1 Case Study Construction waste collection good practice: Gloucester Quays This case study examines how applying good practice, such as segregation at source, produced material streams suitable for direct transfer to reprocessors. The prices realised for material streams were maximised by packaging the material to the reprocessors specifications, resulting in an 80% reduction in waste disposal costs.

2 Construction waste collection good practice: Gloucester Quays 2 Background Bovis Lend Lease is one of the world s leading project management and construction companies, operating in more than 30 countries worldwide. RABBITT Recycling Limited provides innovative waste solutions to assist clients in improving their waste performance and complying with relevant legislation. The Gloucester Quays project provides one example of where RABBITT was able to apply their resource management philosophy to a major development. Service capability RABBITT (Recycle All Bulbs, Batteries, IT and Telecoms) Recycling was founded in 2004 and originally specialised in the management of waste batteries, bulbs and Waste Electrical and Electronic Equipment (WEEE). Today RABBITT Recycling manages a diverse range of waste streams for their clients including inert materials, wood and pallets, cardboard, paper, metals, plastics, batteries, bulbs and WEEE. RABBITT Recycling has a diverse range of clients in various sectors including retail, manufacturing and construction. The company has signed WRAP s (Waste & Resources Action Programme) Construction Commitment: Halving Waste to Landfill, a voluntary agreement that provides a framework for waste reduction. RABBITT s philosophy requires that all waste is thought of as redundant assets with a residual value. The company offers its clients a one-stop-shop, utilising links with material reprocessor and waste handling companies to maximise recycling and the recovery of value from redundant assets. RABBITT Recycling apply a charge for managing and brokering a client s waste, based on the value recovered and/or the costs saved by recycling the redundant assets.

3 Construction waste collection good practice: Gloucester Quays 3 Service provision Project Details Gloucester Quays is a major 200 million, mixed-use retail led development, occupying 25 hectares of largely industrial land and derelict buildings in the centre of Gloucester town centre alongside the historic Gloucester to Sharpness canal. Gloucester Quays is the single largest development scheme ever undertaken in Gloucester and provides over 150,000m 2 of floor space on the 60 acre Brownfield site. Bovis Lend Lease was the main contractor for Phase 1 of the development which brought over 50 shops and restaurants to the City of Gloucester. Fig 1. Gloucester Quays Development under Construction

4 Construction waste collection good practice: Gloucester Quays 4 Service description The service provided by RABBITT Recycling to Bovis Lend Lease was a comprehensive waste management and recycling service that aimed to minimise disposal to landfill by maximising good practice such as source segregation. RABBITT Recycling became involved in Gloucester Quays Phase 1 at the project development stage and were therefore able to directly influence the approach to waste management. Working with the site team, a programme was designed to cut the cost of waste disposal by up to 80% from the waste budget originally proposed. An important aspect in reducing disposal costs was the provision and installation of a mini baler at the central recycling and waste management area on site. This allowed a number of materials to be packaged to the reprocessors specifications, significantly improving the material prices realised. Fig 2. Mini Baler

5 Construction waste collection good practice: Gloucester Quays 5 By encouraging the client to view waste as redundant assets, RABBITT Recycling were able to instil a philosophy of segregation at source. All wastes were captured at the point they became waste and were stored in waste stream specific and colour coded containers to minimise contamination. The types of containers used varied according to the quantities, size, bulk and density of the material. Container types included 660 litre wheeled bins, woven pouches/sacks and plastic bags. Bovis Lend Lease s contractors were responsible for ensuring materials flowed from the various areas on site to the central recycling and waste management area. Once in the recycling and waste management area, materials were packaged by Bovis Lend Lease Waste Champions in order to maximise their value. Plastic film, plastic bottles and cardboard were baled ready for collection and resale. All WEEE was segregated and palletised for removal. Materials arising in high quantities such as metals and wood were contained within skips. Fig 3. Segregated Metal Materials

6 Construction waste collection good practice: Gloucester Quays 6 RABBITT Recycling used a number of different methods to collect the different material streams and maximise value. However, the primary method of collection was through the material reprocessors with transport costs accounted for in the revenue that Bovis Lend Lease received for the material. Collections were arranged by Waste Champions on site who played a very important role monitoring disposal practices as well as organising collections. Waste Champions contact RABBITT Recycling who in turn would contact the relevant reprocessor to arrange for the collection of full containers or packaged materials. Collections were generally made within hours. Finally, just as important as the physical segregation of materials was the adoption of a cultural change in how Bovis Lend Lease viewed waste i.e. from waste to redundant asset. It was necessary to instil this change from the boardroom to the construction yard to ensure buy in to the recycling aims and objectives. RABBITT aim to maximise the recovery of value from redundant assets turning a waste cost into a revenue stream and diverting material from landfill Mike Morris, Managing Director, RABBITT

