1 Carbon Creek Channel (OCFCD Facility. B01) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana Phone: Cell Phone: General Project Information: Name: Description: Goals/Objectives: Need: Carbon Creek Channel (OCFCD Facility. B01) from upstream Intersection of Western/Orange to upstream This channel was constructed in the 1959 designed to convey the 25-year storm event and is not in a FEMA Special Flood Hazard Area, Zone A is contained in channel, however it remains hydraulically deficient. The existing geometrics of this channel is a trapezoidal channel (bottom width is 8-ft, side slope is 1.5 to 1.5) lined with rip; one half of the channel will ultimately be improved as an L shaped channel lined with concrete and designed to convey the 100-year storm event; the length is approximately 2,300 feet. To increase the level of flood protection for the residents within the B01 flood plain by reducing or eliminating potential for personal injury and property damage due to flooding. Improve this reach of the flood control channel to be able to convey the 100-year storm design discharge and eventually reduce the FEMA Special Flood Hazard Area (SFHA) aka 100- year floodplain to containment within the channel, thus eliminating the high cost of obtaining mandatory flood insurance. Utilize a flood control improvement alternative that fits within the existing right-of-way constraints. Prioritize phasing of the construction of the proposed channel improvements to maximize benefits for the watershed. The existing channel is deficient, capacity is 65% of a 25-year storm event Meets statutory eligibility gates of 2015 IRWM Grant Funding: IRWM Goals: 1 of 5
2 Carbon Creek Channel (OCFCD Facility. B01) from Safely co-manage flood protection and water conservation. Maintain quality of life. IRWM Type OWOW Plan Project Type: Construction Latitude: Project Location: Longitude: Project is construction improvements to Orange County Flood Control District (OCFCD) Facility. B01, Carbon Creek Channel located in Orange County, City of Anaheim Benefit Zone Area (mi2): 2 Project Benefits: Benefits Water supply reliability, conservation and water-use efficiency Stormwater capture, storage, cleanup, treatment and management Removal of invasive species; wetlands creation or enhancement; acquisition, protection and restoration of open space n-point source pollution reduction, management, monitoring Groundwater recharge and management Contaminant and salt removal, reclamation, desalting and conveyance to users Water banking, exchange, reclamation and improvement of water quality Multipurpose flood and stormwater management programs Watershed protection and management Drinking water treatment and distribution Ecosystem and fisheries restoration and protection Applicable Where Benefits Accrue: 2 of 5
3 Carbon Creek Channel (OCFCD Facility. B01) from Jurisdiction: Explanation: Watershed/Su b-region: Explanation: Synergies: Multiple Communities The benefactors are residences and businesses from Cities of Fullerton and Anaheim. Entire Watershed The Carbon Creek Watershed has a drainage area of 12,620 acres. It is within the B Watershed which has a drainage area of 16,045 acres. The OCFCD s goal and plans work towards FEMA & National Flood Insurance Program s (NFIP) efforts in protecting property and lives from the threat of flood damage from storms. When the project has been completed, the OCFCD submits a Letter of Map Revision (LOMR) to FEMA to revise Flood Insurance Rate Map (FIRM) to reflect the floodplain as removed or diminished to containment within the channel facility alleviating the costly mandatory flood insurance premiums imposed on the benefactors, the residents and businesses from that community (s). Benefits to Disadvantaged Communities (DAC) and Native Tribal Communities (TC) 100% DAC: Portion DAC: DAC %: 0 100% TC: Portion TC: TC %: 0 Project area benefiting DAC (acres) : 1300 Describe DAC and TC Benefits: Property and lives would be protected from the threat of flood damage and the FEMA Flood Insurance Rate Map will be revised to reflect the 100-year to be contained in channel alleviating the costly mandatory flood insurance premiums imposed on the DAC. Human Right to Water: N/A Environmental Justice: N/A Project Partners: 3 of 5
4 Carbon Creek Channel (OCFCD Facility. B01) from Agency Name Contact Phone Collab Planning Direct Funding In-Kind Service Co-Manager Project Funding: Category Amount Percent Total Project Cost $7,500, Requested OWOW 2015 Funding $ Match Contribution $7,500, Local Contribution $7,500, Federal Contribution $ In-Kind Contribution $ Other $ SRF Loan $ Annual O&M Costs: $140, Funding Secured: Explain: O&M Funding Secured: Explain: Project Criteria: Criteria Metric Description Flood Risk Reduction e+008 $ Project Status: Project Status: Conceptual design (15%) completed Est. Complete Date: 06/30/2019 Est. Operational Life (years): 100 Agency Constructed Similar Projects : CEQA Status: In Progress Date: 06/30/ of 5
5 Carbon Creek Channel (OCFCD Facility. B01) from NEPA Status: t Applicable Date: Project Attachments: Type FileName Project Complete: Project Active: 5 of 5
Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.
