1 Comprehensive Energy Audit For Grayling WTP Prepared For City Of Grayling July 29, 2014 Prepared By: ANTHC DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK

2 Table of Contents PREFACE... 2 ACKNOWLEDGMENTS AUDIT AND ANALYSIS BACKGROUND Program Description Audit Description Method of Analysis Limitations of Study Grayling WTP Building Description Predicted Energy Use Energy Usage / Tariffs Energy Use Index (EUI) AkWarm Building Simulation ENERGY COST SAVING MEASURES Summary of Results Interactive Effects of Projects ENERGY EFFICIENCY ACTION PLAN Appendix A Energy Audit Report Project Summary Appendix B Actual Fuel Use versus Modeled Fuel Use PREFACE The Energy Projects Group at the Alaska Native Tribal Health Consortium (ANTHC) prepared this document for The City of Grayling, Alaska. The authors of this report are Carl Remley, Certified Energy Auditor (CEA) and Certified Energy Manager (CEM) and Gavin Dixon. Kevin Ulrich and Martin Wortman also participated in the onsite portion of this audit. The purpose of this report is to provide a comprehensive document of the findings and analysis that resulted from an energy audit conducted in April of 2014 by the Energy Projects Group of ANTHC. This report analyzes historical energy use and identifies costs and savings of recommended energy conservation measures. Discussions of site specific concerns, nonrecommended measures, and energy conservation action plan are also included in this report. This energy audit was conducted using funds from the United States Department of Agriculture Rural Utilities Service as well as the State of Alaska Department of Environmental Conservation. Coordination with the State of Alaska RMW Program and associated RMW for each community has been undertaken to provide maximum accuracy in identifying audits and coordinating potential follow up retrofit activities. In the near future, a representative of ANTHC will be contacting both the City of Grayling and the water treatment plant operator to follow up on the recommendations made in this audit report. A Rural Alaska Village Grant has funded ANTHC to provide the City with assistance in understanding the report and in implementing the recommendations. Funding for 2

3 implementation of the recommended retrofits is being partially provided for by the above listed funding agencies, as well as the State of Alaska. ACKNOWLEDGMENTS The ANTHC Energy Projects Group gratefully acknowledges the assistance of Water Treatment Plant Operators Joshua Koyukuk and Kyle Anthony, Mayor Shirley Clark, City Administrator Ann Short, and Remote Maintenance Worker Bruce Werba. 1. EXECUTIVE SUMMARY This report was prepared for the City of Grayling. The scope of the audit focused on Grayling WTP. The scope of this report is a comprehensive energy study, which included an analysis of building shell, interior and exterior lighting systems, heating and ventilation systems, water treatment energy use, and plug loads. The total predicted energy cost for the WTP is $79,026 per year. This total compares favorably with the $68,810 actual cost. Electricity represents the largest piece with an annual cost of $50,841 per year. This includes $16,639 paid by the end users and $34,202 paid by the Power Cost Equalization (PCE) program through the State of Alaska. The WTP including the circulation loops and water storage tank was modeled to spend $28,083 for #1 heating oil. These predictions are based on the electricity and fuel prices at the time of the audit. The State of Alaska PCE program provides a subsidy to rural communities across the state to lower the electricity costs and make energy in rural Alaska affordable. In Grayling, the cost of electricity without PCE is $0.55/KWH, and the cost of electricity with PCE is $0.18/KWH. Table 1.1 below summarizes the energy efficiency measures analyzed for the Grayling WTP. Listed are the estimates of the annual savings, installed costs, and two different financial measures of investment return. Table 1.1 PRIORITY LIST ENERGY EFFICIENCY MEASURES Rank Feature Improvement Description 1 Thermostat Reset Thermostat in South Reprogram existing Lift Station #1 to 50 thermostat Degrees 2 Lighting Reduce lighting cost in North Lift Station 3 Thermostat Install new thermostat in WTP and set to 50 degrees. Teach operators that lift station lighting should only be on when lift station is occupied. Add remote thermostat in the North Lift Station and set it at 50 degrees Annual Energy Savings Installed Cost Savings to Investment Ratio, SIR 1 Simple Payback (Years) 2 $998 $ $420 $ $1,540 $1,

4 Table 1.1 PRIORITY LIST ENERGY EFFICIENCY MEASURES Rank Feature Improvement Description 4 Lighting Reduce Relocate light switch for lighting cost in South south lift station from Lift Station. outside building to inside and train to only use lights when building is occupied. 5 Thermostat Combined Retrofit: Intake Gallery Space Heating 6 Other Electrical Identify and repair leaks in distribution piping to reduce pumping electrical usage 7 Lighting - Replace the Gallery exterior metal halide light fixture with LED wall pack. 8 Lighting Replace WTP interior fluorescent lighting with LED replacement bulbs. 9 Setback Thermostat: Water Treatment Plant Add remote thermostat in the Intake Gallery and set at 50 degrees Find and repair leaks to reduce water treatment and pumping needs. Replace with energyefficient LED lighting and a photocell light sensor. Replace with energyefficient LED lighting and eliminate ballasts. Install programmable thermostat that can reset the temperature the building is heated to when unoccupied to 60 degrees, such as at nights and on weekends. 10 Walls: Broken window Eliminate the broken window by installing rigid foam board insulation with additional siding. 11 Lighting - Replace interior fluorescent lighting in WTP with LED replacement bulbs. 12 Lighting Replace exterior fluorescent lighting at WTP with LED wall packs. 13 Window: WTP Single Pane Window Replace with energyefficient LED lighting and remove ballasts. Replace with energyefficient LED wall pack and a photocell light sensor. Replace existing window with new vinyl window 14 HVAC And DHW Add a Recovered Heat System from the AVEC Power Plant to the WTP Annual Energy Savings Installed Cost Savings to Investment Ratio, SIR 1 Simple Payback (Years) 2 $420 $ $1,521 Plus $200 Maintenance Savings $1,748 $2, $7,112 $6, $170 $ $6, $897 $4, $36 $ $66 $ $11 plus $10 Maintenance Savings $ $89 $1, $16,394 plus $1,000 Maintenance Savings TOTAL, all measures $31,422 plus $1,210 Maintenance Savings $375, $397,

5 Table Notes: 1 Savings to Investment Ratio (SIR) is a life cycle cost measure calculated by dividing the total savings over the life of a project (expressed in today s dollars) by its investment costs. The SIR is an indication of the profitability of a measure; the higher the SIR, the more profitable the project. An SIR greater than 1.0 indicates a cost effective project (i.e. more savings than cost). Remember that this profitability is based on the position of that Energy Efficiency Measure (EEM) in the overall list and assumes that the measures above it are implemented first. 2 Simple Payback (SP) is a measure of the length of time required for the savings from an EEM to payback the investment cost, not counting interest on the investment and any future changes in energy prices. It is calculated by dividing the investment cost by the expected first year savings of the EEM. With all of these energy efficiency measures in place, the annual utility cost can be reduced by $31,422 per year, or 39.8% of the buildings total energy costs. These measures are estimated to cost $397,160, for an overall simple payback period of 12.2 years. Table 1.2 below is a breakdown of the annual energy cost across various energy end use types, such as Space Heating and Water Heating. The first row in the table shows the breakdown for the building as it is now. The second row shows the expected breakdown of energy cost for the building assuming all of the retrofits in this report are implemented. Finally, the last row shows the annual energy savings that will be achieved from the retrofits. Annual Energy Cost Estimate Description Space Heating Space Cooling Water Heating Ventilation Fans Table 1.2 Lighting Other Electrical Raw Water Heat Add Water Circulation Heat Existing $14,986 $0 $0 $0 $4,641 $33,825 $1,772 $16,874 $6,869 $79,026 Building With Proposed $8,399 $0 $0 $0 $1,698 $26,774 $743 $7,081 $2,850 $47,605 Retrofits Savings $6,587 $0 $0 $0 $2,944 $7,051 $1,028 $9,793 $4,019 $31,422 Tank Heat Total Cost 2. AUDIT AND ANALYSIS BACKGROUND 2.1 Program Description This audit included services to identify, develop, and evaluate energy efficiency measures at the Grayling WTP, Intake Gallery, and both the North and South Lift Stations. The scope of this project included evaluating building shell, lighting and other electrical systems, water process loads, heating and ventilating equipment, motors and pumps. Measures were analyzed based on life cycle cost techniques, which include the initial cost of the equipment, life of the equipment, annual energy cost, annual maintenance cost, and a discount rate of 3.0%/year in excess of general inflation. 5

6 2.2 Audit Description Preliminary audit information was gathered in preparation for the site survey. The site survey provides critical information in deciphering where energy is used and what opportunities exist within a building. The entire site was surveyed to inventory the following to gain an understanding of how each building operates: Building envelope (roof, windows, etc.) Heating, ventilation, and air conditioning equipment (HVAC) Lighting systems and controls Building specific equipment Water consumption, treatment & disposal The building site visit was performed to survey all major building components and systems. The site visit included detailed inspection of energy consuming components. Summary of building occupancy schedules, operating and maintenance practices, and energy management programs provided by the building manager were collected along with the system and components to determine a more accurate impact on energy consumption. Details collected from Grayling WTP and associated facilities enable a model of the building s energy usage to be developed, highlighting the building s total energy consumption, energy consumption by specific building component, and equivalent energy cost. The analysis involves distinguishing the different fuels used on site, and analyzing their consumption in different activity areas of the building. Grayling WTP is classified as being made up of the following activity areas: 1) Water Treatment Plant: 1,536 square feet In addition, the methodology involves taking into account a wide range of factors specific to the building. These factors are used in the construction of the model of energy used. The factors include: Occupancy hours Local climate conditions Prices paid for energy 2.3. Method of Analysis Data collected was processed using AkWarm Energy Use Software to estimate energy savings for each of the proposed energy efficiency measures (EEMs). The recommendations focus on the building envelope; heating and ventilating; lighting, plug load, water treatment process loads, and other electrical improvements; and motor and pump systems that will reduce annual energy consumption. EEMs are evaluated based on building use and processes, local climate conditions, building construction type, function, operational schedule, existing conditions, and foreseen future 6