7 Construction waste collection good practice: Gloucester Quays 7 Service assessment Key Findings Segregation at source contributed to lower contamination levels, improving material output quality and maximising material prices realised; Reprocessors will collect materials direct from site and will pay more for materials which are packaged to their specification. This turns a waste cost into a revenue stream; The installation of a baler on site allowed for some recyclable materials to be packaged to those reprocessors specifications, thereby maximising the resale value; Buy in to the project s recycling aims and objectives by client and contractor was fundamental to the success of the project. Benefits Through a combination of actions including maximising site segregation, monitoring general (non-recyclable) waste deposits and appropriately packaging materials the cost of waste disposal was reduced by almost 80% from original waste disposal budget. In particular, the installation of a baler on site meant packaging materials (plastic, cardboard) became a revenue generator rather than a cost burden to the project. The RABBITT Recycling service provided one point of contact for Bovis Lend Lease s project team but allowed collections to be carried out by specialist reprocessors offering the most beneficial service maximising returns.

8 While steps have been taken to ensure its accuracy, WRAP cannot accept responsibility or be held liable to any person for loss or damage arising out of or in connection with this information being inaccurate, incomplete or misleading. This material is copyrighted. It may be reproduced free of charge subject to the material being accurate and not used in a misleading context. The source of the material must be identified and the copyright status acknowledged. This material must not be used to endorse or used to suggest WRAP s endorsement of a commercial product or service. For more detail, please refer to our Terms & Conditions on our website:

Zero waste to landfill: Construction waste collection good practice

Zero waste to landfill: Construction waste collection good practice Case study Zero waste to landfill: Construction waste collection good practice Zero waste policies are a key step towards sustainable waste management. This case study examines the economic and environmental

More information

Waste management contractors selling the benefits of your Halving Waste to Landfill Commitment to construction clients

Waste management contractors selling the benefits of your Halving Waste to Landfill Commitment to construction clients Good Practice Guide: Waste management contractors 1 Good Practice Guide Waste management contractors selling the benefits of your Halving Waste to Landfill Commitment to construction clients This short

More information

Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp

Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp Case study Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp By thinking Best Value, not Least Cost when reviewing the way they procure and manage

More information

Innovative waste management approach achieves exemplary recovery rates

Innovative waste management approach achieves exemplary recovery rates : University of the West of Scotland, Ayr Campus Innovative waste management approach achieves exemplary Key facts The new campus was designed to achieve a BREEAM rating of Excellent. 96% of the 1,200

More information

The emphasis should be on the contractor to develop the targets for waste reduction and recovery. What is good practice?

The emphasis should be on the contractor to develop the targets for waste reduction and recovery. What is good practice? Material change for a better environment Procurement guidance for construction Setting a requirement for Waste Minimisation and Management 2 Setting a requirement for Waste Minimisation and Management

More information

Reducing construction waste saves money Bridge Learning Campus, Bristol Contractor: Skanska

Reducing construction waste saves money Bridge Learning Campus, Bristol Contractor: Skanska Exemplar case study Reducing construction waste saves money Bridge Learning Campus, Bristol Contractor: Skanska Background The Bridge Learning Campus (Bristol) ( BLC ) was used as a test bed for achieving

More information

A blueprint for reducing waste and cutting costs

A blueprint for reducing waste and cutting costs A blueprint for reducing waste and cutting costs An average 3-bed unit produces between 5 and 13 tonnes of construction waste. Reducing this could save 250-500 per unit. Five corporate-level actions and

More information

Best Practice Construction Waste Procurement: Office Fit-Out of 15 Canada Square, Canary Wharf

Best Practice Construction Waste Procurement: Office Fit-Out of 15 Canada Square, Canary Wharf Waste procurement case study Best Practice Construction Waste Procurement: Office Fit-Out of 15 Canada Square, Canary Wharf This case study examines how engagement between the main contractor, client and

More information

McGrath works in partnership with Hackney Homes

McGrath works in partnership with Hackney Homes Case study: Achieving good practice waste recovery McGrath works in partnership with Hackney Homes Hackney Homes is using a partnering approach across the whole supply chain, to deliver the Decent Homes

More information

Railways: Waste less and save money

Railways: Waste less and save money Cutting the cost of waste Halving Waste to Landfill Railways: Waste less and save money Procurement good practice for railway infrastructure construction and maintenance Introduction Buying less and throwing

More information

CASE STUDY: NEVIS RANGE MOUNTAIN EXPERIENCE

CASE STUDY: NEVIS RANGE MOUNTAIN EXPERIENCE CASE STUDY: NEVIS RANGE MOUNTAIN EXPERIENCE Rationale Due to the landscape in which the Nevis Range is set, the resort has a long standing environmental commitment to protect its surroundings, and encourage

