1 THE MUNICIPAL INFRASTRUCTURE GROUP LTD Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T F TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT NUMBER Introduction Julia Bahen, Urban Strategies Inc. Bernard KDA Secondary Plan - Preliminary Servicing Analysis Kevin Brown, P.Eng. The Municipal Infrastructure Group Ltd. (TMIG) has been retained by Urban Strategies to conduct a servicing analysis to assess the existing sanitary sewer, storm sewer and watermain systems in the study area and the capacity for the potential redevelopment of the Bernard Key Development Area (KDA). As per the recommended development concept by Urban Strategies Inc., a preliminary servicing analysis was performed for the KDA. Background information for the servicing networks was obtained from the Town of Richmond Hill Urban MESP dated May The MESP InfoSewer models, InfoWater model and Town s design criteria were referenced for the analysis. A preliminary stormwater management analysis was completed to analyze the impact of development within the Bernard KDA as well as to understand the existing condition of the study area. Background information from the Richmond Hill Urban MESP dated May 2014, and governing agency s SWM criteria were referenced for the analysis. 2 Sanitary Collection System 2.1 Previous Richmond Hill Urban MESP Findings The development of the Bernard KDA was previously considered as part of the Richmond Hill Urban MESP (TMIG, 2014). The recommended MESP alternative was that the redevelopment within the area of the Bernard KDA could be serviced with combination of using available capacity in existing local sewers and diverting the excessive flows via new local sewers directly to the Regional trunk. 2.2 Proposed Sanitary Requirements The sanitary servicing requirements for the Bernard KDA have been calculated based on the recommended development densities by Urban Strategies dated May The proposed sanitary flow calculations are shown in Attachment Methodology The InfoSewer hydraulic model provided by the Town has been used to analyze the capacity of the existing sanitary collection system. Per the Town s design criteria, residential flows of 365 Lpcd and employment flows of 90,000 L/ha/day have been considered. Six existing sanitary sewer reaches were identified as having the potential to service the KDA. All of these reaches originate within or immediately adjacent to the Study Area, with only minor external flows from adjacent sanitary sub catchments as the analysis proceeds downstream. Attachment 2 shows the sanitary sewer reaches servicing the KDA lands. Future flows were simulated for Ultimate buildout sanitary design flows and infrastructure based on the Richmond Hill Urban MESP. The Ultimate buildout scenario was established at the time of the MESP, and the sanitary flows for the Bernard KDA were updated based on the recommended development densities (May 2017 concept plan). This method accounts for the future intensification flows from the nearby sub catchments external to the Bernard KDA, based on the projected future population and employment statistics available at the time of Richmond Hill MESP MEMO - Background Servicing Review

2 MEMORANDUM PAGE 2 of 4 JUNE 13, Results The modelling results indicate that there is sufficient existing and future reserve capacity in the current sanitary collection system, to service the North East, North West and SE1, SE2 and SE3 parcels of South East quadrants of the KDA. Sanitary Reach C servicing the South West quadrant of the KDA will surcharge under the full redevelopment of the Bernard KDA, and will need new local sewers connecting to the Regional trunk sewer on Yonge St. These results are consistent with the Richmond Hill MESP findings. The Hydraulic Grade line profile for the sanitary sewer reaches servicing the study area provided in Attachment Recommendations As per the Richmond Hill Urban MESP recommendation, Use the available capacity first, then build local sewers and connect directly to the Regional trunk at three existing manhole locations to collect the flows in excess of the available capacity. This option is particularly attractive because the Regional trunk is located on the east side of Yonge Street.. The Bernard KDA lands are serviceable through a combination of existing sewers east and west of the KDA and through new connections to the Yonge Street Regional Trunk Sewer. The First servicing alternative is to use the existing available capacity for the North East, North West and part of South East quadrants of the KDA. Then build local sewers along the Yonge Street frontage to service SE3 and SE4 and connect to Regional Trunk along Yonge St via existing the existing manhole. To service the South West quadrant, build local sewers along proposed new road, upgrade the existing sewers along the frontage of parcel SW5 and connect to Regional Trunk across Yonge St via the existing manhole. Preliminary sizing for new local sewers along the Yonge Street frontage to service SE3 and SE4 would be 375 mm at 0.5% slope, new local sewers of 250 mm along the proposed new roads at 0.5% slope, and upgrade the existing sewers to 375 mm along the frontage of parcel SW5 at the existing slope. This is a hybrid of recommendations 15-A and 15-B from the MESP, connecting one manhole south of what had been identified in the MESP. An alternate solution to be discussed with the Region is the possibility of installing a new manhole at the intersection of Yonge Street and the new East-West Street. The new local sewer along the proposed road could potentially connect to Regional Trunk along Yonge St via that new Manhole. This alternative would decrease the total length of new sewers required, but installing a new manhole onto the Regional sewer might not be feasible. A detailed review of the underground services at that proposed intersection would also have to be reviewed to determine whether the new sewer could cross Yonge Street. Attachment 4 shows the sanitary servicing alternatives for the KDA lands. 3 Water Analysis 3.1 Previous Richmond Hill Urban MESP Findings The development of Bernard KDA was previously considered as part of the Richmond Hill Urban MESP (TMIG, 2014). The capacity of the existing water distribution system was analyzed using InfoWater. Based on the MESP, the Town s existing water distribution system is generally sufficiently sized to accommodate the potential intensification within the area of the Bernard KDA. 3.2 Proposed Water Requirements The water servicing requirements for the Bernard KDA have been calculated based on the recommended development concept by Urban Strategies dated May The proposed water demand calculations are shown in Attachment Methodology The InfoWater hydraulic model provided by Town has been used to analyze the water distribution system, and its ability to deliver the required demands at the appropriate residual pressures, including an allowance for fire flows. Per Town s design criteria, residential flows of 365 Lpcd and employment flows of 90,000 L/ha/day have been considered. The fire flow requirements for the mixed use high rise buildings were calculated based on FUS methodology (Refer to the attachment 5). The specific fire flow requirements will be refined when building floor plates are established, at the Functional Servicing Stage. Two pressure districts, Pressure Districts 7 and 8 were identified to service the study area. Based on the recommended development concept plan, potential proposed 300 mm KDA watermains were added to the model. The North East and TMIG PROJECT NUMBER MEMO - Background Servicing Review

