Summary of Preparatory Study for Development Study

Size: px
Start display at page:

Download "Summary of Preparatory Study for Development Study"

Transcription

1 Summary of Preparatory Study for Development Study 1. Full Tile of the Project THE STUDY ON IMPROVEMENT OF WATER SUPPLY SYSTEM IN DELHI IN THE REPUBLIC OF INDIA (hereinafter referred to as the Study ) 2. Type of the Study Master plan and Feasibility study (Pilot study) 3. Categorization and its Reason 1) Category: Category B in compliance with JICA Guideline 2) Reason: Several adverse impacts are expected for environmental items of land acquisition and involuntary resettlement, local economy, land use and utilization of local resources, poverty, meteorology, landscape, global warming, bottom sediment, etc. 4. Agency or Institution Responsible for the Project Delhi Jal Board 5. Outline of the Project 5.1 Objectives The objective of the Study is to improve the drinking water supply system of the National Capital Territory of Delhi. 5.2 Justification Outlook: The Republic of India is one of the biggest countries in the world, which had population of 1,027,020,000 (Census 2001), GNI USD per capita (2006) and has land area of 3,280,000 km 2. The National Capital Territory of Delhi (NCTD), the target area of this study, is under the direct control of central government with area of 1,438 km 2, and consist of following three parts; Municipal Corporation of Delhi (MCD:1,397k m2 ), New Delhi Municipal Council (NDMC:43k m2 ), and Delhi Cantonment Board (DCB :43k m2 ). The population of NCTD was 13,900,000 at 2001, and is prospected to increase up to 22,000,000 at 2021 due to high birth rate and population inflow. Water supply body of the NCTD, Delhi Jal Board (DJB), was established at 1998 under Delhi Jal Board Act The DJB supplies clean water for MCD, and bulk water to NDMC and DCB. The main water resources are surface water (88%) of River Yamuna, River Ganga, River Sutlaj-Beas and groundwater (12%). Quantity of clean water for MCD is 2,436 million little/day, 1

2 however rate of non revenue water (NRW) is very high of 40.5 % due to leakage from transmission and distribution pipes and illegal connection of consumer pipes. In addition, water supply quantities vary widely from water supply zone to zone. Especially in southern area, water supply hour is limited to about two hours. This situation made many families to have installed tube wells in their home for self-defense. As a result, excess pumping of groundwater has still continued in several areas of NCTD. Under these circumstances, improvement and augmentation of present water supply system are pressing issues for NCTD. Relevance to the Indian government policy: Government of India aimed at providing water supply and sewage treatment to total population of urban area until 2011/2012 in the 11 th five-year scheme, and requires formulation of comprehensive urban development plan and realization of targets with utilising JNNURM etc. to every state government and every national territory. In addition, the central government has expressed increase of public investment for water supply in the common program (May 2004). 5.3 Location The study area is the National Capital Territory of Delhi (NCTD). 5.4 Proposed activity The proposed plan includes conducting a pilot study of Non Revenue Water (NRW) reduction in one district metering area (DMA), and technical assistance in development of Supervisory Control And Data Acquisition (SCADA) in a pilot study area; formulating a action plan for NRW reduction, formulating an action plan of SCADA for the entire water supply system of NCTD; formulating a Master plan (M/P) for water supply system for year 2021 and extension of water supply and distribution network to outer areas in Delhi; and conducting an environmental and social consideration survey (at the Initial Environment al Examination level). The Study will be carried out in the period of twenty (20) months both in India and Japan in accordance with the tentative schedule. 5.5 Scope of the study Study I: Study on action plan for NRW reduction, NRW pilot project study and technical assistance in implementation of NRW reduction work of South III DMA 1) Hydraulic analysis of water supply and distribution network of South III DMA and sub-zoning of South III DMA for NRW reduction work 2) Selection of two (2) sub-zones (approximately 2,000 consumer connections each) for pilot project study and preparation of network drawing including customer connection pipe and meter. 3) Isolation work of the selected sub-zones such as installation of valves and flow meters, by Delhi Jal Board (hereinafter referred to as DJB ). 4) Essential training of the fieldwork skill for leak detection and pipe repair. 2

3 5) Survey on actual NRW conditions viz. leakage, meter defect and illegal connection, in the selected sub-zones including NRW rate. 6) Preparation of a NRW reduction work plan of the selected sub-zones. 7) Implementation of NRW reduction work of the selected sub-zones such as pipe repair, replacement of meter and legalization of illegal connection, by DJB. 8) Measurement of NRW rate after pilot project study and analysis on cost-benefit of NRW reduction work. 9) Preparation of a detailed action plan for NRW reduction work of South III DMA with recommendation on succeeding stage. 10)Technical assistance in implementation of NRW reduction work of South III DMA by DJB within the Study period 11)Preparation of an action plan for NRW reduction work for entire Delhi Study II: Study on SCADA for the entire water supply system of Delhi and technical assistance in development of SCADA in a pilot study area 1) Survey on actual operational conditions of water supply facilities. 2) Study on optimum use of SCADA for effective operation of water supply facilities. 3) Preparation of a development plan of SCADA in the pilot study area i.e. at Bhagirathi WTP (Water treatment plant) and its command area with taking GIS interface into consideration. 4) Essential training of planning of SCADA. 5) Procurement of equipment for development of SCADA in the pilot study area by DJB with technical assistance of the Study Team. 6) Technical assistance in development of SCADA in the pilot study area and essential training of operation of SCADA. 7) Preparation of an action plan for development of SCADA (including analysis and conceptual plan) for the entire water supply system of Delhi and recommendation on succeeding stage Study III: Study on master plan for water supply system for year 2021 and extension of water supply and distribution network to outer areas in Delhi 1) Collection and analysis of existing data and information. 2) Forecast of planning framework. 3) Preparation of network models of the existing system (water transmission and distribution mains) and future extension to outer areas in Delhi including. 4) Study on zoning and allocation of necessary WTP, pumping station and reservoir for optimum water supply and distribution network taking the planned new water resource into consideration up to ) Formulation of master plan for rehabilitation, renewal and extension of water supply facilities up to ) Assessment of the priority projects based on the above study and selection of the projects for mid-term implementation. 3

4 7) Cost estimation and financial analysis of the above projects. 8) Initial Environment Examination (IEE) and social survey on willingness to pay of the residents in outer areas in Delhi. 9) Recommendations 6. Description of the Project Site 6.1 Study area National Capital Territory of Delhi (UCTD) Bhagirathi WTP DCB NDMC Yamuna River Study area and Provisional pilot project areas NRW Pilot Project Area (South III ) SCADA Pilot Project Area 6.2 Environmental and social condition Following description is mainly quoted from JNNURM (City Development Plan Delhi, 2006) Environmental condition 4

