1 716 IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, VOL. 4, NO. 3, JULY 2013 Probabilistic Model of Payment Cost Minimization Considering Wind Power and Its Uncertainty Yao Xu, Student Member, IEEE, QinranHu, Student Member, IEEE, and Fangxing Li, Senior Member, IEEE Abstract The penetration of wind energy sources to power systems has significantly increased in recent years. With variable and uncertain wind power output, the payment and market-clearing price (MCP) may vary in different cases. In this paper, a methodology to quantitatively model the payment cost minimization (PCM) considering the effects of wind power from a probabilistic viewpoint is presented. The autoregressive moving average (ARMA) method with normal distribution of wind forecast error is used to model a time series of wind speed. Based on the wind turbine power curve, the probability distribution of wind power output can be obtained. Then, Monte Carlo simulation (MCS) is used to produce random samples of wind speed, and the genetic algorithm is applied to solve PCM for each sample. The proposed methodology and its solution are verified with simulation studies of two sample systems. The probabilistic distribution results can give consumers an overview of how much they should pay in a probabilistic sense. Further, the simulation results can serve as a lookup table to provide useful input for more refined unit commitment, and also provide a benchmark for future research works on PCM considering wind power. Index Terms Bid cost minimization (BCM), deregulated electricity market, genetic algorithm, market clearing price (MCP), Monte Carlo simulation (MCS), normal distribution, payment cost minimization (PCM), renewable energy. I. INTRODUCTION I N THE U.S., deregulated wholesale electricity markets are operated by independent system operators (ISOs). Generally, ISOs adopt bid cost minimization (BCM) to select generation offers, demand bids and their respective amounts for energy and ancillary services. A settlement mechanism is then used to calculate the payments based on market clearing prices (MCPs). Therefore, this BCM mechanism may give rise to higher consumer payment. Previous research works [1] [8] investigated the payment cost minimization (PCM) method as an alternative approach to determine generation dispatches. There are some additional previous works that discussed the PCM model. The PCM using surrogate optimization is introduced in [9], which can be viewed as a simplified, combined unit commitment (UC) and economic dispatch (ED) model, since it Manuscript received April 16, 2012; revised December 10, 2012; accepted January 08, Date of publication March 07, 2013; date of current version June 17, This work was supported by the National Science Foundation under Grant ECCS , by the Engineering Research Center Program of the National Science Foundation and the Department of Energy under NSF Award EEC , and by the CURENT Industry Partnership Program for financial and facility support in part to complete this research. The authors are with the Department of Electrical Engineering and Computer Science, The University of Tennessee (UT), Knoxville, TN USA ( fli6@utk.edu). Color versions of one or more of the figures in this paper are available online at Digital Object Identifier /TSTE includes multi-hour model, startup cost, and minimum generation cost. In the problem formulation process, the MCP is used instead of the locational marginal pricing (LMP) and the line constraints are not considered. Improved methods are discussed in [10] and [11] which present the PCM with transmission capacity using surrogate optimization. Since the line limits are considered, LMP is also introduced in [10] and [11] to address locational price difference and congestions. In [12], the PCM with the transmission capacity constraints and the line losses are considered using the objective switching method. As the primary energy source, coal is widely used in power production, which causes serious concerns related to environment and sustainability. Thus, renewable energy sources have been developed significantly, leading to a high penetration of renewables. Unfortunately, renewable energy, especially wind, tends to be variable and uncertain because the prime mover, i.e., the wind, depends on natural and meteorological conditions [13], [14]. Previous PCM studies have not considered effects of wind power. To study the wind power effects on PCM and BCM, this paper presents a customized genetic algorithm (GA) method to solve the PCM model with a high-penetration variable wind power. An autoregressive moving average (ARMA) time series was used to model wind speed, and normal distribution was used to model wind speed forecast error. Based on wind turbine power curve, the wind power probability distribution can be obtained. With the consideration of wind generation uncertainty, MCP can be obtained in a probabilistic model. Then, the expected value of the minimum payment can be calculated, and generation dispatch can be obtained. The Monte Carlo method is used to produce a series of wind speed, and genetic algorithm is applied to solve PCM in this paper. In short, the paper provides a methodology and its solution to the PCM problem considering wind power and demonstrates that PCM can give rise to less consumer payment than BCM in a probabilistic sense with variable wind power. The probabilistic results can serve as a lookup table to provide useful input for further refinement of UC considering stochastic features, and also provide a benchmark for future research works on PCM considering wind power. This paper is organized as follows. Section II illustrates the problem formulation including how to model wind speed, wind power, the BCM model, and the PCM model. Section III presents the solution methodology using GA for PCM with variable wind power. Section IV presents two case studies for the PJM 5-bus system and the IEEE 118-bus system. Section V concludes the paper. II. PROBLEM FORMULATION In this section, with the effect of the wind energy in power systems, the PCM problem is formulated for day-ahead energy /$ IEEE

2 XU et al.: PROBABILISTIC MODEL OF PCM CONSIDERING WIND POWER AND ITS UNCERTAINTY 717 market. Usually, as shown in the PCM model in [9] [12], a multi-hour optimization model is employed as a combined UCED formulation. Although the actual practice in UC and ED takes more complicate processes such as multiple rounds of optimization, the multi-hour optimization model in the previous PCM and BCM studies in [9] [12] addresses multiple hours scheduling, startup cost, minimum generation cost, and thus, can be viewed as a simplified and integrated UCED problem. This paper takes the basic optimization model in [9] as the foundation for the proposed probabilistic study of the PCM and BCM models under high penetration of wind energy. In addition, spinning reserve is considered in this work. Since both PCM and BCM are based on the same UCED formulation, the comparison is fair and meaningful. A. Wind Speed Model Time Series and Forecast Error Distribution Wind energy tends to be variable and uncertain because of the effects of the natural and meteorological conditions. In addition, wind speed at a specific hour is related to previous hours. To model wind speed, an ARMA [15] [17] time series was used. The general ARMA model is given as follows: Fig. 1. Wind turbine power curve. (1) where is the time-series value at time ; ( ) is the autoregressive average of the model; ( ) is the moving average of the model; and [ ] is a normal white noise where NID means normally independently distributed [15] [17]. Based on previous works [18], [19], a normal distribution is applied to the wind speed forecast error in this paper. The model is written as follows: where = wind speed forecast error at time ; denotes normal distribution; = mean value of ; =varianceof ; = probability density function of ; = cumulative density function of. Then, the hourly simulated wind speed can be obtained based on, and B. Wind Power Output Model Wind power output from a wind turbine is determined by the wind speed. In order to build the wind power model, the relationship between wind speed and wind power must be considered. The classic wind power curve [20] is shown in Fig. 1. (2) (3) (4) Fig. 2. Wind speed and the projected wind power probability distribution around 10 m/s. The wind power curve shows strong nonlinearity between power output and wind speed. Based on the wind forecast and the wind turbine power curve, the wind power probability distribution model can be easily obtained. For example, with the assumption that the wind speed forecast is 10 m/s (i.e., ) and wind speed forecast error follows normal distribution with, then the projected probability distribution of wind power can be obtained from the simulated values of wind speed using the wind turbine power curve. The probability distribution results are shown in Fig. 2. Therefore, the probabilistic model of wind power over a duration like 24 hours can be obtained as follows: 1) Obtain the average wind speed at each time spot (e.g., hourly) based on historical meteorological data. 2) Use the ARMA model in (1) (4) to generate samples which stand for the sequence of hourly wind speed. 3) Combine the results in Step 2 with the power curve to calculate the corresponding sequences of wind power. Thus, a number of random samples of hourly sequential wind power output can be obtained. Note, the random samples of hourly sequential wind power output will serve as the input for Monte Carlo simulation (MCS), which is commonly employed to capture the stochastic distribution of a system s output, which will be the consumer s payment in this paper, as discussed in Sections III and IV.

