PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia

Size: px
Start display at page:

Download "PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia"

Transcription

1 PREPARATORY STUDY FOR DEVELOPMENT STUDY 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia 2. Type of the Study Study on improvement of planning capability in sewerage through the preparation of manual and revision of guidelines for sewerage plan, and trial application studies for the evaluation of the manual and guidelines 3. Categorization and Its Reason B (Provisional) Environmental category is not clear at this time because the exact locations of trials are not authorized. It is expected that sewerage plans to be prepared in the trial application studies may be have possibility to cause offensive odour from treatment plants, untreated wastewater discharge without the sludge removal during blackout, noise and vibration during construction. 4. Agency Responsible for Implementation of the Project Sewerage Services Department (SSD) of the Ministry of Energy, Water and Communications has responsibility for the whole project. On the trial application, SSD has responsibility for trial studies on peninsular Malaysia. On Kota Kinabalu, Kota Kinabalu City (DBKK) has responsible for a trial application study. 5. Outlines of the Project (1) Background of the Study In urbanized areas of Malaysia, private developers are obligated to provide sewerage facilities including treatment to serve the area being developed. After completion the facilities are transferred to the government, and the national company Indah Water Konsortium Sd. Bhd. (hereinafter referred to as IWK ) provides operation and maintenance (O&M) services of the sewerage facilities taken over by government. Currently, there are about 8,000 existing treatment plants covering those areas developed by the private sector as well as those older plants previously managed by the local authorities. These facilities comprise a wide range of capacities and treatment processes, and the wide diversity of the facilities complicates the O&M process. Consequently, a large proportion of the treated wastewater does not meet the effluent discharge standards, and a large amount of investment - 1 -

2 is needed for efficient refurbishment of the existing facilities. Moreover, since the sewerage charge to the user is low, there is insufficient revenue to enable IWK to provide the required level of O & M, and financial shortfalls have to be subsidized by government. As a result of the continuing poor performance and the institutional constraints of the current sewerage sector, there have been a number of reviews carried out to evaluate changes to the sewerage sector that will enable the service to be improved and made financially sustainable. The Sewerage Service Department (hereinafter referred to as SSD ) under the Ministry of Energy, Water and Communication (hereinafter referred to as MEWC ), is responsible for sewerage policy, strategy, and planning formulation of the country and has been involved in reviewing/evaluating catchment strategies, including developing priorities for inclusion in the national five-year plan. Following from the recommendations of recent institutional reviews, that also included a review of the capacity and effectiveness of SSD, major changes have been proposed and are now being implemented. The National Water Services Commission (hereinafter referred to as SPAN ) Act and the Water Services Industry Act (WSIA2006) were approved in August 2006 and SPAN has was established under the jurisdiction of the MEMC in January In order to assist in the ongoing sector review, the Malaysian Government requested the Japanese Government to carry out a development study. In response to this request, JICA dispatched a preliminary study team in August 2006, with a second preliminary survey team in November of the same year, and the Scope of Work was signed in February, (2) Objectives To strengthen the sewerage planning capability of Sewerage Services Department in Malaysia and related agencies through the following interventions: To prepare a manual for reviewing/evaluation/prioritizing catchment strategies and sewerage projects To revise the Guidelines for Developers Vol.1 and Vol.4 (Section 4 and 5, only concerning sludge treatment and disposal) To recommend measures for the improvement of planning capability in the sewerage sector in Malaysia To evaluate the effectiveness of the manual and guidelines prepared in this JICA project, the trial for the manual and guidelines will be conducted at the following three places. In these trials IEE will be conducted. 1) Upper Langat (for manual) 2) Kota Kinabalu (for guidelines) 3) Ipoh (for guidelines) - 2 -

3 The results of these trials will be reflected in the environmental and social consideration aspects of the manual and guidelines. (3) Justification of the Project In urbanized areas of Malaysia, private developers are obligated to provide sewerage facilities including private systems, individual septic tanks, etc. to serve the area being developed. After completion of facilities, these are transferred to the Government and the national company, Indah Water Konsortium Sdn. Bhd. (hereinafter referred to as IWK ) provides operation and maintenance (O&M) services of the sewerage facilities taken over by the Government. Currently, there are more than 8,000 existing treatment plants. These facilities comprise a wide range of capacities and treatment processes, and the wide diversity of the facilities complicates the O&M process. Consequently, a large proportion of the treated wastewater does not meet the effluent discharge standards. To overcome the effluent difficulties, the centralization and rationalization to reduce the number of sewerage facilities are important. Since the concept of centralization and rationalization is a part of planning, the improvement of planning capability through the revising the guidelines and making manual is necessary to improve this sewerage situation in Malaysia. Therefore, this study was conducted to improve the planning capability. (4) Location The following three places are selected for conducting the trials for the manual and revised guidelines. 1) Upper Langat (for manual) 2) Kota Kinabalu (for guidelines) 3) Ipoh (for guidelines) (5) Proposed Activities 1) Preparation of a manual for reviewing/evaluation/prioritizing catchment strategies and sewerage projects 2) Revision of the Guidelines for Developers Vol.1 and Vol.4 (Section 4 and 5, only concerning sludge treatment and disposal) 3) Trials using the manual and guidelines 4) Improvement and finalization of the manual and guidelines - 3 -

