1 PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD , GUJARAT, INDIA M E Mail- 1

2 PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s SHREEJI BAPA DYE CHEM is having existing CTE and CTO of the GPCB for manufacturing of S.O. Dyes and proposing expansion 110 MT/Month of S.O. Dyes, located at Plot No & 1320, PHASE-III, GIDC, Vatva, Ahmedabad The project falls under category B, section 5(f) of EIA notification 2006 and amendment thereof. The site is well connected with road and railway, nearest city Ahmedabad and there is no national park, wildlife sanctuary, eco sensitive areas in surrounding 10 km radius. The project doesn t fall under CRZ boundaries. 2.0 INTRODUCTION OF THE PROJECT BACKGROUND INFORMATION 2.1 Identification of project and project proponent. M/s. SHREEJI BAPA DYE CHEM proposing expansion 110 MT/Month of S.O. Dyes, located at PLOT NO 1319 & 1320, PHASE-III, GIDC, Vatva, Ahmedabad M/s SHREEJI BAPA DYE CHEM is a Proprietorship firm. 2.2 Brief description of nature of the project. The project falls under category B, section 5(f) of EIA notification September 2006 and amendment December, Hence Environmental Clearance is applicable to the proposed project. 2.3 Need for the project and its importance to the country and or region To meet the demand of Local & international market. The unit will put best efforts to employ local people depending upon the availability of skilled & un-skilled man-power. In operation phase, the proposed project would require significant work force with nontechnical and technical background. Employment to skilled & unskilled worker will result in increase their standard of living & expenditure power. 2

3 2.4 Employment Generation (Direct and Indirect) due to the project The proposed project will give direct employment to local people based on qualification and requirement. In addition to direct employment, indirect employment shall generate through ancillary business to some extent for the local population. 3.0 PROJECT DESCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any. There is no interlink project. As M/s. SHREEJI BAPA DYE CHEM is planning for expansion of existing business at Plot. No 1319 & 1320, PHASE-III, GIDC, Vatva, Ahmedabad and applying for EC. 3.2 Location (map showing general location, specific location, and project boundary &project site layout) w i t h coordinates. Coordinate of the Project: Point Latitudes Longitudes A N E B N E C N E D N E 3

4 Figure 1: Location Selecting the proposed site, particularly the environmental considerations gone into should be highlighted. Major factors involved in the selection of site are listed below: Proposed project site is in the Vatva Notified Area. The project site is located on level ground, which does not require any major land filling for area grading work. Proximity to Raw Material suppliers. Site is very well connected by road and railway. Availability of Power, Water, etc. Common CETP & TSDF & MEE facility are available. 4

5 3.3 Size or magnitude of operation. T h e p r o d u c t d e t a i l s a r e g i v e n b e l o w : PRODUCTION DETAILS Sr. No. Name of Product Production Capacity MT/Month Existing Proposed After Proposed 1 Reactive Orange-2R Reactive Golden Yellow R 3 Reactive Red H7B 1 Reactive Black 5/8/39-2 Reactive Blue 13/19/49/171/198/220/221/250 3 Reactive Brown 11 4 Reactive Magenta HB 5 Reactive Orange 2R/3R/W3R/12/13/35/84/107/122 6 Reactive Red 3.1/24.1/31/45/111/120/195/198/218/245/278 7 Reactive Yellow 15/18/42/57/84/85/86/95/135/145/160/210 Total Project description with process details (a schematic diagram, flow chart showing the project layout, components of the project etc. should be given) Please refer Form 1, Annexure II for process details. 3.5 Raw m at e r i al required a l o n g with estimated quantity, likely source, marketing area of final products, Mode of transport of raw Material and Finished Product. We shall procure the raw material from domestic & international market by roads& sea. For finished Product we will use Road & sea transportation. Raw materials detail as per Annexure-I 3.6 Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined. 5