5 1) Physical Features The city of Delhi lies in the fertile Northern Plains of India. The main features of Delhi are the Aravalli hill ranges and the Yamuna River. The Aravalli hill ranges are covered with forest called the Ridges. The Yamuna River is the main resource of drinking water for the citizens of Delhi. There is a forest cover of nearly 11.5% of the total area in Delhi. Delhi s mineral sources are primarily sand and stone which are used for construction activities. 2) Geology The geology of Delhi features pre-cambrian to Quaternary formations in geological age. The pre-cambrian formations are represented by the Alwar Quartzites. These are overlain by the Aeolian deposits, which are further overlain by the old and the new alluvial deposits. 3) Climate Delhi has a semi arid climate, with hot summers, moderate winters and average rainfall. Mean monthly temperatures range from 14.3 C in January to 34.5 C in June. During the summer months of April, May and June, temperatures can rise to degrees Celsius. Winters are typically cold with minimum temperatures during December and January falling to 4 to 5 degree Celsius. The average annual rainfall in Delhi is 714 mm, three-fourths of which falls in July, August and September. Heavy rainfall in the catchment area of the Yamuna River can result in a dangerous flood situation for the city. 4) Landuse 44% of the geographical area of Delhi is built-up area. This includes the Delhi urban limits, built-up area in rural-use zones and farmhouse. Even though the Delhi ridge and Asola wildlife sanctuary area has been designated as protected area, built up areas are found in certain pockets. 41% of the area is under agriculture. 5) Water Resource 5-1) Surface water Table-1 Landuse of NCTD Land Use Percentage Built up Area 44 Agriculture 41 Vegetative Cover 8 Water Body 4 Waste Land 2 Open Land 1 Total 100 Source: DEUIP + State of Environment, Report for Delhi, 2001 Surface water contributes to over 86% of Delhi s total drinking water. The Yamuna River provides the major share of this water. Other resources of drinking water supply to Delhi include the Himalayan Rivers through different interstate arrangements and sub-surface resources like 5

6 Ranney wells and tube wells. 5-2) Ground water Table-2 Resources of drinking water Resource Quantity (MLD) Yamuna 950 Bhakra Storage 905 Ganga 450 Surface Water Sub Total 2305 Ranney Wells/ Tube wells 365 Total Raw Water 2670 Source: Delhi Urban Environment & Infrastructure Improvement Project, Status Report for Delhi-21 Ground water exploration is carried out at a depth range of 50 to 150 m in the Delhi Quartzite. The Quaternary deposits constitute the major repository of ground water. Total ground water resources in the NCT Delhi are estimated around as ha m (Central Ground Water Board). The annual extraction of ground water is estimated around ha m (Central Ground Water Board). The abstraction of ground water is more than the estimated availability of ground water. CGWB estimates that 47,945 ha m water is extracted for domestic, industrial and irrigation purposes. 6) Forest Resources Following table shows the areas of protected forests under the Department of Forest and Wildlife. There is one man-made wildlife sanctuary in Delhi managed by the Department of Forests and Wildlife that is Asola Wildlife Sanctuary. Table-3 Protected Forests under Department of Forests and Wildlife Name of the Area (acres) Protected Forest Mitraon 105 Sultanpur 120 Mukhlempur 133 Rajokri 600 Source: Department of Forests and Wildlife, Gov. of NCTD 7) Heritage Resource The NCTD has a lot of heritage resource in the area. These heritage resources continue to be of great significance and relevance to any sustainable development planning vision for Delhi, encompassing a vast range of heritage typologies, including: - Archaeological sites, 6

7 - Fortifications, citadels, different types of palace buildings and administrative complexes, - Religious structures and complexes, including Dargah complexes - Memorials, funerary structures, tombs - Historic gardens, - Traditional networks associated with systems of water harvesting and management - Hunting lodge complexes, - Living settlements such as the historic Walled City, and historic housing stock, - Urbanized historic villages or traditional settlements Social condition 1) Demography Delhi has been one of the fastest growing cities in the country, clocking over 47% decadal growth from , more than double the national rate. A large part of this rapid growth has been due to the high level of migration. Total population of Delhi was13,850,507 at Census The annual average exponential growth rate of population of Delhi was the highest (6.42%) during due to large-scale migration from Pakistan to India after partition in Since then the annual growth has been recorded at 4.22 % during ; 4.25% during ; 4.25% during and 4.15% during The annual growth rate of population of Delhi during has been recorded as 3.85%. 2) Economy Delhi is rapidly emerging as a world-class metropolis. With a 15% average compounded growth rate, it has one of the fastest growing economies in the country, among cities with million plus population. As with all metros, Delhi s economy is driven by the services sector, which accounts for 78% of its GDP and provides employment to 58% of the labor force. The growing affluence of its populace is reflected by the relatively high per capita income, which at Rs. 47,477 in ranks second only to Chandigarh. Its literacy rate of 81.82% (as per census 2001) is fourth highest among states in the country. At the same time, this affluence acts as a magnet for immigration from neighboring states and drives the rapid growth in the City s population. On the one hand the growing population, coupled with the growing per capita income is fuelling the growth of the services sector, which in turn provides employment to a majority of the work force. The high proportion of immigration also provides a ready pool of sources for the unorganized sector of the City, which constitutes a significant portion of the overall economy of Delhi. 3) Urban Poor The Planning Commission of Central Government estimates the proportion and number of poor based on the projection of minimum needs and effective consumption. Such a projection is based 7

8 on the norm of 2,100 calorie per capita per day consumption for an urban area. The calorie norms are invariably expressed in monetary terms that change with respect to weighted commodity indices of the consumer price index. The percentage of people below poverty line (BPL) stood at 49.61% for Delhi in The figure has been declining steadily to 26.22% in 1983; 16.4% in 1991 and 14.69% in The percentage of people below poverty line declined to 10.02% in Around 1 Lakh homeless people (pavement dwellers) constitute another component of the poor in Delhi. They are mostly found in the Walled City or its surrounding areas and generally sleep on the pavements. 7. Legal Framework subject to Environmental and Social Considerations 7.1 Laws, Regulations and Standards Related to Environmental and Social Considerations including requirements and procedures of Environmental Impact Assessment (EIA), stakeholder participation, and information disclosure 1) Laws, Regulations and Standards Related to Environmental and Social Considerations The framework for environment Protection is dictated by the The Environment (Protection) Act enacted in 1986, which is the fundamental law governing environmental protection. The first Notification on Environmental Impact Assessment (EIA) is promulgated at 27 th January 1994, and many amendments or revision added time to time. The latest main notification of EIA is promulgated at 14 th September The other relevant laws on environmental impact assessment are shown in the table below. Table-4 Relevant Environmental Laws and their Enactment Dates The Notification on Environment Impact Assessment 14 September, 2006 Corrigendum 13 November, 2006 Clarification regarding Consideration of Integrated Projects 6 February, 2007 EIA Notification dated 14 th September, 2006 Follow up 15 February, 2007 action reg. 2) Requirements and Procedures of Environmental Impact Assessment (EIA) Requirements of EIA Water supply project itself is not listed in the Schedule of the Notification on EIA (hereafter referred to as EIA Not.2006). However, construction of large-scale buildings including facilities with open to the sky with the area (20,000 m 2 <= area < 150,000 m 2 ) are required EIA. Therefore the necessity of EIA Clearance depends on the proposed projects in the master plan by this JICA Study. Procedure of EIA According to the EIA Not.2006, the environmental clearance procedures in India are as follows: 8

