1 : Description of the Project Development Services and the planned Investment Programme Location of the Project Development Services Province of Bergamo, Italy. 1. Location Main purposes of the Project Development Services The project development services are needed for the preparation and implementation of EE measures in public buildings and public lighting, the production and use of renewable energies through solar thermal collectors and PV, and the construction of small scale district heating networks supplied by biomass. The Province of Bergamo will support these investments in 124 associated municipalities. Description of the Final Beneficiary The beneficiary is the Province of Bergamo, located in the North of Italy. Role of the Final Beneficiary in the Investment Programme to be prepared The Bergamo Province will act as a central purchasing body both for technical support and for implementation of energy efficiency measures. The Province will be in charge of technical assistance (audit assessment, baseline, saving potential and costs identification) and support the preparation of agreements, call for tenders, contract definitions and tender awarding. The Province will also cover the auditing of the performances achieved and carry out monitoring activities. 2. Description of the Project Development Services Aims and objectives of the Project Development Services The investments foreseen will be implemented mainly through Energy Performance Contracting (EPC). For a part of the investment national subsidy schemes will be used. Most of the municipalities are of small size and have neither the capacity nor the competencies to implement a larger investment programme. In addition they have difficulties to hire new staff. Thus the Province will assume the role of a support and coordination entity for the associated municipalities making available the necessary know-how, in particular for EPC, and the preparation capacity for the planned investments. Indicative activities included in the Project Development Services (personal costs, external services, etc.) and main justification. Estimated total budget for the assistance including a detailed budget breakdown according to activities Preliminary Activities (4 months): - selection & recruitment of additional staff; - setup and selection of technical groups for energy audits & baseline identification; - legal, administrative and technical advisors selection; - set up of Steering Committee and Municipality committee; - start of search for complementary investment funding. 21/07/2015 Page 18 of 47
2 Core activities (20 months), repeated in a process cycle with continuous improvement for the different tenders both in public buildings and public lighting: - energy assessment and design all technical analysis needed to check buildings and define technical requirements for tenders (baselines identification, saving potential & estimation of refurbishment costs); - tenders preparation: launch, evaluation & execution; - award of the works & control work progress. In the case of biomass DHNs a preliminary assessment & design will be tendered whose output will constitute the basis for a subsequent concession tender. Support activities (36 months): - project management for the entire duration of the project; - design and implementation of a web platform for & Verification based on IPMVP protocol and in accordance with ISO project internal communication & dissemination First step of the project will consist of the selection and the recruitment of the external additional staff which consists of: external staff: o one project assistant which will help the project manager in the operational management of FABER (this additional person figure will be recruited for the whole project duration) o two junior project assistants which will be in charge of the contact and the coordination of municipalities (these additional persons will be recruited for the whole project duration) o technical experts giving specialist assistance to Management Board in the coordination and quality assurance of energy auditing and monitoring phases (in total 45 months part-time) these energy efficiency experts will technically coordinate and validate the external audit activities in order to guarantee the homogeneity and the quality of the evaluation to be used in building and lighting energy refurbishment tenders; it will support (from a technical point of view) the preparatory and the selection phases of the tender process; o one legal and one administrative advisor giving administrative & legal support (24 advisory months part-time each) these legal and administrative experts will support the definition of tender procedure and documents both in the preparatory and the selection phases including the EPC contract design; This external staff will work in team with the director manager, the project manager and a technical officer (permanent staff of the Bergamo Province). external audit and design expertise: o public building auditors to define buildings baselines and preliminary design of EE measures (of about 450 public buildings distributed in about 100 municipalities) o public lighting auditors to define lighting baselines and preliminary design of EE measures (of about 67 municipalities) o PV plant experts to analyse capacity of buildings (roofs in particular) to host PV plants and preliminary plant design; o biomass DHN designers to define DHNs assessment and design (of 5 municipalities) The director manager is the responsible of FABER project (e.g. he is in charge of signing the contract with all the contractors). All the additional staff will report to the project manager acting on behalf of the director manager. The same is applicable also for the external assessment experts and the legal/administrative advisors. External technical experts will be included in the management board to support (on the technical side) the project manager in this task. The core activities include energy audits and designs and tenders preparation and execution. In view of limiting the risk of unsuccessful tenders, the energy audits and the resulting process of bundling are foreseen in 3 similar loops. 21/07/2015 Page 19 of 47
