1 NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 GIRASSOL FPSO HULL DECK REPAIR BY BONDED REINFORCEMENTS Eduardo LUILA -Total E&P Angola J.P. COURT - COLDPAD

2 Content 1. Introduction 2. Description Block 17 Operations FPSO GIRASSOL 3. Problem Context 4. Repair Methodology Options for Repair Assessment of repair methods ColdShield System Description 5. Conclusion

3 Introduction Localized corrosion identified in main deck of GIRASSOL FPSO exceeding acceptance criteria and requiring repair. Analysis made of repair options showed that Bonded reinforcement Pad is the best alternative, to avoid hot works and reduce impact in production.

4 Description (1/2) Block 17 Operations BLOC 17 : 4 FPSO & offloading buoys Block 17 GIRASSOL DALIA Design Production Capacity: barrels/day Design Production Capacity: barrels/day PAZFLOR CLOV Design Production Capacity: barrels/day Design Production Capacity: barrels/day

5 Description (2/2) Girassol FPSO Girassol FPSO First oil: 2001 Size : 300 m x 60 m x 30 m Storage : barrels Water depth: From 1250 m to 1400 m Design Production Capacity: barrels/day Classification Society: Bureau Veritas

6 Problem Context Localized corrosion on main deck due to coating failure / damage. Some corrosion spots are beyond the acceptance criteria set by per the International Association Classification Societies (IACS). Corrosion spots are either top of cofferdam, crude oil or water ballast tanks. Class recommendation issued to repair the critical corroded spots. Need to minimize production and safety impact of such repair.

7 Options for Repair 3 options for the repair: 1. Weld Build up localized spots 2. Insert plate possible for repair of larger areas 3. Bonded reinforcement Pads (ColdShield)

8 Assessment of repair methods 1. Weld Build up Limited applicability if damage is moderate as per IACS rules. 2. Insert plate Hot works in hydrocarbon tanks Painting repairs inside tanks Safety Application in open sea condition 3. Bonded reinforcement Pads No major constraints and disruption in terms of HSE and production.

9 COLDSHIELD Safe, Reliable & Adapted to Offshore conditions COLDSHIELD = Bonded structural safety reinforcement for FPSO hull Deck Side shell Longitudinal or transverse frames Crude Oil Tanks / Sea Water Ballast Tanks

10 COLDSHIELD Structural reinforcement of corroded hull & deck Base Material (existing) COLDSHIELD Rigid Plate (New) Target Area for Connection (prepared surface) Peripheral Seal Pressure Reduction Control of Internal Atmospheric Parameters Vacuum-Injection Structural Polymer Isolated Internal Volume Attraction Forces Polymer Seal Compression 10

11 COLDSHIELD key take aways Peripheral protection frame ENVELOPPE Compressed Seal Protection Plate Resin Composite REINFORCEMENT Damaged Steel Plate e.g. Corroded FPSO Hull Standard shape 0,5 to 5 m² COLDSHIELD restores Initial Structural Capacity & Protect Against Further Corrosion 10m² = 2 days x 4 pax Or ~150 saved mandays

12 COLDSHIELD Reliabity throughout the life cycle Onsite survey Onshore preparation Offshore Installation Life cycle management Repeatable process whatever weather conditions are Easy access for integrity monitoring Process controlled environment Adequate inspection and repair if needed Full traceability of installation process

13 Conclusions Due to the severity of the localized corrosion main deck needs to be repaired. ColdShield has been jointly developed and validated by TOTAL R&D department & COLD PAD and approved by both BV and ABS as permanent repair methodology. Implementation of ColdShield system on top of Hydrocarbon tanks minimize the hot works and operation disruptions. Intended for permanent installation with an anticipated service life of >10 years A specific life cycle inspection test plan will be implemented (New technology)

Classification of the Largest Ever Floating Storage Regasification Unit

Classification of the Largest Ever Floating Storage Regasification Unit NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Classification of the Largest Ever Floating Storage Regasification Unit Philippe CAMBOS Bureau Veritas AGENDA 1. Introduction 2. The project 3. Liquid

More information

OIL PLATFORMS, DESTROYERS AND FRIGATES - CASE STUDIES OF QINETIQ S MARINE COMPOSITE PATCH REPAIRS. Farnborough, Hampshire, GU14 OLX, UK

OIL PLATFORMS, DESTROYERS AND FRIGATES - CASE STUDIES OF QINETIQ S MARINE COMPOSITE PATCH REPAIRS. Farnborough, Hampshire, GU14 OLX, UK OIL PLATFORMS, DESTROYERS AND FRIGATES - CASE STUDIES OF QINETIQ S MARINE COMPOSITE PATCH REPAIRS ABSTRACT T J Turton a, J Dalzel-Job b, F Livingstone b a Future Systems Technology, QinetiQ, Cody Technology

More information

Contents. 1 Overview of Ship-Shaped Offshore Installations Front-End Engineering Preface Acknowledgments How to Use This Book.

