Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard.

Size: px
Start display at page:

Download "Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard."

Transcription

1 Carbon Creek Channel (OCFCD Facility. B01) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana Phone: Cell Phone: General Project Information: Name: Description: Goals/Objectives: Need: Carbon Creek Channel (OCFCD Facility. B01) from upstream Intersection of Western/Orange to upstream This channel was constructed in the 1959 designed to convey the 25-year storm event and is not in a FEMA Special Flood Hazard Area, Zone A is contained in channel, however it remains hydraulically deficient. The existing geometrics of this channel is a trapezoidal channel (bottom width is 8-ft, side slope is 1.5 to 1.5) lined with rip; one half of the channel will ultimately be improved as an L shaped channel lined with concrete and designed to convey the 100-year storm event; the length is approximately 2,300 feet. To increase the level of flood protection for the residents within the B01 flood plain by reducing or eliminating potential for personal injury and property damage due to flooding. Improve this reach of the flood control channel to be able to convey the 100-year storm design discharge and eventually reduce the FEMA Special Flood Hazard Area (SFHA) aka 100- year floodplain to containment within the channel, thus eliminating the high cost of obtaining mandatory flood insurance. Utilize a flood control improvement alternative that fits within the existing right-of-way constraints. Prioritize phasing of the construction of the proposed channel improvements to maximize benefits for the watershed. The existing channel is deficient, capacity is 65% of a 25-year storm event Meets statutory eligibility gates of 2015 IRWM Grant Funding: IRWM Goals: 1 of 5

2 Carbon Creek Channel (OCFCD Facility. B01) from Safely co-manage flood protection and water conservation. Maintain quality of life. IRWM Type OWOW Plan Project Type: Construction Latitude: Project Location: Longitude: Project is construction improvements to Orange County Flood Control District (OCFCD) Facility. B01, Carbon Creek Channel located in Orange County, City of Anaheim Benefit Zone Area (mi2): 2 Project Benefits: Benefits Water supply reliability, conservation and water-use efficiency Stormwater capture, storage, cleanup, treatment and management Removal of invasive species; wetlands creation or enhancement; acquisition, protection and restoration of open space n-point source pollution reduction, management, monitoring Groundwater recharge and management Contaminant and salt removal, reclamation, desalting and conveyance to users Water banking, exchange, reclamation and improvement of water quality Multipurpose flood and stormwater management programs Watershed protection and management Drinking water treatment and distribution Ecosystem and fisheries restoration and protection Applicable Where Benefits Accrue: 2 of 5

3 Carbon Creek Channel (OCFCD Facility. B01) from Jurisdiction: Explanation: Watershed/Su b-region: Explanation: Synergies: Multiple Communities The benefactors are residences and businesses from Cities of Fullerton and Anaheim. Entire Watershed The Carbon Creek Watershed has a drainage area of 12,620 acres. It is within the B Watershed which has a drainage area of 16,045 acres. The OCFCD s goal and plans work towards FEMA & National Flood Insurance Program s (NFIP) efforts in protecting property and lives from the threat of flood damage from storms. When the project has been completed, the OCFCD submits a Letter of Map Revision (LOMR) to FEMA to revise Flood Insurance Rate Map (FIRM) to reflect the floodplain as removed or diminished to containment within the channel facility alleviating the costly mandatory flood insurance premiums imposed on the benefactors, the residents and businesses from that community (s). Benefits to Disadvantaged Communities (DAC) and Native Tribal Communities (TC) 100% DAC: Portion DAC: DAC %: 0 100% TC: Portion TC: TC %: 0 Project area benefiting DAC (acres) : 1300 Describe DAC and TC Benefits: Property and lives would be protected from the threat of flood damage and the FEMA Flood Insurance Rate Map will be revised to reflect the 100-year to be contained in channel alleviating the costly mandatory flood insurance premiums imposed on the DAC. Human Right to Water: N/A Environmental Justice: N/A Project Partners: 3 of 5