6 ETP shall provide for treatment of effluent and dispose to CETP, Vatva after achieving the desired norms. Process treated water shall use for washing & scrubbing in spray dryer scrubbing system to reduce the water consumption rate. 3.7 Availability of water its source, Energy/power requirement and source should be given. Water Source: The source of water for the proposed project shall meet through GIDC Supply. Electricity and Energy Requirement: Electricity shall be obtained from Torrent Power Ahmedabad. Wood/White Coal/PNG shall use as a fuel for Boiler, HAG & Spray Dryer. Diesel will be used as a fuel for D.G set. The total power & fuel requirement for the proposed project are given below: Source of Electricity Sr. No. Electricity (KW) Existing Total (KW) Proposed Total After (KW) Proposed Source of Supply Torrent Power Air emission & Fuel Requirement: After Proposed Please refer annexure VII. 3.8 Quantity of waste to be generated (liquid and solid) and scheme for their Management/disposal. Waste Water generation & Management plan Total water requirement for the proposed project will be 47.8 KLD. The total waste water generations from Industrial will be KLD KLD of effluent shall be treated in ETP and treated effluent shall dispose to the CETP, Vatva. Industrial process waste 7300 lit/day will be discharged to MEE, Vatva. 2.2 KLD Domestic effluents shall be disposed to Soak pit. Details of water consumption and waste water generation as shown in Annexure IV. 6

7 Effluent Treatment Plant DILUTED EFFLUENT CONCETRATED EFFLUENT INLET 5 TO MEE Sr. Name of Unit Size in meter Capacity in m 3 No. 1 Collection cum neutralization 2.86 x 2.86 x Tank 2 Filter Press 36 x 36 x 36-3 Holding tank 3.65 x 4.87 x Overhead Storage Tank MEE Tank Solid& Hazardous waste generation& Management plan Hazardous waste generate from the process & ETP. Empty drums and bags are hand over to authorize recycler for further recycle or Used for ETP waste packing. The Management of Hazardous waste will be done as per Hazardous Waste Management Rules The list of hazardous waste generation is enclosed as Annexure-VI 7

8 4 SITE ANAYSIS 4.1 Connectivity. Site is very well connected by road and railway. Availability of water, power, etc. Environment Settings Sr. No Particulars Details Distance (km) Nearest Village Vinzol 3.85 S Nearest Town / City Ahmedabad 1.0 N Nearest Railway Station Vatva 2.7 W Nearest Hospital L.G. Hospital Ahmedabad 4.3 N Nearest Highway Express Ahmedabad-Vadodara 1.4 E Nearest Airport Ahmedabad 10.0 NW Nearest Water Body Sabarmati River 9.15 W 4.2 Land Form, Land Use and Land Ownership Land Form: GIDC Land. Land use: Industrial purpose for proposed project of manufacturing of S.O. Dyes. Land Owner ship: Private Land,SHREEJI BAPA DYE CHEM is a proprietorship firm. 8

9 THE LAND OWNERSHIP LETTER FROM GIDC & SITE PLAN. 9

10 10

11 SITE PLAN & FACTORY LAYOUT SHREEJIBAPA DYE CHEM PLOT NO &

12 12

13 13

14 4.3 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wildlife sanctuary, eco sensitive areas, water bodies(distance from HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette notification should be given. There is no forest, national park, wildlife sanctuary, eco sensitive areas in surrounding 10 Km of the plant boundary. CRZ is not applicable to the project. 4.4 Existing Infrastructure The unit is having existing infrastructure to manufacture the S.O Dyes. 4.5 Soil Classification NA proposed project is in GIDC area. 4.6 Social infrastructure available. Depending on the growth of the company the required social infrastructure will be provided. 5 PLANNING BRIEF 5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country planning/development authority classification. Type of Industry: IND (II). 5.2 Land use planning Land Use Planning Sr. No. Details of Land Area For Proposed Plant (m 2 ) 1 Net Plot Area