Contents. 1 Overview of Ship-Shaped Offshore Installations Front-End Engineering Preface Acknowledgments How to Use This Book. Table of Preface Acknowledgments How to Use This Book page xv xix xxi 1 Overview of Ship-Shaped Offshore Installations...1 1.1 Historical Overview of Offshore Structure Developments 1 1.1.1 Early History

More information

Hull Surveys for Liquefied Gas Carriers

Hull Surveys for Liquefied Gas Carriers (May 2007) (Rev.1 Nov 2007) (Rev.2 Mar 2009) (Rev.3 July 2011) Hull Surveys for Liquefied Gas Carriers CONTENTS 1. General 1.1 Application 1.2 Definitions 1.3 Repairs 1.4 Thickness measurements and close-up

More information

Mireille FRANCO DEV/TEC/STR FPSO LIFE EXTENSION TOTAL APPROACH

Mireille FRANCO DEV/TEC/STR FPSO LIFE EXTENSION TOTAL APPROACH Mireille FRANCO DEV/TEC/STR FPSO LIFE EXTENSION TOTAL APPROACH FPSO LIFE EXTENSION: OUTLINE INTRODUCTION TOTAL WOLDWIDE FPSO FLEET LIFE EXTENSION CONCLUSIONS 2 INTRODUCTION INTRODUCTION Life extension

More information

ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) HOW TO DEVELOP AN ECONOMICAL SMALL CAPACITY FLOATING

More information

Furmanite s engineered composite repair technology

Furmanite s engineered composite repair technology Introducing Furmanite s engineered composite repair technology Dr Paul Hill CEng Director Furmanite Center of Excellence Composite Repairs Corporate Headquarters: Furmanite Worldwide Inc. 2435 North Central

More information

BELZONA COMPOSITE SOLUTIONS. Wrap and Plate Bonding Technology for New Build and Maintenance Situations

BELZONA COMPOSITE SOLUTIONS. Wrap and Plate Bonding Technology for New Build and Maintenance Situations BELZONA COMPOSITE SOLUTIONS Wrap and Plate Bonding Technology for New Build and Maintenance Situations NOVEL SOLUTIONS TO AGE-OLD PROBLEMS Plate bonding Asset installation Composite wraps Belzona SuperWrap

More information

Part 0 - Classification and Surveys Classification and Surveys I Classification and Surveys I

Part 0 - Classification and Surveys Classification and Surveys I Classification and Surveys I This edition of GL rules & guidelines is the latest and current edition. Previous editions of GL rules & guidelines, as well as all DNV GL rules and supporting documents, are available from https://www.dnvgl.com/rules-standards.

More information

OTC Abstract. Introduction

OTC Abstract. Introduction OTC 15315 An Innovative "No Hot Work" Approach to Hull Repair on In-Service FPSOs Using Sandwich Plate System Overlay Stephen J. Kennedy, James Bond, and Dale Braun, Intelligent Engineering Limited; Peter

More information

Corrigenda 1. Rule Editorials

Corrigenda 1. Rule Editorials COMMON STRUCTURAL RULES FOR BULK CARRIERS JULY 2012 Corrigenda 1 Rule Editorials Notes: (1) These Rule Corrigenda enter into force on 1st July 2012. (2) These Rule Corrigenda should be read in conjunction

More information

PROTECTING. Pipeline Infrastructure.

PROTECTING. Pipeline Infrastructure. PROTECTING Pipeline Infrastructure. RADIUS SUBTERRA Utilising our vast experience and specialist proven technologies in pipeline rehabilitation and protection, we provide clients with the safest and most

More information

Safety of bulk carriers - prime concern of the maritime community

Safety of bulk carriers - prime concern of the maritime community Safety of bulk carriers - prime concern of the maritime community D. Beghin Bureau Veritas, Paris, France ABSTRACT Further to the severe damages which occurred in the recent years on bulk carriers, the

More information

Hull damage experience in CSR tankers

Hull damage experience in CSR tankers MARITIME Hull damage experience in CSR tankers TSCF SBM, Busan October 2016 Ivar Håberg Senior Principle Surveyor, DNV GL SAFER, SMARTER, GREENER Using data to identify improvement opportunities for the

More information

Technical Information

Technical Information Subject Format Revision of Condition Evaluation Report (CER) To whom it may concern Technical Information No. TEC-1092 Date 17 November 2016 When Special is carried out for ships applying Enhanced Program(ESP),

More information

Information Paper on Oil Tanker In-Service Structural Survey Regimes

Information Paper on Oil Tanker In-Service Structural Survey Regimes Tanker Structure Co-operative Forum Information Paper on Oil Tanker In-Service Structural Survey Regimes SUMMARY This paper reviews the current regime of inspection requirements for oil tankers including

More information

INSPECTION GRADING CRITERIA FOR THE ABS HULL INSPECTION AND MAINTENANCE PROGRAM (HIMP)

INSPECTION GRADING CRITERIA FOR THE ABS HULL INSPECTION AND MAINTENANCE PROGRAM (HIMP) INSPECTION GRADING CRITERIA FOR THE ABS HULL INSPECTION AND MAINTENANCE PROGRAM (HIMP) OUR MISSION The mission of ABS is to serve the public interest as well as the needs of our members and clients by