3 The energy audit and design aim is to evaluate the public buildings current energy consumptions and mode of use (baseline), their geometric and construction characteristic and possible contractual, architectural or technical restrictions, and similarly for public lighting, in order to evaluate the level of efficiency/consumption reduction technically and economically viable to define the tender minimum values (investment, efficiency, contract duration ) required. Regarding the biomass district heating networks (DHN) the external expertise will define and design the networks based on the analysis of the future DHNs customers heating demand and willingness to connect to the DHN. In parallel, in conjunction with local forest owners, studies will be carried out to define local biomass supply chains for the planned DHNs. Biomass plants and DHNs dimensioning should take into account both the specific local heat demand, the availability of sustainable biomass and the replicability of the solution for the different municipalities involved. Project staff (both project assistants and technical external experts) will be in charge of municipalities and auditors coordination in order to obtain affordable baseline definition and design for the three investment sectors. The legal, administrative and technical advisors will be in charge in cooperation with the internal administrative and technical staff for: documents preparation procedure definition EPC contract preparation. evaluation All these listed activities will profit of the experience of Milano, Modena, Chieti and Padova ELENA projects currently in progress. Specific meetings will be provided with the four project managers in order to gather suggestions and advice as well as tender documents (even if they are public available). For project internal communication purposes a web platform will be designed and implemented The Web Platform will support the project first in view of enhancing homogeneity of the auditors approach and to check project scheduling, second to monitor the performance of the efficiency measure, supporting a transparent communication between municipalities, ESCOs and Province. Each of these FABERs actors will be provided of a specific account to the Web Platform. The Web Platform consists of a software delivered by a Web Browser for different level of users (Municipalities, Province, ESCOs) and able to: upload public buildings characteristics (geometric and construction features, heating systems, architectural or technical restrictions ), energy consumptions and mode of use, and similarly for public lightings; analyse and elaborate the previous data at building, municipality and tender lot level (depending on the user restrictions rules). During the project the Web Platform will help to share, homogenize and validate audit input and output in order to help tender lots definition on the base of auditors elaborations (first phase); to store and analyse buildings energy consumptions and performances on the base of ESCO s energy management system (second phase). During the first phase this support is very helpful for the project management due to the high number of municipalities. The Web Platform with a dedicated web site will also serve for communication and dissemination activities. During the project running time this will allow inter alia to attract new municipalities, to publicise the tenders to a large number of ESCOs, and to present the achieved results and acquired experiences to a wider public. 21/07/2015 Page 20 of 47
4 In total, 4,326 expert days are foreseen, at an average cost (comprising junior and senior profiles) of 342 EUR/day. The cost breakdown of the expertise required is presented in the following table: Type of activities / support 1. Project management support 1.a Senior technical experts 1.b Project management assistance Person day cost rate (VAT included) Number of person days Total , ,000 1.c Two junior assistance Technical s 2. a Buildings Baselines and Design 2.b Lighting Baselines and Design 2.c DHN and Design 3. Administrative & Legal Support & Auditing Communication & Dissemination Total 400 1, , , , , , , ,000 4,326 1,478,000 Indicative implementation timetable for the Project Development Services, indicating the link between the Project Development Services and the Investment Programme The preparation activities will be organised in view of having three tenders cycle with two territorial lots each for the EE in buildings, including RE (i.e PV and solar thermal collectors) and in public lighting. A lot dedicated to buildings will comprise around 450 buildings in 120 municipalities. The lot for public lighting will comprise around light columns in 65 municipalities. Preliminary activities CORE: Public Building BUILDING 1,2 BUILDING 3,4 BUILDING 5,6 CORE: Public Lighting LIGHTING 1,2 LIGHTING 3,4 LIGHTING 5,6 CORE: DHNs Project Management Communication & Dissemination Web platform for Mon. & Ver. FABER dissemination to municipalities (Province level) technical requirements FABER dissemination to other interested stakeholders (IT/EU) & Verification 21/07/2015 Page 21 of 47
5 Applicants commitment to facilitate dissemination of experiences and results Dissemination of experiences and results will be targeted at province level to the other municipalities not included in the project. At regional level, dissemination activities will be supported by the Region of Lombardy and its subsidiary Finlombarda. Finally, at national level dissemination support is expected from the Environmental Ministry and in particular through the working group dedicated to the preparation and implementation of the SEAP, which has already endorsed the Province of Bergamo s SEAP Guidelines. The involvement of the Province of Bergamo in existing networks like Coordinamento A21 (national Agenda21 network), the UPI (Provinces National Network) and the municipalities membership in the ANCI (Municipalities National Network) will facilitate the dissemination activities. 3. Presentation of Investment Programme Location of the planned Investment Programme Province of Bergamo, Italy Description of the planned Investment Programme On the basis of SEAPs realised by of the involved Municipalities, the investment programme consists in: 1. Public Buildings (120 municipalities concerned, targeting in total some 445 buildings): works foreseen concern the improvement of the building envelope, the modernisation of the heating generation, distribution, and the building energy management and control systems. Also the increase of the indoor lighting efficiency can be included. In certain cases where financially feasible, the use of renewable energies is also foreseen. In view of making these investments more attractive for an energy performance approach, national subsidy schemes will be solicited, which would reduce the payback time. In case the subsidies will be less or not available at all the investment programme will be redesigned targeting only the measures with an acceptable payback time. 2. Public street lighting (67 municipalities are concerned with some 17,900 light posts): works planned cover the substitution of the existing lightings with more efficient technologies and the installation of voltage regulators. Energy savings of 45% are expected. 3. Biomass fed district heating networks (5 municipalities concerned): The investment programme includes also the construction of 5 small scale biomass fed district-heating networks in municipalities in mountain areas, not served by the gas network. The pre-feasibility studies carried out show an acceptable financial performance. Biomass supply should come from the surrounding forests. 