3 718 IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, VOL. 4, NO. 3, JULY 2013 C. Needed Number of Monte Carlo Samples The number of Monte Carlo samples should be sufficient enough to obtain the output distribution, but not more than a necessary number. Otherwise, it is a waste of computing time. The number of samplings can be obtained by setting criterion for the MCS. According to [15] [17], the stopping criterion is shown mathematically as follows: where is the output variable from the MC simulation (i.e., the consumer s payment as discussed in the next section); is the number of the Monte Carlo samples; is the expected value of ; is the standard variation of ;and is a specific convergence threshold. If the specific convergence threshold is determined, the least number of samples for MCS can be calculated. If is small, then is large, which leads to more computation or simulation time to maintain a good enough accuracy; vice versa for a larger value of. Therefore, in real-world practice, a reasonable convergence threshold needs to consider trade-off between accuracy and computing time. In this paper, the approach to obtain a reasonable number of samples is shown as follows. 1) Set an initial guess of, e.g., ) An MCS run with 100 trials is processed. 3) The statistical results from these 100 MCS, i.e., and, can be used to verify whether (5) is satisfied. If so, then stop and return with all results; otherwise, a new, minimum can be calculated with and from the previous 100 samples based on (5). 4) The whole process in Steps 1 3 will be repeated with additional samples based on the updated until (5) is met. D. Conventional Bid Cost Minimization (BCM) Model The conventional BCM problem can be modeled as the minimization of the total production cost subject to energy balance. Again, transmission constraint is ignored in this work. Considering startup cost, minimum generation cost, and spinning reserve in the 24-hour duration, we have the BCM modeled formulated as follows: (5) where = number of loads; = number of traditional generators; = number of wind plants; = bid price of traditional generator ($/MWh); = cost at minimum generation ($); = bid price of wind plant ($/MWh); = output of traditional generator at time ; = output of wind plant at time ; = maximum output of traditional generator ; = minimum output of traditional generator ; = power of load at time ; = start up cost of traditional generator ; = spinning reserve at hour ; = 1/0: generator is ON/OFF at time ; = 1/0: wind plant is ON/OFF at time. After obtaining the optimal solution of generation dispatch, we can calculate the MCP, which is the maximum bid price of selected generators. is defined as Then, the total payment is given by (7) (8) (9) (10) (11) In (11), and are known based on the solution of (6) (9), and can be obtained with (10). (6) E. Payment Cost Minimization (PCM) In the PCM model, the consumers payment is directly minimized. With the consideration of the startup cost, minimum gen-

4 XU et al.: PROBABILISTIC MODEL OF PCM CONSIDERING WIND POWER AND ITS UNCERTAINTY 719 eration cost, and spinning reserve in the 24-hour duration, the PCM model can be formulated as (12) Subject to: (7) (9). Note that PCM is also subject to (7) (9), the energy balance equation, and the generation upper/lower bounds. If compared with the BCM model in (6) (9), the problem formulation of PCM is much more complicated, because,,and are unknown in (12). In the BCM model, the generation dispatch can be obtained from (6) (9) first, and then the can be obtained afterwards using (10). This is a sequential process. In contrast, in (12) is not explicitly known since the dispatch is not known. Therefore, the original linear integer programming solution applied to the PCM model in (6) (9) is not suitable. In Section III, the genetic algorithm is presented to solve the PCM model in (12), subject to (7) (9). F. Expected Value of Payment The variable wind output power gives variable MCP for different PCM scenarios. Based on the probabilistic distribution of wind generation output, a Monte Carlo method is applied to generate a sequence of random wind power output of 24 hours based on our wind speed model. By generating different cases, we can obtain different values of payment for both PCM and BCM as,. Note each of these cases contains 24 hours. Then, we can simply use the mean value of cases as the expected value (13) (14) Based on the expected value of the PCM objective function, i.e., payment, the total optimal customer payment with the effects of the renewable energy can be calculated, and the actual multi-hour generation scheduling results can be obtained. III. SOLUTION METHODOLOGY Essentially, the proposed optimization problem is to find the optimal dispatch of generators to minimize PCM value under certain scenarios of wind power output. This problem is an NP problem with exponential time. In order to solve this problem, the MCS method is used to produce a series wind speed, and then the genetic algorithm (GA) is applied to solve PCM in each MCS sample. GA, an intelligent search algorithm using stochastic operations, is customized in this work to solve the model given by (12), (7) (9). Because the PCM optimization model is a complicated nonlinear, noncontinuous problem with in the objective function depending on other unknown variables and in the objective function, it is reasonable to apply the heuristic search algorithm GA here for solving PCM. Starting with randomly generated solutions, GA searches the improved solutions through a number of iterations called generations. The performance of each solution is evaluated by a fitness function. In each generation, relatively good solutions will be selected for reproduction of offspring by crossover and mutation. Crossover combines materials from parents to produce their children. Crossover provides pressure for improvement or exploitation while mutation makes small local changes to feasible solutions in order to provide the variability of the population. The reproduction cycle goes on until there is no further improvement in consecutive generations or the maximum number of iterations is met [21]. This heuristic searching approach has been applied to solve optimization problems in power systems [22] [25]. As discussed in Section II, (7) (9) and (12) are integrated to the functions for each random MCS sample as follows: (15) (16) With the application of GA, we can find out which generator to dispatch and the amount of the generator output in time. Therefore, the known parameters here are,,,,,and ; and the unknown parameters are,,and in the proposed formulation. Next, the customized GA for PCM is discussed in details. A. Initial Solution Generation In the first step of this algorithm, an initial set is randomly generated to form an initial population. Since in some cases the generated sets are obviously infeasible under practical consideration, the bad sets should be detected and deleted. The criterionusedhereinthisparticular GA application to ensure a feasible solution is given by (17)

5 720 IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, VOL. 4, NO. 3, JULY 2013 Fig. 3. Structure of one individual. Fig. 4. Structure of whole population. Once infeasible cases are identified, they will be removed immediately and new ones will be regenerated to replace them. This can be repeated until all the population are feasible. B. Population Structure The structure of an individual in a population is shown in Fig. 3. Each individual records all generators statuses in 24 hours, which are noted as in our problem formulation. Thus, 24 bits can represent one individual, where is the number of GA generations. Since we have already defined the structure of an individual, the structure of the whole population in each iteration is shown in Fig. 4. Here, the population size is. C. Fitness Function In order to achieve the objective function in (15), the fitness function that stands for the probability of being chosen can be formulated as follows: Fig. 5. Flowchart of GA for PCM. (18) where is the value of fitness for the th solution in population and is the population size. With an initial solution, the solution structure, and the fitness function, the optimal solution for generation scheduling can be obtained based on crossover and mutation. Since this paper uses the standard process for crossover and mutation, which has been well documented in the literature, the detailed description on these two steps is ignored here. D. Flow Chart of GA for PCM The flowchart of GA for PCM is shown in Fig. 5. Note is the iteration count in the figure. Also note that this flowchart is for one random sample of a wind speed series. Then, MCS, which is the computational algorithm based on repeated random sampling to model stochastic events, is used here to calculate the PCM values with randomly generated wind speed samples, as discussed in Sections II-A and II-B. Also, the needed number of MC samples has been discussed in the Section II-C. IV. NUMERICAL STUDY In this section, two studies based on the PJM 5-bus and the IEEE 118-bus systems are presented. The solutions are implemented with MATLAB. A. PJM 5-Bus System The parameters of the PJM 5-bus system with slight modification are shown in Table I. The parameters of GA are set as below: Generation ; Population Size ; Crossover Rate ;and Mutation Rate. In this system, the demand data for 24 hours are shown in Fig. 6. The spinning reserve is set as.bid1isassumed to be from a wind power plant. Mean value and standard deviation of wind speed at the wind plant of Bid 1 is calculated based on the Regina wind speed data from [17] and [26] during for demonstration here and is shown in Fig. 7. Based on [17], the value of the MCS stopping criterion given in (5)