More information

Hull Surveys for General Dry Cargo Ships

Hull Surveys for General Dry Cargo Ships (June 2002) Hull Surveys for General Dry Cargo Ships CONTENTS 1. General 1.1 Application 1.2 Definitions 1.3 Repairs 2. Special Survey 2.1 Schedule 2.2 Scope 2.2.1 General 2.2.2 Dry Dock Survey 2.2.3 Tank

More information

Fatigue strength of knuckle joints - a key parameter in ship design D. Beghin Marine Division, Bureau Veritas, Paris, France

Fatigue strength of knuckle joints - a key parameter in ship design D. Beghin Marine Division, Bureau Veritas, Paris, France Fatigue strength of knuckle joints - a key parameter in ship design D. Beghin Marine Division, Bureau Veritas, Paris, France Abstract Structural integrity of knuckle joints in inner hull for double hull

More information

Rak Production Technology of Concrete Structures (2015) Concrete Reinforcement

Rak Production Technology of Concrete Structures (2015) Concrete Reinforcement Rak-82-2121 Production Technology of Concrete Structures (2015) Concrete Reinforcement 09.10.2015 1 Learning Outcomes To acquaint the student with concrete reinforcement 2 Reinforcement The of concrete

More information

Impact of Harmonized CSR for oil tanker

Impact of Harmonized CSR for oil tanker Impact of Harmonized CSR for oil tanker UnChul Choi Hundai Heavy Industries Co., Ltd, Ulsan, Korea Abstract This paper covers the design experience for oil tankers designed by the Harmonized

More information

CAPABILITY STATEMENT. Tank Repair

CAPABILITY STATEMENT. Tank Repair CAPABILITY STATEMENT Tank Repair page 1 of 7 Introduction Eptec is a specialist industrial contractor in Asset Preservation and Rehabilitation. Our expertise is engineered solutions using resin technology

More information

ShipRight Notice for. Linked Supporting Services Anti-Corrosion System Notation, July Issue date: September 2014

ShipRight Notice for. Linked Supporting Services Anti-Corrosion System Notation, July Issue date: September 2014 ShipRight Notice for Linked Supporting Services Anti-Corrosion System Notation, July 2012 The status of this Rule set is amended as shown and is now to be read in conjunction with this and prior Notices.

More information

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Elleftheria Deligeorges; Jai Tulsi

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Elleftheria Deligeorges; Jai Tulsi Use of Underwater Dry Welding for In Situ Repair to Offshore Structures Elleftheria Deligeorges; Jai Tulsi engineering@neptunems.com 11/03/2015 In Situ Welding Steel Structures Suitability of Repair Methods

More information

Contents EN 14015:2004 (E) page

Contents EN 14015:2004 (E) page Contents page Foreword... 11 1 Scope... 12 2 Normative references... 13 3 Terms, definitions, symbols and abbreviations... 15 3.1 Terms and definitions... 15 3.2 Symbols... 19 3.3 Abbreviations... 21 4

More information

Hull Structure Assessments of the U.S. Coast Guard's High Endurance Cutters, Application of Reliability Methodology to Aging Ship Structure

Hull Structure Assessments of the U.S. Coast Guard's High Endurance Cutters, Application of Reliability Methodology to Aging Ship Structure Hull Structure Assessments of the U.S. 's High Endurance Cutters, Application of Reliability Methodology to Aging Ship Structure 1 Introduction Objective Approach Required Input Desired Outcomes Discussion

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

GUIDANCE FOR CHECKING THE STRUCTURE OF BULK CARRIERS

GUIDANCE FOR CHECKING THE STRUCTURE OF BULK CARRIERS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T1/2.01 MSC/Circ.1117 24 June 2004 GUIDANCE FOR CHECKING THE STRUCTURE OF BULK

More information

Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above

Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above (1978) (Rev.1 1980) (Rev.2 1996) (Rev.3 May 2002) Rev.4 July 2003) (Rev.5 Sept 2007) (Rev.6 May 2010) (Rev.7 Apr 2013) (Rev.8 Dec 2015) (Rev.9 July 2018) Use of Steel Grades for Various Hull Members -

More information

MICROBIALLY-INFLUENCED CORROSION IN DOUBLE-HULL TANKERS A SCOPING PAPER

MICROBIALLY-INFLUENCED CORROSION IN DOUBLE-HULL TANKERS A SCOPING PAPER MICROBIALLY-INFLUENCED CORROSION IN DOUBLE-HULL TANKERS A SCOPING PAPER INSTITUTE OF PETROLEUM MICROBIALLY-INFLUENCED CORROSION IN DOUBLE-HULL TANKERS A SCOPING PAPER March 2001 Published by The Institute

More information

Contents EN :2008+A1:2011 (E) Page

Contents EN :2008+A1:2011 (E) Page Contents Page Foreword... 9 Introduction... 10 1 Scope... 11 2 Normative references... 12 2.1 General... 12 2.2 Constituent products... 12 2.2.1 Steels... 12 2.2.2 Steel castings... 14 2.2.3 Welding consumables...