4 (6) Scope of the Trials 1) Trial for the manual Upper Langat is selected as a trial area for the manual which deals with the reviewing/evaluation/ prioritizing catchment strategies and sewerage projects. In this trial application, the proposals for new sewerage treatment plants, pumping stations and the expansion and installation of sewers are expected. 2) Trials for guidelines The guidelines are applied for making new catchment strategies and projects in Kota Kinabalu and for reviewing existing catchment strategies and projects in Ipoh. The guidelines deal with rough sewerage plan prior to the making the master plan of sewerage system. In these this trials for new sewerage treatment plants, pumping stations and the expansion and installation sewers are expected. 6. Description of the Trial application Site The trial application sites are shown in Fig. 1. (1) Upper Langat The exact trial location in Upper Langat is not authorized yet. The general outlines of Upper Langat are following. Upper Langat is located at the southeast of Kuala Lumpur. The region has been targeted for significant development in the recent years. The complementation of Kuala Lumpur International Airport (KLIA) has formed. Implementation of the Government Administrative Centre for Malaysia at Putrajaya and the Information Technology City know as Cyberjaya have also commenced. The topography of the study area is generally flat and low-lying, with elevations not exceeding 20m above sea level over a large extent. (2) Kota Kinabalu The exact location in Kota Kinabalu is not authorized yet. The general outlines are following. Kota Kinabalu, is the capital of the Malaysian State of Sabah occupying the northern part of the land of Borneo which incidentally was called North Borneo before the State gained its independence from the British and joined Malaysia in Kota Kinabalu is also currently the one and only local authority in the State that is a city. It thus come under the jurisdiction of the Chief Ministers Department even though its Town Planning roles still remains under the control - 4 -

5 Ipoh Kota Kinabalu Upper Langat Figure 1 Location of Trial Places - 5 -

6 of the Minister of Local Government and Housing under the Town and Country Planning Ordinance Sabah. Kota Kinabalu is located on the west coast of Sabah. The city lies on a narrow flatland, being enveloped by the mountains known as the Crocker Range in the east, and by the South China Sea in the west. The city itself contains several hills which are mostly covered with tropical rainforest. The flat areas are mostly built up commercial, industrial or residential areas. The northeast part of the city around Likas Bay used to contain an extensive mangrove forest, but most of it has disappeared (following the development of the Likas Sprots Complex) leaving only a 10 hectare sanctuary designated as Kota Kinabalu City Bird Sanctuary in Kota Kinabalu s Central Business District (CBD) is located on a narrow strip of land bordered by Signal Hill and the sea. Because of swampy ground where the land is relatively flat and steep slopes where lands are hilly, most of the CSD had to be built on reclaimed land. The climate of Kota Kinabalu can be characterised as tropical monsoon, marked by high a degree of humidity, and high rainfall alternating with lesser periods of dry spells. Temperatures generally range from 21 to 29 degree Celsius. Average annual rainfall is of the order of 2540 mm. Most intense rainfalls occur from December to February. Recently the population growth and urbanization and industrial development have been particularly rapid. The Kota Kinabalu District population grew from 60,382 in 1970 to 108,725 in 1980 to 209,175 in 1991 and 355,435 in year (3) Ipoh Ipoh is the capital city of Perak State and one of the fastest growing cities in Malaysia. The city was founded on mining and much of the city s area has been the site of open cast tin mines. However over the past 20 years most of the mines have closed and reclamation and development of ex-mining lands are well under way. Ipoh is located in a generally flattish valley sited between high limestone hills. The land falls towards the south. The valley bottom has a number of isolated limestone pinnacles and ridges rising up to several hundred feet from the valley floor. The Sungai Kinta flows north to south through the centre of Ipoh. Historically Ipoh developed around the railway, with the commercial centre near to the railway station and industry to the north and south, also adjacent to the railway. The other main axia of older development is the road to Tambun, bordered by low density housing, government and military areas, and educational institutions. Tin mining took place over much of undeveloped area. Over the past 10 years major, new highways have been constructed around Ipoh. They run around the eastern side of Ipoh from Pulai in the south east, to the north of Jelapang to the north - 6 -

7 of Ipoh. The airport is sited 2 km south of the city centre and includes a military base. The city s development then moved outwards with extensive development in Bercham, Gunung Rapat, and between the centre and airport. The population of Ipoh recently increases from 468,765 in 1991 (census data) to 574,041 in 2000 (Census data)

8 7. Legal Frame (1) Laws and Regulations 1) Environmental Quality Act, 1974 This act requires the person intending to carry out any prescribed activity to submit the report on the impact on the environment. 2) Environmental Quality (Amendment) Act, ) Environmental Quality (Amendment) Act, ) Environmental Quality (Amendment) Act, ) Environmental Quality (Amendment) Act, ) Environmental Quality (Sewerage and Industrial Effluents) Regulations, ) Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order, 1987 This order describes the prescribed activities. The prescribed activities on sewerage are described on Schedule 18 (c) as follows. (c) Municipal Sewerage i) Construction of wastewater treatment plant. ii) Construction of marine outfall. According to this order, this JICA Study conducts the planning of Sewerage System which does not include the construction of any facilities. Therefore, this trial application studies are not required to submit the report on the impact on environment on the Malaysian Environmental Act. 8) Malaysian Standard 1228, 1991 This code of practice deals with the planning design, construction and installation and testing of sewerage system. 9) Handbook of Environmental Impact Assessment Guidelines This handbook describes the normalized project planning sequence. Public participation and information disclosure on the detailed assessment stage are required. The following figure shows the relationship between the JICA Study and Malaysian project planning sequence. The trial application studies conducted in the JICA Study are the upper planning than Malaysian project planning required to do environmental impact assessment. Therefore, these trial application studies are not subject to Malaysian EIA process

