TAROOM COAL PROPRIETARY LIMITED (ABN ) ELIMATTA PROJECT UPDATE TO THE PROJECT APPLICATIONS SUPPORTING INFORMATION.

Size: px
Start display at page:

Download "TAROOM COAL PROPRIETARY LIMITED (ABN ) ELIMATTA PROJECT UPDATE TO THE PROJECT APPLICATIONS SUPPORTING INFORMATION."

Transcription

1 TAROOM COAL PTY LTD ABN: TAROOM COAL PROPRIETARY LIMITED (ABN ) ELIMATTA PROJECT UPDATE TO THE PROJECT APPLICATIONS SUPPORTING INFORMATION September INTRODUCTION 1.1 PURPOSE OF DOCUMENT This document is prepared in response to a request from the chief executive of the Department of Natural Resources and Mines (DNRM), pursuant to section 386J of the Mineral Resources Act 1989 (Qld) (MR Act) dated 28 July 2015 (DNRM Request). This document provides additional information supporting the mining lease applications (MLAs) 50254, and (Project MLAs) as requested in the DNRM Request. The information in this document prevails to the extent of any inconsistency with the supporting information initially provided to DNRM in 2009 in respect of the Project MLAs. 1.2 PROJECT OVERVIEW Taroom Coal Proprietary Limited ABN (Taroom Coal) has made the Project MLAs which comprise the Elimatta Mine Project (Project). MLA was made over Exploration Permit for Coal (EPC) 650 in June 2009 for the purpose of coal mining operations and activities. This application was made under section 234(1)(a) of the MR Act. MLA was made over part of EPC 1171 and Prospecting Permit (PP) in December The part of the application within PP50815 was abandoned in February 2013 when agreement could not be reached with the underlying EPC holder. MLA is an application for a specific purpose mining lease (ML) under section 234(1)(b) of the MR Act. MLA was made in December 2009 and is an MLA for transportation under section 316 of the MR Act. MLA is made over the area of land that joins EPC 1171 with EPC 650 to support development of the Project. Page 1 of 23

2 The Project is located in the Western Downs Regional Council area in southern inland Queensland, approximately 35 km west of Wandoan and 380 km north-west of Brisbane. Access to the Project area from Wandoan at the Leichhardt Highway is via the Jackson Wandoan Road to Bundi Road thence to Perretts Road; also known as the Yuleba-Taroom Road. The Project s location is shown in Figure 1. Figure 1: Elimatta Mine Project Location Page 2 of 23

3 Supporting Information as part of Section 15 of the Project MLAs was provided in Since then much work has been carried out to improve the definition of the Project, including: Additional exploration programs to provide data to incorporate into the geological models for mine planning and scheduling; Coal analysis and processing test work to provide data for processing design; Base design for the Project infrastructure, including the rail transport connection to the Surat Basin Rail corridor; Studies to support the Project Environmental Impact Statement (EIS); Preparation and presentation of the EIS; Public submissions stage of the EIS assessment process; Revised EIS and Response to Comments (RTC); Preparation of the Project Environmental Management Plan (EMP); and Extensive consultation with interested and/or affected parties, including local authority and State representatives, landowners and other resource companies. Other factors external to the Project but having the potential to have a significant influence on the Project include: New Hope Corporation Limited (NHC) takeover of Northern Energy Corporation Limited (NEC) in 2011 see section 1.2 below; NHC purchase of the North Surat MLA and EPC assets of Cockatoo Coal Pty Ltd in 2015, whereby it acquired the Collingwood, Taroom and Woori project areas see Figure 2; The significant change in the market dynamics for sea-borne traded thermal coal; The change in development status i.e. slowdown - of the Wandoan Project and the Surat Basin Rail Project; and The transition of the coal seam gas (CSG) activities in the area from, largely, development and construction to operations and production. Page 3 of 23

4 Figure 2: New Hope Corporation North Surat Properties The Project consists of the development of a 259 million tonne (Mt) thermal coal resource (JORC 2004 compliant) of the Juandah formation in the Surat Basin, South East Queensland, Australia. The Project is planned to mine up to 8.2 Mt of Run of Mine (ROM) coal per annum (pa) (average ~7.5 Mtpa), by open cut methods to produce on average 5 Mtpa of product coal for export. Project production life is anticipated to be more than 30 years based on current economic assessment of the resource. Subject to the grant of the MLAs and Environmental Authority (EA) for the Project, the construction period on site prior to the start of coal production is anticipated to be months with the first mine excavation activities site preparation and drainage management commencing after 13 months. Site construction activities will commence after grant of the MLs and once contractual arrangements are well progressed or in place for off-site supporting infrastructure requirements and services for rail (construction and operation), water and power. The Project will involve open cut mining using truck and excavator methods on MLA Topsoil stripped prior to mining will be stockpiled for later use in rehabilitation. Overburden will be relocated from above the coal seams to in-pit dumps, and in out-of-pit spoil dumps located on site and contiguous with the pit excavations. ROM coal will be transported in mine trucks along a purpose built haul road within MLA for processing on MLA A coal handling and preparation plant (CHPP) and associated mine infrastructure workshops, offices, train loader and rail balloon loop and waste storage areas - will be constructed on MLA Page 4 of 23

5 Processing will involve crushing, screening and washing to separate coal from waste materials. Waste rejects will be de-watered, with water recycled to the processing plant and solids disposed of within specially constructed storage areas and in spoil dumps. See Figure 3 for a general layout view of the Project. Product coal will be transported by rail via the Surat Basin Rail and the Moura Rail System to Gladstone Port - Wiggins Island Coal Export Terminal, for export. The medium to long term plan is to link the Project with the Surat Basin Rail via the West Surat Link see section 2.6. During construction the number of on-site personnel is estimated to peak at approximately 500 (erection of CHPP structure) and during operations to start at around 300 people, rising over time to more than 350. Mine operations are planned to be continuous 24 hours a day and all year. MLA covers an area of 2,772 hectares (ha) (plan MP43991), MLA covers an area of 1,072 ha (plan MP43992) and the transportation corridor MLA linking the two covers an area of ha (plan MP43993). Page 5 of 23

6 Figure 3: Elimatta Mine Project General Layout View Page 6 of 23

7 1.3 PROJECT PROPONENT Taroom Coal is the Project proponent. The Project s associated exploration tenements are held in the name of Taroom Coal and the MLAs are made in the name of Taroom Coal. Taroom Coal is a wholly owned subsidiary of NEC. At the time of the applications in 2009, NEC was an independent coal exploration and project development company listed on the Australian Securities Exchange (ASX). In 2010 NHC commenced an on-market takeover of NEC and in 2011 achieved full control. NEC and Taroom Coal thus became wholly owned subsidiary companies of NHC. NHC is an Australian owned Brisbane based coal exploration and mine development/operating company listed on the ASX (ASX code NHC). NHC has held interests in coal mining activities in Queensland and overseas for more than half a century. NHC s office is located at: 3/22 Magnolia Drive Brookwater Qld 4300 Phone Fax Website: PROJECT TENEMENTS Taroom Coal holds the following exploration tenements associated with the Project: EPC 650 (Elimatta) EPC 1171 (Perrett s Road) MLA over EPC 650 was made on 2 June The Project mining excavation area will be located within MLA EPC 1171 is the subject of MLA and is located ~4.0km to the north-east of MLA That application is to provide areas for mine infrastructure, coal processing, waste rejects storage and, potentially, an on-site accommodation facility. Coal mining is not proposed within MLA The area of MLA is required to support coal mining within MLA In addition, EPC 1205 (Culgowie) is located approximately 35 km east of the Project and near to the corridor for the Surat Basin Rail. Subject to exploration success, options for development of this area will be considered once the Project is up and running. Page 7 of 23