More information

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3

More information

IMO ANY OTHER BUSINESS. Verification of technical standards for ship construction. Submitted by the United Kingdom

IMO ANY OTHER BUSINESS. Verification of technical standards for ship construction. Submitted by the United Kingdom INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 48th session Agenda item 24 DE 48/INF.6 17 December 2004 ENGLISH ONLY ANY OTHER BUSINESS Verification of technical standards

More information

MSC Guidelines for Review of Structural Plans for Wooden Vessels

MSC Guidelines for Review of Structural Plans for Wooden Vessels K. B. Ferrie, CDR, Chief, Hull Division References: a. Lloyd s Register Rules and Regulations for the Classification of Yachts and Small Craft (Amended to 1983) b. 1943 ABS Rules for Building and Classing

More information

Composite Solutions for the Automotive Industry

Composite Solutions for the Automotive Industry Composite Solutions for the Automotive Industry 2 COMPOSITE SOLUTIONS FOR THE AUTOMOTIVE INDUSTRY Reduce weight. Reduce costs. Increase quality. Henkel offers composite solutions for the automotive industry.

More information

Viega Seapress. The Press System Especially for Shipbuilding.

Viega Seapress. The Press System Especially for Shipbuilding. Viega Seapress The Press System Especially for Shipbuilding. Viega A better Idea! Some things last Even more than 115 years later. At Viega, innovation and entrepreneurial vision are now more alive than

More information

COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK

COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK ABSTRACT Composite repairs have been utilised within the transmission pipeline

More information

Cathodic Protection Electrolytic Antifouling

Cathodic Protection Electrolytic Antifouling Cathodic Protection Electrolytic Antifouling CATHWELL AS Cathodic Protection Electrolytic Antifouling Business concept Cathwell AS is specialized in providing solutions for cathodic protection and water

More information

NEW DESIGN OF SUEZMAX CLASS TANKER PRESENTED BY : HYUNDAI HEAVY INDUSTRIES CO., LTD.

NEW DESIGN OF SUEZMAX CLASS TANKER PRESENTED BY : HYUNDAI HEAVY INDUSTRIES CO., LTD. NEW DESIGN OF SUEZMAX CLASS TANKER PRESENTED BY : HYUNDAI HEAVY INDUSTRIES CO., LTD. AT TANKER STRUCTURE CO-OPERATIVE FORUM 2000 SHIPBUILDERS MEETING TOKYO, OCTOBER 2000 ABSTRACT NEW DESIGN OF SUEZMAX

More information

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770) Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 Product Guide Specification SECTION 03935 RESTORATION MORTAR AND EPOXY

More information

TRELLINE. hoses. TRELLINE hoses Catalogue TRELLEBORG FLUID HANDLING SOLUTIONS

TRELLINE. hoses. TRELLINE hoses Catalogue   TRELLEBORG FLUID HANDLING SOLUTIONS EN TRELLINE hoses TRELLINE hoses Catalogue www.trelleborg.com/oilandmarinehoses TRELLEBORG FLUID HANDLING SOLUTIONS Trelleborg group, leader in polymer solutions Trelleborg is a world leader in engineered

More information

REBUILDING VESSELS LESS THAN 90 METERS (295 FEET) IN LENGTH AND BARGES OF ANY LENGTH

REBUILDING VESSELS LESS THAN 90 METERS (295 FEET) IN LENGTH AND BARGES OF ANY LENGTH Guide for Rebuilding Vessels Less Than 90 Meters (295 Feet) in Length and Barges of Any Length GUIDE FOR REBUILDING VESSELS LESS THAN 90 METERS (295 FEET) IN LENGTH AND BARGES OF ANY LENGTH NOVEMBER 2014

More information

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770) Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 PART 1 GENERAL Product Guide Specification SECTION 03935 SPRAYABLE MICROSILICA

More information

STEEL BARGES 1991 RULES FOR BUILDING AND CLASSING. NOTICE NO. 8 September The following Rule Changes are EFFECTIVE AS OF 1 JANUARY 2003.

STEEL BARGES 1991 RULES FOR BUILDING AND CLASSING. NOTICE NO. 8 September The following Rule Changes are EFFECTIVE AS OF 1 JANUARY 2003. RULES FOR BUILDING AND CLASSING STEEL BARGES 1991 NOTICE NO. 8 September 2002 The following Rule Changes are EFFECTIVE AS OF 1 JANUARY 2003. SECTION 7 PART B MAIN FRAMING TANK BARGES 7B.3 Double Skin Tank

More information

Not Repeating the Past - A Case Study of Fatigue Fracture in Midship Cargo Tanks

Not Repeating the Past - A Case Study of Fatigue Fracture in Midship Cargo Tanks Not Repeating the Past - A Case Study of Fatigue Fracture in Midship Cargo Tanks Ryan Salamati ABS, Hamburg Germany Dr. Michael B. Kennedy Hellespont Ship Management GmbH & Co. KG, Hamburg Germany Abstract

More information

RULES PUBLICATION NO. 62/P HULL SURVEYS OF GENERAL DRY CARGO SHIPS July

RULES PUBLICATION NO. 62/P HULL SURVEYS OF GENERAL DRY CARGO SHIPS July RULES PUBLICATION NO. 62/P HULL SURVEYS OF GENERAL DRY CARGO SHIPS 2017 July Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules and are mandatory

More information

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc.