More information

Collection of carpet tiles for closed loop recycling through manufacturer take-back scheme

Collection of carpet tiles for closed loop recycling through manufacturer take-back scheme Collection of non-clothing textiles case study: Carpet tile collection Collection of carpet tiles for closed loop recycling through manufacturer take-back scheme In 2012 Desso collected over 100,000m 2

More information

Contractor follows nine-step plan to achieve best practice in construction waste management

Contractor follows nine-step plan to achieve best practice in construction waste management : Strathclyde Fire & Rescue Training Centre Contractor follows nine-step plan to achieve best practice in Key facts Lend Lease has corporate targets to reduce construction waste, aiming to achieve

More information

Reducing Waste in Sainsbury s Supermarket Refits through off site fabrication

Reducing Waste in Sainsbury s Supermarket Refits through off site fabrication WAS031 Off site Construction Case Study Reducing Waste in Sainsbury s Supermarket Refits through off site fabrication Sainsbury s have made effective use of the Fit Out UK / RG s off site fabrication and

More information

Site Waste management Plan (SWMP)

Site Waste management Plan (SWMP) Author: M.Graney & Sons Ltd. 1. Project Title: Underpinning, Lower ground floor Extension and Refurbishment Works. 2. Location: 21 Old Church Street, London, SW3 5DL. 3. Nature of Project: The works comprise

More information

Cost Assessment of Wales Environment Bill Measures on Business Waste Producers in the Construction & Demolition Sector

Cost Assessment of Wales Environment Bill Measures on Business Waste Producers in the Construction & Demolition Sector Final Report Assessment of Wales Environment Bill Measures on Business Waste Producers in the Construction & Demolition Sector Assessment of the financial implications of additional segregation / collection

More information

Resource efficiency pursued through design coordination and waste management

Resource efficiency pursued through design coordination and waste management : Edinburgh International Conference Centre Expansion and Speculative Office Space Resource efficiency pursued through design coordination and Key facts Extensive use of building information modelling

More information

Tool for measuring the recovery rates in CDEW MRFs

Tool for measuring the recovery rates in CDEW MRFs Guidance notes Tool for measuring the recovery rates in CDEW MRFs Guidance notes for the Site-Specific Waste Analysis Tool (SSWAT) to measure recovery rates of construction, demolition and excavation waste

More information

A metric for the construction sector. The Net Waste Method testing a new standard for measuring waste neutrality

A metric for the construction sector. The Net Waste Method testing a new standard for measuring waste neutrality A metric for the construction sector The Net Waste Method testing a new standard for measuring waste neutrality WRAP works in partnership to encourage and enable businesses and consumers to be more efficient

More information

Non-packaging plastics

Non-packaging plastics 00 Good Practice Guide Good Practice Guide Non-packaging plastics Environmental good practice guide for the collection of non-packaging plastics The Waste Protocols Project is a joint Environment Agency

More information

Farmer diversification through anaerobic digestion

Farmer diversification through anaerobic digestion Farmer diversification through anaerobic digestion Presented by: Mike Morris CEO and Andrew Williams Tarling, Sales Manager, RABBITT Recycling (UK) Ltd 13th May 2010 INTRODUCTION RABBITT = Recycle All

More information

Halving Waste to Landfill

Halving Waste to Landfill Case study: BAM Construct Halving Waste to Landfill BAM Construct UK was one of the first contractors to sign up to the Halving Waste to Landfill industry commitment in 2008. Since then, BAM has been working

More information

Halving Waste to Landfill, SEESA

Halving Waste to Landfill, SEESA SEESA is working hard to achieve its target of 90% diversion of waste to landfill by 2012 by exploring new ways of working, applying initiatives to eliminate and minimise waste, and to reuse, recycle and

More information

Utilities: Waste less and save money

Utilities: Waste less and save money Cutting the cost of waste Utilities: Waste less and save money Procurement good practice for utility infrastructure construction and maintenance Who should read this leaflet? utility company senior managers;

More information

Waste FY Introduction. 2. Waste. 3. Management Approach

Waste FY Introduction. 2. Waste. 3. Management Approach 1. Introduction This document forms part of our Disclosures on Management Approach (DMA) series, prepared in accordance with the Global Reporting Initiative s G4 Guidelines. The DMA series is designed

More information

Resources and Waste Management Exhibition recycles 83% of waste

Resources and Waste Management Exhibition recycles 83% of waste i2i Events and the CIWM join forces to achieve 83% recycling Resources and Waste Management Exhibition recycles 83% of waste High recycling rates and plenty of supplier engagement to minimise waste on

More information

Benefits of off site manufacture

Benefits of off site manufacture Case Study Benefits of off site manufacture Jocelyn Park, Somerset Jocelyn Park is a housing development owned and managed by South Somerset Homes Housing Association. There are 64 homes on site designed