7 plans. Energy savings are calculated based on industry standard methods and engineering estimations. Our analysis provides a number of tools for assessing the cost effectiveness of various improvement options. These tools utilize Life Cycle Costing, which is defined in this context as a method of cost analysis that estimates the total cost of a project over the period of time that includes both the construction cost and ongoing maintenance and operating costs. Savings to Investment Ratio (SIR) = Savings divided by Investment Savings includes the total discounted dollar savings considered over the life of the improvement. When these savings are added up, changes in future fuel prices as projected by the Department of Energy are included. Future savings are discounted to the present to account for the time value of money (i.e. money s ability to earn interest over time). The Investment in the SIR calculation includes the labor and materials required to install the measure. An SIR value of at least 1.0 indicates that the project is cost effective total savings exceed the investment costs. Simple payback is a cost analysis method whereby the investment cost of a project is divided by the first year s savings of the project to give the number of years required to recover the cost of the investment. This may be compared to the expected time before replacement of the system or component will be required. For example, if a boiler costs $12,000 and results in a savings of $1,000 in the first year, the payback time is 12 years. If the boiler has an expected life to replacement of 10 years, it would not be financially viable to make the investment since the payback period of 12 years is greater than the project life. The Simple Payback calculation does not consider likely increases in future annual savings due to energy price increases. As an offsetting simplification, simple payback does not consider the need to earn interest on the investment (i.e. it does not consider the time value of money). Because of these simplifications, the SIR figure is considered to be a better financial investment indicator than the Simple Payback measure. Measures are implemented in order of cost effectiveness. The program first calculates individual SIRs, and ranks all measures by SIR, higher SIRs at the top of the list. An individual measure must have an individual SIR>=1 to make the cut. Next the building is modified and resimulated with the highest ranked measure included. Now all remaining measures are reevaluated and ranked, and the next most cost effective measure is implemented. AkWarm goes through this iterative process until all appropriate measures have been evaluated and installed. It is important to note that the savings for each recommendation is calculated based on implementing the most cost effective measure first, and then cycling through the list to find the next most cost effective measure. Implementation of more than one EEM often affects the savings of other EEMs. The savings may in some cases be relatively higher if an individual EEM is implemented in lieu of multiple recommended EEMs. For example implementing a reduced operating schedule for inefficient lighting will result in relatively high savings. Implementing a reduced operating schedule for newly installed efficient lighting will result in lower relative 7

8 savings, because the efficient lighting system uses less energy during each hour of operation. If multiple EEM s are recommended to be implemented, AkWarm calculates the combined savings appropriately. Cost savings are calculated based on estimated initial costs for each measure. Installation costs include labor and equipment to estimate the full up front investment required to implement a change. Costs are derived from Means Cost Data, industry publications, and local contractors and equipment suppliers. 2.4 Limitations of Study All results are dependent on the quality of input data provided, and can only act as an approximation. In some instances, several methods may achieve the identified savings. This report is not intended as a final design document. The design professional or other persons following the recommendations shall accept responsibility and liability for the results. 3. Grayling WTP 3.1. Building Description The 1,536 square foot Grayling WTP was constructed in 1977, with a normal occupancy of one person, the operator. The building is occupied approximately four hours per day, seven days per week. The Grayling WTP houses a circulating water system with three loops that provide water to the residents of the community as well as a supply line that provides water to the school. One loop services the north end of town and is approximately 1850 feet long. Another loop serves the south side of town and is approximately 2000 feet long. A third loop serves the Hill Street area and is approximately 1800 feet long. There is also a supply line that feeds water to the school, which is approximately 125 ft. The raw water is treated with two pressure sand filters. A boost pump is used to maintain system pressure. Two additional water filters treat the water after they are through the pressure sand filters. The water is injected with chlorine prior to making a run up a hill to the 60,000 gallon water storage tank. The water system also has an intake gallery. The intake gallery has two pumps to move the water from the feeder creek to the WTP. One of the two pumps is constantly running, though for about a month both pumps were operating. This was necessary due to system leaks. The sewer system has a force main pipe that goes through two lift stations and is forced to the sewage lagoon about a half mile away. 8

9 Description of Building Shell The exterior walls are four inch panel construction with 3.5 polyurethane insulation. There is 1504 square feet of wall space and the insulation has some damage due to water and ice formation. The 1,619 square foot roof of the building is a cathedral style ceiling. The roof is standard 24 inch panel construction and 3.5 of polyurethane insulation. The floor and foundation of the building are 4 inch concrete slab with no insulation. There is 1536 square feet of floor space. There are multiple windows in various conditions throughout the building. There are two window spaces with plywood covering the opening and no insulation. This totals about 14 square feet. There are four window spaces with a single pane of Lexan or glass present that total about 21 square feet. There are four window spaces with two panes of either glass or Lexan that total about 23 square feet. All of the windows are damaged. There is only one entrance into the water plant with a metal door with no insulation or windows. The door has worn its hinges down and hangs slightly off center from the door frame. Description of Heating Plants The Heating Plants used in the building are: Weil McLean Nameplate Information: BL 676 WS Fuel Type: #1 Oil Input Rating: 300,000 BTU/Hour Steady State Efficiency: 75 % Idle Loss: 2 % Heat Distribution Type: Glycol Boiler Operation: Sep Jun Notes: Boilers are very old Weil McLean Fuel Type: #1 Oil Input Rating: 300,000 BTU/Hour Steady State Efficiency: 75 % Idle Loss: 2 % Heat Distribution Type: Glycol Boiler Operation: Sep Jun Gallery Electric Heater Nameplate Information: Fuel Type: 5000 watts made by Markel Electricity 9

10 Input Rating: 17,000 BTU/Hour Steady State Efficiency: 100 % Idle Loss: 0 % Heat Distribution Type: Air Notes: No remote thermostat room temp was 70 South Lift Station #1 Electric Heater Fuel Type: Electricity Input Rating: 6,100 BTU/Hour Steady State Efficiency: 100 % Idle Loss: 0 % Heat Distribution Type: Air North Lift Station #2 Fuel Type: Electricity Input Rating: 5,100 BTU/Hour Steady State Efficiency: 100 % Idle Loss: 0 % Heat Distribution Type: Air Space Heating Distribution Systems The building is heated with three unit heaters with an output of approximately 10,000 BTU/Hour. The heaters had thermostats attached to them but only one was operational. This was set to 70 deg. F. There are electric heaters present in the gallery and each lift station. The gallery heater has been left running during unoccupied periods, and each heater is also run when the space is occupied. Lighting There are 23 fixtures with four T 12 fluorescent light bulbs in each fixture and 2 fixtures with two T 12 fluorescent light bulbs in each fixture present in the interior of the WTP. Of all the total light bulbs, approximately 50% of the bulbs were in operation and 50% of the bulbs had burned out past their useful lives. The WTP has a fluorescent 20W CFL light bulb on the exterior of the building. Additionally, there are MH 70W lights in each of the three additional buildings apart from the WTP. Plug Loads The WTP has a variety of power tools, a telephone, an electric dryer, and some other miscellaneous loads that require a plug into an electrical outlet. The use of these items is infrequent and consumes a small portion of the total energy demand of the building. Major Equipment There are two raw water pumps that use approximately 2,984 watts each while in operation. These pumps are located in the gallery. One of these pumps is constantly running. 10

11 Each loop has two circulation pumps that use approximately 1,119 watts each while in operation. One circulation pump is constantly running from January through July and October through December for a total of ten months per year. With three loops, there are six pumps total with three in constant operation during these ten months. The line to the water storage tank has a circulation pump that uses approximately 179 watts while in operation and runs constantly for ten months per year. It is not used in August or September. Chlorine is injected into the system by a 60 watt LMI pump that runs whenever the raw water pump runs. The South Lift Station has a pump that consumes approximately 1,650 watts. This runs constantly throughout the year. This pump forces the sewage to the sewage lagoon outside of town. The North Lift Station has a pump that consumes approximately 2,300 watts. This runs constantly throughout the year. The pump forces sewage too move through the force main to the South Lift Station and on to the sewage lagoon. 3.2 Predicted Energy Use Energy Usage / Tariffs The electric usage profile charts (below) represents the predicted electrical usage for the four facilities. The model used to predict usage was calibrated to approximately match actual usage. The electric utility measures consumption in kilowatt hours (KWH). One KWH of usage is equivalent to 1,000 watts running for one hour. The basic usage charges are shown as generation service and delivery charges along with several non utility generation charges. The fuel oil usage profile shows the fuel oil usage for the building. Fuel oil consumption is measured in gallons. One gallon of #1 Fuel Oil provides approximately 132,000 BTUs of energy. The following is a list of the utility companies providing energy to the building and the class of service provided: Electricity: AVEC Grayling Commercial Sm The average cost for each type of fuel used in this building is shown below in Table 3.1. This figure includes all surcharges and utility customer charges: Table 3.1 Average Energy Cost Description Average Energy Cost Electricity $ 0.55/kWh #1 Oil $ 4.10/gallons 11