3 MEMORANDUM PAGE 3 of 4 JUNE 13, 2017 South East quadrants would be serviced via PD7 watermains. The North West quadrant of the KDA would be serviced by existing PD 8. There were two possible options identified to service the South West quadrant. In Option 1, PD 7 mains would be extended to Canyon Hill Avenue along the proposed road and connected east of the PD 7/8 zone valve. In Option 2, PD8 mains would be extended along the proposed road and looped back to Canyon Hill Ave at Yonge St. Creating a Zone 8 loop would require a new local water main to be installed within the properties fronting Yonge Street, and could result in pressures above 700 kpa (100 psi). The pressure profiles resulting from the modelling indicate that the PD7 option is viable and is therefore recommended. Future system pressures were simulated based on Ultimate Buildout water demands and infrastructure for both the options. The Ultimate Buildout scenario was established at the time of the MESP, and demands for the Bernard KDA were updated based on the recommended development densities based on concept plan dated May This method accounts for the future intensification demands, based on the projected future population and employment statistics available at the time of Richmond Hill MESP. Attachment 6 shows the water system for the Bernard KDA. 3.4 Results Preliminary simulations indicate that there is capacity for the water distribution system to support the intensification of the study area. The model was simulated for Peak Hour demand and Maximum Day Demand with Fire flow scenarios. Results show that there is enough pressure available within the system to service the KDA. The pressure range available in the system is provided in Table 3.1. Table 3.1 Modelled Water Distribution System Information Modeling Scenario Minimum Water System Requirements Modeling Results within KDA Peak Hour Demand Maximum Day Demand plus Fire Flow Recommended Normal Pressures within the System = 275 kpa to 690 kpa Employment Fire flow requirements per Town of Richmond Hill, Q f = 185 L/s to 480 L/s System Pressure = 281 kpa to 713 kpa Available Employment Design Fire Flow = 285 L/s to 850 L/s Note: The specific fire flow requirements will be refined when building floor plates are established. Fire flows in the order of 300 L/s will likely be required, and watermains will be identified for potential upgrades as required. 4 Stormwater Management Analysis 4.1 Previous Richmond Hill Urban MESP Findings The capacity of the existing storm sewer network was analyzed using InfoSewer in the Richmond Hill Urban MESP. Based on the MESP, no issues were identified within the area of the Bernard KDA. 4.2 Recommended Criteria for Redevelopment The runoff from the development are to be controlled to the Town and TRCA standards as well as the recommendations from the Richmond Hill Urban MESP, the Oak Ridges Moraine Conservation Plan, and the Source Protection Plan. The recommended criteria for re-development from the Urban MESP are as follows: Volume Control: The minimum volume control criterion is on-site retention of the first 5mm of precipitation. If the redevelopment requires a pond, then the retention of the 25mm storm for 48 hours is required. Water Quality: The minimum water quality criterion is to implement Level 1 (Enhanced) water quality control. Water Quantity: The minimum water quantity criterion is to control post-development peak flows to predevelopment levels for all storms up to and including the 100 year. If the redevelopment is 5ha or greater and drains to the Don River watershed, then the quantity requirement is based on the unit flow relationship. Water Balance: At minimum, the post to pre-development water balance is required to meet the policies of the Oak Ridges Moraine Conservation Plan and the Source Protection Plan. Infiltration, evapotranspiration and runoff should all be assessed. TMIG PROJECT NUMBER MEMO - Background Servicing Review

