Selective Acidizing and Permeability Determination by an Electrical Method

Size: px
Start display at page:

Download "Selective Acidizing and Permeability Determination by an Electrical Method"

Transcription

1 .- AMERICAN INSTITUTE OF MINING ASD METALLURGICAL ESGISEERS Technical Publication No (CLASS G, PETROLEUM DIVISION. NO. 19a) DISCUSSION OF THIS PAPER IS INVITED. Discussion in writing (a cnpies) may be sent to the Secretary. American Institute of Mining and Metallurgical Engineers, 29 West 39th Street. New York. N. Y. Unless special arrangement is made. discussion of this paper will close Sept Any discussion offered thereafter ~ - should preferably be in the form of a new paper.. Selective Acidizing and Permeability Determination by an Electrical Method BY DAXA G. HEFLEY* AND P. E. FITZGERALD,' MEMBER A.I.M.E. (New York Meeting. February 1943) ABSTRACT basic Carr technique were devised to accomplish this result. AN apparatus has been developed which permits selective acidizing of producing forma- In order to overcome the possibility of tions and determination of the relative perme- the acid entering an undesirable section at ability of a formation by fluid injection. This the bottom of the well, organic gel plugs2 apparatus, known as the "Electric Pilot," is an were introduced into the bottom of the well, electrical fluid-interface locator, the electrical which sewed to halt the entrance of the circuit of which is completed when the elec- treating solution into these zones.3 These trodes in the well are in contact with a conduc- chemical later liquefied because of tive fluid, but is not completed when immersed bacterial and were removed from in a nonconductive fluid. Results are given for a the well with the produced fluid. number of typical acidizing applications in In fields where a gas cap existed, as in the which, the interface locator was used to control the acid. Description of the method used in Goldsmith field of Ector County, Texas, it making a permeability survey and the data was imperative that a treating technique be obtained are also included. evolved that would confine the acid to the oil-producing zone below the gas cap. By INTRODUCTION so doing the oil-productive capacity of the Early in the development of the acidizing wells could be improved without greatly industry it was recognized that one of the increasing the gas production and this most important problems to be solved in would lower the gas-oil ratio of the well. the chemical treatment of any well was the The technique employed4 to achieve this determination of what part of the exposed effect utilized two pumps, one for pumping section in the well should be treated and the the chemicals down the tubing, the other to selection of the technique that would insure simultaneousl~ force the treatment of the desired section. space to confine the acid to the oil pay, one of the first techniques adopted for thus preventing the chemicals from enterassisting in proper placement of the acid, ing the upper gas-bearing which is still widely used, is the method of Experience has indicated that gas wells confining the acid to the producing section and certain types of oil weus respond better by means of a column of oil, which is known to "stage treating." This technique utilizes as the carri method of treatment, named the introduction of a certain volume of acid for its inventor. In the Carr method it is not and then the to UP" possible to selectively acidize a specific before introduction of the next and usually horizon in a multiple pay zone, so many successively larger stages. Where such improvements and modifications of the methods are employed steps must be taken Manuscript received to keep a disproportionate share of the acid at the of the r Institute Jan from entering the most permeable and * Dowel1 Incorporated, Tulsa. Oklahoma. 1 References are at the end of the paper. previously treated A special tool -. Copyright by the American Institute of Mining and Metallurgical Engineers. Inc. Pe~RoLEurn TECHNOLOGY. July Printed in U. S. A.

2 2 SELECTIVE ACIDIZING AND PERMEABILITY DETERMINATION called the "jet gun" is often used. This device is attached to the bottom of the tubing through which the. acid is introduced. It contains many small jets, which treated were inaccurately located or the data were so meager that no definite conclusions could be reached in regard to the location of the permeable, porous zones that contained the oil. cause high-velocity streams of acid to be impinged upon the sections of lower permeabilities. All of these selective acidizing methods depend for their success upon the completeness and accuracy of well data provided by the geologist and engineer representing the well owner. Often it has been learned, too late in many instances, that the zones to be Recently there has been placed in field service an apparatus known to the trade as the Electric Pilot, which can be used (I) to determine the relative permeability of various zones in a well bore and (2) to introduce the treating chemicals into the desired zones. Relative permeability is determined by measuring the fluid-injection rate into all parts of the exposed formation, and acidizing control is effected by introducing acid and oil into various parts of the formation at such rates that the top or bottom level of the acid in the borehole, as indicated by the electric pilot, is held at the desired level. Briefly, the instrument is an electrical fluid-interface locator, the electrical circuit of which is completed when the electrodes in the well are in contact with a conductive fluid, such as acid or salt water, but is not completed when immersed in a nonconductive fluid such as oil. The electrode unit is run into the well on an insulated singleconductor cable, the insulated copper core and the external steel wires forming the two conductors required for the electric circuit from the surface to the bottom of the well. A diagrammatic sketch of the electrode unit is given in Fig. I. Essentially, the instrument consists of a steel tube several feet long, on the outside of which are mounted two electrodes, completely insulated from the steel tube. The insulated conductor wire of the cable is connected to the upper electrode, and the lower electrode is electrically connected to the upper by means of an insulated wire having a resistance of several hundred ohms. In order to complete the electric circuit in the well, it is necessary to establish electric connection

3 DANA G. HEFLEY AND P. E. FITZGERALD 3 between the body of the pilot and one or both of the electrodes. In some applications the interface locator is run inside the tubing and in others it is with respect to the electrodes at the bottom of the well. On the commercial units for this service, all the equipment is mounted in a light panel truck. LLEY 1 STUFFING BOX MASURE METER R DRIVEN REEL INSULATED C R AND ON 110 VOLT AC GENERAT TRANSFORMR run in the casing and open hole with no tubing in the well. The seating ring shown near the top of the electrode in Fig. I is required only when it is run inside the tubing. The seating ring seats in a companion piece previously installed on the bottom of the tubing, thus causing any fluid introduced into the tubing to go into the fluid passages of the electrode unit and out the bottom of the unit. The surface equipment used with the interface locating unit is shown in Fig. 2. This consists of a power-driven reel for spooling the insulated cable, with a measure meter and weight indicator installed on the line near the reel. The insulated copper conductors in the cable and the cable sheath are connected to slip rings, mour.ted at one end of the reel. This permits electrical readings to be taken while the cable is in motion. Operating current for the unit is supplied by a small alternating-current generator connected to a transformer. An ammeter in the circuit shows the amount of current flowing, and this is a direct indication of the location of the conductive fluid Actual operation of the interface locator is most easily understood by reference to Fig. 3, in which the electrodes are shown completely immersed in oil, immersed half in acid and half in oil, and completely immersed in acid. The illustrations show the electrode unit connected with a battery (B) and an ammeter (A), and also the ammeter readings that can be expected under each of the three conditions possible at the bottom of the hole during use. In the left-hand illustration of Fig. 3, only oil is in contact with the electrodes, and as oil is a nonconductor the electric circuit between the electrodes and the body of the pilot is not completed. No current flows in the circuit and the ammeter registers zero. In the center illustration, acid is in contact with the lower half of the steel body of the electrode unit, and oil is in contact with the upper electrode and the upper part of the steel body. Acid is a conductor of electricity, therefore the electric circuit is completed between the lower electrode and the body of the unit. Current now flows in