9 The environmental clearance process for new projects will comprise of a maximum of four stages, all of which may not apply to particular cases described in the notification. These four stages in sequential order are: Stage (1) Screening (Only for Category B projects and activities) Stage (2) Scoping Stage (3) Public Consultation Stage (4) Appraisal Stage (1) - Screening: In case of Category B projects or activities in the EIA Not.2006, this stage will entail the scrutiny of an application seeking prior environmental clearance by the State Expert Appraisal Committee (SEAC) for determining whether or not the project or activity requires further environmental studies for preparation of an Environmental Impact Assessment (EIA) for its appraisal prior to the grant of environmental clearance depending upon the nature and location specificity of the project. The projects requiring an EIA report shall be termed Category B1 and remaining projects (Category B2 ) will not require an Environment Impact Assessment report. Category A projects are not required the screening. Stage (2) - Scoping: The Expert Appraisal Committee (for Category A ) of Central Government or State Expert Appraisal Committee (for Category B1 ) of NCTD determines the Terms of Reference on the basis of the information furnished in the prescribed application Form1/Form 1A in the EIA Not.2006 including Terms of Reference proposed by the applicant. All projects and activities listed as Category B in Item 8 of the Schedule (Construction/Township/Commercial Complexes /Housing) in the EIA Not.2006 do not require Scoping and will be appraised on the basis of Form 1/ Form 1A and the conceptual plan. The Terms of Reference (TOR) is conveyed to the applicant by the Expert Appraisal Committee or State Expert Appraisal Committee within sixty days of the receipt of Form 1. Stage (3) - Public Consultation: All Category A and Category B1 projects or activities shall undertake Public Consultation, except the followings: (a) Modernization of irrigation projects (item 1(c) (ii) of the Schedule), (b) All projects or activities located within industrial estates or parks (item 7(c) of the Schedule) approved by the concerned authorities, and which are not disallowed in such approvals, (c) Expansion of Roads and Highways (item 7 (f) of the Schedule) which do not involve any further acquisition of land, (d) All Building /Construction projects/area Development projects and Townships (item 8), 9

10 (e) All Category B2 projects and activities, and (f) All projects or activities concerning national defence and security or involving other strategic considerations as determined by the Central Government. The public hearing is conducted by the State Pollution Control Board (SPCB) or the Union territory Pollution Control Committee (UTPCC) within 45 (forty five) days of a request to the effect from the applicant. After completion of the public consultation, the applicant addresses all the material environmental concerns expressed during this process, and make appropriate changes in the draft EIA and EMP. The final EIA report, so prepared, is submitted by the applicant to the concerned regulatory authority for appraisal. The applicant can alternatively submit a supplementary report to draft EIA and Environmental Management Plan (EMP) addressing all the concerns expressed during the public consultation. Stage (4) - Appraisal: The appraisal is made by Expert Appraisal Committee or State Expert Appraisal Committee concerned in a transparent manner. The appraisal of all projects or activities which are not required to undergo public consultation, or submit an EIA report, are carried out on the basis of the prescribed application Form 1 and Form 1A. The appraisal of an application is completed by the Expert Appraisal Committee or State Expert Appraisal Committee concerned within sixty days of the receipt of the final EIA report and other documents or the receipt of Form 1 and Form 1 A, where public consultation is not necessary and the recommendations of the Expert Appraisal Committee or State Expert Appraisal Committee is placed before the competent authority for a final decision within the next fifteen days. 3) Stakeholder participation The procedure for conduct of public hearing is described at Appendix IV of the EIA Not.2006 The process is as follows; - The Applicant makes a request through a simple letter to the Member Secretary of the Delhi Pollution Control Committee (DPCC), - The Applicant encloses with the letter of request, at least 10 hard copies and an equivalent number of soft (electronic) copies of the draft EIA Report, prepared strictly in accordance with the Terms of Reference communicated after Scoping (Stage-2). Simultaneously the applicant arranges to forward copies, one hard and one soft, of the above draft EIA Report along with the Summary EIA report to the Ministry of Environment and Forests (MoEF) and to the following authorities or offices, within whose jurisdiction the project will be located: 10

11 (a) District Magistrate/s (b) Municipal Corporation (c) District Industries Office (d) Concerned Regional Office of the MoEF - On receiving the draft EIA report, the abovementioned authorities except the MoEF, shall arrange to widely publicize it within their respective jurisdictions requesting the interested persons to send their comments to the concerned regulatory authorities. They also make available the draft EIA Report for inspection electronically or otherwise to the public during normal office hours till the Public Hearing is over. The MoEF promptly display the Summary of the draft EIA report on its website, and also make the full draft EIA available for reference at a notified place during normal office hours in the Ministry at Delhi. - The Delhi Pollution Control Committee (DPCC) also make similar arrangements for giving publicity about the project within the UCTD and make available the Summary of the draft EIA report for inspection in select offices or public libraries etc. They also additionally make available a copy of the draft EIA report to the above five authorities/offices viz, MoEF, District Magistrate etc. 4) Information disclosure The information disclosure system through EIA clearance procedure is already mentioned above. In addition, the Right to Information Act came into force on the 12 th October, 2005 (120 th day from its enactment on 15th June, 2005). The Act extends to the whole of India except the State of Jammu and Kashmir. It includes the right to; - Inspect works, documents, records, - Take notes, extracts or certified copies of documents or records. - Take certified samples of material. - Obtain information in form of printouts, diskettes, floppies, tapes, video cassettes or in any other electronic mode or through printouts. 11