Fullerton Creek Channel (OCFCD Facility. A03) Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana
More informationOcean View Channel (OCFCD Facility No. C06) from downstream of Bushard Street to downstream of Brookhurst Street
Ocean View Channel (OCFCD Facility. C06) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana
More informationLane Channel (OCFCD Facility No. F08) from Von Karman to 1000 downstream Redhill Avenue
Lane Channel (OCFCD Facility. F08) from Von Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana
More informationEast Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Warner Avenue to downstream Goldenwest Street.
Facility. C05) from upstream Warner Avenue to Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana
More informationLane Channel (OCFCD Facility No. F08) from Confluence with F05 channel to Von Karman.
Lane Channel (OCFCD Facility. F08) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana 92702
More informationRegional Water Recycling Plant No. 1 (RP-1) Expansion
Regional Water Recycling Plant. 1 (RP-1) Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Avenue Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636
More informationRegional Water Recycling Plant No. 5 (RP-5) Expansion
Regional Water Recycling Plant. 5 (RP-5) Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Avenue Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636
More informationJurupa Community Services District Joint Projects for Inclusion in the Santa Ana River Watershed-scale Conjunctive Use Program (SARCUP) Future Phases
Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Avenue Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636 Cell Phone: General Project Information:
More informationRW Supply Optimization and Drought Relief Project Project ID: 3064
Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Ave Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636 Cell Phone: 909-342-4429 General Project Information:
More informationDESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 5 FISCAL YEARS THROUGH
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 5 FISCAL YEARS 2018-19 THROUGH 2022-23 Number Stg No. Title Total Remaining
More informationUPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM
featherriver.org UPPER FEATHER RIVER IRWM UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM PROJECT INFORMATION FORM Please submit by 5: p.m. on August 3, 215, to UFR.contact@gmail.com Please provide information
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation
More informationAppendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South
Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location
More informationThere is a reliable, clean water supply for current and future generations.
E2 There is a reliable, clean water supply for current and future generations. E2.1. Current and future water supply for municipalities, industries, agriculture, and the environment is reliable. 2.1.1.
More informationTahoe Sierra IRWM Please submit by 17 January 2014 to Project Template
Please submit by 17 January 2014 to AraceliCazarez@KennedyJenks.com Project Template Please provide information in the tables below: I. Project Proponent Information Agency/ Organization Town of Truckee
More informationSanta Ana River Watershed. SAWPA Celeste Cantú April 17, 2012
Santa Ana River Watershed SAWPA Celeste Cantú April 17, 2012 What is SAWPA? SAWPA Member Agencies & Other Stakeholders Other Stakeholders 97 Water-related Agencies 4 Counties 59 Cities State water, environmental,
More informationPROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised
Name Proponent(s) Location Description Status Background (75) Tertiary Treatment at Fresno/Clovis Regional Reclamation Facility City of Fresno 36.70201, -119.89517 This project is for the construction
More informationOWOW PROGRAM STATUS UPDATE FOR THE OWOW STEERING COMMITTEE MAY 24, 2018
OWOW PROGRAM STATUS UPDATE FOR THE OWOW STEERING COMMITTEE MAY 24, 2018 OWOW Plan Update 2018 Chapter Updates Call for Projects to be included in the Plan Disadvantaged Communities Involvement Program
More informationTahoe Sierra IRWM Please submit by 17 January 2014 to Project Template
Please submit by 17 January 2014 to AraceliCazarez@KennedyJenks.com Project Template Please provide information in the tables below: I. Project Proponent Information Agency/ Organization Tahoe City Public
More informationAMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region
AMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region 1. PURPOSE The purpose of this Memorandum of Understanding
More informationSouth Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013
South Orange County Watershed Management Area Stakeholder Workshop April 30, 2013 Agenda Schedule of Review and Approval Process Overview Overview of the Proposition 84 Guidelines Overview of the Contents
More informationA10. Cost and Benefits Summary
A10. Cost and Benefits Summary The goals of the Proposal are to increase regional self-sufficiency through water conservation and water reuse; more efficiently manage water supplies; improve water quality
More information5. RESOURCE MANAGEMENT STRATEGIES
Central Orange County Integrated Regional Water Management Plan 5. RESOURCE MANAGEMENT STRATEGIES 5.1 STRATEGIES INAPPLICABLE TO REGION Nearly all types of resource management strategies are applicable
More informationChapter 3 Previous Studies
Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the
More informationTHE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description
THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific
More informationThe Future of Integrated Water Management: Moving the Program Forward
The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water Resources Santa Ana River Watershed 2013 Conference April 11, 2013 1 Today s Presentation
More informationWater Quality Stewardship Plan (WaQSP)
Salt Lake Countywide Water Quality Stewardship Plan (WaQSP) Natalie Rees Salt Lake County Flood Control & Engineering Division 2008 Watershed Symposium COUNTY RESPONSIBILITY AND AUTHORITY Salt Lake County
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE
FORM GEN. 160 (Rev. 8-12) CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE DATE: June 1, 2018 TO: Honorable Nury Martinez, Chair Honorable Paul Koretz, Vice Chair Honorable Paul Krekorian, Member
More informationInformational Meeting- March 31, Boxelder B-2/B-3 Watershed Planning Study
Informational Meeting- March 31, 2016 Boxelder B-2/B-3 Watershed Planning Study Agenda Introductions Work Completed to Date Phase 1 Evaluations Alternatives Evaluations Economic Evaluations Draft Watershed
More information-For SAC Discussion Purposes Only- Page 1 of 17
Project Scoring Criteria Framework The following describes project scoring criteria for the Safe, Clean Water Program. The Scoring Criteria within this framework is meant to evaluate the merit of every
More informationNOVATO WATERSHED PROGRAM
NOVATO WATERSHED PROGRAM NOVATO CITY COUNCIL Photo Credit: Sue Lattanzio AGENDA OVERVIEW OF TONIGHT S TALK Slide 2 Context what is a watershed? Process how did we implement the watershed approach? Content
More informationODOT Floodplain Management. Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering
ODOT Floodplain Management Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Background NFIP Ohio Department of Natural Resource
More informationCentral Orange County Integrated Regional Water Management Plan 1.1 GEOGRAPHY OF INTEGRATED REGIONAL WATERSHED MANAGEMENT PLAN
1. INTRODUCTION 1.1 GEOGRAPHY OF INTEGRATED REGIONAL WATERSHED MANAGEMENT PLAN FIGURE 1.1 CENTRAL ORANGE COUNTY WATERSHED MANAGEMENT AREA LOCATION MAP 1-1 September 2012 The Central Orange County WMA is
More information3.10 Hydrology and Water Quality. Environmental Setting
3.10 Hydrology and Water Quality This section describes the potential hydrology and water quality impacts associated with the proposed changes to the approved project. Environmental Setting This section
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
PROJECT OVERVIEW General Project Information Project Title: Conservation Planning and On-farm Irrigation Efficiency support Project Location: Pajaro Basin Estimated Cost: $896,452 Brief Project Description
More informationSan Diego IRWMP Public Meeting. Agenda. Morning Agenda
San Diego IRWMP Public Meeting June 29, 2007 Agenda Morning Background Outline of IRWM Plan Overview of IRWM Plan Prioritization Process Approach to Funding Application Prioritization Afternoon Explanation
More informationThe OC PLAN for IRWM in North and Central Orange County Section 3 Goals, Objectives, and Strategies
SECTION 3. GOALS, OBJECTIVES AND STRATEGIES 3.1 Regional Vision, Mission and Goals The OC Plan focuses on the North OC WMA and the Central OC WMA. The OC Plan builds upon projects and plans of the agencies