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc. LNG Carriers Ship Life Extension Ed Waryas Lloyd s Register North America, Inc. Longevity Study - Outline Owners Records Classification Records Ship inspection RAM Study Structural Integrity Analysis Owner

More information

Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO

Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO INNOVATIVE MARITIME SOFTWARE Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO Kevin Brunn, Head of Clients & Markets, Maritime Software, DNV GL Tanker

More information

How Passive Fire Protection (PFP) Works

How Passive Fire Protection (PFP) Works Objectives How passive fire protection (PFP) works Testing and certification requirements for epoxy PFP Main factors that determine PFP thickness Advantages of Pyroclad X1 Estimating a project Sample specification

More information

Review of ASME Guidance Articles on Repair Strategies

Review of ASME Guidance Articles on Repair Strategies Review of ASME Guidance Articles on Repair Strategies Clay Rodery BP Chemicals Technology & Engineering Member/ASME Post Construction Standards Committee ASME PCC-2: Repair of Pressure Equipment and Piping

More information

Fatigue Life Extension Procedure by Ultrasonic Peening. Luis Lopez Martinez LETS Global Version 2 July 2010

Fatigue Life Extension Procedure by Ultrasonic Peening. Luis Lopez Martinez LETS Global Version 2 July 2010 Delegation of The Netherlands IIW Doc. XIII-2316-10 Commission XIII Working Group 2 Fatigue Life Extension Procedure by Ultrasonic Peening Luis Lopez Martinez LETS Global Version 2 July 2010 Abstract The

More information

External Reinforcement System

External Reinforcement System (Revised October 2013) Specifications of SMC Water Tank Product External Reinforcement System DOHA INDUSTRY CO., LTD. Table of Contents 1. General Matters A. Scope of Application B. Product Requirements

More information

Fixed covers are dished upward and anchored to the top of the tank wall.

Fixed covers are dished upward and anchored to the top of the tank wall. Steel digester covers are either fixed or floating: Fixed covers are dished upward and anchored to the top of the tank wall. Floating type covers move vertically in the tank and are designed to float either

More information

EQUIPMENT DESIGN LECTURE TANKS, VESSELS & DRUMS - MECHANICAL DESIGN

EQUIPMENT DESIGN LECTURE TANKS, VESSELS & DRUMS - MECHANICAL DESIGN EQUIPMENT DESIGN LECTURE 12-13 TANKS, VESSELS & DRUMS - MECHANICAL DESIGN ١ ٢ ٣ LIQUID STORAGE TANKS : Vertical cylindrical tanks, with flat bases and conical roofs, are universally used for the bulk storage

More information

DOUBLE WALLED PIPING SYSTEMS

DOUBLE WALLED PIPING SYSTEMS DOUBLE WALLED PIPING SYSTEMS The design and construction of a double wall pipe is more complex than a single wall pipe because of the additional pipe, associated welds and tie in procedures. There are

More information

Bridge Preservation Beyond the Short Term

Bridge Preservation Beyond the Short Term Bridge Preservation Beyond the Short Term Anwar S. Ahmad, P.E. Bridge Preservation Engineer Federal Highway Administration Louisiana Transportation Conference Baton Rouge, LA January 12, 2011 Presentation

More information

ABS TECHNICAL PAPERS 2003 ASSESSMENT OF CORROSION RISKS TO AGING SHIPS USING AN EXPERIENCE DATABASE

ABS TECHNICAL PAPERS 2003 ASSESSMENT OF CORROSION RISKS TO AGING SHIPS USING AN EXPERIENCE DATABASE Proceedings of OMAE 2003 22 nd International Conference on Offshore Mechanics and Arctic Engineering 8-13 JUNE 2003, CANCUN, MEXICO OMAE2003-37299 ASSESSMENT OF CORROSION RISKS TO AGING SHIPS USING AN

More information

Using advanced technologies to reduce costs and improve quality & safety Vicky J. Machera Director Southern Europe, Maritime Software

Using advanced technologies to reduce costs and improve quality & safety Vicky J. Machera Director Southern Europe, Maritime Software Using advanced technologies to reduce costs and improve quality & safety Vicky J. Machera Director Southern Europe, Maritime Software Tanker Operator Conference April 3 rd 2012 Athens www.gl-maritime-software.com

More information

POST CONSTRUCTION COMMITTEE ASME (PCC-2) REPAIR AND TESTING

POST CONSTRUCTION COMMITTEE ASME (PCC-2) REPAIR AND TESTING POST CONSTRUCTION COMMITTEE ASME (PCC-2) REPAIR AND TESTING Contents of this presentation: Scope, organization, and intent ASME PCC Organization Subcommittee ASME PCC-2 Integrating Standards for Inspection

