1 6th International Conference on Sustainable Development in the 645 Strategic mine planning of surface mining projects incorporating sustainability concepts C. Roumpos and E. Papacosta Public Power Corporation of Greece S.A., Mines Division, Greece ABSTRACT Long-term strategic mining planning and scheduling is a critical stage for the design and development of surface mining projects. It requires an integrated approach and optimization based on all available technical (mineral deposit characteristics, geological, geotechnical and hydrogeological data), economic, environmental or social parameters. Many of these parameters are crucial for the viability and sustainability of the mining project. Within this context, the quantification of the main parameters effect on mine design and scheduling incorporating sustainability concepts is very important for a successful mine planning. The objective of this paper is the development of a framework for the strategic mine planning of surface mining projects considering parameters of sustainability, their interrelationships and their influence on the optimization model as well as on mine development. A case study with a description of the proposed model in a surface lignite mine development is presented. 1. INTRODUCTION Mining projects are dynamic complex systems, with a long-term horizon, affected by many uncertainty and risk sources. Project uncertainties may relate to geological-mineral deposit characteristics, technical, environmental, social, economic or other factors. Especially in surface mines, which extend over very large areas and usually have a long life the long-term strategic mine planning should take into account these uncertainties. The planning stage is critical for the successful development of the mining projects (Roumpos and Spanidis, 2003; Roumpos et al., 2006). Strategic open pit mine planning, incorporating stochastic optimization techniques in mine design and production scheduling, allows modeling and direct integration of the project uncertainties and provides a framework for the optimization of life-of-mine planning (Dimitrakopoulos, 2011). Public acceptance of surface mining operations in relation to sustainable development may also affect the viability of the corresponding projects (Pavloudakis et al., 2012). Modeling and evaluation of the exploitation strategy of such projects in the strategic mine planning and scheduling phase should incorporate sustainability issues connected with activities that take place throughout the whole mine life cycle, from the first exploratory stages to the post mining period (Roumpos et al., 2005). A holistic approach model for the mine planning of surface mining projects should be based on an integrated approach to the long-term strategic mining planning and development, taking into account the latest technical, environmental, economic and social data with regards to the operation of surface mines (Roumpos et al., 2011). Within this context, the critical role of sustainability parameters on the strategic mine planning of surface mining projects can be described by dividing the mine planning model into the following interrelated sub-models: - Mineral deposit geologic hydrogeologic - geotechnical model. - Mine development and scheduling model. - Environmental impact assessment model. - Financial - mining economics - market model.
2 646 6th International Conference on Sustainable Development in the In this paper the effect of sustainability parameters on the mine planning sub-models is described. A case study, clarifying some critical issues of the analysis, is presented concerning the mine planning of Mavropigi Mine. 2. SUSTAINABLE MINE PLANING OF SURFACE MINING PROJECTS The critical effect of sustainability parameters on the strategic mine planning of surface mining projects is presented, examining every submodel of the mine planning model. 2.1 Mineral deposit - geologic- geotechnical - hydrogeological model The mineable ore reserves estimation process is a very important subject for the mine planning and design phase of the mining project. It is a core component of any surface mining project, affecting the life of the project, the annual production rate of the mine, the life of the corresponding mineral processing or other facilities and the viability of the overall project (Roumpos et al., 2009). The role of reserve estimation is also crucial in setting sustainable targets in the context of managing the mining industry s greatest asset (Weatherstone, 2005). Quality parameters of run-off-mine ore are also very important in strategic mine planning. They also affect the economic viability of the project, the efficiency of the processing facilities, the environmental performance of the project or the decision for the mining sequence. Mine planning activities should take into account the efficient use of mineral resources. It is, therefore, essential a reliable mineral deposit model, based on the geologic and fault model of the deposit and on exploration drill holes data. This model should be based on conventional and geostatistical grade and tonnage assessment techniques, incorporating errors and uncertainties related to the exploration data or other uncertainties concerning the spatial tonnage or grade distribution variability. It should also be revised periodically, adding the new knowledge acquired during the mining project. The model can be used for the optimization of final pit limits as well as for the optimization of long and short-term of mine development. Geotechnical analysis is also a very important issue of the mine planning process. Geotechnical model affects the overall mining ratio (volume of waste per ton of ore) and therefore the cost and the economics of the project. It also plays a critical role in strategic mine development. Geotechnical investigations should start in the early exploration phase of the deposit and a geotechnical model should be available in the mine planning phase in order to be used into the mine planning optimization processes, ensuring geotechnical stability of the excavation and dumping process and safe mining operations. The geotechnical parameters of surface mining projects contribute to sustainable mine planning design of the projects. Hydrogeological analysis is also an essential issue for the mine planning process. Hydrogeological investigations referring to groundwater and surface water problems that will be encountered during the mining project should also start from the early exploration phase and continue to after mining closure phase. In surface mining projects the hydrogeological model is an integral part of mine planning process as it is related to geotechnical model and also affects the dewatering planning of the mine, the environmental impact of the project, the water balance of the mining area and the environmental reclamation of the mine. It is clear that the hydrogeological parameters are also critical in the sustainability of mine development parameters and in the viability of the project. 2.2 Mine development and scheduling model Strategic mine development and scheduling model is the most important part of mine planning activities. It is a complex, multi-objective optimization problem incorporating technical, environmental, economic, social or other constraints. The main optimization model includes the selection of the mining method or the combination of mining methods, the location of the opening phase of the surface mine and the sequence of the excavations and the waste dumping and waste management, the optimization of bench design, the optimization of the production