9 JICA Study Catchment Plan (CP) (Trial) Guidelines Prioritization of CP (Trial) Manual Malaysian Project Planning Sequence (Technical and Economical Project Planning) (Environmental Project Planning) Identification Projects Pre-Feasibility Study Preliminary Assesment Project Re-appraisal Detailed Assesment Feasibility Study Review Project Re-appraisal Project Implementation Environmental Monitoring and Auditing Figure 2 JICA Trial Application Study and Malaysian Project Planning Sequence - 9 -

10 (2) Relatives Agencies Ministry of Environment State of Environment National Development Planning Committee State Executive Council for State Government sponsored projects Regional Development Authorities with respect to planning approval Ministry of International Trade and Industry for industrial projects 8. Alternatives Including Without Project Option Upper Langat, Kota Kinabalu and Ipoh Proposal for new sewerage treatment facilities will be considered as alternative plan as well as utilization of the existing on- site sanitation facilities such as septic tank. However, treated effluent discharger from septic tanks having low treatment ability is one of the causes to pollute the rivers and overflow of the effluent to the surface could be annoyed to the inhabitants, so that new sewerage facilities are expected. 9. Procedure of Environmental and Social Consideration Following figure shows the schedule of the JICA Study and the process of environmental and social considerations. In the 1 st and 2 nd phase part 1, the Manual and guidelines will be made, and in the 2 nd phase part 2 trials for manual and guidelines will be conducted. In the end of the 3 nd phase the results of trials will be used for the finalizing and refurbishment of the manual and guidelines. Stakeholder meeting will be held on the prior to Draft Final Report in the 3 rd phase

11 1st Phase Part1 (Mar2007) Collection and Analysis of the Existing Data Preparation of Inception Report Study Outputs Inception Report Environmental and Social Considerlations Review Report to JICA 2nd Phase Part1 (Apr-Sep 2007) Sewerage sector analysis Selection of trial area Draft manual for prioritizing catchment plan Draft revised Guidelines for catchment plans Progress Report (1) 1) Draft Scoping for Priority Plan and Catchment Plan 2nd Phase Part 2 (Nov-Aug 2008) Contact with local consultants Trial application of draft manual & revised guideline Improvement of draft manual & Revised Guideline Interim Report Progress Report (2) 2) Rough Outline of Environmental Social Considerations 3rd Phase (Sep-Nov 2008) Finalization of manual and revised Guidelines Recommendations for planning capability Recommendations for Manual Feedback Environmental aspects Draft Final Report 3) Draft Final Report for priority plan and cathment plan Preparation of Final Report Final Report Figure 3 Processes of Environmental and Social Considerations

12 10. Scoping of Environmental and Social Impact Study 1) Location Upper Langat (Trial for Manual) Environmental category is considered as B because some impacts of construction and operation of sewerage systems such as on offensive odour from treatment plants, untreated wastewater discharge without the sludge removal during blackout, noise and vibration during construction are expected. Table 1 Scoping Checklist for Upper Langat Environmental Items Evaluation Reason 1 Resettlement C Land acquisition for expanding sewerage treatment plants may be necessary depending on the Catchment Strategy. Some proposed sites will be acquired from the local community. 2 Local Economy such as employment C Ditto. and livelihood 3 Existing social infrastructures and services B Traffic congestion during the construction period may be prospected. 4 Land use and utilization of local D No impact is expected. resources 5 Cultural Property D No impact is expected. 6 Water Rights and Rights of Common D Water rights problem is not expected. 7 Public Health Condition D (Positive impact is expected.) 8 Waste B Treatment of sludge may be necessary. 9 Hazards (Risk) D No large scale construction is expected. 10 Topography and geology D No large scale construction is expected. 11 Soil erosion D No large scale construction is expected. 12 Groundwater During the excavating work, pumping up groundwater may be C expected in order to lower groundwater level. 13 Lake/River D No significant impact. 14 Sea/Coastal zone D There is no sea and costarl zone. 15 Flora and Fauna D No conservation areas around the site 16 Climate D No large scale construction is expected 17 Landscape D No large scale construction is expected 18 Air pollution D No impact is expected 19 Water contamination D No impact is expected 20 Soil contamination D No impact is expected 21 Noise and vibration Hindrance and vibration during the construction period are B expected. 22 Offensive odor C Offensive odor may cause from a discharge point. Reference: Environmental Guidelines for Infrastructure Projects, JICA, 1992 (some modifications) Note: Evaluation classification A: Expected serious impact B: Expected somewhat impact C: Not clear D: IEE or EIA is not necessary (no expected impact)

