Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd
|
|
- Ross Daniel
- 6 years ago
- Views:
Transcription
1 Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd
2 MADHYA PRADESH POWER GENERATING Co. Ltd.
3 INTRODUCTION Satpura Thermal Power Station is an oldest running plant in India. The 1 st installed unit (62.5 MW) completed its 42 years in the month of Oct. 09. The total installed capacity of this station is MW. The units are running with their full efficiency round the year. Many times these units are awarded for meritorious productivity by CEA. The per day coal consumption of these units is 22 thousand MT. The geographical area is surrounded by Satpura ranges in which the oldest and very known forest situated for its well known teak wood i.e. CP Teak.
4
5 DETAILS OF UNITS OF STPS, SARNI UNITS CAPACITY (MW) COMMISSIONING DATES Unit I (GE) Unit II (GE) Unit III (GE) Unit IV (GE) Unit V (GE) Unit VI (LMZ) Unit VII (LMZ) Unit VIII (LMZ) Unit IX (LMZ)
6 Random view of SATPURA THERMAL POWER STATION, SARNI before installation of online stack monitoring
7 In our country major source of electricity is fossil fuels, we are generating nearly 70% of electricity from coal. The coal utilities for this purpose of low grade having high ash content about 40% & low calorific value about 3500 kilo calories. The ash handling is the major task for these utilities. About 20% of ash go through bottom of boiler and rest through the fly ash. Therefore measurement & control on SPM (suspended particulate matter) is very essential. The ESP is serving the major role to maintain it with in limits, we are trying to achieve full efficiency of ESP.
8 COAL ANALYSIS In our country major source of electricity is fossil fuels, we are generating nearly 70% of electricity from coal. The coal utilities for this purpose of low grade heaving high ash content about 40% & low calorific value about 3500 kilo calories. The ash handling is the major task for these utilities. About 20% of ash go through bottom of boiler and rest through the fly ash. Therefore measurement & control on SPM (suspended particulate matter) is very essential. The ESP is serving the major role to maintain it with in limits, we are trying to achieve full efficiency of ESP. PARAMETERS COAL COMPOSIT ION Carbon 35.08% Nitrogen 0.66% Hydrogen 2.50% Sulphur 0.56% Oxygen 5.20% Ash 44% Moisture 12% Gross Calorific Value (kcal/kg) 3400
9
10
11
12 STACK EMMISION MONITORING NORMS:- Govt. of India form the air (Prevention & control of Pollution) act rule 1981 and amendments. M.P. Pollution control Board issue license to all the industries which are covered under this act to fulfill the statutory requirement as per norms. The stack emission monitoring of all the units of Satpura is done by traditional / online measurement and report submitted to M.P. Pollution Board. Apart from fulfilling the regulatory requirement the stack emission measurement is essential for improving the efficiency of the Boiler, ESP etc.
13 REVISED REGULATORY NORMS:- The central pollution Board declared process emission as the major pollutant and they fix the limit of SPM in flue gas not more than 150mg per Nm3 and stack height not less than 230 meters for high capacity unit above 200MW.
14 ONLINE STACK/GAS EMMISION MONITORING:- To meet the PCB norms, in the year the online stack emission monitoring system is installed in all the 9 units of Sarni TPS, it has been installed by M/s Forbes Marshall, Pune. DCEM 2100 for SPM measurement. GCEM 4000 multi gas Insitu (non sampling) analyzer for SO X, NO X & CO measurement. These measurements are done in flue gas path after ID Fan and just before the chimney (Stack).
15 ADVANTAGE OF STACK EMISSION MONITORING SYSTEM:- Online stack emission monitoring system fulfills the norms of air pollution act 1981 & CREP (Charter for corporate responsibility for environmental protection) issue by Govt. of India. Efficiency of ESP is measured round the clock, by adjusting ESP parameters & NH3 dosing By CO measurement Quality of combustion in Boiler is improved by controlling oxygen in flue gas & it helped to control the heat rate.
16 Designed / Actual SPM emission after using online stack monitoring Unit No. Capacity (MW) Stack (Height) ESP (Fields) ESP (Efficiency in %) Required SPM(mg/N m 3 ) levels Actual SPM (mg/nm 3 ) M M M M M M M M M
17 AMMONIA DOSING SYSTEM IN FLUE GAS:- To increase the efficiency of ESP ammonia gas dosing is done in flue gas at 0.2kg/cm2 this reduces resistivity of SPM & accelerate the coagulation. The dosing can be regulated very easily by monitoring online stack emission, further ammonia dosing also increases the fertility of the ash.