3 6th International Conference on Sustainable Development in the 647 rate meeting short and long-term tonnage and grade targets, the optimization of mining equipment reliability and utilization and the stockpile management and blending procedures. The model should be optimized taking into account the operation of a number of mines of a mining center and incorporating the interlinking ore and waste handling systems. Mine development flexibility is a very important issue concerning the complexity and uncertainties that a surface mining project faces through mine lifetime. Strategic long term planning requires a cyclical reassessment of exploitation options, in the context of anticipated changes in the near- and long-term business operating environment (Smith, 2012). It is obvious that in the optimization process of a surface mine development and scheduling problem sustainability parameters should be incorporated in all stages of the project, throughout the whole mine life cycle, from the first exploratory stages to the post mining period. These parameters, which are also related with the parameters of the other three mine planning sub-models, may include: - The recovery and efficient utilization of the mineral resource. - The optimal environmental and ecological planning of the mining operation as well as the landscape and environmental reclamation of the mine, minimizing the volumes of waste outside dumps. - The economic performance of the mining project. - The social acceptance of the project and the contribution to long-term viability of the local and regional economies. - The minimization of risk in all stages of mining operation. The above-mentioned parameters should be taken into account into integrated optimization of mine development and scheduling model. 2.3 Environmental impact assessment model Surface mines are complex operations that can affect numerous environmental constituents in various ways. The environmental impact assessment model aims at the sustainable environmental planning and development of the mining project throughout the entire mine life cycle. The type and magnitude of environmental impacts of surface mining projects are closely related to various site-specific physical, chemical, ecological, socioeconomic and cultural characteristics, which must be thoroughly identified, analyzed and modeled. The corresponding model requires the identification of inflows and outflows of the mining system defining appropriately the boundaries of the system, the determination of the best available environmental management practices as well as the definition of environmental monitoring and sustainable development indicators. Environmental and social issues often have a direct impact on the economics of the mining project. They may be related to the following parameters: - Land acquisition requirements essential for mining excavations and waste dumping development. One of the main parameters in the optimization of mine development is the minimization of the waste outside dumping areas, minimizing the land acquisition requirements and consequently the corresponding cost as well as the environmental impact of the surface mining project. Land acquisition processes may be crucial in mine operation causing delays in mine development or changes in the direction of mining operation. Therefore, a land acquisition planning should be incorporated into the mine planning procedures. - Relocation of infrastructures affected by the project. An appropriate management model for large technical projects is also required from the initial phase of mine planning activities (Roumpos et al., 2011). The large technical projects may necessitate significant modifications-revisions of the mine limits and of its development schedule. They are also related to the environmental and sustainability planning of the mining project and have a direct effect on the economics of the project. - Environmental protection and land reclamation planning of the mined out and waste
4 648 6th International Conference on Sustainable Development in the dumping areas. These activities are closely connected with mine planning procedures, with the land uses prior to mining operation and the planned land uses of the reclaimed areas. They should also take into account the transportation and deposition of the byproducts of the mining project. They start from the early stages of deposit exploration and expand many years after the mine closure and affect directly the social acceptance as well as the economic performance of the mining project. - Archaeological investigations in the mining area. Surface mining projects offer an opportunity to conduct Archaeological fieldwork by funding the Archaeological research prior to mining operations and thus to contribute to sustainable mining operation concerning the Archaeological findings. On the other hand inappropriate planning of Archaeological investigation taking place in the region surface mine may cause significant delays or changes in the mine development. 2.4 Financial - mining economics - market model This model is related with the financial, mining economics and market parameters that are usually taken into account in the mine optimization model. They may refer to objective function, to the criteria and economic analysis for investment decision - making or to the constraints of the model. The basic economic parameters of the mining project are directly connected with the parameters of the other mine planning submodels. They mainly include the escalation of capital and operating mining cost through all phases of mining project, from the exploration to post mining activities, the commodity prices, the interest rates and the financial engineering and risk analysis model. The economic analysis model could also be integrated by incorporating the evaluation technique of real options or the game theory analysis taking into account the competition of other mining projects. 3. CASE STUDY An analysis of the described mine planning model concerning the strategic mine planning of the Mavropigi surface lignite mine is presented in this section. 3.1 Mine location - Description of the Mavropigi lignite deposit The Mavropigi mining field is located in the northern part of the west boundary of the Ptolemais mining area (Fig. 1). The area of the mine covers approx. 11 km 2. In the NW-SE direction, it extends over approx. 5 km from the Ptolemais power station to the Komanos village and in the NE-SW direction from the former opencast mines of North Field and Komanos, to the mountain front where pre-tertiary slates and limestone layers occur near the surface. The mining field includes administrative buildings of the opencast mines, industrial facilities and parts of the Ptolemais power station. Inside the planned mining area, the Mavropigi village is located in the southwest of the field. From the beginning of the mining operations at the end of 2002 until the end of 2012, 51.8 Mt of lignite was produced. The remaining exploitable lignite reserves amount to Mt. The main mine equipment consists of 8 bucket wheel excava- Figure 1: Ptolemais lignite basin and the Mavropigi Mine.