12 Total Energy Use and Cost Breakdown At current rates, the unsubsidized cost of energy for the WTP and associated facilities is $79,026 for electricity and fuel costs. Figure 3.1 below reflects the estimated distribution of costs across the primary end uses of energy based on the AkWarm computer simulation. Comparing the Retrofit bar in the figure to the Existing bar shows the potential savings from implementing all of the energy efficiency measures shown in this report. Figure 3.1 Annual Energy Costs by End Use Annual Energy Costs by End Use $80,000 $60,000 $40,000 Service Fees Tank Heat Water Circulation Heat Raw Water Heat Add Other Electrical Lighting Space Heating $20,000 $0 Existing Retrofit Figure 3.2 below shows how the annual energy cost of the building splits between the different fuels used by the building. The Existing bar shows the breakdown for the building as it is now; the Retrofit bar shows the predicted costs if all of the energy efficiency measures in this report are implemented. 12

13 Figure 3.2 Annual Energy Costs by Fuel Type Recovered Heat #1 Fuel Oil Electricity Figure 3.3 below addresses only Space Heating costs. The figure shows how each heat loss component contributes to those costs; for example, the figure shows how much annual space heating cost is caused by the heat loss through the Walls/Doors. For each component, the space heating cost for the Existing building is shown (blue bar) and the space heating cost assuming all retrofits are implemented (yellow bar) are shown. Figure 3.3 Annual Space Heating Cost by Component The tables below show AkWarm s estimate of the monthly fuel use for each of the fuels used in the building. For each fuel, the fuel use is broken down across the energy end uses. Note, in the tables below DHW refers to Domestic Hot Water heating. 13

14 Electrical Consumption (KWH) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Space_Heating DHW Ventilation_Fans Lighting Other_Electrical Raw_Water_Heat_Add Water_Circulation_Heat Tank_Heat Fuel Oil #1 Consumption (Gallons) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Space_Heating DHW Raw_Water_Heat_Add Water_Circulation_Heat Tank_Heat Energy Use Index (EUI) Energy Use Index (EUI) is a measure of a building s annual energy utilization per square foot of building. This calculation is completed by converting all utility usage consumed by a building for one year, to British Thermal Units (Btu) or kbtu, and dividing this number by the building square footage. EUI is a good measure of a building s energy use and is utilized regularly for comparison of energy performance for similar building types. The Oak Ridge National Laboratory (ORNL) Buildings Technology Center under a contract with the U.S. Department of Energy maintains a Benchmarking Building Energy Performance Program. The ORNL website determines how a building s energy use compares with similar facilities throughout the U.S. and in a specific region or state. Source use differs from site usage when comparing a building s energy consumption with the national average. Site energy use is the energy consumed by the building at the building site only. Source energy use includes the site energy use as well as all of the losses to create and distribute the energy to the building. Source energy represents the total amount of raw fuel that is required to operate the building. It incorporates all transmission, delivery, and production losses, which allows for a complete assessment of energy efficiency in a building. The type of utility purchased has a substantial impact on the source energy use of a building. The EPA has determined that source energy is the most comparable unit for evaluation purposes and overall global impact. Both the site and source EUI ratings for the building are provided to understand and compare the differences in energy use. The site and source EUIs for this building are calculated as follows. (See Table 3.4 for details): Building Site EUI = (Electric Usage in kbtu + Fuel Oil Usage in kbtu) Building Square Footage Building Source EUI = (Electric Usage in kbtu X SS Ratio + Fuel Oil Usage in kbtu X SS Ratio) Building Square Footage where SS Ratio is the Source Energy to Site Energy ratio for the particular fuel. 14

15 Table 3.4 Grayling WTP EUI Calculations Energy Type Building Fuel Use per Year Site Energy Use per Year, kbtu Source/Site Ratio Source Energy Use per Year, kbtu Electricity 91,836 KWH 313, ,046,880 #1 Oil 6,850 gallons 904, ,186 Hot Water Dist Heat million Btu 13, ,831 Total 1,230,730 1,976,896 BUILDING AREA 1,536 Square Feet BUILDING SITE EUI 801 kbtu/ft²/yr BUILDING SOURCE EUI 1,287 kbtu/ft²/yr * Site Source Ratio data is provided by the Energy Star Performance Rating Methodology for Incorporating Source Energy Use document issued March AkWarm Building Simulation An accurate model of the building performance can be created by simulating the thermal performance of the walls, roof, windows and floors of the building. The heating and ventilation system and central plant are modeled as well, accounting for the outside air ventilation required by the building. The model uses local weather data and is trued up to historical energy use to ensure its accuracy. The model can be used now and in the future to measure the utility bill impact of all types of energy projects, including improving building insulation, modifying glazing, changing air handler schedules, increasing heat recovery, installing high efficiency boilers, using variable air volume air handlers, adjusting outside air ventilation and adding cogeneration systems. For the purposes of this study, the Grayling WTP and associated facilities were modeled using AkWarm energy use software to establish a baseline space heating energy usage. Climate data from Grayling was used for analysis. From this, the model was be calibrated to predict the impact of theoretical energy savings measures. Once annual energy savings from a particular measure were predicted and the initial capital cost was estimated, payback scenarios were approximated. Limitations of AkWarm Models The model is based on typical mean year weather data for Grayling. This data represents the average ambient weather profile as observed over approximately 30 years. As such, the gas and electric profiles generated will not likely compare perfectly with actual energy billing information from any single year. This is especially true for years with extreme warm or cold periods, or even years with unexpectedly moderate weather. The heating and ventilation load model is a simple two zone model consisting of the building s core interior spaces and the building s perimeter spaces. This simplified approach loses accuracy for buildings that have large variations in cooling/heating loads across different parts of the building. 15

16 The energy balances shown in Section 3.1 were derived from the output generated by the AkWarm simulations. 4. ENERGY COST SAVING MEASURES 4.1 Summary of Results The energy saving measures are summarized in Table 4.1. Please refer to the individual measure descriptions later in this report for more detail. Table 4.1 Grayling WTP, Grayling, Alaska PRIORITY LIST ENERGY EFFICIENCY MEASURES Rank Feature Improvement Description 1 Thermostat Reset Thermostat in South Reprogram existing Lift Station #1 to 50 Degrees thermostat 2 Lighting Reduce lighting cost in North Lift Station 3 Thermostat Install new thermostat in WTP and set to 50 degrees. 4 Lighting Reduce lighting cost in South Lift Station. 5 Thermostat Combined Retrofit: Intake Gallery Space Heating 6 Other Electrical Identify and repair leaks in distribution piping to reduce pumping electrical usage 7 Lighting - Replace the Gallery exterior metal halide light fixture with LED wall pack. 8 Lighting Replace WTP interior fluorescent lighting with LED replacement bulbs. Teach operators that lift station lighting should only be on when lift station is occupied. Add remote thermostat in the North Lift Station and set it at 50 degrees Relocate light switch for south lift station from outside building to inside and train to only use lights when building is occupied. Add remote thermostat in the Intake Gallery and set at 50 degrees Find and repair leaks to reduce water treatment and pumping needs. Replace with energyefficient LED lighting and a photocell light sensor. Replace with energyefficient LED lighting and eliminate ballasts. Annual Energy Savings Installed Cost Savings to Investment Ratio, SIR Simple Payback (Years) $998 $ $1,521 Plus $200 Maintenance Savings $420 $ $1,540 $1, $420 $ $1,748 $2, $7,112 $6, $170 $ $6,

17 Table 4.1 Grayling WTP, Grayling, Alaska PRIORITY LIST ENERGY EFFICIENCY MEASURES Rank Feature Improvement Description 9 Setback Thermostat: Install programmable Water Treatment thermostat that can reset Plant the temperature the building is heated to when unoccupied to 60 degrees, such as at nights and on weekends. 10 Walls: Broken window Eliminate the broken window by installing rigid foam board insulation with additional siding. 11 Lighting - Replace interior fluorescent lighting in WTP with LED replacement bulbs. 12 Lighting Replace exterior fluorescent lighting at WTP with LED wall packs. 13 Window: WTP Single Pane Window Replace with energyefficient LED lighting and remove ballasts. Replace with energyefficient LED wall pack and a photocell light sensor. Replace existing window with new vinyl window 14 HVAC And DHW Add a Recovered Heat System from the AVEC Power Plant to the WTP Annual Energy Savings Installed Cost Savings to Investment Ratio, SIR Simple Payback (Years) $897 $4, $36 $ $66 $ $11 plus $10 Maintenance Savings $ $89 $1, $16,394 plus $1,000 Maintenance Savings TOTAL, all measures $31,422 plus $1,210 Maintenance Savings $375, $397, Interactive Effects of Projects The savings for a particular measure are calculated assuming all recommended EEMs coming before that measure in the list are implemented. If some EEMs are not implemented, savings for the remaining EEMs will be affected. For example, if ceiling insulation is not added, then savings from a project to replace the heating system will be increased, because the heating system for the building supplies a larger load. In general, all projects are evaluated sequentially so energy savings associated with one EEM would not also be attributed to another EEM. By modeling the recommended project sequentially, the analysis accounts for interactive affects among the EEMs and does not double count savings. Interior lighting, plug loads, facility equipment, and occupants generate heat within the building. Lighting efficiency improvements are anticipated to slightly increase heating requirements. Heating penalties and cooling benefits were included in the lighting project analysis. 4.3 Building Shell Measures 17