4 MEMORANDUM PAGE 4 of 4 JUNE 13, 2017 Details of the stormwater management strategy for each proposed development will be determined during the development application process as a functional servicing report is required to demonstrate conformity to the Urban MESP as well as Town and TRCA standards. As per the Urban MESP, The FSR should provide details of the proposed on-site measures for quality and quantity control, and volume control through the use of feasible LID measures. The FSR storm drainage and SWM analysis should be completed in accordance with Town and TRCA standards. Minor system drainage design sheets in accordance with Town standards shall be submitted at the detailed site plan design stage to verify system capacity. 4.3 Results Drainage areas for the study area has been delineated based on the existing drainage pattern and the recommended development plan provided by Urban Strategies Inc. in May The approximate outlet location of each drainage area as well as the required storm sewers along the proposed roadways have also been identified and are illustrated in Attachment 7. Based on the proposed development plan, new roads are proposed to provide additional connections within the key development area. As a result, additional storm sewers will be required to safely capture the runoff from the roadways to an appropriate outlet and to provide safe access of the roadways. The proposed storm sewers will be required to be designed to convey the 5-year design storm frequency as per the Town s standards. The outlet locations identified have been determined based on existing drainage patterns and the existing outlet locations. Two new outlets are proposed to discharge directly into the nearby watercourse and two new connections to the existing storm sewers are proposed. The Richmond Hill Urban MESP dated May 2014 did not identify any capacity issues of the existing storm sewer network. Additionally, the drainage area and outlet locations have been delineated based on existing drainage patterns. Thus, through the implementation of the required SWM controls, the existing system should have sufficient capacity to convey the runoff from the roadways. 5 Conclusion Overall, the major infrastructure currently servicing the Bernard KDA appears to have the capacity to accommodate additional development. There are a few infrastructure upgrades required to servicing future development at this time, based on the capacities of the City s existing systems. These findings are in consistent with the findings of the Richmond Urban MESP. Once the site plan details are defined, a more detailed analysis of the serviceability will be refined. Local sanitary sewer, storm sewer, or watermain upgrades or network extensions are required, many of which are anticipated within planned future roads. TMIG PROJECT NUMBER MEMO - Background Servicing Review

5 Project: Date: 19-May-17 Bernard KDA Draft plan Wastewater flows Sanitary Flows Attachment 1 High Rise = 2.7 ppu, Low to Mid rise = 3.5 ppu Avg Residential Sanitary Flows = 365 LPCD Avg Employment Sanitary Flows = L/ha/day Parcel Number JOBS RES UNITS RES PPU Res Pop Res Flow Peaking Factor Peak Res Flow Emp Flow Total Peak Flow D/S Reach MH NE D 106 NE E SA3379 NW1 Omitted Omitted A - NW A SA3013 NW B SA3011 SE G SA E SA3382 SE F SA3124 SE G SA4817 SE G SA4817 SE F SA3124 SW C SA8668 SW C SA C SA6843 SW C SA8668 SW C SA8668 SW C SA8668

6 Attachment 2

7 Attachment 3 Reach ID MAIN ID From MH To MH Diameter Full Flow Total Flow Reserve Capacity % Reserve Capacity B SL3106 SA3011 SA % B SL3080 SA3012 SA % A SL3081 SA3013 SA % 1

8 Attachment 3 Reach ID MAIN ID From MH To MH Diameter Full Flow Total Flow Potential Reserve Capacity % Potential Reserve Capacity C SL8644 SA8668 SA % C SL8645 SA8669 SA % C SL8646 SA8670 SA % C SL8334 SA4758 SA % C SL4635 SA8296 SA % C SL5389 SA4759 SA % C SL4636 SA5445 SA % C SL4637 SA4760 SA % C SL1320 SA1207 SA % 2

9 Attachment 3 Reach ID MAIN ID From MH To MH Diameter Full Flow Total Flow Potential Reserve Capacity % Potential Reserve Capacity D % D SA % 3