5 6th International Conference on Sustainable Development in the Strategic mine planning of Mavropigi mine The main issues concerning the strategic mine planning of Mavropigi mine include the following: Figure 2: Fault system - initial and final pit limits of the Mavropigi mine. tors and 3 spreaders, transferred from the exhausted mines of North Field and Komanos as appropriate for the Moavropigi deposit (Kolovos, 2006) and the annual lignite production of the mine is approximately 8 Mt (Pagonis et al., 2009). After a zone of very small thicknesses of the lignite-bearing series in the south, the thickness grows towards the northwest where it mainly ranges between 50 and 150 m, while it rises up to approximately 200 m towards the southwestern mountain boundary. The increase in thickness of the lignite-bearing layers is accompanied by a division into a multitude of split seams. In a graben settling down to the north and opening towards the Proastio field, the lignite-bearing series reaches a thickness of 200 to 250m in the planned mining area. The overlying strata thicknesses mainly range between 10 and 50m. The mining field is separated by NW-SE striking faults into individual fault blocks (Fig. 2). Towards the mountain front it is limited by one or several faults with dips towards the mine. Furthermore, sandy-gravelly layers of the overburden strata locally incorporate consolidated layers. Excavation pit limits Strategic mine planning and scheduling of Mavropigi mine has been modified since the initial phases of the mining project. The pit limits in the initial mining study of Mavropigi mine (Rheinbraun Engineering & Public Power Corporation of Greece, 2006) did not include Mavropigi Village (Fig. 2). Figure 3 shows the mine development sequence (A-B-C-D-E) mainly by the use of continuous mining equipment and the areas of exhausted mines North Field and Komanos mine planned for waste material outside dumping (areas of outside dump 1 (2 spreaders) and 2 (1 spreader) respectively). In a revision of mine planning, based on the decision for a new power plant construction, and on the new exploration, geotechnical, environmental, social and economic data, the pit limits in the area of Mavropigi village were extended, increasing the mineable lignite reserves of the deposit and consequently the increasing the contribution to the sustainability of the mining project concerning the efficient utilization of the lignite deposit and to the to long-term viability of the local and regional economies. Also, the need for covering part of the production needs of the adjacent Kardia surface lignite mine, the exploitation of low depth deposit of Komanos village, which initially was part of the lignite deposit of Mavropigi mine, was assigned to Kardia mine (Fig. 2). This part of the deposit was planned to be excavated by non-continuous mining equipment. Lignite production rate-excavations sequence In the initial mining study the annual production rate of the mine was ~ 6 Mt, covering the feeding needs of Ptolemais Power Plant. The demand for higher annual production rates (8-10 Mt) covering the needs of other power plants of the lignite center, necessitated the application of a rapid mine development plan with significant modifications in the excavations sequence of the mining sectors (Fig. 4), introducing the applica-
6 650 6th International Conference on Sustainable Development in the Figure 4: Mine development sequence after the modifications of pit limits and production targets. Figure 3: Mine development sequence in the initial strategic planning of the Mavropigi mine. tion of non-continuous mining equipment to a large extent in various areas and incorporating the production flexibility of the project. As a consequence, there was a need for a new area for dumping the waste material excavated by non-continuous equipment (outside dump 3). The site that was selected for the construction of the new power plant had been planned for the outside dump 2 of waste material (Fig. 3). Because of this selection, the area of outside dump 2 was changed (Fig. 4). Further changes of mining sectors sequence due to land acquisition and the consequent geotechnical problems Land acquisition of a small area (L) (Fig. 5) in front of excavation face became a crucial issue in excavation development of the Mavropigi mine. The delays in the acquisition of that area caused production problems and imposed significant changes in the direction of excavations. A flexible planning of the mine included the changes of the mining direction shown in Figure 5. The new excavations sequence formulated excavations face geometry with adverse geotechnical effects. A new geotechnical investigation of the south-west final perimeter slope of the excavations revealed the movement model, identified the risk factors, improved the geological and fault model and suggested a safe slope inclination in for excavating the deep lignite seams in that area with safe mine operations. The occurrence of the limestone in the upper benches of the mine also imposed the use of continuous mining equipment in the west boundaries of the mine. In that area, hard rock conglomerate material also exists, so the planning of the excavations with the combination of continuous and noncontinuous mining equipment in different mining areas is a critical issue for the efficient use of the main mine equipment and the appropriate mine development. Hydrogeological problems in the western mine perimeter require a water management planning. As a result of these changes in mine excavation planning and based on the outcome of the new geotechnical investigations, the estimation of the volume of waste material that will be dumped to the outside dump area 1 increased. An increase is also anticipated for the final levels of the outside dump area 1 (avoiding new dumping areas) as well as the delay of the installation of spreaders in the inside dump of the mine.