More informationAppendix A Stormwater Site Plan Report Short Form
Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within
More informationDrainage Criteria Manual Review
City of Colorado Springs Stormwater Management Assessment and Standards Development Drainage Criteria Manual Review March 8, 2013 Springsgov.com/City Agencies/Stormwater/Stormwater Engineering/ Stormwater
More informationComprehensive Plan Update - Stormwater Management Section Planning Commission Workshop: November 10, 2014
Comprehensive Plan Update - Stormwater Management Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation
More informationAppendix B Stormwater Site Plan Submittal Requirements Checklist
Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following
More informationAppendix A. SWRP Self Certification Checklist
Appendix A SWRP Self Certification Checklist Storm Water Resource Plan Checklist and Self-Certification The following should be completed and submitted to the State Water Resources Control Board Division
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot
17-082 Van Sloun Residence, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: May 8, 2017 AGENDA NUMBER: 17 FILE NUMBER: 17-082 ITEM: Van Sloun Residence RECOMMENDATION: Approve with
More informationCity of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility
December 16, 2014 City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility Prepared by CBBEL Project Background & Timeline June and July 2010 Severe storm events hit Elmhurst,
More informationSanta Clara Basin Stormwater Resource Plan
Santa Clara Basin Stormwater Resource Plan November 29, 2018 Vishakha Atre SCVURPPP Presentation Overview Stormwater Resource Plan (SWRP) Description and Purpose Methodology for Identifying and Prioritizing
More informationStevenson Creek Watershed Plan and Project Implementation
Stevenson Creek Watershed Plan and Project Implementation 1999-2007 Stevenson Creek Watershed Management Plan (WMP) Project Site The Watershed Management Plan was completed in 2001 with cooperative funding
More informationCITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California
CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact
More informationIntegrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants
Tahoe-Sierra Integrated Regional Water Management Plan July 2014 K/J 1270036 Photo courtesy of Matthew Grimm South Tahoe Public Utility District Prepared By Kennedy/Jenks Consultants 10850 Gold Center
More informationThe Chollas Creek Watershed Master Plan
The Chollas Creek Watershed Master Plan FMA Luncheon March 13, 2017 City of San Diego Rick Engineering Company Tetra Tech HELIX Environmental Planning Key Drivers and Considerations Drivers Considerations
More informationWhat to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia
What to Expect When You re Expecting A LOMR Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia Thursday, June 4 th, 2015 Agenda 1 Why File a Letter Of Map Revision (LOMR)? 2 Basic Requirements and Common
More informationDRAFT ANNOTATED OUTLINE 12/4/2006
DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan)
More informationJuly 18, GEOSCIENCE Support Services, Inc. P.O. Box 220, Claremont, CA Tel: (909) Fax: (909)
SUMMARY REPORT OF RECHARGE PARTIES PURSUANT TO RWQCB RESOLUTION R8 2008 0019 COOPERATIVE AGREEMENT TO PROTECT WATER QUALITY AND ENCOURAGE THE CONJUNCTIVE USES OF IMPORTED WATER IN THE SANTA ANA RIVER BASIN
More informationThe Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632
Study Partners The Nature Conservancy Cosumnes River Preserve 13501 Franklin Boulevard Galt CA 95632 East Bay Municipal Utility District 1 Winemaker Way, Unit K Lodi CA 95240 Sacramento County Water Agency
More informationSTORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A )
STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A. 093-1049) Summary of the Act In November 2004, the responsibility of Stormwater Management* in Cook County was placed under the authority of the MWRDGC
More informationPEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet
PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet Authority s Regional Water Supply Infrastructure The RV Griffin Reserve (RVG) property is owned by the
More informationAQR Goal 1: Groundwater And Aquifer The element shall contain one or more goal Recharge. MSW Goal 3: Recycling And Waste Diversion directed.
