Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects

Size: px
Start display at page:

Download "Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects"

Transcription

1 Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects Meeting #1 of the Technical Advisory Committee March 18,

2 Press 2 Prepared February 2016

3 Undersized Culverts! Culvert Sizes (~7,500 VT culverts) 6,000 5,000 69% Number of Culverts 4,000 3,000 2,000 21% 3 1, % 2% 3% < >125 Culvert Size (% of Bankfull Channel Width)

4 Project Goals 1. Create an easy to use Excel based tool for municipalities in prioritizing culvert replacements and stream crossing restorations. 2. The tool will be community driven with built in flexibility in weighing key environmental, engineering and road safety related factors in prioritizing road, stream crossing and culvert infrastructure upgrades prior to emergency repairs. 3. The aim is to get ahead of the storm and work with and train three municipalities in developing, field testing and implementing the tool The tool will be designed and available for all eleven municipalities located in the Piscataquog River Watershed.

5 Former culvert (MMI, 2015) New culvert 5

6 Scope of Work 1. Project Planning and Conceptual Design 2. Project Development Team and Outreach 3. Design Screening Tool 4. Run and Test Model 5. Create User Friendly Instructions 6. Project Team Review 7. Project Summary and Town Reports 8. Concept Designs and Community Outreach 6

7 Existing Information 7

8 Existing Information 8 (SNHPC, TU, DES, 2015)

9 Existing Information 9 (SNHPC, TU, DES, 2015)

10 Existing Information 10

11 Geomorphic Compatibility Screen 11 (Schiff et al., 2008)

12 Incorporating Culvert Restoration into Paving 12 (MMI, 2013)

13 Stream Power Total Stream Power (TSP) [W/m] = *Q*S Specific Stream Power (SSP) [W/m 2 ] = *Q*S / w Source: Bagnold, 1966 Source: Brierley and Fryirs, 2005 Source: Kleinhans and van den Berg, 2010

14 Flood Sensitivity Coarse Screen (Schiff et al., 2015)

15 River Sensitivity Coarse Screen 15 (MMI, 2015)

16 Culvert Vulnerability Screening Vulnerability Score < 0.4 >=0.4 to 0.6 >=0.6 to 1 High Medium Low Specific Stream Power versus Bed Resistance Specific Stream Power (W/m 2 ) Dominant Particle Size (Bed Resistance) Silt Sand Gravel Cobble Boulder Bedrock Structure Width Structure Width / Channel Bankfull Width (%) < 50% 50 75% >75 100% > % >125% Change in Slope Local Channel Slope Structure Slope (feet / feet) > 0.03 and <= 0.03 <= 0.02 > 0.02 and <=0 >0 and <=0.02 >0.02 and <=0.03 > Sediment Continuity Upstrea m Bed Downstream Bed Erosion None Aggradation Aggradation None Erosion Structure Alignment Skewed Aligned Legend Highest Vulnerability Lowest Vulnerability (MMI, 2016)

17 Culvert Vulnerability Screening 17 (MMI, 2016)

18 Culvert Vulnerability Screening 18 (MMI, 2016)

19 Draft Screening Draft Culvert Scoring System (V.2) GC = Geomorphic compatibility (NHGS) combined with a variable describing the predicted relationship between stream power and bed resistance (see below). Risk STR = An indicator of the structure condition from field observations combined with the approximate hydraulic capacity (TU/SNHPC) (see below). AOP = Aquatic organism passage (TU/SNHPC) plus fisheries prioritization data (NHFG). C = Criticality of the structure such as essential links, public safety routes, proximity to infrastructure, paving schedules, etc. (Town) R = Overall risk that is the intersection between vulnerability and criticality. Specific Stream Power & Bed Resistance Specific Stream Power (W/m 2 ) Dominant Particle Size (Bed Resistance) Silt Sand Gravel Cobble Boulder Bedrock GC Geomorphic Compatibility Aquatic Organism Passage AOP STR Structure Condition and Approximate Hydraulic Capacity Criticality C NEW CONDITION OTHER CONDITION (Potentially bad condition) Hydraulic Capacity Category Hydraulic Capacity Category Flood Pass Transition Fail Flood Pass Transition Fail (RI year) Hw/D< >1.15 (RI year) Hw/D< > L H H 2 L H H 10 L H H 10 L H H 25 L M H 25 L H H 50 L M M 50 L H H 100 L M M 100 L M H Risk Scoring Examples Risk Fisheries Prioritization Data (NHFG) AOP Category (TU) wild book trout sculpin / trout 0 0 dace only none Green Gray Orange Lowest Risk Low Risk Moderate Risk High Risk Highest Risk 19 Red Prepared February 2016