More information

FLOORING RESOURCE EFFICIENCY PLAN 1 ST BROADLOOM CARPET MAP MEETING 13 TH OCTOBER 2009

FLOORING RESOURCE EFFICIENCY PLAN 1 ST BROADLOOM CARPET MAP MEETING 13 TH OCTOBER 2009 FLOORING RESOURCE EFFICIENCY PLAN 1 ST BROADLOOM CARPET MAP MEETING 13 TH OCTOBER 2009 Key Findings of Scoping Study FLOORING: Towards a Resource Efficiency Plan Scoping Study February / March 2009 Looked

More information

Grays Waste Management

Grays Waste Management Grays Waste Management WRAP Cymru (Waste & Resources Action Programme in Wales) works directly with the recycling industry, specifically on waste management and materials recovery, and with reprocessing

More information

To maximise recyclability and ensure the consistency in aluminium products recovered from suppliers, this specification aims to:

To maximise recyclability and ensure the consistency in aluminium products recovered from suppliers, this specification aims to: Contents 1. Introduction... 1 2. Benefits of these Guidelines... 1 3. How to use these Guidelines... 2 4. Glossary of Terms... 2 5. What is Aluminium... 2 5.1. Chemical Characteristics... 2 5.2. Physical

More information

RNLI makes waves with lifejacket recycling scheme

RNLI makes waves with lifejacket recycling scheme Resource efficiencies in facilities management RNLI makes waves with lifejacket recycling scheme The Royal National Lifeboat Institution operates a stringent environmental management system and encourages

More information

MATERIALS RECOVERY & RDF PRODUCTION OVERVIEW

MATERIALS RECOVERY & RDF PRODUCTION OVERVIEW MATERIALS RECOVERY & RDF PRODUCTION OVERVIEW INTRODUCTION Atlantic Recycling are an environmentally conscious company supporting the needs of the construction sector in South Wales. The construction industry

More information

Resource efficiency in the UK cider sector

Resource efficiency in the UK cider sector Case Study: UK Drinks Sector Resource efficiency in the UK cider sector Reducing water, material and packaging use in the cider sector. Resource efficiency in the UK cider sector 2 WRAP s vision is a world

More information

Site Waste Management Plans A guide for the construction industry and supply chain

Site Waste Management Plans A guide for the construction industry and supply chain GG899 www.envirowise.gov.uk Envirowise Advice Line: 0800 585794 Notes:...... Envirowise - sustainable practices, sustainable profits. Envirowise is a Government-funded programme dedicated to putting the

More information

UNIVERSITY OF TEESSIDE DEPARMENT OF CAMPUS FACILITIES WASTE STRATEGY/RECYCLING - UPDATE ON POSITION FEBRUARY 2009

UNIVERSITY OF TEESSIDE DEPARMENT OF CAMPUS FACILITIES WASTE STRATEGY/RECYCLING - UPDATE ON POSITION FEBRUARY 2009 UNIVERSITY OF TEESSIDE DEPARMENT OF CAMPUS FACILITIES WASTE STRATEGY/RECYCLING - UPDATE ON POSITION FEBRUARY 2009 The University has always seen itself as part of the community and working for the community

More information

Minimising construction waste through project design

Minimising construction waste through project design Case Study: New South Glasgow Hospitals Minimising construction waste through project design Key facts Applying WRAP s Designing out Waste principles to the project design identified 21 areas of potential

More information

EU Green Capital Competition 2015

EU Green Capital Competition 2015 EU Green Capital Competition 2015 Section 7 Waste Production & Management chapter 7A. The present situation in relation to waste production and management Bristol leads in the UK on waste reduction and

More information

The Demolition Protocol: Aggregates Resource Efficiency in Demolition and Construction. Volume 3. For Contractors

The Demolition Protocol: Aggregates Resource Efficiency in Demolition and Construction. Volume 3. For Contractors The Demolition Protocol: Aggregates Resource Efficiency in Demolition and Construction Volume 3. For Contractors 2 Extracted from the Demolition Protocol Who is this document aimed at? The Demolition Protocol

More information

Delivering Sustainability with Prestige: at the BMW PGA Championships

Delivering Sustainability with Prestige: at the BMW PGA Championships Delivering Sustainability with Prestige: at the BMW PGA Championships Delivering Sustainability with Prestige at the BMW PGA Tour The European Tour's flagship event attracts the elite of the world s golfers

More information

Raploch: urban regeneration

Raploch: urban regeneration Construction case study Raploch: urban regeneration This case study describes how the WRAP Regeneration Guide principles have been applied to the tendering and procurement stage of the Raploch regeneration

More information

Case Study: Barts Health NHS Trust Food Waste Collection

Case Study: Barts Health NHS Trust Food Waste Collection Case study Case Study: Barts Health NHS Trust Food Waste Collection Case study outlining food waste collection services from Barts Health NHS Trust hospital sites March 2014 Case Study: Barts Health NHS