15 5.3 Assessment of Infrastructure Demand( Physical & Social) Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed project activity. 5.4 Amenities/Facilities Proper site services such as First Aid, Drinking Water etc. will be provided to the workers. 6.0 PROPOSED INFRASTRUCTURE Plot Area: 1406 m 2 Sr. No. Floor Built Up Area In m 2 1 Ground Floor First Floor Second Floor Third Floor 6.02 Total Social Infrastructure Depending on the growth of the company the required social infrastructure will be provided. 6.2 Connectivity (Traffic and Transportation Road/ Rail/ Metro/ Waterways etc.) Road and railways are very close to the working site. There is no proposal to make any new kind of connectivity. 6.3 Drinking water Management(Source & Supply of water) Water for drinking will be met from GIDC supply. 15

16 6.4 Sewerage System Domestic waste water will be disposed in to soak pit. 6.5 Industrial Waste Management The unit have membership of CETP & MEE of GESCSL, Vatva for effluent disposal. The unit also Having membership of Society for Clean Earth, Vatva for effluent disposal. Industrial process waste 7300 lit/day will be discharged to MEE. Washing and other diluted streams after lit/day will be discharged to the CETP, Vatva, Ahmedabad. 6.6 Solid Waste Management ETP & Process waste shall discharge to TSDF site of CETP (GESCSL), Vatva, Ahmedabad and Eco Care Infrastructure Pvt. Ltd. Surendranagar. Membership certificates are enclosed. 6.7 Power Requirement & Supply/Source Electricity shall be obtained from Torrent Power Ltd. The total power requirement for the proposed project is 200 KW. We are also using solar energy (25 KW) 7.0 REHABILITATIONAND RESETTLEMENT(R & R) PLAN Not Applicable 8.0 PROJECT SCHEDULE & COSTESTIMATES 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given). We are having existing facilities of manufacturing of S.O. Dyes. 8.2 Estimated Project cost along with analysis in terms of economic viability of the project. Total Project Cost for proposed project activity is Rs.0.80 crores. 16

17 9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) 9.1 Financial and social benefits with special emphasis on the benefit to be local people including tribal population, if any, in the area. The project will be prove time by time for beneficial to the people as the company progress and expands its activity. By CSR activity company management will committed to improve infrastructural facilities for the local people like Educational facilities, Medical facilities, and Transportation facilities etc. as well the local people especially tribal population will be taken as employers which will improve the socio economic environment to the area. Date: Place: Ahmedabad Signature of the Applicant With Name and Full Address Mr. K.C.PATEL Plot No 1319 & 1320, PHASE-III, GIDC, Vatva, Ahmedabad. (Project proponent /Authorized Signatory) 17

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat-393001

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Pre-feasibility Report For Coal Washery at Village Tehsil District : Budbud & Kerajharia : Pali : Korba [C.G.] Promoter Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Contents 1.0 Executive

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Telefax : 011: Dated 1 st March, 2013

Telefax : 011: Dated 1 st March, 2013 F. No. J-11011/263/2012- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 To, Shri Jigar Shah, Director M/s

More information

Total 155 files quick download in editable form by e delivery

Total 155 files quick download in editable form by e delivery Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

Total 155 files quick download in editable form by e delivery

Total 155 files quick download in editable form by e delivery Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY

PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY Plot No.97/P1, Survey No. 214, 216 and 219 Humnabad Industrial Area, Humnabad Taluk, Bidar At Project Proponents, Plot No.97/P1,

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

DETERGENT POWDER & CAKE

DETERGENT POWDER & CAKE Profile No.: 18 NIC Code: 20233 DETERGENT POWDER & CAKE 1. INTRODUCTION Washing materials are made from different types of natural and synthetic raw materials. Soaps derived from vegetable oils were used

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

Himachal Pradesh State Pollution Control Board

Himachal Pradesh State Pollution Control Board Himachal Pradesh State Pollution Control Board Him Parivesh, Phase III, New Shimla 171009, HP. Form V (See Rule 14) (To be enclosed along with Consent Renewal Application Form for the subsequent ) Submission

More information

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1 P. G. D. E. M. (Semester - I) Examination - 2009 ENVIRONMENTAL MANAGEMENT TECHNIQUES - I (1) Answer any four questions. (3) Use of calculator

More information

Guidance statement - Premises notification for the Hazardous Waste Regulations

Guidance statement - Premises notification for the Hazardous Waste Regulations Guidance statement - Premises notification for the Hazardous Waste Regulations Background In 2009, the Hazardous Waste Regulations 1 (the Regulations) were amended so that all places where hazardous waste

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

M/s ARYAN ENERGY (P) LTD.