18
19
20 SURROUNDING AIR QUALITY (µg/m 3 ) MAJOR POLLUTANTS OF FLUE GAS MONITOR AT VARIOUS PLACES AFTER COMMISSION OF ONLINE STACK MONITORING INSTRUMENT DCEM-2100 & GCEM-4000 MULTI GAS ANALIZER RPM SPM SO 2 NO X MAX MIN AVG MAX MIN AVG MAX MIN AVG MAX MIN AVG Inside Plant Village Kherwani Village Bakur Village- Hirapalia MPPGCL 6th November 135 Hospital 2009,
21 OVERALL BACKGROUND AIR QUALITY (µg/m 3 ) Background air quality was measured in five (5) locations in and around the Thermal Power Station after commission of online emission measuring instrument. CPCB / MOEF POLLUTANTS MAX. MIN. AVG LIMIT RPM SPM SO NO X Findings of EIA Study Sampling & analysis procedure is as per IS 5182.
22
23
24
25
26
BHUSHAN STEEL LIMITED Environmental Assessment for 5.6 MTPA Steel Plant Expansion at Meramandali, Orissa
BHUSHAN STEEL LIMITED Environmental Assessment for 5.6 MTPA Steel Plant Expansion at Meramandali, Orissa CONTENTS Sl. No. 1. INTRODUCTION Description Page No. 1 1 to 1 7 2. PROJECT DESCRIPTION 2 1 to 2
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationEmissions Inventory and Emission factors for Cement Industry
International Journal of ChemTech Research CODEN (USA): IJCRGG, ISSN: 0974-4290, ISSN(Online):2455-9555 Vol.10 No.5, pp 402-408, 2017 Emissions Inventory and Emission factors for Cement Industry S. Anand
More informationAccord Energy Corporation India Pvt. Ltd.
Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II
More informationPERFORMANCE IMPROVEMENT OF ELECTROSTATIC PRECIPITATOR: SOME EXPERIMENTAL STUDIES
ICESP X Australia 2006 Paper 8A1 PERFORMANCE IMPROVEMENT OF ELECTROSTATIC PRECIPITATOR: SOME EXPERIMENTAL STUDIES A. CHANDRA Centre for Energy Studies, Indian Institute of Technology Delhi, Hauz Khas,
More informationCO27: DEVELOPMENT OF AN EFFICIENT SLOP FIRED BOILER. Speaker Rajesh Singla. ISGEC Heavy Engineering Ltd, Noida, India IBEES
IBEES CO27: DEVELOPMENT OF AN EFFICIENT SLOP FIRED BOILER Speaker Rajesh Singla ISGEC Heavy Engineering Ltd, Noida, India At : 29th ISSCT, Chiang Mai, Thailand, 7 Dec 2016 AUTHORS A.K. Subramanian Head
More informationClearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004
Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:
More informationINTRODUCTION ENVIRONMENTAL STATEMENT
INTRODUCTION MB Power (Madhya Pradesh) Limited (MBPMPL) is a 100% owned subsidiary of Moser Baer Power & Infrastructure Limited (MBPIL). Moser Baer group headquartered in New Delhi, is leading global technology
More informationA Presentation On. Gaseous Emissions in the Fertilizer Industry and Their Impact on Specific Energy Consumption Per Tonne Of Product
A Presentation On Gaseous Emissions in the Fertilizer Industry and Their Impact on Specific Energy Consumption Per Tonne Of Product By Dr. S. Chandra Department of Fertilizers Ministry of Chemicals & Fertilizers
More informationState Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests
State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us
More informationTechnical Notes for Biomass and Air Quality Guidance
Technical Notes for Biomass and Air Quality Guidance Appendix 1 Restricted Commercial AEA/ED45645/Draft 1 Unit conversion tool Introduction In order to assess the impact of a combustion appliance on air
More informationSuperintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal
Last Amended on - Page 1 of 16 I. WATER 1. Drinking Water ph IS 3025 (Part 2): 2004, Colour APHA (22 nd Edition) 2120 B: Turbidity (NTU) IS 3025 (Part 10): 1984 Residual, Free Chlorine IS 3025 Part 26/1986
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under
More informationStatus of new environmental norm implementation: Coal-based thermal power stations. Centre for Science and Environment
Status of new environmental norm implementation: Coal-based thermal power stations Centre for Science and Environment Objective of the presentation Broad overview on pollution control technology for coal
More informationGerman experience on compliance of environmental norms by thermal power generation companies