More information

Bondstrand Marine Piping Systems

Bondstrand Marine Piping Systems Bondstrand Marine Piping Systems Bondstrand Marine Pipe Systems Historically, ship owners have faced the grim reality of continuously replacing most metal piping because of severe corrosion. This results

More information

W-17 Clad Steel Plate

W-17 Clad Steel Plate Guideline No.W-17(201510) W-17 Clad Steel Plate Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains technical requirements, inspection

More information

Information Paper on Cargo Tank Corrugated Bulkhead Damages of Double Hull Tankers

Information Paper on Cargo Tank Corrugated Bulkhead Damages of Double Hull Tankers Tanker Structure Co-operative Forum Information Paper on Cargo Tank Corrugated Bulkhead Damages of Double Hull Tankers SUMMARY The paper reviews current corrugated bulkhead design practise and provides

More information

Container Securing Devices

Container Securing Devices STANDARD FOR CERTIFICATION No. 2.23 Container Securing Devices JULY 2011 The content of this service document is the subject of intellectual property rights reserved by Det Norske Veritas AS (DNV). The

More information

PRESENT STATUS AND FUTURE DEVELOPMENT FOR THE DESIGN AND CONSTRUCTION OF DOUBLE HULLS TANKERS

PRESENT STATUS AND FUTURE DEVELOPMENT FOR THE DESIGN AND CONSTRUCTION OF DOUBLE HULLS TANKERS PRESENT STATUS AND FUTURE DEVELOPMENT FOR THE DESIGN AND CONSTRUCTION OF DOUBLE HULLS TANKERS PRESENTED BY: MITSUBISHI HEAVY INDUSTRIES, LTD. AT TANKER STRUCTURAL CO-OPERATIVE FORUM 2000 SHIPBUILDERS MEETING

More information

FATIGUE ASSESSMENT OF BILGE KNUCKLEJOINT OF VLCC ACCORDING TO JTP/JBP RULES

FATIGUE ASSESSMENT OF BILGE KNUCKLEJOINT OF VLCC ACCORDING TO JTP/JBP RULES FATIGUE ASSESSMENT OF BILGE KNUCKLEJOINT OF VLCC ACCORDING TO JTP/JBP RULES 1. DESCRIPTION OF TEST AND EXPERIMENTAL RESULTS The model was a bilge knuckle section for a double hull VLCC in approximately

More information

GS-Hydro Non-Welded Piping Solutions for Offshore

GS-Hydro Non-Welded Piping Solutions for Offshore GS-Hydro Non-Welded Piping Solutions for Offshore Customer environment Customers GS-Hydro s non-welded piping systems are used in a number of applications in the offshore market. Drilling packages, ring

More information

TRELLINE hoses. Catalogue 2012

TRELLINE hoses. Catalogue 2012 EN TRELLINE hoses Catalogue 2012 Trelleborg group, leader of elastomers Trelleborg is a global industrial group whose leading positions are based on advanced polymer technology and in-depth applications

More information

AB-1020 EP Dust Free Vacuum Blast Machine

AB-1020 EP Dust Free Vacuum Blast Machine AB-1020 EP Dust Free Vacuum Blast Machine This compact electric-pneumatic driven injection vacuum blasting machine with an average blasting pattern of 16 mm width, is excellent to apply for blast cleaning

More information

Guideline for Ultrasonic Thickness Measurements of ships classed with Det Norske Veritas

Guideline for Ultrasonic Thickness Measurements of ships classed with Det Norske Veritas Guideline for Ultrasonic Thickness Measurements of ships classed with Det Norske Veritas Det Norske Veritas MTPNO864 September 2004 1 Table of content 1. Objective and applicability 3 2. Terms and abbreviations

More information

For Bridge Decks, Buildings and Construction.

For Bridge Decks, Buildings and Construction. For Bridge Decks, Buildings and Construction www.stirlinglloyd.com INNOVATION AND EXPERIENCE Since 1970 Stirling Lloyd has been involved in the development, manufacture and application of specialist membrane

More information

RULES FOR THE CLASSIFICATION OF SHIPS

RULES FOR THE CLASSIFICATION OF SHIPS RULES FOR THE CLASSIFICATION OF SHIPS 2013 Part 2 - HULL Amendments No. 1 CROATIAN REGISTER OF SHIPPING Hrvatska (Croatia) 21000 Split Marasovićeva 67 P.O.B. 187 Tel.: (...) 385 (0)21 40 81 11 Fax.: (...)