M/s ARYAN ENERGY (P) LTD. Application for Environmental Clearance (EC) PRE-FEASIBILITY REPORT For Expansion of Coal Washery Plant from 2.34 Million TPA to 5.00 Million TPA M/s ARYAN ENERGY (P) LTD. at IDCO s Industrial Estate at

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT PRE FEASIBILITY REPORT Of JOJOBERA CEMENT PLANT (STAND-ALONE CEMENT GRINDING UNIT) FOR ENVIRONMENTAL CLEARANCE FOR CHANGE IN PRODUCT MIX OF 4.6 MILLION TONNES PER ANNUM CEMENT PRODUCTION (NO INCREASE IN

More information

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 2nd September, 1999 1 [S. 0.705 (E-).-Whereas draft rules in exercise of the powers

More information

Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad. Construction of Helipad Building at V. S. Hospital, Ahmedabad

Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad. Construction of Helipad Building at V. S. Hospital, Ahmedabad Birla Vishvakarma Mahavidyalaya Engineering College, V. V. Nagar 388120 A Report on Industrial/Site Visit Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad Construction of Helipad Building at V. S. Hospital,

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Torpa Small Hydro Power Project

Torpa Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II Appendix 4 : Regulations for the Control of Pollution by NLS Standard format for the Procedures and Arrangements Manual Note 1: The format consists of a standardized introduction and index of the leading

More information

1. (I)Name of the applicant & company name. (II)Father s / Husband s Name in the case of individuals. (III)Complete Postal Address

1. (I)Name of the applicant & company name. (II)Father s / Husband s Name in the case of individuals. (III)Complete Postal Address APPLICATON FOR ISSUE OF GROUND WATER CLEARANCE / NO OBJECTION CERTIFICATE FOR INDUSTRY / CONSTRUCTION / HORTICULTURE / COMMERCIAL / INFRA STRUCTURES / OTHER USERS 1. (I)Name of the applicant & company

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

1. Identification of the preparation and of the company/undertaking

1. Identification of the preparation and of the company/undertaking ARPRO is not a hazardous product and under normal conditions of use, no toxic, personal or ecological hazards are expected. This Safety Data Sheet is provided to assist you in the unlikely event that you

More information

BASIC INFORMATION QUESTIONNAIRE

BASIC INFORMATION QUESTIONNAIRE Application No. Central Environmental Authority BASIC INFORMATION QUESTIONNAIRE Essential information to determine the environmental approval requirement of projects (Note Use separate sheets as and when

More information

Sandipbhai Shankarbhai Patel

Sandipbhai Shankarbhai Patel Minor Mineral Ordinary Sand Mine (Existing Project) Village : Oze, Ta : Karjan, Dist : Vadodara (Gujarat) Production Capacity : 9000 TPM Area : 04-33-52 Ha. Proposal For Environmental Clearance (Category

More information

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR)

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION-MUNICIPAL SECTION PO BOX 301463 MONTGOMERY, ALABAMA 36130-1463 INSTRUCTIONS: APPLICATIONS

More information

Land Reclamation Site Siting and Application Guidelines

Land Reclamation Site Siting and Application Guidelines Department of Environment and Local Government Land Reclamation Site Siting and Application Guidelines Rationale In an effort to reduce the cost associated with the transportation of demolition wastes,

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report For 20 MLD Common Effluent Treatment Plant (ZLD) With Recycling of Treated Waste Water For Textile Processing Industries At TDK Green Enviro Private Limited Village Tadkeshwar, Taluka

More information

VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED

VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED POST BOX NO. 125, A-14, SECTOR -1, NOIDA - 201301, DIST - GAUTAM BUDH NAGAR, UP, INDIA PHONE: 91-120-2529842, 843, 854 FAX: 91-120-2529801/2541493

More information

New connection to a public sewer

New connection to a public sewer New connection to a public sewer Application form You can go to our website thameswater.co.uk/buildover and apply online or complete this form and return to Thames Water, Developer Services, Clearwater

More information

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra.