4 4 SELECTIVE ACIDIZING AND PERMEABILITY DETERMINATION the circuit from the battery to the top electrode, through the resistance, to the bottom electrode, through the acid to the body of the unit, to the ammeter and back operator observes an electrical instrument, and when this instrument reads zero it means that the acid or salt water is below the bottom electrode. When the instrument ELECTRODES ELECTRODES IN OIL AND ACID IN ACID 1 FIG. 3.-OPI;RATION OF IXTERFACE LOCATOR. No current flows when electrode unit is immersed in oil but a definite current flows when one or both electrodes are in acid. to the battery. A definite amount of current is now flowing in the circuit and the ammeter will show about a half scale deflection. In the right-hand drawing of Fig. 3, only acid is in contact with the electrode unit. In this case the electric circuit is completed between the lower and the upper electrodes and the body of the unit. The current now flows in the circuit from the battery to the top electrode, through the acid to the body of the unit, to the ammeter and back to the battery. As the resistance between the two electrodes has now been shorted out, considerably more current will flow than was possible in the previous illustration. The ammeter will now indicate practically a full-scale deflection. Although these illustrations have assumed acid and oil to be the two fluids in contact with the electrodes, other conductive anti nonconductive fluids will work equally well. In making permeability surveys it is customary to use salt water insteacl of acid. The illustrations in Fig. 3 are analogous to the actual happenings in a ell. The gives a half-scale deflection it means that the interface between acid or salt water and oil is between the bottom and top electrodes. When the instrument gives a fullscale deflection it means that the conductive fluid is at or above the top electrode. Location of the interface between a conductive and a nonconductive fluid in a well makes possible two distinct types of well applications: (I) control of fluid-injection rates so as to maintain the interface at the desired level, and (2) surveying wells by following the movement of the interface under controlled conditions. Under the first classification the most important commercially to date has been selective acidizing of the lower pay in a zone containing two or more pays, although successful acidizing of an upper pay has also been accomplished using an electrode having an electrical connection practically the reverse of that described previously. The most important commercial application of the moving electrode technique is the determination of the relative permeability of a formation by observing the rate of the oil-

5 DANA G. HEFLEY AND P. E. FITZGERALD 5 water interface while fluid is being injected into the formation. ACIDIZING OF SELECTED ZONE The electric interface locator has proved of great value in the acidizing of many ously, oil is pumped into the annulus between the tubing and casing. By this means an acid-oil interface is obtained that is relatively free from turbulence and from the possibility of emulsion formation. The relative pumping rates of acid and oil INJECTION RATE DATA PRESSURE PSI PERMEABILITY WRDSITY : 4940 c' m 5020 TIME FROM START RELATNE PERMEABILITY OF SURVEY. MINUTES RATE OF FLOW, FT/MIN FIG. 4.-PERMEABILITY BEFORE ACIDIZING. Before acidiiing, the formation had two permeable zones with a relative permeability of nearly seven in the upper zone and three in the lower zone. wells with high gas-oil ratios, high water-oil rat,ios, two or more pay zones, sands exposed above or below limestone, leaky casing, or wells that have been deepened. In such wells it is desirable that acid be placed in a selected zone in order to produce best results. To acidize the lower pay of a multiplezone well the electrode seating nipple is installed on the lower end of the tubing and sufficient tubing is run in the well to place the electrode seat 2 ft. above the top level to which acid should rise during the treatment. The electrode unit is then run into the tubing and seated in the bottom of the tubing. As the electrode seating ring is near the top end of the unit, this permits the two electrodes to project out below the bottom of the open-end tubing, with the mid-point between the electrodes at the top acid level. During the treatment, acid is pumped down the tubing and discharged into the well below the electrodes, and simultane- employed during the treatment are then determined by the readings on the electric meter at the surface. When the meter gives a full-scale deflection, indicating that the acid level is too high, either the acidintroduction rate is slowed down or the oil rate speeded up. If the acid level is too low, as indicated by a zero reading on the instrument, the acid introduction rate is speeded up or the oil slowed down. It is generally found that the ratio of oil to acid required to hold the top of the acid at the desired point is much less toward the end of the acid treatment than at the beginning. This is exactly what would be expected, as it means that the permeability of the lower zone is increased by the acid while the permeability of the upper zone, which received no acid, remains substantially unchanged. Fig. 5 shows the injection rates for acid and oil used in treatment of a well in the West Texas area where the electric interface locator was used to confine

6 6 SELECTIVE ACIDIZING AND PERMEABILITY DETERMINATION the acid to the bottom pay in a well having two pay zones. At the start of this treatment the acid-injection rate was approximately half the oil-injection rate, while at of wells consists of the introduction of sufficient salt water into the bottom of the well to cover completely all of the section to be surveyed and the forcing of this salt KID TREATMENT, FLUID INTER- FACE WNTAINED AT 4990 F T FIG. 5.-ACID-TREATMENT DATA. During treatment of the lower pay, the casing pressure remained nearly constant, but the rate of introduction of acid increased as the treatment progressed. the end of the treatment, acid and oil were beingpumpedat substantiallythesame rate. Without some means of continuously determining the location of the top of the acid throughout the treatment, selective acidizing by pumping acid down the tubing and oil down the annulus is merely guesswork. The electric interface locator makes this method of selective acidizing an accurate and reliable procedure. General well data and results obtained from a number of selective acidizing treatments in which the electric interface locator was used are shown in Table I. This gives an idea of some of the various types of wells and different techniques to which the electric interface locator has been found applicable. Various techniques have been used for permeability surveys, but the one that seems to give the best results in a majority water into the formation by introduction of oil into the well. The rate of fall of the salt water-oil interface is determined, by means of the interface locator, during the injection of salt water into the formation. From these data the relative permeability of various sections of the formation can be calculated. A good example of the technique employed and the data obtained is given for a well in the Slaughter pool of Hockley County, West Texas, on which a permeability survey was made before and after a selective acidizing treatment. This well had an original total depth of 5028 ft. with 5%-in. casing set at 4720 ft. On completion of the well in 1939, it was given a 5000-gal. acid treatment but no attempt was made to direct the acid to any particular zone. Production history of the well over a 3-yr. period indicated that selective re-acidizing of the less permeable zones should result in increased production. In making the permeability survey before re-acidizing, sufficient salt water was