18 4.3.1 Insulation Measures Rank Location Existing Type/R Value Recommendation Type/R Value 10 Windowl: WTP Boarded Window Area Window Type: Broken, no glass Install rigid foam board insulation with additional siding to eliminate broken window. Installation Cost $365 Estimated Life of Measure (yrs) 30 Energy Savings (/yr) $36 Breakeven Cost $846 Savings to Investment Ratio 2.3 Simple Payback yrs 10 Auditors Notes: There were window spaces with no window and a sheet of un insulated plywood covering the space. Consider replacing this with R 25 rigid foam board and T1 11 siding or equivalent Window Measures Rank Location Size/Type, Condition Recommendation 13 Window: WTP Single Pane Window Glass: Single, 1/8" Acrylic/Polycarbonate Frame: Wood\Vinyl Spacing Between Layers: Half Inch Gas Fill Type: Air Modeled U Value: 0.87 Solar Heat Gain Coefficient including Window Coverings: 0.51 Replace existing window with better double pane vinyl window Installation Cost $1,334 Estimated Life of Measure (yrs) 20 Energy Savings (/yr) $89 Breakeven Cost $1,544 Savings to Investment Ratio 1.2 Simple Payback yrs 15 Auditors Notes: The current windows are damaged, single pane, and some have Lexan sheets in place of glass. Consider replacing all these windows with U 0.22 vinyl window. 4.4 Mechanical Equipment Measures Heating Measure Rank Recommendation 14 Add a Recovered Heat System from the AVEC Power Plant to the WTP Installation Cost $375,000 Estimated Life of Measure (yrs) 30 Energy Savings (/yr) $16,394 Maintenance Savings (/yr) $1,000 Breakeven Cost $412,589 Savings to Investment Ratio 1.1 Simple Payback yrs 22 Auditors Notes: The AVEC plant is approximately 200ft. from the WTP building. AVEC uses a Detroit Diesel Series 60 generator that could be outfitted with marine jacket manifold to increase available recovered heat to supply the WTP. 18

19 4.4.3 Night Setback Thermostat Measure Rank Building Space Recommendation 9 Water Treatment Plant Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Water Treatment Plant. Installation Cost $4,000 Estimated Life of Measure (yrs) 15 Energy Savings (/yr) $897 Breakeven Cost $12,116 Savings to Investment Ratio 3.0 Simple Payback yrs 4 Auditors Notes: Most heaters are set to 70 deg. F for all the time. Reducing the heat load by lowering the temperature during unoccupied times can lower the heat demand and the energy costs. This can be done with the installation of a setback thermostat that is programmed to reduce the call for heat on nights and weekends when the facility is unoccupied. Includes the labor hours of an electrician and materials. 4.5 Electrical & Appliance Measures Lighting Measures The goal of this section is to present any lighting energy conservation measures that may also be cost beneficial. It should be noted that replacing current bulbs with more energy efficient equivalents will have a small effect on the building heating loads. The building heating load will see a small increase, as the more energy efficient bulbs give off less heat a Lighting Measures Replace Existing Fixtures/Bulbs Rank Location Existing Condition Recommendation 2 North Lift Station Interior Lighting MH 70 Watt Magnetic with Manual Switching Improve controls. Installation Cost $110 Estimated Life of Measure (yrs) 7 Energy Savings (/yr) $420 Breakeven Cost $2,598 Savings to Investment Ratio 23.6 Simple Payback yrs 0 Auditors Notes: Train operators to utilize existing switches to only use North Lift Station #2 interior lighting when the lift station is occupied. Rank Location Existing Condition Recommendation 4 South Lift Station Interior Lighting MH 70 Watt Magnetic with Manual Switching Relocate light switch from outside the building to inside and train the operators to only use the light when occupying the building. Installation Cost $200 Estimated Life of Measure (yrs) 7 Energy Savings (/yr) $420 Breakeven Cost $2,598 Savings to Investment Ratio 13.0 Simple Payback yrs 0 Auditors Notes: Train operators to utilize existing switches to only use North Lift Station #2 interior lighting when the lift station is occupied. 19

20 Rank Location Existing Condition Recommendation 7 Exterior MH Fixture at Gallery MH 70 Watt Magnetic with Manual Switching Replace with energy efficient LED wall pack lighting and a photocell light sensor. Installation Cost $500 Estimated Life of Measure (yrs) 20 Energy Savings (/yr) $170 Breakeven Cost $2,482 Savings to Investment Ratio 5.0 Simple Payback yrs 3 Auditors Notes: Replace with an 17 watt LED wall pack with photocell control. Rank Location Existing Condition Recommendation 8 WTP 4 Lamp Fluorescent 23 FLUOR (4) T12 4' F40T12 40W Standard fixtures with energy efficient magnetic ballasts Replace with energy efficient LED lighting and a occupancy sensor Installation Cost $6,000 Estimated Life of Measure (yrs) 20 Energy Savings (/yr) $1,521 Maintenance Savings (/yr) $200 Breakeven Cost $24,428 Savings to Investment Ratio 4.1 Simple Payback yrs 3 Auditors Notes: Replace fluorescent lighting with direct wired 17 watt replacement LED bulbs. Remove the old fluorescent ballast and light bulbs. This assumes a local installation. Rank Location Existing Condition Recommendation 11 WTP 2 Lamp Fluorescent 2 FLUOR (2) T12 4' F40T12 40W Standard energy efficient magnetic ballasts. Replace with energy efficient LED lighting and a occupancy sensor. Installation Cost $250 Estimated Life of Measure (yrs) 7 Energy Savings (/yr) $66 Breakeven Cost $405 Savings to Investment Ratio 1.6 Simple Payback yrs 4 Auditors Notes: Replace fluorescent lighting with direct wired 17 watt replacement LED bulbs. Remove the old fluorescent ballast and light bulbs. This assumes a local installation. Rank Location Existing Condition Recommendation 12 Exterior Fluorescent Fixture on WTP FLUOR CFL, Spiral 20 W with Manual Switching Replace with energy efficient LED wall pack lighting and a photocell light sensor. Installation Cost $200 Estimated Life of Measure (yrs) 20 Energy Savings (/yr) $11 Maintenance Savings (/yr) $10 Breakeven Cost $305 Savings to Investment Ratio 1.5 Simple Payback yrs 10 Auditors Notes: Replace with LED 17W exterior wall pack with a photocell. The photocell will automatically cause the light to turn on and off based on the amount of sunlight. 20

21 4.5.6 Other Measures Rank Location Description of Existing Efficiency Recommendation 1 South Lift Station #1 Electric Heater Reset Thermostat in South Lift Station #1 to 50 Degrees Installation Cost $200 Estimated Life of Measure (yrs) 15 Energy Savings (/yr) $998 Breakeven Cost $11,718 Savings to Investment Ratio 58.6 Simple Payback yrs 0 Auditors Notes: Since the lift station is largely unoccupied, it does not need to be heated to 70 deg. F. Setting the thermostat to 50 deg. F will reduce heating demand and costs. Rank Location Description of Existing Efficiency Recommendation 3 North Lift Station #2 Electric Heater Add remote thermostat set at 50 degrees Installation Cost $1,000 Estimated Life of Measure (yrs) 15 Energy Savings (/yr) $1,540 Breakeven Cost $18,088 Savings to Investment Ratio 18.1 Simple Payback yrs 1 Auditors Notes: Since the lift station is largely unoccupied, it does not need to be heated to 70 deg. F. Adding a remote sensor thermostat and setting the thermostat to 50 deg. F will reduce heating demand and costs. Rank Location Description of Existing Efficiency Recommendation 5 Gallery Space Heating Load Add remote thermostat set at 50 degrees Installation Cost $2,000 Estimated Life of Measure (yrs) 15 Energy Savings (/yr) $1,748 Breakeven Cost $20,536 Savings to Investment Ratio 10.3 Simple Payback yrs 1 Auditors Notes: Since the gallery is largely unoccupied, it does not need to be heated to 70 deg. F. Adding a thermostat and setting the thermostat to 50 deg. F will reduce heating demand and costs. Rank Location Description of Existing Efficiency Recommendation 6 Gallery Pump & Raw Water Booster Pump Raw Water Booster Pumps with Manual Switching Find and repair distribution system leaks Installation Cost $6,000 Estimated Life of Measure (yrs) 10 Energy Savings (/yr) $7,112 Breakeven Cost $59,894 Savings to Investment Ratio 10.0 Simple Payback yrs 1 Auditors Notes: System in ground water leaks are resulting in the need to make water at the rate of 19 GPM 24 hours per day 365 days per year. This is a consumption rate of 148 gallons per person per day based on a population of 188 people. It should be in the range of 30 to 70 gallons per person per day. Find and repair system leaks. 21

22 5. ENERGY EFFICIENCY ACTION PLAN Through inspection of the energy using equipment on site and discussions with site facilities personnel, this energy audit has identified several energy saving measures. The measures will reduce the amount of fuel burned and electricity used at the site. The projects will not degrade the performance of the building and, in some cases, will improve it. Several types of EEMs can be implemented immediately by building staff, and others will require various amounts of lead time for engineering and equipment acquisition. In some cases, there are logical advantages to implementing EEMs concurrently. For example, if the same electrical contractor is used to install both lighting equipment and motors, implementation of these measures should be scheduled to occur simultaneously. In the near future, a representative of ANTHC will be contacting both the City of Grayling and the water plant operator to follow up on the recommendations made in this audit report. A Rural Alaska Village Grant has funded ANTHC to provide the City with assistance in understanding the report and implementing the recommendations. 22