12 7.2 Relative Agencies and Institutions 1) Directly Relative Agencies and Institution for EIA Name of the Agency Role Ministry of Environment & The MoEF is the nodal agency in the administrative Forests (MoEF) structure of the Central Government. The Impact Assessment Division controls the EIA in whole country and controls EIA application of Category A.. State Environment Impact Assessment Authority (SEIAA) Expert Appraisal Committee (EAC) State Expert Appraisal Committee (SEAC) Delhi Pollution Control Committee (DPCC) Environmental Pollution (Prevention and Control) Authority (EPPCA) Central Ground Water Board SEIAA is constituted by the Central Government under the Environment (Protection) Act, EAC controls ant appraises EIA application of Category A. SEAC controls and appraises EAI application of Category B. The DPCC hold public hearing for the application of Category B in EIA procedure at Delhi level Enforcement of environmental regulation in NCR, hazardous substances Control of well digging and ground water monitoring. 2) Other Relative Agencies and Institution Name of the Agency The Role Central Pollution Control Board Compliance at national level, monitoring of water quality of the Yamuna River and discharging drains at various locations Municipal Corporation of Delhi (MCD) Environmental Pollution (Prevention and Control) Authority (EPPCA) Department of Industry Delhi State Industrial Development Corporation (DSIDC) Delhi Development Authority (DDA) New Delhi Municipal Corporation (NDMC) Delhi Cantonment Board (DCB) Central Water Commission Central Ground Water Board Solid Waste Management, drainage and sewerage, street cleaning Enforcement of environmental regulation in National Capital Region, hazardous substances relocation of polluting and non conforming industries Development of parks and open spaces Solid waste management, drainage and sewerage, street cleaning of the New Delhi area Solid waste management, drainage and sewerage, street cleaning of the Delhi Cantonment area Monitors the river flow and water quality at three regular stations Ground water monitoring. 12

13 Other Relative Agencies and Institution (Continue) Name of the Agency The Role Ridge Management Board Management of Delhi Ridge Irrigation and Flood Control Department Delhi Jal Board (DJB) Management of water bodies lakes, tanks and ponds of Delhi Ensuring water supply & sewerage treatment in Delhi, and discharges in River Yamuna. 8. Provisional Scoping (types and magnitudes of possible adverse impacts ) The preparatory study team conducted provisional scoping for the Study in compliance with JICA Guideline. The components of the Study are NRW reduction pilot project, SCADA pilot project. And possible components to be proposed in the M/P are likely to be reconstruction/rehabilitation of existing water treatment plants (WTPs) and pipe networks, and construction of new WTPs and water supply facilities in outer areas of Delhi. The SCADA project is excluded from the scoping due to no adverse impact expected. Therefore the scoping for possible five components is examined at this stage. The result is shown following pages. 13

14 Environmental Elements Social Environment 1 Involuntary Resettlement 2 Local Economy such as employment and Livelihood, etc. 3 Land use and Utilization of Local resources 4 The poor, Indigenous and Ethnic people NRW Project in the Zone South III Provisional Scoping for the Study Reconstruction/Rehabilitation of existing WTPs Provisional Possible Components in the M/P Reconstruction/Rehabilitation of existing Pipe Networks Construction of New WTPs in outer areas of Delhi Construction of New Water Supply Facilities in outer areas of Delhi Rating and Justification Rating and Justification Rating and Justification Rating and Justification Rating and Justification C The roadwork may B The roadwork may B Small scale B Small scale entail temporary entail temporary resettlement of local resettlement of local involuntary involuntary residents may be residents may be resettlement of resettlement of required. required. pavement dwellers if pavement dwellers in they live in the zone. the Walled City or its C The roadwork may temporarily cost pavement dwellers their job opportunities and means of livelihood if they live in the zone. C Pavement dwellers may temporarily loose their means of livelihood if they live in the zone. surrounding areas. B The roadwork may temporarily cost pavement dwellers their job opportunities and means of livelihood in the Walled City or its surrounding areas. B The poor are basically considered to be beneficiaries of the project. However, Pavement dwellers may temporarily loose their means of livelihood during the roadwork. - Drinking-water selling businesses with small scale seem not to have been developed yet. The upcoming development study shall clarify the issue. B Land-use alteration of acquisitioned lands is probably expected The issue on water resource is out of scope of this project, B Land-use alteration of acquisitioned lands is probably expected 14

15 Environmental Elements Social Environment Natural Environment 5 Cultural Heritage 6 Topography and Geological Features 7 Flora and Fauna and Biodiversity NRW Project in the Zone South III Provisional Scoping for the Study (continue 1) Reconstruction/Rehabilitation of existing WTPs Provisional Possible Components in the M/P Reconstruction/Rehabilitation of existing Pipe Networks Construction of New WTPs in outer areas of Delhi Construction of New Water Supply Facilities in outer areas of Delhi Rating and Justification Rating and Justification Rating and Justification Rating and Justification Rating and Justification C The Siri Fort exists in C NCTD riches in NCTD riches in NCTD riches in the Zone, however, the. cultural heritage, cultural heritage, cultural heritage, adverse impacts especially in the against the Fort are central zone. unknown at present. 8 Meteorology Hhowever, the adverse impacts against those are unknown at present. however, the adverse impacts against those are unknown at present. C The construction may have adverse impacts on important topography and geological features. However, its possibility and extent are unknown at present. C Many conservation and protected areas exist in the NCTD. Hhowever, the adverse impacts against those are unknown at present. B Enough water supplies may cause expansion of urbanized area and industrial development in NCTD. It may contribute to change of local meteorology. C C B however, the adverse impacts against those are unknown at present. The construction may have adverse impacts on important topography and geological features. However, its possibility and extent are unknown at present. Many conservation and protected areas exist in the NCTD. Hhowever, the adverse impacts against those are unknown at present. Enough water supplies may cause expansion of urbanized area and industrial development in NCTD. It may contribute to change of local meteorology. 15

16 Environmental Elements Natural Environment Pollution NRW Project in the Zone South III Provisional Scoping for the Study (continue 2) Reconstruction/Rehabilitation of existing WTPs Provisional Possible Components in the M/P Reconstruction/Rehabilitation of existing Pipe Networks Construction of New WTPs in outer areas of Delhi Construction of New Water Supply Facilities in outer areas of Delhi Rating and Justification Rating and Justification Rating and Justification Rating and Justification Rating and Justification 9 Landscape B The construction may B The construction may. influence landscape to influence landscape to 10 Global Warming 11 Air Pollution 12 Water B The augmentation of Pollution supply water will increase discharged water to natural water resources and cause their deterioration. 13 Wastes C Generated wastes are anticipated very marginal. 14 Noise and Vibration B Some noise/vibrations may occur during the roadwork. B The construction vehicles may cause air pollution B The augmentation of supply water will increase discharged water to natural water resources and cause their deterioration. B Increase of B construction and sludge wastes are anticipated. Some noise/vibrations may occur during the roadwork. B The construction vehicles may cause air pollution B The augmentation of supply water will increase discharged water to natural water resources and cause their deterioration. B Increase of B construction wastes may happen. It will depend on contents of proposal. Some noise/vibrations may occur during the roadwork. B some extent. Enough water supplies may cause expansion of urbanized area and industrial development in NCTD. It may contribute to global warming. B The construction vehicles may cause air pollution B The augmentation of supply water will increase discharged water to natural water resources and cause their deterioration. B Increase of sludge wastes is anticipated due to increase of treated water.. B Some noise/vibrations may occur during the roadwork. B some extent. Enough water supplies may cause expansion of urbanized area and industrial development in NCTD. It may contribute to global warming. B The construction vehicles may cause air pollution B C B The augmentation of supply water will increase discharged water to natural water resources and cause their deterioration. Generated wastes are anticipated very marginal. Some noise/vibrations may occur during the roadwork. 16