7 DANA G. IIEFLEY AND P. E. FITZGERALD 7 introduced into the bottom of the well to fill approximately to the casing point. The well was then filled with oil, and oil was pumped into the well at a rate of 10 gal. per min. throughout the survey. The pressure at the surface is shown on the curve marked "Casing Pressure" on Fig. 4. This shows that the pressure was constant at 295 lb. until after the interface passed the first pick the permeable sections from the wellcutting data. The survey showed that thc upper permeable zone at 4975 ft. had twice the permeability of the lower zone at 5020 ft., so the lower zone was acidized with 5000 gal. of acid, using the interface locator to control the injection of acid. The electrode unit was seated in the lower end of the TABLE I.-Data on Selective Acidizing Well Location.Before After Creek County. Oklahoma Arbuckle 8 ft Arbuckle and Bartles- Rogers County, Okla- Mississippi homa. a Greenwood County. Kansas City Kansas. I Ector County. Texas.... Permian permeable zone, and that after this the pressure rose rather rapidly. The location of the salt water-oil interface was followed with the electric interface locator, and a graph of interface location against time was made from these data (Fig. 4). For comparison with this injection permeability data, a "relative porosity" log, derived from microscopic determinations run on well cuttings, is also shown in Fig. 4. There seems to be some general agreement between the two sets of data but in this case it might have been difficult to tubing and so located that the acid would be held below 4990 ft. Oil was pumped down the casing and acid down the tubing in the quantities required to maintain the interface at the desired point. Fig. 5 shows the pumping rates for oil and acid; also the casing and tubing pressures used throughout the treatment. After acidizing, the well was put on production until practically all the spent acid had been produced frnm the formation. An after-treatment permeability survey was then conducted, using a technique

8 8 SELECTIVE ACIDIZING AND PERMEABILITY DETERMINATION similar to that used on the pretreatment survey. However, it was found that this survey could be conducted with the hydrostatic head of a well full of oil, so no surface 49W INJECTION RATE DATA PRESSURC,PSI equivalent to gallons per minute, since a hole drilled with a 4%-in. bit holds approximately I gal. per foot. The flow rate into a given zone is obtained by taking the differ- PERMEABILITY f n 49.. MOO JON) TIME FROM START RELATIVE PERMEABILITY OF YIRVCY, MINUTES RATE OF FLOW, FT/MIN. FIG. 6.-PERMEABILITY AFTER ACIDIZMC. The formation exhibits the same permeable zones as before acidizing but the permeability of the lower zone has been increased by a factor of three. pressure was put on the well except near the end of the survey. This lower pressure on the formation caused the injection rates into all zones to be proportionately less than on the first survey. The data obtained on the after-treatment permeability survey are shown in Fig. 6, and a compilation of the results of both surveys is given in Table 2. Time TABLE 2.-Results ence in the injection rates above and below the permeable zone. The relative permeabilities before acidizing, as shown in Table 2, are numerically the same as the flow rates into the respective zones. In calculating the relative permeabilities after acidizing it was assumed that the section at 4975 ft. had the same permeability before and after the of Permeability Survey Injection Rates, Ft. per Flow Rates into Permeable Relative Permeability Min. Zone, Ft. per Min. Before a++$ng Mteraalmng I :::: I : : 1.69 The injection-rate data given in Table 2 acidizing treatment, since no acid entered are calculated from the slopes of the curves this section. Using 6.96 to represent the in Figs. 4 and 6, which represent the permeability of the section at 4975 ft., the quantity of fluid entering all permeable relative permeability of the section at 5020 zones below the interface. These data are ft. after acidizing will be 8.11, and the given in feet per minute, which is nearly section at 5026 will be Thus, the

9 .DANA G. HEFLEY AND P. E. FITZGERALD 9 permeability of the zones at 5020 and below were approximately 3.2 times as great after acidizing as before. The electric interface locator or "Electric Pilot" has been used in numerous types of wells in several states. The results obtained to date indicate that by the use of this instrument new economies in well treating may be secured through resultant improvement in acidizing techniques. Improved acidizing techniques, or the introduction of the chemicals into the proper zones in a well, should result in better wells and increased recoveries. The use of this apparatus in surveying wells for the location and relative permeabilities of porous sections in all kinds of wells, including those used in secondaryrecovery projects, will provide data of much value in determining completion and workover practices. I. R. H. Carr: U. S. Patent (1932). 2. J. J. Grebe and S. M. Stoesser: U. S. Patent (1934). 3. P. E. Fitzgerald and F. R. Holland: Use of Gel Compounds Aids in Acidizing Wells. Oil and Gas Jnl. (Feb. A. 1937) R. J. Sullivan: Gas-oil RaiG-Cbntrol in Flowing Wells. Amer. Petr. Inst. Drill. and Prod. Practice (1937) G. L. Leach: Improved Gas Well Acidizing. The Oil Weekly (March ) 17.

. ABSTRACT NOMENCLATURE

. ABSTRACT NOMENCLATURE AMERICAN ISSTITUTE OF MINISG AND METALLURGICAL ESGISEERS Technical Publication No. 1759... PKTROLELW DIVISION. SO. 212) (CLASS DISCUSSION OF THIS PAPER IS INVITED. Discussion in writing (a cu ies) may

More information

Aquifer Airlift Testing

Aquifer Airlift Testing Presentation for the CWWCA Annual Meeting 2008 by Hank Baski Colorado Springs January 12, 2008 Overview Ground Water: Fallacies & Forecasts Commonly believed fallacies hinder optimal development of water

More information

Capillary Injection Tubing Anchor Technologies

Capillary Injection Tubing Anchor Technologies Capillary Injection Tubing Anchor Technologies Patent Pending Randy Matthews- Weatherford Shad Frazier- SandRidge Energy ABSTRACT There are many oil and gas fields across the United States which have been

More information

Capillary Tube for Deliquification Growing Rapidly in USA. Over 600 MMSCF/Day increased production in USA

Capillary Tube for Deliquification Growing Rapidly in USA. Over 600 MMSCF/Day increased production in USA Capillary Tube for Deliquification Growing Rapidly in USA Over 6,000 Wells Completed to date Over 600 MMSCF/Day increased production in USA Successful applications in high PI wells in Europe Big break

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS. Filed with the Secretary of State on

DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS. Filed with the Secretary of State on DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS Filed with the Secretary of State on These rules become effective immediately upon filing with the Secretary of

More information

Module 2, Add on Lesson Conductivity Sensor. Student. 90 minutes

Module 2, Add on Lesson Conductivity Sensor. Student. 90 minutes Module 2, Add on Lesson Conductivity Sensor 90 minutes Student Purpose of this lesson Investigate the variation of resistance with conductivity Construct a sensor to measure the conductivity of water Graph

More information

Module 2, Add on Lesson Conductivity Sensor. Teacher. 90 minutes

Module 2, Add on Lesson Conductivity Sensor. Teacher. 90 minutes Module 2, Add on Lesson Conductivity Sensor 90 minutes Teacher Purpose of this lesson Investigate the variation of resistance with conductivity Construct a sensor to measure the conductivity of water Graph

More information

Enhanced Oil Recovery Institute IOR/EOR Conference Jackson, Wyoming September 10 & 11, 2012

Enhanced Oil Recovery Institute IOR/EOR Conference Jackson, Wyoming September 10 & 11, 2012 Enhanced Oil Recovery Institute IOR/EOR Conference 2012 Jackson, Wyoming September 10 & 11, 2012 What s new in Polymer Technology? Polymer Gel Candidate Selection Well Preparation Case Studies Polymer

More information

Acoustics and Ultrasonics for Downhole Oil and Gas Logging

Acoustics and Ultrasonics for Downhole Oil and Gas Logging Acoustics and Ultrasonics for Downhole Oil and Gas Logging Eric Molz MSS Piezo Technologies 2015 Meggitt PLC. Presentation Roadmap Method of Well Drilling Method of Well Completion Questions Sonic Formation

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

Electrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come)

Electrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come) Electrical Conductivity & Hydraulic Profiling The Combining of Two Subsurface Investigation Methods (With More to Come) How has field work been progressing? Split Spoon and Standard Penetration Testing

More information

Appendix VIII. Guidelines for groundwater bores and wells

Appendix VIII. Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells 1. Construction Bores used for water supply are normally constructed by drilling, either

More information

477 kcmil, 3M Brand Composite Conductor Mechanical Properties, Volume 1 Tensile and Stress-Strain Tests

477 kcmil, 3M Brand Composite Conductor Mechanical Properties, Volume 1 Tensile and Stress-Strain Tests 477 kcmil, 3M Brand Composite Conductor Mechanical Properties, Volume 1 Tensile and Stress-Strain Tests Minnesota Mining and Manufacturing (3M) Company Purchase Order 0000227040 NEETRAC Project Number:

More information

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 652. UNDERGROUND INJECTION CONTROL

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 652. UNDERGROUND INJECTION CONTROL Codification through the 2016 legislative session. Subchapters 1, 3 and 11 Board adoption - June 16, 2015 Gubernatorial approval - June 9, 2016 Effective date - September 15, 2016 TITLE 252. DEPARTMENT

More information

Innovative Method to Reduce Land Area and Cost in the Treatment of Acid mine Drainage by

Innovative Method to Reduce Land Area and Cost in the Treatment of Acid mine Drainage by Presented at the 2001 National Association of Abandoned Mine Lands Conference, August 19-22, 2001, Athens, Ohio Innovative Method to Reduce Land Area and Cost in the Treatment of Acid mine Drainage by

More information

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION M.S. Bruno and J. Couture, GeoEnvironment Technologies LLC J.T. Young, Terralog Technologies USA, Inc. Abstract The Reverse Osmosis (RO) process

More information

The Geysers Geothermal Field, an Injection Success Story

The Geysers Geothermal Field, an Injection Success Story The Geysers Geothermal Field, an Injection Success Story M. Ali Khan Division of Oil, Gas, and Geothermal Resources, 50 D Street # 300, Santa Rosa, CA 95404 (USA) Email: akhan@conservation.ca.gov, WEBSITE:

More information

Kelly B. Fox, Drilling Specialties Company; Carl E. Stouffer, Drilling Specialties Company and Beau Utley, Drilling Specialties Company

Kelly B. Fox, Drilling Specialties Company; Carl E. Stouffer, Drilling Specialties Company and Beau Utley, Drilling Specialties Company AADE-8-DF-HO-3 Evaluation Of A New Friction Reducer for Brines Kelly B. Fox, Drilling Specialties Company; Carl E. Stouffer, Drilling Specialties Company and Beau Utley, Drilling Specialties Company Copyright

More information

SECTION GRAVEL PACKED WATER WELL

SECTION GRAVEL PACKED WATER WELL SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean

More information

Tennessee Underground Injection Control Program Overview

Tennessee Underground Injection Control Program Overview Tennessee Underground Injection Control Program Overview Mission of the UIC Program The UIC program s mission is to protect underground sources of drinking water from contamination by regulating the construction

More information

:2:1. Sis: United States Patent 19. East w. 11) Patent Number: 5,289,888 (45) Date of Patent: Mar. 1, Talley 22 S2. .

:2:1. Sis: United States Patent 19. East w. 11) Patent Number: 5,289,888 (45) Date of Patent: Mar. 1, Talley 22 S2. . United States Patent 19 Talley 54 WATER WELL COMPLETION METHOD (75) Inventor: Robert R. Talley, Katy, Tex. 73) Assignee: RRKT Company, Katy, Tex. (21) Appl. No.: 888,007 22 Filed: May 26, 1992 51) Int.

More information

Apparatus for Vacuum Heating of TEM Samples

Apparatus for Vacuum Heating of TEM Samples Apparatus for Vacuum Heating of TEM Samples Adam Callens Capstone Project, Physics 492R May 1, 2007 Advisor: Richard Vanfleet Abstract The purpose of this capstone project was to create a sample holder

More information

SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED

SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED 8 September 2008 Companies Announcement Office Via Electronic Lodgement SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED Independent review of historical data has confirmed that the Lance Project is suitable

More information

SPE Copyright 2012, Society of Petroleum Engineers

SPE Copyright 2012, Society of Petroleum Engineers SPE 152530 Impact of Completion System, Staging, and Hydraulic Fracturing Trends in the Bakken Formation of the Eastern Williston Basin Randy F. LaFollette, SPE, William D. Holcomb, SPE, and Jorge Aragon,

More information

Coiled Tubing for Downhole Applications

Coiled Tubing for Downhole Applications Coiled Tubing for Downhole Applications Tenaris Tubular technologies. Innovative services. Tenaris is the leading global manufacturer and supplier of tubular products and services used in the drilling,

More information

SPE Introduction. Objectives. There are three primary objectives of this new pumping method:

SPE Introduction. Objectives. There are three primary objectives of this new pumping method: SPE 109141 Using a New Artificial-Lift System in Mexican Mature Oil Fields Vann Roy R./Vann Pumping, Gachuz-Muro Heron/Pemex E&P, Alcazar-Cancino Luis O./Pemex E&P, Guerra-López Mauricio/LLEGAR EOR International

More information

HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING

HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING Dale RUCKER and Jim FINK hydrogeophysics, Inc., USA ABSTRACT Electrical resistivity geophysics has been

More information

CENTRAL TEXAS AREA, AUSTIN CHALK, HORIZONTAL WELLS BURLESON COUNTY

CENTRAL TEXAS AREA, AUSTIN CHALK, HORIZONTAL WELLS BURLESON COUNTY CENTRAL TEXAS AREA, AUSTIN CHALK, HORIZONTAL WELLS BURLESON COUNTY Burleson I Total Depth: 13,000 feet, Horizontal Hole 9,500' to 13,000' Casing: 7 5/8" O.D. Set Vertically at 9,500' Producing Formation:

More information

Optimization Design of ESP Well Extract for Offshore Oilfield

Optimization Design of ESP Well Extract for Offshore Oilfield Optimization Design of ESP Well Extract for Offshore Oilfield Zhigang Yu Zhanjiang Branch of CNOOC Ltd., Zhanjiang 524057, China Abstract As an important measure of getting stable production for ESP wells,

More information

Laboratory Apparatus Improves Simulation of Lost Circulation Conditions

Laboratory Apparatus Improves Simulation of Lost Circulation Conditions AADE-13-FTCE-09 Laboratory Apparatus Improves Simulation of Lost Circulation Conditions Matthew L. Miller, Dale Jamison, and Robert J. Murphy, Halliburton Copyright 2013, AADE This paper was prepared for

More information

Pitot Tubes and Industrial DP Transmitters (Optional Exercise)

Pitot Tubes and Industrial DP Transmitters (Optional Exercise) Exercise 3-4 Pitot Tubes and Industrial DP Transmitters (Optional Exercise) EXERCISE OBJECTIVE In this exercise, you will study how pitot tubes operate. You will measure flow using a pitot tube and a differential-pressure

More information

Figure (12.1) Foundation Grouting

Figure (12.1) Foundation Grouting Chapter 12 - Foundation Grouting 12. Foundation Grouting 12.1. Introduction: The construction of structures on weak ground often requires the soil to be improved in order to ensure the safety and the stability

More information

Thermal Recovery Status and Development Prospect for Heavy Oil in China

Thermal Recovery Status and Development Prospect for Heavy Oil in China UNITAR Centre for Heavy Crude and Tar Sands 1998 1 No.1998.198 Thermal Recovery Status and Development Prospect for Heavy Oil in China Liu Wenzhang Research Institute of Petroleum Exploration and Development,

More information

P d-rain Joint Validation Testing. Final Report. d-rain Validation Testing P Prepared for: Bio-Microbics INC

P d-rain Joint Validation Testing. Final Report. d-rain Validation Testing P Prepared for: Bio-Microbics INC Final Report d-rain Validation Testing P16-0028 Prepared for: Bio-Microbics INC By Kansas State University Advanced Manufacturing Institute May 2016 Matthew Campbell Mechanical Engineer 1 P a g e Table

More information

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection Injection Wells for Liquid-Waste Disposal Long-term reliability and environmental protection ACHIEVE MULTIPLE GOALS FOR LIQUID-WASTE DISPOSAL INJECTION WELLS Expertly located, designed, constructed, and

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 7.4 PERMEATION GROUTING 7.4.1 Definitions 7.4.1.1 Geotechnical Data Report (GDR)

More information

is funded principally through a grant of the SPE FOUNDATION

is funded principally through a grant of the SPE FOUNDATION SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION The Society gratefully acknowledges those companies that support the program by allowing their professionals

More information

STANDARD SPECIFICATION EARTH GROUNDING Section (Straight Shaft Model)

STANDARD SPECIFICATION EARTH GROUNDING Section (Straight Shaft Model) STANDARD SPECIFICATION EARTH GROUNDING Section 16000 (Straight Shaft Model) PART 1 - GENERAL 1.01 DESCRIPTION A. Related Work Specified Elsewhere: 1. Electrical General Provisions ( Section xxx) 2. Basic

More information

WELL RECORD INSTRUCTIONS (Unconventional Operators only)

WELL RECORD INSTRUCTIONS (Unconventional Operators only) COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS MANAGEMENT WELL RECORD INSTRUCTIONS (Unconventional Operators only) Pursuant to 58 Pa C.S. 3222(b)(1) and 3222(b)(2),

More information

URBANA 'U-'NO'S STATE GEOLOGICAL SURVEY

URBANA 'U-'NO'S STATE GEOLOGICAL SURVEY URBANA 'U-'NO'S STATE GEOLOGICAL SURVEY 3 3051 00003 5240 Digitized by the Internet Archive in 2012 with funding from University of Illinois Urbana-Champaign http://archive.org/details/oilfieldflooding101squi

More information

DOE Project Officer: DOE GRANT NO.: ParaMagnetic Logging, Inc. SUMMARY ANNUAL REPORT. Principal Investigator:

DOE Project Officer: DOE GRANT NO.: ParaMagnetic Logging, Inc. SUMMARY ANNUAL REPORT. Principal Investigator: PROOF OF CONCEPT OF MOVING THRU CASING RESISTIVITY APPARATUS DOE GRANT NO.: ParaMagnetic Logging, Inc. SUMMARY ANNUAL REPORT Principal Investigator: DOE Project Officer: Reporting Period: DISCLAJMER This

More information

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y VTG. Vertical Turbine Generator

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y VTG. Vertical Turbine Generator N N O V A T I O N E F F I C I E N C Y Q U A L I T Y VTG For more than 60 years the name Ruhrpumpen has been synonymous worldwide with innovation and reliability for pumping technology Ruhrpumpen is an

More information

Sand Control. Gravel packing is the oldest and simplest method of sand control. Works in both on and off shore wells.

