1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to

2 SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV 2010 Table of Contents 1 INTRODUCTION DEDICATED DISPOSAL AREA (DDA) PLAN ENGINEERING DESIGN FOR THE MRM CELL 1 DDA STRUCTURE DYKE DYKE PITWALL OPERATING PROCEDURES FOR THE CONTAINMENT STRUCTURE AND DEPOSIT Summary of CT Operating Premises for Cell 1 DDA TIMELINES FOR CONSTRUCTION, OPERATION, CLOSURE, CAPPING, FORMATION OF A TRAFFICABLE DEPOSIT AND FINAL LANDFORM DESIGN FORMATION AND CAPPING OF TRAFFICABLE DEPOSIT FINAL LANDFORM DESIGN Closure Drainage Design Reclamation Material Placement Revegetation Design PLANNED ANNUAL FINES CAPTURE IN CELL 1 DDA List of Tables Table 2.1: Dyke Fill Material Descriptions... 3 Table 2.2: Timeline Summary Table 3.1: Planned Annual Fines Capture in Cell 1 DDA List of Figures Figure 1.1: Layout of Dedicated Disposal Areas within Surrounding Area... 2 Figure 2.1: Dyke 1 Design... 5 Figure 2.2: Dyke 2 Design... 5 Figure 2.3: Pitwall Design... 6 Figure 2.4 Cell 1 DDA Operating View... 9 Figure 2.5 Cell 1 DDA Section... 9 Figure 2.4: Closure Landform Design and Drainage Features Figure 2.5: Reclaimed Dedicated Disposal Area Cross Section A A Figure 2.6: Reclaimed Dedicated Disposal Area Cross Section B B Figure 2.7: Reclaimed Dedicated Disposal Area Cross Section C C Figure 2.8: Reclaimed Dedicated Disposal Area Cross Section D D i

3 SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV 2010 Concordance Table Appendix C Conditions 1 Engineering designs and operating procedures for the containment structure and the deposit, including details and timelines for construction, operation, closure, capping, formation of a trafficable deposit, and final landform design; 2 The planned rate and amount of fines captured within the deposit each year, and 3 A comprehensive plan on removal or remediation of segregated fluid tailings each year. Information Location Sections Section 3 Section 2.2 ii

4 1 INTRODUCTION The Muskeg River Mine (MRM) Tailings Management Plan, as submitted in September 2010, utilizes one in-pit dedicated disposal area (DDA) for the period 2012 through This area is known as Cell 1. After 2016, it is expected that a portion of Cell 2B will be used for CT deposition as a DDA until the in-pit Cell 4 is available in DDA plans for Cell 2B and Cell 4 will be submitted at a future date. Additionally, the Atmospheric Fines Drying (AFD) area external to the mine pit, will act as a future DDA. This project is being managed under the test application process, and future DDA documentation will adhere to any requirements as set out by the ERCB. The location of the Cell 1 DDA within the Muskeg River Mine (MRM) is shown in Figure 1.1. Further details are provided in Section 1.6. The Cell 1 DDA is designed to be filled with composite tailings (CT) made by combining mature fine tails (MFT) from the external tailings facility at Muskeg River Mine, with coarse sand tailings (CST) produced as waste from the extraction process. Page 1 of 18

5 Figure 1.1: Layout of Dedicated Disposal Areas within Surrounding Area 2 DEDICATED DISPOSAL AREA (DDA) PLAN 2.1 ENGINEERING DESIGN FOR THE MRM CELL 1 DDA STRUCTURE The Cell 1 DDA is located west of the confluence of the Muskeg River and Jackpine Creek and north of the plant site. The facility is contained by: Dyke 1 along the northwest, Dyke 2 along the northeast and the pit wall along the remainder of the perimeter (see Figure 1.1). The footprint of the structure is approximately 1.8 km2 and provides Mm3 of containment including freeboard. The Cell 1 DDA is the first in-pit cell to provide containment for tailings, and began fluid tailings storage in mid The cell currently contains fluid tailings that will require pumping to Cell 2A prior to Cell 1 being utilized as a DDA starting in Q A perimeter dyke, currently in conceptual design stages, is required to separate tailings storage areas from the Muskeg River. Preliminary designs are planned for the end of Page 2 of 18