7 6th International Conference on Sustainable Development in the 651 issues concerning the development of Mavropigi mine. Figure 5: Further changes in mine development sequence after land acquisition problems and geotechnical investigation of south-west final perimeter slope. Concerning the areas of archaeological interest at the south part of the Mavropigi mine (Fig. 5), a major archaeological fieldwork was funded and started in 2008, prior to mining operations that identified a number of areas of archaeological interest, contributing to sustainability of mining operations. The appropriate planning of archaeological investigations did not cause any delays in mine development. 4. CONCLUSIONS Strategic mine planning surface mining projects is a complex, multi-objective optimization problem that requires an integrated approach with the incorporation of technical, environmental, economic, social or other issues. In the optimization process of a surface mine development and scheduling problem sustainability parameters should be incorporated in all stages of the mining project, throughout the whole mine life cycle, from the first exploratory stages to the post mining period. In this paper, the critical role of sustainability parameters on the strategic mine planning of surface mining projects was described by dividing the mine planning model into interrelated sub-models, with a discussion of some critical REFERENCES Dimitrakopoulos, R., (2011). Strategic Mine Planning under Uncertainty. Stochastic Optimization for Strategic Mine Planning: A Decade of Developments, Journal of Mining Science, Vol. 47, No. 2. Kolovos. C., (2006). Technical Aspects Regarding the Opening of a New Mine with Old Already-Existing Equipment, Energy Sources, Part B: Economics, Planning, and Policy, 1, pp Pagonis, G., Ch. Roumpos, K. Liakoura and N. Paraskevis, (2009). Revised mine planning of Mavropigi mine, Public Power Corporation of Greece (in Greek). Rheinbraun Engineering & Public Power Corporation of Greece, (1996). Technical Mine Master Plan, unpublished report, 600 p. Roumpos, Ch., F. Pavloudakis and M. Galetakis, (2005). Modelling and evaluation of open-pit lignite mines exploitation strategy, 2nd Int. Conference on Sustainable Development Indicators in the Minerals Industry (SDIMI 2005), May 18th - 20th, 2005, Aachen, Germany, pp Roumpos, Ch., K. Liakoura and M. Leontidis, (2006). Strategic mine planning framework for continuous surface mining systems operation, 8th International Symposium Continuous Surface Mining (ISCSM), Aachen, Germany, September, pp Roumpos, Ch., F. Pavloudakis and M. Galetakis, (2009). Optimal production rate model for a surface lignite mine. Proceedings of the 3rd AMIREG International Conference: Assessing the Footprint of Resource Utilization and Hazardous Waste Management, 7-9 Sept. 2009, Athens, Greece: pp Roumpos, Ch., K. Liakoura and N. Paraskevis, (2011). A model for management of large technical projects in surface lignite mines, Mineral Wealth, 159/2011, pp (in Greek). Smith, G.L., (2012). Strategic long term planning in mining, The Journal of The Southern African Institute of Mining and Metallurgy, Vol. 112, pp Weatherstone, N., (2005). The role of the mineral reserve estimator in promoting sustainable development in the mining industry, Applied Earth Science (Trans. Inst. Min. Metall. B) Vol. 114, pp. B14- B21.
Strategic mine planning of surface mining projects incorporating sustainability concepts
Strategic mine planning of surface mining projects incorporating sustainability concepts CHRISTOS ROUMPOS and E. PAPACOSTA Public Power Corporation S.A. Division of Mines Characteristics of surface mining
More informationEnvironmental and socioeconomic impacts of surface mining operations: A review of the Greek experience
Environmental and socioeconomic impacts of surface mining operations: A review of the Greek experience Francis F. Pavloudakis Public Power Corporation SA West Macedonia Lignite Centre, P.O.Box 21, Ptolemais
More informationEvaluation of Bench Height Selection for Limestone Resource Optimization A Case Study. N K Sharma, R Mazumder, D K Panda, A K Dubey
Evaluation of Bench Height Selection for Limestone Resource Optimization A Case Study N K Sharma, R Mazumder, D K Panda, A K Dubey Abstract The economic viability of the modern day limestone mine and its
More informationMINING EQUIPMENT FOR MINES IN REK BITOLA
MINING EQUIPMENT FOR MINES IN REK BITOLA Skopje, 2016 INTRODUCTION Project description The procurement of the mining equipment for the mines in REK Bitola refer to the following mines: Underlying coal
More informationIMPACT OF IN-PIT CRUSHING AND CONVEYING ON PIT SHELL OPTIMIZATION. Marc Johnson, Regional Manager - South America
IMPACT OF IN-PIT CRUSHING AND CONVEYING ON PIT SHELL OPTIMIZATION Marc Johnson, Regional Manager - South America Abstract In Pit Crushing and Conveying (IPCC) systems have matured as a technology to the
More informationDraft Mine Closure Plan. 17 October 2018 Longlac & Geraldton
Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval
More informationFeasibility studies Ulaanbaatar August 2016
Feasibility studies Uranium exploration, development and eventual production, form a series of progressive and logical steps. Each step is part of a progression of activities with the objective of obtaining
More informationJoyce Lake update, the new DSO zones at Lac Le Fer to Iron Arm Range
Joyce Lake update, the new DSO zones at Lac Le Fer to Iron Arm Range Allan Gan Mineral Resources Review 2015 St John s, NL TSX: FER www.centuryiron.com Forward Looking Statement Except for statements of
More informationTHE FALL AND RISE DRAGLINES
THE FALL AND RISE OF DRAGLINES Neil Tyson, Deswik, Australia, details ways to improve dragline engineering and in turn improve planning cycle time and mitigate complex risks. L arge walking draglines are
More informationFor personal use only
Initial JORC Reserves Estimate for Bluff Project HIGHLIGHTS Initial JORC Reserves Estimate of 11 Mt mineable for Bluff Project In-fill drilling program completed to support further Resources and Reserves
More informationDesign and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro
Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro P. Kontothanassis, N. Koronakis, A. Karinas & S. Massinas Omikron Kappa
More informationAmania Mining Company Bakhud Fluorite Project
Amania Mining Company Bakhud Fluorite Project Introduction Amania Mining Company, an Afghan mining company established in 2010, has quickly established itself with a proven track record of performance
More informationPhase VII Expansion Waste Rock and Overburden Management Plan
Phase VII Expansion Waste Rock and Overburden Management Plan 2018-01 Prepared by: Minto Explorations Ltd. Minto Mine January 2018 Minto Mine Phase VII Expansion January 2018 TABLE OF CONTENTS 1 Introduction...