4. PV in public buildings: on around 280 buildings PV plants will be installed with an average capacity of 14 kwp. The electricity production will be used to reduce the electricity purchase of the municipality. Joined tenders are foreseen with point 1. The total expected investment amount of EUR 54.1m is planned to be implemented through the energy performance contract approach using ESCOs for the investments in public buildings and public lighting. For the district heating network the concession approach is the preferred option. The implementation set up for PV foresees a partnership with private companies (e.g. ESCOs). Description of the approach to implement the Investment Programme The Province will be responsible for the entire programme acting as central purchasing body, pursuant to an agreement with the Municipalities. Lombardy Region acts as a guarantor in case the status of the Province institution will change. All the 124 municipalities involved in the project have already formally delegated to the Province (through a municipal resolution) this coordination role and the role of the central purchasing body. The in-house company Finlombarda of the Lombardy Region will cooperate in 21/07/2015 Page 22 of 47
6 technical assistance activities (by its Energy Unit) and in searching for best conditions for ESCOs to benefit from funding sources (i.a. EIB or commercial banks). The EPC with performance guarantee will state that payments from the municipalities to ESCOs are proportional to the performance results and thus should be off-balance for municipalities (in accordance with the Eurostat decisions). The fuel supply will be separated from the EPC contract. The municipalities will purchase fuel and electricity through the national platform for public procurement (CONSIP) or other platforms that guarantee equivalent or better conditions. The cooperation between Bergamo Province, Lombardy Region and Finlombarda has been fixed in an institutional agreement. Both partners will share and validate the key strategic project decisions with the Province in the Steering Committee. Finlombarda as in-house company of Lombardy Region will make available additional technical, financial and legal support if required, which is not covered by the ELENA grant. The municipality commitment has been already stated through a municipal council declaration of interest on renovation interventions on specific public buildings and/or public lightings (all under their property and not being under contractual restrictions) and/or biomass district heating networks. (Municipalities concerned: Brembilla, Foppolo, Piazzatorre, Serina and S. Omobono). During the assessment phase the municipalities will be consulted as main stakeholders in the confirmation of the priority settings for the pre-selected public buildings. During the tendering phase the municipalities will be consulted as main stakeholders to check the requested ESCO s requirements and proposed EPC contract, and during the tender assignation to judge the proposed efficiency measures. The contract signature will be done by each municipality as final step of the process. The case of biomass district heating networks is treated in a specific way: the instrument of concession is the reference option currently considered for the activities of preliminary and detailed design, construction and operation of the district heating network, including heat supply service. The concessionaire shall bear the cost of the investments (e.g. biomass plants and district heating network) and will receive income from the heat sale revenues for the whole duration of the concession and any incentives provided for by law. Concerning the planned PV plants the approach foreseen is to make available rooftops of public buildings to private companies (e.g. ESCOs). The selected partner will be responsible for the building, management and maintenance of the PV plant, being paid by the municipalities through savings in their electricity bill. Expected results in terms of increase in energy efficiency, decrease in energy consumption, renewable energy production and reduction of greenhouse gas emissions The estimated impacts are shown below: Investment sector Energy saved (in GWh/y) RE generated (in GWh/y) CO 2 emissions avoided (in tons/y) EE in buildings (incl. solar thermal) ,600 EE in public lighting 7.1-2,900 Biomass district heating ,100 networks PV in buildings 4.2 1,700 Total ,300 Expected other relevant results In addition to significant energy savings and CO 2 reductions, the investment programme is expected to generate the following results: Improvements of buildings indoor comfort and street lighting quality. Life span extension of buildings and improvements/economic savings in the operation and maintenance of buildings. 21/07/2015 Page 23 of 47
7 Employment created estimated at approx. 350 FTE years. Capacity building through skills development and training of local technicians in best practices and innovative and energy efficient technologies and methods. Increasing the demand for locally produced biomass. It should be noted that these are initial estimates and the figures will be updated throughout the project implementation. Expected overall investment cost The total amount of investment is estimated at EUR 54.1m distributed as follows: Investment sector Investments (MEUR) EE in public buildings (incl solar thermal) EE in public lighting 11.0 Small scale biomass district 9.1 heating networks PV in public buildings 8.0 Total 54.1 Preliminary financing plan for the Investment Programme For the energy refurbishment of buildings and for street lighting renovation, the Energy Performance Contracting with a result guarantee through ESCO will be used. The financing (total CAPEX EUR 37m) will thus come mainly through the ESCO. For some of the investments national incentives (Conto Termico and White Certificates) might reduce the upfront investment amounts (initial estimations of grant amount for the building refurbishment reaches 30% of investment). In the case of the biomass district heating networks the instrument of concession will be implemented, which will include also the financing of the investments through the concessionaire. The construction of the PV plants will be done through private companies (e.g. ESCOs). The selected company will be responsible for the installation, management and maintenance of the plants. It will be paid through the savings on the electricity bill of the municipalities (possibility of net metering according to Italian regulation). In addition the financial value of white certificates related to PV plants will reduce the upfront investment amount for the private company. Preliminary implementation timetable for the Investment Programme Due to the high number of public buildings and municipalities involved, in the scheme six tenders (each including two separate lots of territorially contiguous aggregations of municipalities) are planned for both public buildings and public lightings. Following the scheme implementation phase the award of the first public building tender will start in month 17 until the end of the project. Thanks to a short preliminary phase and to the partial overlapping of the audit phases, all the tenders will be awarded at the end of the second year. An intermediate check of the investment program (milestone 1) is provided at month 20 when 2 public building and 2 public lighting tender lots should be awarded. 21/07/2015 Page 24 of 47