23 APPENDICES Appendix A Energy Audit Report Project Summary ENERGY AUDIT REPORT PROJECT SUMMARY General Project Information PROJECT INFORMATION AUDITOR INFORMATION Building: Grayling WTP Auditor Company: ANTHC DEHE Address: PO Box 89 Auditor Name: Carl Remley and Kevin Ulrich City: Grayling Auditor Address: 3900 Ambassador Drive, Suite 301 Client Name: Joshua Koyukuk & Kyle Anthony Anchorage, AK Client Address: PO Box 89 Auditor Phone: (907) Grayling, AK Auditor FAX: Client Phone: (907) Auditor Comment: Client FAX: Design Data Building Area: 1,536 square feet Design Space Heating Load: Design Loss at Space: 31,600 Btu/hour with Distribution Losses: 35,111 Btu/hour Plant Input Rating assuming 82.0% Plant Efficiency and 25% Safety Margin: 53,523 Btu/hour Note: Additional Capacity should be added for DHW and other plant loads, if served. Typical Occupancy: 0 people Design Indoor Temperature: 70 deg F (building average) Actual City: Grayling Design Outdoor Temperature: 47 deg F Weather/Fuel City: Grayling Heating Degree Days: deg F days Utility Information Electric Utility: AVEC Grayling Commercial Sm Average Annual Cost/kWh: $0.554/kWh Natural Gas Provider: None Average Annual Cost/ccf: $0.000/ccf Annual Energy Cost Estimate Description Space Heating Space Cooling Water Heating Ventilation Fans Lighting Other Electrical Raw Water Heat Add Water Circulation Heat Existing $14,986 $0 $0 $0 $4,641 $33,825 $1,772 $16,874 $6,869 $79,026 Building With Proposed $8,399 $0 $0 $0 $1,698 $26,774 $743 $7,081 $2,850 $47,605 Retrofits Savings $6,587 $0 $0 $0 $2,944 $7,051 $1,028 $9,793 $4,019 $31,422 Tank Heat Total Cost 23

24 Appendix B Actual Fuel Use versus Modeled Fuel Use The Orange bars show Actual fuel use, and the Blue bars are AkWarm s prediction of fuel use. Annual Fuel Use Modeled Actual Electricit y Natural Gas Propane #1 Oil #2 Oil Birch Wood Spruce Wood Coal Steam District Ht Hot Wtr District Ht Electricity Fuel Use Modeled Actual Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec #1 Fuel Oil Fuel Use Modeled Actual Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 24

25 Recovered Heat Modeled Actual Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 25

Comprehensive Energy Audit For. Savoonga Water Treatment Plant

Comprehensive Energy Audit For. Savoonga Water Treatment Plant Comprehensive Energy Audit For Savoonga Water Treatment Plant Prepared For: City of Savoonga August 30, 2010 Prepared By: ANTHC-DEHE Energy Projects Group 1901 Bragaw St. Suite 200 Anchorage, AK 99508

More information

Comprehensive Energy Audit For. Ambler Water Treatment Plant

Comprehensive Energy Audit For. Ambler Water Treatment Plant Comprehensive Energy Audit For Ambler Water Treatment Plant Prepared For City of Ambler December 22, 2014 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents

More information

For Point. Prepared For City of Nunapitchuk. June 14, 2012 ANTHC DEHE

For Point. Prepared For City of Nunapitchuk. June 14, 2012 ANTHC DEHE Comprehensive Energy Audit For West Watering Point Prepared For City of Nunapitchuk June 14, 2012 Prepared By: ANTHC DEHE 1901 Bragaw Street, Suite 200 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For. Elim Water Treatment Plant

Comprehensive Energy Audit For. Elim Water Treatment Plant Comprehensive Energy Audit For Elim Water Treatment Plant Prepared For City of Elim July 8, 2014 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Comprehensive Energy Audit For Chevak Vacuum Plant

Comprehensive Energy Audit For Chevak Vacuum Plant Comprehensive Energy Audit For Chevak Vacuum Plant Prepared For City of Chevak March 30, 2013 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For Holy Cross Water Treatment Plant and Lift Station

Comprehensive Energy Audit For Holy Cross Water Treatment Plant and Lift Station Comprehensive Energy Audit For Holy Cross Water Treatment Plant and Lift Station Prepared For City of Holy Cross August 5, 2014 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508

More information

Comprehensive Energy Audit For. Nondalton WTP

Comprehensive Energy Audit For. Nondalton WTP Comprehensive Energy Audit For Nondalton WTP Prepared For City of Nondalton January 2, 2015 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 201 Anchorage, AK 99508 1 Table of Contents PREFACE... 2

More information

Compr For. Prepared For. August 15, Prepared By: ANTHC DEHE Energy

Compr For. Prepared For. August 15, Prepared By: ANTHC DEHE Energy Compr rehensive Energy Audit For Toksook Bay Water Treatment Plant Prepared For City of Toksook Bay August 15, 2011 Prepared By: ANTHC DEHE Energy Projects Group 1901 Bragaw, Suite 200 Anchorage, Alaska

More information

Comprehensive Energy Audit For Kongiganak Health Clinic

Comprehensive Energy Audit For Kongiganak Health Clinic Comprehensive Energy Audit For Kongiganak Health Clinic Prepared For Native Village of Kongiganak September 15, 2011 Prepared By: ANTHC DEHE Energy Projects Group Anchorage, Alaska 99508 1 Table of Contents

More information

For. Prepared For ANTHC DEHE

For. Prepared For ANTHC DEHE Comprehensive Energy Audit For Tuluksakk Health Clinic Prepared For Tuluksak Native Community February 7, 20122 Prepared By: ANTHC DEHE 1901 Bragaw, Suite 200 Anchorage, AK 99508 1 Table of Contents 1.

More information

Compr For & Washeteria

Compr For & Washeteria Compr rehensive Energy Audit For Water Treatment Plant & Washeteria Prepared For Pitkas Point Village Council March 6, 2013 Prepared By: ANTHC DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508

More information

Comprehensive Energy Audit For Sleetmute Water Treatment Plant

Comprehensive Energy Audit For Sleetmute Water Treatment Plant Comprehensive Energy Audit For Sleetmute Water Treatment Plant Prepared For Sleetmute Traditional Council August 1, 2011 Prepared By: ANTHC-DEHE Energy Projects Group 1901 Bragaw, Suite 200 Anchorage,

More information

Comprehensive Energy Audit For. Ruby Water Treatment Plant & Washeteria

Comprehensive Energy Audit For. Ruby Water Treatment Plant & Washeteria Comprehensive Energy Audit For Ruby Water Treatment Plant & Washeteria Prepared For City of Ruby July 17, 2015 Prepared By: Alaska Native Tribal Health Consortium 3900 Ambassador Dr. Anchorage, AK 99508

More information

Comprehensive Energy Audit For. Kobuk Water and Sanitiation

Comprehensive Energy Audit For. Kobuk Water and Sanitiation Comprehensive Energy Audit For Kobuk Water and Sanitiation Prepared For City of Kobuk March 23, 2015 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Comprehensive Energy Audit For Akiak Health Clinic

Comprehensive Energy Audit For Akiak Health Clinic Comprehensive Energy Audit For Akiak Health Clinic Prepared For Akiak Native Community October 19, 2011 Prepared By: ANTHC-DEHE Energy Projects Group Anchorage, Alaska 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For. Anvik Water Treatment Plant & Washeteria

Comprehensive Energy Audit For. Anvik Water Treatment Plant & Washeteria Comprehensive Energy Audit For Anvik Water Treatment Plant & Washeteria Prepared For City of Anvik May 21, 2015 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents

More information

For Newtok. Prepared For. March 16, 2012 ANTHC DEHE

For Newtok. Prepared For. March 16, 2012 ANTHC DEHE Comprehensive Energy Audit For Newtok Triball Court Prepared For Newtok Village March 16, 2012 Prepared By: ANTHC DEHE 1901 Bragaw Suite 200 Anchorage, Alaska 99508 1 Table of Contents 1. EXECUTIVE SUMMARY...

More information

Comprehensive Energy Audit For. Akiachak Water Treatment Plant

Comprehensive Energy Audit For. Akiachak Water Treatment Plant Comprehensive Energy Audit For Akiachak Water Treatment Plant Prepared For Native Village of Akiachak December 14, 2015 Prepared By: ANTHC-DEHE 3900 Ambassador Drive Anchorage, AK 99508 1 Table of Contents

More information

Comprehensive Energy Audit For. Quinhagak Utility Building

Comprehensive Energy Audit For. Quinhagak Utility Building Comprehensive Energy Audit For Quinhagak Utility Building Prepared For City of Quinhagak May 11, 2016 Prepared By: ANTHC-DEHE 4500 Diplomacy Dr., Anchorage, AK 99508 1 Table of Contents PREFACE... 3 ACKNOWLEDGMENTS...