4 Carbon Creek Channel (OCFCD Facility. B01) from Agency Name Contact Phone Collab Planning Direct Funding In-Kind Service Co-Manager Project Funding: Category Amount Percent Total Project Cost $7,500, Requested OWOW 2015 Funding $ Match Contribution $7,500, Local Contribution $7,500, Federal Contribution $ In-Kind Contribution $ Other $ SRF Loan $ Annual O&M Costs: $140, Funding Secured: Explain: O&M Funding Secured: Explain: Project Criteria: Criteria Metric Description Flood Risk Reduction e+008 $ Project Status: Project Status: Conceptual design (15%) completed Est. Complete Date: 06/30/2019 Est. Operational Life (years): 100 Agency Constructed Similar Projects : CEQA Status: In Progress Date: 06/30/ of 5

5 Carbon Creek Channel (OCFCD Facility. B01) from NEPA Status: t Applicable Date: Project Attachments: Type FileName Project Complete: Project Active: 5 of 5

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway. Fullerton Creek Channel (OCFCD Facility. A03) Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana

More information

Ocean View Channel (OCFCD Facility No. C06) from downstream of Bushard Street to downstream of Brookhurst Street

Ocean View Channel (OCFCD Facility No. C06) from downstream of Bushard Street to downstream of Brookhurst Street Ocean View Channel (OCFCD Facility. C06) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana

More information

Lane Channel (OCFCD Facility No. F08) from Von Karman to 1000 downstream Redhill Avenue

Lane Channel (OCFCD Facility No. F08) from Von Karman to 1000 downstream Redhill Avenue Lane Channel (OCFCD Facility. F08) from Von Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana

More information

East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Warner Avenue to downstream Goldenwest Street.

East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Warner Avenue to downstream Goldenwest Street. Facility. C05) from upstream Warner Avenue to Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana

More information

Lane Channel (OCFCD Facility No. F08) from Confluence with F05 channel to Von Karman.

Lane Channel (OCFCD Facility No. F08) from Confluence with F05 channel to Von Karman. Lane Channel (OCFCD Facility. F08) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana 92702

More information

Regional Water Recycling Plant No. 1 (RP-1) Expansion

Regional Water Recycling Plant No. 1 (RP-1) Expansion Regional Water Recycling Plant. 1 (RP-1) Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Avenue Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636

More information

Regional Water Recycling Plant No. 5 (RP-5) Expansion

Regional Water Recycling Plant No. 5 (RP-5) Expansion Regional Water Recycling Plant. 5 (RP-5) Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Avenue Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636

More information

Jurupa Community Services District Joint Projects for Inclusion in the Santa Ana River Watershed-scale Conjunctive Use Program (SARCUP) Future Phases

Jurupa Community Services District Joint Projects for Inclusion in the Santa Ana River Watershed-scale Conjunctive Use Program (SARCUP) Future Phases Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Avenue Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636 Cell Phone: General Project Information:

More information

RW Supply Optimization and Drought Relief Project Project ID: 3064

RW Supply Optimization and Drought Relief Project Project ID: 3064 Lead Agency: Agency: Project Director: Address: Inland Empire Utilities Agency Jason Gu 6075 Kimball Ave Chino 91708 Email: jgu@ieua.org Phone: 909-993-1636 Cell Phone: 909-342-4429 General Project Information:

More information

DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 5 FISCAL YEARS THROUGH

DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 5 FISCAL YEARS THROUGH RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 5 FISCAL YEARS 2018-19 THROUGH 2022-23 Number Stg No. Title Total Remaining

More information

UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM

UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM featherriver.org UPPER FEATHER RIVER IRWM UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM PROJECT INFORMATION FORM Please submit by 5: p.m. on August 3, 215, to UFR.contact@gmail.com Please provide information

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation

More information

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location

More information

There is a reliable, clean water supply for current and future generations.

There is a reliable, clean water supply for current and future generations. E2 There is a reliable, clean water supply for current and future generations. E2.1. Current and future water supply for municipalities, industries, agriculture, and the environment is reliable. 2.1.1.