13 2) Locaton Kota Kinabalu (Trial for Guideline) B as Environmental category is expected because some impacts of construction and operation of sewerage systems on factors like land acquisition and offensive odour from treatment plants, untreated wastewater discharge without the sludge removal, noise and vibration during construction are assumed. Also, the bird sanctuary exists near the coast of Kota Kinabalu. Table 2 Scoping Checklist for Kota Kinabalu Environmental Items Evaluation Reason 1 Resettlement C Land acquisition for expanding sewerage treatment plants may be necessary depending on the Catchment Strategy. Some proposed sites will be acquired from the local community. 2 Local Economy such as employment C Ditto. and livelihood 3 Existing social infrastructures and services B Traffic congestion during the construction period may be prospected. 4 Land use and utilization of local D No impact is expected. resources 5 Cultural Property D No impact is expected. 6 Water Rights and Rights of Common D Water rights problem is not expected. 7 Public Health Condition D (Positive impact is expected.) 8 Waste B Treatment of sludge may be necessary. 9 Hazards (Risk) D No large scale construction is expected. 10 Topography and geology D No large scale construction is expected. 11 Soil erosion D No large scale construction is expected. 12 Groundwater During the excavating work, pumping up groundwater may be C expected in order to lower groundwater level. 13 Lake/River D No significant impact. 14 Sea/Coastal zone B Mangrove forest designated as Kota Kinabalu City Bird Sanctuary exists. The treatment of sewage is positive effect for mangrove, but the negative effect of the discharge of collected treated water on the discharge point is expected. The discharge point may be necessary to be constructed away from sanctuary. 15 Flora and Fauna B 10 hectare sanctuary designated as Kota Kinabalu City Bird Sanctuary exits near coast. The discharge point may be necessary to be constructed away from sanctuary. 16 Climate D No large scale construction is expected 17 Landscape D No large scale construction is expected 18 Air pollution D No impact is expected 19 Water contamination D No impact is expected 20 Soil contamination D No impact is expected 21 Noise and vibration Hindrance and vibration during the construction period are B expected. 22 Offensive odor C Offensive odor may cause from a discharge point. Reference: Environmental Guidelines for Infrastructure Projects, JICA, 1992 (some modifications)

14 Note: Evaluation classification A: Expected serious impact B: Expected somewhat impact C: Not clear D: IEE or EIA is not necessary (no expected impact) 3) Location Ipoh (Trial for guideline) B as Environmental category is expected because some impacts of construction and operation of sewerage systems on factors like land acquisition and offensive odour from treatment plants, untreated wastewater discharge without the sludge removal, noise and vibration during construction are assumed. Table 3 Scoping Checklist for Ipoh Environmental Items Evaluation Reason 1 Resettlement C Land acquisition for expanding sewerage treatment plants may be necessary depending on the Catchment Strategy. Some proposed sites will be acquired from the local community. 2 Local Economy such as employment C Ditto. and livelihood 3 Existing social infrastructures and services B Traffic congestion during the construction period may be prospected. 4 Land use and utilization of local D No impact is expected. resources 5 Cultural Property D No impact is expected. 6 Water Rights and Rights of Common D Water rights problem is not expected. 7 Public Health Condition D (Positive impact is expected.) 8 Waste B Treatment of sludge may be necessary. 9 Hazards (Risk) D No large scale construction is expected. 10 Topography and geology D No large scale construction is expected. 11 Soil erosion D No large scale construction is expected. 12 Groundwater During the excavating work, pumping up groundwater may be C expected in order to lower groundwater level. 13 Lake/River D No significant impact. 14 Sea/Coastal zone D There is no sea and costarl zone. 15 Flora and Fauna D No conservation areas around the site 16 Climate D No large scale construction is expected 17 Landscape D No large scale construction is expected 18 Air pollution D No impact is expected 19 Water contamination D No impact is expected 20 Soil contamination D No impact is expected 21 Noise and vibration Hindrance and vibration during the construction period are B expected. 22 Offensive odor C Offensive odor may cause from a discharge point. Reference: Environmental Guidelines for Infrastructure Projects, JICA, 1992 (some modifications)

15 Note: Evaluation classification A: Expected serious impact B: Expected somewhat impact C: Not clear D: IEE or EIA is not necessary (no expected impact)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8 Summary of Preliminary Study Result for Technical Cooperation Project Date: 2008/10/8 1. Full title of the Project The Project on Integrated UMRT and Urban Development for Hanoi 2. Type of the study Feasibility

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project Project for Updating Dakar Urbanization Master Plan by

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Full title of the Project The Study for the Development of an Integrated Solution Related to Industrial Waste Management in the Industrial Pole of Manaus 2. Type of the

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Appendix 3 The World Bank s New Operational Manual

Appendix 3 The World Bank s New Operational Manual Appendix 3 The World Bank s New Operational Manual Appendix 4 Environmental Consideration in JICA Outline of Environmental Consideration in JICA 1Introduction Various studies

More information

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda Summary of Preparatory Study 1. Full Title of the Project The Development Study on Water Resources Development and Management for Lake Kyoga asin in the Republic of Uganda 2. Type of Study Master plan

More information

PREPARATORY STUDY FOR DEVELOPMENT STUDY (M/P & F/S)

PREPARATORY STUDY FOR DEVELOPMENT STUDY (M/P & F/S) PREPARATORY STUDY FOR DEVELOPMENT STUDY (M/P & F/S) 1. Title of the ooperation Project and Name of the Project Proponent (1) Title of the ooperation Project (2) The Study on Water Supply and Sewerage System