More information

The efficient use of materials in regeneration projects

The efficient use of materials in regeneration projects Linking demolition and new build a step by step guide The efficient use of materials in regeneration projects 5. Key Performance Indicators WRAP works in partnership to encourage and enable businesses

More information

Commercial and industrial waste in Sydney. Overview. Department of Environment, Climate Change and Water NSW

Commercial and industrial waste in Sydney. Overview. Department of Environment, Climate Change and Water NSW Commercial and industrial waste in Sydney Overview Department of Environment, Climate Change and Water NSW House Commercial deconstruction and industrial waste in Sydney Manufacturers, shops and businesses

More information

Opportunities for contract changes in recycling collection in the hospitality sector

Opportunities for contract changes in recycling collection in the hospitality sector Summary Report Opportunities for contract changes in recycling collection in the hospitality sector This project reviews how hospitality businesses procure their waste management services, specifically

More information

Multi-bottle beer pack

Multi-bottle beer pack Carbon Ready Reckoner Worked Example Multi-bottle beer pack This worked example shows how the WRAP Carbon Ready Reckoner can be used to provide insight into the carbon footprint of a multi-bottle beer

More information

CONTENTS FORWARD FROM OUR DIRECTORS

CONTENTS FORWARD FROM OUR DIRECTORS 2015 ANNUAL REPORT CONTENTS FORWARD FROM OUR DIRECTORS 01 OPERATIONAL LEARNINGS 08 BACKGROUND 02 ACHIEVEMENTS 10 LAUNCHING SIMPLY CUPS 04 THE FUTURE 12 THE PROCESS 06 OUR VISION 14 ANNUAL REPORT 2015 FORWARD

More information

Waste Management Statement for Demolition, Construction and Operation. Proposed Office Development. Ballsbridge, Merrion Road, Dublin 4.

Waste Management Statement for Demolition, Construction and Operation. Proposed Office Development. Ballsbridge, Merrion Road, Dublin 4. Waste Management Statement for Demolition, Construction and Operation Proposed Office Development Ballsbridge, Merrion Road, Dublin 4. Client: RGRE Ballsbridge Developments Ltd Job No. R024 08 th February

More information

Packaging Compliance. Your responsibilities explained and how we can help you

Packaging Compliance. Your responsibilities explained and how we can help you Packaging Compliance Your responsibilities explained and how we can help you Veolia has pioneered sustainable waste management and recycling techniques in the UK for over twenty years. Our research, development

More information

Vinyl flooring: Making take-back schemes pay back on refurbishment projects

Vinyl flooring: Making take-back schemes pay back on refurbishment projects Refurbishment Resource Efficiency Case Study: Vinyl flooring take-back schemes Vinyl flooring: Making take-back schemes pay back on refurbishment projects This case study focuses on three UK vinyl flooring

More information

Producer Responsibility. Alan Hodgson Senior Environmental Planning Officer

Producer Responsibility. Alan Hodgson Senior Environmental Planning Officer Producer Responsibility Packaging Regulations Alan Hodgson Senior Environmental Planning Officer Topics About The Environment Agency The Packaging Regulations Who is affected What Packaging means What

More information

Reducing Food and Packaging Waste in the Egg Supply Chain

Reducing Food and Packaging Waste in the Egg Supply Chain Reducing Food and Packaging Waste in the Egg Supply Chain Packaging-related product damage across the food and drink sector in the UK represents a significant cost to the grocery industry in terms of lost

More information

commercial & industrial solutions Recycling & Recovery facility management and retail solutions

commercial & industrial solutions Recycling & Recovery facility management and retail solutions commercial & industrial solutions Recycling & Recovery facility management and retail solutions The retail trade sector is the second highest contributor to employment in Australia, with total retail sales

More information

Assessing the costs and benefits of reducing waste in construction trade packages

Assessing the costs and benefits of reducing waste in construction trade packages Assessing the costs and benefits of reducing waste in construction trade packages Dense concrete blocks and facing bricks, with mineral wool insulation batts Value Percentage of 100k spend Cost saving

More information

CASE STUDY: ABERDEENSHIRE COUNCIL

CASE STUDY: ABERDEENSHIRE COUNCIL WRAP ABERDEENSHIRE COUNCIL October 2012 CASE STUDY: ABERDEENSHIRE COUNCIL Aberdeenshire Council received funding to trial three different types of RotG units across town centres and outside schools to

More information

Expenditure. Vehicles. Call centre cost. Marketing. Cost of reuse. Disposal

Expenditure. Vehicles. Call centre cost. Marketing. Cost of reuse. Disposal Costs Introduction The cost of running a bulky waste collection service is the difference between income and expenditure. However, any set-up and up-front costs, prior to starting the service will also