20 20 Anticipated Screening Results

21 Draft Screening Add power / resistance to NH GC screen Specific Stream Power & Bed Resistance Specific Stream Power (W/m 2 ) Dominant Particle Size (Bed Resistance) Silt Sand Gravel Cobble Boulder Bedrock Prepared February 2016

22 Draft Screening 22 Prepared February 2016

23 Draft Screening Fisheries Information (from NHFG) Fish Category Fisheries Prioritization Data (NHFG) wild book trout AOP Category (TU) wild book trout sculpin / trout?? dace only none sculpin / trout?? dace only none Green Gray Orange Red 23 Prepared February 2016

24 Draft Screening Criticality (Identified by Town) Critical link Near public safety Near infrastructure Replacement need aligns with paving cycle High traffic volume Near village center Risk AOP not in risk screen Vulnerability Criticality Risk GC STR C R 24 Prepared February 2016

25 Additional Slides 25

26 Recent Design Guidance 26 (Schiff et al., 2014)

27 Project Area 27

28 Funding Sources NH Department of Safety and Homeland Security FEMA NH Department of Environmental Services Aquatic Resource Mitigation (ARM) Funding Local Capital Improvement Programming Local Conservation Funding Local Bonding 28

29 Existing Hydraulic Capacity Information Hw/D> >Hw/D>0.85 Hw/D<0.85 (TU and SNHPC, 2014) 29

30 Screening Culverts for Risk Reduction and AOP (MMI, 2014) VT116 30

31 Geomorphic Compatibility Screen 31 (Schiff et al., 2008)

32 Retrofit Potential Screen 32 (MMI, 2008)

Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects

Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects SNHPC Meeting January 24, 2017 1 Undersized Culverts! Culvert Sizes (~7,500 VT culverts) 6,000 5,000 69%

More information

Stream Crossings II: Bridges, Culverts, Flood Resiliency, and Connectivity

Stream Crossings II: Bridges, Culverts, Flood Resiliency, and Connectivity University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

REPLACING CULVERTS FOR FLOOD RESILIENCY AND AQUATIC CONNECTIVITY. Cheryl Bondi and Lori Sommer NHDES Aquatic Resource Mitigation Program

REPLACING CULVERTS FOR FLOOD RESILIENCY AND AQUATIC CONNECTIVITY. Cheryl Bondi and Lori Sommer NHDES Aquatic Resource Mitigation Program REPLACING CULVERTS FOR FLOOD RESILIENCY AND AQUATIC CONNECTIVITY Cheryl Bondi and Lori Sommer NHDES Aquatic Resource Mitigation Program How do stream crossings impact aquatic ecosystems and public safety?

More information

Stream Restoration at Road Crossings in Northern Wisconsin. Dale Higgins, USDA Forest Service

Stream Restoration at Road Crossings in Northern Wisconsin. Dale Higgins, USDA Forest Service Stream Restoration at Road Crossings in Northern Wisconsin Dale Higgins, USDA Forest Service Key Points Large # of road and trail stream crossings on the landscape Many crossings adversely impact streams

More information

Amherst. University of Massachusetts - Amherst. Nathaniel Gillespie United State Department of Agriculture, Forest Service

Amherst. University of Massachusetts - Amherst. Nathaniel Gillespie United State Department of Agriculture, Forest Service University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT

CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT Key Stakeholders: CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT Funded By: VT Dept. of Environmental Conservation VT Agency of Transportation (VTrans) Town of Brattleboro NEWEA Spring Meeting Omni Mt.