8 Preliminary activities CORE: Public Building BUILDING 1,2 BUILDING 3,4 BUILDING 5,6 CORE: Public Lighting LIGHTING 1,2 LIGHTING 3,4 LIGHTING 5,6 CORE: DHNs MILESTONES 1 2 Two milestones are foreseen: the first in mid tender phase (month 20), when two tenders will be awarded (one buildings and one lighting) each with two lots and the second at the end of the implementation phase (month 36). Estimate of the planned investment is: at milestone 1 o 1/3 of the investment regarding public buildings o 1/3 of the investment regarding public lightings For a total investment of about 15 million equal to about one third of the total investment and a cumulated leverage factor of 19.7 at milestone 2 o Total investment regarding public buildings o Total investment regarding public lightings o Total investment regarding DHN All the investment should be implemented at this stage and the final leverage factor of 40.7 should be reached. 21/07/2015 Page 25 of 47
9 4. Overview table: Milestones presentation for measuring leverage factor Reporting time (end of year) Estimated budget Project Development Service Milestones for Investment Programme implementation (indicate here the part of the total Investment Programme which is planned to be launched at the indicated reporting time) Leverage factor according to phasing + milestones Staff costs [in EUR] External experts / subcontracts [in EUR] Sub-total [in EUR] Short description of area, technologies concerned 1 Estimated Identification of investor 2 total costs [EUR] Estimated annual final energy saved for EE projects 3 [in GWh] Estimated annual final energy productio n by RES 3 [in GWh] Estimated annual reduction of CO2 eq [in t] Year 1: ESCO Year 2: Buildings, public lighting and DHNs ESCO Year 3: Buildings, public lighting and DHNs ESCO TOTAL Interim report (cumulated, at the end of month 20) Specifying which main area concerned (i.e. EE, RES, transport or urban infrastructure) and which technology(ies)/measure(s) implemented 2 Indicate the final investor, the one who will order the work to be carried out 3 Indicate the main type of energy saved or produced (thermal or electrical) 21/07/2015 Page 26 of 47
The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE
The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE Dr. KONSTANTINOU Kostas, Director of Local Development, ANATOLIKI S.A Thessaloniki, November
More informationThe Intelligent Energy Europe Programme: Call for Proposals 2012
The Intelligent Energy Europe Programme: Call for Proposals 2012 Emilio FONT DE MORA Project Officer Executive Agency for Competitiveness and Innovation Renewable Energy Unit Sofia, 28 February 2012 The
More informationELENA PROGRAMME IN LIGURIA REGION
ELENA PROGRAMME IN LIGURIA REGION A SUPPORT SCHEME FOR SEAPS Thematic Workshop- The Monitoring process of Sustainable Energy Action Plans Maria Fabianelli, Director of IRE SpA Energy Department Plovdiv,
More informationEnergy Services Establishing Markets for Energy Efficiency. Michael Geissler CEO Berliner Energieagentur GmbH
Energy Services Establishing Markets Michael Geissler CEO Berliner Energieagentur GmbH Berlin, 31 May 2017 Berlin Energy Agency (BEA) more than 20 years experience in energy efficiency founded in 1992
More informationNATIONAL CONFERENCE ON ENERGY PERFORMANCE CONTRACTING (EPC)
NATIONAL CONFERENCE ON ENERGY PERFORMANCE CONTRACTING (EPC) The Energy Performance Contracting Experience in Romania Catalin CSASZAR The Energy Efficiency and Renewable Energies Agency Ploiesti Prahova,
More informationZAGREB ENERGY EFFICIENT CITY. Refurbishment of public buildings and modernization of public lighting
Refurbishment of public buildings and modernization of public lighting Contract N : IEE/12/816.SI2.645701, Duration: 1 April 2013 30 March 2017 Energy Efficiency Finance Market Place 19 January 2017 WHY
More informationPROJECT DEVELOPMENT ASSISTANCE OPPORTUNITIES AND EXPERIENCE 2020 Together!! project May, 21 st. Silvio De Nigris Metropolitan City of Torino
PROJECT DEVELOPMENT ASSISTANCE OPPORTUNITIES AND EXPERIENCE 2020 Together!! project May, 21 st Silvio De Nigris Metropolitan City of Torino The context Location: north-west part of Italy Population: about
More informationThe Intelligent Energy Europe Programme: Call for Proposals 2012
The Intelligent Energy Europe Programme: Call for Proposals 2012 Dario Dubolino Project Officer Executive Agency for Competitiveness and Innovation Renewable Energy Unit Bratislava, 3 rd February 2012
More informationReport on specific multi-level GPP approaches and strategies and implementation of G.PP.S
2018-02-02 GreenS - green public procurement supporters for innovative and sustainable institutional change H2020-EE-2014-3-MarketUptake Proposal: (649860) Topic: EE-08-2014 Type of action: CSA DELIVERABLE
More informationTerms of reference INDIVIDUAL CONSULTANT PROCUREMENT NOTICE
Terms of reference INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Position: RE/EE Investment Specialist Closing date: 25 May 2014 GENERAL INFORMATION Title: RE/EE Investment Specialist Project Name : Market
More information2020 Together!! project April, 28 th. Giovanni Vicentini -Silvio De Nigris Metropolitan City of Torino
2020 Together!! project April, 28 th Giovanni Vicentini -Silvio De Nigris Metropolitan City of Torino The context Location: north-west part of Italy Population: about 2,300,000 inh. Number of Municipalities:
More informationUNECE Activities in Energy Efficiency in Buildings and Housing Sector
UNECE Activities in Energy Efficiency in Buildings and Housing Sector Oleg Dzioubinski Energy Efficiency 21 Programme Manager UNECE Sustainable Energy Division ESCWA Expert Group Meeting on Best Practices
More informationJoint actions 2017: Frequently Asked Questions
EUROPEAN COMMISSION CONSUMERS, HEALTH, AGRICULTURE AND FOOD EXECUTIVE AGENCY Health Unit Luxembourg, 12 April 2017 Joint actions 2017: Frequently Asked Questions Frequently Asked Questions' content 1.
More informationSREP MALI - INVESTMENT PLAN Scaling Up Renewable Energy. Scaling Up Renewable Energy in Low Income Countries (SREP)