More information

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template Please submit by 17 January 2014 to AraceliCazarez@KennedyJenks.com Project Template Please provide information in the tables below: I. Project Proponent Information Agency/ Organization Town of Truckee

More information

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012 Santa Ana River Watershed SAWPA Celeste Cantú April 17, 2012 What is SAWPA? SAWPA Member Agencies & Other Stakeholders Other Stakeholders 97 Water-related Agencies 4 Counties 59 Cities State water, environmental,

More information

PROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised

PROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised Name Proponent(s) Location Description Status Background (75) Tertiary Treatment at Fresno/Clovis Regional Reclamation Facility City of Fresno 36.70201, -119.89517 This project is for the construction

More information

OWOW PROGRAM STATUS UPDATE FOR THE OWOW STEERING COMMITTEE MAY 24, 2018

OWOW PROGRAM STATUS UPDATE FOR THE OWOW STEERING COMMITTEE MAY 24, 2018 OWOW PROGRAM STATUS UPDATE FOR THE OWOW STEERING COMMITTEE MAY 24, 2018 OWOW Plan Update 2018 Chapter Updates Call for Projects to be included in the Plan Disadvantaged Communities Involvement Program

More information

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template Please submit by 17 January 2014 to AraceliCazarez@KennedyJenks.com Project Template Please provide information in the tables below: I. Project Proponent Information Agency/ Organization Tahoe City Public

More information

AMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region

AMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region AMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region 1. PURPOSE The purpose of this Memorandum of Understanding

More information

South Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013

South Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013 South Orange County Watershed Management Area Stakeholder Workshop April 30, 2013 Agenda Schedule of Review and Approval Process Overview Overview of the Proposition 84 Guidelines Overview of the Contents

More information

A10. Cost and Benefits Summary

A10. Cost and Benefits Summary A10. Cost and Benefits Summary The goals of the Proposal are to increase regional self-sufficiency through water conservation and water reuse; more efficiently manage water supplies; improve water quality

More information

5. RESOURCE MANAGEMENT STRATEGIES

5. RESOURCE MANAGEMENT STRATEGIES Central Orange County Integrated Regional Water Management Plan 5. RESOURCE MANAGEMENT STRATEGIES 5.1 STRATEGIES INAPPLICABLE TO REGION Nearly all types of resource management strategies are applicable

More information

Chapter 3 Previous Studies

Chapter 3 Previous Studies Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

The Future of Integrated Water Management: Moving the Program Forward

The Future of Integrated Water Management: Moving the Program Forward The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water Resources Santa Ana River Watershed 2013 Conference April 11, 2013 1 Today s Presentation

More information

Water Quality Stewardship Plan (WaQSP)

Water Quality Stewardship Plan (WaQSP) Salt Lake Countywide Water Quality Stewardship Plan (WaQSP) Natalie Rees Salt Lake County Flood Control & Engineering Division 2008 Watershed Symposium COUNTY RESPONSIBILITY AND AUTHORITY Salt Lake County

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160 (Rev. 8-12) CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE DATE: June 1, 2018 TO: Honorable Nury Martinez, Chair Honorable Paul Koretz, Vice Chair Honorable Paul Krekorian, Member

More information

Informational Meeting- March 31, Boxelder B-2/B-3 Watershed Planning Study

Informational Meeting- March 31, Boxelder B-2/B-3 Watershed Planning Study Informational Meeting- March 31, 2016 Boxelder B-2/B-3 Watershed Planning Study Agenda Introductions Work Completed to Date Phase 1 Evaluations Alternatives Evaluations Economic Evaluations Draft Watershed

More information

-For SAC Discussion Purposes Only- Page 1 of 17

-For SAC Discussion Purposes Only- Page 1 of 17 Project Scoring Criteria Framework The following describes project scoring criteria for the Safe, Clean Water Program. The Scoring Criteria within this framework is meant to evaluate the merit of every

More information

NOVATO WATERSHED PROGRAM

NOVATO WATERSHED PROGRAM NOVATO WATERSHED PROGRAM NOVATO CITY COUNCIL Photo Credit: Sue Lattanzio AGENDA OVERVIEW OF TONIGHT S TALK Slide 2 Context what is a watershed? Process how did we implement the watershed approach? Content

More information

ODOT Floodplain Management. Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering

ODOT Floodplain Management. Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering ODOT Floodplain Management Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Background NFIP Ohio Department of Natural Resource

More information

Central Orange County Integrated Regional Water Management Plan 1.1 GEOGRAPHY OF INTEGRATED REGIONAL WATERSHED MANAGEMENT PLAN