More information

Wood-Pawcatuck Watershed Flood Resiliency Management Plan

Wood-Pawcatuck Watershed Flood Resiliency Management Plan Wood-Pawcatuck Watershed Flood Resiliency Management Plan Project Steering Committee Meeting May 21, 2015 Wood-Pawcatuck Watershed Association Meeting Agenda 10:00 10:05 Welcome and Opening Remarks 10:05

More information

Stream Simulation in Very Low Gradient Channels

Stream Simulation in Very Low Gradient Channels University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Dianne Timmins - NH Fish and Game Dept. 1 Rachelle Lyons - PSU Center for Business and Community Partnerships

Dianne Timmins - NH Fish and Game Dept. 1 Rachelle Lyons - PSU Center for Business and Community Partnerships Watershed Scale Crossing Assessment to Promote Community Restoration Priorities Dianne Timmins - NH Fish and Game Dept 1 Rachelle Lyons - PSU Center for Business and Community Partnerships ARSCAP Team

More information

Mike Jastremski, CFM Watershed Conservation Director

Mike Jastremski, CFM Watershed Conservation Director Planning for Flood Resilient and Fish Friendly Road-Stream Crossings in CT s Northwest Hills Mike Jastremski, CFM Watershed Conservation Director Presentation Outline Project area Climate threats Field

More information

In re: Town of Norwich Pool Dam Reconstruction, Stream Alteration Permit Application

In re: Town of Norwich Pool Dam Reconstruction, Stream Alteration Permit Application Agency of Natural Resources October 20, 2015 Neil R. Fulton Town Manager Town of Norwich P.O. Box 376 Norwich, VT 05055 In re: Town of Norwich Pool Dam Reconstruction, Stream Alteration Permit Application

More information

PROJECT SCREENING MATRIX: A User s Guide

PROJECT SCREENING MATRIX: A User s Guide Version 2.0 Page 1 of 7 November 9, 2010 PROJECT SCREENING MATRIX: A User s Guide BACKGROUND The Project Screening Matrix (Screening Matrix) is one of several tools that comprise the River Restoration

More information

Wood-Pawcatuck Watershed Flood Resiliency Management Plan

Wood-Pawcatuck Watershed Flood Resiliency Management Plan Wood-Pawcatuck Watershed Flood Resiliency Management Plan Project Steering Committee Kickoff Meeting March 26, 2015 Wood-Pawcatuck Watershed Association Meeting Agenda 10:00 10:05 Welcome and Opening Remarks

More information

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 Agenda Introductions Purpose & Goals of Meeting Planning Area Master Plan Restoration Planning: Cost Estimates, Grants, Scope, Timeline

More information

Stream Restoration Raccoon Creek A Case Study

Stream Restoration Raccoon Creek A Case Study Stream Restoration Raccoon Creek A Case Study Restoration of a Degraded Stream System Steven Glickauf Presentation Overview Stream Restoration Raccoon Creek Restoration Site Case Study Existing Conditions

More information

Wood-Pawcatuck Watershed Flood Resiliency Management Plan Community Meeting October 20, 2016

Wood-Pawcatuck Watershed Flood Resiliency Management Plan Community Meeting October 20, 2016 Wood-Pawcatuck Watershed Flood Resiliency Management Plan Community Meeting October 20, 2016 Wood-Pawcatuck Watershed Association Meeting Agenda 10:00 10:05 Introductions and Meeting Goals 10:05 10:15

More information

NANEUM, WILSON, AND CHERRY CREEK WATERSHED ASSESSMENT

NANEUM, WILSON, AND CHERRY CREEK WATERSHED ASSESSMENT NANEUM, WILSON, AND CHERRY CREEK WATERSHED ASSESSMENT Presentation for Voluntary Stewardship Program November 9, 2016 Watershed Assessment This Watershed Assessment is intended to develop a partnership

More information

Flood Resiliency, Aquatic Organism Passage, Critical Infrastructure, and Economics A Case for Stream Simulation Design and ERFO Policy Changes

Flood Resiliency, Aquatic Organism Passage, Critical Infrastructure, and Economics A Case for Stream Simulation Design and ERFO Policy Changes Flood Resiliency, Aquatic Organism Passage, Critical Infrastructure, and Economics A Case for Stream Simulation Design and ERFO Policy Changes Presented by Robert Gubernick R.G. USDA Forest Service Region

More information

Developing Tools for Hydromodification Management and Assessment

Developing Tools for Hydromodification Management and Assessment Developing Tools for Hydromodification Management and Assessment Hydromodification: Channel Erosion Before Development After Development Increase in: - Imperviousness - Drainage Slope - Direct Runoff Decrease

More information

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

REQUEST FOR CONSTRUCTION BIDS May 23, 2017 REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge

More information

Stream Crossing Reconstruction on the Bog Dam Loop Road (FR15) Scoping Notice. Androscoggin Ranger District

Stream Crossing Reconstruction on the Bog Dam Loop Road (FR15) Scoping Notice. Androscoggin Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Stream Crossing Reconstruction on the Bog Dam Loop Road (FR15) Scoping Notice Androscoggin Ranger District Androscoggin