1. Title of the investment plan SREP MALI - INVESTMENT PLAN Scaling Up Renewable Energy 2. Program under the SCF Scaling Up Renewable Energy in Low Income Countries (SREP) 3. Name of the reviewer Naceur
More informationEIB support to Energy Efficiency
EIB support to Energy Efficiency Louise White Energy Efficiency Division Projects Directorate EUROPEAN INVESTMENT BANK Brussels, 26 Sept 2017 26/09/2017 1 Fossil Fuels 5% Gas Networks 14% Electricity networks
More informationROADMAP TOWARDS NEARLY ZERO ENERGY SPORT BUILDINGS
ROADMAP TOWARDS NEARLY ZERO ENERGY SPORT BUILDINGS Neuza Rosa neuza.rosa@jesusferreira.pt Final Dissemination Event 21 February 2017, Brussels Topics What is a Nearly Zero Energy Sport Building? Steps
More informationLAW ON ENERGY EFFICIENCY
Pursuant to article 82 paragraph 1 clause 2 and article 91 paragraph 1 of the Constitution of Montenegro, the Parliament of Montenegro during its 24th electoral term, on the fifth sitting in the first
More informationCOVENANT OF MAYORS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS,
COVENANT OF MAYORS WHEREAS, the Inter-Governmental Panel on Climate Change has confirmed that climate change is a reality and that the use of energy for human activities is largely responsible for it;
More informationEnergy Efficiencies Practices for European Smart Cities. Athens, February 2018
Energy Efficiencies Practices for European Smart Cities Athens, February 2018 Ingoing hypothesis Talking about energy efficiency opportunity: 60-100bn per year in Europe (investments required) Converting
More informationIntelligent Energy Europe (IEE) programme
Intelligent Energy Europe (IEE) programme 2011 funding priorities Christof Marx Project Officer Executive Agency for Competitiveness and Innovation National Info Day Slovakia Bratislava, 11 March 2011
More informationUnderstanding the Energy Performance Contracting (EPC) model and process
Understanding the Energy Performance Contracting (EPC) model and process Professor Theocharis Tsoutsos Director, Renewable and Sustainable Energy Systems Lab School of Environmental Engineering Technical
More informationRENOWATT Sustainable Energy Investment Forum September 28, RenoWatt is partner of the H2020 project
RENOWATT Sustainable Energy Investment Forum September 28, 2017 RenoWatt is partner of the H2020 project Ordre du jour Introduction RenoWatt: presentation RenoWatt+: Next steps 2 GRE Liege Reconversion
More informationELENA-Modena project for technical assistance to enhance energy saving in the Public Sector *** The Modena Energy Agency s experience and results
ELENA-Modena project for technical assistance to enhance energy saving in the Public Sector *** The Modena Energy Agency s experience and results 1) Short introductory presentation ELENA- Modena project
More informationState of play of energy efficiency financing in Italy
State of play of energy efficiency financing in Italy Alessandro Federici ENEA, Italy s National Agency for Energy Efficiency Financing Energy Efficiency in Italy and Malta Malta, 22 November 2018 Italy
More informationESD implementation in Greece
May 2011 ESD implementation in Greece Introduction: The legal transposition of the 2006/32/EC Directive in Greece, was performed by the recently enacted Law 3855/2010, of June 2010. L3855/2010 on Measures
More informationEPC Basics and Financing. Rodrigo Morell Creara Investor Days Madrid 15 July 2017
EPC Basics and Financing Rodrigo Morell Creara Investor Days Madrid 15 July 2017 TABLE OF CONTENTS ENERGY EFFICIENCY AND EPC INTRODUCTION TO EPC ENERGY EFFICIENCY EPC ENERGY PERFORMANCE CONTRACTING MAIN
More informationPublic Building Renovation through Energy Performance Contracting (EPC)
Public Building Renovation through Energy Performance Contracting (EPC) Rüdiger Lohse Brussels, March, 2017 Intention of this presentation What is Energy Performance Contracting? Demonstrate KEA s role
More informationBTG plc Terms of Reference of the Remuneration Committee ( Committee ) of the Board of Directors ( Board ) of BTG plc ( Company )
Constitution and Authority 1. The Committee is established as a committee of the Board pursuant to the Articles of Association of the Company and in accordance with the principles set out in The UK Corporate
More informationEEOS in Italy Alberto Pela, Regulatory Affairs - GSE. Albert Borschette Conf. Centre - Brussels November, 2016
EEOS in Italy Alberto Pela, Regulatory Affairs - GSE Albert Borschette Conf. Centre - Brussels 15-16 November, 2016 GSE MSE Ministry of Economic Development (with others Ministries) MEF Ministry of Economy
More informationResearch and Innovation Roadmap Call for Tender Appendix I Statement of Work
Research and Innovation Roadmap 2014-2020 Call for Tender Appendix I Statement of Work E2BA/CFT-2011/1 E2BA/CFT-2011/1 December 2, 2011 Page 1 Table of Contents 1. TECHNICAL SPECIFICATIONS... 3 1.1 Background...
More informationEfficient Buildings First
Efficient Buildings First Eva Athanasakou EUDITI Energy & Environmental Design 27 June 2018 Contents Current consumption and Energy Efficiency Potential Where are we today and where are we going for 2030
More informationPort of Seattle Commission. Policy Directive on Diversity in Contracting. As Adopted January 9, 2018
Port of Seattle Commission Policy Directive on Diversity in Contracting As Adopted January 9, 2018 Document last updated April 6, 2018 SECTION 1. Purpose. The Port finds that minority and women businesses
More informationFINANCING INSTRUMENTS FOR EPC PROJECTS IN CROATIA
ENERGY PERFORMANCE CONTRACTING (EPC) FOR PUBLIC BUILDINGS FINANCING INSTRUMENTS FOR EPC PROJECTS IN CROATIA International EnPC-INTRANS Conference 15 th November 2016 Vesna Bukarica, Ph.D. vbukarica@eihp.hr
More informationFederal Buildings Initiative Qualification Requirements
Federal Buildings Initiative Qualification Requirements Important Note: Companies who wish to be qualified under the Federal Buildings Initiative (FBI) and who wish to bid on a project for which a Request
More informationELECTRICITY NETWORK TRANSFORMATION ROADMAP: KEY CONCEPTS REPORT SUMMARY DECEMBER 2016
ELECTRICITY NETWORK TRANSFORMATION ROADMAP: KEY CONCEPTS REPORT SUMMARY DECEMBER 2016 A partnership between Energy Networks Australia and CSIRO A TRANSFORMED ELECTRICITY SYSTEM BY» Customers retain security
More informationSustainable Energy Action Plan. Paros. Action Plan for Energy. Cofinanced by the European Regional Development Fund - MED Programme
Sustainable Energy Action Plan of Paros Action Plan for Energy 09/2011 Sustainable Energy Action Plan of Paros INDEX 1. INTRODUCTION 2. OVERALL OBJECTIVES. REDUCTION TARGET 3. GREENHOUSE GASES EMISSIONS
More informationFramework document for the ECOWAS directive for Energy Efficiency in Buildings Table of contents
Framework document for the ECOWAS directive for Energy Efficiency in Buildings Table of contents 1. Considerations... 2 2. Objective of the ECOWAS directive on energy efficiency in buildings... 2 3. Definitions...