6 Dykes 1 and 2 reach a maximum elevation of 290 metres above sea level (masl), with an average height of 60m, and a maximum height of 85m (Figure 2.1 and Figure 2.2). Dykes 1 and 2 have a combined crest length of 3.5 km. The crest width is 50 m beginning in the southwest on the insitu pillar, narrowing to 35 m for much of the dykes before flaring out to 100 m at the east abutment. Table 2.1: Dyke Fill Material Descriptions Fill Type Type 1 Type 2 Type 4 Type 4w Type 5 G1 Toe Berm Fill C2 Clay Waste Seepage Blanket Description Good Quality Sandy Fill Good Quality Clayey Fill Moderate Quality Sandy Fill Moderate Quality Sandy Fill (Low Permeability Fill) Lower McMurray Clay Units General Waste Fill Clay Waste Fill DYKE 1 The core of Dyke 1 is comprised of Type 4 fill (see Table 2.1 and Figure 2.1), with a downstream shell constructed of Type 1 fill with a slope of 4H:1V. The upstream shell is constructed of Types 1, 2 and G1 fills, and has a slope of 3H:1V. The toe berm on the upstream slope is built to an elevation of 250 m with a minimum 56 m crest. With several benches cut into the berm, an overall slope of approximately 5H:1V is achieved. Mitigation of seepage through Dyke 1 is managed by internal chimney drains and foundation cutoffs. A 2.5 m thick sand blanket underlies the downstream dyke wall (Figure 2.1). With the exception of the portions of Dyke 1 along the east abutment, French drains are installed at approximately 100 m spacing and are supplemented by perforated HDPE drainage pipes. Seepage discharge from the blanket and drains will be collected in a ditch at the toe of the dyke and flows to sumps where it will be pumped back into Cell 2A. Seepage through the foundation Page 3 of 18

7 on the upstream side is controlled by a 200 m long, 5 m thick seepage control blanket built from the toe of the upstream shell, under the toe berm and out into the cell area (Figure 2.1) DYKE 2 The design of Dyke 2 has been modified as a requirement of the Tailings Management Plan submitted in conjunction with this Cell 1 DDA plan, but has not yet been approved by the Dam Safety Board. The modifications from previous designs are to accommodate fluid tailings storage in both Cell 1 (during CT consolidation) and Cell 2A (fluid tailings storage for CT production), where it was previously planned to have fluid tailings only on the upstream side of the dyke. The core of Dyke 2 is comprised of Type 4 and 4w fill (see Table 2.1 and Figure 2.2). The downstream and upstream shells are constructed of Types 1, 2 and 4 fill, with a toe berm constructed of Types 1, 2, 4, 4w and G1 fill at the toe of the upstream shell. The upstream dyke wall has a slope of 4H:1V including the toe berm and several benches, and the downstream has an overall slope of 4H:1V (Figure 2.2). Seepage through Dyke 2 is managed by a cutoff under the dyke core, and a 200 m long, 5 m thick seepage control blanket built from the toe of the upstream dyke out into the cell area (Figure 2.2) PITWALL The pit wall is divided into two sectors with different overall slopes (Figure 2.3). Sector 1 includes the southwest pillar, upon which approximately 1.5 km of Dyke 1 is founded. The overall highwall slopes along this sector are 3.1H:1V. Sector 2 comprises of the portion of the pit wall north of the plant approximately 3 km in length and offset 110 m from the Muskeg River. Overall highwall slopes in this sector are 3.5H:1V. Highwall slopes are controlled by the potential for deep-seated failures through the LM2 and paleosol. Page 4 of 18

