1 ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL Prepared by : SEPTEMBER 2015

2

3 EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION Nagarcoil Municipality is planning to install MLD capacity common Sewage Treatment Plant in Valampurivilai, Nagercoil Village, Agastheeswaram Taluk of Kannyakumari District along with a Sewage pumping station at Vadiveeswaram, Nagercoil Village through Tamil Nadu Water Supply and Drainage Board (TWAD Board). The EIA report is being prepared for getting environmental clearance for the proposed main pumping station and common STP at Nagercoil Village, Agastheeswaram Taluk of Kannyakumari District. Nagercoil Town is a special grade Municipality in Kanyakumari District of Tamil Nadu State. It lies at a latitude of 8 10 N. and Longitude of E. It is situated at 19Km from Kanyakumari Town in NH-47. This Municipality is the head quarters of Kanyakumari District. The famous Nagaraja temple is located in this town. Tamil Nadu Water Supply and Drainage Board (TWAD Board) is a statutory body formed by Government of Tamil Nadu on It is responsible for the implementation of providing Water Supply and Sewerage facilities to the public of the entire state of Tamilnadu except Chennai Metropolitan area. Its main objective is Supply of Safe and potable water to the public and it is ensured by the quality through 83 laboratory services throughout the state. 1.1 Project Proposal Nagercoil municipality is divided into 9 zones based on the topography of the area & in Phase I, it is proposed to implement sewage scheme to the zone II which is the core area of the Municipality. The balance zones will be covered in the second phase of the UGSS. For the proposed scheme a pumping station is located at Vadiveeswaram to collect the sewage. From this Pumping station, sewage will be pumped to the treatment plant at Valampurivilai which is about 2.48 km away from this pumping station. The total sewage collected is proposed to be treated in the Sewage Treatment Plant of capacity MLD with EASP technology. The treated effluent will be pumped to the Thengampudur ayacuts for irrigation of 833 acres. 1

4 The Proposal for Phase I has been administratively approved vide G.O. Ms. No. 37/MAWS/DT for Rs Crores Land Requirement The land-use breakup details are given in Table TABLE - 1.1: LANDUSE BREAK-UP S.No Area (Acres) Area (Acres) 1 Plant and buildings Road Area Green belt Area Vacant Area 1.48 Total Water Requirement The requirement of water for pumping station is 2 KLD and the requirement of water for STP is 5 KLD. The Nagercoil Municipality will supply the water as per requirement by providing water connection. The sewage generated will be pumped into raw sewage receiving chamber of STP Manpower Requirement The manpower requirement of the proposed project is 128 Nos Power and Fuel Requirement The power Requirement for the proposed STP and pumping station is 280 KW and 528 KW, which will be sourced from Tamil Nadu Generation and Distribution Corporation (TANGEDCO). One standby 1000 KVA, 3 phase 415 V water cooled Diesel Genset is proposed. Provision of separate EB feeder main is also available. 2.0 DESCRIPTION OF THE ENVIRONMENT 2.1 Location of the Project The proposed STP site is located at Valampurivilai, Nagercoil Village,. Geographically, it is situated at 2

5 latitude N, longitude E and is located at 40 m above the MSL. The proposed sewage pumping station is located at Vadiveeswaram, Nagercoil Village,. Geographically, it is situated at latitude N, longitude E and is located at 11 m above the MSL. The details of environmental setting are given in Table 1.2. The topographical feature of the study area within 10-km radius is depicted in Figure TABLE : Environmental Setting S. No. Particulars Details STP Pumping Station 1 Latitude N N 2 Longitude E E 3 Elevation above MSL 40 m 11 m 4 Land use Public & semi public use Educational use and now alienation proposal is sent to Govt. 5 Nearest Highway NH-47 connecting Salem Kochi - Kannyakumari 0.8 km, NE NH-47 connecting Salem Kochi - Kannyakumari 1.0 km, S 6 Nearest Railway station Nagercoil Railway Station 1.5 km, NE Nagercoil Railway Station 0.5 km, SE 7 Nearest Air Port Thiruvananthapuram Airport 66 Km, NW Thiruvananthapuram Airport 66 Km, NW 8 Nearest Habitation Kottar 0.2 km, SW Vadiveeswaram 0.1 km, W 9 Nearest Town Nagercoil 3.4 km, NW Nagercoil 3.4 km, WNW 10 Nearest Harbour Thoothukudi 107 km, NE Thoothukudi 105 km, NE 11 Reserve Forests Nil in 5 km radius 12 Nearest Water body Sabayar Kulam 1.4 km, E Pazhayar River 1.8 km, E Parakkai Lake 1.72 km, SE 13 Ecologically sensitive places Sabayar Kulam 1.5 km, SE Pazhayar River 0.8 km, NE Parakkai Lake 2.2 km, SE Nil in 5 km radius 14 Defense Installation Nil in 5 km radius 15 Historical places Nil in 5 km radius 16 Socio-economic factors No Resettlement and Rehabilitation issues are involved 3