17 Environmental Elements Pollution Bottom Sediment Overall judgement NRW Project in the Zone South III Provisional Scoping for the Study (continue 3) Reconstruction/Rehabilitation of existing WTPs Provisional Possible Components in the M/P Reconstruction/Rehabilitation of existing Pipe Networks Construction of New WTPs in outer areas of Delhi Construction of New Water Supply Facilities in outer areas of Delhi Rating and Justification Rating and Justification Rating and Justification Rating and Justification Rating and Justification B B Augmentation of water supply will entail increase of sludge and back wash water in WTPs. The discharged sludge and back wash water may deposit in drains and river bottoms. Augmentation of water supply will entail increase of sludge and back wash water in WTPs. The discharged sludge and back wash water may deposit in drains and river bottoms. B The NRW project may increase of discharged water and cause deterioration of surrounding water environment. In addition, some noise/vibration may occur temporarily during the roadwork. The M/P is likely to propose reconstruction/rehabilitation of existing WTPs and pipe networks, and construction of new WTPs and water supply facilities in outer areas of Delhi. In such a case, the implementation of those proposed components may cause adverse impacts such as land acquisition and involuntary resettlement, local economy, land use and utilization of local resources, poverty, meteorology, landscape, global warming, bottom sediment, etc. Note : Rating A : Serious, B : Some, C : Extent of impact is unknown - : No. IEE or EIA is not necessary. 17

18 9. Alternatives to the project activities including without project option and impact mitigation measures 9.1 Alternatives to the project activities The Study aims at improvement of drinking water supply condition to meet drinking water demand in NCTD. On the other hand, rapid growth population in NCTD requires larger amount of drinking water supply, however, the water resource in NCTD is limited and scarce: groundwater tables have been getting lower and lower in various areas for years and the groundwater quality also getting worse in NCTD. Other water resource in the Study Area, i.e. rain water, is also limited. Therefore, the development plan of those local water resources can not meets increasing water demand, and can not be alternatives of the Study. Other idea for alternatives is decentralization of current and future population in NCTD. However, the main cause of rapid growth population in NCTD is population inflow from neighbour states, and the upper level Mater plan of the Study, Delhi Master Plan 2021, has been formulated on the base of prospected increased population. Therefore the idea with decentralization of the population is not realistic as the alternative. Under these situations, it is very difficult to find effective alternatives of the Study so that consideration about without project case and with project case is implemented from the environmental and social points of view. The consideration result is shown in following table as relative evaluation. Social Environment Consideration results on without project case and with project case Case Environmental Elements Without the Study With the Study Impacts Good Impact /Bad 1 Involuntary Nothing will occur. Partially possible Resettlement 2 Local Economy No change Creation of employment opportunity, temporary involuntary resettlement of pavement dwellers 3 Land use and No change Change of land use Utilization of Local resources 4 Social institution Deterioration of Increase of reliability such as Social reliability among among citizens, infrastructure and citizens, Government Government of NCTD and - Local of NCTD and DJB DJB decision-making institutions 5 Existing Social Infrastructure and Services 6 The poor, Indigenous and Ethnic people 7 Misdistribution of benefits and Damage. No change Deterioration of health and water supply conditions No change - Good /Bad - +/- Improvement of drinking water supply condition :+ Improvement of health and water supply conditions + Realization of fair allocation of drinking water 8 Cultural Heritage No change No change is anticipated

19 Social Environment Natural environment Consideration results on without project case and with project case (continue) Environmental Elements Without the Study Impacts Good /Bad Case With the Study Impact 9 Local Conflict of Scrambling of drinking Mitigation of sscrambling - interest water of drinking water + 10 Water Usage, Water Rights and Commune No change Out of the scope of the Study Rights 11 Sanitation Deterioration of health Improvement of health and and water supply conditions - drinking water supply condition + 12 Natural Disaster Nothing will occur. Decrease of draught (Risk) damage + Infectious Disease No change. No change such as HIV/AIDS 13 Topography and No change The impacts are unknown Geological Features 14 Soil Erosion No change No possibility 15 Groundwater Illegal digging of wells Appropriate groundwater - may increase. use + 16 Hydrological No change. Out of the scope Situation 17 Coastal area No coastal area No coastal area 18 Flora and Fauna and No change Avoiding adverse impacts Biodiversity 19 Meteorology No change Change of local meteorology by extension - of urbanized area 20 Landscape No change Partially possible - 21 Global Warming No change Global warming by extension of urbanized - area 22 Air Pollution Nothing will occur. Temporarily occur? - 23 Water Pollution Nothing will occur. Increase of discharged water - 24 Soil Contamination Nothing will occur. Almost nothing will occur 25 Wastes No change Increase of wastes? 26 Noise and Vibration No change Temporarily occur - 27 Ground Subsidence Increase of illegal Decrease of illegal groundwater use may groundwater use - cause ground + subsidence 28 Offensive Odor Nothing will occur. No change 29 Bottom Sediment Nothing will occur. Deposition of sludge in drains and river beds Accidents Nothing will occur. Almost nothing will occur Note : +: Positive impact, -: Adverse impact, +/- Both impacts will occur Pollution Good /Bad The consideration above brings following conclusion; Without the Study case is considered to bring increases of drinking water shortage, its pollution, illegal distraction of groundwater and illegal connection to water transmission and 19

20 distribution pipes. In addition to that, it will bring deterioration of social capital among Government of NCTD, DJB and citizens. With the Study case is considered to bring adverse impacts such as temporary involuntary resettlement of pavement dwellers and few permanent involuntary resettlement, and positive impacts such as dissolution of water shortage and water pollution, realization of fair water allocation, moderation of interest opposition, reduction of drought damage, appropriate groundwater use, creation of job opportunity, increase of social capital and so on; the With project case shows high performances though it has several adverse impacts. The implementation of the Study is supposed to be more relevant than without the Study case for sustainable development of NCTD. 9.2 Provisional impact mitigation measures to be considered Provisional mitigation measures to be considered listed in the following table for with the Study case Provisional impact mitigation measures to be considered Environmental Elements Alternatives / Mitigation Measures 1 Involuntary Resettlement Rehabilitation and augmentation of existing water supply systems shall be firstly examined to increase water supply capacity. In case that there are no other ways except construction of new water supply system, the land acquisition shall be planed to minimize involuntary resettlement. 2 Local Economy It is necessary to make a plan to decrease loss of means of livelihood of pavement dwellers. 3 Land use and Utilization of Local resources Rehabilitation and augmentation of existing water supply systems shall be firstly examined to increase water supply capacity. In case that there are no other ways except construction of new water supply system, allocation of the water supply systems and land acquisition shall be planed to minimize the impacts against those land use and utilization of local resources. 6 Poor It is necessary to make a plan to decrease loss of means of livelihood of pavement dwellers. 8 Cultural Heritage Rehabilitation and augmentation of existing water supply systems shall be firstly examined to increase water supply capacity. In case that there are no other ways except construction of new water supply system, allocation of the water supply systems shall be planed to minimize the impacts against cultural heritage. Social Environment Natural Environment 6 Topography and Geological Features Rehabilitation and augmentation of existing water supply systems shall be firstly examined to increase water supply capacity. In case that there are no other ways except construction of new water supply system, allocation of the water supply systems and land acquisition shall be planed to minimize the impacts against valuable topography and geological features. 20