10 Attachment 3 Reach ID MAIN ID From MH To MH Diameter Full Flow Total Flow Potential Reserve Capacity % Potential Reserve Capacity E SL3442 SA3378 SA % E SL3443 SA3379 SA % E SL3444 SA3382 SA % E SL3445 SA3119 SA % E SL3446 SA3156 SA % E SL3447 SA3157 SA % E SL3448 SA3158 SA % E SL3449 SA3159 SA % E SL3450 SA3160 SA % E SL3476 SA3161 SA % E SL3477 SA3393 SA % E SL3478 SA3394 SA % 4

11 Attachment 3 Reach ID MAIN ID From MH To MH Diameter Full Flow Total Flow Potential Reserve Capacity % Potential Reserve Capacity F SL3413 SA3124 SA % F SL3414 SA3364 SA % F SL3415 SA3365 SA % F SL3416 SA3366 SA % F SL3485 SA3367 SA % F SL3481 SA3397 SA % F SL3482 SA3398 SA % F SL3479 SA3395 SA % F SL2937 SA2856 SA % F SL2938 SA2855 SA % F SL2939 SA2854 SA % F SL2942 SA2853 SA % F SL4638 SA2851 SA % F SL3396 SA3348 SA % F SL3395 SA3347 SA % 5

12 Attachment 3 Reach ID MAIN ID From MH To MH Diameter Full Flow Total Flow Potential Reserve Capacity % Potential Reserve Capacity Yonge St SL4705 SA4815 SA % Yonge St SL4706 SA4816 SA % Yonge St SL4707 SA4817 SA % Yonge St SL0345 SA0341 SA % 6

13 RIDGESTONE DRIVE BROOKGREENE CRESCENT ROTHBURY ROAD LEYBURN AVENUE Bernard KDA - Sanitary Servicing Alternatives Attachment 4 LAREDO DRIVE LOYAL BLUE CRESCENT ALADDIN CRESCENT BROOKSIDE ROAD SILVERWOOD AVENUE SQUIRE DRIVE A 1 STANCROFT DRIVE ABITIBI STREET B D NAUGHTON DRIVE DEBONAIR STREET LANE N E BERNARD AVENUE CANYON HILL AVENUE C F YORKLAND STREET LORRAINE STREET JUSTUS DRIVE COOPERAGE CRESCENT Legend Sanitary Sewer Other Ex. Sewers LEONARD STREET Alternative 1 - Upsize the Ex Sewers Prop-San-sewers Name Alternative 2: -Extend new sewers along new east-west street -Connect to a new MH on the Regional Trunk Drainage Alternative 2 Alternative 1 Alternative 1 & 2 YONGE STREET Manhole Other Ex. Manholes 2 Alternative 1: -Upgrade sewer along west side of Yonge St -New sewer along east side of Yonge St. -Connect to Existing Regional MH NEWMILL CRESCENT ELMPARK COURT Prop - MH Alternative 2 - NEW Regional MH Local new MH Ex. MH Connect New/Upgraded Sewers to Ex. Reg MH

14 Project: Date: 19-May-17 Bernard KDA Draft plan Water demand Calculations Attachment 5 High Rise = 2.7 ppu, Low to Mid rise = 3.5 ppu Average daily demand (ADD) = 365 LPCD Maximum daily demand (MDD) = 545 LPCD Peak Hour demand (PHD) = 910 LPCD Parcel Number Parcel Area JOBS RES UNITS RES PPU Res Pop Res ADD Water Demands Res Res Emp DMD MDD PHD Total MDD NE NE NW1 Omitted Omitted Omitted NW NW SE SE SE SE SE SW SW SW SW SW