Sand Control. Gravel packing is the oldest and simplest method of sand control. Works in both on and off shore wells. Sand Control Marine deposited sands, most oil and gas reservoir sands, are often cemented with calcareous or siliceous minerals and may be strongly consolidated. In contrast, Miocene or younger sands are

More information

American Oil LLC. Cooper Field. Graham County, Kansas. For Sale: Four Arbuckle Leases. 1 Arbuckle SWD. Net Revenue Interest 80% all leases

American Oil LLC. Cooper Field. Graham County, Kansas. For Sale: Four Arbuckle Leases. 1 Arbuckle SWD. Net Revenue Interest 80% all leases American Oil LLC. Cooper Field Graham County, Kansas For Sale: Four Arbuckle Leases 1 Arbuckle SWD Net Revenue Interest 80% all leases Total Daily Production 9 BBL/day Net Daily Production 7.2 BBL/day

More information

PERFORMANCE OF FLOATING HORIZONTAL AERATORS IN AERATED LAGOONS AND OXIDATION DITCHES

PERFORMANCE OF FLOATING HORIZONTAL AERATORS IN AERATED LAGOONS AND OXIDATION DITCHES PERFORMANCE OF FLOATING HORIZONTAL AERATORS IN AERATED LAGOONS AND OXIDATION DITCHES PRESENTED ON WEDNESDAY, APRIL 4, 2001 AT THE TEXAS WATER 2001 ANNUAL CONFERENCE LARRY W. MOORE CIVIL ENGINEERING DEPARTMENT

More information

California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA

California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA 95811 cga@groundh2o.org 916-231-2134 CGA STANDARD PRACTICE SERIES ARTICLE 550 MANAGEMENT OF SURFACE ARTESIAN

More information

Ground Water Quantity Measurement on the Foot of Mt. Fuji by the Use of Radioisotopes

Ground Water Quantity Measurement on the Foot of Mt. Fuji by the Use of Radioisotopes Ground Water Quantity Measurement on the Foot of Mt. Fuji by the Use of Radioisotopes Toshlro OCHIAI and V. C. RODRIGUEZ* (Agricul. Eng. Res. Station, Ministry of Agriculture and Forestry, * Filipino IAEA

More information

Water Well Screens and Well Efficiencies Designing an Efficient Well

Water Well Screens and Well Efficiencies Designing an Efficient Well A brand of Aqseptence Group Water Well Screens and Well Efficiencies Designing an Efficient Well Efficiency in any system is defined as the ratio of the effective output to the total input. In machines,

More information

NEW SOUTH WALES DEPARTMENT OF EDUCATION AND TRAINING. Manufacturing and Engineering ESD. Sample Examination EA607 MAGNETIC PARTICLE TESTING

NEW SOUTH WALES DEPARTMENT OF EDUCATION AND TRAINING. Manufacturing and Engineering ESD. Sample Examination EA607 MAGNETIC PARTICLE TESTING Name: NEW SOUTH WALES DEPARTMENT OF EDUCATION AND TRAINING Manufacturing and Engineering ESD Sample Examination EA607 MAGNETIC PARTICLE TESTING AS3998 LEVEL 2 1143B 6161J * * * * * * * Time allowed Two

More information

MACKERAL OIL TOOLS PVT. LTD. PRODUCT CATALOGUE RIGID CENTRALIZERS & STOP RING CATALOGUE

MACKERAL OIL TOOLS PVT. LTD. PRODUCT CATALOGUE RIGID CENTRALIZERS & STOP RING CATALOGUE Mackeral centralizer designed to withstand the most extreme down hole conditions. Manufactured form mechanical stock tubing, the centralizer designed to perform in wells containing tight clearances and

More information

SPL -ANODE SERIES. Impressed Current Linear Anodes PRODUCT DATA SHEET. Contact a MATCOR corrosion expert

SPL -ANODE SERIES.  Impressed Current Linear Anodes PRODUCT DATA SHEET. Contact a MATCOR corrosion expert PRODUCT DATA SHEET 2500 foot lengths of MATCOR SPL -Anodes ready to ship for pipeline cathodic protection PRODUCT DATA SHEET, P2 MATCOR has developed a complete line of flexible impressed current SPL-Anodes

More information

CHAPTER 5 WELL CONSTRUCTION

CHAPTER 5 WELL CONSTRUCTION CHAPTER 5 WELL CONSTRUCTION Wells Shallow ( < 15 meters) Deep ( > 15 meters) Shallow Wells Include Dug wells Kanats Vertical wells Horizontal wells They are drilled by: digging, boring, driving, and jetting

More information

Artificial Lift Technique (VI Semester)

Artificial Lift Technique (VI Semester) Artificial Lift Technique (VI Semester) Q.1. What do you mean by artificial lift technique in Petroleum industry? Answer. Artificial lift is a means of overcoming bottomhole pressure so that a well can

More information

Developments in Triaxial Testing Technique

Developments in Triaxial Testing Technique Developments in Triaxial Testing Technique John A. Franklin and Evert Hoek Rock Mechanics Volume 2, Pages 223-228, 1970 Triaxial Testing Technique 2 Summary A simple triaxial cell is described together

More information

Wellhead Protection General Guidelines for New Private Domestic Wells

Wellhead Protection General Guidelines for New Private Domestic Wells Wellhead Protection General Guidelines for New Private Domestic Wells Key principles for wellhead protection for private domestic wells are as follows. Proper Location of Well (Proper sanitary control

More information

Saving lives one drop at a time. Down-hole Rock Drill

Saving lives one drop at a time. Down-hole Rock Drill Saving lives one drop at a time. Down-hole Rock Drill Michael Chavez George Tietz Heath Hendricks Tyler Zimbelman Mission Statement H 2 Oasis Innovations is proud to support Water4 Foundation in their

More information

PLASTICS TODAY THE MAGAZINE OF PLASTICS MANUFACTURING PRODUCTIVITY

PLASTICS TODAY THE MAGAZINE OF PLASTICS MANUFACTURING PRODUCTIVITY PLASTICS TODAY THE MAGAZINE OF PLASTICS MANUFACTURING PRODUCTIVITY Selecting the 'Right' Thermocouple: There Are More Choices Today Used every day by most processors, thermocouples tend to be taken for

More information

Core Analysis of the Round Tank Queen Reservoir, Chaves County, New Mexico. By: Garrett Wilson

Core Analysis of the Round Tank Queen Reservoir, Chaves County, New Mexico. By: Garrett Wilson Core Analysis of the Round Tank Queen Reservoir, Chaves County, New Mexico By: Garrett Wilson 1. Introduction 2. Apparatus 3. Procedure 4. Results and Calculations 1. Porosity 2. Permeability 3. Fluid

More information

Hydrogeologic Characterization. Thomas Doe Winter 2009

Hydrogeologic Characterization. Thomas Doe Winter 2009 Hydrogeologic Characterization Thomas Doe Winter 2009 What You Need to Know from Previous Lecture Hydrologic Cycle Vadose Zone Specific Yield Capillary pressure Groundwater Flow Systems Confined versus