6 FIGURE : STUDY AREA MAP 10 KM RADIUS 2.2 Baseline environmental monitoring The project site area forms the core zone and the 10 kms radius around core zone forms buffer zone. These two together forms study area and map showing the same is shown in Figure The environment consisting of geology, micro-meteorology, ambient air quality, water quality, soil quality and noise levels and field investigations of ecology in the study area generated from 20 th March 2015 to 20 th June 2015 representing pre monsoon season. Land use pattern and socio-economic profile of the study area is also presented. 4

7 2.3 Meteorology The predominant wind direction observed during the study period was West for 22.5% of the total time and followed by West South West [13.75%] of the total time. The mean maximum and mean minimum temperatures recorded at site during study period were 34 C and 23 C. The Relative Humidity was observed to range from 42-94% during the study period at the site. 2.4 Ambient Air Quality Ambient Air Quality Monitoring (AAQM) stations were set up at eight locations. The air samples were analyzed as per standard methods specified by Central Pollution Control Board (CPCB), IS: 5184 and American Public Health Association (APHA). The maximum value for PM10 was observed at project site as 69.4 µg/m 3 and minimum value for PM10 was observed at Melasurankudi as 41.2 µg/m 3. The maximum value for PM2.5 was observed at TWAD Office Nagercoil as 36.4-µg/m 3 and minimum value for PM2.5 was observed at Suseendram as 15.1 µg/m 3. The maximum value for SO2 was observed at TWAD Office Nagercoil as 10.3 µg/m 3 and minimum value for SO2 was observed at Melasurankudi as 5.1-µg/m3. The maximum value for NO2 was observed at project site as 20.9 µg/m 3 and minimum value for NO2 was observed at Ozuginasery as 10.4µg/m 3. The concentrations of VOCs in the study area were observed to be below the detectable level of µg/m 3. The concentrations of PM10, PM2.5, SO2 and NO2 are observed to be well within the standards prescribed by Central Pollution Control Board (CPCB) for rural/residential zone. 2.5 Noise Level Survey The noise monitoring has been conducted for determination of ambient noise levels at ten locations in the study area. The daytime noise levels in all the rural and residential locations were observed to be in the range of 47.1 to 51.5 db(a). The night time noise level in all the rural and residential locations was observed to be in the range of 39.1 to 42.8 db(a). The day and night time noise level at all locations was observed to be within the prescribed limit of 55 db (A) and 45 db(a) respectively. 5

8 2.6 Water Quality The water quality monitoring has been conducted at 6 number of ground water locations and 3 surface water sources covering 10 km radial distance were examined for physico-chemical, heavy metals and bacteriological parameters. The water in general is not fit for drinking as most of the parameters are above the standards prescribed under IS drinking water standards. The analysis of ground water results indicate that the average ph ranges in between , TDS ranges from 49 mg/l mg/l, Total Hardness ranges from 36 mg/l mg/l, Electrical Conductivity was observed to be ranging from μs/cm in ground water, Sodium ranges from mg/l, Total Alkalinity ranges from mg/l, chloride ranges from mg/l and sulphate ranges from 2-65 mg/l, iron content ranges from BDL (<0.05) mg/l 0.08 mg/l, nitrate content ranges from BDL (<1) mg /l 108 mg/l was observed. The analysis of Surface water results indicate that the average ph ranges in between , TDS ranges from 139 mg/l mg/l, Total Hardness ranges from 76 mg/l mg/l, DO ranges from 12 mg/l 36 mg/l, nitrate content ranges from BDL (<1) mg /l 3.4 mg/l was observed. 2.7 Soil Characteristics Various locations within 10 km radius of the project site boundary were selected for soil sampling. It has been observed that the ph of the soil was ranging from 6.73 to Texture of the soil sample is predominantly clay and sandy clay loam. The available nitrogen content ranges between 28.1 to 71.4 mg/kg in the locality. The value of phosphorus content varies between 46.5 to 118 mg/kg and the potassium content varies from 214 to 425 mg/kg which indicates that the soils have moderate quantities of potassium. 2.8 Flora and Fauna Studies Field survey conducted during the study period revealed that total number of 19 species have been recorded of which maximum of 14 species are accounted for trees followed by 6