8 1.5 UNDERLYING TENURES MINING TENEMENTS Glencore Coal Queensland Pty Ltd and its joint venturers Sumisho Coal Australia Pty Ltd and ICRA Wandoan Pty Ltd (together Wandoan JV) hold MDL 411 and MDL 449 and are applicants for MLA MLA (for transport purposes) overlaps part of each of MDL 411 and MDL 449 and is wholly overlapped by MLA see Figure 4. Figure 4: Mining Tenements around the Elimatta Mine Project PETOLEUM TENEMENTS BG International (Aus) Pty Ltd, Tokyo Gas QCLNG Pty Ltd and CNOOC Coal Seam Gas Company Pty Ltd (together the Gas Party) are holders of ATP 852, which includes the area of MLA 50254, MLA and MLA The Gas Party also holds of PL 299 and PL 397. PL 299 includes the area of MLA and MLA PL 397 includes the area of MLA Figure 5 shows the area of the overlapping production tenements. Taroom Coal and the Gas Party are parties to a Co-Development Agreement dated 26 March As required under the MR Act and the Petroleum and Gas (Production and Safety) Act 2005, Taroom Coal and QGC Pty Ltd, as manager for the Gas Party, have exchanged technical and other information and have held discussion about making a Coordination Arrangement to cover the activities each wishes to carry out in the overlap area of MLA 50254, and and PL 299 Page 8 of 23

9 and PL 397. As at the date of this document (September 2015) a Coordination Arrangement that is acceptable to the Minister is anticipated to be finalised shortly. Figure 5: Petroleum Tenements and the Elimatta Mine Project Page 9 of 23

10 2.0 PROJECT DESCRIPTION 2.1 TECHNICAL AND FINANCIAL RESOURCES OF THE APPLICANT See attachments for details of the technical and financial resources available to Taroom Coal due to its subsidiary status to NHC. 2.2 PROJECT RESOURCES The coal resource within the MLA area has been classified into measured, indicated and inferred categories in accordance with the 2004 JORC Code as shown in Table 1. Table 1: Coal Resources within MLA Horizon Measured Tonnage - Mt Indicated Tonnage - Mt Inferred Tonnage - Mt UG Y A B BC C Sub Total Mt Mt 50 Mt Total 259 Mt 2.3 MINE OPERATIONS ON MLA Prior to the development of the Project, mine topsoil will be progressively removed from the footprint area and stockpiled for later re-use in rehabilitation activities. Progressive rehabilitation will be undertaken through the life of the Project as operation areas become available. A layout of the Project mining area as it is envisaged at about the year 10 stage of operation is provided in Figure 6 which shows the scheduled mining progression across the tenure area. The deposit to be mined within MLA comprises two major seams of economic interest; the A and B Seams with smaller contributions from the UG, Y and C seam groups. Typically the overburden above the A Seam averages about 40 m in thickness and varies between 20 m and 60 m. Also present in the overburden are two smaller upper seams, the UG and the Y seams. The typical depth of overburden above the UG Seam is 15 m to 20 m, the interburden down to the Y Seam is 7 m to 8 m and the typical interburden to the A Seam is 7 m to 8 m. The configuration of seams favours shovel/excavator and truck mining methods. The C Seam has not Page 10 of 23

11 been included in mine plans at prefeasibility study level on the basis of its incremental strip ratio below the B seam being too high to allow for economic extraction. The suitability of a dragline for overburden/interburden removal is currently under consideration and remains an option for the Project. Further details of the geology of the Project area are contained in the EIS and the Amended Initial Development Plan documentation. Figure 6: Indicative Mine Concept Plan at Operating Year 10 Page 11 of 23

12 Spoil will initially be placed out of pit beside the first excavation or used for construction of infrastructure and thereafter backfilled to the mining void. The Project plan proposes three open pit operating areas which are separated by a fault zone within the deposit towards the northern end and the creek diversion works. The larger southern area will contain the diversion of Horse Creek which would otherwise drain though the middle of the major mining area. The Horse Creek diversion is described in detail in the EIS and environmental management conditions are included in the draft EA. The final rehabilitation plan for overburden dumps and waste storage areas has been detailed in the EIS and EMP and management conditions are shown in the draft EA. Where water quality within the void is suitable for stock, a safe access to the water shall be provided for stock, or the water will be pumped to a stock watering point. Consultation with landholders will be undertaken to determine the preferred use for the water. Where water in voids is not suitable for stock, the voids will be bunded or fenced to prevent stock access. 2.4 MINE INFRASTRUCTURE ON MLA The following mine infrastructure for the Project will be located within MLA 50270: Access and haul roads; Offices, workshops and ablutions facilities; CHPP; ROM stockpile pads and lay-down areas; Surface water management dams; Raw water storage dam; Water pipelines; Fuel, oil and chemical storages; Transmission lines and power supply infrastructure; Train loading facility. The proposed infrastructure layout is as shown in Figure 7. Page 12 of 23

13 Figure 7: General Layout Infrastructure Arrangement on MLA Page 13 of 23

14 Approvals for off-lease transmission lines and water pipelines to be provided by others will be undertaken separately. 2.5 RUN OF MINE COAL TRANSPORT ON MLA The MLA for transportation purposes will provide a transport corridor linking the mining operations planned for MLA with the processing and coal handling operations planned for MLA ROM coal will be hauled in large capacity trucks to the dump hopper at the CHPP area or to stockpile for later reclaiming and processing. Rejects material from the CHPP will be hauled back to the mine excavation areas. The transport corridor will also provide for light vehicle access between the mining and processing areas and for services such as power, water, and communications to link the two production working areas. The facilities will be contained within the boundary of the transport corridor. 2.6 PRODUCT TRANSPORT AND PORT Transport of the Project product coal will be by rail to Gladstone Port. A new rail link is expected to be constructed to connect the Moura Rail System south to the Wandoan area to service the transport needs of the mine developments in the North Surat. The Surat Basin Infrastructure Corridor has been mandated by the State and declared as a State Development Area. As at September 2015, plans to develop the rail infrastructure have not been finalised. Participants in the Surat Basin Rail Joint Venture (who were the original proponents of the rail project and who hold the rail design information) have advised Taroom Coal that a project to finalise corridor land acquisition, re-validate the design, establish the construction program and then to construct the rail to a ready for operations stage, would likely take in the order of months. Taroom Coal intends to continue to work closely with potential developers of the rail so that it is able to contract for capacity should the opportunity arise and the economics be acceptable. The original proposal for the Project as a standalone mine development (owned by NEC) was for a rail connection from the mine area to join the SBR at a location approximately 10 km north of Wandoan. This connection was named the West Surat Link (WSL). In the period following making the MLAs in 2009 a large body of work has been carried out delineating a probable corridor for the WSL and environmental and initial sign studies completed. This work is comprehensively reported in the EIS documentation. Page 14 of 23

15 The probable corridor location, as shown in Figure 8, has been selected as a best balance between the competing interests: Minimising disruptions to landowners whose property would be crossed by the corridor; Avoiding potential sterilisation of coal resources; Providing for extensions for the corridor (and rail) further westward to service mine development opportunities west (and also south) of Elimatta; Constructability cutting and embankment balancing within a long narrow corridor; Operability horizontal and vertical alignments suitable for the train configuration that would be used to haul the product; Functionality the corridor would also likely carry pipelines for water, communications and power lines and possibly a public road, and A defined location (driven by train operations requirements) join the main rail in the Surat Basin Infrastructure corridor. The WSL will connect the Project with the SBR at a junction approximately 10km north of the Wandoan. Page 15 of 23

16 Figure 8: Possible West Surat Link Alignment 2.7 PROJECT SERVICES Approximately 800 ML/pa of water will be required during the construction phase of the Project and ~2,800 ML/pa for production activities. Details of water usage during operations can be found in Section of the Project EIS. The potential for using untreated CSG extraction water as a supply at the front end of the Project is under investigation. CSG water is not expected to be available as a source in the quantities the Project and all other mine projects in the North Surat require over time, so longer term an alternative water supply will be required. This alternative is the Nathan Dam Project. The estimated installed electrical energy load for the Project is 12 MW which covers the operation of mining equipment, the CHPP and maintenance and domestic use. Approval of transmission lines and related power supply infrastructure outside of the MLA will be undertaken separately with Ergon Energy Corporation Limited which has advised that a connection application takes typically four years to complete. Diesel (or CSG) powered generators may be located on site for use as a power source during the construction stage and as a back-up supply to maintain essential services in the event that the grid supply is interrupted. 2.8 STAFFING AND ACCOMMODATION Page 16 of 23