15 Fire Flow Calculation Fire Underwriters Survey Methodology Bernard KDA Development-Block SE4 Project: By: VP Date: 8-Jun-17 Checked: KCB Attachment 5 Step 1: Fire Flow Formula F= 220 * C * A 0.5 C= Construction Coefficient C= Wood Framing 1.0 Ordinary - Brick Walls, Combustible Interior 0.8 Non-combustible (metal structure, masonry or metal walls) 0.6 Fire Resistive A= Total Floor Area in sq.meters A= 30,000 m² Step 2: Reduction/Surcharge for Occupancy Non Combustible Content -25% Limited Combustible -15% Combustible 0% Free Burning 15% Rapid Burning 25% F= 30,484 L/min Charge= -15% Revised F= 25,911 L/min Step 3: Reduction for Sprinkler System The Revised F value may be reduced up to: 50% for a complete automatic sprinkler system 30% for a sprinkler system conforming to NFPA 13 Reduction= 60% (Note 1) Reduction= 15,547 L/min Step 4: Exposure Surcharges 0 to 3.0 m 25% 3.1 to 10 m 20% 10.1 to 20 m 15% 20.1 to 30 m 10% 30.1 to 45 m 5% Unpierced Party Wall 10% The sum of all exposures must be less than 75% Direction Distance Charge % North 45 5% South 45 5% East Party Wall 10% West Party Wall 10% Total Charge= 30% Exposure Surcharge= 7,773 L/min Step 5: Design Fire Flow Min 2,000 L/min; Max 40,000 L/min (rounded to 1,000 L/min) Revised F= 18,000 L/min Revised F= 300 L/s Note 1: Additional credit of 10% is applied because the water supply will be standard for both the system and the fire department hose lines. (per "Water Supply for Public Fire Protection, FUS 1999) G:\Projects\2016\ USI - Bernard KDA\Design\ Water-Wastewater calculations Fire Flow -Building 6/13/2017

16 BERNARD KDA - Water System Attachment 6 BERNARD AVENUE Legend Junction AVAIL_FLOW < 75 L/s L/s L/s L/s > 480 L/s TRH_WAT_Valves ValveType, Status!U Relocated Zone Valve, Proposed PresureDistricts DISTRICT 7 8 Pipe Ex Pipes Proposed Pipes Proposed Pipes - PD7 Extension KDA_Study_Area

17 Bernard KDA - Storm Drainage Plan Attachment 7 Legend SWM Drainage Area Bernard KDA Study Area Culvert SWM Facility Watercourse Existing Storm MH Proposed Storm Sewer Existing Storm Sewer Ownership Private Regional Municipal Town of Richmond Hill 1 2

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Site Servicing & Stormwater Management Report for Site Plan Control Application Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Prepared for: Martin Clement Attention: Mr. Martin

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 62 667 BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT R 816 41A (Rev. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD.

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A REV. 1 MAY 2018 T. L. MAK ENGINEERING

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A T. L. MAK ENGINEERING CONSULTANTS LTD.

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

Dunpar Developments Inc.

Dunpar Developments Inc. Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site

More information

Silver Seven Corporate Centre Phase 1

Silver Seven Corporate Centre Phase 1 SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

Marianneville Developments Ltd.

Marianneville Developments Ltd. Estates of Glenway Project No. L09-301 March 2012 Executive Summary Cole Engineering Group was retained by Marianneville Developments Limited to undertake a Functional Servicing Report in support of the

More information

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 March 29, 2016 2343065 Ontario

More information

255 NORTHFIELD DRIVE EAST

255 NORTHFIELD DRIVE EAST 255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

Addendum Revised Section 7 to Address Region of Halton Comments March 2013

Addendum Revised Section 7 to Address Region of Halton Comments March 2013 PALETTA INTERNATIONAL LIMITED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT EAGLE HEIGHTS & TAYLOR PROPERTY CITY OF BURLINGTON Updated June 2010 Addendum Revised Section 7 to Address Region of

More information

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET 120 Iber Road, Suite 103 Ottawa, Ontario K2S 1E9 Tel. (613)836-0856 Fax (613) 836-7183 www.dsel.ca SITE SERVICING REPORT FOR CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET CITY OF OTTAWA PROJECT NO.: 17-959

More information

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Prepared by: Stantec Consulting Ltd. 1505 Laperriere Avenue Ottawa, ON K1Z 7T1 File: 160401004/83 January 17,

More information

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

St. Boniface Industrial Park Phase 2 Municipal Servicing Report

St. Boniface Industrial Park Phase 2 Municipal Servicing Report St. Boniface Industrial Park Phase 2 Municipal Servicing Report Prepared for: City of Winnipeg Prepared by: Stantec Consulting Ltd. File: 116809351 November 5, 2015 ST. BONIFACE INDUSTRIAL PARK PHASE 2

More information

PROPOSED FOUR-STOREY APARTMENT BUILDING DEVELOPMENT SITE FOR SUPERIOR CONSTRUCTION INC. LOT 8 R-PLAN MERIVALE ROAD CITY OF OTTAWA

PROPOSED FOUR-STOREY APARTMENT BUILDING DEVELOPMENT SITE FOR SUPERIOR CONSTRUCTION INC. LOT 8 R-PLAN MERIVALE ROAD CITY OF OTTAWA PROPOSED FOUR-STOREY APARTMENT BUILDING DEVELOPMENT SITE FOR SUPERIOR CONSTRUCTION INC. LOT 8 R-PLAN 327929 999 MERIVALE ROAD CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R-813-12A T. L. MAK ENGINEERING