9 shrubs-5. None of the reserve or natural forests falls within the 10 km radius around the project site area. No wild life sanctuaries or national parks or biosphere or hotspots in 10 km radius from the project site area. A total number of 13 species of fauna were identified during the survey under the study area. 2.9 Land Use Studies To demarcate different land use classes using the remote sensing data such as satellite imagery and application of GIS techniques for assessing the areal extent of the different classes that is interpreted Demography and Socio-Economics The methodology adopted for the study is primarily based on the review of secondary data, such as District Primary Census Statistical Handbook of Kanyakumari District, 2011 for the parameters of demography, occupational structure of people within the study area of 10-km radius around the project site area. During the operation phase it will generate job opportunities for both skilled and unskilled workers for operation and maintenance of STP. 3.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES The anticipated environmental impacts and mitigation measures are presented in Table-1.3. Table- 1.3: Anticipated Adverse Environmental Impacts & Mitigation Measures Discipline Potential Negative Impacts Constructional Impact Water Quality Wastewater generation from construction site, Probable Source Through sanitary toilets and day to day construction activity at construction site. Mitigative Measures The earthwork (cutting and filling) will be avoided during rainy season and will be completed during summer season. Stone pitching on the slopes and construction of concrete drains for storm water to minimize soil erosion. Remarks _ 7

10 Discipline Air Quality Noise Terrestrial Ecology Potential Negative Impacts Increase in dust and NOx concentration Increase in noise level Clearing Vegetation of Operational Impact Water Quality The project will not have any adverse impact on local ground water and/or surface water resources. Air Quality Increase in SO 2, NO X, CO and VOC s in ambient air. Solid waste Degrade the ground water quality. Ecology a. Terrestrial Impact on plant species b. Aquatic Impact on aquatic life of the Probable Source Leveling activity and Heavy vehicular movement Construction equipment Soil enabling activities Discharge from Phase I and domestic usages. Stack emissions. Sewage generated Emissions from stack Treated waste water Mitigative Measures Sprinkling of water in the construction area and unpaved roads. Proper maintenance of vehicles will be done. Equipment will be kept in good condition to keep the noise level within 85- db (A). Landscaping and extensive plantation will be done. Sewage generated will be treated in STP itself. Adequate stack height will be provided as per CPCB guidelines for the proper dispersion of pollutants. Motorable roads in the plant area will be paved to reduce dust emission. Plantation programs will be undertaken around the plant area. Dust suppression measures will be implemented raw material handling area. Solid waste will be dried and converted as manure. Emission will be controlled as well as dispersed through appropriate design. The domestic wastewater will be Remarks The impact will be low, as the main approach road will be tarred. Workers will be provided with necessary protective equipment e.g. ear plug, earmuffs. Plantation will be done in consultation with the local forest department. The treated effluent will be disposed in Thengampudur channel ayacut for irrigation purpose The resultant air quality will confirm to the stipulated standards. Solid waste will be utilized as manure in nearby agricultural fields. As ambient air quality will be within limits, no active injury to the vegetation is expected. As the sewage water will be treated 8

11 Discipline Potential Negative Impacts water bodies c. Noise Increase in noise levels in the plant area. Strain on existing amenities like housing, water sources and sanitation, medical and infrastructure facilities. Probable Source Equipment in STP. Influx of employees as well as contractor's employees/ labourers. Mitigative Measures provided with adequate treatment facilities Equipment will be designed to conform to noise levels prescribed by regulatory agencies. Provision of green belt and plantation would further help in attenuating noise. Most the workers requirement will be fulfilled by local people. No significant impact is envisaged Remarks properly no significant impact on aquatic life is expected. Employees working in high noise areas would be provided earplugs/ earmuffs as protective device. d. Demography and Socioeconomics Overall socioeconomic status of the area is expected to improve. 4.0 ENVIRONMENTAL MONITORING PROGRAMME Environmental monitoring will be conducted on regular basis to assess the pollution level in the surrounding area. A comprehensive monitoring program is suggested in Table 1.4. TABLE 1.4: Monitoring Schedule for Environmental Parameters S. No. Component Parameter Construction Phase No of Locations Frequency/ Duration 1 Ambient Air Quality PM 10, PM 2.5, SO 2, NO 2, CO Project site Once in a month & surrounds 2 Ambient Noise Quality 3 Ground water Quality Ambient noise level (Hourly Leq, L10, L50, L90) Parameters specified under IS:10500, Soil Quality Parameter for soil quality: ph, texture, electrical conductivity, organic matter, nitrogen, phosphate, potassium, sodium, calcium Project site Project site Project site Once in a month Once in 3 Months Once in 6 months 9