More information

Case Study 15. Moonlight Crossing Concrete Box Vented Ford

Case Study 15. Moonlight Crossing Concrete Box Vented Ford Appendix A Case Study 15 Case Study 15. Moonlight Crossing Concrete Box Vented Ford Location Northeastern California. Plumas National Forest. On Lights Creek, 8 miles north of Taylorsville, CA., Forest

More information

Surface Water. Solutions for a better world

Surface Water. Solutions for a better world 1 Surface Water Solutions for a better world Our Surface Water Services Expertise Growing worldwide awareness of water scarcity has encouraged water preservation programs, better irrigation techniques

More information

Partnering for Resilient Infrastructure and Ecosystems in Massachusetts

Partnering for Resilient Infrastructure and Ecosystems in Massachusetts Partnering for Resilient Infrastructure and Ecosystems in Massachusetts Northeastern Transportation & Wildlife Conference September 10 th, 2018 1 Tim Dexter, MassDOT Highway Division Brad Chase, MA Division

More information

Aquatic Resource Mitigation Fund

Aquatic Resource Mitigation Fund Aquatic Resource Mitigation Fund Lori Sommer- Mitigation Program Coordinator Land Resource Management Program NH Department of Environmental Services PRESENTATION OVERVIEW Brief overview on mitigation

More information

Massachusetts River and Stream Crossing Standards: Technical Guidelines

Massachusetts River and Stream Crossing Standards: Technical Guidelines Massachusetts River and Stream Crossing Standards: Technical Guidelines August 6, 2004 INTRODUCTION As long and linear ecosystems, rivers and streams are very important for fish and other wildlife movements,

More information

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS Bethany Matousek Inland Lakes and Streams Program Coordinator Wetlands, Lakes and Streams Unit DEQ Water Resources Division MatousekB@Michigan.gov 517-243-6421

More information

Old Mill School Stream Restoration

Old Mill School Stream Restoration Project Overview This conceptual plan restores and stabilizes two consecutive reaches of a highly incised and unstable stream and reconnects them with the floodplain. The restoration reaches are part of

More information

Temporary Stream Crossing

Temporary Stream Crossing Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Temporary Stream Crossing

Temporary Stream Crossing Temporary Stream Crossing NS-4 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution

More information

Climate Ready Culverts. Funding

Climate Ready Culverts. Funding Climate Ready Culverts Thomas P. Ballestero University of New Hampshire Stormwater Center 2016 INAFSM Annual Conference Florence, IN 7 9 Sep 2016 1 Funding 2 1 Culvert Hydraulics 3 Bridge Versus Culvert

More information

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES April 28, 2016 Table of Contents 3.1 Introduction... 2 3.1.1 Purpose of Chapter 3... 2 3.1.2 Policy vs. Design

More information

State of Vermont Culvert sizing based on the Stream Alteration General Permit

State of Vermont Culvert sizing based on the Stream Alteration General Permit State of Vermont Culvert sizing based on the Stream Alteration General Permit Northeastern Transportation and Wildlife Conference September 11, 2018 Todd Menees, PE River Management Engineer VT DEC Rivers

More information

Local Flood Hazard Mitigation Program. A framework for hazard mitigation in the NYC West of Hudson Water Supply Watersheds

Local Flood Hazard Mitigation Program. A framework for hazard mitigation in the NYC West of Hudson Water Supply Watersheds Local Flood Hazard Mitigation Program A framework for hazard mitigation in the NYC West of Hudson Water Supply Watersheds Flood Hazard Mitigation Defined 2 2 Presentation Overview Why and how is the NYC

More information

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Your comments are encouraged and appreciated, as this will provide us an opportunity to address project issues and

More information

Developing a multi-metric habitat index for wadeable streams in Illinois (T-25-P-001).

Developing a multi-metric habitat index for wadeable streams in Illinois (T-25-P-001). T E C H N I C A L R E P O R T Developing a multi-metric habitat index for wadeable streams in Illinois (T-25-P-001). Annual Segment Report to the Illinois Department of Natural Resources. Laura L. Sass,

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

SECTION 6: MITIGATION STRATEGIES

SECTION 6: MITIGATION STRATEGIES SECTION 6: MITIGATION STRATEGIES This section presents mitigation actions for Onondaga County to reduce potential exposure and losses identified as concerns in the Risk Assessment portion of this plan.