More informationThe economics of extended pre-strip stripping
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2013 The economics of extended pre-strip stripping Retief Nel Mehmet S. Kizil University
More informationFor personal use only
16 September 2011 SULTAN ACCELERATES GROWTH WITH ACQUISITION OF HIGHLY STRATEGIC POLISH BASE METALS PROJECT Secures Bogdan Project Located Adjacent to Europe s Largest Copper Mine 42 sq km tenement sits
More informationApplication of optimized models through direct block scheduling in traditional mine planning
http://dx.doi.org/10.17159/2411-9717/2018/v118n4a8 Application of optimized models through direct block scheduling in traditional mine planning by P.H.A. Campos*, C.E.Arroyo, and N. Morales Many papers
More informationEnvironmental Effects of Dewatered Open Pit Mines
Environmental Effects of Dewatered Open Pit Mines By Dr R. Jambrik Associate Professor, Head of the Department of Hydrogeology and Engineering Geology, University ofmiskolc ABSTRACT Before the initial
More informationLong Term Planning for Open Pit Mines
Long Term Planning for Open Pit Mines Introduction The profitable exploitation of a mineral deposit requires considerable evaluation and planning. First it must be determined what portion of the deposit
More informationBisha Mining Share Company
Bisha Mining Share Company Asmara Mining Conference 2014 Bisha Mine Geology Activities Samson Ephrem Mine Geologist October 2014 Forward Looking Statements This Presentation contains forward-looking statements
More informationDRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationIron Mining In the Lake Superior Basin
Iron Mining In the Lake Superior Basin Minntac Iron Mine in Minnesota Project Report 11-1 October 2011 Great Lakes Indian Fish & Wildlife Commission Environmental Section P.O. Box 9 Odanah, WI 54861 (715)
More informationISSN: (Online)
MINING AND METALLURGY INSTITUTE BOR UDK: 622 ISSN: 2334-8836 (Štampano izdanje) ISSN: 2406-1395 (Online) UDK: 622.012:.003.8(045)=111 doi:10.5937/mmeb1704051k Daniel Kržanović *, Milenko Ljubojev *, Ivana
More informationPapua New Guinea Mineral resources and ore reserves
Harmony Annual Report 2009 139 Papua New Guinea and ore reserves Geology: Papua New Guinea (PNG) lies at the northern end of the Australian Plate and has three major components: a continental cratonic
More information-31- MANAGEMENT PLAN FOR ACID MINE DRAINAGE FOR THE QUINSAM COAL MINE T. E. MILNER, P. ENG
-31- MANAGEMENT PLAN FOR ACID MINE DRAINAGE FOR THE QUINSAM COAL MINE T. E. MILNER, P. ENG -32- INTRODUCTION Acid generation in surface mines requires a source of sulphide minerals, moisture and oxygen.
More informationArrium Mining. Continued Mining Success in the Face of Lower Iron Ore Prices. 11 th SAEMC 5 December 2014
Arrium Mining Continued Mining Success in the Face of Lower Iron Ore Prices 11 th SAEMC 5 December 2014 Disclaimer The information in this presentation that relates to Mineral Resources or Ore Reserves
More informationMuskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1
Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV
More informationMINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015
# 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENT UPDATE The evaluation of a mining project from exploration through development and production is a lengthy and complicated process. Mine development
More informationEstimating and Reporting of
AUSTRALIAN GUIDELINES FOR Estimating and Reporting of Inventory Coal, Coal Resources and Coal Reserves 2003 EDITION PREPARED BY THE COALFIELDS GEOLOGY COUNCIL OF NEW SOUTH WALES AND THE QUEENSLAND MINING
More informationManagement of Uranium Mine Waste Rock and Mill Tailings. Support Document to DIS-10-01
Management of Uranium Mine Waste Rock and Mill Tailings Support Document to DIS-10-01 March 2010 i Introduction SUPPORT DOCUMENT: DISCUSSION PAPER ON THE MANAGEMENT OF URANIUM MINE WASTE ROCK AND MILL
More informationEnvironmental Reclamation Practice in a Brazilian Coal Mine -- An Economical Approach
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2005 Environmental Reclamation Practice in a Brazilian Coal Mine -- An Economical Approach
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationSOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced
More informationNICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept
NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept Open pit and underground mine The project has 31 Mt of ore reserve Ore to be processed at a rate of 4,650 t/d Life of mine is 20 years
More information3 PROJECT ALTERNATIVES
3 PROJECT ALTERNATIVES In terms of the National Environmental Management Act (NEMA) Section 21(3) and Appendix 2 of the EIA Regulations (2014), due consideration must be given to project alternatives during
More informationMCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land
MCDR INSPECTION REPORT S/ No. Particulars Details 1 Name of the Mine Navalutti Iron Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land 32.40Ha (excluding 2.0 Hect. of road). Complete
More informationOptimal Economic Envelope of Joint Open-Pit and Underground Mines*
Optimal Economic Envelope of Joint Open-Pit and Underground Mines* Cecilia Julio Department of Mining Engineering, University of Chile Jorge Amaya LP Laboratory, Centre for Mathematical Modelling, University
More informationNEW GOLD DISCOVERY REPORTED BY IRELAND INC.