12 S. No. Component Parameter Operational Phase & Magnesium. No of Locations Frequency/ Duration 1 Ambient Air Quality PM 10, PM 2.5, SO 2, NO 2, CO 3 locations Once in a month 2 Fugitive Emission PM 10, PM 2.5, SO 2, NO 2, HC, S H 2 3 Stack Emission PM, SO 2, NO 2 & CO Monitoring 4 Source Noise Instantaneous Noise level in db(a) 5 Ambient Noise Quality 6 Ground water Quality Existing ambient noise level (Leq, L day & L night ) Parameters specified under IS:10500, Soil Quality Parameter for soil quality: ph, texture, electrical conductivity, organic matter, NPK, sodium, calcium & Magnesium. Near sewage tanks DG Set Pumps, Blowers, DG sets Boundaries Project site Green Belt area Once in a month Once in a month Once in a month Once in a month Once in 3 months Once in a year Other than this Sewer Network/Machineries will be monitored once in a year for maintenance purpose. 5.0 ADDITIONAL STUDIES The following additional studies/activities have been carried out for the proposed project on different aspects: Risk assessment studies have been carried out including preparation of Disaster Management Plan; 6.0 PROJECT BENEFITS The project uses Extended Aeration Activated Sludge Process (EASP), which is a space and power saving technology and it is a better alternative to conventional wastewater treatment plants that are large-sized, power intensive and require a lot of monitoring. EASP offers an effective option as the conventional systems are 10

13 unviable due to scarcity of open space, geographical network of piping, high power and land cost. It is an Odourless operation. The project will contribute to the substantial decrease of pollution caused by the discharge of untreated sewage into the environment. This in turn would improve the quality of water resources such as ground as well as surface water. The contamination of the region s soil is also prevented by the proper collection and disposal of wastewater. The employment potential will improve economic conditions of the families directly and indirectly. 7.0 EMP - ADMINISTRATIVE ASPECTS A separate Environment Department with qualified staff along with engineers, technicians, supervisors, helpers, etc is working in project site. 8.0 SUMMARY & CONCLUSION The proposed Construction of Sewage Treatment plant will have marginal adverse impacts on the local environment. However, with the implementation of the adequate pollution control and environment management measures, the minor impacts due to construction and operation of the proposed plan will be mitigated. With the effective implementation of the environment management measures as suggested in the EIA report, the negative impacts will be minimized. The development of this project has beneficial impact in terms it will provide direct employment to about 128 persons and indirect employment to about 200 persons. Apart from the employment for the local people, they will also be benefited in the areas such as health care, infrastructure facilities, including significant improvement in the quantity of life of people in the region. 11

14

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows: 1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s Mahavir Benefication Pvt. Ltd. (MBPL) proposes expansion of its coal washery from 1.0 MTPA to 5.0 MTPA capacity at Dhiroul Village, Anuppur District, Madhya Pradesh

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

APPENDIX I PROPOSED TERMS OF REFERENCE

APPENDIX I PROPOSED TERMS OF REFERENCE APPENDIX I PROPOSED TERMS OF REFERENCE 1. Environment Impact Assessment/Environment Management Plan document shall be in accordance with the provisions & generic structure stipulated in the EIA Notification

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN A. Attach a note on the status of baseline information with regard to the following: To identify with the interrelationship between the eco-friendly quarry operations and

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32 CONTENTS CHAPTER 1... 1 1.0 PROJECT SUMMARY... 1 CHAPTER 2... 2 2.0 INTRODUCTION... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 2 (II) BRIEF DESCRIPTION OF NATURE OF THE PROJECT... 2 (III)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

Shri Girija Alloy & Power (I) Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN For BUILDING STONE AND M SAND QUARRY Sri. N.C. Prasanna Kumar #663, Somanahalli Maddur Taluk Mandya District - 571429 Prepared by SMS ENVOCARE LIMTED # 301, 3 RD FLOOR, SHRESHTA

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

SUMMARY. for New Standalone Cement Grinding Unit. proposed at

SUMMARY. for New Standalone Cement Grinding Unit. proposed at SUMMARY of ENVIRONMENT IMPACT ASSESSMENT REPORT for New Standalone Cement Grinding Unit ( 2 x 1.0 million tons per annum) proposed at Gaithulapalem, Tallapalem & Narasapuram Villages, Kasimkota Mandal,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village TABLE-1 PROJECT AT A GLANCE Registered Address M/s. Pallavada Technical Textiles Park Private Limited, No. 78, Greams Road, Thousand Lights, Chennai-600006. Communication Address of M/s. Pallavada Technical