6 XU et al.: PROBABILISTIC MODEL OF PCM CONSIDERING WIND POWER AND ITS UNCERTAINTY 721 TABLE I SUPPLY OFFER PARAMETERS FOR PJM 5-BUS SYSTEM Fig. 8. Monte Carlo hourly wind speed. TABLE II PJM-5 BUS SYSTEM PAYMENT IN BCM: MEDIAN SAMPLE HOURLY VALUES Fig. 6. PJM 5-bus system demand. Fig. 7. Mean value and standard deviation of wind speed at Bid 1. is set to After an initial 100 samples, the mean and deviation of the results from these initial samples suggest about 1000 samples for MCS to converge. Note, the MCS method is used to produce 1000 random 24 hours wind speed samples in the simulation. These 1000 cases of hourly wind speed are shown in Fig. 8. For each case, based on the GA algorithm, the optimal generation dispatch and the lowest consumer payment can be obtained. The generation dispatches in 24 hours in the BCM and PCM formulations for a particular sample, the median sample basedonsortedpcmvalues,areshownintablesiiandiii,respectively, for illustrative purpose. Hourly mean values of all samples in BCM and PCM are shown in Tables IV and V, respectively. From Tables II and III, the results represent the generation scheduling under the proposed combined UCED model in PCM and BCM. Moreover, all the results can be used to build a lookup table as the input for a more refined unit commitment study, if we want to apply this to a more practical, detailed UCED model. Based on the results of all random samples of 24 hours wind power output, the discretized probability mass function of and are shown in Fig. 9. The expected values of the payment inpcmandbcmare and, respectively. From Fig. 9, the overall comparison of PCM and BCM with wind power considered matches the general conclusion from the literature that the PCM model gives lower consumer payment than BCM. The methodology presented in this paper is a comprehensive and systematic approach to develop the impact to these two models under probabilistic consideration. The probability distribution results can give the consumer an overview of how much they should pay with an associated probability. The results also verify that PCM is a more economically efficient

7 722 IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, VOL. 4, NO. 3, JULY 2013 TABLE III PJM-5 BUS SYSTEM PAYMENT IN PCM: MEDIAN SAMPLE HOURLY VALUES TABLE V PJM-5 BUS SYSTEM PAYMENT IN PCM: MEAN HOURLY VALUES TABLE IV PJM-5 BUS SYSTEM PAYMENT IN BCM: MEAN HOURLY VALUES Fig. 9. Probability distribution of PCM and BCM for PJM 5-bus system. mechanism for consumers under a high-penetration of variable wind generation. B. IEEE 118-Bus System The study results on the IEEE 118-bus system are brieflypresented in this subsection to further demonstrate the applicability of the proposed methodology, while similar conclusions to those for the PJM 5-bus system can be drawn. The IEEE 118-bus system has 54 generators. In the original IEEE 118-bus system, there is no generator bidding data, which

8 XU et al.: PROBABILISTIC MODEL OF PCM CONSIDERING WIND POWER AND ITS UNCERTAINTY 723 TABLE VI GENERATOR STARTUP COST FOR IEEE 118-BUS SYSTEM Fig. 11. Probability distribution of PCM and BCM for IEEE 118-Bus Study. than the BCM model. The presented PCM model and the solution methodology are able to be applied in a larger system and are robust models for the optimal generator dispatches. Again, while the result itself represents the generation scheduling output under the combined UCED optimization framework, it can serve as a lookup table to provide useful input for a more refined UC considering the stochastic nature of wind power when applied to actual practice. Fig. 10. IEEE 118-bus system demand. are indispensable to perform the economic study here. Therefore, the generator bidding data per MWh are assumed as follows for illustrative purpose [27]: 20 low-cost generators with bidding from $10.0 to $19.5 with $0.5 increments; 20 expensive generators with bidding from $30 to $49 with $1 increments; and 14 most expensive generators with bidding from $70 to $83 with $1 increments. The startup cost is shown in Table VI. In the simulation,. The generators at 10, 26, and 40 are set as wind units with no startup cost. Note that other units with a low to zero startup cost may represent a gas or combined cycle unit, while a high startup cost unit may represent a steam turbine unit. In this system, the demand data for 24 hours are shown in Fig. 10. The spinning reserve is set as. Similar to the PJM 5-bus system study, the mean value and the standard deviation of wind speed at Bid 10, 26, 40 are obtained from actual operational data set as Regina, Saskatoon, and Swift Current wind speed in [17] and [26]. Basedonthedistributionofwindgenerationindifferent cases, the discretized probability mass functions of and are shown in Fig. 11. The expected values of the payment are with BCM and with PCM, respectively. It is apparent that the expected value of the payment from the PCM model in this case gives much lower consumer payment V. CONCLUSION With the development of the wind power in recent years, the effects of the variable wind power on the power market operation becomes an increasingly hot topic. Meanwhile, a number of papers addressed the BCM and PCM models in deregulated power markets. However, few have discussed the PCM model with the effects of the wind energy. This challenge has been addressed in this paper. The contribution of this paper can be summarized as follows: In this paper, a methodology to quantitatively model PCM considering the effects of the wind power from the probabilistic viewpoint has been discussed. The ARMA method with normal distribution of wind forecast error was used to model a time series of wind speed. Based on wind turbine power curve, the wind power probability distribution can be obtained. The MCS method was used to produce randomly generated series of wind speed data, and the genetic algorithm was applied to solve PCM for each sample. The probabilistic distribution results, obtained with the proposed methodology, can give consumers an overview of how much they probably should pay in the probabilistic sense. While the result itself represents the generation scheduling output under the simplified, combined UCED model, it can serve as a lookup table to provide useful input for a more refined UC to consider stochastic features when applied to actual practice of UC with wind power. Since both PCM and BCM take the same UCED model, the comparison is fair and meaningful. Future work may include transmission constraints considering network model as well as the probabilistic characteristics