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

Case Study 19. Mill Creek Embedded Box Culvert Vented Ford

Case Study 19. Mill Creek Embedded Box Culvert Vented Ford Case Study. Mill Creek Embedded Box Culvert Vented Ford Location Southeast Missouri. Mark Twain National Forest; Houston-Rolla Ranger District. Southeast of Rolla, south of Interstate 44, off of State

More information

Table D1: WC-R1 to WC-R3 (Wilket Creek Park)

Table D1: WC-R1 to WC-R3 (Wilket Creek Park) APPENDIX D Table D1: WC-R1 to WC-R3 (Wilket Creek Park) Category of Consideration Criteria Alternative 1 Do Nothing Alternative 2 Local Improvements Alternative 3 Channel Realignment Natural Geomorphic

More information

Introducing Act 64 - the Vermont Clean Water Act - and Vermont s Clean Water Goals

Introducing Act 64 - the Vermont Clean Water Act - and Vermont s Clean Water Goals Introducing Act 64 - the Vermont Clean Water Act - and Vermont s Clean Water Goals Marli Rupe, DEC Clean Water Initiative Program Asst. Manager February 22, 2016 Clean Waters are a Critical Community Asset

More information

Struggles for Flood Resiliency and AOP in Rhode Island

Struggles for Flood Resiliency and AOP in Rhode Island University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Bluff Creek One Water

Bluff Creek One Water Bluff Creek One Water The Bluff Creek Watershed has no lakes within its boundaries. As the westernmost watershed within the District, land use changes from agricultural to residential have occurred relatively

More information

Case Study 5. Willow Creek Concrete Plank Ford

Case Study 5. Willow Creek Concrete Plank Ford Appendix A Case Study Case Study. Willow Creek Concrete Plank Ford Location Northeastern California. Plumas National Forest. Willow Creek. miles northwest of Portola, CA, on Spur Road 23N97Y off Forest

More information

Use of WARSSS in Stream Restoration and Watershed Planning. Michigan Aquatic Restoration Conference 2015

Use of WARSSS in Stream Restoration and Watershed Planning. Michigan Aquatic Restoration Conference 2015 Use of WARSSS in Stream Restoration and Watershed Planning Michigan Aquatic Restoration Conference 2015 October 22, 2015 Use of WARSSS in Stream Restoration and Watershed Planning 1. Watershed Management

More information

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT U.S.D.A. Forest Service Cleveland National Forest Trabuco Ranger District Orange County, California Background The current configuration

More information

Sawmill Brook Culvert and Green Infrastructure Analysis

Sawmill Brook Culvert and Green Infrastructure Analysis Sawmill Brook Culvert and Green Infrastructure Analysis Looking at Impacts of Climate Change in Both a Coastal and Riverine Environment Mary Reilly, Grants Administrator Town of Manchester-by-the-Sea Massachusetts

More information

The North Atlantic Aquatic Connectivity Collaborative (NAACC)

The North Atlantic Aquatic Connectivity Collaborative (NAACC) The North Atlantic Aquatic Connectivity Collaborative (NAACC) Evaluating Road-Stream Crossings Across a Thirteen-State Region Jessie Levine September 14, 2016 NETWC Scale of the Problem Data on 9,064 crossings

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

Fish Passage Assessment of Road-Stream Crossings in Cooks Creek Watershed Priority Projects and Conceptual Design Bucks County, Pennsylvania

Fish Passage Assessment of Road-Stream Crossings in Cooks Creek Watershed Priority Projects and Conceptual Design Bucks County, Pennsylvania November 30, 2012 Bucks County Trout Unlimited c/o Joe Mihok 412 Manor Drive Dublin, PA 18917 Scientists, Engineers & Environmental Planners Designing Innovative Solutions for Water, Wetland and Soil Resource

More information

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013 United States Department of Agriculture Natural Resources Conservation Service Denver Federal Center Building 56, Room 2604 P.O. Box 25426 Denver, CO 80225 720-544-2818-OFFICE alton.albin@co.usda.gov Flood

More information

Integrating Biodiversity & Infrastructure Priorities

Integrating Biodiversity & Infrastructure Priorities Integrating Biodiversity & Infrastructure Priorities Bill Napolitano Director of Environmental Planning, Southeastern Regional Planning and Economic Development District Jennifer Carlino Conservation Agent