More information

GREENCINDIA Consulting Pvt. Limited

GREENCINDIA Consulting Pvt. Limited Expansion of Tamar Bauxite Mine from 10,000 TPA to 40,000 TPA in Tamar & Kirkiran Villages, Majhgawan Tehsil, Satna District, Madhya Pradesh : The M.P. State Mining : GREENCINDIA Consulting Pvt. Limited

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF 0.80.0Ha IN ANAIMALLUR VILLAGE, ARCOT TALUK, VELLORE DISTRICT, TAMILNADU OF THIRU.R.VINOTHKUMAR, (Under

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

1. Name of the project/s Eraiyur Brick Earth Quarry project 2. Name of the applicant/s A.Venkatesan

1. Name of the project/s Eraiyur Brick Earth Quarry project 2. Name of the applicant/s A.Venkatesan EIA & EMP REPORT OF ERAIYUR BRICK EARTH QUARRY FOR OVER AN EXTENT OF 1.00.0Ha IN ERAIYUR VILLAGE, TIRUVALLUR TALUK, TIRUVALLUR DISTRICT,TAMILNADU OF THIRU.A.VENKATESAN ENVIRONMENTAL IMPACT ASSESSMENT (EIA)

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES Project Category Project Proponent Location Expansion of Lucknow Airport in Respect of Construction of New Integrated Terminal Building at Amausi, Lucknow, Uttar Pradesh. A [7 (a): Development of an Airport]

More information

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/06 Hydro Carbon Block In West Tripura and Sepahijala Districts of Tripura

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

Submitted by: M/s Panasonic India Ltd

Submitted by: M/s Panasonic India Ltd Environmental Monitoring Report (June-2014) FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana Submitted by: M/s Panasonic India Ltd INDUSTRIAL PLOT NO-1, VILLAGE- BID DADRI JHAJJAR (HARYANA)

More information

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/14 Hydro Carbon Block inkarimganj, Hailakandi, Cachar districts of Assam

More information

Industrial Estate Planning For Mangalore

Industrial Estate Planning For Mangalore INDUSTRIAL ESTATE PLANNING FOR MANGALORE 161 Jr. of Industrial Pollution Control 22 (1)(2006) pp 161-170 Enviromedia Printed in India. All rights reserved Industrial Estate Planning For Mangalore Taluk

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA

CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA (TOR) FOR THE PREPARATION OF ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA SUBMITTED

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT 01-07-2018/R3 PRE-FEASIBILITY REPORT FOR EXPANSION OF STEEL MANUFACTURING UNIT BY REPLACING EXISTING INDUCTION FURNACE CAPACITY Steel Billets/ Ingots- 28,800 TPA to 75,240 TPA By M/S TRISHALA ALLOYS PVT.

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

Treatment Of Municipal Waste Water In Salem City

Treatment Of Municipal Waste Water In Salem City RESEARCH ARTICLE OPEN ACCESS Treatment Of Municipal Waste Water In Salem City T. Subramani 1 D. Kavitha 2 R. Thiyagu 3 1 Professor & Dean, Department of Civil Engineering, VMKV Engineering College, Vinayaka

More information

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I) Executive Summary Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN Table of Contents 1 INTRODUCTION... 1 1.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP)... 1 1.2 Impacts on Land Environment... 1 1.2.1 Mitigation Measures... 1 1.3 WATER ENVIRONMENT... 2 1.3.1 Impacts on Water

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

Panasonic India Pvt. Ltd.

Panasonic India Pvt. Ltd. Panasonic India Pvt. Ltd. December-2014 FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana 1 Details of Environmental Monitoring INTRODUCTION M/s Panasonic India Pvt Ltd granted its Environmental

More information

Standard TOR for Onshore Oil & Gas Exploration, Development & Production

Standard TOR for Onshore Oil & Gas Exploration, Development & Production Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/15 in Lakhimpur, Dhemaji, Jorhat, Dibrugarh, Sibsagar Districts of Assam

More information

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project

More information

PRE FEASIBILITY REPORT OF R.PUDUPATTI ROUGH STONE QUARRY UNDER EIA NOTIFICATION 2006

PRE FEASIBILITY REPORT OF R.PUDUPATTI ROUGH STONE QUARRY UNDER EIA NOTIFICATION 2006 LEASE APPLIED AREA FOR OVER AN EXTENT OF 1.49.0Ha IN R.PUDUPATTI VILLAGE, RASIPURAM TALUK, NAMAKKAL DISTRICT, TAMILNADU OF THIRU.K.K.PERUMAL, (Under the Guidelines of Ministry of Environment and Forest

More information

Simran Industries Pvt. Ltd.

Simran Industries Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information