More informationSustainable Energy Action Plan. Sifnos. Save Energy for Tomorrow
Sustainable Energy Action Plan of Sifnos Save Energy for Tomorrow 09/2011 Sustainable Energy Action Plan of Sifnos INDEX 1. INTRODUCTION 2. OVERALL OBJECTIVES. REDUCTION TARGET 3. GREENHOUSE GASES EMISSIONS
More informationAnnex 2 ACTION FICHE OF THE WECSP PROJECT. Capacity-Building in Wind Energy and Concentrating Solar Power (WECSP) in Jordan. Decentralised management
Annex 2 ACTION FICHE OF THE WECSP PROJECT 1. IDENTIFICATION Title Total cost Aid method / Management mode Capacity-Building in Wind Energy and Concentrating Solar Power (WECSP) in Jordan 10 M Euro Decentralised
More informationSmart and Flexible 100 % Renewable District Heating and Cooling Systems for European Cities
Smart and Flexible 100 % Renewable District Heating and Cooling Systems for European Cities Regional strategy Ireland (EN) Deliverable WP 2 Task 2.1 Del. 2.1 Improving the regional framework Survey of
More informationEnergy Efficiency in Public Buildings through Energy Services The example of Germany
through Energy Services The example of Germany Michael Geissler CEO Berlin Energy Agency Odessa, 1 June 2016 Contents Berliner Energieagentur (BEA) Energy Efficiency in Public Buildings Energy Services
More informationMANDATE OF THE BOARD OF DIRECTORS
North American Palladium Ltd. February 21, 2018 Purpose MANDATE OF THE BOARD OF DIRECTORS The Board of Directors (the Board ) of North American Palladium Ltd. (the Company ) shall assume the responsibility
More informationThe challenge of energy efficiency: Promoting innovative business models for SMEs
ENERGY PERFORMANCE CONTRACTING PLUS (EPC+) SME Partnerships for Innovative Energy Services through Standardisation The challenge of energy efficiency: Promoting innovative business models for SMEs ECEEE
More informationNational Action Plan on Energy Efficiency (NAPE)
National Action Plan on Energy Efficiency (NAPE) CO2-Modernisation Program 5 th Meeting of the Concerted Action for the Energy Efficiency Directive March 24 th 2015, Riga Johannes Thomas Federal Ministry
More informationD.3.5 Report on best practice implementation of bankable energy actions
D.3.5 Report on best practice implementation of bankable energy actions Best practice title 1 Building energy efficiency and refurbishment by Energy Performance Contracting in municipal buildings EPC coaching
More information2013 Best Practice Selection
2013 Best Practice Selection Covenant Signatories Buildings, equipments, facilities Sustainable Järva Refurbishment Project STOCKHOLM (SE) - Optimisation of heating and ventilation systems, - Conversion
More informationTASK 3.1. Project Infinite Solutions. INnovative FINancIng for Local SusTainable Energy Solutions. Local Study and Action Plan.
Project Infinite Solutions INnovative FINancIng for Local SusTainable Energy Solutions Grant agreement no.: IEE/13/392.SI2.675530 TASK 3.1 Local Study and Action Plan Date: June 2015 COMUNE DI UDINE MUNICIPALITY
More informationThe Welsh Assembly Government is grateful for the report. We welcome the findings and offer the following response to the recommendations within it.
The Welsh Assembly Government s response to the report of the National Assembly Audit Committee's report on NHS Energy Management: Committee Report (2)07-06 The Welsh Assembly Government is grateful for
More informationRenovation of Public Buildings through EPC in Ljubljana
Renovation of Public Buildings through EPC in Ljubljana Alenka Loose Financing Energy Renovation of Buildings in Italy, Croatia and Slovenia 17 November 2017, Milan, Italy alenka.loose@ljubljana.si Background
More informationPromotion of Smart Grids Application in Energy Management and Environmental Protection through EPEEF s Activities
Promotion of Smart Grids Application in Energy Management and Environmental Protection through EPEEF s Activities Environmental Protection and Energy Efficiency Fund Republic of Croatia Maja Rajčić, MEE
More informationThe city of Vrbovec is situated in Zagreb County, 30 km from the north-east of the city of Zagreb, the capital of Croatia. The city refurbished its entire street lighting system to LED technology using
More informationREPORT ON EUROPEAN ENERGY EFFICIENCY SERVICES MARKETS AND QUALITY
REPORT ON EUROPEAN ENERGY EFFICIENCY SERVICES MARKETS AND QUALITY This project receives funding from the European Union s Horizon 2020 research and innovation programme. European Report on the Energy Efficiency
More informationMr. Paul Kenny. The Citizens Assembly
Paper of Mr. Paul Kenny Tipperary Energy Agency delivered to The Citizens Assembly on 01 October 2017 1 Introduction This submission seeks to establish a context for the changes we need in society and
More informationPillar II. Institutional Framework and Management Capacity
PILLAR II. INSTITUTIONAL FRAMEWORK AND MANAGEMENT CAPACITY Pillar II. Institutional Framework and Management Capacity Pillar II assesses how the procurement system defined by the legal and regulatory framework
More informationFinancing of Energy-Efficiency Measures: Program Design / International Examples
Financing of Energy-Efficiency Measures: Program Design / International Examples Workshop on Energy Efficiency in Buildings European Commission, Joint Research Centre Moscow, 2nd of September 2010 Arne
More informationCONTENT, OBJECTIVES, MILESTONES, RESULTS. National Roadshow Event Berlin, Germany, - 15 September 2016
CAPACITY BUILDING ON ENERGY PERFORMANCE CONTRACTING IN EUROPEAN MARKETS IN TRANSITION (ENPC-INTRANS) CONTENT, OBJECTIVES, MILESTONES, RESULTS National Roadshow Event Berlin, Germany, - 15 September 2016
More informationInternational Monitoring, Verification and Enforcement Conference
International Monitoring, Verification and Enforcement Conference LONDON 14-16 JUNE, 2010 ENERGY BALANCE SITUATION 2005-2008 Total Primary Energy Supply [ktoe] Ktoe Heat 2500 2000 Solar Energy Electricity
More informationOffice of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE
Office of Climate Change Guyana September, 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE HOUSEHOD BASELINE SURVEY FOR BARTICA TOWN 1. INTRODUCTION AND
More informationPPP and Energy Saving Performance Contracting (ESPC) in France
The University of Hong Kong PPP and Energy Saving Performance Contracting (ESPC) in France SEMINAR organised by CICID HKU Frédéric BOUGRAIN Centre for Infrastructure and Construction Industry Development
More informationCall for Applications for the constitution of a Panel of External Experts for the assessments of Urban Innovative Actions in the framework of the 2
Call for Applications for the constitution of a Panel of External Experts for the assessments of Urban Innovative Actions in the framework of the 2 nd Call for Proposals 19/12/2016 16/02/2017 1 Table of
More informationIntroduction of Regional Energy Concepts (CEP-REC)
Introduction of Regional Energy Concepts (CEP-REC) Award cometition and selected projects in the regional energy concept of the Province of Torino Silvio de Nigris, Province of Turin the CENTRAL EUROPE
More informationBOARD OF DIRECTORS TERMS OF REFERENCE OF SUB-COMMITTEES
BOARD OF DIRECTORS TERMS OF REFERENCE OF SUB-COMMITTEES January 2011 Page 1 of 19 AUDIT, RISK AND ASSURANCE COMMITTEE TERMS OF REFERENCE STRUCTURE AND RELATIONSHIPS 1. CONSTITUTION The Audit, Risk & Assurance
More informationPadovaFIT! A Financing Investment Tool for the retrofitting of housing and service facility buildings in the PADOVA area
Regional conference on financing energy efficiency in Spain and Portugal Madrid, 15 June, 2017 PadovaFIT! A Financing Investment Tool for the retrofitting of housing and service facility buildings in the
More informationVocational Education and Training (VET) Systems: Role of the Social Partners
Austria Belgium Cyprus Czech Republic Cooperative partnership between associations of employers and of employees has a long tradition in Austria. Social partnership is based on the principle of voluntarism.