More information

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345

More information

10 LOUISA STREET - THORNBURY

10 LOUISA STREET - THORNBURY 10 LOUISA STREET - THORNBURY Town of The Blue Mountains Functional Servicing Report prepared by: C.C. Tatham & Associates Ltd. 115 Sandford Fleming Drive, Suite 200 Collingwood, ON L9Y 5A6 Tel: (705) 444-2565

More information

Appendix A Water Demand and Fire Flow Calculations

Appendix A Water Demand and Fire Flow Calculations Appendix A Water Demand and Fire Flow Calculations 1604-00:1251 Shillington Ave. 2011-06-13 Estimated Water Demand Water demand may be estimated based on the City of Ottawa Watermain Distribution Guidelines,

More information

Appendix J Conceptual Design of Watermain and Sanitary Sewer

Appendix J Conceptual Design of Watermain and Sanitary Sewer City of Barrie - Hewitt's Secondary Plan Class Environmental Assessment (Phase 3 and 4) Study Environmental Study Report Appendix J Conceptual Design of Watermain and Sanitary Sewer Hatch 2017 All rights

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario Report No. 13030-SWM February 6, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO CLARIDGE HOMES (PRESTON) INC. DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO PROJECT: 31637-5.2.2 OCTOBER 2014 IBI GROUP PROJECT: 31637-5.2.2 TABLE OF CONTENTS 1. INTRODUCTION...

More information

STORMWATER MANAGEMENT REPORT. Dundas Square Gardens Inc. High Rise Residential/Commercial Development

STORMWATER MANAGEMENT REPORT. Dundas Square Gardens Inc. High Rise Residential/Commercial Development STORMWATER MANAGEMENT REPORT Dundas Square Gardens Inc. Revised: April 6, 2016 Revised: January 12, 2016 Revised: July 10, 2015 OUR FILE: 14-RE-352 June 16, 2014 TABLE OF CONTENTS PAGE 1.0 Scope of work

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Prepared By: R.J. Burnside & Associates Limited 1465 Pickering Parkway, Suite 200 Pickering ON L1V 7G7 Prepared

More information

JOHNSTON ROAD LAND USE STUDY

JOHNSTON ROAD LAND USE STUDY JOHNSTON ROAD LAND USE STUDY SERVICING FEASIBILITY STUDY Project No. 2814 Prepared for: City of Ottawa Planning Branch Infrastructure Approvals Branch Prepared by: David McManus Engineering Ltd. 400 30

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road

More information

SITE SERVICING & STORMWATER MANAGEMENT STUDY

SITE SERVICING & STORMWATER MANAGEMENT STUDY SITE SERVICING & STORMWATER MANAGEMENT STUDY IN SUPPORT OF MAJOR ZONING BY-LAW AMENDMENT AND SITE PLAN CONTROL APPLICAITON Location: 190 Richmond Road, Ottawa, Ontario CPE Project #: 16032 City of Ottawa

More information

Municipal Servicing Class Environmental Assessment Master Plan

Municipal Servicing Class Environmental Assessment Master Plan VAUGHAN METROPOLITAN CENTRE Municipal Servicing Class Environmental Assessment Master Plan CITY OF VAUGHAN NOVEMBER 2012 TMIG The Municipal Infrastructure Group Ltd 8800 Dufferin Street, Suite 200 Vaughan

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 280-282 Crichton Street Ottawa, Ontario Report No. 09069-SB July 28, 2010 Revised November 3, 2010 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA FUN NCTIONAL SER RVICING AN ND STO ORMWATER R MA ANAGEMENT T RE PORT 333 AN ND 351 KING STR REET EAST P PREPARED FOR: CITY O OF TORONTO F IRST GULF COR PORATION 3 751 VICTORIA PA ARK AVENUE T TORONTO,

More information

STEERING COMMITTEE MEETING #6

STEERING COMMITTEE MEETING #6 STEERING COMMITTEE MEETING #6 August 7 th, 2017 Topic: Infrastructure (Sewer & Water, Transportation follow up) 6:00 p.m. Transportation follow up Follow up issues map Transportation plan strategies table

More information

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN 149 1162 ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT No. R-815-41 T. L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2015