Central Orange County Integrated Regional Water Management Plan 1.1 GEOGRAPHY OF INTEGRATED REGIONAL WATERSHED MANAGEMENT PLAN 1. INTRODUCTION 1.1 GEOGRAPHY OF INTEGRATED REGIONAL WATERSHED MANAGEMENT PLAN FIGURE 1.1 CENTRAL ORANGE COUNTY WATERSHED MANAGEMENT AREA LOCATION MAP 1-1 September 2012 The Central Orange County WMA is

More information

3.10 Hydrology and Water Quality. Environmental Setting

3.10 Hydrology and Water Quality. Environmental Setting 3.10 Hydrology and Water Quality This section describes the potential hydrology and water quality impacts associated with the proposed changes to the approved project. Environmental Setting This section

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form PROJECT OVERVIEW General Project Information Project Title: Conservation Planning and On-farm Irrigation Efficiency support Project Location: Pajaro Basin Estimated Cost: $896,452 Brief Project Description

More information

San Diego IRWMP Public Meeting. Agenda. Morning Agenda

San Diego IRWMP Public Meeting. Agenda. Morning Agenda San Diego IRWMP Public Meeting June 29, 2007 Agenda Morning Background Outline of IRWM Plan Overview of IRWM Plan Prioritization Process Approach to Funding Application Prioritization Afternoon Explanation

More information

The OC PLAN for IRWM in North and Central Orange County Section 3 Goals, Objectives, and Strategies

The OC PLAN for IRWM in North and Central Orange County Section 3 Goals, Objectives, and Strategies SECTION 3. GOALS, OBJECTIVES AND STRATEGIES 3.1 Regional Vision, Mission and Goals The OC Plan focuses on the North OC WMA and the Central OC WMA. The OC Plan builds upon projects and plans of the agencies

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

Drainage Criteria Manual Review

Drainage Criteria Manual Review City of Colorado Springs Stormwater Management Assessment and Standards Development Drainage Criteria Manual Review March 8, 2013 Springsgov.com/City Agencies/Stormwater/Stormwater Engineering/ Stormwater

More information

Comprehensive Plan Update - Stormwater Management Section Planning Commission Workshop: November 10, 2014

Comprehensive Plan Update - Stormwater Management Section Planning Commission Workshop: November 10, 2014 Comprehensive Plan Update - Stormwater Management Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

Appendix A. SWRP Self Certification Checklist

Appendix A. SWRP Self Certification Checklist Appendix A SWRP Self Certification Checklist Storm Water Resource Plan Checklist and Self-Certification The following should be completed and submitted to the State Water Resources Control Board Division

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot 17-082 Van Sloun Residence, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: May 8, 2017 AGENDA NUMBER: 17 FILE NUMBER: 17-082 ITEM: Van Sloun Residence RECOMMENDATION: Approve with

More information

City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility

City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility December 16, 2014 City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility Prepared by CBBEL Project Background & Timeline June and July 2010 Severe storm events hit Elmhurst,

More information

Santa Clara Basin Stormwater Resource Plan

Santa Clara Basin Stormwater Resource Plan Santa Clara Basin Stormwater Resource Plan November 29, 2018 Vishakha Atre SCVURPPP Presentation Overview Stormwater Resource Plan (SWRP) Description and Purpose Methodology for Identifying and Prioritizing

More information

Stevenson Creek Watershed Plan and Project Implementation

Stevenson Creek Watershed Plan and Project Implementation Stevenson Creek Watershed Plan and Project Implementation 1999-2007 Stevenson Creek Watershed Management Plan (WMP) Project Site The Watershed Management Plan was completed in 2001 with cooperative funding

More information

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact

More information

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants Tahoe-Sierra Integrated Regional Water Management Plan July 2014 K/J 1270036 Photo courtesy of Matthew Grimm South Tahoe Public Utility District Prepared By Kennedy/Jenks Consultants 10850 Gold Center

More information

The Chollas Creek Watershed Master Plan

The Chollas Creek Watershed Master Plan The Chollas Creek Watershed Master Plan FMA Luncheon March 13, 2017 City of San Diego Rick Engineering Company Tetra Tech HELIX Environmental Planning Key Drivers and Considerations Drivers Considerations

More information

What to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia

What to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia What to Expect When You re Expecting A LOMR Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia Thursday, June 4 th, 2015 Agenda 1 Why File a Letter Of Map Revision (LOMR)? 2 Basic Requirements and Common