9 724 IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, VOL. 4, NO. 3, JULY 2013 of load variation, especially under the smart grid initiatives for demand response. ACKNOWLEDGMENT The authors are grateful to Prof. P. B. Luh from the University of Connecticut and Dr. J. H. Yan from Southern California Edison for their useful discussions on PCM. REFERENCES [1] C. Vazquez, M. Rivier, and I. J. Perez-Arriaga, Production cost minimization versus consumer payment minimization in electricity pools, IEEE Trans. Power Syst., vol. 17, no. 1, pp , Feb [2] S. Hao, G. A. Angelidis, H. Singh, and A. D. Papalexopoulos, Consumer payment minimization in power pool auctions, IEEE Trans Power Syst., vol. 13, no. 3, pp , Aug [3] F.Zhao,P.B.Luh,Y.Zhao,J.H.Yan,G.A.Stern,andS.Chang, Bid cost minimization vs. payment cost minimization: A game theoretic study of electricity markets, in Proc. Power Eng. Soc. General Meeting, Tampa, FL, USA, Jun [4] J. Alonso, A. Trias, V. Gaitan, and J. J. Alba, Thermal plant bids andmarket clearing in an electricity pool: Minimization of costs vs. Minimization of consumer payments, IEEE Trans. Power Syst., vol. 14, no. 4, pp , Nov [5]J.H.YanandG.A.Stern, Simultaneousoptimalauction and unit commitment for deregulated electricity markets, Electricity J., vol. 15, no. 9, pp , Nov [6]G.A.Stern,J.H.Yan,P.B.Luh,andW.Blankson, What objective function should be used for simultaneous optimal auctions in the ISO/RTO electricity market, in Proc. IEEE Power Eng. Soc. General Meeting, Montreal, Canada, [7] J. H. Yan, Bid cost minimization versus payment cost minimization in the ISO/RTO markets, in Proc. IEEE PES General Meeting, Tampa, FL, USA, Jun [8] S. Hao and F. Zhuang, New models for integrated short-term forward electricity markets, IEEE Trans. Power Syst., vol. 18, no. 2, pp , May [9] P.B.Luh,W.E.Blankson,Y.Chen,J.H.Yan,G.A. Stern, S.-C. Chang, and F. Zhao, Payment cost minimization auction for deregulated electricity markets using surrogate optimization, IEEE Trans. Power Syst., vol. 21, no. 2, pp , May [10] F. Zhao, P. B. Luh, J. H. Yan, G. A. Stern, and S.-C. Chang, Payment cost minimization auction for deregulated electricity markets considering transmission capacity constraints, in Proc. IEEE ISAP, 2005, pp [11] F.Zhao,P.B.Luh,J.H.Yan,G.A.Stern,and S.-C. Chang, Payment cost minimization auction for deregulated electricity markets with transmission capacity constraints, IEEE Trans. Power Syst., vol.23, no. 2, pp , May [12] X. Han, P. B. Luh, J. H. Yan, G. A. Stern, and S.-C. Chang, Payment cost minimization with transmission capacity constraints and losses using the objective switching method, in Proc. IEEE PSCE, 2011, pp [13] S. Mathew, Wind Energy, Fundamentals, Resource Analysis and Economics. Berlin, Germany: Springer-Verlag, [14] S. Heier and R. Waddington,GridIntegration of Wind Energy Conversion Systems, 2nd ed. Hoboken, NJ, USA: Wiley, [15] R. Billinton, H. Chen, and R. Ghajar, A sequential simulation technique for adequacy evaluation of generating systems including wind energy, IEEE Trans. Energy Convers., vol. 11, no. 4, pp , Dec [16] R. Billinton and G. Bai, Generating capacity adequacy associated with wind energy, IEEE Trans. Energy Convers., vol. 19, no. 3, pp , Sep [17] W. Wangdee and R. Billinton, Considering load carrying capability and wind speed correlation of WECS in generation adequacy assessment, IEEE Trans. Energy Convers., vol. 21, no. 3, pp , Sep [18] H. Mori and E. Kurata, Application of Gaussian process to wind speed forecasting for wind power generation, in Proc. IEEE Int. Conf. Sustainable Energy Technologies, 2008 (ICSET 2008), Nov. 2008, pp [19] M. Lange, On the Uncertainty of Wind Power Prediction, analysis of the forecast accuracy and statistical distribution of errors, J. Solar Energy Eng., vol. 127, no. 2, pp , May [20] General Specification Vestas, V90-3.0MW, May 2011 [Online]. Available: R1_V90-GeneralSpecification.pdf [21] M. C. Chan, C. C. Wong, B. K. S. Cheung, and G. Y. N. Tang, Genetic algorithms in multi stage portfolio optimization systems, in Proc. 8th Int. Conf. Society for Computational Economics, Computing in Economics and Finance, Aix-en-Provence, France, [22] S. O. Orero and M. R. Irving, Economic dispatch of generators with prohibited operating zones: A genetic algorithm approach, IEE Proc. Gen., Transm., Distribut., vol. 143, no. 6, pp , [23] F. Li, J. D. Pilgrim, C. Dabeedin, A. Chebbo, and R. K. Aggarwal, Genetic algorithms for optimal reactive power compensation on the national grid system, IEEE Trans. Power Syst., vol. 20, no. 1, pp , Feb [24] C.-P. Cheng, C.-W. Liu, and C.-C. Liu, Unit commitment by Lagrangian relaxation and genetic algorithms, IEEE Trans. Power Syst., vol. 15, no. 2, pp , May [25] E. Zio, P. Baraldi, and N. Pedroni, Optimal power system generation scheduling by multi-objective genetic algorithms with preferences, Reliab. Eng. Syst. Saf., vol. 94, pp , Feb [26] National Climate Data and Information Archive, [Online]. Available: last accessed Jul. 19, 2012 [27] R. Bo and F. Li, Probabilistic LMP forecasting considering load uncertainty, IEEE Trans. Power Syst., vol. 24, no. 3, pp , Aug Yao Xu (S 11) received the B.S. and M.S. degrees in electrical engineering from Changsha University of Science and Technology, China,in2006and2009,respectively. She is working toward the Ph.D. degree at The University of Tennessee, Knoxville, TN, USA. Her research interests include utility application of power electronics, power system control, and power markets. She received the Min Kao Graduate Fellowship in Electrical Engineering. Qinran Hu (S 11) received the B.S. degree in electrical engineering from Southeast University, Nanjing, China, in He is working toward the Ph.D. degree at The University of Tennessee, Knoxville, TN, USA. His research interests include power system optimization, smart grid, and renewable energy integration. Fangxing Li (M 01 SM 05), also known as Fran Li, received the BSEE and MSEE degrees from Southeast University, Nanjing, China, in 1994 and 1997, respectively, and then the Ph.D. degree from Virginia Tech in He is an Associate Professor at The University of Tennessee, Knoxville, TN, USA. He had been a senior and then a principal engineer at ABB Electrical System Consulting (ESC) in Raleigh, NC, USA, from 2001 to 2005, prior to joining UTK in August His current interests include renewable energy integration, power markets, distributed energy resources, and smart grid. Dr. Li is a registered Professional Engineer (P.E.) in the state of North Carolina, and a Fellow of IET (formerly IEE).

Deregulation, Locational Marginal Pricing, and Critical Load Levels with Applications

Deregulation, Locational Marginal Pricing, and Critical Load Levels with Applications ECE 620 Lecture Nov. 2nd, 2016 Deregulation, Locational Marginal Pricing, and Critical Load Levels with Applications Fangxing (Fran) Li, Ph.D., P.E. Professor Dept. of EECS The University of Tennessee

More information

568 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 2, MAY 2006

568 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 2, MAY 2006 568 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 2, MAY 2006 Payment Cost Minimization Auction for Deregulated Electricity Markets Using Surrogate Optimization Peter B. Luh, Fellow, IEEE, William E.

More information

THE Locational Marginal Pricing (LMP) methodology has

THE Locational Marginal Pricing (LMP) methodology has 1638 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Continuous Locational Marginal Pricing (CLMP) Fangxing Li, Senior Member, IEEE Abstract This paper proposes a solution to eliminate

More information

Probabilistic LMP Forecasting Considering Load Uncertainty Rui Bo, Student Member, IEEE, and Fangxing Li, Senior Member, IEEE

Probabilistic LMP Forecasting Considering Load Uncertainty Rui Bo, Student Member, IEEE, and Fangxing Li, Senior Member, IEEE IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 24, NO. 3, AUGUST 2009 1279 Probabilistic LMP Forecasting Considering Load Uncertainty Rui Bo, Student Member, IEEE, and Fangxing Li, Senior Member, IEEE Abstract

More information

532 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 23, NO. 2, MAY 2008

532 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 23, NO. 2, MAY 2008 532 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 23, NO. 2, MAY 2008 Payment Cost Minimization Auction for Deregulated Electricity Markets With Transmission Capacity Constraints Feng Zhao, Student Member,

More information

WITH the deregulation of electrical power systems, market

WITH the deregulation of electrical power systems, market IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 15, NO. 3, AUGUST 2000 981 Optimization Based Bidding Strategies in the Deregulated Market Daoyuan Zhang, Yajun Wang, Peter B. Luh, Fellow, IEEE Abstract With the

More information

To Study the Adequacy Assessment of Chitradurga distribution substation using MCS

To Study the Adequacy Assessment of Chitradurga distribution substation using MCS To Study the Adequacy Assessment of Chitradurga distribution substation using MCS Shruthi.M 1, S.B.Karajgi 2 PG Scholar, Department of Electrical and Electronics, SDMCET, Dharwad, India 1 Professor, Department