For Immediate Release NEW GOLD DISCOVERY REPORTED BY IRELAND INC. BULK LEACH TEST EXTRACTS GOLD AND SILVER METALS; DRILL RESULTS INDICATE LARGE TONNAGE POTENTIAL HENDERSON, Nevada March 19, 2009 Ireland
More informationNOTE COVER PAGE GENERAL
ANNEXURE-I SCRUNITY COMMENTS ON MINING PLAN OF M/S TUMKUR MINERALS, JANAHAR IRON & MANGANESE APPLIED MINING LEASE AREA OF IRON AND MANGANESE ORE, OVER AN AREA 259 HA.( 178.00 HA IN FOREST AREA, 81.00HA
More informationGUIDELINES to the MINING ACT
GUIDELINES to the MINING ACT PART I Format Requirements Reports 1. All reports required to be submitted to the minister by the Mining Act or regulations shall (a) be bound in a folder; (b) be a typewritten
More informationINTRODUCTION SUMMARY. misclassification, resulting in increased ore recovery.
Minimizing Mining Dilution, Ore Loss, and Misclassification by Accounting for Blast Movement in South American Porphyry-Skarn and Manto Copper Mines Jeff Loeb, Principal Consultant Marcell Silveira, Consultant
More informationFor personal use only
a Level 14, 31 Queen Street Melbourne, Victoria 3000 t +61 3 8610 8633 f +61 3 8610 8666 e info@aruntaresources.com.au www.aruntaresources.com.au ABN 73 089 224 402 18 August 2015 ASX ANNOUNCEMENT (ASX:
More informationFor personal use only
Malachite Resources Limited ABN 86 075 613 268 ASX Announcement ASX Code: MAR 12 March 2012 LORENA GOLD PROJECT - UPDATE Summary Malachite s commitment to establish a gold mining and production plant at
More informationSEMINARI MAGGIO Management of Geotechnical Risks
SEMINARI MAGGIO 2015 Management of Geotechnical Alessandro Palmieri Water Infrastructure Adviser former Lead Dam Specialist, World Bank 1 Outline Project s Bankability Management of Project Minimising
More informationAdvice to decision maker on coal mining project
. Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January
More informationTable 3-5: Coal Quality Purewa Seam. Proximate Analysis M% A% V.M.%
The full thickness of Purewa Merged seam including all dirt bands varies from minimum 19.50m (CMSM-1) to the maximum thickness of 26.15m (CMAE-40). There is slight increase in the full thickness of the
More informationForward Looking Statements Forward Looking
MINERALS NORTH 2009 Forward Looking Statements Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements
More informationThe groundwater study is relevant to both the MLP and EIS.
1 2 3 Iron Road has been engaging with the community for a number of years now and water, particularly water security, has been a common theme raised by Eyre Peninsula residents in many forums. Rather
More informationFor personal use only
ASX ASX ANNOUNCEMENT ANNOUNCEMENT th 15 15th January January 2018 2018 For personal use only PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA HIGHLIGHTS Pacific Bauxite has acquired the
More informationThe Mineral Industry Environmental Protection Regulations
MINERAL INDUSTRY E-10.2 REG 5 The Mineral Industry Environmental Protection Regulations Repealed by Chapter 10.2 Reg 7 (effective March 6, 1996). Formerly Chapter E-10.2 Reg 5. NOTE: This consolidation
More informationPACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA
ASX ASX ANNOUNCEMENT ANNOUNCEMENT th 15 15th January January 2018 2018 PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA HIGHLIGHTS Pacific Bauxite has acquired the Darling Range Bauxite
More informationNatural Resources. Presented by Victor Tibane
Natural Resources Presented by Victor Tibane Mineral Resources Impossible to keep up with consumption over the longterm based on the finite resource principle and the exponential growth in population.
More informationVALUE CREATION USING SMART DRILLING
Case Study ::: Testing Objectivity s Drilling Reporting and Targeting (DRX) VALUE CREATION USING SMART DRILLING Shareholder Value Drill Hole Planning and Increasing the Return on Investment With mining
More informationIN-PIT CRUSHING AND CONVEYING MINE PLANNING AND OPERATIONS Skillings Mining Review, June 1, 1985 by: Independent Mining Consultants, Inc.
1 IN-PIT CRUSHING AND CONVEYING MINE PLANNING AND OPERATIONS Skillings Mining Review, June 1, 1985 by: Independent Mining Consultants, Inc. Introduction The rising operating costs and declining commodity
More informationLignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co.