17 The Project is located approximately 35 km west of Wandoan southern inland Queensland (45 50 km by road). During construction the number of on-site personnel is estimated to peak at approximately 500 (erection of CHPP structure) and during operations directly employ up to 300 full time staff initially increasing to more than 350 over time, with additional staff required for periodic large maintenance tasks and for special projects. The labour estimates for the construction period are shown in Figure 9. The labour estimates for the operations period are shown in Figure 10. Figure 9: Construction Period on-site Labour Estimates Figure 10: Operations On-Site Labour Estimates Page 17 of 23

18 At the time the MLAs were made in 2009, in the midst of significant activity by CSG project proponents and other coal mining companies, Taroom Coal formed the view that, being a comparatively smaller project, it would be outbid by the larger projects for local labour. Its labour strategy was therefore to utilise firstly what it could source locally but to link to the Fraser Coast area where NEC had another small mining project aspiration potentially using the Fraser Coast project as the front door to the Elimatta Project. This philosophy generated the requirement for an onsite accommodation village. However, with the extended time required to develop the Project together with the change in the labour dynamics in the Western Downs Region with the CSG industry passing from a construction phase into a operations phase (more stable labour wise), means that local labour resources are more likely to be available to the Project in higher numbers than was the case some years ago. An on-site (or near site) accommodation facility is still a major part of the labour management component of the Project given the significant travel times if labour is not housed near to the work site. But Miles, Chinchilla and to an extent Wandoan now have accommodation infrastructure that is underutilised. This will hopefully facilitate a much higher number of locally sourced labour. A final decision on a labour sourcing strategy will be made after the Project MLAs are granted as part of the development strategy for the Project to be approved by the Project owners. 2.9 ENVIRONMENTAL MANAGEMENT Environmental impacts and management considerations for the Project are fully documented in the Project EIS and the Project EMP. A draft EA for the Project was issued in August 2015 and will be subjected to the normal approvals processes for a mining project application. Page 18 of 23

19 In May 2008, the Commonwealth advised Taroom Coal that the proposed project was not a controlled action for the purposes of the Environment Protection and Biodiversity Conservation Act 1999 (Cth). An Application for an EA was made with MLA on 2 June Subsequently the Project draft Terms of Reference (TOR) for the EIS and the Project Initial Advice Statement were made available for public comment from November The EIS that was generated to address the TOR reporting requirements was made available for public comment in February 2013 and the updated EIS and Response to Comments documentation was provided to the Department of Environment and Heritage Protection (DEHP) in April The EIS assessment report was subsequently issued to Taroom Coal on 18 July The Project EMP was updated to reflect the requirements of the EIS assessment report and submitted to DEHP in June The EMP was approved in July SITE REHABILITATION MLA is to provide land for permanent infrastructure for the Project. MLA is to provide a transport corridor linking the mining operations planned for MLA with the processing and coal handling operations planned for MLA As such plant and facilities will be constructed at start of the Project and remain in place to the end of the production time. Once their use in support of the mining operations is finished, buildings and the like will be removed and the areas re-contoured to blend in with the surrounding land and then revegetated. Surface preparation before revegetation will include surface contouring, ripping and topsoil spreading. Surface contouring will occur to minimise soil erosion. Topsoil will be stockpiled for use in rehabilitation as it contains organic material and local seed banks. Preserved topsoil will be spread to a thickness similar to the original topsoil). After appropriate surface preparation has occurred as outlined above, disturbed land will be revegetated as follows: Spread fertiliser and/or other ameliorates, such as gypsum at an appropriate rate, if required; Native species occurring naturally in the local area will be chosen for areas requiring the re-establishment of local native habitat; Where an agricultural land use is planned, the species planted will be those commonly used for pasture known to be successful on soils of similar texture; and Where practicable, revegetation will occur through direct seeding of selected species. Where direct seeding is not possible (e.g. small areas with limited access), seeds will be manually broadcast. 3.0 APPLICATION BOUNDARY AND AREA 3.1 MLA MLA is made using the EPC 650 boundary as the MLA boundary. The mining studies that Taroom Coal has conducted to date for the Project indicate that all but a small area in the central part (no near surface coal resource) and an area in the south western corner of MLA (deeper coal resource) contains potentially economically extractable coal resources by open cut mining methods using evaluation standards appropriate for today. For resource delineation purposes, all of the area of MLA has been properly explored and it is this exploration that Page 19 of 23

20 allows Taroom Coal to be confident that all of the tenure area except as noted above is potentially mineable. Thus, locking some of the area of MLA up for infrastructure would potentially sterilize what would otherwise be economic open pit coal. 3.2 MLA MLA is made over land contained within EPC 1171 using the boundary of the tenure in the main and Perretts Road (also known as the Yuleba Taroom Road) as the MLA boundary. MLA was made to provide working areas for mine infrastructure workshops, offices etc, the coal processing facility and waste storage that are necessary to support the mining operation within MLA 50254, leaving all of MLA available to Taroom Coal for coal mining. Taroom Coal has elected to use this area as its knowledge of the coal occurrence environment in and around this area together with the results from its exploration within the area lead it to the conclusion that the area does not contain economically viable near surface coal resource suitable for open pit mining. MLA has an area of 1,072 ha. Individual infrastructure to be placed on this tenure does not necessarily have large footprints, other than the waste storage facilities. The interconnection, for example by conveyors, between plant items means they have to be comparatively widely spaced. As part of the application area is also within the Q100 flood plain of Horse Creek, the remaining land for the infrastructure is constrained. The proposed layout represents a compromise between capital i.e. construction, and operation cost efficiency and land access restraints. A small part of the northern part of MLA area may also be utilised for an accommodation facility for the mine workforce. 3.3 MLA MLA is ha and is made using the boundary of MLA to the north and MLA to the south as markers such that these tenures are joined in this application with a 500 metres wide corridor. The MLA width was set to allow for potential mining activities by the Wandoan JV Project whilst maintaining an access and haulage corridor for the Elimatta Project. 4.0 MINING LEASE TERM In 2009 the Project MLAs were made for a period of 40 years based on consideration of the Project as a whole and determined from: Project construction prior to start of production being estimated to take in the order of 18 months (now months); The mine production period (based on coal resources within MLA 50254) at 5 Mtpa average product taking more than 30 years. This is dependent on the economics of operations later in the Project when operations could otherwise cease; Project de-commissioning and final rehabilitation taking 5 to 10 years depending on the rate of progress towards meeting expected final rehabilitation conditions for water management, soil and spoil stability and vegetative cover. Taroom Coal has been advised that DNRM policy is to recommend grant for 25 years as a maximum given that the MR Act provides a process for renewing a ML. Taroom Coal therefore proposes an initial term of 25 years as an alternative to the 40 year term initially requested. Page 20 of 23