More information

5.4 Initial Environmental Examination

5.4 Initial Environmental Examination 5.4 Initial Environmental Examination The objectives of Initial Environmental Examination (IEE) are to examine and identify the necessity of Environmental Impact Assessment (EIA), and to identify potentially

More information

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco Summary of Environmental and Social Considerations in Detailed Planning Survey on the Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

More information

Summary of Preparatory Study for Development Study

Summary of Preparatory Study for Development Study Summary of Preparatory Study for Development Study Creation Date: 30 March 2007 1. Full title of the Project The Study for Sustainable Rural Drinking Water Supply in the Southern Khatlon Oblast in the

More information

4. Agency (or Institution) Responsible for Implementing the Project

4. Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study 1. Full Title of the Project Urban Transport Policy and System Development Master Plan for the ity of Dar es Salaam 2. Type of Study Master Plan 3. ategorisation and Its Reason

More information

CHAPTER 4 REVISION OF GUIDELINES VOL.1 PARTS B & C

CHAPTER 4 REVISION OF GUIDELINES VOL.1 PARTS B & C CHAPTER 4 REVISION OF GUIDELINES VOL.1 PARTS B & C The Study on Improvement of Planning Capability in Sewerage Sector in Malaysia CHAPTER 4 REVISION OF GUIDELINES VOL. 1 PARTS B & C 4.1 Discrepancies in

More information

Fecal Sludge Management A Case Study of Malaysia

Fecal Sludge Management A Case Study of Malaysia Fecal Sludge Management A Case Study of Malaysia Sasidharan Velayutham Indah Water Konsortium Kuala Lumpur, Malaysia Status of Sanitation & Environmental Health in Malaysia 14 States 144 Local Authorities

More information

Preparatory Study for Development Study (M/P or F/S)

Preparatory Study for Development Study (M/P or F/S) Preparatory Study for Development Study (M/P or F/S) 1. Title of the Cooperation Project and Name of the Project Proponent (1) Title of the Cooperation Project The Study for Groundwater Development in

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study ate: September 9, 2008 1. Title of the Cooperation Project Waste Minimization and Recycling Promotion Project 2. Categorization and its reason Environmental Category: B The

More information

Summary Report on the Preparatory Study for Environmental and Social Considerations

Summary Report on the Preparatory Study for Environmental and Social Considerations Summary Report on the Preparatory Study for Environmental and Social Considerations October 25, 2007 1. Title of the Cooperation Project, Relevant Project Report 1-1 Title of the cooperation project Feasibility

More information

PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA

PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA BY SYAZRIN SYIMA SHARIFUDDIN NATIONAL HYDRAULIC RESEARCH INSTITUTE OF MALAYSIA (NAHRIM) PRESENTATION OUTLINE Introduction

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

MALAYSIA. Soil Resource Management

MALAYSIA. Soil Resource Management Paper presented in the Asian Soil Partnership Consultation Workshop on Sustainable Management and Protection of Soil Resources 12 14 th May 2015; Bangkok,Thailand MALAYSIA Soil Resource Management Presented

More information

Economic Partnership Program Water Demand Management and Leakage Control

Economic Partnership Program Water Demand Management and Leakage Control Economic Partnership Program Water Demand Management and Leakage Control 1 CONTENTS 2 ORGANIZATION BACKGROUND 3 Organizational Structure of Ministry of Energy, Green Technology and Water Minister Energy

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Dhaka Mass Rapid Transit Development Project (Line 5) (E/S) Loan

More information

SANITATION DEVELOPMENT MALAYSIAN CITIES. By Ir. Jamal Nasir Ali Director of Facility Management Division Perbadanan Putrajaya.

SANITATION DEVELOPMENT MALAYSIAN CITIES. By Ir. Jamal Nasir Ali Director of Facility Management Division Perbadanan Putrajaya. SANITATION DEVELOPMENT IN MALAYSIAN CITIES By Ir. Jamal Nasir Ali Director of Facility Management Division Perbadanan Putrajaya. October 2016 Sanitation in Malaysia cities Kuala Lumpur Kuching Putrajaya

More information

Summary of Preparatory Study for Development Study (M/P)

Summary of Preparatory Study for Development Study (M/P) Summary of Preparatory Study for Development Study (M/P) 1. Title of the Cooperation Project The Study on Integrated Water Resources Management for Poverty Alleviation and Economic Development in the Pampanga

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Date: March 16, 2015 Environmental and Social onsiderations in Detailed Planning Survey (Technical ooperation for Development Planning) 1. Full title of the Project THE PROJET ON THE ORRIDOR DEVELOPMENT

More information

INTRODUCTION AND OBJECTIVE

INTRODUCTION AND OBJECTIVE Chapter 1 INTRODUCTION AND OBJECTIVE 1.1 INTRODUCTION Of all environmental issues, pollution must surely be of major importance in terms of its impact on people s health and their living and working environments.

