Senior Project Manager Patricia Frayre,

More information

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual New York

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual New York On-Site Leaching Chamber Specifications & Features Design & Installation Manual New York 1 This manual provides general design and installation information for use of Arc plastic leaching chambers in the

More information

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

A complex reinforced structure applied at hilly road repair case in Taiwan

A complex reinforced structure applied at hilly road repair case in Taiwan A complex reinforced structure applied at hilly road repair case in Taiwan Introduction In the filed of geotechnical engineering, frequently soil nailing is applied to the application of the shallow-depth

More information

Pipe Bursting Services. pipe bursting. services

Pipe Bursting Services. pipe bursting. services Pipe Bursting Services pipe bursting services We have decades of experience solving the really big problems. Concern over the condition of the nation s infrastructure has caused government, municipalities,

More information

22 Tubewell Drainage Systems

22 Tubewell Drainage Systems 22 Tubewell Drainage Systems WK Boehmer' and J Boonstra2 221 Introduction ' Tubewell drainage is a technique of controlling the watertable and salinity in agricultural areas It consists of pumping, from

More information

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals DEQ Mission Statement The Michigan Department of Environmental Quality promotes wise management

More information

Section 8 Minimum Horizontal and Vertical Setback Distances

Section 8 Minimum Horizontal and Vertical Setback Distances Section 8 Minimum Horizontal and Vertical Setback Distances 1. Horizontal Distances a. Horizontal distances from the various components of a system to pertinent terrain features, including streams, lakes,

More information

Overview. Students will...

Overview. Students will... Overview Students will... Understand the interaction between ground water and surface water. Observe the difference between a permeable layer and an impermeable layer in an aquifer. See how water is stored

More information

A-2. Soils. Soil Media. Chapter Contents. Soil Media In-situ Soil Testing Separation from Seasonal High Water Table (SHWT)

A-2. Soils. Soil Media. Chapter Contents. Soil Media In-situ Soil Testing Separation from Seasonal High Water Table (SHWT) A-2. Soils Chapter Contents Soil Media In-situ Soil Testing Separation from Seasonal High Water Table (SHWT) Importance of Soil Composition in SCMs The soil composition of many stormwater SCMs also is

More information

Analysis of Retaining Structure of Deep Foundation Pit in Soft Soil Stabilization of Pumping Station * Yanming Chen and Wei Wu

Analysis of Retaining Structure of Deep Foundation Pit in Soft Soil Stabilization of Pumping Station * Yanming Chen and Wei Wu 5th International Conference on Education, Management, Information and Medicine (EMIM 2015) Analysis of Retaining Structure of Deep Foundation Pit in Soft Soil Stabilization of Pumping Station * Yanming

More information

Modular Sediment Barriers (Instream)

Modular Sediment Barriers (Instream) Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

Bates College Lewiston Maine

Bates College Lewiston Maine Bates College Lewiston Maine Success with the Stormcrete Precast Porous Concrete System used as a Gravel Filter Inlet 2017 North Country Stormwater Tradeshow and Conference Benefits of Porous Pavement

More information

Part III will be filled out by all applicants applying for a permit to perform dredging.

Part III will be filled out by all applicants applying for a permit to perform dredging. INTRODUCTION AND INSTRUCTIONS ENVIRONMENTAL QUESTIONNAIRE FOR CORPS OF ENGINEERS PERMIT APPLICATIONS Philadelphia District, Corps of Engineers Philadelphia, Pennsylvania 19107 CENAP-OP-R The District Engineer

More information

August 1, 2013 Reference No S048 Page 1 of 5

August 1, 2013 Reference No S048 Page 1 of 5 August 1, 2013 Reference No. 1201-S048 Page 1 of 5 Caledon Villas Corp. 55 Blue Willow Drive Woodbridge, Ontario L4L 9E8 Attention: Mr. John Spina Re: Addendum to Soil Investigation for Proposed Residential

More information

WATER SUPPLY SERVICES

WATER SUPPLY SERVICES PRACTICE MANUAL FOR WATER SUPPLY SERVICES IN KENYA PART A WATER SUPPLY A 1 LIST OF CONTENTS PART A - WATER SUPPLY Page: A1 1. INTRODUCTION A16 1.1 Background A16 1.2 Purpose A17 1.3 Water Supply Administration

More information

ACTIVITY: Infiltration Systems and Methods ST 03

ACTIVITY: Infiltration Systems and Methods ST 03 Runoff Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

Creek East Hill Slide Area, AMEC report submitted to AIT, October 2006, AMEC project number CG25239.

Creek East Hill Slide Area, AMEC report submitted to AIT, October 2006, AMEC project number CG25239. 4.20 S23 HIGHWAY 507:02 EAST OF MILL CREEK Site Description and Background This site is located on Highway 507, immediately east of the bridge across Mill Creek and approximately 5 km eastbound (measured

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

Permeable Pavement Facilities and Surfaces

Permeable Pavement Facilities and Surfaces Permeable Pavement Facilities and Surfaces This checklist is intended to highlight items critical to the performance of permeable pavement facilities and surfaces that need to be addressed in the design

More information

Northeastern Illinois

Northeastern Illinois Groundwater Recharge in Northeastern Illinois NE Illinois Regional Water Supply Planning Committee April22 22, 2008 Belvidere, IL Donald A. Keefer, P.G. Director Geologic Mapping & Hydrogeology Center,

More information

Confined Groundwater at No. 52, Hollywood Road, Hong Kong

Confined Groundwater at No. 52, Hollywood Road, Hong Kong International Conference on Slope Engineering, 8-10 December 2003, Hong Kong Confined Groundwater at No. 52, Hollywood Road, Hong Kong Jimmy Jiao, Chiman Leung, and Guoping Ding Department of Earth Sciences,

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING Journal of GeoEngineering, Vol. 5, No. 3, pp. 77-85, December 2010 Shou and Yen: On the Behavior of a Stuck Curved Pipejacking 77 ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING Keh-Jian Shou 1 and Jung-Hsing

More information