More information

Congestion and Price Prediction Under Load Variation Fangxing Li, Senior Member, IEEE, and Rui Bo, Student Member, IEEE

Congestion and Price Prediction Under Load Variation Fangxing Li, Senior Member, IEEE, and Rui Bo, Student Member, IEEE IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 24, NO. 2, MAY 2009 911 Congestion and Price Prediction Under Load Variation Fangxing Li, Senior Member, IEEE, and Rui Bo, Student Member, IEEE Abstract In market-based

More information

Robust Optimization Based Economic Dispatch for Managing System Ramp Requirement

Robust Optimization Based Economic Dispatch for Managing System Ramp Requirement 2014 47th Hawaii International Conference on System Science Robust Optimization Based Economic Dispatch for Managing System Ramp Requirement Anupam A. Thatte Texas A&M University, College Station, Texas,

More information

Incidence Matrix-Based LMP Calculation: Algorithm and Applications

Incidence Matrix-Based LMP Calculation: Algorithm and Applications Incidence Matrix-Based LMP Calculation: Algorithm and Applications Mohammad Sadegh Javadi Department of Electrical Engineering, Science and Research Branch, Islamic Azad University, Fars, Iran Abstract

More information

Modelling of Locational Marginal Based Transmission Pricing in Restructured Power System

Modelling of Locational Marginal Based Transmission Pricing in Restructured Power System Modelling of Locational Marginal Based Transmission Pricing in Restructured Power System 1 Mr.V.G.Umale, 2 Dr. S.B.Warkad 1 Priyadarshini College of Engineering, 2 Pote College of Engineering Abstract:

More information

Robust Supply Function Bidding in Electricity Markets With Renewables

Robust Supply Function Bidding in Electricity Markets With Renewables Robust Supply Function Bidding in Electricity Markets With Renewables Yuanzhang Xiao Department of EECS Email: xyz.xiao@gmail.com Chaithanya Bandi Kellogg School of Management Email: c-bandi@kellogg.northwestern.edu

More information

Transmission Expansion Planning of Systems With Increasing Wind Power Integration

Transmission Expansion Planning of Systems With Increasing Wind Power Integration IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 28, NO. 2, MAY 2013 1355 Transmission Expansion Planning of Systems With Increasing Wind Power Integration George A. Orfanos, Pavlos S. Georgilakis, Senior Member,

More information

A Probability-Driven Multilayer Framework for Scheduling Intermittent Renewable Energy

A Probability-Driven Multilayer Framework for Scheduling Intermittent Renewable Energy IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, VOL. 3, NO. 3, JULY 2012 455 A Probability-Driven Multilayer Framework for Scheduling Intermittent Renewable Energy Fangxing Li, Senior Member, IEEE, andyanliwei,

More information

Statistical Scheduling of Economic Dispatch and Energy Reserves of Hybrid Power Systems with High Renewable Energy Penetration

Statistical Scheduling of Economic Dispatch and Energy Reserves of Hybrid Power Systems with High Renewable Energy Penetration University of Denver Digital ommons @ DU Electronic Theses and Dissertations Graduate Studies 1-1-2014 Statistical Scheduling of Economic Dispatch and Energy Reserves of Hybrid Power Systems with High

More information

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report ERCOT Public 2016 LTRA Probabilistic Reliability Assessment Final Report November 21, 2016 Contents Summary... 1 Software Model Description... 3 Demand Modeling... 3 Controllable Capacity Demand Response

More information

Scheduling and Coordination of Distributed Design Projects

Scheduling and Coordination of Distributed Design Projects Scheduling and Coordination of Distributed Design Projects F. Liu, P.B. Luh University of Connecticut, Storrs, CT 06269-2157, USA B. Moser United Technologies Research Center, E. Hartford, CT 06108, USA

More information

DUE to several supportive regulations worldwide [1] [8],

DUE to several supportive regulations worldwide [1] [8], IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 26, NO. 2, MAY 2011 957 Bidding Strategy of Virtual Power Plant for Participating in Energy and Spinning Reserve Markets Part II: Numerical Analysis Elaheh Mashhour,

More information

Congestion Influence on Bidding Strategies in an Electricity Market

Congestion Influence on Bidding Strategies in an Electricity Market 1054 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 18, NO. 3, AUGUST 2003 Congestion Influence on Bidding Strategies in an Electricity Market Tengshun Peng and Kevin Tomsovic, Senior Member, IEEE Abstract Much

More information

CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET

CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET 61 CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET 5.1 INTRODUCTION Electricity markets throughout the world continue to be opened to competitive forces. The underlying objective of introducing

More information

Can a Newly Proposed Mechanism for Allocating Contracts in U.S. Electricity Wholesale Markets Lead to Lower Prices? A Game Theoretic Analysis

Can a Newly Proposed Mechanism for Allocating Contracts in U.S. Electricity Wholesale Markets Lead to Lower Prices? A Game Theoretic Analysis University of Connecticut DigitalCommons@UConn Economics Working Papers Department of Economics April 2004 Can a Newly Proposed Mechanism for Allocating Contracts in U.S. Electricity Wholesale Markets

More information

WIND has been shown to be the fastest growing source

WIND has been shown to be the fastest growing source 792 IEEE TRANSACTIONS ON ENERGY CONVERSION, VOL. 24, NO. 3, SEPTEMBER 2009 A Reliability Model of Large Wind Farms for Power System Adequacy Studies Ahmad Salehi Dobakhshari, Student Member, IEEE, and

More information

Stochastic Optimization for Unit Commitment A Review

Stochastic Optimization for Unit Commitment A Review Stochastic Optimization for Unit Commitment A Review Qipeng P. Zheng +, Jianhui Wang and Andrew L. Liu + Department of Industrial Engineering & Management Systems University of Central Florida Argonne

More information

A Study of Energy Procurement Strategies for Intermittent Sources

A Study of Energy Procurement Strategies for Intermittent Sources A Study of Energy Procurement Strategies for Intermittent Sources Muhammad Kumail Haider, Ghufran Baig, and Syed Taha LUMS School of Science and Engineering, Lahore, Pakistan {13100183,13100162,13100123}@lums.edu.pk

More information

A New Methodology for Solving Different Economic Dispatch Problems

A New Methodology for Solving Different Economic Dispatch Problems A New Methodology for Solving Different Economic Dispatch Problems Divya Mathur Assistant Professor, JECRC University, Jaipur Abstract- This paper presents a Biogeography-Based Optimization (BBO) algorithm

More information

Ph.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen

Ph.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen Ph.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen Department of Electrical and Computer Engineering Colorado State University Fort Collins, Colorado,

More information

Multi Objective Evolutionary Programming Based Optimal Placement of Distributed Generators

Multi Objective Evolutionary Programming Based Optimal Placement of Distributed Generators Multi Objective Evolutionary Programming Based Optimal Placement of Distributed Generators T.Hussain Basha PG Student, Department of EEE (PS), K.Meenendranath Reddy Assistant Professor, Department of EEE,

More information

Two Stage Approach for Economic Dispatch in Using Quasi-Oppositional Based Particle Swarm Optimization

Two Stage Approach for Economic Dispatch in Using Quasi-Oppositional Based Particle Swarm Optimization GRD Journals Global Research and Development Journal for Engineering International Conference on Innovations in Engineering and Technology (ICIET) - 2016 July 2016 e-issn: 2455-5703 Two Stage Approach

More information

RECENT changes in the electric power industry over several

RECENT changes in the electric power industry over several IEEE TRANSACTIONS ON POWER SYSTEMS, VOL 21, NO 4, NOVEMBER 2006 1729 A Diffusion-Model-Based Supply-Side Offer Agent HyungSeon Oh and Robert J Thomas, Fellow, IEEE Abstract Worldwide energy markets have

More information

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q4 2013 Report on Market Issues and Performance February 10, 2014 Prepared by: Department of Market Monitoring Department of Market Monitoring