More information

Comprehensive Energy Audit For. Unalakleet Pump House

Comprehensive Energy Audit For. Unalakleet Pump House Comprehensive Energy Audit For Unalakleet Pump House Prepared For City of Unalakleet March 9, 2017 Prepared By: Kevin Ulrich and Martin Wortman ANTHC-DEHE 4500 Diplomacy Dr. Anchorage, AK 99508 1 Table

More information

Comprehensive Energy Audit For Pitkas Point Tribal Office

Comprehensive Energy Audit For Pitkas Point Tribal Office Comprehensive Energy Audit For Pitkas Point Tribal Office Prepared For Native Village of Pitkas Point March 7, 2013 Prepared By: ANTHC DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table

More information

For. Prepared For. June 11, 2012 ANTHC DEHE

For. Prepared For. June 11, 2012 ANTHC DEHE Comprehensive Energy Audit For Tununak Tribal Police Office Prepared For Native Village of Tununak June 11, 2012 Prepared By: ANTHC DEHE 1901 Bragaw Suite, Suite 200 Anchorage, AK 99508 1 Table of Contents

More information

Compr For. Prepared For City of Teller. Prepared By: ANTHC DEHE Energy

Compr For. Prepared For City of Teller. Prepared By: ANTHC DEHE Energy Compr rehensive Energy Audit For Teller Water Plant and Washeteria Prepared For City of Teller September 14, 2011 Prepared By: ANTHC DEHE Energy Projects Group 1901 Bragaw St. Suite 200. Anchorage, AK

More information

Comprehensive Energy Audit For. Kake Water Treatment Plant and Water Dam

Comprehensive Energy Audit For. Kake Water Treatment Plant and Water Dam Comprehensive Energy Audit For Kake Water Treatment Plant and Water Dam Prepared For City of Kake August 9, 2016 Prepared By: ANTHC-DEHE 4500 Diplomacy Dr. Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Comprehensive Energy Audit For Community Building

Comprehensive Energy Audit For Community Building Comprehensive Energy Audit For Community Building Prepared For Hooper Bay Tribal Council June 29, 2012 Prepared By: ANTHC 1901 Bragaw St. Suite 200 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For CMTRS Building

Comprehensive Energy Audit For CMTRS Building Comprehensive Energy Audit For CMTRS Building Prepared For Chevak Native Village December 21, 2011 Prepared By: ANTHC-DEHE 1901 Bragaw Street, Suite 200 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For. Old Harbor Water Treatment Plant

Comprehensive Energy Audit For. Old Harbor Water Treatment Plant Comprehensive Energy Audit For Old Harbor Water Treatment Plant Prepared For City of Old Harbor August 9, 2016 Prepared By: ANTHC-DEHE 4500 Diplomacy Dr. Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Comprehensive Energy Audit For Sleetmute Tribal Office

Comprehensive Energy Audit For Sleetmute Tribal Office Comprehensive Energy Audit For Sleetmute Tribal Office Prepared For Traditional Council of Sleetmute August 17, 2011 Prepared By: ANTHC Energy Projects Group 1901 Bragaw St. Suite 200 Anchorage, AK 99508

More information

Comprehensive Energy Audit For Sleetmute Community Center

Comprehensive Energy Audit For Sleetmute Community Center Comprehensive Energy Audit For Sleetmute Community Center Prepared For The Traditional Council of Sleetmute, and the Alaska Rural Utility Collaborative Apr 26, 2011 Prepared By: ANTHC 1901 Bragaw St. Suite

More information

Comprehensive Energy Audit For Eek Tribal Office/City Office

Comprehensive Energy Audit For Eek Tribal Office/City Office Comprehensive Energy Audit For Eek Tribal Office/City Office Prepared For: Native Village of Eek And City of Eek August 5, 2011 Prepared By: ANTHC-DEHE Energy Projects Group 1901 Bragaw St. Suite 200 Anchorage,

More information

For. Prepared For. June 11, 2012 ANTHC DEHE

For. Prepared For. June 11, 2012 ANTHC DEHE Comprehensive Energy Audit For Chuathbaluk Tribal Office Prepared For Native Village of Chuathbaluk June 11, 2012 Prepared By: ANTHC DEHE 1901 Bragaw Suite, Suite 200 Anchorage, Alaska 99508 1 Table of

More information

Comprehensive Energy Audit For Akiak Native Community

Comprehensive Energy Audit For Akiak Native Community Comprehensive Energy Audit For Akiak Native Community Prepared For Akiak Native Community October 19, 2011 Prepared By: ANTHC-DEHE Energy Projects Group 1901 Bragaw, Suite 200 Anchorage, AK 99508 1 Table

More information

Comprehensive Energy Audit For. Kiana Lift Station

Comprehensive Energy Audit For. Kiana Lift Station Comprehensive Energy Audit For Kiana Lift Station Prepared For City of Kiana July 27, 2016 Prepared By: Bailey Gamble ANTHC 4500 Diplomacy Dr., Suite 545 Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Comprehensive Energy Audit For. Noorvik Water Treatment Plant

Comprehensive Energy Audit For. Noorvik Water Treatment Plant Comprehensive Energy Audit For Noorvik Water Treatment Plant Prepared For City of Noorvik November 17, 2015 Prepared By: ANTHC-DEHE 4500 Diplomacy Dr., Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

For. Prepared For City of Nulato. Prepared By: ANTHC DEHE Energy

For. Prepared For City of Nulato. Prepared By: ANTHC DEHE Energy Comprehensive Energy Audit For Nulato Health Clinic Prepared For City of Nulato October 27, 20111 Prepared By: ANTHC DEHE Energy Projects Group 1901 Bragaw Street, Suite 200 Anchorage, AK 99508 1 Table

More information

Comprehensive Energy Audit For. Fort Yukon Water Treatment Plant

Comprehensive Energy Audit For. Fort Yukon Water Treatment Plant Comprehensive Energy Audit For Fort Yukon Water Treatment Plant Prepared For City of Fort Yukon June 29, 2016 Prepared By: ANTHC-DEHE 4500 Diplomacy Dr., Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Comprehensive Energy Audit For Kwigillingok Water Treatment Plant

Comprehensive Energy Audit For Kwigillingok Water Treatment Plant Comprehensive Energy Audit For Kwigillingok Water Treatment Plant Prepared For Native Village of Kwigillingok August 24, 2016 Prepared By: Bailey Gamble, Kevin Ulrich Alaska Native Tribal Health Consortium

More information

Comprehensive Energy Audit For Buckland Washeteria

Comprehensive Energy Audit For Buckland Washeteria Comprehensive Energy Audit For Buckland Washeteria Prepared For City of Buckland May 12, 2017 Prepared By: Bailey Gamble Alaska Native Tribal Health Consortium 4500 Diplomacy Dr., Suite 454 Anchorage,

More information

Comprehensive Energy Audit For White Mountain Water Treatment Plant

Comprehensive Energy Audit For White Mountain Water Treatment Plant Comprehensive Energy Audit For White Mountain Water Treatment Plant Prepared For White Mountain Utilities December 13, 2016 Prepared By: Bailey Gamble Alaska Native Tribal Health Consortium 4500 Diplomacy

More information

Comprehensive Energy Audit For Alakanuk Water Treatment Plant

Comprehensive Energy Audit For Alakanuk Water Treatment Plant Comprehensive Energy Audit For Alakanuk Water Treatment Plant Prepared For City of Alakanuk November 27, 2015 Prepared By: ANTHC-DEHE 500 Diplomacy Drive, Suite 454, Anchorage, AK 99508 Anchorage, Alaska

More information

Comprehensive Energy Audit For. Angoon Water Treatment Plant

Comprehensive Energy Audit For. Angoon Water Treatment Plant Comprehensive Energy Audit For Angoon Water Treatment Plant Prepared For City of Angoon August 9, 2016 Prepared By: ANTHC-DEHE 4500 Diplomacy Dr. Anchorage, AK 99508 1 Table of Contents PREFACE... 3 ACKNOWLEDGMENTS...

More information

Investigative Energy Audit For. Koliganek IGAP Office Building. Prepared For Koliganek Village Council. Prepared By Curtis Boudreau, PE, CEM

Investigative Energy Audit For. Koliganek IGAP Office Building. Prepared For Koliganek Village Council. Prepared By Curtis Boudreau, PE, CEM Investigative Energy Audit For Koliganek IGAP Office Building Prepared For Koliganek Village Council Prepared By Curtis Boudreau, PE, CEM February 22, 2017 ANTHC DEHE 4500 Diplomacy Dr. Anchorage, AK 99508

More information

Comprehensive Energy Audit For. Shungnak Water Treatment Plant

Comprehensive Energy Audit For. Shungnak Water Treatment Plant Comprehensive Energy Audit For Shungnak Water Treatment Plant Prepared For City of Shungnak November 9, 2018 Prepared By: Kevin Ulrich, CEM ANTHC-DEHE 4500 Diplomacy Dr., Anchorage, AK 99508 1 Table of

More information

Comprehensive Energy Audit For Kiana Water Treatment Plant

Comprehensive Energy Audit For Kiana Water Treatment Plant Comprehensive Energy Audit For Kiana Water Treatment Plant Prepared For City of Kiana July 12, 2016 Prepared By: Bailey Gamble ANTHC-DEHE 4500 Diplomacy Dr., Suite 545 Anchorage, AK 99508 1 Table of Contents

More information

Compr For. Prepared For

Compr For. Prepared For Compr rehensive Energy Audit For Sand Point Water Treatment Plant and Intake Facility Prepared For City of Sand Pointt August 18, 2016 Prepared By: Gavin Dixon and Martin Wortman, ANTHC 4500 Diplomacy