8 Figure 2.1: Dyke 1 Design Figure 2.2: Dyke 2 Design Page 5 of 18

9 Figure 2.3: Pitwall Design 2.2 OPERATING PROCEDURES FOR THE CONTAINMENT STRUCTURE AND DEPOSIT Summary of CT Operating Premises for Cell 1 DDA Full details of the tailings engineering scheme for the Muskeg River Mine can be found in the Tailings Management Plan submission that addresses ERCB Directive 074 Appendix E requirements. To produce CT, MFT from the ETF are recovered and mixed with coagulant (alum) and CST from the tailings plant. The resulting mixture is transferred to the Cell 1 DDA. Release water produced in the cell is reclaimed to Cell 2A before being returned to the ETF. To provide an adequate deposition slope, CST will be placed in the DDA prior to start of CT deposition during the period 2010 and Page 6 of 18

10 Any fluid tailings that segregate from the CT deposited in the Cell 1 DDA will be pumped as fluid fine tailings to Cell 2A. Through the reclaim and clarification process of Cell 2A and the External Tailings Facility (ETF), these fluid tailings will be recycled back into the CT or AFD production processes. Any material not meeting the sand to fines ratio (SFR) of CT within the Cell 1 DDA will be remediated in place such that it meets the strength criteria required by Directive 074. Remediation in place of CT deposits not meeting the strength requirements as set out in D074, could include, but are not limited to, installation of wick drains, use of mechanical equipment means to promote dewatering and drying, and placement of sand layers to promote consolidation and fluid drainage CT Stream Management CT production will be monitored continuously with the aim of ensuring that material is produced that meets the expected constitution for CT. Cell 1 will be developed with specific areas that allow for short-term deposition of varying CT materials. Various factors including sand-to-fines ratio and fines over fines plus water, will be monitored to ensure CT is produced as designed. If CT production is being produced on-spec, the CT mixture is to be deposited on the east side of Cell 1 along the on-spec CT beach. If the CT production is determined to be falling into a transition zone and becoming off-spec, the CT product will continue to be deposited along the on-spec CT beach with immediate operations focus on improving the CT production quality. The amount of time spent operating in the transition zone will be minimized. If the CT production becomes off-spec, or continues in the transition zone for an extended period, the CT product will be deposited along the off-spec beach within Cell 1. If the product is Page 7 of 18

11 to be off-spec for more than a one 12-hour shift, alternate disposal areas will be considered, including the ETF or switching to alternate production lines away form Cell CT Deposition Methods Both sub-aerial and sub-ct methods of CT deposition are considered as viable deposition methods. Currently the sub-aerial method is being considered in the CT design. Sub-CT opportunities will continue to be investigated and it is likely that a combination of both methods will be used. The most critical element with sub-aerial deposition is to ensure that the CT is not discharged into freestanding water, as this will promote fines segregation from the CT deposit. Irrespective of the deposition methods chosen, the CT must not be deposited into free standing water and sub-aerial beaches should be maintained as long as practical. Consequently, Cell 1 will be aggressively dewatered. The objective is to introduce the CT slurry just below the surface of the CT discharge pool and to have the slurry flow to distal points in shallow meandering channels in a sub-aerial deposition mode. The absence of pooled water prevents dilution of the carrier fluids and subsequent resuspension of the flocculated fine mineral solids during deposition. It is preferable to have multiple CT discharge points so that localized shear of the CT slurry during discharge and deposition is minimized. Page 8 of 18

12 N Fluid to Cell 2A Fluid Collection Pool Off-Spec Beach (CST, WT, off-spec CT) CST, WT, off-spec CST spigot and flushing area Off-Spec Beach (CST, WT, off-spec CT) Cell 1 on-spec CT CST and CT Spigot CT CT or CST Current CST 2 line Figure 2.4 Cell 1 DDA Operating View Figure 2.5 Cell 1 DDA Section Page 9 of 18