More information

Bellevue s Approach to Stormwater Management

Bellevue s Approach to Stormwater Management Bellevue s Approach to Stormwater Management By Don McQuilliams Operations Manager-Regulatory Compliance and Surface Water Bellevue Utilities Department City of Bellevue, Washington Bellevue, Washington

More information

Session C7- Building on the $10 million/year H TAP program for culvert mitigation on national forest system lands

Session C7- Building on the $10 million/year H TAP program for culvert mitigation on national forest system lands University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Step-Pool Creation to Restore Fish Passage and Riparian Health

Step-Pool Creation to Restore Fish Passage and Riparian Health Step-Pool Creation to Restore Fish Passage and Riparian Health Jenny Kindig Water Resources Engineer Denny Mengel, Senior Environmental Scientist Steve Miller, Water Resources Engineer Gloria Beattie,

More information

CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION

CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION 1 Chatham Park Basics 7,600 Acre Mixed Use Development 22,000 New Residences 22 Million Square Feet Commercial Space 60,000 Jobs 2,000+ Acres Open Space Estimated

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: CULVERT DESIGN SPECIFIC SUBJECT: COUNTERSINKING AND LOW FLOW CONSIDERATIONS

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term

More information

Stinson Beach Watershed Program

Stinson Beach Watershed Program Stinson Beach Watershed Program www.marinwatersheds.org Purpose The Board of Supervisors authorized the Department of Public Works to begin implementation of a County-wide Watershed Program on May 13,

More information

REQUEST FOR CONSTRUCTION BIDS February 22, 2010

REQUEST FOR CONSTRUCTION BIDS February 22, 2010 REQUEST FOR CONSTRUCTION BIDS February 22, 2010 Roaring Branch Channel and Floodplain Restoration Project 1.0 Project Background Roaring Branch (watershed area ~ 41 square miles) flows generally west through

More information

Final Project Report Big Creek Road Sediment Reduction Project, 03-DG

Final Project Report Big Creek Road Sediment Reduction Project, 03-DG TRINITY COUNTY NATURAL RESOURCES & LONG RANGE PLANNING 190 GLEN RD. P.O. BOX 1445 WEAVERVILLE, CA 96093 (530) 623-1458 ext.3409 mlancaster@trinitycounty.org Big Creek Road Sediment Reduction Project, 03-DG-11051400-053

More information

Upper South Platte Source Water Assessment and Protection Plan

Upper South Platte Source Water Assessment and Protection Plan Upper South Platte Source Water Assessment and Protection Plan Unpaved Roads and Trails Presented by: Kyle Hamilton, P.E. CH2M HILL May 9, 2014 Background Four watershed / unpaved roadway system assessments

More information

Project Goals and Scoping

Project Goals and Scoping Prepared for: Boulder County, Colorado Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch and Scoping May 24, 2016 Meeting with General Public In association

More information

EcoStream Getting Our Feet Wet at Every Stage: Optimizing the Restoration of Urban Streams August 16, 2018

EcoStream Getting Our Feet Wet at Every Stage: Optimizing the Restoration of Urban Streams August 16, 2018 EcoStream 2018 Getting Our Feet Wet at Every Stage: Optimizing the Restoration of Urban Streams August 16, 2018 Presentation Outline Planning/Design challenges, approaches, optimization Public Outreach/Stakeholder

More information

404(b)(1) EVALUATION

404(b)(1) EVALUATION 404(b)(1) EVALUATION SECTION 404(b)(1) EVALUATION DETAILED PROJECT REPORT AND ENVIRONMENTAL ASSESSMENT POMEROY SECTION 14 EMERGENCY STREAMBANK PROTECTION PROJECT POMEROY, OH I. INTRODUCTION As required

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL Submittal Deadline: 5:00 pm July 7, 2017 The Vermont Chapter of The Nature Conservancy invites proposals from qualified consultants for two fish passage restoration projects on culverts

More information

Designing roads for fish, floods and foxes

Designing roads for fish, floods and foxes Designing roads for fish, floods and foxes Calculations 9 Swimming Plunging Flow & Leaping Occupied Velocity Prolonged > Capability Yes Swim in Burst Total Time in Burst Time to > Exhaustion Yes Barrier

More information

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 EVALUATING SCOUR AT BRIDGES

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 EVALUATING SCOUR AT BRIDGES OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 EVALUATING SCOUR AT BRIDGES APRIL 2011 Table of Contents 11.1 Introduction... 4 11.1 General......4 11.2 Qualifications of Personnel......4

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Case Study 12. Grubbs Concrete Slab Vented Ford

Case Study 12. Grubbs Concrete Slab Vented Ford Appendix A Case Study Case Study. Grubbs Concrete Slab Vented Ford Location North central California. Plumas National Forest. Mount Hough Ranger District. Grizzly Creek. 3 miles west of Bucks Lake, CA.