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra. PUBLIC CONSULTATION PUBLIC HEARING According to EIA Notification 2006 and its subsequent amendments, the proposed project comes under the project activity of 7 (c) & (a), Industrial estates /parks, complexes/area

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD.

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD. TECHNO ECONOMIC FEASIBILITY REPORT FOR EXPANSION OF DYES AND CHEMICALS MANUFACTURING UNIT AT SPECTRUM DYES AND CHEMICALS PVT.LTD. BLOCK NO-484, 502, 503-A, 504 & 505, N.H.NO.8, PALSANA-394315, DIST.: SURAT,

More information

TENNESSEE DEPARTMENT OF TRANSPORTATION DISPOSAL CORE PLAN FOR THE MANAGEMENT OF HAZARDOUS WASTES, UNIVERSAL WASTES, AND USED OIL

TENNESSEE DEPARTMENT OF TRANSPORTATION DISPOSAL CORE PLAN FOR THE MANAGEMENT OF HAZARDOUS WASTES, UNIVERSAL WASTES, AND USED OIL TENNESSEE DEPARTMENT OF TRANSPORTATION DISPOSAL CORE PLAN FOR THE MANAGEMENT OF HAZARDOUS WASTES, UNIVERSAL WASTES, AND USED OIL February 21, 2000 Prepared for State of Tennessee Department of Transportation

More information

Year: Gujarat Technological University, Ahmedabad, Gujarat

Year: Gujarat Technological University, Ahmedabad, Gujarat Vishwakarma Yojana: Phase IV PROJECT REPORT ON VISHWAKARMA YOJNA: AN APPROACH TOWARDS Prepared by RURBANISATION ----------Village, ------------District Prepared By: NAME ENROLLMENT NO Year: 2016-17 Gujarat

More information

Part 5 (Dangerous Goods Packaging)

Part 5 (Dangerous Goods Packaging) 1 Part 5 (Dangerous Goods Packaging) The objective of the proposed amendments to Part 5 (Dangerous Goods Packaging) of the Transportation of Dangerous Goods Regulations (TDG Regulations) is to introduce

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

M/S. CLEAN SCIENCE PRIVATE LIMITED.

M/S. CLEAN SCIENCE PRIVATE LIMITED. M/S. CLEAN SCIENCE PRIVATE LIMITED. PFR for Environmental Clearance (EC) of Proposed Greenfield project of Manufacturing of Synthetic Organic Chemicals at Plot No.: No.: D-25/1/1 MIDC, Kurkumbh, Tehsil

More information

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres )

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres ) PRE FEASIBILITY REPORT FOR Mining of Riverbed Sand From Darakeswar River Area : 8.09 Ha ( 20 Acres ) AT Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus,,

More information

NEW SUPPLIER REGISTRATION FORM (SRF)

NEW SUPPLIER REGISTRATION FORM (SRF) RECEIPT NO.: INDIAN RAILWAY CATERING AND TOURISM CORPORATION LTD. (A Govt. of India Enterprise) th 9 FLOOR, BANK OF BARODA BUILDING 16 - PARLIAMENT STREET NEW DELHI - 110 001 Tel:-011-23311263-64, Fax:-011-23311259

More information

M/S HERCULES PIGMENTS PVT. LIMITED

M/S HERCULES PIGMENTS PVT. LIMITED ON PROPOSED PROJECT FOR THE MANUFACTURE OF ORGANIC AZO PIGMENTS Category 5 (f) By M/S HERCULES PIGMENTS PVT. LIMITED Located at: Plot No. 1704, Chemical Zone GIDC Notified Industrial Area, GIDC Sarigam,

More information

INFORMATION REQUIRED FROM PHARMACEUTICAL FIRMS FOR REGISRATION

INFORMATION REQUIRED FROM PHARMACEUTICAL FIRMS FOR REGISRATION INFORMATION REQUIRED FROM PHARMACEUTICAL FIRMS FOR REGISRATION Part A: Details of the market Authorization holder (local agent)- 1. Name of Company: 2. Address and contact details of the company : 3. a)