Lignite Mining and Reclamation Process Kayla Torgerson The Coteau Properties Co. 1 Presentation Overview History of Regulation The Process of Mining and Reclamation Harmony Lake 2 1 2 3 4 5 6 7 8 Which
More informationMCDR INSPECTION REPORT
1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup
More informationPRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements
PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements PURPOSE OF THIS DOCUMENT: This document contains preliminary draft language related to silica sand
More informationCRU Phosphates Optimising processing costs through the assessment of geological and mining cut-off grades. Tim Lucks. Presenter: Location:
1 CRU Phosphates 2017 Image copyright B Brown, Atelie_A_Singkhma, 2014. Used under licence from shutterstock.com Optimising processing costs through the assessment of geological and mining cut-off grades
More informationCertifiable Risk Management & Business Continuity Approach in Mining Industry
Proceedings of the 4 th World Congress on Mechanical, Chemical, and Material Engineering (MCM'18) Madrid, Spain August 16 18, 2018 Paper No. MMME 108 DOI: 10.11159/mmme18.108 Certifiable Risk Management
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District
More informationASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold
ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2
More informationKumtor Gold Company 2018
Kumtor Gold Company 2018 Kumtor Gold Company Kumtor is one of the highest gold deposits in the world. The deposit was discovered in the Central Tien Shan at an altitude of 4,200 meters in 1978. The Kumtor
More informationSMARA Reclamation Standards Review
SMARA Reclamation Standards Review Focused Discussion SMARA Section 3704.1 - Performance Standards for Reclamation and Section 2711 Extraction of Minerals Essential to Well-Being of the State and the Needs
More informationNew blasting methods to a efficiency in economics and environmental
New blasting methods to a efficiency in economics and environmental João Gonçalves Cardoso (October 2015) joaocardoso3@gmail.com Master Thesis Abstract The blasting operation in open pit, causes environmental
More informationNEWS RELEASE. Post Tax NPV 10%) Post Tax IRR (100% equity) 17.6% Probable Reserves Project Life (based on Probable Reserves)
June 18, 2015 NEWS RELEASE Symbol: TSX-V: FBX FWB/BER: FBI FIRST BAUXITE CORPORATION ANNOUNCES PROPPANT FEASIBILITY STUDY RESULTS Toronto, ON - First Bauxite Corporation ( First Bauxite or the Company
More informationIncreasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation. Presented by Alex Campbell
Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation Presented by Alex Campbell Presentation Overview Three year project to optimise the draw strategy
More informationOre Reserve Estimation of Saprolite Nickel Using Inverse Distance Method in PIT Block 3A Banggai Area Central Sulawesi
Journal of Physics: Conference Series PAPER OPEN ACCESS Ore Reserve Estimation of Saprolite Nickel Using Inverse Distance Method in PIT Block 3A Banggai Area Central Sulawesi To cite this article: Muhammad
More informationsmart(er) management of technical risk:
New digital technologies for the smart(er) management of technical risk: Examples and added value Roussos Dimitrakopoulos COSMO Stochastic Mine Planning Laboratory - http://cosmo.mcgill.ca/ Outline Introduction
More informationFig. 5: Lakka s open pits A, B, C, D. Quarry site B C
Fig. 5: Lakka s open pits A, B, C, D A Quarry site B C D Fig. 5a: open pit A Fig. 5b: open pit B Fig. 5c: open pit C 8 9 2. GEOLOGICAL SETTING AND RESOURCES 2.1 Type of aggregates The geological setting
More informationNEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA
February 1, 2006 NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA ULAANBAATAR, MONGOLIA John Macken, President of
More informationOre Blending as Mine Scheduling Strategy to Accommodate Resources Conservation at Pakal Nickel Mine, PT ANTAM (Persero) Tbk.
Available online at www.sciencedirect.com Procedia Earth and Planetary Science 6 ( 2013 ) 24 29 International Symposium on Earth Science and Technology, CINEST 2012 Ore Blending as Mine Scheduling Strategy
More informationRAGGED ROCK COARSE MAGNETITE UPDATE HIGHLIGHTS
ASX Release 5 September 2012 ASX code: MAU Level 2, 16 Ord St West Perth WA 6005 PO Box 1388 West Perth WA 6872 Telephone 08 9226 1777 Facsimile 08 9485 2840 info@magres.com.au www.magres.com.au ABN 34
More informationSDPS for Windows: An Integrated Approach to Ground Deformation Prediction
SDPS for Windows: An Integrated Approach to Ground Deformation Prediction D. Newman, Appalachian Mining and Engineering, Inc./Geolab Z. Agioutantis Department of Mineral Resources Engineering, Technical
More informationMAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationDevelopment Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements
1 Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements 2 COAL RESOURCE Indonesia has large resources of lower heating value subbituminous coal the resources are
More informationIDENTIFICATION OF FAILURE SURFACES IN DRAGLINE DUMPS OF OPENCAST COAL MINES
IDENTIFICATION OF FAILURE SURFACES IN DRAGLINE DUMPS OF OPENCAST COAL MINES S. Sharma, S. Sengupta and I. Roy Department of Civil and Environmental Engineering, Birla Institute of Technology, Mesra, Ranchi,
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Hyderabad regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION AP/ANP/L.ST-27/ HYD (ii) Designation : (iii) Accompaning mine : Official
More informationKrasny project JORC resources update: oz of gold at 1,200 USD/oz gold price
Kopy Goldfields AB (publ) Press release 11/2016 Stockholm, May 26, 2016 Krasny project JORC resources update: 955 000 oz of gold at 1,200 USD/oz gold price Kopy Goldfields AB (publ) ( Kopy Goldfields or
More informationMinara Resources Limited Investor Relations Presentation October Peter Johnston Managing Director and CEO