13 2.3 TIMELINES FOR CONSTRUCTION, OPERATION, CLOSURE, CAPPING, FORMATION OF A TRAFFICABLE DEPOSIT AND FINAL LANDFORM DESIGN Table 2.2 provides a summary of the timelines established for planned construction, operation and closure of the MRM Cell 1 DDA. Specific details concerning construction and operation of Cell 1 DDA containment are provided in Sections 2.1 and 2.2, and for closure and reclamation in Sections 2.4 and 2.5. Table 2.2: Timeline Summary Start Date End Date Construction Preparation of Dyke Preparation of Dyke Preparation of Dyke 1i Operations MFT and TT deposition into Cell 1A Cell 1 CST deposition Cell 1 CT deposition Cell 1 fluid removal Reclamation Completion of tailings deposition n/a 2016 CST layer deposition Drainage piping into CST surface trafficable tailings surface construction Overburden capping and drainage contouring Reclamation coversoil placement Nurse crop coverage and cap settlement Revegetation Monitoring 2033 TBD Note 1: CST is used in the DDA after CT start-up to create the operational working benches for CT deposition 2.4 FORMATION AND CAPPING OF TRAFFICABLE DEPOSIT Completion of tailings deposition and pumping of fluid tailings to Cell 2A is anticipated in 2016, followed by one year of CST deposition to an average depth of 5 m across the CT surface. CST deposition will be accompanied by installation of a pipeline system to ensure positive drainage Page 10 of 18

14 within the sand layer, such that the water table is drawn down and further capping activities are supported. Deposit strength required to allow a trafficable surface is anticipated by Overburden sourced from stripping operations in Cells 7 and 8 and possibly stockpiled on the surface of Cell 2B (pending capping operations) will be placed onto the trafficable CST surface to an average thickness of 3 m. The overburden cap will be contoured to grade to the adjacent dyke walls to provide channels for drainage and to supply mesotopographical features for reclamation activities. Cross sections showing typical overburden depths along drainage channels and at high and low elevations on the Cell 1 DDA surface are provided in Section 2.5. Overburden capping activities are scheduled to occur between 2024 and 2026 (see Table 2.2) to cover the 1.8 km2 surface area of the DDA. 2.5 FINAL LANDFORM DESIGN As the Cell 1 DDA is part of the larger northeastern drainage catchment area, reclamation activities and drainage features have been adapted to provide an operational reclamation plan until such time as the surrounding tailings cells and dyke walls are complete and the closure drainage plan for the entire area can be integrated Closure Drainage Design The closure drainage plan for the northeastern drainage catchment at Muskeg River Mine includes a drainage system linking a series of in-pit cells to a future pit lake. Until closure of the northeastern area, the drainage plan has been modified for the Cell 1 DDA area, to drain surface water northwest towards the adjacent Cell 2 area (Figure 2.4). In this way, drainage from the Cell 1 DDA will be designed to expand to the drainage network across the remainder of the area at closure, but will be maintained within a closed-loop area while adjacent in-pit cells remain in operation. Page 11 of 18

15 Overburden capping materials will be contoured to provide appropriate channel morphologies, as described in detail in the Muskeg River Mine Expansion ERCB application (2005) and shown in cross-section in Figures 2.5 to 2.8. It is anticipated that the overburden-capped DDA will settle by up to 2 m over time, and provide micro-topographical variation on the top surface. Ecosites that naturally incorporate limited low-lying wetlands have therefore been planned for revegetation activities Reclamation Material Placement On completion of overburden capping, reclamation materials will be placed according to prescribed replacement depths within EPEA Approval No Reclamation material will be direct placed from salvage activities in northern pit areas, or from Reclamation Material Stockpiles located close to the Cell 1 DDA. An average of 20 cm of upland surface soil and 30 cm of upland subsoil will be placed over the overburden capping materials. These upland soils will be either medium or coarse-textured depending on the ecosite planned for the location (see Revegetation Design below). Cell 1 DDA surface areas adjacent to drainage channels and in flat areas will have 20 cm of coarse-textured upland surface soil and 30 cm of medium-textured subsoil placed in areas designed for g1 ecosites. Peat-mineral mix to a depth of 30 cm will be placed on the banks of drainage channels Revegetation Design Creation of the channel areas also provides adjacent raised hummock areas that will be used for upland ecosite development in the reclamation plans (Figure 1-7 to 1-9). It is anticipated that given the shallow gradient on the surface of the Cell 1 DDA area, most of the areas around the drainage channels have the potential to remain moist and have been designed as g1 ecosites, with areas of c1 in hummock areas and h1 adjacent to drainage channels (Figures 2.6 to 2.8). Page 12 of 18