21 Natural Environment Pollution Pollution Provisional impact mitigation measures to be considered (continue) Environmental Elements 6 Topography and Geological Features 7 Flora and Fauna and Biodiversity Alternatives / Mitigation Measures Rehabilitation and augmentation of existing water supply systems shall be firstly examined to increase water supply capacity. In case that there are no other ways except construction of new water supply system, allocation of the water supply systems and land acquisition shall be planed to minimize the impacts against valuable topography and geological features. Rehabilitation and augmentation of existing water supply systems shall be firstly examined to increase water supply capacity. In case that there are no other ways except construction of new water supply system, allocation of the water supply systems and land acquisition shall be planed to minimize the impacts against valuable flora and fauna and biodiversity. 8 Meteorology Envisaged local meteorological change will be a result of urbanization planed in Delhi Master Plan It is impossible to avoid the impacts by this project itself. 9 Landscape Rehabilitation and augmentation of existing water supply systems shall be firstly examined to increase water supply capacity. In case that there are no other ways except construction of new water supply system, the facilities shall be designed to minimize the impacts against existing landscape. 10 Global Warming Envisaged global warming will be a result of urbanization planed in Delhi Master Plan It is impossible to avoid global warming by this project itself. 11 Air Pollution Countermeasures against air pollution shall be taken during the construction stages of the proposed water supply system. 12 Water Pollution Suitable treatment of back washed water and sludge disposal in water treatment plants shall be considered. It is desirable to conduct enlightening activity of public about saving water for decrease of pollution load in discharged water. 13 Waste Suitable treatment for construction debris and sludge disposal in water treatment plants shall be considered. 14 Noise and Vibration The equipment with lower noise and vibration shall be preferred in the M/P. In addition, allocation plan, which can minimize the impacts to surrounding area, shall be examined. 15 Bottom Sediment Treatment of back wasted water and sludge disposal in water treatment plants shall be considered. 10. Result of the consultation with recipient government or environmental and social consideration including roles and responsibilities. No consultation results with recipient government at present. 11. Terms of Reference of Environmental and Social Considerations Collect necessary additional information and review results of the provisional environmental scoping 21

22 carried out during the preparatory study, and conduct the environmental screening and scoping as Initial Environmental Examination (IEE) in the phase of the Study in accordance with the JICA Environmental and Social Considerations Guideline. Water supply project itself is not listed in the Schedule of the EIA Not.2006 of Indian government regulation. However, construction of large-scale buildings including facilities with open to the sky with the area (20,000 m 2 <= area < 150,000 m 2 ) are required EIA. Therefore it is necessary to obtain EIA Clearance to implement the components proposed in the M/P under the Study when the proposed facilities request wider areas than the regulation value. 12. Other relevant information For baseline information related to the environment in the Study Area, State of Environment of Delhi, 2008 will issue at an early date. The information will be available at Department of Environment in Government of NCTD. 22

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

Summary of Preparatory Study for Development Study

Summary of Preparatory Study for Development Study Summary of Preparatory Study for Development Study Creation Date: 30 March 2007 1. Full title of the Project The Study for Sustainable Rural Drinking Water Supply in the Southern Khatlon Oblast in the

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco Summary of Environmental and Social Considerations in Detailed Planning Survey on the Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project Project for Updating Dakar Urbanization Master Plan by

More information

4. Agency (or Institution) Responsible for Implementing the Project

4. Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study 1. Full Title of the Project Urban Transport Policy and System Development Master Plan for the ity of Dar es Salaam 2. Type of Study Master Plan 3. ategorisation and Its Reason

More information

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda Summary of Preparatory Study 1. Full Title of the Project The Development Study on Water Resources Development and Management for Lake Kyoga asin in the Republic of Uganda 2. Type of Study Master plan

More information

CHECKLIST FOR ENVIRONMENTAL PUBLIC HEARINGS and PUBLIC CONSULTATION UNDER EIA NOTIFICATION,

CHECKLIST FOR ENVIRONMENTAL PUBLIC HEARINGS and PUBLIC CONSULTATION UNDER EIA NOTIFICATION, CHECKLIST FOR ENVIRONMENTAL PUBLIC HEARINGS and PUBLIC CONSULTATION UNDER EIA NOTIFICATION, 2006 1 The EIA notification, 2006 specifies four stages for the environment clearance of development and industrial

More information

1.Background JICA PROJECT BRIEF NOTE. May 2014

1.Background JICA PROJECT BRIEF NOTE. May 2014 JICA PROJECT BRIEF NOTE Japanese Technical Cooperation for THE ASSISTANCE RELATED TO DELHI WATER SUPPLY IMPROVEMENT PROJECT IN CHANDRAWAL WATER TREATMENT PLANT COMMAND AREA - Accelerating Implementation

More information

Summary Report on the Preparatory Study for Environmental and Social Considerations

Summary Report on the Preparatory Study for Environmental and Social Considerations Summary Report on the Preparatory Study for Environmental and Social Considerations October 25, 2007 1. Title of the Cooperation Project, Relevant Project Report 1-1 Title of the cooperation project Feasibility

More information

Summary of Preliminary Study Result for Technical Cooperation Project

Summary of Preliminary Study Result for Technical Cooperation Project Summary of Preliminary Study Result for Technical Cooperation Project 1. Title of the Cooperation Project, Relevant Project Report The Project for Bridge Construction in Southeast Sulawesi Province Project

More information

Agency (or Institution) Responsible for Implementing the Project

Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study Full Title of the Project The Study on Integrated Flood Management for Nyando River asin in the Republic of Kenya Type of Study Master Plan ategorisation and Its Reason 3.1

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 10 December 2007 Summary of and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Study on Bheramara 450MW Combined Cycle Power Station in Bangladesh 2. Type of the study:

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Full title of the Project The Study for the Development of an Integrated Solution Related to Industrial Waste Management in the Industrial Pole of Manaus 2. Type of the

More information

ENVIRONMENTAL SCOPING PLAN

ENVIRONMENTAL SCOPING PLAN APPENDIX F ENVIRONMENTAL SCOPING PLAN F.1 DATA OF EXAMINATION Table F.1.1 Data of Examination No. Items Description 1 Full title of the Project and relevant report 2 Type of the study Development Study