21 5.0 LAND TENURE AND NATIVE TITLE 5.1 MLA The land within EPC 650 (the area the subject of MLA 50254) is freehold except for Lot 43, Plan AB222 (Reserve Land) which is Leasehold Land. Native Title has been extinguished other than for one area of unextinguished land the Reserve Land noted above. This area is located within the Iman No. 2 Native Title Claim (QUD6162/1998). Taroom Coal has obtained a Future Act Determination that the grant of ML may be done (QF2013/0001). Taroom Coal has an approved Cultural Heritage Management Plan for the area of the Project. The underlying land tenure for MLA is as follows: Lot 1 on AB241 Lot 1 on SP Lot 2 on SP Lot 33 on AB128 Lot 43 on AB222 (Reserve Land) Lot 38 on AB188 Lot 41 on AB241 Lot 42 on AB241 Lot 37 on AB180 Perretts Road (also sometimes known as Yuleba-Taroom Road) Horse Creek Taroom Coal intends to make an Infrastructure Agreement with the Western Downs Regional Council to provide for the road network that will be impacted by the Project. 5.2 MLA Four pastoral landholdings overlap the area covered by EPC 1171 and two are affected by the ML application. There are two local authority roads in the MLA area as shown on the survey plan: Perretts Road (also known as the Yuleba Taroom Road) and an unnamed local road. The ML boundary overlaps the Perretts Road corridor which will serve as an access route to the Project. The unnamed (and unconstructed) road will be upgraded to provide access across the lease to the adjoining western Lot and, potentially to the accommodation village. Taroom Coal intends to make an Infrastructure Agreement with the Western Downs Regional Council to provide for the road network that will be impacted by the Project. The pastoral land within MLA is freehold. Native title has been extinguished over the area of the application by the underlying land titles. The underlying land tenure for MLA is as follows: Lot 131 on SP Lot 60 on FT 900 Perretts Road (also known as Yuleba-Taroom Road) Unnamed local Road Page 21 of 23

22 5.3 MLA Two pastoral landholdings overlapping the area of the corridor. There is one local authority road crossing the area, Goldens Bimbadeem Road and the corridor is cornered on Perretts Road. The mine haul road will cross Goldens Bimbadeen Road and enter the area of MLA beside Perretts Road. The intersection of the mine haul road and Goldens - Bimbadeen Road will be a controlled intersection with traffic lights and/or boom gates with right of way referencing the more heavily used mine haul road. The pastoral land underlying MLA is freehold. Native title has been extinguished over the area of MLA by the underlying land tenure. Taroom Coal intends to make an Infrastructure Agreement with the Western Downs Regional Council to provide for the road network that will be impacted by the Project. The underlying land tenure for MLA is as follows: Lot 131 on SP Lot 41 on AB241 Perretts road (also known as Yuleba-Taroom Road) Goldens Bimbadeen Road 6.0 PUBLIC INTEREST STATEMENT The Project scope and objectives are to: Extract an open cut coal Resource of ~259 Mt at shallower than 100m below surface. At a production rate of up to 8.2 Mtpa ROM coal average 7.5 Mtpa for + 30 years (current assessment actual production duration will be dependent on coal prices for the product prevailing at the time of production). Establish and operate a conventional open cut mining operation using trucks and excavators. Construct and operate mine related infrastructure including workshop, offices and CHPP. Transport product to Gladstone Port for export. The Project is considered by Taroom Coal to be viable given the following: Total Resource measured, Indicated and Inferred of 259 Mt (reported to JORC standard). Mining resource is suitable for low cost open pit extraction. Thermal Coal product is suitable for use in the power generating industry. As there is no infrastructure suitable for mine processing activities, heavy equipment maintenance, coal stockpiling and waste storage located within the area of or near to the MLA areas. Coal is one of Queensland s highest value exports and the coal industry provides significant value to the State by way of direct and indirect employment, purchase of goods and services and payment of taxes and royalties. The Project provides an opportunity to add to the contribution the industry makes to the State with its development in a region not currently directly benefiting from the continued growth of the coal and other resource sectors. The Project will also provide a benefit to the country on a national scale. This is achieved through increased foreign exchange revenue from the export of coal and general economic stimulus through increased employment and the purchase of goods and services. Page 22 of 23

23 Taroom Coal has identified a resource of +250 Mt within the Project area, of which up to 170 Mt can be economically extracted using today s evaluation standards by efficient open cut mining methods to generate 5.0 Mtpa product coal suitable for the international market for thermal coals. The Project is anticipated to have a production life in excess of 30 years. The value of infrastructure construction is estimated to be $400 - $500 million (2013 dollars). Although many of the mining inputs will be imported into the regional economy, the workforce is expected to be recruited locally where available and/or provided as FIFO or DIDO/BIBO. As the Project is now following on from the CSG industry construction boom, rather than competing with CSG for resources and labour a local workforce is expected to be available. It is expected that about $250 million of construction expenditures will be sourced from domestic suppliers and $ million will be spent on imports. The wage costs during construction are estimated to be $40-45 million, most of which will be Queensland based. Annual employee payroll in the operating phase is expected to be more than $36 million per year. A range of operational expenditures will be sourced from Queensland based firms including rail services, port services, power and water supplies and plant maintenance. Full year expenditures on rail and port services are expected to exceed $125 million per annum. The Project will pay significant on-going revenue to the State Government through royalty and payroll tax obligations. Without the mine these payments will not be received. The annual royalty payment to the State resulting from sales of the product from mining operations, based on 5.0 Mtpa sales and a price of A$100 is in the order of $35 million. The Project will directly generate approximately up to 500 full time equivalent jobs during construction and 300 for early production to generate spending potential in the regional area where the workforce is located of approximately $18 million each year. The Project will have a positive impact on the economy of the region and the State through ongoing expenditures for materials and services, payment of rates, purchase of infrastructure, plant and consumables, use of service industries and payment of taxes. Page 23 of 23

TAROOM COAL PROPRIETARY LIMITED ELIMATTA PROJECT - MINING LEASE APPLICATION. Section 15 - Accompaniments 1.0 INTRODUCTION.

TAROOM COAL PROPRIETARY LIMITED ELIMATTA PROJECT - MINING LEASE APPLICATION. Section 15 - Accompaniments 1.0 INTRODUCTION. 28 May, 2009 TAROOM COAL PROPRIETARY LIMITED ELIMATTA PROJECT - MINING LEASE APPLICATION Section 15 - Accompaniments 1.0 INTRODUCTION 1.1 PROJECT OVERVIEW This Mining Lease Application (MLA) is made over

More information

TAROOM COAL PROPRIETARY LIMITED (ABN ) ELIMATTA PROJECT MINING LEASE APPLICATION. for TRANSPORTATION and SERVICES PURPOSES

TAROOM COAL PROPRIETARY LIMITED (ABN ) ELIMATTA PROJECT MINING LEASE APPLICATION. for TRANSPORTATION and SERVICES PURPOSES ACN 081 244 395 TAROOM COAL PROPRIETARY LIMITED (ABN 16 079 251 442) ELIMATTA PROJECT MINING LEASE APPLICATION for TRANSPORTATION and SERVICES PURPOSES MINING LEASE APPLICATION SUPPORTING INFORMATION PART

More information

TAROOM COAL PTY LTD ACN ELIMATTA MINE PROJECT MINING LEASE APPLICATIONS MLA OVER EPC 650 MLA OVER EPC 1171 AND MLA 50271

TAROOM COAL PTY LTD ACN ELIMATTA MINE PROJECT MINING LEASE APPLICATIONS MLA OVER EPC 650 MLA OVER EPC 1171 AND MLA 50271 TAROOM COAL PTY LTD ABN: 16 079 251 442 TAROOM COAL PTY LTD ACN 079 251 442 ELIMATTA MINE PROJECT MINING LEASE APPLICATIONS MLA 50254 OVER EPC 650 MLA 50270 OVER EPC 1171 AND MLA 50271 AMENDED INITIAL

More information

COLTON COAL PTY LTD COLTON MINE PROJECT - MINING LEASE APPLICATION COLTON C

COLTON COAL PTY LTD COLTON MINE PROJECT - MINING LEASE APPLICATION COLTON C November 2010 COLTON COAL PTY LTD COLTON MINE PROJECT - MINING LEASE APPLICATION COLTON C Section 15 - Accompaniments 1.0 INTRODUCTION 1.1 PROJECT OVERVIEW Colton Coal Pty Ltd ACN 140 768 636 (Colton Coal)