More information

ABS TECHNICAL PAPERS 2003 ESTIMATION OF CORROSION RATES OF STRUCTURAL MEMBERS IN OIL TANKERS

ABS TECHNICAL PAPERS 2003 ESTIMATION OF CORROSION RATES OF STRUCTURAL MEMBERS IN OIL TANKERS Proceedings of OMAE 2003 22 nd International Conference on Offshore Mechanics and Arctic Engineering 8-13 JUNE 2003, CANCUN, MEXICO OMAE2003-37361 ESTIMATION OF CORROSION RATES OF STRUCTURAL MEMBERS IN

More information

CTS1 TANK SEALS LIQUID MOUNTED PRIMARY SHOE PLATE SEAL. Features

CTS1 TANK SEALS LIQUID MOUNTED PRIMARY SHOE PLATE SEAL. Features CTS1 LIQUID MOUNTED PRIMARY SHOE PLATE SEAL The CTS1 liquid mounted shoe plate seal has been developed into a market leading efficient and reliable shoe plate seal, often replacing outdated shoe plate

More information

FibaRoll as the best solution for corrosion protection & prevention

FibaRoll as the best solution for corrosion protection & prevention FibaRoll as the best solution for corrosion protection & prevention FibaRoll What is it? UV curing Glass Reinforced Polymer (GRP) Supplied in rolls 0.6m/1m x 10m FibaRoll FibaRoll cures with sunlight or

More information

Steel Tank Structures. By Eric MacFarlane, SE, PE, LEED AP

Steel Tank Structures. By Eric MacFarlane, SE, PE, LEED AP Steel Tank Structures By Eric MacFarlane, SE, PE, LEED AP Presentation Topics: 1. What is a Tank? 2. Tank Dimensional Characteristics. 3. Tank Operational Characteristics. 4. Tank Component Parts (Tank

More information

YOUR SINGLE-SOURCE INDUSTRIAL SERVICE PROVIDER

YOUR SINGLE-SOURCE INDUSTRIAL SERVICE PROVIDER BUSINESS OVERVIEW 2 AND BUSINESS PHILOSOPHY Southey is a leader in providing fabric maintenance, insulation, repair and maintenance services to clients throughout Africa and the Middle East. These services

More information

Z10.2 Z10.2. Hull Surveys of Bulk Carriers

Z10.2 Z10.2. Hull Surveys of Bulk Carriers 1992 (Rev.1 1994) (Rev.2 1994) (Rev.3 1995) (Rev.4 1996) (Rev.5 1996) (Rev.6 1996) (Rev.7 1997) (Rev.8 April 1998) (Rev.9 July 1999) (Rev.10 Sept. 2000) (Rev.10.1 Sept. 2000) (Rev.11 Nov. 2000) (Rev.11.1

More information

Guideline on Türk Loydu Hull Inspection and Maintenance Program-Grading for Findings During Inspections 2013

Guideline on Türk Loydu Hull Inspection and Maintenance Program-Grading for Findings During Inspections 2013 Guideline on Türk Loydu Hull Inspection and Maintenance Program-Grading for Findings During Inspections 2013 This latest edition incorporates all rule changes. The latest revisions are shown with a vertical

More information

Pulsed Eddy-Current (PEC) Inspection through Insulation

Pulsed Eddy-Current (PEC) Inspection through Insulation INDUSTRIAL SERVICES WHITE PAPER PULSED EDDY CURRENT Pulsed Eddy-Current (PEC) Inspection through Insulation Method statement of an advanced non-destructive testing technique for inspection through insulation.

More information

Cathodic Protection Electrolytic Antifouling

Cathodic Protection Electrolytic Antifouling Cathodic Protection Electrolytic Antifouling CATHWELL AS Cathodic Protection Electrolytic Antifouling Business concept Cathwell specialises in design, manufacture and supply of systems for cathodic protection

More information

Development of Corrosion-resistant Steels and their Application to Crude Oil Tankers

Development of Corrosion-resistant Steels and their Application to Crude Oil Tankers Development of Corrosion-resistant Steels and their Application to Crude Oil Tankers Taizo Yoshida Jun Kato Minoru Ito Seiji Nishimura Kazuyuki Kashima NYK Line NYK Line Nippon Steel & Sumitomo Metal Corporation

More information

Structural. Lubron. Self-Lubricating PTFE Resin Slide Bearings. Lubron Bearing Systems. Bearings to move the world.

Structural. Lubron. Self-Lubricating PTFE Resin Slide Bearings. Lubron Bearing Systems. Bearings to move the world. Structural Lubron TR Lubron Bearing Systems Bearings to move the world. LUBRON TR slide bearings offer a simple and economic solution for most moderate load bearing requirements. LUBRON TR slide bearings

More information

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney

More information

RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS. Braemar Engineering

RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS. Braemar Engineering RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS Agenda Introduction to LNG what is it, what are the risks, what are the myths? Introduction to FLNG

More information

ACI MANUAL OF CONCRETE PRACTICE-2009

ACI MANUAL OF CONCRETE PRACTICE-2009 ACI MANUAL OF CONCRETE PRACTICE-2009 The ACI Manual of Concrete Practice is a six-part compilation of current ACI standards and committee reports. -ACI117-06 to ACI224.3R-95(08) Part 2-ACI 225-99(05) to

More information

VERTEX. different. Molded Fiberglass Composite Shelters

VERTEX. different. Molded Fiberglass Composite Shelters VERTEX Molded Fiberglass Composite Shelters different Vertex shelters are unique: joint-less molded fiberglass outer and inner shells with a foamed-in-place polyurethane foam core between, to produce the