Rule 9J-5.011, FAC Requirements Proposed INF Objectives and Policies Goals (2)(a) AQR Goal 1: Groundwater And Aquifer The element shall contain one or more goal Recharge statements for each of the facilities
More informationDry Creek Flood Control Improvement Project
Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)
More informationStorm Water Resource Plan Criteria and Metrics Checklist
APPENDIX F Storm Water Resource Plan Criteria and Metrics Checklist Prepared for: San Diego Regional Storm Water Copermittee County of San Diego Department of Public County of San Diego, Department of
More informationAPPLICATION FOR HAZARD MITIGATION GRANT
Project Number South Dakota Office of Emergency Management 118 W. Capitol Ave Pierre, SD 57501 605-773-3231 APPLICATION FOR HAZARD MITIGATION GRANT This application is for a Hazard Mitigation Grant under
More informationHackensack River Flood Reduction Study Update
Township of River Vale Hackensack River Flood Reduction Study Update November 11, 2013 Purpose of Study To Analyze Where Frequent Flooding Is Impacting Property and How It Might Be Reduced Hackensack River
More informationPublic Facilities Element (WAT) (SEW) (SOL) (STM)
Public Facilities Element (WAT) (SEW) (SOL) (STM) Potable Water Sub-Element (WAT) Goal Provide public potable water supply facilities in a manner, which ensures the health, welfare and safety of the residents
More informationPROJECT BUDGET SUMMARY - ZONE 3
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT PROJECT BUDGET SUMMARY - ZONE 3 FISCAL YEAR 2017-18 DESCRIPTION FY 2016-17 FY 2016-17 FY 2017-18 FUND BALANCE FORWARD Actual Estimated Zone
More informationCONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation
M a r y l a n d P a r k L a k e D i s t r i c t Advisory Committee Meeting CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation City of Maryland Heights, Missouri November 07, 2018
More informationContents Chapter 1: Introduction Chapter 2: Identification and Description of Santa Clara Basin Watershed
Contents Chapter 1: Introduction 1.1 Background and Purpose... 1 1 1.2 Goals and Elements of the SWRP... 1 2 1.3 Previous and Current Planning Efforts... 1 3 1.3.1 Regional Plans... 1 3 1.3.2 Local Watershed
More informationNewport Bay Watershed Executive Committee
Newport Bay Watershed Executive Committee December 13, 2017 Discussion Calendar AGENDA ITEM 1 MINUTES OF THE SEPTEMBER 20, 2017 MEETING Recommended Action Approve the minutes of the September 20, 2017
More informationREPORT CONTENTS: (1) Case Analysis and Staff Recommendation (2) GIS Information & Maps (3) Application and Supporting Documents (4) Conceptual Plan
DOÑA ANA COUNTY PLANNING AND ZONNING COMMISSION Doña Ana County Government Complex 845 N. Motel Blvd. Las Cruces, New Mexico 88007 Office: (575) 647-7350 MEETING DATE: August 10, 2017 REQUEST: Variance
More informationGo Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014
Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management Kristen Clark VCPC Alumna, Spring 2014 Rising Waters, Rising Rates Coastal Communities in Virginia are confronted
More informationSanta Barbara County Region
Attachment 3 Santa Barbara County Region IRWM Implementation Grant Proposal Attachment 3 consists of the following items:. Attachment 3 provides a project description, estimated physical benefits, technical
More informationSANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN
SANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN UPDATE 2019 EXECUTIVE SUMMARY Prepared for : SANTA BARBARA COUNTY IRWM COOPERATING PARTNERS INTEGRATED REGIONAL WATER MANAGEMENT PLAN UPDATE
More informationProject Prioritization
Project Prioritization The Santa Ana Watershed Project Authority (SAWPA), as the regional watershed planning group for the Santa Ana River Watershed, has been facilitating efforts to implement a watershed
More informationChapter 4. Drainage Report and Construction Drawing Submittal Requirements
4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for
More informationI. Welcome & Introductions WPAC History (Paul Racette, PEC)
Poquessing Creek Watershed ACT 167 STORM WATER MANAGEMENT PLAN Public Hearing July 10, 2012 I. Welcome & Introductions ---------- WPAC History (Paul Racette, PEC) Primary WPAC Members: Bucks County: Bensalem
More informationRiparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP
Riparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP Agenda Introduction Stream and Riparian Impacts Ohio EPA Stormwater General Permit
More informationWAVERLY FLOODPLAIN BACKGROUND INFORMATION
WAVERLY FLOODPLAIN BACKGROUND INFORMATION Who designates the floodplains in Waverly? The Federal Emergency Management Agency (FEMA) is responsible for delineating floodplains. The floodplain FEMA uses
More informationLOCATION HYDRAULIC REPORT
Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID
More informationDRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT
Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect
More informationSouth Orange County Watershed Management Area Public Workshop. September 19, 2012
South Orange County Watershed Management Area Public Workshop September 19, 2012 AGENDA 8:00 8:45 Purpose of the IRWMP Regional Goals Prop 84 Implementation $ Results of Project Self Scoring Process for
More informationChapter 13. Implementation Plan
Chapter 13 Implementation Plan Table of Contents 13-3 13.1 Agencies Responsible for Implementation... 13-3 13.2 Updating and Amending the List of Projects and Programs... 13-5 13.3 Timelines for Active
More informationStream and Watershed Restoration Design and Quantitative Benefits. Kelly Gutshall, RLA and Mike LaSala
Stream and Watershed Restoration Design and Quantitative Benefits Kelly Gutshall, RLA and Mike LaSala Suquehanna Greenway River Towns Workshop September 30, 2013 Benefit Stacking Single Function Multiple
More informationCurrent / Recent Construction Projects
Zone 1 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2017 Current / Recent Construction Projects Monroe MDP - Monroe Channel Stage 4 (1-8-00071-04) In June 2017,
More information1. Red Clover Poco Restoration Project Environmental Permitting
1. Red Clover Poco Restoration Project Environmental Permitting 2. County: Plumas 3. Project Number: 4. Project Sponsor: Plumas Corporation (contact Leslie Mink); USDA- Plumas National Forest 5. Date:
More informationRUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION
RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION OCTOBER 7, 2016 1 INTRODUCTION Rubonia Neighborhood (Rubonia) is located in northern
More informationHas a median household income that is 80 percent or less than the statewide median household income.