More informationD2.5 Country Report on Recommendations for Action for Development of EPC Markets
D2.5 Country Report on Recommendations for Action for Development of EPC Markets NORWAY Transparense project This document has been conducted within the framework of project Transparense Increasing Transparency
More informationEIB actions for Energy Efficiency in the Urban Sector
EIB actions for Energy Efficiency in the Urban Sector Brussels, 17th June 2009 1 EIB s environmental and sustainable objectives Promoting social well-being Minimising adverse environmental impact in all
More informationWhy does the list of thematic objectives not include integrated urban and spatial development as a separate objective?
Questions Why does the list of thematic objectives not include integrated urban and spatial development as a separate objective? What is the difference between an ITI and LD? Could LD strategy be basis
More informationGOOD PRACTICE IN FINANCING THE RENOVATION OF PUBLIC AND RESIDENTAL BUILDINGS
GOOD PRACTICE IN FINANCING THE RENOVATION OF PUBLIC AND RESIDENTAL BUILDINGS CONTENT: Introduction of SEVEn 1. List of financial instruments 1. Own and banking resources 2. Subsidy schemes 3. Energy services
More informationD4.2 TRAINING MODULES FOR TERTIARY SECTOR ACTORS GUIDANCE AND TEMPLATES CREARA 29/01/2016
D4.2 TRAINING MODULES FOR TERTIARY SECTOR ACTORS GUIDANCE AND TEMPLATES CREARA 29/01/2016 TABLE OF CONTENTS CAPACITY BUILDING ACTIVITIES OBJECTIVES RELEVANCE PREPARATION OF EVENTS POSSIBLE AGENDA PRESENTATION
More informationFinance Model used to Achieve the Bond in Lighting Retrofit. Declan Keogh Energy Engineer Carlow Kilkenny Energy Agency
Finance Model used to Achieve the Bond in Lighting Retrofit Declan Keogh Energy Engineer Carlow Kilkenny Energy Agency Municipalities Funding & Financing for EPC Projects Self Financing through own budgetary
More informationInternational EPC Conference
International EPC Conference EPC Best Practice in public buildings: A pilot EPC Light project in Barcelona Josep M. Granollers Catalan Institute for Energy (ICAEN) Stuttgart, November 15 th 2016 AGENDA
More informationEMPLOYMENT POLICY BRIEF
EMPLOYMENT POLICY BRIEF INVESTMENT IN INFRASTRUCTURE ASSESSMENT OF EMPLOYMENT OUTCOMES USING PROJECT- LEVEL ANALYSIS: APPROACH AND INDICATORS This policy paper presents an overview of the approach and
More informationResolution No Resolution No. 3737, Diversity in Contracting Policy Directive Page 1 of 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Resolution No. 3737 A RESOLUTION of the Port of Seattle Commission establishing a
More informationTunisia renewable Energy and Energy efficiency NAMA in the building sector. CCAP Climate Finance Forum 2016 Bonn, Germany
Tunisia renewable Energy and Energy efficiency NAMA in the building sector CCAP Climate Finance Forum 2016 Bonn, Germany Project point of contact National : Ms. Rym SAHLI: Head of Studies and Planning
More informationOptimized ENERGY management
HEALTHCARE Optimized ENERGY management OUR WORLWIDE ACTIVITIES: 48 COUNTRIES 94 M PEOPLE supplied with drinking water 4,532 drinking water production PLANTS managed 62 M PEOPLE connected to wastewater
More informationEUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT. Programme for Supporting Renewable Energy in Ukraine
EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT TERMS OF REFERENCE Programme for Supporting Renewable Energy in Ukraine Support to the Entity responsible for target setting The Programme for Supporting
More informationEtihad Energy Services Company. October 2017
Etihad Energy Services Company October 2017 Last update: 02/11/2017 1 TABLE OF CONTENT 1 Introduction to DSM Strategy and Etihad ES 2 Etihad Retrofit and Solar 3 TAQATI 4 Etihad ES Projects and Accomplishments
More informationEuropean Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations
European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations March 2006 CONTENTS CONTENTS...2 INTRODUCTION...3 1 BACKGROUND...4 1.1 The concept of CDM
More informationEnergy Efficiency and policies in Households - Bulgaria
BULGARIA Energy Efficiency and policies in Households - Bulgaria Tsvetomira Kulevska Lyudmil Kostadinov Third meeting of the project ODYSSEE-MURE Vienna, Austria 26-27 April 2018 SEDA Bulgaria Content
More informationCOMMISSION STAFF WORKING DOCUMENT. Guidance for National Energy Efficiency Action Plans. Accompanying the document COMMISSION IMPLEMENTING DECISION
EUROPEAN COMMISSION Brussels, 22.5.2013 SWD(2013) 180 final COMMISSION STAFF WORKING DOCUMENT Guidance for National Energy Efficiency Action Plans Accompanying the document COMMISSION IMPLEMENTING DECISION
More informationProject bundling to unlock finance for local energy efficiency implementation
Project bundling to unlock finance for local energy efficiency implementation Knowledge Sharing on Management and Financing of Energy Efficiency in Multi-apartment Buildings 16 May 2018 Yerevan, Armenia
More informationAction Fiche for EGYPT
Action Fiche for EGYPT 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation 200 MW Wind Farm in Gulf of El Zayt Project EU contribution : EUR 20 million Joint co-financing: i)