German experience on compliance of environmental norms by thermal power generation companies Prof. Dr. W.A. Benesch Director Energy Technologies STEAG Energy Services Germany Rough development of environmental
More informationnat Presentation Title ( Arial, Font size 28 ) Control of Sulphur Dioxide, Oxides of Nitrogen and Mercury Date, Venue, etc..( Arial, Font size 18 )
nat Presentation Title ( Arial, Font size 28 ) Control of Sulphur Dioxide, Oxides of Nitrogen and Mercury Date, Venue, etc..( Arial, Font size 18 ) New Emission Norms Industry Parameter Standards TPPs
More informationZZJ/CLAB-KSPCB/04/ Environmental Officer,
ZZJ/CLAB-KSPCB/04/ 07-07-2016 4133 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada
More informationHybrid System to Enhance Particulate Collection Efficiency in Coal Based Thermal Power Plants
Hybrid System to Enhance Particulate Collection Efficiency in Coal Based Thermal Power Plants Avinash Chandra Professor (Retired), Centre For Energy Studies, Indian Institute Of Technology, Delhi, Haus
More informationImproving our environment by controlling existing thermal power and
Improving our environment by controlling existing thermal power and desalination plants emission A study of emission control in an existing thermal power and desalination plant Engr. Abdullah H. Hodhan
More informationAN EXPERIMENTAL STUDY OF BIOMASS FUEL MADE BY A COMBINATION OF SUGARCANE BAGASSE, SAWDUST AND PAPER WASTE
AN EXPERIMENTAL STUDY OF BIOMASS FUEL MADE BY A COMBINATION OF SUGARCANE BAGASSE, SAWDUST AND PAPER WASTE Shreya Shukla 1, Savita Vyas 2 1 Department of energy and environment management, Rajiv Gandhi
More informationMitigation of Emission in Thermal Power Plant Using Conventional and Non-Conventional Fuel
International Journal of Engineering Science Invention ISSN (Online): 319 6734, ISSN (Print): 319 676 Volume Issue 4 ǁ April. 013 ǁ PP.01-06 Mitigation of Emission in Thermal Using Conventional and Non-Conventional
More informationMONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I
MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02
More informationWe are sending herewith the following for the month of September 2016.
ZZJ/CLAB-KSPCB/04/6499 07-10-2016 Environmental Officer, Regional Office, Karnataka State Pollution Control Board, Parisara Bhavan, LIG II, B 217, B-1, Main Road, A-16th Cross, Near Hari Om Trust, Habbuwada,
More informationPrakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat
Prakruti Environmental Engineers (Environmental ), Last Amended on - Page 1 of 7 I. WATER 1. Water (Ground Water/ Surface Water/ Drinking Water/ Treated Water) ph APHA 4500-H + B, Temperature APHA 2550
More informationTHERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA
New Environment Norms Issues and Challenges By: Sanjeev Kumar Kassi Director (TETD), CEA INSTALLED CAPACITY (MW) AS ON 29-02-2016 Type Capacity Share (%) Hydro 42703.42 14.79% Thermal 201360.04 69.76%
More informationSUSPENDED PARTICULATE MATTER ATTENUATION BY FLUE GAS CONDITIONING
DATE OF PUBLICATION: JULY 5, 014 ISSN: 48-4098 OLUME 0 ISSUE 06 JULY 014 SUSPENDED PARTICULATE MATTER ATTENUATION BY FLUE GAS CONDITIONING 1 NITIN G. PUNEKAR, S. Y. KAMDI, R.E.THOMBARE 1 Chandrapur Super
More informationEnvironment protection measures / technology
Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,
More informationLAKHERI CEMENTWORKS Lakheri, Dist-Bundi, Rajasthan
NOTE ON ENVIRONMENTAL IMPACTS DUE TO USE OF PET COKE, LIGNITE IN ADDITION TO COAL IN CEMENT PLANT AND CAPTIVE POWER PLANT FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE EC Granted :MoEF letter no. J-11011/ 250/2003
More informationAppendix VIII: Determination of chimney heights
Appendix VIII: Determination of chimney heights 181 Regional Air Quality Plan for Taranaki 182 Regional Air Quality Plan for Taranaki Appendix VIII: Determination of stack heights and boiler operation
More informationSix Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013
Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II
More informationCOMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)]
COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)] STATUS AS ON 30 th SEPTEMBER, 2015 ON COMPLIANCE OF CONDITIONS AND SAFE GUARDS LAID DOWN BY GOVT. OF INDIA, MINISTRY OF ENVIRONMENT OF FORESTS VIDE MEMORANDUM
More informationEnhancing Capacity Empowering Nation. Technological Parameters in selecting systems to control emissions in Thermal Power Plants
Technological Parameters in selecting systems to control emissions in Thermal Power Plants Environmental Gazette Notification 2015 Part A-NOX 1. NOx Fundamentals 2. Major NOx Reduction Techniques 3. SCR
More informationDistrict: Chhindwara (MP)
Executive Summary 1. INTRODUCTION 1.1 Background: Pandhurna industrial area consist of nearly 34 small and large units which basically consist of Cotton ginning & Processing, Food Processing, Copper Wire,
More informationZZH/CLAB-KSPCB/04/ Environmental Officer,
ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada
More informationZZK/CLAB-KSPCB/04/ Environmental Officer,
ZZK/CLAB-KSPCB/04/ 5491 09-10-2017 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwadaa
More informationImprovements of the EGTEI Cost Calculation Tool for Emission Reduction Measures in LCPs
Improvements of the EGTEI Cost Calculation Tool for Emission Reduction Measures in LCPs EGTEI Technical Secretariat 10 October 2014 1 What is currently available? Methodology for cost estimation of abatement
More informationBoilers & Fired Systems. Clean Coal Technology Dr. Tanveer Iqbal
Boilers & Fired Systems Clean Coal Technology Dr. Tanveer Iqbal 1 What is a Boiler? Vessel that heats water to become hot water or steam At atmospheric pressure water volume increases 1,600 times Hot water
More informationAdvanced Coal Power Plant Water Usage
CoalFleet for Tomorrow Advanced Coal Power Plant Water Usage Ronald L. Schoff (rschoff@epri.com) Project Manager Advanced Coal Generation Options Charlotte, North Carolina July 8 9, 2008 CoalFleet for
More informationEIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)
EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement
More informationNATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS
NATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS PAPER EM2: Energy Efficiency in Thermal Utilities Date: 22.05.2004 Timings: 1400-1700 HRS Duration: 3 HRS Max. Marks: 150 General instructions:
More informationPoint wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)
SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T)
More informationEXECUTIVE SUMMARY 1. INTRODUCTION
EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive
More informationImpact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi
Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi Dr Narendra Dave Principal Research Engineer CSIRO Energy Technology, North Ryde, Australia
More informationNew Frontier in Energy, Engineering, Environment & Science ( NFEEES-2018 ) Feb
RESEARCH ARTICLE OPEN ACCESS Determination of Energy Potential of Biomass & Coal Ratios by Proximate Analysis Ritesh Mathur 1, Jitin Yadav 2 1(Department of Mechanical Engineering, ACEIT, Jaipur) Email:
More informationZZL/CLAB-KSPCB/17/ Environmental Officer,
ZZL/CLAB-KSPCB/17/ 160 08-01-2018 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwadaa
More informationMahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management
PROPOSED RESIDENTIAL CUM COMMERCIAL PROJECT WITH MCGM PARKING LOT, AT LOWER PAREL, MUMBAI, MAHARASHTRA GROUND WATER ANALYSIS October, 2017 Parameter Units Sample 1 Source Location Date of collection of
More informationHope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory
To 13 th August, 2018 The Director Government of India Ministry of Environment & Forest (I.A. Division) Paryavarn Bhavan, CGO COMPLEX, Lodhi Road New Delhi- 110 003 Sub: Compliance status of conditions
More informationComputational Approach of Green House Gases in Thermal Power Plant (An Energy Audit Approach) - Process Model
Computational Approach of Green House Gases in Thermal Power Plant (An Energy Audit Approach) - Process Model Anil B. Onkar, Dr. G. A. Dhomane, Dr. R.M.Moharil, Prashant P.Mawle Addl.Ex.Engr. Prof. Elect.