16 Areas around the periphery of the top surface and on the top of the dyke walls have been designed as d ecosites with an area of c ecosite on the potentially drier south-facing top slope (Figures 2.4 and 2.8). Figure 2.4: Closure Landform Design and Drainage Features Page 13 of 18

17 Figure 2.5: Reclaimed Dedicated Disposal Area Cross Section A A 1 Page 14 of 18

18 Figure 2.6: Reclaimed Dedicated Disposal Area Cross Section B B 1 Page 15 of 18

19 Figure 2.7: Reclaimed Dedicated Disposal Area Cross Section C C 1 Page 16 of 18

20 Figure 2.8: Reclaimed Dedicated Disposal Area Cross Section D D 1 Page 17 of 18

21 3 Planned Annual Fines Capture in Cell 1 DDA Planned fines capture in the MRM in-pit Cell 1 DDA is as outlined in table 3.1 and is consistent with the supplied numbers in the 2011 MRM Annual Tailings Management Plan (D074 Appendix E) submitted in September Table 3.1: Planned Annual Fines Capture in Cell 1 DDA MRM Fines Sequestered in DDAs Cell 1 DDA Year CT Deposit (Mt) A full fines balance is available within the report submitted on September 30, 2010, in support of Directive Appendix E: Muskeg River Mine Annual Tailings Management Plan Tables 3.7 and 3.10 Page 18 of 18

Shell Albian Sands Jackpine Mine. ERCB Directive 074 Submission September 2009

Shell Albian Sands Jackpine Mine. ERCB Directive 074 Submission September 2009 Shell Albian Sands Jackpine Mine ERCB Directive 074 Submission September 2009 TABLE OF CONTENTS TABLE OF CONTENTS Directive 074 Appendix C Dedicated Disposal Area Plan for Cell 1 Section 1 Directive 074

More information

OIL SANDS TAILINGS TECHNOLOGY: UNDERSTANDING THE IMPACT TO RECLAMATION. Melinda Mamer, P.Eng

OIL SANDS TAILINGS TECHNOLOGY: UNDERSTANDING THE IMPACT TO RECLAMATION. Melinda Mamer, P.Eng OIL SANDS TAILINGS TECHNOLOGY: UNDERSTANDING THE IMPACT TO RECLAMATION Melinda Mamer, P.Eng Suncor Energy Inc. P.O. Box 4001 Fort McMurray, AB T9H 3E3 ABSTRACT Managing tailings is a critical component

More information

2009 Annual Tailings Plan Submission Syncrude Aurora North (Leases 10, 12 and 34) Submitted to: Energy Resources Conservation Board

2009 Annual Tailings Plan Submission Syncrude Aurora North (Leases 10, 12 and 34) Submitted to: Energy Resources Conservation Board 2009 Annual Tailings Plan Submission Syncrude Aurora North (Leases 10, 12 and 34) Submitted to: Energy Resources Conservation Board Submitted by: Syncrude Canada Ltd. Fort McMurray, Alberta September 30,

More information

Canadian Natural Upgrading Limited

Canadian Natural Upgrading Limited 20180523B Canadian Natural Upgrading Limited Application for Jackpine Mine Tailings Management Plan May 23, 2018 Alberta Energy Regulator Decision 20180523B: Canadian Natural Upgrading Limited; Application

More information

Category 1 Waste Rock Stockpile Groundwater Containment System

Category 1 Waste Rock Stockpile Groundwater Containment System Memorandum To: Jennifer Saran, Poly Met Mining Inc. Project: 23690862.00-042-008 1.0 Introduction The Co-Lead Agencies have requested a summary of the four containment systems that are planned for the

More information

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept Open pit and underground mine The project has 31 Mt of ore reserve Ore to be processed at a rate of 4,650 t/d Life of mine is 20 years

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

Oil sands tailings dewatering can it be done?