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

Leveraging Geospatial Technology in Asset Management

Leveraging Geospatial Technology in Asset Management Leveraging Geospatial Technology in Asset Management Mohd Zubaidi bin Daud Asset Management Department, Technical Division, Indah Water Konsortium Sdn Bhd ABSTRACT Indah Water Konsortium Sdn Bhd (IWK),

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: India Project: Orissa Integrated Sanitation Improvement Project (Loan Agreement: 03/30/2007; Loan Amount: 19,061 million yen; Borrower: The President

More information

Summary of Preliminary Study Result for Technical Cooperation Project

Summary of Preliminary Study Result for Technical Cooperation Project Summary of Preliminary Study Result for Technical Cooperation Project 1. Title of the Cooperation Project, Relevant Project Report The Project for Bridge Construction in Southeast Sulawesi Province Project

More information

Study on Economic Partnership Projects. in Developing Countries in FY2009. Da Nang City in Socialist Republic of Viet Nam SUMMARY.

Study on Economic Partnership Projects. in Developing Countries in FY2009. Da Nang City in Socialist Republic of Viet Nam SUMMARY. Study on Economic Partnership Projects in Developing Countries in FY2009 Study on the Water Environment Improvement Project for Da Nang City in Socialist Republic of Viet Nam SUMMARY March 2010 NIHON SUIDO

More information

SCOPING SUMMARY [DRAFT] THE PROJECT FOR THE UPGRADING AND REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA

SCOPING SUMMARY [DRAFT] THE PROJECT FOR THE UPGRADING AND REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA 1. Title of the Project: SCOPING SUMMARY [RAFT] THE PROJECT FOR THE UPGRAING AN REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA The Project for the Upgrading and Refurbishment of CEMASTEA

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Internationalisation of Malaysian Construction Industry

Internationalisation of Malaysian Construction Industry 1 Internationalisation of Malaysian Construction Industry 5 TH BUSINESS FORUM ROAD ENGINEERING ASSOCIATION OF ASIA AND AUSTRALASIA Manila, Philippines MEGAT KAMIL AZMI MEGAT RUS KAMARANI Senior General

More information

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Country Partnership Strategy: Bhutan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

8 th World Water Forum, Regional Process. RECCA THARMARAJAH Sewerage Regulatory Department National Water Services Commission

8 th World Water Forum, Regional Process. RECCA THARMARAJAH Sewerage Regulatory Department National Water Services Commission 8 th World Water Forum, Regional Process RECCA THARMARAJAH Sewerage Regulatory Department National Water Services Commission INSTITUTIONAL REFORM WHERE WE ARE CURRENTLY SEWERAGE COVERAGE IN MALAYSIA PERCENTILE

More information

Charging for sewerage

Charging for sewerage Charging for sewerage services a practical perspective Prof. Ir. Mohd. Haniffa Abdul Hamid Ir Dorai Narayana Indah Water Konsortium Kuala Lumpur dorain@iwk.com.my People think mobile phones provide better

More information

Roadmap toward Effective Flood Hazard Map in Lampang Thailand. JICA region-focused training course on flood hazard mapping JFY 2005

Roadmap toward Effective Flood Hazard Map in Lampang Thailand. JICA region-focused training course on flood hazard mapping JFY 2005 Roadmap toward Effective Flood Hazard Map in Lampang Thailand JICA region-focused training course on flood hazard mapping JFY 2005 Prepared by MR. SOMCHIT AMNATSAN Chief of Water Planning and Solution

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Second Ho Chi Minh City Water Environment Improvement Project (I) (II) (III) L/A signed on: March

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: The Kanchpur, Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation

More information

Agency (or Institution) Responsible for Implementing the Project

Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study Full Title of the Project The Study on Integrated Flood Management for Nyando River asin in the Republic of Kenya Type of Study Master Plan ategorisation and Its Reason 3.1

More information

COMBATING LAND DEGRADATION IN MALAYSIA FOR SUBMISSION AS NATIONAL REPORT FOR THE UNITED NATION CONVENTION TO COMBAT DESERTIFICATION

COMBATING LAND DEGRADATION IN MALAYSIA FOR SUBMISSION AS NATIONAL REPORT FOR THE UNITED NATION CONVENTION TO COMBAT DESERTIFICATION COMBATING LAND DEGRADATION IN MALAYSIA FOR SUBMISSION AS NATIONAL REPORT FOR THE UNITED NATION CONVENTION TO COMBAT DESERTIFICATION INTRODUCTION Soon after the independence, Malaysia launched an aggressive

More information

Current and Future Challenges of Water Environment and Wastewater Management in Myanmar

Current and Future Challenges of Water Environment and Wastewater Management in Myanmar Water and Sanitation Division Department of Building, Ministry of Construction Watershed Management for Controlling Municipal Wastewater in South East Asia Current and Future Challenges of Water Environment

More information

WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION

WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION Written by Charles Riedlinger, P.E. and Norm Risavi, County Administrator INTRODUCTION In 1995, Resource International,

More information

Strategic Environment Assessment. For the. New Structure Plan for the Maltese Islands. Scoping Report

Strategic Environment Assessment. For the. New Structure Plan for the Maltese Islands. Scoping Report Strategic Environment Assessment For the New Structure Plan for the Maltese Islands Scoping Report Structure Plan Team December 2004 CONTENTS 1 Introduction...3 1.1 Purpose of the scoping report...3 1.2

More information

East Asia Urban Sanitation Review

East Asia Urban Sanitation Review EAP REGION URBAN SANITATION REVIEW East Asia Urban Sanitation Review Presentation prepared by Bank Team September 2013 Outline Sector Overview Issues Recommendations 1. Sector Overview PURPOSE OF THE STUDY