More information

low impact development demonstration project

low impact development demonstration project NORTH HUMBER EXTENSION NEIGHBOURHOOD - KLEINBURG TMIG TRIECA Conference 2012 March 27 and 28 The International Centre Mississauga 8800 Dufferin Street Suite 200 Vaughan ON CA L4K 0C5 905 738 5700 www.tmig.ca

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

APPENDIX F DRAINAGE AND STORMWATER MANAGEMENT TECHNICAL MEMO

APPENDIX F DRAINAGE AND STORMWATER MANAGEMENT TECHNICAL MEMO APPENDIX F DRAINAGE AND STORMWATER MANAGEMENT TECHNICAL MEMO MEMO To: Emily Sangster Date: April 28, 2015 From: Bhavika Patel Job No.: 34-14015-000-B02 Subject: Stormwater Management Impact Assessment

More information

Half Moon Bay South Draft Plan #3

Half Moon Bay South Draft Plan #3 Half Moon Bay South Draft Plan #3 SERVICING REPORT Prepared for: Mattamy Homes Ltd. Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document entitled Half Moon Bay South Draft Plan #3 was prepared

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

Storm Sewers, Page 2

Storm Sewers, Page 2 Storm Sewers storm sewer systems are dendritic systems used to collect and direct stormwater runoff storm sewer systems are integral components of any urban infrastructure curbs, gutters and storm inlets

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

APPENDIX E Drainage and Stormwater Management Report

APPENDIX E Drainage and Stormwater Management Report APPENDIX E Drainage and Stormwater Management Report Drainage and Stormwater Management Report Courtneypark Drive East Class EA & Preliminary Design Prepared for: City of Mississauga Prepared by: Stantec

More information

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT Prepared for: West Minister Woods Ltd. R.R. #2 6783 Wellington Road #34 Cambridge ON N3C 2V4 Prepared by: Stantec Consulting

More information

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review...

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review... Table of Contents 1.0 Introduction... 1 1.1. Existing Site Conditions... 1 1.2. Proposed Site Statistics... 1 2.0 Sanitary Servicing Review... 1 2.1. Potential Sanitary Sewage Outlets... 2 2.2. Internal

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure GENERAL INFRASTRUCTURE ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee

More information

Functional Servicing Report. Sorensen Court Townhouses. 25 Sorensen Court, Niagara-on-the-Lake, Ontario

Functional Servicing Report. Sorensen Court Townhouses. 25 Sorensen Court, Niagara-on-the-Lake, Ontario Functional Servicing Report Sorensen Court Townhouses 25 Sorensen Court, Niagara-on-the-Lake, Ontario Prepared by: Quartek Group Inc. Engineers, Architects & Planners 89-91 St. Paul Street, Suite 100 St.

More information

To: Kevin Murphy From: Gregory Chochlinski David Schaeffer Engineering Ltd. 120 Iber Road, Unit 103 Stittsville, ON K2S 1E9

To: Kevin Murphy From: Gregory Chochlinski David Schaeffer Engineering Ltd. 120 Iber Road, Unit 103 Stittsville, ON K2S 1E9 Memo To: From: Gregory Chochlinski David Schaeffer Engineering Ltd. 120 Iber Road, Unit 103 Stittsville, ON K2S 1E9 Stantec Consulting Ltd. 400-1331 Clyde Avenue Ottawa, ON K2C 3G4 File: 163401487 Date:

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario STORMWATER DRAINAGE ASSESSMENT 479 Line 1 Road, Niagara-on-the-Lake, Ontario November, 2015 1. Site Description Size: Location: Existing Land Use: Proposed Land Use: Soils: Stormwater Outlet: 1.38 hectares

More information

West Clayton NCP Stage 1

West Clayton NCP Stage 1 West Clayton NCP Stage 1 Citizens Advisory Committee Meeting #7 Preliminary Utility Servicing Summary Agenda Water Distribution Sanitary Sewer Stormwater Infrastructure West Clayton NCP Water Distribution

More information

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech

More information

Sanitary Sewer Design. Sanitary Sewers, Page 1

Sanitary Sewer Design. Sanitary Sewers, Page 1 Sanitary Sewer Design Sanitary Sewers, Page 1 Sanitary Sewers, Page 2 Sanitary Sewer Design sanitary sewers collect and transport domestic and industrial wastes via gravity flow the ultimate destination

More information

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 December 17, 2013 130208 2343065

More information

SERVICING AND STORM WATER MANAGEMENT REPORT

SERVICING AND STORM WATER MANAGEMENT REPORT The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Agua Consulting Inc. Engineered Water Solutions