More information

DRAFT ANNOTATED OUTLINE 12/4/2006

DRAFT ANNOTATED OUTLINE 12/4/2006 DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan)

More information

July 18, GEOSCIENCE Support Services, Inc. P.O. Box 220, Claremont, CA Tel: (909) Fax: (909)

July 18, GEOSCIENCE Support Services, Inc. P.O. Box 220, Claremont, CA Tel: (909) Fax: (909) SUMMARY REPORT OF RECHARGE PARTIES PURSUANT TO RWQCB RESOLUTION R8 2008 0019 COOPERATIVE AGREEMENT TO PROTECT WATER QUALITY AND ENCOURAGE THE CONJUNCTIVE USES OF IMPORTED WATER IN THE SANTA ANA RIVER BASIN

More information

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632 Study Partners The Nature Conservancy Cosumnes River Preserve 13501 Franklin Boulevard Galt CA 95632 East Bay Municipal Utility District 1 Winemaker Way, Unit K Lodi CA 95240 Sacramento County Water Agency

More information

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A )

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A ) STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A. 093-1049) Summary of the Act In November 2004, the responsibility of Stormwater Management* in Cook County was placed under the authority of the MWRDGC

More information

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet Authority s Regional Water Supply Infrastructure The RV Griffin Reserve (RVG) property is owned by the

More information

AQR Goal 1: Groundwater And Aquifer The element shall contain one or more goal Recharge. MSW Goal 3: Recycling And Waste Diversion directed.

AQR Goal 1: Groundwater And Aquifer The element shall contain one or more goal Recharge. MSW Goal 3: Recycling And Waste Diversion directed. Rule 9J-5.011, FAC Requirements Proposed INF Objectives and Policies Goals (2)(a) AQR Goal 1: Groundwater And Aquifer The element shall contain one or more goal Recharge statements for each of the facilities

More information

Dry Creek Flood Control Improvement Project

Dry Creek Flood Control Improvement Project Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)

More information

Storm Water Resource Plan Criteria and Metrics Checklist

Storm Water Resource Plan Criteria and Metrics Checklist APPENDIX F Storm Water Resource Plan Criteria and Metrics Checklist Prepared for: San Diego Regional Storm Water Copermittee County of San Diego Department of Public County of San Diego, Department of

More information

APPLICATION FOR HAZARD MITIGATION GRANT

APPLICATION FOR HAZARD MITIGATION GRANT Project Number South Dakota Office of Emergency Management 118 W. Capitol Ave Pierre, SD 57501 605-773-3231 APPLICATION FOR HAZARD MITIGATION GRANT This application is for a Hazard Mitigation Grant under

More information

Hackensack River Flood Reduction Study Update

Hackensack River Flood Reduction Study Update Township of River Vale Hackensack River Flood Reduction Study Update November 11, 2013 Purpose of Study To Analyze Where Frequent Flooding Is Impacting Property and How It Might Be Reduced Hackensack River

More information

Public Facilities Element (WAT) (SEW) (SOL) (STM)

Public Facilities Element (WAT) (SEW) (SOL) (STM) Public Facilities Element (WAT) (SEW) (SOL) (STM) Potable Water Sub-Element (WAT) Goal Provide public potable water supply facilities in a manner, which ensures the health, welfare and safety of the residents

More information

PROJECT BUDGET SUMMARY - ZONE 3

PROJECT BUDGET SUMMARY - ZONE 3 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT PROJECT BUDGET SUMMARY - ZONE 3 FISCAL YEAR 2017-18 DESCRIPTION FY 2016-17 FY 2016-17 FY 2017-18 FUND BALANCE FORWARD Actual Estimated Zone

More information

CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation

CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation M a r y l a n d P a r k L a k e D i s t r i c t Advisory Committee Meeting CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation City of Maryland Heights, Missouri November 07, 2018

More information

Contents Chapter 1: Introduction Chapter 2: Identification and Description of Santa Clara Basin Watershed

Contents Chapter 1: Introduction Chapter 2: Identification and Description of Santa Clara Basin Watershed Contents Chapter 1: Introduction 1.1 Background and Purpose... 1 1 1.2 Goals and Elements of the SWRP... 1 2 1.3 Previous and Current Planning Efforts... 1 3 1.3.1 Regional Plans... 1 3 1.3.2 Local Watershed