More information

COLTON COAL PTY LTD COLTON MINE PROJECT - MINING LEASE APPLICATION COLTON B

COLTON COAL PTY LTD COLTON MINE PROJECT - MINING LEASE APPLICATION COLTON B COLTON COAL PTY LTD COLTON MINE PROJECT - MINING LEASE APPLICATION COLTON B Section 15 - Accompaniments 1.0 INTRODUCTION 1.1 PROJECT OVERVIEW Colton Coal Pty Ltd ACN 140 768 636 (Colton Coal) makes this

More information

INITIAL DEVELOPMENT PLAN

INITIAL DEVELOPMENT PLAN JELLINBAH GROUP PTY LTD ACN 010 754 793 PLAINS EAST PROJECT MINING LEASE APPLICATION over Mineral Development Licence 185 INITIAL DEVELOPMENT PLAN CHECKLIST OF LEGISLATIVE REQUIREMENTS Document Section

More information

1.0 INTRODUCTION 1.1 PROJECT PROPONENT

1.0 INTRODUCTION 1.1 PROJECT PROPONENT 1.0 INTRODUCTION 1.1 PROJECT PROPONENT The proponent for the Elimatta Project (the Project) is Taroom Coal Proprietary Limited (Taroom Coal) which is a wholly owned subsidiary of Northern Energy Corporation

More information

15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes

15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes ASX/Media Announcement 10 September 2012 Level 12, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3337 9944 fax + 61 (0) 7 3337 9945 Carbon

More information

Postal Address: PO Box Brisbane Adelaide Street QLD 4000

Postal Address: PO Box Brisbane Adelaide Street QLD 4000 1.0 INTRODUCTION 1.1 PROJECT PROPONENT The proponent for the Elimatta Project (the Project) is Taroom Coal Proprietary Limited (Taroom Coal) which is a wholly owned subsidiary of Northern Energy Corporation

More information

SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT

SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT AIEIS for the 13. SUBMISSION NUMBER 13 SUNWATER 13.1 Issue Number 13.1 Section 3.2 of the Byerwen Coal project Terms of Reference

More information

Arrow Energy. Surat development update. December 2017

Arrow Energy. Surat development update. December 2017 Surat development update December 2017 Why we are here today Arrow has agreed one of the largest gas supply deals on Australia s east coast: - 27-year deal between Arrow and QCLNG to commercialise the

More information

MLA METES & BOUNDS DESCRIPTION AND PLANS FOR ABANDONMENT MLA ELIMATTA INFRASTRUCTURE

MLA METES & BOUNDS DESCRIPTION AND PLANS FOR ABANDONMENT MLA ELIMATTA INFRASTRUCTURE MLA 50270 METES & BOUNDS DESCRIPTION AND PLANS FOR ABANDONMENT MLA 50270 ELIMATTA INFRASTRUCTURE Prepared by Cottrell Cameron & Steen Surveys Pty Ltd 10/9/2012 DESCRIPTION OF AREAS TO BE ABANDONED FROM

More information

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT ASX RELEASE 30 DECEMBER 2016 STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT HIGHLIGHTS Independent Pre-Feasibility Study (PFS) supports development of the Urquhart Bauxite

More information

Taroborah Coal Project. Environmental Impact Statement. Section 2 Project Needs and Alternatives. Prepared for: Shenhuo International Group Pty Ltd

Taroborah Coal Project. Environmental Impact Statement. Section 2 Project Needs and Alternatives. Prepared for: Shenhuo International Group Pty Ltd Taroborah Coal Project Environmental Impact Statement Section 2 Project Needs and Alternatives Prepared for: Shenhuo International Group Pty Ltd Chapter 2 Table of Contents 2.0 PROJECT NEEDS AND ALTERNATIVES...

More information

2. Project Justification and Feasible Alternatives

2. Project Justification and Feasible Alternatives 2. Project Justification and Feasible Alternatives 2.1 Project Justification Energy intensive industries associated with the coal and gas sectors in the Surat region continue to drive electricity demand

More information

Arrow Energy. Surat operational update. July 2016

Arrow Energy. Surat operational update. July 2016 Surat operational July 2016 Why we are here today Provide an to the community on Arrow s operational activities over the past 24 months Approval stages for the Surat Gas Project Upcoming survey activities

More information

GLOUCESTER COAL QUARTERLY REPORT PERIOD ENDED 31 DECEMBER 2011 HIGHLIGHTS

GLOUCESTER COAL QUARTERLY REPORT PERIOD ENDED 31 DECEMBER 2011 HIGHLIGHTS GLOUCESTER COAL QUARTERLY REPORT HIGHLIGHTS 5 years LTI free at Stratford CHPP Record coal mining at Gloucester Basin s Duralie mine Middlemount rail project commissioned ahead of expectations Mining activities

More information

ASX ANNOUNCEMENT 5 March 2013

ASX ANNOUNCEMENT 5 March 2013 ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX Code: ABZ Progress Towards Production From Tasmania in 2014: MoU Signed For Bell Bay Port & Drilling Scottsdale Targets Commenced A Memorandum of Understanding

More information

Arrow Update. Arrow Research. Groundwater monitoring and modelling. Demonstrations at Theten. Arrow Update. Domestic gas expansion activities

Arrow Update. Arrow Research. Groundwater monitoring and modelling. Demonstrations at Theten. Arrow Update. Domestic gas expansion activities Arrow appreciates the importance of groundwater for agricultural and domestic use, and the concern of potential impacts of coal seam gas development on water quality and supply. Groundwater monitoring

More information

FACT SHEET. QCLNG pipeline The Narrows crossing. QCLNG and Australia Pacific LNG projects. The Narrows pipeline specifications.

FACT SHEET. QCLNG pipeline The Narrows crossing. QCLNG and Australia Pacific LNG projects. The Narrows pipeline specifications. FACT SHEET QCLNG pipeline The Narrows crossing QGC and Australia Pacific LNG are developing coal seam gas (CSG) in central and southern Queensland for domestic and export markets. QGC is the Australian

More information

Appendix AF. Greenhouse Gas Management Plan. Document Name i Insert Month/Year

Appendix AF. Greenhouse Gas Management Plan. Document Name i Insert Month/Year Appendix AF Greenhouse Gas Management Plan Document Name i Insert Month/Year Elimatta Project Greenhouse Gas Management Plan Prepared for: Northern Energy Corporation Limited April 2014 Document History

More information

For personal use only

For personal use only Initial JORC Reserves Estimate for Bluff Project HIGHLIGHTS Initial JORC Reserves Estimate of 11 Mt mineable for Bluff Project In-fill drilling program completed to support further Resources and Reserves

More information

Galilee Basin Overview

Galilee Basin Overview Galilee Basin Overview Ellie Smith Lock the Gate Alliance Central Queensland Macmines China Stone Currently completing EIS Adani Carmichael SEIS Complete Awaiting State and Federal decisions NGBR EIS currently

More information

Newstan Colliery S75W Modification Project Briefing Paper

Newstan Colliery S75W Modification Project Briefing Paper 2 Table of Contents 1 INTRODUCTION...5 2 EXISTING DEVELOPMENT APPROVALS...6 2.1 CONSENTS, LEASES AND LICENSES...7 3 THE PROJECT...8 3.1 MINING METHOD...11 3.2 MINING AND PLANT EQUIPMENT...12 3.3 MINE INFRASTRUCTURE

More information

2.9 SURFACE WATER DIVERSION. Horse Creek Diversion

2.9 SURFACE WATER DIVERSION. Horse Creek Diversion Figure 5.17 TDP Dimensions 2.9 SURFACE WATER DIVERSION Horse Creek, an ephemeral tributary of the Dawson River, passes centrally through MLA 50254 and to the east of MLAs 50271 and 50270. Horse Creek has

More information

Industrial land demand forecasting for supply chain business supporting Queensland s resources sector

Industrial land demand forecasting for supply chain business supporting Queensland s resources sector Industrial land demand forecasting for supply chain business supporting Queensland s resources sector Queensland is the focus of major developments in the resources sector, creating huge potential for

More information

For personal use only

For personal use only 15 June 2016 ASX ANNOUNCEMENT Low cost highwall mining to commence at Isaac Plains Coking Coal Mine HIGHLIGHTS Highwall mining contract signed, targeting extraction of over 300,000 ROM tonnes of low cost

More information

Western Downs. A Future begins QUPEX Event

Western Downs. A Future begins QUPEX Event Western Downs A Future begins 2012 QUPEX Event Mayor Ray Brown 25 September 2012 Where is the Surat Basin? It covers an area stretching from Roma in the west, to Taroom in the north and east to Toowoomba.