More information

Comprehensive Energy Audit For. Koliganek Water Treatment Plant

Comprehensive Energy Audit For. Koliganek Water Treatment Plant Comprehensive Energy Audit For Koliganek Water Treatment Plant Prepared For New Koliganek Village Council April 25, 2017 Prepared By: Kevin Ulrich and Cody Uhlig ANTHC-DEHE 4500 Diplomacy Dr. Anchorage,

More information

Comprehensive Energy Audit For New Stuyahok Water Plant

Comprehensive Energy Audit For New Stuyahok Water Plant Comprehensive Energy Audit For New Stuyahok Water Plant Prepared For City of New Stuyahok February 14, 2017 Prepared By: Bailey Gamble Alaska Native Tribal Health Consortium 4500 Diplomacy Dr., Suite 454

More information

Comprehensive Energy Audit For. Mountain Village Boys & Girls Club

Comprehensive Energy Audit For. Mountain Village Boys & Girls Club Comprehensive Energy Audit For Mountain Village Boys & Girls Club Prepared For City of Mountain Village August 11, 2017 Prepared By: Kevin Ulrich ANTHC-DEHE 4500 Diplomacy Dr. Anchorage, AK 99508 1 Table

More information

Comprehensive Energy Audit For. Hughes Water Treatment Plant & Washeteria

Comprehensive Energy Audit For. Hughes Water Treatment Plant & Washeteria Comprehensive Energy Audit For Hughes Water Treatment Plant & Washeteria Prepared For City of Hughes November 11, 2016 Prepared By: Kevin Ulrich, Martin Wortman, & Kameron Hartvigson ANTHC-DEHE 4500 Diplomacy

More information

Comprehensive Energy Audit For Shaktoolik Health Clinic

Comprehensive Energy Audit For Shaktoolik Health Clinic Comprehensive Energy Audit For Shaktoolik Health Clinic Prepared For Native Village of Shaktoolik July 18, 2011 Prepared By: ANTHC DEHE Energy Projects Group 1901 Bragaw Street, Suite 200 Anchorage, AK

More information

ENERGY AUDIT REPORT. City of Kenai Public Safety 105 & 107 South Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-05 May 2012

ENERGY AUDIT REPORT. City of Kenai Public Safety 105 & 107 South Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-05 May 2012 ENERGY AUDIT REPORT City of Kenai Public Safety 5 & 7 South Willow Kenai, Alaska 99611 CAEC Project No. CIRI-ENA-CAEC-05 May 2012 SUBMITTED BY: PRIMARY CONTACT: 220 SE 51 st Street 32266 Lakefront Drive

More information

ENERGY AUDIT REPORT. (Photo From Google Maps) City of Kenai Airport 305 North Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-04 May 2012

ENERGY AUDIT REPORT. (Photo From Google Maps) City of Kenai Airport 305 North Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-04 May 2012 ENERGY AUDIT REPORT (Photo From Google Maps) City of Kenai Airport 305 North Willow Kenai, Alaska 99611 CAEC Project No. CIRI-ENA-CAEC-04 May 2012 SUBMITTED BY: PRIMARY CONTACT: 220 SE 51 st Street 32266

More information

Klatt Elementary School

Klatt Elementary School Klatt Elementary School 1190 Juniper Drive Anchorage, Alaska 99517 AkWarm-C ID No. CIRI-ANC-CAEC-28 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring, P.E., C.E.A. 32215 Lakefront

More information

ENERGY AUDIT REPORT. Soldotna Sports Center 538 Arena Avenue Soldotna, AK 99669

ENERGY AUDIT REPORT. Soldotna Sports Center 538 Arena Avenue Soldotna, AK 99669 ENERGY AUDIT REPORT Soldotna Sports Center 538 Arena Avenue Soldotna, AK 99669 CAEC Project No. CIRI SXQ CAEC 06 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

Slana School. Mile 4 Nabesna Road. Slana, Alaska AkWarm ID No. AHTNA-Z93-CAEC-02. Submitted by:

Slana School. Mile 4 Nabesna Road. Slana, Alaska AkWarm ID No. AHTNA-Z93-CAEC-02. Submitted by: Slana School Mile 4 Nabesna Road Slana, Alaska 99586 AkWarm ID No. AHTNA-Z93-CAEC-02 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring, P.E., C.E.A. 32215 Lakefront Drive Soldotna,

More information

Willard Bowman Elementary School

Willard Bowman Elementary School Willard Bowman Elementary School 11700 Gregory Rd Anchorage, Alaska 99517 AkWarm ID No. CIRI-ANC-CAEC-26 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring, P.E., C.E.A. 32215 Lakefront

More information

ENERGY AUDIT REPORT. Skyview High School Sterling Hwy. Soldotna, AK 99669

ENERGY AUDIT REPORT. Skyview High School Sterling Hwy. Soldotna, AK 99669 ENERGY AUDIT REPORT Skyview High School 46188 Sterling Hwy. Soldotna, AK 99669 CAEC Project No. CIRI SXQ CAEC 10 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

ENERGY AUDIT REPORT. Kenai Middle School 201 N. Tinker Lane Kenai, AK 99611

ENERGY AUDIT REPORT. Kenai Middle School 201 N. Tinker Lane Kenai, AK 99611 ENERGY AUDIT REPORT Kenai Middle School 201 N. Tinker Lane Kenai, AK 99611 CAEC Project No. CIRI ENA CAEC 11 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT Saint Paul 1032 Diamond Hill Road Prepared for: Ms. Wanda Melovidov 950 Girbash Street Prepared by: David C. Lanning PE, CEA Jeremy Spargur CEAIT July 13, 2012 Acknowledgment:

More information

Results and Recommendations from Energy Audit of Shageluk. For VEEP Grants Village of Shageluk, Alaska

Results and Recommendations from Energy Audit of Shageluk. For VEEP Grants Village of Shageluk, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Shageluk For VEEP Grants Village of Shageluk, Alaska June 21, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage,

More information

ENERGY AUDIT REPORT. Soldotna High School 425 W. Marydale Ave. Soldotna, AK 99669

ENERGY AUDIT REPORT. Soldotna High School 425 W. Marydale Ave. Soldotna, AK 99669 ENERGY AUDIT REPORT Soldotna High School 425 W. Marydale Ave. Soldotna, AK 99669 CAEC Project No. CIRI SXQ CAEC 11 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

ENERGY AUDIT REPORT. Women s Bay Volunteer Fire Department 538 Sargent Creek Road Kodiak, Alaska AkWarm ID No. KONI-ADQ-CAEC-04.

ENERGY AUDIT REPORT. Women s Bay Volunteer Fire Department 538 Sargent Creek Road Kodiak, Alaska AkWarm ID No. KONI-ADQ-CAEC-04. ENERGY AUDIT REPORT Women s Bay Volunteer Fire Department 538 Sargent Creek Road Kodiak, Alaska 99615 AkWarm ID No. KONI-ADQ-CAEC-04 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring,

More information

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager Glenn Barnes Environmental Finance Center University of North Carolina at Chapel Hill 919-962-2789 glennbarnes@sog.unc.edu Energy

More information

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity Energy Accounting & Education Energy Managers Kermit King School District of La Crosse John Daily School District of Holmen 1 Topics (Electricity) Creating electricity Defining degree days Customer charges

More information

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company. Report To: Mr. John Smith Smith Printing Company ENERGY AUDIT 123 Main Street Mississauga, Ontario January 1, 2009 120 Carlton Street, Suite 212 Toronto, Ontario M5A 4K2 Tel 416-964-3246 Toll Free 1-866-964-3246

More information

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan Energy Plan 1 EXECUTIVE SUMMARY SCORECARD RESULTS An assessment of current energy management efforts was performed; current performance falls into all categories on the SEP-Performance Scorecard (Appendix

More information

BB&E GREENHOUSE GAS EMISSIONS INVENTORY. Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland.

BB&E GREENHOUSE GAS EMISSIONS INVENTORY. Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland. BB&E GREENHOUSE GAS EMISSIONS INVENTORY Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland Prepared By: BB&E, Inc. July 2014 This Greenhouse Gas (GHG) Emissions Inventory

More information

Energy Audits of Buildings owned by the Atmautluak Tribal Council. Executive Summary

Energy Audits of Buildings owned by the Atmautluak Tribal Council. Executive Summary Executive Summary Energy Audits of Buildings owned by the Atmautluak Tribal Council Prepared For Native Village of Atmautluak Andrew Steven, Tribal Administrator P.O. Box 6568 Atmautluak, AK 99559 atmauluaktc@gmail.com

More information

The energy benefits of View Dynamic Glass

The energy benefits of View Dynamic Glass Workplace demonstration Energy monitoring over a period of 12 months resulted in the commercial office room installed with View Dynamic Glass saving 39 percent of the total energy consumed compared to

More information

Results and Recommendations from Energy Audit of Nikolai. For VEEP Grants. City of Nikolai, Alaska

Results and Recommendations from Energy Audit of Nikolai. For VEEP Grants. City of Nikolai, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Nikolai For VEEP Grants City of Nikolai, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT ANDREW K. DEMOSKI SCHOOL Prepared for: Ms. Kerry Boyd 4762 Old Airport Way Fairbanks, Alaska Prepared by: David C. Lanning PE, CEA Steven Billa EIT, CEAIT July 10, 2012 Acknowledgment:

More information

Results and Recommendations from Energy Audit of Kipnuk. For VEEP Grants. City of Kipnuk, Alaska