More information

Appendix 3 The World Bank s New Operational Manual

Appendix 3 The World Bank s New Operational Manual Appendix 3 The World Bank s New Operational Manual Appendix 4 Environmental Consideration in JICA Outline of Environmental Consideration in JICA 1Introduction Various studies

More information

Environment Impact Assessment (EIA) Notification 2006

Environment Impact Assessment (EIA) Notification 2006 Environment Impact Assessment (EIA) Notification 2006 Information Sources: 1.) Environment Impact Notification 2006; Gazette of India, 14th September, 2006 2.) Green Tapism; Environment Support Group;

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study ate: September 9, 2008 1. Title of the Cooperation Project Waste Minimization and Recycling Promotion Project 2. Categorization and its reason Environmental Category: B The

More information

Summary of Preparatory Study for Development Study (M/P)

Summary of Preparatory Study for Development Study (M/P) Summary of Preparatory Study for Development Study (M/P) 1. Title of the Cooperation Project The Study on Integrated Water Resources Management for Poverty Alleviation and Economic Development in the Pampanga

More information

Summary of Preliminary Study

Summary of Preliminary Study Summary of Preliminary Study 1. Title of the Cooperation Project ridge Construction Project for Expanded Agrarian Reform Communities Development in the Republic of the Philippines 2. Categorization and

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: India Project: Orissa Integrated Sanitation Improvement Project (Loan Agreement: 03/30/2007; Loan Amount: 19,061 million yen; Borrower: The President

More information

Water Supply & Sanitation

Water Supply & Sanitation Water Supply & Sanitation 1. Delhi Jal Board is responsible for procurement and treatment of allocated raw water to Delhi. Delhi Jal Board make bulk supply of treated potable water to Delhi Cantonment

More information

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8 Summary of Preliminary Study Result for Technical Cooperation Project Date: 2008/10/8 1. Full title of the Project The Project on Integrated UMRT and Urban Development for Hanoi 2. Type of the study Feasibility

More information

Outline of the presentation

Outline of the presentation Socio-economic considerations in environmental decision-making in India Asha Rajvanshi ar@wii.gov.in Head, EIA Cell Wildlife Institute of India, Dehradun Outline of the presentation Historical perspective

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

Investing in Sustainable cities. Water Management in urban areas: Yangon s case

Investing in Sustainable cities. Water Management in urban areas: Yangon s case Investing in Sustainable cities Water Management in urban areas: Yangon s case I. Water management: general perspective The main goals of urban water and waste water management are : provide clean water

More information

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and

More information

Ex-ante Evaluation (for Japanese ODA Loan)

Ex-ante Evaluation (for Japanese ODA Loan) Ex-ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Kerala Water Supply Project (III) Loan Agreement: March 31, 2009 Loan Amount: 12,727 million Yen Borrower: The

More information

5.4 Initial Environmental Examination

5.4 Initial Environmental Examination 5.4 Initial Environmental Examination The objectives of Initial Environmental Examination (IEE) are to examine and identify the necessity of Environmental Impact Assessment (EIA), and to identify potentially

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Date: March 16, 2015 Environmental and Social onsiderations in Detailed Planning Survey (Technical ooperation for Development Planning) 1. Full title of the Project THE PROJET ON THE ORRIDOR DEVELOPMENT

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Preparatory Study for Development Study (M/P or F/S)

Preparatory Study for Development Study (M/P or F/S) Preparatory Study for Development Study (M/P or F/S) 1. Title of the Cooperation Project and Name of the Project Proponent (1) Title of the Cooperation Project The Study for Groundwater Development in

More information

PREPARATORY STUDY FOR DEVELOPMENT STUDY (M/P & F/S)

PREPARATORY STUDY FOR DEVELOPMENT STUDY (M/P & F/S) PREPARATORY STUDY FOR DEVELOPMENT STUDY (M/P & F/S) 1. Title of the ooperation Project and Name of the Project Proponent (1) Title of the ooperation Project (2) The Study on Water Supply and Sewerage System

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: The Kanchpur, Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Kanchpur, Meghna and Gumti 2 nd Bridges Construction and Existing

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Kingdom of Morocco Project: Sewerage System Development Project (III) Loan Agreement: March 26, 2013 Loan

More information

PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia

PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia PREPARATORY STUDY FOR DEVELOPMENT STUDY 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia 2. Type of the Study Study on improvement of planning capability

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods. 1 FACTSHEET INTRODUCTION World Water Day, on 22 March every year, is about focusing attention on the importance of water. This year s theme, Nature for Water, explores nature-based solutions (NBS) to the

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

SCOPING SUMMARY [DRAFT] THE PROJECT FOR THE UPGRADING AND REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA

SCOPING SUMMARY [DRAFT] THE PROJECT FOR THE UPGRADING AND REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA 1. Title of the Project: SCOPING SUMMARY [RAFT] THE PROJECT FOR THE UPGRAING AN REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA The Project for the Upgrading and Refurbishment of CEMASTEA

More information

REPORT ON ENVIRONMENTAL ASPECTS COMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA

REPORT ON ENVIRONMENTAL ASPECTS COMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA REPORT ON ENVIRONMENTAL ASPETS OMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA 1. TITLE OF THE OOPERATION PROJET AND NAME OF THE PROJET PROPONENT 1.1 Project Title omprehensive study on Disaster

More information

Public Consultation: Environmental Impact Assessment (EIA) Indian Perspective

Public Consultation: Environmental Impact Assessment (EIA) Indian Perspective Public Consultation: Environmental Impact Assessment (EIA) Indian Perspective G.V.Reddy*, M.Srinivasa Reddy and J.Jyothirmai TEAM LABS AND CONSULTANTS B- 115-117 & 509, Aditya Enclave, Ameerpet, Hyderabad,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Ex-ante Evaluation. Indonesia have one of the important strategic programs of increasing stable water supply and

Ex-ante Evaluation. Indonesia have one of the important strategic programs of increasing stable water supply and Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Integrated Water Resources and Flood Management Project for Semarang (Loan Agreement: March 29, 2006; Loan Amount:

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS 20.8.10 PURPOSE AND INTENT... 8-2 20.8.20 INCORPORATION OF SMARA AND STATE REGULATIONS... 8-2 20.8.30 APPLICABILITY...8-2 20.8.40 CONTENTS OF

More information

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Category Environmental Item Main Check Items Confirmation of Environmental Considerations al Checklist: 2. Oil and Natural Gas Development 1 1 Permits and Explanation 2 Mitigation (1) EIA and al Permits (2) Explanation to the Public (1) Air Quality (2) Water Quality (3) Wastes Have EIA reports