More information

Applying Robust Optimization to MISO Look-ahead Unit Commitment

Applying Robust Optimization to MISO Look-ahead Unit Commitment 1 Applying Robust Optimization to MISO Look-ahead Unit Commitment Yonghong Chen, MISO Qianfan Wang, Xing Wang, Alstom Grid Yongpei Guan, University of Florida IEEE General Meeting July, 2014 2 Outline

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket Nos. ER12-1630 Operator Corporation ) ER14-971 Informational Report of the California Independent System

More information

Ancillary Service Markets

Ancillary Service Markets Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;

More information

Integration of Photovoltaic Generation in a Microgrid: Spinning Reserve Analysis

Integration of Photovoltaic Generation in a Microgrid: Spinning Reserve Analysis 1 Integration of Photovoltaic Generation in a Microgrid: Spinning Reserve Analysis Luis E. Luna, Member IEEE, Horacio Torres, Senior Member IEEE, Andrés Pavas, Senior Member IEEE Department of Electrical

More information

Bi-level two-stage stochastic SCUC for ISO day-ahead scheduling considering uncertain wind power and demand response

Bi-level two-stage stochastic SCUC for ISO day-ahead scheduling considering uncertain wind power and demand response The 6th International Conference on Renewable Power Generation (RPG) 19 20 October 2017 Bi-level two-stage stochastic SCUC for ISO day-ahead scheduling considering uncertain wind power and demand response

More information

A Heuristic Approach for Economic Dispatch Problem in Insular Power Systems

A Heuristic Approach for Economic Dispatch Problem in Insular Power Systems A Heuristic Approach for Economic Dispatch Problem in Insular Power Systems G.J. Osório 1, J.M. Lujano-Rojas 1, J.C.O. Matias 1, J.P.S. Catalão 1,2,3 1 University of Beira Interior, Covilha, Portugal 2

More information

Implications of Cost and Bid Format on Electricity Market Studies: Linear Versus Quadratic Costs

Implications of Cost and Bid Format on Electricity Market Studies: Linear Versus Quadratic Costs Large Engineering Systems Conference on Power Engineering, July 2004, Halifax Canada. IEEE 2004 1 Implications of Cost and Bid Format on Electricity Market Studies: Linear Versus Quadratic Costs Mary B.

More information

Advanced Studies on Locational Marginal Pricing

Advanced Studies on Locational Marginal Pricing University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Doctoral Dissertations Graduate School 5-2013 Advanced Studies on Locational Marginal Pricing Yanli Wei ywei9@utk.edu

More information

Coupon-Based Demand Response Considering Wind Power Uncertainty: A Strategic Bidding Model for Load Serving Entities

Coupon-Based Demand Response Considering Wind Power Uncertainty: A Strategic Bidding Model for Load Serving Entities IEEE TRANSACTIONS ON POWER SYSTEMS 1 Coupon-Based Demand Response Considering Wind Power Uncertainty: A Strategic Bidding Model for Load Serving Entities Xin Fang, Student Member, IEEE, QinranHu, Student

More information

An Improved Genetic Algorithm for Generation Expansion Planning

An Improved Genetic Algorithm for Generation Expansion Planning 916 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 15, NO. 3, AUGUST 2000 An Improved Genetic Algorithm for Generation Expansion Planning Jong-Bae Park, Young-Moon Park, Jong-Ryul Won, and Kwang Y. Lee Abstract

More information

Transaction Security Cost Analysis By Take-risk Strategy

Transaction Security Cost Analysis By Take-risk Strategy Transaction Security Cost Analysis By Take-risk Strategy Hong Chen, Claudio A. Cañizares, Ajit Singh University of Waterloo Waterloo, Canada claudio@thunderbox.uwaterloo.ca Abstract - Transaction Security

More information

AS A RESULT of being environmental friendly, the utilization

AS A RESULT of being environmental friendly, the utilization IEEE TRANSACTIONS ON SMART GRID, VOL. 4, NO. 1, MARCH 2013 425 DSM Considered Probabilistic Reliability Evaluation and an Information System for Power Systems Including Wind Turbine Generators Jaeseok

More information

Development of simultaneous energy and reserve dispatch model and corresponding pricing mechanism. Stefanos Delikaraoglou and Yi Ding

Development of simultaneous energy and reserve dispatch model and corresponding pricing mechanism. Stefanos Delikaraoglou and Yi Ding Development of simultaneous energy and reserve dispatch model and corresponding pricing mechanism Stefanos Delikaraoglou and Yi Ding DTU CET March 2012 1. Abstract This study aims to develop a market structure

More information

Strategic Selection of Capacity and Mileage Bids in California ISO Performance-based Regulation Market

Strategic Selection of Capacity and Mileage Bids in California ISO Performance-based Regulation Market 1 Strategic Selection of Capacity and Mileage Bids in California ISO -based Regulation Market Ashkan Sadeghi-Mobarakeh and Hamed Mohsenian-Rad Department of Electrical and Computer Engineering, University

More information

Energy Uplift (Operating Reserves)

Energy Uplift (Operating Reserves) Section 4 Energy Uplift Energy Uplift (Operating Reserves) Energy uplift is paid to market participants under specified conditions in order to ensure that resources are not required to operate for the

More information

Examining the Viability of Energy-Only Markets with High Renewable Penetrations

Examining the Viability of Energy-Only Markets with High Renewable Penetrations Examining the Viability of Energy-Only Markets with High Renewable Penetrations Jenny Riesz (Member, IEEE), Iain MacGill School of Electrical Engineering and Telecommunications and Centre for Energy and

More information

Measuring the volatility of wholesale electricity prices caused by wind power uncertainty with a correlation model

Measuring the volatility of wholesale electricity prices caused by wind power uncertainty with a correlation model Published in IET Renewable Power Generation Received on 5th April 2011 Revised on 10th May 2012 Measuring the volatility of wholesale electricity prices caused by wind power uncertainty with a correlation

More information

The Influence of Demand Resource Response Time in Balancing Wind and Load

The Influence of Demand Resource Response Time in Balancing Wind and Load 2013 46th Hawaii International Conference on System Sciences The Influence of Demand Resource Response Time in Balancing Wind and Load Judith Cardell Smith College jcardell@smith.edu Lindsay Anderson Cornell

More information

INTERVAL ANALYSIS TO ADDRESS UNCERTAINTY IN MULTICRITERIA ENERGY MARKET CLEARANCE

INTERVAL ANALYSIS TO ADDRESS UNCERTAINTY IN MULTICRITERIA ENERGY MARKET CLEARANCE 1 INTERVAL ANALYSIS TO ADDRESS UNCERTAINTY IN MULTICRITERIA ENERGY MARKET CLEARANCE P. Kontogiorgos 1, M. N. Vrahatis 2, G. P. Papavassilopoulos 3 1 National Technical University of Athens, Greece, panko09@hotmail.com

More information

Quantifying Spinning Reserve in Systems With Significant Wind Power Penetration

Quantifying Spinning Reserve in Systems With Significant Wind Power Penetration IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 27, NO. 4, NOVEMBER 2012 2385 Quantifying Spinning Reserve in Systems With Significant Wind Power Penetration Guodong Liu, StudentMember,IEEE,andKevinTomsovic,Fellow,IEEE

More information

Research of Load Leveling Strategy for Electric Arc Furnace in Iron and Steel Enterprises Yuanchao Wang1, a*, Zongxi Xie2, b and Zhihan Yang1, c

Research of Load Leveling Strategy for Electric Arc Furnace in Iron and Steel Enterprises Yuanchao Wang1, a*, Zongxi Xie2, b and Zhihan Yang1, c International Conference on Mechanics, Materials and Structural Engineering (ICMMSE 2016) Research of Load Leveling Strategy for Electric Arc Furnace in Iron and Steel Enterprises Yuanchao Wang1, a*, Zongxi