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 10 December 2007 Summary of and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Study on Bheramara 450MW Combined Cycle Power Station in Bangladesh 2. Type of the study:

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Kingdom of Morocco Project: Sewerage System Development Project (III) Loan Agreement: March 26, 2013 Loan

More information

UN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality

UN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality UN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality of Orhei SEA Environmental Report (summary) Chisinau-Orhei,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name. Danang Sustainable City Development Project (SCDP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name. Danang Sustainable City Development Project (SCDP) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name Danang

More information

CHAPTER 6 SANITARY SEWER SUB-ELEMENT

CHAPTER 6 SANITARY SEWER SUB-ELEMENT CHAPTER 6 SANITARY SEWER SUB-ELEMENT Page 1 of 10 CHAPTER 6 SANITARY SEWER SUB-ELEMENT A. OVERVIEW The following Future Land Use categories are considered to be urban and require the provision of sanitary

More information

OUTLINE OF PRESENTATION

OUTLINE OF PRESENTATION International Symposium on HARMONISING ENVIRONMENTAL CONSIDERATIONS WITH SUSTAINABLE DEVELOPMENT POTENTIAL of River Basins PROTECTING WATER RESOURCES - ISSUES AND CHALLENGES by: NOORHASHIM BIN BARON National

More information

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement Wellington Dock Planning Application, Liverpool Non-Technical Summary for Environmental Statement INTRODUCTION United Utilities PLC (UU) has applied for planning permission for an extension to Liverpool

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project The Project for the Study on Strengthening Competitiveness

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information PROJECT INFORMATION FORM Part A - General information Country Project submission Date Serbia and Montenegro, Republic of Montenegro February 2003 1 (updated June 2005) Sector Project Code (filled by the

More information

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER) Greater Colombo Water and Wastewater Management Improvement Investment Program (RRP SRI 45148) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Greater Dublin Drainage Project

Greater Dublin Drainage Project Greater Dublin Drainage Project The Wastewater Treatment Process: How Does it Work? June 2013 The Greater Dublin Drainage initiative aims to provide the drainage infrastructure needed to allow the Greater

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sectors Project ID Borrower Responsible Agency Report No. PID6537

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: Ukraine Name of the Project: Bortnychi Sewage Treatment Plant Modernization Project Loan Agreement: June 15, 2015 Loan Amount: 108.193 billion yen

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Feasibility Study on Development of Toamasina Port in the Republic of Madagascar 2. Type

More information

WASTE TO WEALTH: SEWERAGE BIO-PRODUCTS

WASTE TO WEALTH: SEWERAGE BIO-PRODUCTS WASTE TO WEALTH: SEWERAGE BIO-PRODUCTS NATIONAL SEWERAGE MODEL WITH GREEN TECHNOLOGY MASTERPLAN 2017-2030 MINISTRY of FINANCE MALAYSIAN ENVIRONMENTAL ENHANCEMENT 50% BIO-SOLIDS TO BE RECYCLED 17.5 million

More information

4.10 MINERAL RESOURCES

4.10 MINERAL RESOURCES 4.10 MINERAL RESOURCES SCOPE AND METHODOLOGY This section examines the City s predominant mineral resource, aggregate, and the current mining operations in place to extract aggregate. Reclamation and reuse

More information

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Category Environmental Item Main Check Items Confirmation of Environmental Considerations al Checklist: 2. Oil and Natural Gas Development 1 1 Permits and Explanation 2 Mitigation (1) EIA and al Permits (2) Explanation to the Public (1) Air Quality (2) Water Quality (3) Wastes Have EIA reports

More information

GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT

GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Wednesday, November 1, 2017 6:00 PM 8:00 PM Grand Valley District Community Centre Grand

More information

Design of a district water and wastewater system under the concepts of DESAR and water metabolism

Design of a district water and wastewater system under the concepts of DESAR and water metabolism Design of a district water and wastewater system under the concepts of DESAR and water metabolism Prof. Xiaochang C Wang Xi an University of Architecture and Technology, Xi an China Outlines Introduction

More information

Queensville Holland Landing Sharon Sanitary Servicing. York Region Project Update

Queensville Holland Landing Sharon Sanitary Servicing. York Region Project Update Queensville Holland Landing Sharon Sanitary Servicing York Region Project Update Daniel Kostopoulos Director, Capital Planning and Delivery Town of East Gwillimbury Committee of the Whole May 22, Presentation

More information

Waste Water Treatment Plant Location Options. Presented by: Ben Greenough, Superintendent of Public Works Date: April 3, 2017 In Camera Meeting

Waste Water Treatment Plant Location Options. Presented by: Ben Greenough, Superintendent of Public Works Date: April 3, 2017 In Camera Meeting Waste Water Treatment Plant Location Options Presented by: Ben Greenough, Superintendent of Public Works Date: April 3, 2017 In Camera Meeting Sewer Study Review 2010 Sewage Treatment and Disposal Feasibility

More information

ECRAN Working Group: Environmental Assessment. Activity st TRAINING OF TRAINERS ON SEA/EIA TRAINING WORKSHOP METHODOLOGY