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

GREEN DEVELOPMENT POLICY

GREEN DEVELOPMENT POLICY GREEN DEVELOPMENT POLICY 1. A NEED AND JUSTIFICATION FOR THE TRANSITION TO GREEN DEVELOPMENT 1.1. Global Perspective Climate change, rapid economic and population growth, the sharp increase in consumption

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Second Ho Chi Minh City Water Environment Improvement Project (I) (II) (III) L/A signed on: March

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

Forest (Conservation) Amendment Rules, 2004

Forest (Conservation) Amendment Rules, 2004 Forest (Conservation) Amendment Rules, 2004 (Published in Gazette of India: Extraordinary on 3 rd February, 2004 and Corrigendum on 9 th February, 2004) G.S.R.94 (E)- In exercise of the powers conferred

More information

14. Sewerage / Urban Drainage Sub-sector. Guideline:

14. Sewerage / Urban Drainage Sub-sector. Guideline: Sub-sector Guideline: (1) Sewerage (Adaptation Project) (2) Sewerage (BAU Development with Adaptation Options) (3) Urban Drainage (Adaptation Project) (4) Urban Drainage (BAU Development with Adaptation

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014. EXECUTIVE SUMMARY E1 Introduction The proponent is SOLAR FIELD LTD, a consortium between 1. Dhamma Energy, a company based in Spain, specialised in photovoltaic projects 2. Harel Mallac & Co. Ltd, a company

More information

Preparatory Survey for Regional Development for Poverty Reduction Phase II Final Report

Preparatory Survey for Regional Development for Poverty Reduction Phase II Final Report Republic of the Union of Myanmar Foreign Economic Relations Department, Ministry of Planning and Finance Planning Department, Ministry of Planning and Finance Department of Highways, Ministry of Construction

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS CHAPTER 19.66 SURFACE MINING AND RECLAMATION PLAN REGULATIONS Section: 19.66.010 PURPOSE AND INTENT 19.66.020 INCORPORATION OF SMARA AND STATE REGULATIONS 19.66.030 APPLICABILITY 19.66.040 EXEMPTIONS 19.66.050

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japan ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: Republic of Tunisia Project: Mejerda River Flood Control Project Loan Agreement: July 17, 2014 Loan Amount: 10,398

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PETROCHEMICAL PLANTS C A G Citizen consumer and civic Action Group 1. What are the pollution problems associated with petrochemical plants? Petrochemical plants

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Madhya Pradesh Transmission System Modernisation Project Loan Agreement: June 16, 2011 Loan Amount:

More information

Ex-ante Project Evaluation

Ex-ante Project Evaluation Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:

More information

5. EIA Program for Developmental Assistance

5. EIA Program for Developmental Assistance 5. EIA Program for Developmental Assistance 5.1 EIA Process in World Bank In May 1987, a series of structural changes were introduced to strengthen the Bank's environmental policies, procedures and resources.

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives Ex-ante Evaluation 1. Name of the Project Country: India Project: Swan River Integrated Watershed Management Project (Loan Agreement: 03/31/2006; Loan Amount: 3,493 million yen; Borrower: The President

More information

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA Additional Financing of Local Government Enhancement Sector Project (RRP SRI 42759) LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA A. Eligible Local Authority and Subprojects 1. Unless otherwise agreed

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization

More information

1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE

1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE 1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE The Indian experience with Environmental Impact Assessment is just over 20 years old. Till 1994, Environmental Clearance from the central government was an

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The Republic of Albania Project: Greater Tirana Sewerage System Improvement Project (Loan Agreement: June 30, 2008; Loan Amount: 11,121 million yen; Borrower:

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities Pehur High Level Canal Extension Project (RRP PAK 47024) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT Sector Road Map 1. Sector Performance, Problems, and Opportunities

More information

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES PREAMBLE: The purpose of this Implementation Protocol is to detail the

More information

Water Resources CHOIR in China

Water Resources CHOIR in China Water Resources CHOIR in China Strategic research and innovation priorities for water Liu Dengwei 水利部发展研究中心 Development Research Center of the Ministry of Water Resources of China Water Resources CHOIR

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

GREEN NORMS FOR WIND POWER. Potential Impacts and the Need for Green Norms

GREEN NORMS FOR WIND POWER. Potential Impacts and the Need for Green Norms GREEN NORMS FOR WIND POWER Potential Impacts and the Need for Green Norms INDIA WORLD RE: 1% Hydro 2% Biomass 34% Oil: 8% Coal, 43% Nuclear 6% Natural Gas: 21% Hydro 2% Biomass 10% RE 1% Oil: 32% Coal

More information

Excreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India

Excreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India Excreta Matters: 7 th Citizens Report on the state of India s Environment An agenda for water-prudent and waste-wise India Water for growth? Cities-industries need water for growth Vague old water sums

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Dhaka Urban Transport Development Project (I) Loan Agreement: February

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: Ukraine Name of the Project: Bortnychi Sewage Treatment Plant Modernization Project Loan Agreement: June 15, 2015 Loan Amount: 108.193 billion yen

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The People s Republic of China Project: Xinjiang Environmental Improvement Project II (Loan Agreement: December 21, 2007; Loan Amount: 3,802 million yen;

More information

SUMMARY WATER BALANCE ASSESSMENT

SUMMARY WATER BALANCE ASSESSMENT Guangdong Chaonan Water Resources Development and Protection Demonstration Project (RRP PRC 46079) SUMMARY WATER BALANCE ASSESSMENT I. Water Resource Assessment in Chaonan District A. Natural Condition

More information

Sustainable Water Management - Goa Initiatives

Sustainable Water Management - Goa Initiatives Sustainable Water Management - Goa Initiatives Date:27-09.2013 Er. ANAND WACHASUNDAR PROJECT DIRECTOR JICA Project. PWD 1 Goa About Goa Population(2011 Census) 14.57Lakhs Urban Population 62.17% Area 3702

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Feasibility Study on Development of Toamasina Port in the Republic of Madagascar 2. Type

More information

10.1 OBJECTIVES. Note: Refer to Section 6 for Issues, Methods of Implementation, and Environmental Results Anticipated.

10.1 OBJECTIVES. Note: Refer to Section 6 for Issues, Methods of Implementation, and Environmental Results Anticipated. SECTION 10 : RURAL SETTLEMENTS Note: Refer to Section 6 for Issues, Methods of Implementation, and Environmental Results Anticipated. 10.1 OBJECTIVES The objectives contained in this section are specific

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Ex-ante Evaluation. (1) Current Status and Issues of the Agriculture and Irrigation Sector in Kenya

Ex-ante Evaluation. (1) Current Status and Issues of the Agriculture and Irrigation Sector in Kenya Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: The Republic of Kenya Project: Mwea Irrigation Development Project Loan Agreement: August 16, 2010 Loan Amount: 13,178 million yen Borrower:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name. Danang Sustainable City Development Project (SCDP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name. Danang Sustainable City Development Project (SCDP) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name Danang

More information