More information

Demand Dispatch and Probabilistic Wind Power Forecasting in Unit Commitment and Economic Dispatch: A Case Study of Illinois

Demand Dispatch and Probabilistic Wind Power Forecasting in Unit Commitment and Economic Dispatch: A Case Study of Illinois 1 Demand Dispatch and Probabilistic Wind Power Forecasting in Unit Commitment and Economic Dispatch: A Case Study of Illinois Zhi Zhou*, Audun Botterud Computational Engineer Argonne National Laboratory

More information

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 1475 DCOPF-Based LMP Simulation: Algorithm, Comparison With ACOPF, and Sensitivity Fangxing Li, Senior Member, IEEE, and Rui Bo, Student

More information

Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power

Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power Energies 2014, 7, 4281-4299; doi:10.3390/en7074281 Article OPEN ACCESS energies ISSN 1996-1073 www.mdpi.com/journal/energies Unit Commitment Considering Interruptible Load for Power System Operation with

More information

Sensitivity of Var Compensation Economic Benefits Considering Generator Marginal Cost

Sensitivity of Var Compensation Economic Benefits Considering Generator Marginal Cost DRPT8 6-9 April 8 Nanjing China Sensitivity of Var Compensation Economic Benefits Considering Generator Marginal Cost Wenjuan Zhang Fangxing Li Leon M. Tolbert IEEE Student Member IEEE Senior Member IEEE

More information

Cyber physical social systems: Modelling of consumer assets and behavior in an integrated energy system

Cyber physical social systems: Modelling of consumer assets and behavior in an integrated energy system Cyber physical social systems: Modelling of consumer assets and behavior in an integrated energy system in Energy Systems Integration 102 Research Challenges 1 by Tim Hansen and Sid Suryanarayanan Department

More information

Game Theory Approach to Solve Economic Dispatch Problem

Game Theory Approach to Solve Economic Dispatch Problem Game Theory Approach to Solve Economic Dispatch Problem Nezihe Yildiran and Emin Tacer Abstract This paper presents a game theory application for economic dispatch problem. In this application, economic

More information

Optimal Scheduling Strategy in Insular Grids Considering Significant Share of Renewables

Optimal Scheduling Strategy in Insular Grids Considering Significant Share of Renewables Optimal Scheduling Strategy in Insular Grids Considering Significant Share of Renewables Marcos D. B. Silva 1, Gerardo J. Osório 2, Miadreza Shafie-khah 2, Juan M. Lujano-Rojas 3, João P. S. Catalão 1,2,3

More information

Introduction to Artificial Intelligence. Prof. Inkyu Moon Dept. of Robotics Engineering, DGIST

Introduction to Artificial Intelligence. Prof. Inkyu Moon Dept. of Robotics Engineering, DGIST Introduction to Artificial Intelligence Prof. Inkyu Moon Dept. of Robotics Engineering, DGIST Chapter 9 Evolutionary Computation Introduction Intelligence can be defined as the capability of a system to

More information

Mobilizing Grid Flexibility for Renewables Integration through Topology Control and Dynamic Thermal Ratings

Mobilizing Grid Flexibility for Renewables Integration through Topology Control and Dynamic Thermal Ratings 1 Mobilizing Grid Flexibility for Renewables Integration through Topology Control and Dynamic Thermal Ratings Jiaying Shi and Shmuel Oren Department of IEOR and TBSI University of California at Berkeley

More information

Applying Robust Optimization to MISO Look- Ahead Commitment

Applying Robust Optimization to MISO Look- Ahead Commitment Applying Robust Optimization to MISO Look- Ahead Commitment Yonghong Chen, Qianfan Wang, Xing Wang, and Yongpei Guan Abstract Managing uncertainty has been a challenging task for market operations. This

More information

Power Flow Control Through Topology Optimization Software: Applications and Case Studies

Power Flow Control Through Topology Optimization Software: Applications and Case Studies 1 Power Flow Control Through Topology Optimization Software: Applications and Case Studies Pablo A. Ruiz IEEE PES Transmission & Distribution Conference and Expo Denver, CO, April 17, 2018 2 Current Congestion

More information

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool 2016 Probabilistic Assessment December 5, 2016 Southwest Power Pool Table of Contents 1. Summary...2 a. SPP Planning Coordinator Footprint...2 b. Seasonal Capacity Totals... Error! Bookmark not defined.

More information

Fuel Cost Optimization of an Islanded Microgrid Considering Environmental Impact

Fuel Cost Optimization of an Islanded Microgrid Considering Environmental Impact Journal of Clean Energy Technologies, Vol. 4, No., March 6 Fuel Cost Optimization of an Islanded Microgrid Considering Environmental Impact Vinod M. Raj and Saurabh Chanana Abstract This paper shows how

More information

ACKNOWLEDGEMENT. The following staff members of the Department of Market Monitoring contributed to this report:

ACKNOWLEDGEMENT. The following staff members of the Department of Market Monitoring contributed to this report: ACKNOWLEDGEMENT The following staff members of the Department of Market Monitoring contributed to this report: Eric Hildebrandt Jeffrey McDonald Brad Cooper Bryan Swann Dan Yang David Robinson Douglas

More information

What Objective Function Should Be Used for Optimal Auctions in the ISO/RTO Electricity Market?

What Objective Function Should Be Used for Optimal Auctions in the ISO/RTO Electricity Market? What Objective Function Should Be Used for Optimal Auctions in the ISO/RTO Electricity Market? Gary A. Stern +, Joseph H. Yan +, Peter B. Luh *, and William E. Blankson * +: Market Monitoring & Analysis,

More information

Reduced Network Modeling of WECC as a Market Design Prototype

Reduced Network Modeling of WECC as a Market Design Prototype PAPER 2011GM0942 1 Reduced Network Modeling of WECC as a Market Design Prototype James E. Price, Member, IEEE, and John Goodin Abstract California s administration, legislature, and energy regulators have

More information

Reliability Assessment of a Power Grid with Customer Operated Chp Systems Using Monte Carlo Simulation

Reliability Assessment of a Power Grid with Customer Operated Chp Systems Using Monte Carlo Simulation University of Massachusetts Amherst ScholarWorks@UMass Amherst Masters Theses 1911 - February 2014 2009 Reliability Assessment of a Power Grid with Customer Operated Chp Systems Using Monte Carlo Simulation

More information

GRID MODERNIZATION INITIATIVE PEER REVIEW Multi-scale Production Cost Modeling

GRID MODERNIZATION INITIATIVE PEER REVIEW Multi-scale Production Cost Modeling GRID MODERNIZATION INITIATIVE PEER REVIEW 1.4.26 AARON BLOOM April 18-20, 2017 Sheraton Pentagon City Arlington, VA Planning and Design Tools 4/5/2017 1 High Level Summary Project Description The goal

More information

Power Grid Simulation Model for Long Term Operation Planning

Power Grid Simulation Model for Long Term Operation Planning A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 35, 2013 Guest Editors: Petar Varbanov, Jiří Klemeš, Panos Seferlis, Athanasios I. Papadopoulos, Spyros Voutetakis Copyright 2013, AIDIC Servizi

More information

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Summary Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Draft Final Proposal Comments by Department of Market Monitoring August 23, 2016 The ISO proposal to lower the energy bid floor from

More information

Optimizing the Generation Capacity Expansion. Cost in the German Electricity Market

Optimizing the Generation Capacity Expansion. Cost in the German Electricity Market Optimizing the Generation Capacity Expansion Cost in the German Electricity Market Hamid Aghaie Research Scientist, AIT Austrian Institute of Technology Novemebr 2017 1 Motivation Energy-only Market Generators

More information

Coordination of Generation Maintenance Scheduling in Electricity Markets

Coordination of Generation Maintenance Scheduling in Electricity Markets IEEE TRANSACTIONS ON POWER SYSTEMS 1 Coordination of Generation Maintenance Scheduling in Electricity Markets Yang Wang, Student Member, IEEE, Daniel S. Kirschen, Fellow, IEEE, Haiwang Zhong, Member, IEEE,