More information

3. MINING SYSTEM AND RESOURCE RECOVERY

3. MINING SYSTEM AND RESOURCE RECOVERY 3. MINING SYSTEM AND RESOURCE RECOVERY (SMP Guideline Section 6.1) 3.1. MINING METHOD Longwalls 705 to 710 will be extracted using a longwall retreating system of mining, an established method of coal

More information

Carbon Energy Poised to Become a Major Gas Player Following an 83% Increase in 2P UCG Gas Reserves

Carbon Energy Poised to Become a Major Gas Player Following an 83% Increase in 2P UCG Gas Reserves ASX / Media Announcement Level 9, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3156 7777 fax + 61 (0) 7 3156 7776 www.carbonenergy.com.au

More information

EXECUTIVE SUMMARY PROJECT OVERVIEW

EXECUTIVE SUMMARY PROJECT OVERVIEW EXECUTIVE SUMMARY PROJECT OVERVIEW The Elimatta Project (the Project) is located in southern Queensland, approximately 45 kilometres (km) southwest of the township of Taroom and approximately 380 km northwest

More information

QUARTERLY REPORT March 2011

QUARTERLY REPORT March 2011 QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The

More information

QUARTERLY ACTIVITIES REPORT 30 APRIL 2015

QUARTERLY ACTIVITIES REPORT 30 APRIL 2015 NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 30 APRIL 2015 28 May 2015 Quarter Ended 9 Months Ended Apr 15 Apr 14 Change (%) Apr 15 Apr 14 Change (%) Raw Coal Production

More information

5 th Asian Bauxite & Alumina Conference

5 th Asian Bauxite & Alumina Conference 5 th Asian Bauxite & Alumina Conference October 2015 Bauxite Hills Project Deliberate Focus ASX : MMI CORPORATE SNAPSHOT Shareholders 0.140 0.120 MMI Share Price (A$) Other 47% NetWealth Investments 5%

More information

8.0 - WATER MANAGEMENT STRATEGY

8.0 - WATER MANAGEMENT STRATEGY 8. - WATER MANAGEMENT STRATEGY 8.1 POTENTIAL IMPACTS The project has the potential to adversely affect water quality and flow frequency in the downstream receiving waters of Horse Creek. Such adverse impacts

More information

Bowen Gas Project. EIS Community Information Sessions. June Arrow s Moranbah Compression Station Bowen Basin

Bowen Gas Project. EIS Community Information Sessions. June Arrow s Moranbah Compression Station Bowen Basin Bowen Gas Project EIS Community Information Sessions June 2012 Arrow s Moranbah Compression Station Bowen Basin TODAY S AGENDA Arrow Energy Overview Arrow Energy Activities Bowen Gas Project Environmental

More information

ATTACHMENT 2 COMMUNITY INFORMATION

ATTACHMENT 2 COMMUNITY INFORMATION ATTACHMENT 2 COMMUNITY INFORMATION Wilpinjong Coal Wilpinjong s 75W modification November, 2012 The Wilpinjong Coal Mine is located in the developing western coalfields of NSW and produces a high quality

More information

EIS TABLE OF CONTENTS

EIS TABLE OF CONTENTS EIS TABLE OF CONTENTS GLOSSARY OF TERMS... GL-1 Glossary and Abbreviations... GL-1 Units... GL-14 EXECUTIVE SUMMARY... ES-1 INTRODUCTION... ES-1 PROJECT PROPONENTS... ES-1 LOCATION... ES-1 PROJECT DESCRIPTION...

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT Environmental and Social Impact Assessment (ESIA) December 2017 Malingunde Graphite Project, Lilongwe District, Malawi Purpose of this document This document provides information

More information

For personal use only

For personal use only GROSVENOR WEST CONCEPT STUDY COMPLETED HIGHLIGHTS Study concludes strong development potential for either open cut or underground operations at Grosvenor West: Production of 5Mtpa (ROM) and 3.5Mtpa saleable

More information

Moolarben Coal Complex UG1 Optimisation Modification. Environmental Assessment APPENDIX F SURFACE WATER ASSESSMENT REVIEW

Moolarben Coal Complex UG1 Optimisation Modification. Environmental Assessment APPENDIX F SURFACE WATER ASSESSMENT REVIEW Moolarben Coal Complex UG1 Optimisation Modification Environmental Assessment APPENDIX F SURFACE WATER ASSESSMENT REVIEW Moolarben Coal Complex UG1 Optimisation Modification Surface Water Assessment Review

More information

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL ASX ANNOUNCEMENT Thursday 8 April 2010 ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL Metallica Minerals Limited (ASX-MLM) advises that it s 56% owned subsidiary,

More information

In-Pit Tailing Storage Facility Management Plan

In-Pit Tailing Storage Facility Management Plan J.1 In-Pit Tailing Storage Facility Management Plan IN-PIT TAILINGS STORAGE FACILITY MANAGEMENT PLAN New Acland Coal Mine Stage 3 Project JANUARY 2014 Contents 1. Introduction 2 1.1. Overview 2 1.2. Purpose

More information

CASE STUDY: A blue-print to meeting your environmental obligations and achieving optimal eco-sustainability in your mine

CASE STUDY: A blue-print to meeting your environmental obligations and achieving optimal eco-sustainability in your mine CASE STUDY: A blue-print to meeting your environmental obligations and achieving optimal eco-sustainability in your mine ENVIRONMENTAL ADVISORS ANSWERING THE CASE STUDY 1. Embracing climate change and

More information

Pre-Feasibility Study on Titiribi coal project completed - highlights relatively low capital and operating cost profile to support fasttracking

Pre-Feasibility Study on Titiribi coal project completed - highlights relatively low capital and operating cost profile to support fasttracking Perth Office: Ascot Resources Ltd 512 Hay Street Subiaco WA 6008 T: + 61 8 9381 4534 F: + 61 8 9380 6440 E: info@ascotresources.com W: www.ascotresourcs.com ASX ANNOUNCEMENT 26 August 2013 The Manager

More information

Market Update Southdown Magnetite Project

Market Update Southdown Magnetite Project MEDIA RELEASE 23 February 2018 Market Update Southdown Magnetite Project Grange Resources Limited (ASX:GRR) (Grange) is pleased to announce that, in conjunction with its joint venture participant, SRT

More information

A1 Australian and South Australian Government Guidelines 813. A2 South Australian Government Guidelines 871

A1 Australian and South Australian Government Guidelines 813. A2 South Australian Government Guidelines 871 Appendix A EIS Guidelines CONTENTS A1 Australian and South Australian Government Guidelines 813 A2 South Australian Government Guidelines 871 A3 Northern Territory Government Guidelines 929 Olympic Dam

More information

For personal use only

For personal use only Friday, 2 November 2012 ASX release Cape Alumina sells Hey Point bauxite tenements and makes placement In a transaction valued at approximately $3.4 million, Cape Alumina Limited (ASX Code: CBX) has reached

More information

Arrow Energy Arrow in the Surat

Arrow Energy Arrow in the Surat Arrow Energy Arrow in the Surat TSBE Enterprise Evening in Dalby Leisa Elder Vice President External Relations and Tenure Management 11 October 2018 TSBE members at Arrow s Braemar 2 Power Station (above)

More information

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST For electronic distribution 12 th May 2014 Highlights PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST A Prefeasibility Study for an underground coal mine based on a 200Mt portion of the A Seam within