More information

DEEPA TM Stimulation of Natural Fracture Networks in Austin Chalk

DEEPA TM Stimulation of Natural Fracture Networks in Austin Chalk DEEPA TM Stimulation of Natural Fracture Networks in Austin Chalk Contents 1. Background 2. Laboratory Tests 3. Field Test - Vertical Well 4. Field Test - Horizontal Well Summary DEEPA TM in-situ acidizing

More information

Standard Test Method for Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method 1

Standard Test Method for Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method 1 Designation: G57 06 (Reapproved 2012) Standard Test Method for Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method 1 This standard is issued under the fixed designation G57; the

More information

Dynamic MudCap Drilling in the Granite Wash Formation. Kurt A. Shipley

Dynamic MudCap Drilling in the Granite Wash Formation. Kurt A. Shipley Dynamic MudCap Drilling in the Granite Wash Formation Kurt A. Shipley Presentation Outline LINN Energy Overview Mid-Continent Drilling Program Extreme Lost Circulation Challenges MudCap and Dynamic MudCap

More information

HT-406 Specification Guide

HT-406 Specification Guide 2.101 Part 1 - General Pre-insulated HDPE-Jacketed Steel Piping Systems suitable for Steam, Condensate Return, and High Temperature Heating Water. 1.1 Pre-insulated Piping - Furnish a complete HDPE jacketed

More information

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water

More information

Producing a well. Folie 1

Producing a well. Folie 1 roducing a well There are many steps in the life of a well. So far we saw how the well location was determined, it was drilled, logged, cased and cemented. To bring this well to production it first needs

More information

The Kraken is a propellant. Powered by GasGun

The Kraken is a propellant. Powered by GasGun (Front cover) The Kraken is a propellant enhanced perforating gun system designed to overcome the reservoir damaging effects of conventional perforating guns. This integrated system allows for perforation

More information

The artesian well hydrology of Big Bertha has been logically divided into 5 phases of monitoring, analysis, and investigation as outlined below:

The artesian well hydrology of Big Bertha has been logically divided into 5 phases of monitoring, analysis, and investigation as outlined below: B. ARTESIAN WELL HYDROLOGY The artesian well hydrology of Big Bertha has been logically divided into 5 phases of monitoring, analysis, and investigation as outlined below: Sample Station Locations and

More information

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services rick@curaes.com And ye shall know the truth and the truth shall make you free.

More information

FTSI Fracture Fluids 101

FTSI Fracture Fluids 101 FTSI Fracture Fluids 101 Executive Overview Fracture Fluids 101 Understanding Reservoir Properties Permeability Porosity Fracture Geometry Fluids Behavior Image courtesy of Nexen & Deborah Provais FTS

More information

Peerless Pump Company Handbook of Engineering Data

Peerless Pump Company Handbook of Engineering Data Peerless Pump Company Handbook of Engineering Data Brochure EM77 DEFINITION OF PUMP TERMS A.1 A line shaft vertical turbine pump is a vertical-shaft centrifugal or mixed-flow pump with rotating impeller

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EG Engineer Regulation 1110-1-1807 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design PROCEDURES FOR DRILLING IN EARTH EMBANKMENTS ER 1110-1-1807

More information

Wassara Jet grouting hammer. - Enabling single fluid jet grouting in difficult formations!

Wassara Jet grouting hammer. - Enabling single fluid jet grouting in difficult formations! Wassara Jet grouting hammer - Enabling single fluid jet grouting in difficult formations! Jet grouting Jet grouting is a ground stabilization procedure which uses the principle of high velocity injection

More information

Earthing in electrical network purpose, methods and measurement

Earthing in electrical network purpose, methods and measurement Earthing in electrical network purpose, methods and measurement Earth / Ground Conductive ground whose electrical potential at each point is set equal to zero, It is a conductor which provides a low impedance

More information

Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main

Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main Authors: Rogelio de las Casas, Ron Turner, Kristi Roe; EN Engineering This paper discusses two sections of pipeline

More information

Fracturing Overview: Fact vs. Fiction Andy Bond, Subsurface Manager December 8,

Fracturing Overview: Fact vs. Fiction Andy Bond, Subsurface Manager December 8, Fracturing Overview: Fact vs. Fiction Andy Bond, Subsurface Manager December 8, 2016 www.caelusenergy.com Agenda Brief History of Hydraulic Fracturing Why is Hydraulic Fracturing Used? Alaska Regulations

More information

Environmental Management Chapter

Environmental Management Chapter Environmental Management Chapter 335-9-1 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER WELL STANDARDS PROGRAM ADMINISTRATIVE CODE CHAPTER 335-9-1 LICENSING AND CERTIFICATION OF

More information

Innovation and Integrity by Design

Innovation and Integrity by Design 3 rd EUROPEAN CONFERENCE ON GAS WELL DELIQUIFICATION NEW DEVELOPMENTS IN OFFSHORE DELIQUIFICATION SOLUTIONS Mark Murray Daniel Stewart 17 th September 2008 Market Size (excluding Russia and China) 775,000

More information

m4 & G*o? THE NEED FOR SAND CORING IN THE SOUTHEASTERN ILLINOIS OIL FIELD SURVEY LIBRARY

m4 & G*o? THE NEED FOR SAND CORING IN THE SOUTHEASTERN ILLINOIS OIL FIELD SURVEY LIBRARY G*o? Scl&^ 1 Press Bulletin Series For The Oil And Gas Industry STATE OF ILLINOIS DEPARTMENT OF REGISTRATION AND EDUCATION M. F. WALSH. Director DIVISION OF THE STATE GEOLOGICAL SURVEY M. M. LEIGHTON.

More information

OMAE The 22nd International Conference on Offshore Mechanics And Arctic Engineering Cancun, Mexico, 8-13 June 2003 No

OMAE The 22nd International Conference on Offshore Mechanics And Arctic Engineering Cancun, Mexico, 8-13 June 2003 No OMAE The 22nd International Conference on Offshore Mechanics And Arctic Engineering Cancun, Mexico, 8-13 June 2003 No. 37199 DESIGNING, MAKING, AND TESTING SYNTACTIC FOAM OF PRECISELY CONTROLLED HYDROSTATIC

More information

Division Mandates. Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources.

Division Mandates. Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources. Division Mandates Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources. Supervise and permit the owners/operators to utilize all

More information

Prediction of Water Production in CBM wells

Prediction of Water Production in CBM wells CHAPTER 7 Prediction of Water Production in CBM wells 7.1 Introduction Coal is a complex heterogeneous system with methane gas remaining adsorbed on coal surface by lithostatic and hydrostatic pressure

More information

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations.