More information

FIRST JACK-UP RIG LOAD-OUT IN VIET NAM

FIRST JACK-UP RIG LOAD-OUT IN VIET NAM FIRST JACK-UP RIG LOAD-OUT IN VIET NAM Ngo Tuan Dung Petrovietnam Marine Shipyard Joint Stock Company (PV Shipyard) Summary This paper presents the design concept and operation results of load-out for

More information

FIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection

FIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection FIRETEX Hydrocarbon Series Epoxy Passive Fire Protection FIRETEX Epoxy Passive Fire Protection Systems Steelwork, New Construction and Maintenance World class epoxy passive fire protection solutions With

More information

FIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection

FIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection FIRETEX Hydrocarbon Series Epoxy Passive Fire Protection FIRETEX Epoxy Passive Fire Protection Systems Steelwork, New Construction and Maintenance World class epoxy passive fire protection solutions With

More information

ISO Ships and marine technology Protective coatings and inspection method Part 3: Cargo oil tanks of crude oil tankers

ISO Ships and marine technology Protective coatings and inspection method Part 3: Cargo oil tanks of crude oil tankers INTERNATIONAL STANDARD ISO 16145-3 First edition 2012-10-01 Ships and marine technology Protective coatings and inspection method Part 3: Cargo oil tanks of crude oil tankers Navires et technologie maritime

More information

Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above

Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above (1978) (Rev.1 1980) (Rev.2 1996) (Rev.3 May 2002) Rev.4 July 2003) (Rev.5 Sept 2007) (Rev.6 May 2010) (Rev.7 Apr 2013) (Rev.8 Dec 2015) Use of Steel Grades for Various Hull Members - Ships of 90 m in Length

More information

Enhance Oil, Chemicals, LPG and LNG transfer and production. using innovative and field proven Trelleborg bonded hose solutions

Enhance Oil, Chemicals, LPG and LNG transfer and production. using innovative and field proven Trelleborg bonded hose solutions EN Enhance Oil, Chemicals, LPG and LNG transfer and production using innovative and field proven Trelleborg bonded hose solutions Trelleborg group, leader of elastomers For over 100 years, Trelleborg is

More information

Environmental concerns include the presence of oxygen, moisture (water), contact with dissimilar metals, and chemicals.

Environmental concerns include the presence of oxygen, moisture (water), contact with dissimilar metals, and chemicals. Construction Concern: Corrosion Article and photos by Gregory Havel May 9, 2018 Corrosion of a metal can be defined as its degrading from a reaction with its environment. This degradation can cause weakening

More information

Apprenticeship Training Standard. Schedule of Training. Composite Structures Technician. Trade Code: 267G

Apprenticeship Training Standard. Schedule of Training. Composite Structures Technician. Trade Code: 267G Apprenticeship Training Standard Schedule of Training Composite Structures Technician Trade Code: 267G Development Date: February 2000 NOTICE OF COLLECTION OF PERSONAL INFORMATION 1. At any time during

More information

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork. DIVISION 03 CONCRETE 03 0100 MAINTENANCE OF CONCRETE 03 0505 UNDER SLAB VAPOR BARRIER A. Sheet vapor retarder shall be polyethylene sheet, ASTM D 4397, 10 mils thick minimum. Consult with Facilities Management

More information

PROTECTIVE COATINGS SIGMAZINC ZINC PRIMER RANGE PRODUCT LINE SERVING EUROPE, MIDDLE EAST AND AFRICA.

PROTECTIVE COATINGS SIGMAZINC ZINC PRIMER RANGE PRODUCT LINE SERVING EUROPE, MIDDLE EAST AND AFRICA. PROTECTIVE COATINGS SIGMAZINC ZINC PRIMER RANGE PRODUCT LINE SERVING EUROPE, MIDDLE EAST AND AFRICA www.sigmacoatings.com/protective SIGMAZINC ZINC PRIMER RANGE PPG PROTECTIVE & MARINE COATINGS UNRIVALLED

More information

Hull Survey for New Construction

Hull Survey for New Construction (July 2006) (Rev.1 Mar 2007) (Corr.1 Oct 2007) (Rev.2 Apr 2009) (Corr.1 August 2012) Hull Survey for New Construction 1. Scope The scope of this UR includes the following main activities: 1.1 Examination

More information

Hot Dip Galvanized Case Study No. 21 Eskom Coastal Sub-station

Hot Dip Galvanized Case Study No. 21 Eskom Coastal Sub-station The Application Eskom have since the early seventies specified hot dip galvanizing for their electrical power distribution transmission lines throughout South Africa. Hot dip galvanizing has become the

More information

DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS

DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION 20 05 80 PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete vibration isolation system to isolate motorized equipment, piping,

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION STEEL ROOF DECK

2016 CDM Smith All Rights Reserved July 2016 SECTION STEEL ROOF DECK PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 31 23 STEEL ROOF DECK A. Furnish all labor, materials, equipment and incidentals required and install steel roof deck complete as shown on the Drawings and

More information