More information

Sustainable Procurement Case Study Natural History Museum

Sustainable Procurement Case Study Natural History Museum Sustainable Procurement Case Study Natural History Museumm Embedding sustainability in procurement practices: a UK museum s persp pective This documentt is uncontrolled if printed London s Natural History

More information

Carbonated drink in steel can

Carbonated drink in steel can Carbon Ready Reckoner Worked Example Carbonated drink in steel can This worked example shows how the WRAP Carbon Ready Reckoner can be used to provide insight into the carbon footprint of a 6 pack of 330ml

More information

Trialling the re-use of used EEE from Leeds City Council HWRCs

Trialling the re-use of used EEE from Leeds City Council HWRCs Trialling the re-use of used EEE from Leeds City Council HWRCs Background Leeds City Council (LCC) has been working in close partnership with its WEEE producer compliance scheme (PCS), WeeeLink, to establish

More information

WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK

WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK 1. OUR APPROACH 2. DANISH WASTE POLICY 3. COLLECTION AND SORTING 4. PRE-TREATMENT AND RECYCLING 5. ORGANIC WASTE 6. NON-RECYCLABLES 1The

More information

WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK

WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK 1. OUR APPROACH 2. DANISH WASTE POLICY 3. COLLECTION AND SORTING 4. PRE-TREATMENT AND RECYCLING 5. ORGANIC WASTE 6. NON-RECYCLABLES 1The

More information

Benefits of Consistency in Household Collections in Cheshire West & Chester

Benefits of Consistency in Household Collections in Cheshire West & Chester Benefits of Consistency in Household Collections in Cheshire West & Chester Summary Cheshire West and Chester Council is the fourth largest unitary authority in the North West with 154,500 households.

More information

SOUTH AUSTRALIA S WASTE AND RESOURCE RECOVERY INFRASTRUCTURE PLAN Companion Report: Modelling Assumptions

SOUTH AUSTRALIA S WASTE AND RESOURCE RECOVERY INFRASTRUCTURE PLAN Companion Report: Modelling Assumptions SOUTH AUSTRALIA S WASTE AND RESOURCE RECOVERY INFRASTRUCTURE PLAN Companion Report: Modelling Assumptions Contents 1. Assumptions for Waste Flow Projection Modelling...04 1.1 Baseline waste volumes estimates...04

More information

Construction Site Waste Management Process.

Construction Site Waste Management Process. Construction Site Waste Management Process. EMS DOCUMENT TYPE: ENVIRONMENTAL ASPECT: PURPOSE: Operational Control Document Waste Management To ensure we manage our waste in compliance with legislation

More information

The efficient use of materials in regeneration projects

The efficient use of materials in regeneration projects Linking demolition and new build a step by step guide The efficient use of materials in regeneration projects 10. Demolition phase The Demolition phase section outlines the planning of the demolition activities

More information

Data recording and reporting

Data recording and reporting Data recording and reporting Accurate recording and reporting of bring site data is essential to both measuring individual site and overall scheme performance and to identifying potential service improvements.

More information

Toilets and baths to aggregate paths

Toilets and baths to aggregate paths CASE STUDY Toilets and baths to aggregate paths A bathroom ceramics and tile manufacturer in East London recognised the need to save money on waste costs, improve their environmental impact and increase

More information

Aberdeen Harbour Expansion Project. Construction Environmental Management Document

Aberdeen Harbour Expansion Project. Construction Environmental Management Document Aberdeen Harbour Expansion Project Construction Environmental Management Document 11th May 2017 Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 Chapter 7 Chapter 8 Chapter 9 Chapter

More information

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM)

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM) Costs and benefits of reducing waste in construction Defence sector new build Woolwich single living accommodation modernisation (SLAM) Value Percentage of 3.2m construction cost Cost saving potential

More information

The content in this APC Annual Report is hereby endorsed by the Chief Executive Officer, or equivalent officer of the organisation.

The content in this APC Annual Report is hereby endorsed by the Chief Executive Officer, or equivalent officer of the organisation. Signatory Name: Smiths Snackfoods Company, The Status: Completed The content in this APC Annual Report is hereby endorsed by the Chief Executive Officer, or equivalent officer of the organisation. Industry

More information

unpackaging extended producer responsibility

unpackaging extended producer responsibility unpackaging extended producer responsibility Achieving a circular economy in the United Kingdom through a world-leading producer-responsibility system for products and packaging What is extended producer

More information

Laying the foundations to double re-use

Laying the foundations to double re-use Laying the foundations to double re-use How research provided the catalyst for a new to re-use in Leicestershire, Leicester City and Rutland Three neighbouring local authorities Leicestershire County Council,

More information

7. REVIEW OF WASTE MANAGEMENT PLAN IMPLEMENTATION

7. REVIEW OF WASTE MANAGEMENT PLAN IMPLEMENTATION 7. REVIEW OF WASTE MANAGEMENT PLAN IMPLEMENTATION Section 12 of the Joint Waste Management Plan for South East Region (2002) (JWMPSE) outlined a number of policy actions/targets for the period of the plan.