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee December 13, 2017 Discussion Calendar AGENDA ITEM 1 MINUTES OF THE SEPTEMBER 20, 2017 MEETING Recommended Action Approve the minutes of the September 20, 2017

More information

REPORT CONTENTS: (1) Case Analysis and Staff Recommendation (2) GIS Information & Maps (3) Application and Supporting Documents (4) Conceptual Plan

REPORT CONTENTS: (1) Case Analysis and Staff Recommendation (2) GIS Information & Maps (3) Application and Supporting Documents (4) Conceptual Plan DOÑA ANA COUNTY PLANNING AND ZONNING COMMISSION Doña Ana County Government Complex 845 N. Motel Blvd. Las Cruces, New Mexico 88007 Office: (575) 647-7350 MEETING DATE: August 10, 2017 REQUEST: Variance

More information

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014 Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management Kristen Clark VCPC Alumna, Spring 2014 Rising Waters, Rising Rates Coastal Communities in Virginia are confronted

More information

Santa Barbara County Region

Santa Barbara County Region Attachment 3 Santa Barbara County Region IRWM Implementation Grant Proposal Attachment 3 consists of the following items:. Attachment 3 provides a project description, estimated physical benefits, technical

More information

SANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN

SANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN SANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN UPDATE 2019 EXECUTIVE SUMMARY Prepared for : SANTA BARBARA COUNTY IRWM COOPERATING PARTNERS INTEGRATED REGIONAL WATER MANAGEMENT PLAN UPDATE

More information

Project Prioritization

Project Prioritization Project Prioritization The Santa Ana Watershed Project Authority (SAWPA), as the regional watershed planning group for the Santa Ana River Watershed, has been facilitating efforts to implement a watershed

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

I. Welcome & Introductions WPAC History (Paul Racette, PEC)

I. Welcome & Introductions WPAC History (Paul Racette, PEC) Poquessing Creek Watershed ACT 167 STORM WATER MANAGEMENT PLAN Public Hearing July 10, 2012 I. Welcome & Introductions ---------- WPAC History (Paul Racette, PEC) Primary WPAC Members: Bucks County: Bensalem

More information

Riparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP

Riparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP Riparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP Agenda Introduction Stream and Riparian Impacts Ohio EPA Stormwater General Permit

More information

WAVERLY FLOODPLAIN BACKGROUND INFORMATION

WAVERLY FLOODPLAIN BACKGROUND INFORMATION WAVERLY FLOODPLAIN BACKGROUND INFORMATION Who designates the floodplains in Waverly? The Federal Emergency Management Agency (FEMA) is responsible for delineating floodplains. The floodplain FEMA uses

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

South Orange County Watershed Management Area Public Workshop. September 19, 2012

South Orange County Watershed Management Area Public Workshop. September 19, 2012 South Orange County Watershed Management Area Public Workshop September 19, 2012 AGENDA 8:00 8:45 Purpose of the IRWMP Regional Goals Prop 84 Implementation $ Results of Project Self Scoring Process for

More information

Chapter 13. Implementation Plan

Chapter 13. Implementation Plan Chapter 13 Implementation Plan Table of Contents 13-3 13.1 Agencies Responsible for Implementation... 13-3 13.2 Updating and Amending the List of Projects and Programs... 13-5 13.3 Timelines for Active

More information

Stream and Watershed Restoration Design and Quantitative Benefits. Kelly Gutshall, RLA and Mike LaSala

Stream and Watershed Restoration Design and Quantitative Benefits. Kelly Gutshall, RLA and Mike LaSala Stream and Watershed Restoration Design and Quantitative Benefits Kelly Gutshall, RLA and Mike LaSala Suquehanna Greenway River Towns Workshop September 30, 2013 Benefit Stacking Single Function Multiple

More information

Current / Recent Construction Projects

Current / Recent Construction Projects Zone 1 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2017 Current / Recent Construction Projects Monroe MDP - Monroe Channel Stage 4 (1-8-00071-04) In June 2017,

More information

1. Red Clover Poco Restoration Project Environmental Permitting

1. Red Clover Poco Restoration Project Environmental Permitting 1. Red Clover Poco Restoration Project Environmental Permitting 2. County: Plumas 3. Project Number: 4. Project Sponsor: Plumas Corporation (contact Leslie Mink); USDA- Plumas National Forest 5. Date:

More information

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION OCTOBER 7, 2016 1 INTRODUCTION Rubonia Neighborhood (Rubonia) is located in northern

More information

Has a median household income that is 80 percent or less than the statewide median household income.