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

INFRASTRUCTURE PROJECTS IN PIPELINE

INFRASTRUCTURE PROJECTS IN PIPELINE Now Available INFRASTRUCTURE PROJECTS IN PIPELINE Sector Analysis and Outlook; Opportunities and Projections Report (PDF) Data-set (Excel) 3 Quarterly Updates India Infrastructure Research Table of Contents

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

PUNJAB POLLUTION CONTROL BOARD

PUNJAB POLLUTION CONTROL BOARD PUNJAB POLLUTION CONTROL BOARD Application form for obtaining 'Consent to establish' (NOC)/'Consent to Operate' u/s 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and u/s 21 of the Air(Prevention

More information

Jayendrasinh Bharatsinh Jadeja

Jayendrasinh Bharatsinh Jadeja Minor Mineral Ordinary Sand Mine (Proposed Project) Village : Jodiya, Taluka : Jodiya, Dist. Jamnagar (Gujarat) Production Capacity : 30,600 TPM Area : 04-90-00 Ha. Proposal For Environmental Clearance

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260 (A Govt. of Maharashtra Undertaking) CIN: U40109MH2005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief Engineer (Commercial) Prakashgad, 5th Floor, Station Road, Bandra

More information

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS The Government Ministries and Agencies responsible for Management and Improvement of the Transport System include:

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 1.00 ha) Survey No: - 526, 527 & 528 (Part) Village Raimoha, Taluka Shirur (Kasar), Dist - Beed (M.S). Owner & Lessee Shri. Chakradhar Subhash Dhakane Prepared

More information

PROJECT PROFILE ON BISCUIT INDUSTRY

PROJECT PROFILE ON BISCUIT INDUSTRY PROJECT PROFILE ON BISCUIT INDUSTRY 1. Name of the Project: BISCUIT INDUSTRY 2. Location within State/Country: ODISHA 3. Nearest Road, Rail & Sea connection: 4. Estimated Capital Cost of the Project: Rs.

More information

Struma Lot 3.2 EIA Development, Working Document

Struma Lot 3.2 EIA Development, Working Document Struma Lot 3.2 EIA Development, Working Document Revision 1, 03 February 2016 1 Introduction 1.1 Background Struma Motorway is one of the most challenging road projects in Bulgaria. The motorway is about

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

Ref:QA/ITI/BSNL/2 Mbps PCM IA/F-20 Date: General Information Comments of BSNL QA 1.1 Name of the Manufacturer ITI LIMITED

Ref:QA/ITI/BSNL/2 Mbps PCM IA/F-20 Date: General Information Comments of BSNL QA 1.1 Name of the Manufacturer ITI LIMITED Annexure-5 QF-501 BHARAT SANCHAR NIGAM LIMITED TELECOM QUALITY ASSURANCE CIRCLE Office of the Chief General Manager, TQA Circle, II Floor, Sanchar Complex, Bangalore 560041 INFRASTRUCTURE ASSESSMENT /

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

Revised FORM - I & PRE-FEASIBILITY REPORT

Revised FORM - I & PRE-FEASIBILITY REPORT Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,

More information

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

HOLDING TANK PLANNING & INSTALLATION GUIDELINES HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS

More information

NOIDA METRO RAIL CORPORATION (NMRC) LIMITED

NOIDA METRO RAIL CORPORATION (NMRC) LIMITED EXPRESSION OF INTEREST (EoI) For Property Development at Sector 71 NOIDA METRO RAIL CORPORATION (NMRC) LIMITED December 2016 Issued by: Noida Metro Rail Corporation (NMRC) Limited Block-III, 3 rd Floor,

More information

A. INTRODUCTION PREFEASIBILITY REPORT

A. INTRODUCTION PREFEASIBILITY REPORT A. INTRODUCTION a. BRIEF DESCRIPTION OF PROJECT M/s Bharat Petroleum Corporation Limited has set up the Haldia Coastal Installation at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The Depot

More information