More information

For personal use only

For personal use only NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 30 APRIL 2016 30 May 2016 Quarter Ended 9 Months Ended Apr 16 Apr 15 Change (%) Apr 16 Apr 15 Change (%) Raw Coal Production

More information

MINE OPERATIONS PLAN (MOP)

MINE OPERATIONS PLAN (MOP) MINE OPERATIONS PLAN (MOP) Dlulwa Sand Mine Over ERF 9231 Golden Gate in and around the Umzumbe River, KwaZulu-Natal Prepared for Prepared by Dlulwa Trading (Pty) Ltd 073 1754 298 mpisaneblessing@gmail.com

More information

BOGGABRI COAL PROJECT MODIFICATION ENVIRONMENTAL ASSESSMENT

BOGGABRI COAL PROJECT MODIFICATION ENVIRONMENTAL ASSESSMENT BOGGABRI COAL PROJECT MODIFICATION ENVIRONMENTAL ASSESSMENT PREPARED FOR BOGGABRI COAL PTY LIMITED JULY 2013 Project No. WHC-12-08 Document No. 00532603.doc TABLE OF CONTENTS EXECUTIVE SUMMARY ES-1 1 INTRODUCTION

More information

Australia s leading magnetite producer Southdown Magnetite Project. Russell Clark Managing Director & CEO February 2012

Australia s leading magnetite producer Southdown Magnetite Project. Russell Clark Managing Director & CEO February 2012 Australia s leading magnetite producer Southdown Magnetite Project Russell Clark Managing Director & CEO February 2012 Disclaimer The material in this presentation ( material ) is not and does not constitute

More information

For personal use only

For personal use only Tuesday, 11 December 2012 ASX release Cape Alumina completes Pre-Feasibility Study for Bauxite Hills Highlights Cape Alumina Limited (ASX Code: CBX) engaged GHD in April 2012 to carry out a pre-feasibility

More information

BLAST MANAGEMENT STRATEGY

BLAST MANAGEMENT STRATEGY BLAST MANAGEMENT STRATEGY For Boggabri Tarrawonga Maules Creek Complex J U L Y 2 0 1 4 Idemitsu Australia Resources Boggabri Coal Pty Ltd Whitehaven Coal Pty Ltd Tarrawonga Coal Pty Ltd, Maules Creek Coal

More information

Hunter Valley Operations South

Hunter Valley Operations South Hunter Valley Operations South This booklet outlines a modification proposal being prepared for Coal & Allied s Hunter Valley Operations (HVO) South mining activities. In this booklet you will find an

More information

For personal use only

For personal use only 24 August 2015 PROPOSED COAL SEAM ACCESS AT BUCK CREEK NO.2 MINE CONFIRMS LOW CAPITAL COST HIGHLIGHTS: Shallow depth of coal seam (100 to 125 feet / 30 to 38 metres) at proposed Buck Creek No. 2 Mine allows

More information

Caval Ridge Mine Change Request 8 Accommodation Village Condition Changes

Caval Ridge Mine Change Request 8 Accommodation Village Condition Changes Caval Ridge Mine Change Request 8 Accommodation Village Condition Changes 31 May 2013 Contents Executive Summary... 3 1 Introduction... 5 1.1 Project Background... 6 1.1.1 Bowen Basin Coal Growth Project...

More information

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES ASX Release: 9 September 2010 MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES Definitive Mining Studies confirm continuity, quality and quantum of Ore body at MARILLANA Detrital Ore Reserves

More information

Taroborah Coal Project. Appendix 1 Final Terms of Reference

Taroborah Coal Project. Appendix 1 Final Terms of Reference Taroborah Coal Project Appendix 1 Final Terms of Reference Terms of Reference for the Taroborah Project Environmental Impact Statement (EIS) Proposed by Shenhuo International Group Pty Ltd August 2012

More information

MEDIA RESPONSE THE WHITSUNDAY COAST GUARDIAN

MEDIA RESPONSE THE WHITSUNDAY COAST GUARDIAN Tuesday, 15 July 2008 MEDIA RESPONSE THE WHITSUNDAY COAST GUARDIAN Please attribute the below responses to QER Director of Corporate Affairs Simon Eldridge Questions re Proserpine Shale Oil 1) What exactly

More information

DEVELOPMENT CONSENT MODIFICATION Statement of Environmental Effects

DEVELOPMENT CONSENT MODIFICATION Statement of Environmental Effects BENGALLA MINE DEVELOPMENT CONSENT MODIFICATION for Bengalla Mining Company Pty Limited August 2015 BENGALLA MINE DEVELOPMENT CONSENT MODIFICATION STATEMENT OF ENVIRONMENTAL EFFECTS Prepared by: HANSEN

More information

Chapter 22 Conclusion and recommendations

Chapter 22 Conclusion and recommendations Chapter 22 Conclusion and recommendations November 2013 Table of contents 22. Conclusion and recommendations... 22-1 22.1 Purpose of this chapter... 22-1 22.2 Rationale for NGBR Project... 22-1 22.3 Economic

More information

COMMUNITY OVERVIEW MARCH Overburden Management Project Environmental Impact Statement (EIS)

COMMUNITY OVERVIEW MARCH Overburden Management Project Environmental Impact Statement (EIS) COMMUNITY OVERVIEW MARCH 2017 Overburden Management Project Environmental Impact Statement (EIS) About McArthur River Mine McArthur River Mining Pty Ltd (MRM) is wholly owned by Glencore and is the operator

More information

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment Executive Summary TABLE OF CONTENTS ES1 BACKGROUND ES-1 ES2 EXISTING OPERATIONS ES-1 ES3 MODIFICATION OVERVIEW ES-1 ES4 CONSULTATION ES-1 ES5 COMMUNITY INITIATIVES AND INVOLVEMENT ES-3 ES6 ENVIRONMENTAL

More information

QUARTERLY REPORT FOR THE QUARTER ENDED 30 JUNE 2018 (ASX : CNX)

QUARTERLY REPORT FOR THE QUARTER ENDED 30 JUNE 2018 (ASX : CNX) QUARTERLY REPORT FOR THE QUARTER ENDED 30 JUNE 2018 (ASX : CNX) CARBON ENERGY LIMITED (ABN 58 057 552 137) QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018 KEY EVENTS FOR THE QUARTER AND

More information

Carbon Energy Low cost, low emission energy has arrived

Carbon Energy Low cost, low emission energy has arrived Carbon Energy Low cost, low emission energy has arrived Investor Presentation Andrew Dash Managing Director Australian Securities Exchange Spotlight Conference London 10th March 2011 Important Statements

More information

NOISE MANAGEMENT STRATEGY

NOISE MANAGEMENT STRATEGY NOISE MANAGEMENT STRATEGY For Boggabri Tarrawonga Maules Creek Complex M A Y 2017 Idemitsu Australia Resources Pty Limited Boggabri Coal Operations Pty Ltd Whitehaven Coal Limited Tarrawonga Coal Pty Ltd,

More information

ASX ANNOUNCEMENT 15 August 2011

ASX ANNOUNCEMENT 15 August 2011 ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ 6 Million Tonnes Maiden Guyra Resource: High-Grade Bauxite Company resources grow to 68 million tonnes 1,2 Maiden Resource: 6 million tonnes of gibbsite-rich

More information

Suitable land with negligible limitations which is well suited to a proposed use.

Suitable land with negligible limitations which is well suited to a proposed use. 4.2.1.6 Land Suitability As described in Section 4.2.1.4, AARC has undertaken a Soil and Land Suitability Assessment of the Project site and this report is contained within Appendix O. LRAM has also undertaken

More information

CTSCo s Surat Basin Carbon Capture and Storage Project

CTSCo s Surat Basin Carbon Capture and Storage Project CTSCo s Surat Basin Carbon Capture and Storage Project The Surat Basin Carbon Capture and Storage Project aims to determine the viability of industrial-scale carbon capture and storage in the Surat Basin.