C. Disadvantaged Unincorporated Communities Assessment 1. Context SB 244 (Wolk, 2011) requires cities and counties to address the infrastructure and service needs of unincorporated disadvantaged communities
More informationSea Level Rise and Recurrent Flooding Update
Sea Level Rise and Recurrent Flooding Update Informational Briefing City Council Meeting September 18, 2018 Thomas M. Leahy, Deputy City Manager The Sea, Inland Waters, & Groundwater are Rising Projected
More informationWestminster East Garden Grove, California Flood Risk Management Feasibility Study
1 Public Scoping Meeting Westminster East Garden Grove, California 255 255 255 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 62
More informationSTORMWATER MANAGEMENT GOALS, OBJECTIVES, AND POLICIES
STORMWATER MANAGEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 1: The City of North Port shall provide a stormwater management system which protects real and personal properties, preserves natural resources,
More informationStormwater Management and Groundwater Recharge. Laguna-Mark West Petaluma River Sonoma Creek
Stormwater Management and Groundwater Recharge Watershed Scoping Studies Laguna-Mark West Petaluma River Sonoma Creek www.sonomacountywater.org Scoping Studies in Three Watersheds Sonoma County Laguna
More informationATTACHMENT 6-Description of Proposal
Pajaro River Watershed IRWMP Page 1-1 ATTACHMENT 6-Description of Proposal Attachment 6 outlines the proposal for grant funding according to the requirement from the Proposal Solicitation Package for Implementation
More informationPUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT
COMPREHENSIVE PLAN EXHIBIT DD D. Infrastructure Element (Sanitary Sewer, Potable Water, Solid Waste, Drainage and Natural Groundwater Aquifer Recharge) Goals, Objectives and Policies GOAL D.1: Putnam County
More informationCHATHAM PARK EXCEPTIONAL DESIGN EVALUATION
CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION 1 Chatham Park Basics 7,600 Acre Mixed Use Development 22,000 New Residences 22 Million Square Feet Commercial Space 60,000 Jobs 2,000+ Acres Open Space Estimated
More informationChapter 4. Drainage Report and Construction Drawing Submittal Requirements
4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for
More informationRIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA
167842 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Public Budget Hearing Zone 1 Monday, January 26, 2015 AGENDA 1. Receive requests from interested parties for projects for Fiscal Year
More informationIRWMP UPDATE IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs
IRWMP UPDATE 2013 IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs Outline IRWMP Plan Update - Jennifer IRWMP Implementation Grants (proposed & ongoing) - Harry Round 3 Implementation Grant
More informationDRAINAGE SUBMITTAL CHECKLIST
Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following
More informationFunctional Uplift Based Stream Assessment & Restoration Design
Functional Uplift Based Stream Assessment & Restoration Design Darcy K.L. Turner Senior Environmental Scientist, Biohabitats, Inc. (dturner@biohabitats.com) Christopher A. Streb, PE Ecological Engineer,
More informationAppendix J. Existing Efforts for Identifying Multi-Benefit Projects
Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts
More informationTotal Budget Year 1 - FY
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 4 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project Title
More informationNewport Bay Watershed Executive Committee
Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action
More informationCurrent Construction Projects
Zone 4 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2018 Current Construction Projects Sunnymead MDP Line B (aka Heacock Channel), Stages 3 and 4 (4-8-00011-03,
More informationCarpinteria Valley Water District Carpinteria Advanced Purification Project
NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:
More information