Has a median household income that is 80 percent or less than the statewide median household income. C. Disadvantaged Unincorporated Communities Assessment 1. Context SB 244 (Wolk, 2011) requires cities and counties to address the infrastructure and service needs of unincorporated disadvantaged communities

More information

Sea Level Rise and Recurrent Flooding Update

Sea Level Rise and Recurrent Flooding Update Sea Level Rise and Recurrent Flooding Update Informational Briefing City Council Meeting September 18, 2018 Thomas M. Leahy, Deputy City Manager The Sea, Inland Waters, & Groundwater are Rising Projected

More information

Westminster East Garden Grove, California Flood Risk Management Feasibility Study

Westminster East Garden Grove, California Flood Risk Management Feasibility Study 1 Public Scoping Meeting Westminster East Garden Grove, California 255 255 255 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 62

More information

STORMWATER MANAGEMENT GOALS, OBJECTIVES, AND POLICIES

STORMWATER MANAGEMENT GOALS, OBJECTIVES, AND POLICIES STORMWATER MANAGEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 1: The City of North Port shall provide a stormwater management system which protects real and personal properties, preserves natural resources,

More information

Stormwater Management and Groundwater Recharge. Laguna-Mark West Petaluma River Sonoma Creek

Stormwater Management and Groundwater Recharge. Laguna-Mark West Petaluma River Sonoma Creek Stormwater Management and Groundwater Recharge Watershed Scoping Studies Laguna-Mark West Petaluma River Sonoma Creek www.sonomacountywater.org Scoping Studies in Three Watersheds Sonoma County Laguna

More information

ATTACHMENT 6-Description of Proposal

ATTACHMENT 6-Description of Proposal Pajaro River Watershed IRWMP Page 1-1 ATTACHMENT 6-Description of Proposal Attachment 6 outlines the proposal for grant funding according to the requirement from the Proposal Solicitation Package for Implementation

More information

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT COMPREHENSIVE PLAN EXHIBIT DD D. Infrastructure Element (Sanitary Sewer, Potable Water, Solid Waste, Drainage and Natural Groundwater Aquifer Recharge) Goals, Objectives and Policies GOAL D.1: Putnam County

More information

CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION

CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION 1 Chatham Park Basics 7,600 Acre Mixed Use Development 22,000 New Residences 22 Million Square Feet Commercial Space 60,000 Jobs 2,000+ Acres Open Space Estimated

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA 167842 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Public Budget Hearing Zone 1 Monday, January 26, 2015 AGENDA 1. Receive requests from interested parties for projects for Fiscal Year

More information

IRWMP UPDATE IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs

IRWMP UPDATE IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs IRWMP UPDATE 2013 IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs Outline IRWMP Plan Update - Jennifer IRWMP Implementation Grants (proposed & ongoing) - Harry Round 3 Implementation Grant

More information

DRAINAGE SUBMITTAL CHECKLIST

DRAINAGE SUBMITTAL CHECKLIST Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following

More information

Functional Uplift Based Stream Assessment & Restoration Design

Functional Uplift Based Stream Assessment & Restoration Design Functional Uplift Based Stream Assessment & Restoration Design Darcy K.L. Turner Senior Environmental Scientist, Biohabitats, Inc. (dturner@biohabitats.com) Christopher A. Streb, PE Ecological Engineer,

More information

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts

More information

Total Budget Year 1 - FY

Total Budget Year 1 - FY RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 4 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project Title

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action

More information

Current Construction Projects

Current Construction Projects Zone 4 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2018 Current Construction Projects Sunnymead MDP Line B (aka Heacock Channel), Stages 3 and 4 (4-8-00011-03,

More information

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Carpinteria Valley Water District Carpinteria Advanced Purification Project NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:

More information