More information

Preparing for the Storms: Municipal Adaptation for Climate Change Resiliency

Preparing for the Storms: Municipal Adaptation for Climate Change Resiliency Preparing for the Storms: Municipal Adaptation for Climate Change Resiliency Massachusetts Association of Planning Directors Annual Conference UMass Lowell Inn and Conference Center June 6, 2013 E. Heidi

More information

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat S.R. 4007, Section 14B PADEP Environmental Assessment Form Description of Aquatic Habitat Cresheim Creek is the only water resource that exists within the project area. No jurisdictional wetlands were

More information

Floodplains are an important constituent of coho habitats and can be targeted for restoration. NetMap s advanced floodplain mapping tool calculates

Floodplains are an important constituent of coho habitats and can be targeted for restoration. NetMap s advanced floodplain mapping tool calculates 1 2 3 Floodplains are an important constituent of coho habitats and can be targeted for restoration. NetMap s advanced floodplain mapping tool calculates floodplains based on multiples of bankfull depths

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 1338 Thornhill Dr Project ID Number: 1-3 Problem: Creek bank erosion is occurring along from the northern property line at

More information

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission Plan Rollout Presentation July 31, 2014 Michael G. Hahn, P.E., P.H. Chief Environmental Engineer Southeastern Wisconsin Regional Planning Commission # 219703 Racine County Flooding Recommendations and

More information

Forest Service AOP Policy and Program. John R. Kattell, P.E. Northern Region Structures Engineer

Forest Service AOP Policy and Program. John R. Kattell, P.E. Northern Region Structures Engineer Forest Service AOP Policy and Program John R. Kattell, P.E. Northern Region Structures Engineer AOP Policy and Program In years past: Aquatic passage to be considered where important and economically feasible.

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL ARTICLE 20 SOIL EROSION AND SEDIMENT CONTROL 20.01 Activities Affected... 20-1 20.02 Exemptions to Soil Erosion and Sediment Control Requirements... 20-2 20.03 Basic Erosion Control Objectives... 20-3

More information

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 EVALUATING SCOUR AT BRIDGES

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 EVALUATING SCOUR AT BRIDGES OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 EVALUATING SCOUR AT BRIDGES May 26, 2015 Preface ABSCOUR 10 is the current version of the scour evaluation program used by the

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

City of Fortuna Rohner Creek Flood Control Project

City of Fortuna Rohner Creek Flood Control Project City of Fortuna Rohner Creek Flood Control Project Presented To: Fortuna City Council Special Session April 26, 2013 Presented By: Merritt Perry, PE Jeremy Svehla, PE Robert Holmlund, AICP Presentation

More information

National. Park Service Mr. Chris. and Flathead PO Box 638 Kalispell, MT 59903

National. Park Service Mr. Chris. and Flathead PO Box 638 Kalispell, MT 59903 QUARTZ CREEK FISH EXCLUSION BARRIER PROJECT CONCEPTUAL DESIGN ALTERNATIVES REPORT Submitted To: National Park Service Mr. Chris Downs, Fishery Biologist Science Center, Glacier National Park West Glacier,

More information

Rascal Goose. Reach 1. Rascal Goose. Reach 2. å å å. Main Goose Pit. Stream Reach 3. Main Goose Pit. Stream Reach 7

Rascal Goose. Reach 1. Rascal Goose. Reach 2. å å å. Main Goose Pit. Stream Reach 3. Main Goose Pit. Stream Reach 7 434000 March 16 2014 434200 434400 ± 434600 434800 435000 Goose Lake 7269800 WRSA B 7269800 7270000 433800 GIS # BAC-06-180a 7270000 PROJECT # 0234411-0005 Rascal Goose Reach 1 Main Goose Pit Stream Reach

More information

Stream Health. Stream Bugs Our Stream Health Communicators. Upper Nottawasaga River Stream Health. NVCA Science & Stewardship