More informationElectron beam flue gas treatment process for purification of exhaust gases with high SO 2 concentrations
Electron beam flue gas treatment process for purification of exhaust gases with high SO 2 concentrations Andrzej G. Chmielewski 1, Janusz Licki 2 1 Department of Nuclear Methods in Process Engineering,
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationZZL/CLAB-KSPCB/17/ Environmental Officer,
ZZL/CLAB-KSPCB/17/ 3657 10-10-2018 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada
More informationSummary of DPR. ETPS Expansion Thermal Power Project 1x660 MW
Summary of DPR ETPS Expansion Thermal Power Project 1x660 MW 1 X 660 MW SUPERCRITICAL ENNORE TPS EXPANSION PROJECT Sheet - 1 PROJECT HIGHLIGHTS 1. Project : 1x660 MW Supercritical Ennore Thermal Power
More informationMODIFICATIONS IN COAL PULVERISERS TO INCREASE AVAILABILITY OF COAL FIRED BOILERS (3 x 35 TPH - RUSSIAN MAKE) - A Case Study
MODIFICATIONS IN COAL PULVERISERS TO INCREASE AVAILABILITY OF COAL FIRED BOILERS (3 x 35 TPH - RUSSIAN MAKE) - A Case Study Tej Bahadur Additional General Manager Pollution Control Research Institute BHEL,
More informationPresentation Outline..
Presentation Outline.. R&M of Old Units Advances Steam Parameters for Sub-critical Units PC - Supercritical / Ultra Supercritical Use of High Efficiency Gas Turbines CFBC IGCC Emission Control Technologies
More informationBMM Ispat Ltd., Danapura Village, Hospet Taluk, Bellary District, PIN , Karnataka. ENVIRONMENT MONITORING REPORT. Stage I units. For.
BMM Ispat Ltd., Danapura Village, Hospet Taluk, Bellary District, PIN 583222, Karnataka. ENVIRONMENT MONITORING REPORT Stage I units For Nov 2015 Prepared by: M/s. Premier Analytical Laboratories, Near
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationZZM/CLAB-KSPCB/17/ Environmental Officer,
ZZM/CLAB-KSPCB/17/ 399 08-02-2019 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada
More informationThe following were present to supervise the proceedings:-
Proceeding of the Public Hearing conducted on 20.01.2009 for grant of environmental clearance to M/s Green Planet Energy Pvt. Ltd. for setting up of 13 MW capacity Bio-mass based power plant at Village
More informationREPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN
REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN FOR INCREMENTAL INCREASE IN PRODUCTION CAPACITY DUE TO PROCESS OPTIMIZATION FROM 359 KTPA to 371 KTPA AUGMENTATION IN ALUMINIUM METAL PRODUCTION
More information3. Up stream & Downstream water quality monitoring report of Kali River. ZZM/CLAB-KSPCB/17/ Environmental Officer,
ZZM/CLAB-KSPCB/17/ 724 12-03-2019 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada
More informationINTHUU MEASUREMENTS CC
INTHUU MEASUREMENTS CC VAT REG NO.: 4960254359 REG NO.: 2009/190265/23 P.O. Box 14769 Bredell, 1623 Plot 2/410 Seventh Road Bredell A/H, Kempton Park, 1619 Tel: +27 (0)82 572-2380 Fax: +27 (0)86 659-2231
More informationEnergy Performance Assessment of CFBC Boiler
Energy Performance Assessment of CFBC Boiler Rakesh Kumar Sahu G.Ishwar Rao Kirti Maurya Abstract Steam power plant generates electricity by using fuel as input. In steam power plant boiler is a crucial
More informationHigh efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.
Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the
More informationFACILITATING NEW ENVIRONMENT STARNDARDS FOR COAL BASED THERMAL POWER PLANT
FACILITATING NEW ENVIRONMENT STARNDARDS FOR COAL BASED THERMAL POWER PLANT Regulatory Perspective 30th January 2017 Dialogue on Enforcing New Environmental Norms (in mg/ Nm³) Unit Size (in MW) SO 2 NOx
More informationEnergy Values and Technologies for Non woody Biomass: as a clean source of Energy
IOSR Journal of Electrical and Electronics Engineering (IOSRJEEE) ISSN : 2278-1676 Volume 1, Issue 2 (May-June 2012), PP 10-14 Energy Values and Technologies for Non woody Biomass: as a clean source of
More informationThe data for the period, April 2016 September 2016, is enclosed at Annexure III (1 nos. of pages)
1.0 Treated Liquid Effluent Data The data for the period, April 2016 September 2016, is enclosed at Annexure III (1 nos. of pages) 2.0 Ambient Air Quality The data for the period, April 2016 September
More informationL-28 Electrostatic Precipitator (ESP) Air Pollution and Control (Elective-I)
L-28 Electrostatic Precipitator (ESP) Air Pollution and Control (Elective-I) Electrostatic Precipitators Electrostatic precipitators (ESP) are particulate collection devices that use electrostatic force
More informationExcerpt of Thermal Power Guidelines for New Plants
Excerpt of Thermal Power Guidelines for New Plants The following is an excerpt of the Thermal Power guidelines for New Plants, a complete version of which is found in the Pollution Prevention and Abatement
More informationNTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh
NTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh Unit Capacity Year of Comml Power Share AP TN Kar Ker Pud Unit-1 500 MW Sep 2002 100% X X X X Unit-2 500 MW Mar 2003 100% X X X X Unit-3 500 MW Sep
More information2 NECESSITY OF THE PROPOSED PROJECT
Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power
More informationExecutive Summary for R-EIA Report for 60
Executive Summary 1. INTRODUCTION Maihar Cement is a unit of M/s Century Textiles and Industries Ltd. located at Sarla Nagar near Maihar in district Satna (M.P). Maihar Cement Unit has come into operation
More informationExpediting Implementation of New Norms
Expediting Implementation of New Norms Rohit Pathania About Founded in 1980, CSE researches into, advocates for and communicates the urgency of development that is both sustainable and equitable >165 staff
More informationHamm MW Pyrolysis Plant. Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials
Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials Schematic Flow sheet Integrated Pyrolysis for Power Plants Pyrolysis of high calorific solid recovered fuels
More informationDESIGN CHALLENGES IN LOW FLUE GAS TEMPERATURE HEAT EXCHANGER
DESIGN CHALLENGES IN LOW FLUE GAS TEMPERATURE HEAT EXCHANGER INTRODUCTION Inventor of fuel economisers Founded in Wakefield, UK, 1833 Patented fuel economiser in 1845 More than 180 years heritage Edward
More informationPerformance Assessment of 2X250 MW Coal Based Thermal Power Plant
Performance Assessment of X50 MW Coal Based Thermal Power Plant Vivek Khare 1, Ashish Bhargava, Priyanka Mishra 3 1M. Tech Student, Department of Electrical Engineering Bhabha Institute of Research & Technology
More informationBiomass Boiler Emission Abatement Technologies. Simon Wakefield
Biomass Boiler Emission Abatement Technologies Simon Wakefield simon.wakefield@hwenergy.co.uk About Us Established in 2003 Specialise only in biomass heating Team of 50 staff Design & engineering led company
More informationMars Power & Steel Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive
More informationInput Output Mass Balance of Trace Elemental Species at a Typical Indian Coal Fired Power Plant
e t International Journal on Emerging Technologies 8(1): 357-362(2017) ISSN No. (Print) : 0975-8364 ISSN No. (Online) : 2249-3255 Input Output Mass Balance of Trace Elemental Species at a Typical Indian
More informationPROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.
STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA
More informationARCHEAN CHEMICAL INDUSTRIES PRIVATE LIMITED. Ambient Air Monitoring Report
Sampling Locations Near Bromine, Plant/Near ETP. Ambient Air Monitoring Report Sr. No. Parameters Unit (SI) Specification/SPCB October November December Avg. 1 PM 10 µg/m 3 100 53 63 70 62 2 PM2.5 µg/m
More informationRENOVATION AND EFFICIENCY ENHANCEMENT OF PULVERIZED COAL FIRED BOILERS (3 x 35 TPH - RUSSIAN MAKE) - A Case Study
RENOVATION AND EFFICIENCY ENHANCEMENT OF PULVERIZED COAL FIRED BOILERS (3 x 35 TPH - RUSSIAN MAKE) - A Case Study Tej Bahadur Additional General Manager Pollution Control Research Institute BHEL, Haridwar
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationCENTRAL ELECTRICITY AUTHORITY NEW DELHI
AMENDMENT TO STANDARD TECHNICAL SPECIFICATION FOR RETROFIT OF WET LIMESTONE BASED FLUE GAS DESULPHURISATION (FGD) SYSTEM IN A TYPICAL 2 x 500 MW THERMAL POWER PLANT CENTRAL ELECTRICITY AUTHORITY NEW DELHI
More informationDevelopment Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements
1 Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements 2 COAL RESOURCE Indonesia has large resources of lower heating value subbituminous coal the resources are
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,
More informationEnergy is essential for meeting basic human needs, for
16 Using energy efficiently 4 Energy is essential for meeting basic human needs, for economic growth, and for social development. India is well aware of the challenge of providing access to modern energy
More informationREDUCTION OF PARTICULATE MATTER EMISSION AFTER ELECTROSTATIC PRECIPITATORS RECONSTRUCTION AT UNIT A5 OF THE TPP KOLUBARA
REDUCTION OF PARTICULATE MATTER EMISSION AFTER ELECTROSTATIC PRECIPITATORS RECONSTRUCTION AT UNIT A5 OF THE TPP KOLUBARA M. Erić, A. Erić, P. Škobalj, D. Cvetinović, P. Stefanović Institute of Nuclear
More informationJAYPEE NIGRIE SUPER THERMAL POWER PROJECT
JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)
More informationUp gradation of Boilers to Implement New Pollution Norms
Up gradation of Boilers to Implement New Pollution Norms 1 Key Regulatory Drivers: Power Plants Pollutant Unit* TPPs installed before December 31, 2003 (Refer Note 1) TPPs installed after 2003 to December
More informationARCHEAN CHEMICAL INDUSTRIES PRIVATE LIMITED. Ambient Air Monitoring Report
Sampling Locations- Near Bromine, Plant/Near ETP. Ambient Air Monitoring Report Sr. No. Parameters Unit (SI) Specification/SPCB 1 PM 10 µg/m 3 100 61 71 59 63.66 2 PM2.5 µg/m 3 60 16 24 18 19.33 3 Sulphur
More informationhttp://shaktifoundation.com http://shaktifoundation.in Thermal Power Plants in India Technical opportunities for improving efficiency and reducing emissions About Shakti Sustainable Energy Foundation
More informationThe following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.
Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power
More informationINTHUU MEASUREMENTS CC
INTHUU MEASUREMENTS CC VAT REG NO.: 4960254359 REG NO.: 2009/190265/23 P.O. Box 14769 Bredell, 1623 Plot 2/410 Seventh Road Bredell A/H, Kempton Park, 1619 Tel: +27 (0)82 572-2380 Fax: +27 (0)86 659-2231
More informationNew trends in electron beam flue gas treatment
New trends in electron beam flue gas treatment Andrzej Pawelec Institute of Nuclear Chemistry and Technology, Warsaw, Poland Warsaw, 11.04.2013 Part-financed by the European Union (European Regional Development
More informationRole of thermal power plants in particulate matter emission # A case study of NTPC Dadri plant Using DMAIC approach
Role of thermal power plants in particulate matter emission # A case study of NTPC Dadri plant Using DMAIC approach Himanshu Kumar*, Aditya Agrawal# * Manager (P&S Deptt.) - NTPC Dadri, # Senior system
More informationPerformance evaluation of industrial boiler by heat loss method.
Performance evaluation of industrial boiler by heat loss method. Divyesh T. Patel 1, Dr. K.V.Modi 2 1 ME Scholar in Mechanical (Energy Engg.), Government Engineering College, Valsad, India 2 Associate
More informationInternational Journal of Advance Engineering and Research Development
Scientific Journal of Impact Factor (SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 3, Issue 2, February -2016 e-issn (O): 2348-4470 p-issn (P): 2348-6406 ENERGY
More information2. The expected cost of the project is Rs.50 crores.
Subject Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management System for Pathankot Cluster" by Municipal Council, Pathankot at Village Kalanaur,
More information