More information

IN the last years, the power industry is undergoing massive

IN the last years, the power industry is undergoing massive 356 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 1, FEBRUARY 2004 Bidding Strategies for Electricity Producers in a Competitive Electricity Marketplace Vasileios P. Gountis, Student Member, IEEE, and

More information

Chance Constrained Multi-objective Programming for Supplier Selection and Order Allocation under Uncertainty

Chance Constrained Multi-objective Programming for Supplier Selection and Order Allocation under Uncertainty Chance Constrained Multi-objective Programming for Supplier Selection and Order Allocation under Uncertainty Xi Li 1, Tomohiro Murata 2 Abstract This paper proposes a chance-constrained multi-objective

More information

Optimization of the CHP Plant EL-TO Zagreb Operation

Optimization of the CHP Plant EL-TO Zagreb Operation Optimization of the CHP Plant EL-TO Zagreb Operation Mladen Zeljko, Krešimir Komljenović, Dražen Jakšić, Ivana Milinković Turalija and Hrvoje Keko Abstract CHP plant EL-TO Zagreb consists of four cogeneration

More information

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations Technical Bulletin 2009-06-03 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations June 15, 2009 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

More information

Energy Uplift (Operating Reserves)

Energy Uplift (Operating Reserves) Section 4 Energy Uplift Energy Uplift (Operating Reserves) Energy uplift is paid to market participants under specified conditions in order to ensure that resources are not required to operate for the

More information

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES Evangelos Dialynas Professor in the National Technical University of Athens Greece dialynas@power.ece.ntua.gr

More information

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation. Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required

More information

Future Market Implementation

Future Market Implementation SPP.org 1 Future Market Implementation Requirements - way forward MWG June 29 th, 2009 SPP.org WebEx Instructions Please submit questions to host. If it is a long question you can type a summary until

More information

Capacity and Flexibility Needs under Higher Renewables

Capacity and Flexibility Needs under Higher Renewables Capacity and Flexibility Needs under Higher Renewables Project Deliverable October 1, 2015 Arne Olson, Partner Ana Mileva, Senior Consultant Elaine Hart, Managing Consultant Defining today s planning problem

More information

Congestion and Marginal Losses

Congestion and Marginal Losses Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at any bus is made up of three components:

More information

California ISO 2009 Annual Report on Market Issues and Performance

California ISO 2009 Annual Report on Market Issues and Performance California Independent System Operator Corporation California ISO 2009 Annual Report on Market Issues and Performance Special Revised Executive Summary June 30, 2010 Prepared by: Department of Market Monitoring

More information

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM Wholesale Markets Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM RTO Functions Grid Operation Non-discriminatory treatment Monitoring transmission system Reliability

More information

CARIS Procedure Development and Simulation Model Evaluation

CARIS Procedure Development and Simulation Model Evaluation CARIS Procedure Development and Simulation Model Evaluation Bill Lamanna Manager Long Term Planning New York Independent System Operator ESPWG Meeting NYISO September 16, 2009 Draft 1 for discussion only

More information

PJM s Clean Power Plan Modeling Reference Model and Sensitivities

PJM s Clean Power Plan Modeling Reference Model and Sensitivities PJM s Clean Power Plan Modeling Reference Model and Sensitivities Muhsin K. Abdur-Rahman Senior Market Strategist MC Webinar April 25, 2016 What it is Reference Model Robust modeling representation of

More information

Integrating Wind Power Efficiently into Electricity Markets Poses New Regulatory Challenges

Integrating Wind Power Efficiently into Electricity Markets Poses New Regulatory Challenges PSERC Webinar, January 19, 2010 Integrating Wind Power Efficiently into Electricity Markets Poses New Regulatory Challenges Tim Mount Department of Applied Economics and Management Cornell University TDM2@cornell.edu

More information

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Virtual Workshop on PJM ARR and FTR Market 2017/2018 Virtual Workshop on PJM ARR and FTR Market 2017/2018 PJM State & Member Training Dept. Webex February 10, 2017 PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information

More information

AS the penetration of wind power in power systems

AS the penetration of wind power in power systems 1 Robust Bidding Strategy for Wind Power Plants and Energy Storage in Electricity Markets Anupam A. Thatte, Student Member, IEEE, Daniel E. Viassolo, Member, IEEE, andlexie,member, IEEE Abstract This paper

More information

Performance Improvement in Distribution Network with DG

Performance Improvement in Distribution Network with DG The 23 224 nd International 25 Power Engineering and Optimization Conference (PEOCO2008), Shah Alam, Selangor, MALAYSIA. 4-5 June 2008. Performance Improvement in Distribution Network with DG 1 Siti Rafidah

More information

Generational and steady state genetic algorithms for generator maintenance scheduling problems

Generational and steady state genetic algorithms for generator maintenance scheduling problems Generational and steady state genetic algorithms for generator maintenance scheduling problems Item Type Conference paper Authors Dahal, Keshav P.; McDonald, J.R. Citation Dahal, K. P. and McDonald, J.

More information

Genetic Algorithm for Supply Planning Optimization under Uncertain Demand

Genetic Algorithm for Supply Planning Optimization under Uncertain Demand Genetic Algorithm for Supply Planning Optimization under Uncertain Demand Tezuka Masaru and Hiji Masahiro Hitachi Tohoku Software, Ltd. 2-16-10, Honcho, Aoba ward, Sendai City, 980-0014, Japan {tezuka,hiji}@hitachi-to.co.jp

More information

GRAPHICAL SCHEME FOR DETERMINATION OF MARKET CLEARING PRICE USING QUADRATIC BID FUNCTIONS

GRAPHICAL SCHEME FOR DETERMINATION OF MARKET CLEARING PRICE USING QUADRATIC BID FUNCTIONS GRAPHICAL SCHEME FOR DETERMINATION OF MARKET CLEARING PRICE USING QUADRATIC BID FUNCTIONS Tanay Joshi and Gagan Uberoi School Of Electrical Engineering, VIT University, Vellore 632014 tanayjoshi2008@vit.ac.in

More information

Supply Chain Network Design under Uncertainty

Supply Chain Network Design under Uncertainty Proceedings of the 11th Annual Conference of Asia Pacific Decision Sciences Institute Hong Kong, June 14-18, 2006, pp. 526-529. Supply Chain Network Design under Uncertainty Xiaoyu Ji 1 Xiande Zhao 2 1

More information

EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results

EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results Paul Sotkiewicz Chief Economist Muhsin Abdur-Rahman Senior Engineer, Market Simulation Members Committee Webinar November 17,

More information

Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA

Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA , June 30 - July 2, 2010, London, U.K. Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA Imran Ali Chaudhry, Sultan Mahmood and Riaz

More information

2014 Grid of the Future Symposium

2014 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Concepts and Practice Using Stochastic Programs for Determining Reserve Requirements

More information

Adaptive Robust Optimization with Dynamic Uncertainty Sets for Power System Operation Under Wind

Adaptive Robust Optimization with Dynamic Uncertainty Sets for Power System Operation Under Wind Adaptive Robust Optimization with Dynamic Uncertainty Sets for Power System Operation Under Wind Andy Sun Georgia Institute of Technology H. Milton Stewart School of Industrial and Systems Engineering

More information

Robust and Decentralized Operations for Managing Renewable Generation and Demand Response in Large-Scale Distribution Systems

Robust and Decentralized Operations for Managing Renewable Generation and Demand Response in Large-Scale Distribution Systems Robust and Decentralized Operations for Managing Renewable Generation and Demand Response in Large-Scale Distribution Systems Research Team Andy Sun, Georgia Tech Duncan Callaway, UC Berkeley PSERC Industry-University

More information