Stream Health. Stream Bugs Our Stream Health Communicators. Upper Nottawasaga River Stream Health. NVCA Science & Stewardship NVCA Science & Stewardship Stream Health Upper Nottawasaga River, 2015 Stream Bugs Our Stream Health Communicators Stream bugs (benthic macroinvertebrates) are organisms that spend much or all of their

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Development of a Watershed Management and Restoration Plan for the Turkey River Watershed Bow, Concord, Dunbarton, and Hopkinton, New Hampshire January 2019 Upper Merrimack Watershed

More information

Selection of Aquatic Organism Passage Design Methodology Based on Geomorphic Setting, Site Conditions, and Engineering Constraints

Selection of Aquatic Organism Passage Design Methodology Based on Geomorphic Setting, Site Conditions, and Engineering Constraints Selection of Aquatic Organism Passage Design Methodology Based on Geomorphic Setting, Site Conditions, and Engineering Constraints Robert Gubernick R.G. USDA Forest Service Region 9 Eastern Region Acknowledgements

More information

COTTON CREEK CULVERT REPLACMENT

COTTON CREEK CULVERT REPLACMENT COTTON CREEK CULVERT REPLACMENT Integrating Mobility with Environmental Innovation Located along a scenic section of Highway 3/95 in British Columbia, Moyie Bluffs, a 6.5 km stretch of inland highway had

More information

Moonlight Aquatic Organism Passage Project

Moonlight Aquatic Organism Passage Project Notice of Proposed Action Moonlight Aquatic Organism Passage Project Mt. Hough Ranger District Plumas National Forest Plumas County, California Figure 1. Hungry 1 aquatic organism passage outlet showing

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Appendix H: Stream Habitat Assessment

Appendix H: Stream Habitat Assessment Appendix H: Stream Habitat Assessment H CH2MHill and Greenways Incorporated conducted Stream Habitat Assessments on several streams throughout Wake County to determine the affect of development density

More information

Gulf of Mexico Hydrological Restoration Criteria for Identifying and Prioritizing Projects

Gulf of Mexico Hydrological Restoration Criteria for Identifying and Prioritizing Projects Gulf of Mexico Hydrological Restoration Criteria for Identifying and Prioritizing Projects Definition of hydrological restoration for this Partnership To remove or modify anthropogenic barriers to restore

More information

Sizing Hydraulic Structures in Cold Regions to Balance Fish Passage, Stream Function, and Operation and Maintenance Cost

Sizing Hydraulic Structures in Cold Regions to Balance Fish Passage, Stream Function, and Operation and Maintenance Cost Sizing Hydraulic Structures in Cold Regions to Balance Fish Passage, Stream Function, and Operation and Maintenance Cost Matt Blank, WTI-MSU David Dockery, Wild Rivers Consulting Chrissy Pohl, BPXA 1 Background

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information

INTERMEDIATE BMI ASSESSMENT TIER 2 FIELD SHEET

INTERMEDIATE BMI ASSESSMENT TIER 2 FIELD SHEET INTERMEDIATE BMI ASSESSMENT TIER 2 FIELD SHEET PHYSICAL PARAMETERS ASSESSMENT FIELD SHEET ALL TIERS NAME: DATE: TIME: STREAM OR RIVER NAME: WATERSHED NAME: TOWN: WEATHER PRESENT PAST 48 HOURS SITE DESCRIPTION

More information

Northern Forest Watershed Incentives Project:

Northern Forest Watershed Incentives Project: Northern Forest Watershed Incentives Project: Using Incentives to Connect Forests, Water, and Communities ACES Todd Gartner, M.F. Senior Associate Conservation Incentives and Markets tgartner@wri.org December

More information

FISH COLLECTION PERMIT SUMMARY REPORT FOR PERMIT NO.: CB

FISH COLLECTION PERMIT SUMMARY REPORT FOR PERMIT NO.: CB North/South Consultants Inc. 440, 1121 Centre St. NW Calgary, Alberta T2E 7K6 Tel: (403) 410-4068 Fax: (403) 410-5633 Email: cfazakas@nscons.ca Web: www.nscons.ca FISH COLLECTION PERMIT SUMMARY REPORT

More information

2012 Mill Creek Watershed Habitat Assessment Level 3 Project Study Plan Results

2012 Mill Creek Watershed Habitat Assessment Level 3 Project Study Plan Results 2012 Mill Creek Watershed Habitat Assessment Level 3 Project Study Plan Results Cranberry Run This project study plan was financed through a Sub-grant from the Ohio EPA with funds from the State of Ohio.

More information