More information

ACQUISITION OF CROYDON COAL LTD

ACQUISITION OF CROYDON COAL LTD Registered Office: Level 2, 395 Collins Street Melbourne, Victoria 3000 Telephone (03)8611 5320 4th December 2013 ACQUISITION OF CROYDON COAL LTD 3D Resources Ltd. ( 3D Resources or the company ) is pleased

More information

ARROW ENERGY ARROW LNG PLANT. May 15 th to 19 th 2012

ARROW ENERGY ARROW LNG PLANT. May 15 th to 19 th 2012 ARROW ENERGY ARROW LNG PLANT May 15 th to 19 th 2012 ARROW LNG PLANT TODAY S AGENDA Welcome and introductions Arrow Energy update Arrow LNG Plant update Arrow LNG Plant Environmental Impact Statement (EIS)

More information

2.0 Description of Existing Mine Operations

2.0 Description of Existing Mine Operations 2.0 2.1 Mine History Austar Coal Mine is an amalgamation of several older mines and operates within a number of mining leases under 12 separate development consents issued by Cessnock City Council between

More information

NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT

NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT SYDNEY CONSTRUCTION MATERIALS NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT QUARRY PLAN MineConsult mine management consultants May, 2004 Job No. 1864 CONFIDENTIALITY AND USE OF INTELLECTUAL PROPERTY

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

Environmental Risk Analysis

Environmental Risk Analysis Appendix 10 11 12 13 14 15 16 17 18 191 Groundwater Controlled UHSA Air Agricultural Historic EIS Preliminary Environmental Blasting Quality Surface Secretary s Noise Statement Aboriginal Economic Action

More information

BENGALLA Mining Company. Contamination Assessment

BENGALLA Mining Company. Contamination Assessment BENGALLA Mining Company U Contamination Assessment U CONTINUATION OF BENGALLA MINE PRELIMINARY CONTAMINATION ASSESSMENT Prepared by: HANSEN BAILEY 6 / 127 129 John Street SINGLETON NSW 2330 July 2013 For:

More information

Stratford Extension Project Technical Overview

Stratford Extension Project Technical Overview Stratford Extension Project Technical Overview November 2012 Yancoal Australia Limited Level 11, 68 York Street Sydney NSW 2000 Stratford Coal Pty Ltd 3364 The Bucketts Way Stratford NSW 2422 PO Box 168

More information

ASX Announcement 25 November 2010 MT BEVAN IRON ORE PROJECT EXPLORATION UPDATE. About Legacy Iron Ore. The Company Announcements Office ASX Limited

ASX Announcement 25 November 2010 MT BEVAN IRON ORE PROJECT EXPLORATION UPDATE. About Legacy Iron Ore. The Company Announcements Office ASX Limited I R O N O R E L I M I T E D About Legacy Iron Ore Legacy Iron Ore Limited ( Legacy or the Company ) is a Western Australian based Exploration Company, focused on iron ore and gold exploration and discovery.

More information

23 September 2010 CHL: AIM. Churchill Mining PLC

23 September 2010 CHL: AIM. Churchill Mining PLC 23 September 2010 CHL: AIM Churchill Mining PLC 30 Million Tonnes per Annum East Kutai Coal Project Feasibility Study Returns Pre-Tax NPV of US$1.8 Billion Highlights: Study confirms the technical and

More information

Section 2 Proposal Description

Section 2 Proposal Description Section 2 Proposal Description 2. PROPOSAL DESCRIPTION 2.1 Overview The Proposal comprises the construction, operation and closure of mining at the J5 and Bungalbin East iron ore deposits and associated

More information

CARBON ENERGY. May Morné Engelbrecht Acting Chief Executive Officer

CARBON ENERGY. May Morné Engelbrecht Acting Chief Executive Officer CARBON ENERGY May 2013 Morné Engelbrecht Acting Chief Executive Officer IMPORTANT STATEMENTS Disclaimer The information contained in this presentation is given without any liability whatsoever to Carbon

More information

1.0. Stage 2 CSG water monitoring and management plan

1.0. Stage 2 CSG water monitoring and management plan 1.0 Stage 2 CSG water monitoring and management plan 2 1.0 Stage 2 CSG water monitoring and management plan 1.1 Introduction Coal seam gas has been produced in Queensland for more than 10 years and accounts

More information

Native Title Act 1993

Native Title Act 1993 APPENDIX A2: Regulatory approvals Table 1: Regulatory approvals Approval / permit type Commonwealth approvals Permission to intervene in matters where traditional cultural heritage interests are considered

More information

8. Greenhouse Gas Emissions

8. Greenhouse Gas Emissions 8. Greenhouse Gas Emissions This section provides a summary of the greenhouse gas assessment undertaken, and the potential impacts identified, in regards to the Project (Mine) during construction and operation.

More information

Consultation Regulatory Impact Statement

Consultation Regulatory Impact Statement Consultation Regulatory Impact Statement Post Implementation Review of the Industry Levy to fund the petroleum and gas water functions of the Office of Groundwater Impact Assessment December 2016 This

More information

For personal use only

For personal use only NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JULY 2015 27 August 2015 Quarter Ended 12 Months Ended Jul 15 Jul 14 Change (%) Jul 15 Jul 14 Change (%) Raw Coal Production

More information

PART 2 Tabs EIS General Comments

PART 2 Tabs EIS General Comments EIS ES1 J:\Jobs\42626440\6 Deliv\GLNG EIS Supplement Final for Stakeholder Release\0. EIS Responses\Part 2 00a EIS \Part_2_00a EIS _Final.doc GLNG Project - Environmental Impact Statement Supplement GLNG

More information

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results 31 January 2007 ASX ANNOUNCEMENT. Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results The Company is pleased to announce results of infill drilling at the Mt Thirsty Cobalt Nickel Project, strategically

More information

Southern Cross Goldfields Ltd

Southern Cross Goldfields Ltd Southern Cross Goldfields Ltd ASX Announcement - 20 December 2013 Marda Gold Project: Feasibility Study Review Additional Information On 10 December 2013, Southern Cross Goldfields (ASX: SXG SXG or the

More information

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors

More information

MINE DESIGN AND PLANNING

MINE DESIGN AND PLANNING TE KUHA PROJECT STEVENSON MINING LIMITED AUGUST 2016 V13 MINE DESIGN AND PLANNING MINE DESIGN PIT DESIGN DESIGN Pit Slope Design is based on 10m high horizontal benches to allow for steep dipping coal

More information

3 PROJECT ALTERNATIVES

3 PROJECT ALTERNATIVES 3 PROJECT ALTERNATIVES In terms of the National Environmental Management Act (NEMA) Section 21(3) and Appendix 2 of the EIA Regulations (2014), due consideration must be given to project alternatives during

More information

Environmental Assessment Chapter 8 Surface Water

Environmental Assessment Chapter 8 Surface Water Environmental Assessment Chapter 8 Surface Water 8.2.7 Rainfall and Evaporation Based on recorded data for the area of interest, the mean annual rainfall is about 700mm, with maximum monthly rainfalls

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

PRESENTATION TO THE CONFEDERATION OF INDIAN INDUSTRIES DELEGATION

PRESENTATION TO THE CONFEDERATION OF INDIAN INDUSTRIES DELEGATION 07 September 2009 The Manager Company Announcements Office ASX Limited Via: www.asx.online.com PRESENTATION TO THE CONFEDERATION OF INDIAN INDUSTRIES DELEGATION Coalworks presented to the Confederation

More information

Ganajur Gold Project highlights of Feasibility Study

Ganajur Gold Project highlights of Feasibility Study Ganajur Gold Project highlights of Feasibility Study Bangalore, India May 12, 2017 Deccan Gold Mines Limited DGML (BSE Scrip Code: 512068) is pleased to report on the highlights of a positive Feasibility

More information

For personal use only

For personal use only MetroCoal Limited (ASX:MTE) and Developing a Multi Commodity Company Presentation to Annual General Meeting 25 November 2014 1 METROCOAL AT YEAR END 2014 MetroCoal Holds >90% of Cape Alumina Commenced

More information