More informationCasework Technical Support (Social Welfare - Project Management)
Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend
More informationRationale for energy saving obligations for utilities (Energy Efficiency Resource Standards) and experiences in Denmark
Rationale for energy saving obligations for utilities (Energy Efficiency Resource Standards) and experiences in Denmark Dr Milou Beerepoot Director GIZ Energy Efficiency Programme Thailand Page 1 Content
More informationGreen Electricity in Austria - Summary 2010
Green Electricity in Austria - Summary 2010 Report by E-Control GmbH pursuant to section 25 para 1 Ökostromgesetz (Green Electricity Act) September 2010 Supported green power contributes 11.4% of public
More informationQuestions and Answers on call for tender RAN Centre of excellence HOME/2014/ISFP/PR/RADZ/0023) First set.
Questions and Answers on call for tender RAN Centre of excellence HOME/2014/ISFP/PR/RADZ/0023) First set. Q1. Could you please provide Annex 1 in Word, Annex 2 in either Word or Excel, Annex 3A in Excel
More informationCredit line to support energy efficiency in Slovak municipalities
Credit line to support energy efficiency in Slovak municipalities Introduction to MunSEFF Municipal Finance Facility Energy Efficiency is an initiative of the European Bank for Reconstruction and Development
More informationLeonardo Piccinetti E4Business
CIP Competitiveness and Innovation Programme, 2007-20132013 Leonardo Piccinetti E4Business Expected funding areas 2009 Renewable energy & local and special initiatives The policy framework Action Plan
More informationEU Energy Efficiency Policy and the support to energy efficiency investments
Margot Pinault, DG ENERGY EU Energy Efficiency Policy and the support to energy efficiency investments Financing Energy Efficiency in Poland, Czech Republic, Slovakia and Lithuanian 30 November 2017 -
More informationClimate and Energy Concepts in Germany
ICLEI - Local Governments for Sustainability European Secretariat Climate and Energy Concepts in Germany examplified by Südwestpfalz County Carsten Rothballer Climate Policy Officer, ICLEI Europe 3rd twinning
More information2018 annual report in accordance with Article 24(1) of the EED
- 1-2018 annual report in accordance with Article 24(1) of the EED For the 2018 annual report on progress in meeting the national energy efficiency targets in accordance with Article 24(1) in conjunction
More informationGABON, NATIONWIDE WATER & POWER. Case Study (Water and Power) Project Summary:
GABON, NATIONWIDE WATER & POWER Case Study (Water and Power) Project Summary: In July 1997, the government of Gabon signed a twenty-year concession contract with a private French consortium to operate
More informationExistence of functioning market economy, ability to face competitive pressure and market forces within EU
TWINNING LIGHT THE DETAILED PROJECT FICHE 1. Basic Information 1.1 CRIS Number: CZ 2004/006-237/09.01.09 Twinning number: CZ04/IB/FI/02-TL 1.2 Title: Assistance with the assessment of Public Private Partnership
More informationSant Cugat Smart City Strategy, achievements and perspectives
Sant Cugat Smart City Strategy, achievements and perspectives Tuesday, May 31, 2016 Sant Cugat del Vallès, Barcelona, Spain This project is co-funded by the European Union Contents General information
More informationOur Net-Zero Energy Journey IEMA Webinar, 8 th February, 2017 Mark Harris Building Technology Director KIP.
Our Net-Zero Energy Journey IEMA Webinar, 8 th February, 2017 Mark Harris Building Technology Director KIP. Agenda Who are we? What? Why? How? Progress to date What are the benefits Future progress 2 Who
More informationUN Economic Commission for Europe. Policy Reforms to Promote Energy Efficiency and Renewable Energy Investments in Bosnia and Herzegovina
UN Economic Commission for Europe Policy Reforms to Promote Energy Efficiency and Renewable Energy Investments in Seminar on Policy Reforms to Promote Energy Efficiency and Renewable Energy Investments
More informationThe Alterenergy Project Energy Sustainability for Adriatic Small Communities. Silvia Stefanelli Friuli Venezia Giulia Region, Italy
The Alterenergy Project Energy Sustainability for Adriatic Small Communities Silvia Stefanelli Friuli Venezia Giulia Region, Italy Workshop on geothermal energy - Status and future in the Peri-Adriatic
More informationEXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS
EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS / / / 1) Motivation for this evaluation According to the founding Regulation (168/2007) of the Fundamental
More informationForest Carbon Partnership Facility (FCPF): Readiness Plan Idea Note (R-PIN) Template
Forest Carbon Partnership Facility (FCPF): Readiness Forest Plan Carbon Idea Note Partnership (R-PIN) Facility External (FCPF) Review Form Readiness Plan Idea Note (R-PIN) Template Guidelines for Reviewers:
More informationUN Economic Commission for Europe
UN Economic Commission for Europe Sustainable Energy Financing Facilities Case Study of Bulgaria Workshop on Case Studies on overcoming barriers to investments in energy efficiency and renewable energy
More information