More information

Market Snapshot March 2016

Market Snapshot March 2016 Market Snapshot March 2016 UK recovered material prices generally increased in value between December 2015 and March 2016 with the strongest gains seen in recovered metal can markets. The price of recovered

More information

Coral Cobh Leisure Centre Environmental Improvement Plan 2011

Coral Cobh Leisure Centre Environmental Improvement Plan 2011 Coral Cobh Leisure Centre Environmental Improvement Plan 2011 1 TABLE OF CONTENTS 1 Introduction 3 2 Improving Environmental Performance 5 3 Waste Management Practices on site and recommendations 7 4 Review

More information

MATERIALS RECOVERY FACILITY. providing recycling solutions for the midlands.

MATERIALS RECOVERY FACILITY. providing recycling solutions for the midlands. MATERIALS RECOVERY FACILITY providing recycling solutions for the midlands www.veolia.co.uk/birmingham four ashes MRF Our skills, resources and market knowledge are the driving force behind the construction

More information

Signatory Name: Integria Healthcare (Australia) Pty Ltd

Signatory Name: Integria Healthcare (Australia) Pty Ltd Signatory Name: Integria Healthcare (Australia) Pty Ltd The question numbers in this report refer to the numbers in the report template. t all questions are displayed in this report. Status: Completed

More information

NATIONAL WASTE STREAM PROFILES

NATIONAL WASTE STREAM PROFILES Overview NATIONAL WASTE STREAM PROFILES Key fact: In 2010 11, the Construction and Demolition (C&D) waste stream represented both the greatest amount of waste generated and, at 66 per cent, the highest

More information

Re-use Partnership Diverts Electricals from Landfill

Re-use Partnership Diverts Electricals from Landfill Re-use Partnership Diverts Electricals from Landfill Key points The strategy aimed to reduce e-waste going to landfill, help to meet a growing demand for good quality re-used items and maximise product

More information

Greens NSW Waste Elimination Policy

Greens NSW Waste Elimination Policy Greens NSW Waste Elimination Policy (Under review) Principles 1. Waste elimination is based on two fundamental principles: 1.1 The best way to deal with waste is to avoid producing it in the first place;

More information

A Guide to Waste Reduction, Recycling & Composting in the Food Service Industry RRFB

A Guide to Waste Reduction, Recycling & Composting in the Food Service Industry RRFB A Guide to Waste Reduction, Recycling & Composting in the Food Service Industry www.rrfb.com 1-877-313-RRFB 1. Reducing Your Restaurant's Waste A Good Investment! Smart waste management is a positive step

More information

Reducing and recycling plasterboard waste on a site where space is a constraint

Reducing and recycling plasterboard waste on a site where space is a constraint Plasterboard case study Reducing and recycling plasterboard waste on a site where space is a constraint This case study describes the approaches taken to design out, recover and recycle plasterboard waste

More information

Garth Hill College WASTE MANAGEMENT POLICY

Garth Hill College WASTE MANAGEMENT POLICY Garth Hill College WASTE MANAGEMENT POLICY (Bracknell Forest Council Policy) Policy Owner: Site Manager Amended: No changes Ratified by Environment Committee: 18-03-2015 Recorded by Board of Governors:

More information

waste management solutions integrity expertise partnership service corporate overview Part of the WM Group

waste management solutions integrity expertise partnership service corporate overview Part of the WM Group integrity expertise partnership service corporate overview Part of the WM Group corporate overview WMS is a company at the forefront of total waste solutions in the UK. Working with companies across all

More information

Valpak Data Solutions Packaging Waste Template Guidance) Packaging Data Template Guidance. Valpak Ltd August Valpak Data Solutions

Valpak Data Solutions Packaging Waste Template Guidance) Packaging Data Template Guidance. Valpak Ltd August Valpak Data Solutions Valpak Data Solutions Packaging Waste Template Guidance) Packaging Data Template Guidance Valpak Ltd August 2014 Valpak Data Solutions Table of Contents 1.Introduction 2 2.Column Headings 2 3.Packaging

More information

A framework for. greater consistency in household recycling in England

A framework for. greater consistency in household recycling in England A framework for greater consistency in household recycling in England Contents Foreword 3 Greater consistency in household recycling 4 Introduction 5 Why greater consistency? 6 Greater consistency explained

More information

ASSET MANAGEMENT SUSTAINABILITY POLICY 2016

ASSET MANAGEMENT SUSTAINABILITY POLICY 2016 ASSET MANAGEMENT SUSTAINABILITY POLICY 2016 SUSTAINABILITY POLICY STATEMENT FOR DEVELOPMENT PROJECTS In our activities as developers of buildings we uphold the aims of Sustainable Development: to enhance

More information

Assessment form for packaging recyclability

Assessment form for packaging recyclability Assessment form for packaging recyclability In late 2013, WRAP initiated a call for projects to Courtauld Commitment 3 (CC3) signatories to trial new approaches to enable them to meet their packaging targets.