Minara Resources Limited Investor Relations Presentation October 2006 Peter Johnston Managing Director and CEO Contents Corporate and Financial Overview Operations Overview The Road Ahead - 2007 & beyond
More informationDEPARTMENT OF ENVIRONMENTAL RESOURCES REVIEW NOTICE
DEPARTMENT OF ENVIRONMENTAL RESOURCES REVIEW NOTICE This report, prepared by outside consultants, has been reviewed by the Department of Environmental Resources and approved for publication. The contents
More informationOil Shale prospective development methods
Oil Shale prospective development methods Sergei Sabanov, PhD 31 st Oil Shale Symposium, Colorado School of Mines, Golden, CO COPYRIGHT AND DISCLAIMER Copyright (and any other applicable intellectual property
More informationNevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics
NEWS RELEASE TSX: NCU Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics September 24, 2018 - Nevada Copper Corp. (TSX: NCU) ("Nevada Copper" or the Company ) is pleased
More informationRelease Notes. Datamine NPV Scheduler Products Version 4.26 Public Release
Release Notes Datamine NPV Scheduler Products Version 4.26 Public Release DATAMINE NPV SCHEDULER EXECUTIVE SUMMARY An optimal strategic plan for an open pit mine maximizes Net Present Value (NPV) while
More informationDRDGOLD Annual Report
DRDGOLD Annual Report 21 17 Review of operations DRDGOLD reported two fatalities in FY21 compared with five in the previous year, translating into a 58% improvement in the Fatal Injury Frequency Rate (FIFR)
More informationDraft. Scope of Work. Task 1 RCRA Facility Investigation and Corrective Measures Study
Draft Scope of Work Task 1 RCRA Facility Investigation and Corrective Measures Study DRAFT Table of Contents Task 1 RCRA Facility Investigation and Corrective Measures Study... 2 Scope of Work:... 2 Technical
More informationReclamation Plan Modification for the Patrie Pit
for the Patrie Pit Table of Contents Reclamation Plan Narrative.. Page 1 11 Plat Map.... Figure 1 Soils Map & Descriptions. Figure 2 Erosion Control Typical BMPs.... Figure 3 WI Construction Specification
More informationMining and Our Natural Resources
Mining and Our Natural Resources February 28, 2008 Jennifer Engstrom Division of Lands and Minerals MN Department of Natural Resources Overview Brief overview of environmental review Permit to Mine for
More informationSubsidence Peer Review
I Subsidence Peer Review BYLONG COAL PROJECT Environmental Impact Statement BYLONG COAL PROJECT EIS I 22 December 2014 Rory Gordon WorleyParsons L11 12/141 Walker Street North Sydney NSW 2060 Dear Rory
More informationRecent initiatives in reducing dilution at Konkola Mine, Zambia
Recent initiatives in reducing dilution at Konkola Mine, Zambia by D.M. Mubita* Synopsis Dilution reduction is one of the areas that offer metal mines an opportunity to increase revenue and reduce costs,
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/BLR/FE/12/BNG (ii) Designation : (iii) Accompaning mine : Official
More informationINVESTIGATION METHODOLOGY FOR UNCONTROLLED LANDFILLS
INVESTIGATION METHODOLOGY FOR UNCONTROLLED LANDFILLS MAVROPOULOS ANTONIS *, KALIAMPAKOS DIMITRIOS** *: EPEM Ltd., Solid Waste Management Department - 34A Averof str., 142 32 N. Ionia, Athens, Greece, **:
More informationOptimization of Supports in a Road Tunnel through Conglomerate during Construction
Optimization of Supports in a Road Tunnel through Conglomerate during Construction Tülin SOLAK, Temelsu International Engineering Services Inc., Turkey, tulin.solak@temelsu.com.tr Bülent ULUKAN, Temelsu
More informationSeizing Opportunity and Building Value
Hanson Lake District Seizing Opportunity and Building Value December 2017 www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Parties Committed to value creation 100%
More informationEnsuring the Environmental and Industrial Safety in Solid Mineral Deposit Surface Mining
Ensuring the Environmental and Industrial Safety in Solid Mineral Deposit Surface Mining Kliment Trubetskoy 1, Marina Rylnikova 1*, and Ekaterina Esina 1 1 Federal State-Funded Research Establishment Academician
More informationNumerical Modelling and Prediction of Abandoned Mine Methane Recovery: Field Application from the Saar Coalfield, Germany
Numerical Modelling and Prediction of Abandoned Mine Methane Recovery: Field Application from the Saar Coalfield, Germany Sevket Durucan, Ji-Quan Shi and Anna Korre Minerals, Energy and Environmental Engineering
More information2016 Mineral Resource Tritton Tenement Package
2016 Mineral Resource Tritton Tenement Package Tritton Underground Measured 3,850 1.9 73 2,750 2.1 59 Indicated 4,940 1.2 61 4,140 1.6 66 Total M + I 8,790 1.5 133 6,890 1.8 125 Inferred 1,960 1.2 24 3,140
More information2010 Annual Inspections of the On-site Earth Structures Wolverine Mine Site, South Eastern Yukon
ISSUED FOR USE EBA File: W14101095.009 Yukon Zinc Corporation Suite 701, 475 Howe Street Vancouver, British Columbia V6C 2B3 Attention: Subject: Mr. Chiew Yeo, Manager Design Engineering 2010 Annual Inspections
More information2014 AGM PRESENTATION
2014 AGM PRESENTATION David Mendelawitz Managing Director 1 IMPORTANT INFORMATION Disclaimer This presentation contains certain forward looking statements. All statements, other than statements of historical
More informationScienceDirect. Wirtgen drives the development of surface mining
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 138 (2016 ) 30 39 SYMPHOS 2015, 3rd International Symposium on Innovation and Technology in the Phosphate Industry Wirtgen drives
More informationQUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS
QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS Vancouver, Canada October 13 th, 2009 Quadra Mining Ltd. ( Quadra or the Company ) (QUA:TSX) announces the production results for the third quarter
More informationOptimal cut-off grade determination based on variable capacities in open-pit mining
Optimal cut-off grade determination based on variable capacities in open-pit mining by J. Abdollahisharif*, E. Bakhtavar, and M. Anemangely* Synopsis Optimal cut-off grade is one of the most critical parameters
More information