Results and Recommendations from Energy Audit of Kipnuk. For VEEP Grants. City of Kipnuk, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Kipnuk For VEEP Grants City of Kipnuk, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK 99507

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT FALSE PASS SCHOOL PO Box 52 Prepared for: Mr. Jim Brown PO Box 349 Sand Point, Alaska Prepared by: David Lanning PE, CEA Jeremy Spargur EIT, CEAIT July 9, 2012 Acknowledgment:

More information

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT Report Clayville Elementary School October 2016 3 George Washington Highway, Clayville, RI 02815 Clayville Elementary School Summary of Findings On behalf of the School Building Authority at Rhode Island

More information

REPORT COMPREHENSIVE ENERGY AUDIT. For SELAWIK WATER TREATMENT PLANT AND SANITATION SYSTEM. Selawik, Alaska DRAFT. Prepared for

REPORT COMPREHENSIVE ENERGY AUDIT. For SELAWIK WATER TREATMENT PLANT AND SANITATION SYSTEM. Selawik, Alaska DRAFT. Prepared for REPORT COMPREHENSIVE ENERGY AUDIT For SELAWIK WATER TREATMENT PLANT AND SANITATION SYSTEM Selawik, Alaska DRAFT Prepared for The City Selawik, Alaska And The Alaska Rural Utility Collaborative (ARUC) Prepared

More information

Richard S. Armstrong, PE, LLC

Richard S. Armstrong, PE, LLC Richard S. Armstrong, PE, LLC Mechanical/Electrical Engineer Comprehensive Energy Audit of Icy View Fire Station Project # BSNC-OME-RSA-05 Prepared for: The City of Nome October 8, 2011 Prepared by: Richard

More information

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC LIBRARY ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT Diamond Hill Road Prepared for: Ms. Wanda Melovidov P.O. Box 901 Prepared by: David C. Lanning PE, CEA Steven Billa EIT, CEAIT July 13, 2012 Acknowledgment: This material is based

More information

Richard S. Armstrong, PE, LLC

Richard S. Armstrong, PE, LLC Richard S. Armstrong, PE, LLC Mechanical/Electrical Engineer Comprehensive Energy Audit of Barrow Search and Rescue Hangar Building 1797 and 1799 Ahkovak Project # ASRC-BRW-RSA-06 Prepared for: The North

More information

Campus Annual Energy Use Report

Campus Annual Energy Use Report 2017 2018 Campus Annual Energy Use Report Macalester College 2017 2018 Energy Report Contents Year at a Glance... 3 Executive Summary... 3 Fuel Consumption & Cost... 4 Campus Fuel Consumption... 4 Campus

More information

Results and Recommendations from Energy Audit of Beaver. For VEEP Grants City of Beaver, Alaska

Results and Recommendations from Energy Audit of Beaver. For VEEP Grants City of Beaver, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Beaver For VEEP Grants City of Beaver, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK 99507

More information

Results and Recommendations from Energy Audit of Koyukuk. For VEEP Grants. City of Koyukuk, Alaska

Results and Recommendations from Energy Audit of Koyukuk. For VEEP Grants. City of Koyukuk, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Koyukuk For VEEP Grants City of Koyukuk, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK

More information

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345 ENERGY MANAGEMENT PLAN - HEADQUARTERS ABC Winery 123 1st Street Franklin, NJ 12345 TABLE OF CONTENTS Executive Summary 3 Background and Site Information 3 Summary 3 Energy Conservation Opportunities 4

More information

MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 10.8 kbtu/ 2/yr

MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 10.8 kbtu/ 2/yr MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE 50 kbtu/sf/yr 45.1 PROJECT INFORMATION 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 13.0 kbtu/ft2/yr Baseline 10.8 kbtu/ft2/yr

More information

Deep Energy Retrofit of a HighRise MURB

Deep Energy Retrofit of a HighRise MURB Deep Energy Retrofit of a HighRise MURB COLIN SHANE M.Eng., P.Eng. RDH BUILDING SCIENCES INC. SAN FRANCISCO, CA AIA Credits National Institute of Building Sciences Provider #G168 Credit(s) earned on completion

More information

PV Generation Potential 17.1 kbtu/ft2/yr 15.4

PV Generation Potential 17.1 kbtu/ft2/yr 15.4 TOWNHOME PROTOTYPE HIGH PERFORMANCE 60 kbtu/sf/yr 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 54.4 Baseline 21.8 kbtu/ 2/yr 15 MMBtu 12 MMBtu 9 MMBtu 6 MMBtu 3 MMBtu

More information

ELEMENTARY SCHOOL ENERGY AUDIT CHALLENGE

ELEMENTARY SCHOOL ENERGY AUDIT CHALLENGE ELEMENTARY SCHOOL ENERGY AUDIT CHALLENGE ALTERNATIVE ENERGY DOSSIN Table of Contents Introduction Page 2 General Questioner Audit (Step 1).. Page 4 Energy Basics.. Page 6 Tracking Energy.. Page 9 Recording

More information

LOGO. Trivium Level II Energy Audit

LOGO. Trivium Level II Energy Audit LOGO Trivium Level II Energy Audit Submission Date: 9/16/2016 Table of Contents 1.0 EXECUTIVE SUMMARY 3 2.0 SITE ENERGY CONSUMPTION 5 3.0 BACKGROUND INFORMATION 6 3.1 Description of the Client 6 3.2 Description

More information

LOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 17.9 kbtu/ 2/yr

LOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 17.9 kbtu/ 2/yr LOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE 40 kbtu/sf/yr 35 kbtu/sf/yr 30 kbtu/sf/yr 25 kbtu/sf/yr 20 kbtu/sf/yr 15 kbtu/sf/yr 10 kbtu/sf/yr 5 kbtu/sf/yr 0 kbtu/sf/yr 11.9 kbtu/ft2/yr 36.0

More information

SURNA Grow Facility: Systems Comparison - IEA

SURNA Grow Facility: Systems Comparison - IEA SURNA Grow Facility: Systems Comparison - IEA May 2016 SURNA Grow Facility This analysis provides the projected energy and associated cost comparison between the Surna proposed facility in comparison to

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: i Energy Audit Report Lift Station #1, 3, 5, 6, 7, 8, and 9 Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part

More information

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Energy Auditing for Schools Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Schools Consumption breakdown 19% 6% 9% Space Heating 46% Water Heating Lighting Cooling 20%

More information

REPORT COMPREHENSIVE ENERGY AUDIT. For SOUTH NAKNEK WATER TREATMENT PLANT, SANITATION SYSTEM, TRIBAL OFFICE, CLINIC, AND COMMUNITY CENTER

REPORT COMPREHENSIVE ENERGY AUDIT. For SOUTH NAKNEK WATER TREATMENT PLANT, SANITATION SYSTEM, TRIBAL OFFICE, CLINIC, AND COMMUNITY CENTER REPORT COMPREHENSIVE ENERGY AUDIT For SOUTH NAKNEK WATER TREATMENT PLANT, SANITATION SYSTEM, TRIBAL OFFICE, CLINIC, AND COMMUNITY CENTER South Naknek, Alaska Prepared for Village of South Naknek, Alaska

More information

Ground-Coupled Heat Pump And Energy Storage

Ground-Coupled Heat Pump And Energy Storage Ground-Coupled Heat Pump And Energy Storage By Ed Lohrenz, Member ASHRAE; and Sergio Almeida, P.Eng., Member ASHRAE Ground-coupled heat pump (GCHP) systems consume less purchased energy than an HVAC system

More information

Greening Your Business Energy Efficiency in Buildings

Greening Your Business Energy Efficiency in Buildings Greening Your Business Energy Efficiency in Buildings Ben J. Sliwinski Building Research Council School of Architecture University of Illinois at Urbana-Champaign Overview Introduction Where is the Money?

More information

PV Generation Potential 17.1 kbtu/ft2/yr 15.4

PV Generation Potential 17.1 kbtu/ft2/yr 15.4 TOWNHOME PROTOTYPE BASELINE 60 kbtu/sf/yr 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 54.4 Baseline 54.4 kbtu/ 2/yr 21.8 High Performance 18.2 PHIUS - IES 60 MMBtu

More information

YWCA 1503 S. Denver Tulsa, Oklahoma 5/18/2010 Performed By

YWCA 1503 S. Denver Tulsa, Oklahoma 5/18/2010 Performed By Energy Audit for YWCA 1503 S. Denver Tulsa, Oklahoma 5/18/2010 Performed By 220 E. 8th Street Tulsa, Oklahoma 74119 918-582.0229 Fax: 918.599.0665 www.craftontullsparks.com Table of Contents Cover Page...

More information

Whitemarsh Township Municipal Building

Whitemarsh Township Municipal Building Whitemarsh Township Municipal Building 616 Germantown Pike, Lafayette Hill, PA 19444 Prepared For: Whitemarsh Township practical energy solutions 101 e. evans street, suite 2, west chester, pa 19380 t.610.430.1382

More information

ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING

ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING Brittany Hanam 1, Lorne Ricketts 2, Andrew Pape-Salmon 3 ABSTRACT The National Institute of Building Sciences estimates that over 70% of the

More information

Low Cost Building Automation System for Small- and Medium- Sized Commercial Buildings

Low Cost Building Automation System for Small- and Medium- Sized Commercial Buildings Low Cost Building Automation System for Small- and Medium- Sized Commercial Buildings Srinivas Katipamula, Ph.D. Staff Scientist, Pacific Northwest National Laboratory Other TAG Members: Irfan Rehmanji

More information