More information

There will be no significant impact from solid waste arising during the development of the proposed power plant.

There will be no significant impact from solid waste arising during the development of the proposed power plant. 11 SOLID WASTE 11.1 SUMMARY OF RESIDUAL IMPACTS There will be no significant impact from solid waste arising during the development of the proposed power plant. 11.2 INTRODUCTION This chapter considers

More information

CIAL SOLID WASTE COLLECTION SERVICE MANAGEMENT PLAN

CIAL SOLID WASTE COLLECTION SERVICE MANAGEMENT PLAN CIAL SOLID WASTE COLLECTION SERVICE MANAGEMENT PLAN 1 PURPOSE This management plan outlines the operation of CIAL s solid waste collection service, both for landfill waste and recyclable materials on the

More information

Materials and Packaging Policy

Materials and Packaging Policy Materials and Packaging Policy GC2018 0 Contents 1. HEADLINE SUMMARY AND KEY IMPACTS. 2 1.1 Functional Areas/Partners Impacts... 2 2. POLICY DETAILS... 2 2.1 Policy Objectives... 2 2.2 Policy Statement...

More information

Chilled ready meal potato mash

Chilled ready meal potato mash Carbon Ready Reckoner Worked Example Chilled ready meal potato mash This worked example shows how the WRAP Carbon Ready Reckoner can be used to provide insight into the carbon footprint of chilled potato

More information

Developments in Scottish Waste Management Legislation compared to England and Wales

Developments in Scottish Waste Management Legislation compared to England and Wales Developments in Scottish Waste Management Legislation compared to England and Wales Bruno P Bernacchi National Compliance Manager M.Sc. Waste Management Chartered Waste Manager (MCIWM) Chartered Environmentalist

More information

Chapter 8 Monitoring contamination

Chapter 8 Monitoring contamination Improving the Performance of Waste Diversion Schemes: A Good Practice Guide to Monitoring and Evaluation Chapter 8 Monitoring contamination As kerbside collections expand and people who aren t so committed

More information

Highlights from 2015 Market-Based Solutions for Used Agricultural Plastics: Survey of Municipalities

Highlights from 2015 Market-Based Solutions for Used Agricultural Plastics: Survey of Municipalities Highlights from 2015 Market-Based Solutions for Used Agricultural Plastics: Survey of Municipalities A challenging issue With the increasing usage of agricultural, like grain bags, twine, net wrap and

More information

Reducing stretch film waste in the food. and drink sector: Good practice for buyers and users

Reducing stretch film waste in the food. and drink sector: Good practice for buyers and users Reducing stretch film waste in the food and drink sector: Good practice for buyers and users Introduction The UK market for stretch film in pallet stabilisation is estimated at 140,000 tonnes annually.

More information

Post-consumer film recycling Protomax trial

Post-consumer film recycling Protomax trial Trial report Post-consumer film recycling Protomax trial Report of panel manufacturing trial at Protomax Plastics Limited Project code: MDP041 Research date: January to March 2011 Date: September 2011

More information

Resource Recovery TIMBER Collection and Transportation

Resource Recovery TIMBER Collection and Transportation Resource Recovery TIMBER Collection and Transportation This guide provides good-practice advice to improve recovery rates for all types of waste timber from construction and demolition (C&D) sites. The

More information

1 Receives the Waters and Waste Manager s report Recycling Issues and Costs dated 15 January 2018; and

1 Receives the Waters and Waste Manager s report Recycling Issues and Costs dated 15 January 2018; and File number: Approved for agenda Report to: Council Meeting date: 25 January 2017 Subject: Recycling issues and costs Date of report: 15 January 2018 From: Donnick Mugutso, Waters and Waste Manager Report

More information

Resource efficient remediation

Resource efficient remediation Case study Resource efficient remediation Achieving savings through remediation and onsite reuse of contaminated material Bellway, Taylor Wimpey and Hydrock Costs and savings achieved by housing developers

More information

Dendrobium Mine. Waste Management Plan

Dendrobium Mine. Waste Management Plan Dendrobium Mine Waste Management Plan DOCUMENT SIGN OFF SHEET AND REVISION LOG Document Owner: Authorised by: Peter McMillan 25/06/2018 (Name) (Date) Peter McMillan 25/06/2018 (Name) (Date) VERSION HISTORY

More information