Agua Consulting Inc. Engineered Water Solutions Agua file: 023-01.340 District of Summerland 9215 Cedar Avenue Box 159 Summerland, BC V0H 1Z0 Attention: Mr. Devon van der Meulen, Manager of Utilities Dear Devon: RE: Banks Crescent Proposed 346 Unit

More information

Site Servicing and Stormwater Management Report Sélection Retraite - Orléans

Site Servicing and Stormwater Management Report Sélection Retraite - Orléans Site Servicing and Stormwater Management Report Sélection Retraite - Orléans Project # 160401451 November 22, 2018 Prepared for: Réseau Sélection Developpement Hors Quebec Inc. Prepared by: Stantec Consulting

More information

Blackstone Community Phase 4-8 Functional Servicing Report

Blackstone Community Phase 4-8 Functional Servicing Report Blackstone Community Phase 4-8 Functional Servicing Report Project #160401130 Prepared for: 2129786 Ontario Inc. Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document entitled Blackstone Community

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

STANLEY FARM SUBDIVISION

STANLEY FARM SUBDIVISION STANLEY FARM SUBDIVISION SERVICING OPTIONS AND STORMWATER MANAGEMENT REPORT BRIEF CITY OF OTTAWA PREPARED FOR: STANLEY FARM DEVELOPMENTS PREPARED BY: (November 2014 - Revision 0) LOT 9, CONCESSION 5 WATER

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN 348 351 CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 817 21 T.L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2017 REFERENCE

More information

STORM DRAINS AND IRRIGATION

STORM DRAINS AND IRRIGATION TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.

More information

Rainwater Harvesting at Stillwater Country Club

Rainwater Harvesting at Stillwater Country Club technical memo Project Name BCWD Community Demonstration BMP Projects Date 12/05/2018 / Contact info Cc / Contact info From / Contact info Regarding BCWD Board of Managers Karen Kill, District Administrator

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 2 7 BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 81 41 (REV. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD. JULY

More information

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond. Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts

More information

The proponent is responsible for meeting all approval requirements from relevant agencies.

The proponent is responsible for meeting all approval requirements from relevant agencies. 5.0 INFILL DEVELOPMENT 5.1 General Infill projects can range in size from a single lot to the complete redevelopment of significantly larger areas. Many forms of infill development can be more intensive

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

Ridgewood South Precinct Plan Servicing Infrastructure Stantec Project #

Ridgewood South Precinct Plan Servicing Infrastructure Stantec Project # Ridgewood South Precinct Plan Servicing Infrastructure Stantec Project # 116808360 Prepared By: Stantec Consulting Ltd. 905 Waverley Street Winnipeg Manitoba R3T 5P4 September 18, 2012 Introduction The

More information

Mofan Holdings Inc. 249 Bayview Drive

Mofan Holdings Inc. 249 Bayview Drive Mofan Holdings Inc. 249 Bayview Drive Functioning Service Report Project Number 213586 Prepared By: Yousef Saigh, P. Eng. exp Services Inc. 4 Cedar Pointe Drive, Unit L Barrie, ON L4N 5R7 Canada T: +1.705.719.1100

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report 453211 Ontario Ltd. Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721

More information

LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT

LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT 0823D 7 January 2019 7 January 2019 0823D LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

115 & 117 Erb Street East, Waterloo, Ontario Functional Servicing Report

115 & 117 Erb Street East, Waterloo, Ontario Functional Servicing Report 115 & 117 Erb Street East, Waterloo, Ontario Functional Servicing Report Prepared for: Erb East Developments Inc. c/o ABA Architects Inc. 5-564 Weber Street Waterloo, ON N2L 5C6 Prepared by: Stantec Consulting

More information

Stormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by

Stormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by Concept Proposal Submitted by Public Works Department 1947 Center Street, Fourth Floor Berkeley, CA 94704 December 17, 2009 Executive Summary The s Public Works Department submits this concept proposal

More information

Action plans for hotspot locations

Action plans for hotspot locations Action plans for hotspot locations Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side of the railway. Guildford

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

Master Plans for Urban Water Infrastructure in The City of Vaughan

Master Plans for Urban Water Infrastructure in The City of Vaughan Master Plans for Urban Water Infrastructure in The City of Vaughan City-Wide Water & Wastewater Master Plan Class EA APPENDIX G Wastewater Collection System Modelling Technical memorandum JUNE 2014 The

More information

Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions

Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions Presented at: National Water and Wastewater Conference (November 15, 2016) Presented by:

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

The Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1

The Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1 Prepared for the FINAL November 2015 The Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1 RFP No. OBMH-02-2015 November 18, 2015 Submitted by: McElhanney Consulting Services

More information