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations. DEFINITIONS 1. Conductor Hole A large diameter hole bored to facilitate steel pipe. May be cemented in place to allow conventional oil and gas well drilling operations,and also allows fluid returns to

More information

Everything You Always Wanted to Know About Class I Injection Wells in Texas

Everything You Always Wanted to Know About Class I Injection Wells in Texas Everything You Always Wanted to Know About Class I Injection Wells in Texas Lorrie Council, P.G., Manager UIC Permits Section Texas Commission on Environmental Quality Shelly Bergel, MLEIP Intern Summer

More information

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications Well abandonment procedures and perforation with a slotted charge for cement squeeze applications European and West African Perforating Symposium (EWAPS) 7 9 th November 2012 Presented by Co-Author Frank

More information

DEEP INJECTION WELL CONSTRUCTION AND OPERATION

DEEP INJECTION WELL CONSTRUCTION AND OPERATION DEEP INJECTION WELL CONSTRUCTION AND OPERATION MORGAN COUNTY PLANNING AND ZONING DEPARTMENT UIC WELL STAKEHOLDERS HAL DEMUTH, M.S. WES JANES, P.G. PETROTEK ENGINEERING CORPORATION SEPTEMBER 19, 2017 2

More information

North American Society for Trenchless Technology (NASTT) NASTT s 2016 No-Dig Show. Dallas, Texas March 20-24, 2016 WM-T3-01

North American Society for Trenchless Technology (NASTT) NASTT s 2016 No-Dig Show. Dallas, Texas March 20-24, 2016 WM-T3-01 North American Society for Trenchless Technology (NASTT) NASTT s 2016 No-Dig Show Dallas, Texas March 20-24, 2016 WM-T3-01 A Comprehensive Understanding of ASTM F3097-15 Standard Practice for Installation

More information

Chaparral Natural Resources, Inc.

Chaparral Natural Resources, Inc. OIL AND GAS DOCKET NO. 09-0254315 THE APPLICATION OF CHAPARRAL NATURAL RESOURCES, INC. TO INJECT FLUID INTO A RESERVOIR PRODUCTIVE OF OIL AND GAS, SCHERTZ UNIT WELL NO. 2, BIG BUCK (CADDO 1 ST ) FIELD,

More information

BEFORE THE CORPORATION COMMIS OF THE STATE OF OKLAHOMA OVERFLOW ENERGY, LLC

BEFORE THE CORPORATION COMMIS OF THE STATE OF OKLAHOMA OVERFLOW ENERGY, LLC ri F ILED NOV 07 2011 BEFORE THE CORPORATION COMMIS OF THE STATE OF OKLAHOMA CLERK'S OFFICE - 0KG O+ION COMMISSION OKLAHOMA APPLICANT: RELIEF SOUGHT: OVERFLOW ENERGY, LLC AUTHORIZATION FOR A CONVERSION

More information

Railroad Commission of Texas PROPOSAL FOR DECISION PROCEDURAL HISTORY

Railroad Commission of Texas PROPOSAL FOR DECISION PROCEDURAL HISTORY OIL & GAS DOCKET NO. 08-0240234 ENFORCEMENT ACTION AGAINST GEORGE M. CAMPBELL DBA PRODUCTION SERVICE CO. (OPERATOR NO. 680870) FOR VIOLATIONS OF STATEWIDE RULES ON THE HENDRICKS -M- LEASE, WELL NO. 18,

More information

EMERGING CHALLENGES IN PRODUCED WATER MANAGEMENT

EMERGING CHALLENGES IN PRODUCED WATER MANAGEMENT EMERGING CHALLENGES IN PRODUCED WATER MANAGEMENT MARCH 22, 2017 David Lampert, Assistant Professor Civil & Environmental Engineering Oklahoma State University PRESENTATION OVERVIEW Oil and gas production

More information

Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids

Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids INL/EXT-5-533 Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids X. Xie K. K. Bloomfield G. L. Mines G. M. Shook July 25 The INL is a U.S. Department of Energy National Laboratory

More information

Optimising Cementing. Rev: /04/01. Author: Peter Aird Ref:

Optimising Cementing. Rev: /04/01. Author: Peter Aird  Ref: Optimising Cementing Rev: 1.0 21/04/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment during cementing operations The following operational

More information

TRIL Submersible Container

TRIL Submersible Container 2018 Sucker Rod Pumping Workshop Cox Convention Center, September 11-13, 2018 TRIL Submersible Container Mikhail Skachko SWW Industries LLC, Houston TRIL Submersible Containers with inhibitors for treatment

More information

TESTING PTE EARTHING

TESTING PTE EARTHING 1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole

More information

INTERNATIONAL PERFORATING SYMPOSIUM 2014

INTERNATIONAL PERFORATING SYMPOSIUM 2014 INTERNATIONAL PERFORATING SYMPOSIUM 2014 Completion evolution: The role of perforating in horizontal shale wells Kerry Daly, Global BD Manager- DST TCP WELL FLOW MANAGEMENT TM Introduction The first horizontal

More information

Advanced Reservoir Monitoring

Advanced Reservoir Monitoring Advanced Reservoir Monitoring Water Oil Overview Following topics will be addressed in this course: Saturations of Water (Sw), oil (So) and gas (Sg) are likely to change with time. This is caused by fluid

More information

Hydrocar Phys. Sci. Lab

Hydrocar Phys. Sci. Lab Hydrocar Phys. Sci. Lab Name: Class: Date: Physical Sciences Middle School 5 hours Objective Build and modify a hydrogen fuel cell car to improve its efficiency and increase the time it can run on a single

More information

Overview of State Pre-Drill Water Quality Testing

Overview of State Pre-Drill Water Quality Testing Overview of State Pre-Drill Water Quality Testing Water/Energy Track -- Water Quality and Oil & Natural Gas Development GWPC Annual Forum 2013, Sep 23-25, St. Louis, MO Robert W. Puls, Ph.D. Director,

More information

PROCEDURAL HISTORY EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

PROCEDURAL HISTORY EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE OIL AND GAS DOCKET NO. 05-0261133 THE APPLICATION OF TEXAS M. O. R., INC. FOR A PERMIT TO INJECT FLUID INTO A RESERVOIR PRODUCTIVE OF OIL OR GAS, CORSICANA SHALLOW AREA LEASE, WELL NOS. 4I, 6I, 7I, I205,

More information

Cross Borehole Electrical Resistivity Tomography (ERT) Measurements

Cross Borehole Electrical Resistivity Tomography (ERT) Measurements Introduction Cross Borehole Electrical Resistivity Tomography (ERT) Measurements Resistivity imaging at the surface may be used for applications such as cavity detection, geotechnical investigation, site

More information