ECRAN Working Group: Environmental Assessment. Activity st TRAINING OF TRAINERS ON SEA/EIA TRAINING WORKSHOP METHODOLOGY ECRAN Working Group: Environmental Assessment Activity 2.4 1 st TRAINING OF TRAINERS ON SEA/EIA TRAINING WORKSHOP METHODOLOGY Since the local authorities/municipalities and other local stakeholders have

More information

1. Title of the Cooperation Project and Name of the Project Proponent

1. Title of the Cooperation Project and Name of the Project Proponent Preparatory Study for Development Study Date: 6 April 2006 1. Title of the ooperation Project and Name of the Project Proponent 1-1 Title of the ooperation Project The Study on Integrated Basin Management

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Prepared By: Mike Squire, AScT AWS / ERWS Program Manager Program

More information

Susan P. Abano Engineer IV Policy and Program Division

Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Integrated Water Resources Management Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Outline Philippines Water Resources Situationer

More information

ENVIRONMENTAL SCOPING PLAN

ENVIRONMENTAL SCOPING PLAN APPENDIX F ENVIRONMENTAL SCOPING PLAN F.1 DATA OF EXAMINATION Table F.1.1 Data of Examination No. Items Description 1 Full title of the Project and relevant report 2 Type of the study Development Study

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Kanchpur, Meghna and Gumti 2 nd Bridges Construction and Existing

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

Appendix 1: Scoping Techniques

Appendix 1: Scoping Techniques Appendix 1: Scoping Techniques 1 Scoping Techniques Checklist technique Checklist technique is used for identifying the project impacts. Such lists usually cover all possible impacts of the project. In

More information

WASTE TO WEALTH: RECLAIMED WATER STRATEGIES

WASTE TO WEALTH: RECLAIMED WATER STRATEGIES WASTE TO WEALTH: RECLAIMED WATER STRATEGIES WATER & ENERGY MODEL WITH MALAYSIAN GREEN TECHNOLOGY MASTERPLAN 2017-2030 MINISTRY of FINANCE MALAYSIAN ENVIRONMENTAL ENHANCEMENT 50% BIO-SOLIDS TO BE RECYCLED

More information

208 Plan Amendment Process for New Wastewater Treatment Facilities. Pima Association of Governments

208 Plan Amendment Process for New Wastewater Treatment Facilities. Pima Association of Governments 208 Plan Amendment Process for New Wastewater Treatment Facilities Pima Association of Governments The following packet includes the PAG 208 amendment process, a copy of ADEQ s 208 Amendment Checklist,

More information

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and

More information

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities Water Sector Improvement Program (RRP PAL 44031) SECTOR ASSESSMENT: WATER AND SANITATION Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Anticipated water supply shortfall by 2010.

More information

Agricultural Re-Use of Treatment Wastewater

Agricultural Re-Use of Treatment Wastewater Agricultural Re-Use of Treatment Wastewater Proposed Project Forestation the Central Coastal Strip of the Nile Delta By Dr. Ahmed Rakha Manager of Land, Soil and Forestations Egyptian Environmental Affairs

More information

Consultation Document

Consultation Document Consultation Document Timetable and Work Programme for making a River Basin Management Plan For the Western River Basin District 22 nd June 26 This document is prepared and published in accordance with

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Project Number: SR0113.02 1.2 Title: Waste water disposal system of the villages in the basin of the River Morava 1.3 Sector: Cross-border co-operation

More information

PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK

PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK SCOPING REPORT EXECUTIVE SUMMARY 1 INTRODUCTION SANParks proposes, as a key element of a wider infrastructure

More information

The environmental objectives and Programme of Measures of the River Basin Management Plan. The case of Cyprus. Iacovos Papaiacovou

The environmental objectives and Programme of Measures of the River Basin Management Plan. The case of Cyprus. Iacovos Papaiacovou The environmental objectives and Programme of Measures of the River Basin Management Plan The case of Cyprus Iacovos Papaiacovou General Manager Sewerage Board of Limassol Amathus www.sbla.com.cy The island

More information

INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT

INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES GOAL, OBJECTIVES & POLICIES GOAL SS. SANITARY SEWER PUBLIC SERVICE. It is the goal of the City of Casselberry to provide,

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands Mauritius Design Sheet Wastewater Treatment Plant Revised 08 October 2014 Ministry of Housing and Lands Design Sheet Wastewater Treatment plant Ministry of Housing and Lands Contents: Page 1.0 Introduction

More information

ENVIRONMENTAL IMPACT ASSESSMENT ACT

ENVIRONMENTAL IMPACT ASSESSMENT ACT ENVIRONMENTAL IMPACT ASSESSMENT ACT Wholly Amended by Act No. 9037, Mar. 28, 2008 CHAPTER Ⅰ GENERAL PROVISIONS Article 1 (Purpose) The purpose of this Act Is to promote the pleasant and safe livlihood

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT A. Project Identification Name: Murray City Sewer Facilities Project (CS390037-0008) Carbon Hill Sewer Facilities Project (CS390037-0011) Address: Hocking County Commissioners

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country:Mongolia Project:New Ulaanbaatar International Airport Construction Project (II) Loan Agreement:April 16, 2015

More information

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY DECEMBER 2013 EXECUTIVE SUMMARY 1. PROJECT BACKGROUND

More information