Oil sands tailings dewatering can it be done? Paste 2011 R.J. Jewell and A.B. Fourie (eds) 2011 Australian Centre for Geomechanics, Perth, ISBN 978-0-9806154-3-2 https://papers.acg.uwa.edu.au/p/1104_20_longo/ S. Longo Golder Paste Technology Ltd.,

More information

Canadian Natural Upgrading Limited

Canadian Natural Upgrading Limited 20180523A Canadian Natural Upgrading Limited Application for Muskeg River Mine Tailings Management Plan May 23, 2018 Alberta Energy Regulator Decision 20180523A: Canadian Natural Upgrading Limited; Application

More information

The Faces of Oil Sands Reclamation. Patrick Sean Wells, P.Eng. Oct 21, 2010

The Faces of Oil Sands Reclamation. Patrick Sean Wells, P.Eng. Oct 21, 2010 The Faces of Oil Sands Reclamation Patrick Sean Wells, P.Eng. Oct 21, 2010 The Need - Conceptual Bitumen Ore SAND PARTICLE WATER ENVELOPE WITH SUSPENDED FINES BITUMEN FILM SAND PARTICLE Ore Block with

More information

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval

More information

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates Ltd., Canada I. Bin Ahmed Golder Associates Ltd., Canada

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Ronson Chee Company: Rosemont Copper Company Date: January

More information

Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment

Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment Appendix 17.4-C Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment AJAX PROJECT Environmental Assessment Certificate Application / Environmental Impact Statement for a Comprehensive

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations Black Butte Copper Project Mine Operating Permit Application (Revision 3) APPENDIX K-2: Water Management During Construction and Operations Tintina Montana, Inc. July 2017 www.knightpiesold.com Mr. Bob

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116 (i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:

More information

The Facts on Oil Sands Reclamation. By: Don Thompson July 31, 2008

The Facts on Oil Sands Reclamation. By: Don Thompson July 31, 2008 The Facts on Oil Sands Reclamation By: Don Thompson July 31, 2008 The History 1 In the Beginning The oil sands industry is ~ 45 years old 1/2 the average return period for forest fires in the region (80

More information

Integrated Surface Water and Groundwater Modelling for Oil Sands Reclamation

Integrated Surface Water and Groundwater Modelling for Oil Sands Reclamation Integrated Surface Water and Groundwater Modelling for Oil Sands Reclamation Ranjeet Nagare 1, Young-Jin Park 2, Jalpa Pal 1 1 WorleyParsons Canada Services Ltd. 2 Aquanty Inc. Shell, 2006 (AER, 2014)

More information

Jackpine Mine Expansion Project

Jackpine Mine Expansion Project Shell Canada Limited Application for the Approval of the Jackpine Mine Expansion Project Volume 1: Project Description December 2007 PREFACE Section P.1 APPLICATION FOR APPROVAL OF THE JACKPINE MINE EXPANSION

More information

Phase VII Expansion Waste Rock and Overburden Management Plan

Phase VII Expansion Waste Rock and Overburden Management Plan Phase VII Expansion Waste Rock and Overburden Management Plan 2018-01 Prepared by: Minto Explorations Ltd. Minto Mine January 2018 Minto Mine Phase VII Expansion January 2018 TABLE OF CONTENTS 1 Introduction...

More information

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Converting slurry tailings facilities to filtered dry stacks a case history John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Objectives General discussion on the geotechnical issues. Case

More information

WATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS. Randy J. Mikula Kalium Research

WATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS. Randy J. Mikula Kalium Research WATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS Randy J. Mikula Kalium Research Reserves and Production Summary 2005 (billions of barrels) EUB NR2006-024 Bitumen Total Resource 1,694 Reserve

More information

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance Independent Expert Engineering Investigation and Review Panel Report on Mount Polley Tailings Storage Facility Breach Appendix G: Water Balance January 30, 2015 Report on Mount Polley Tailings Storage

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

50% $3 BILLION CAPTURE 3.5 TAILINGS MANAGEMENT OF TAILINGS FINE PARTICLES IN DEDICATED DISPOSAL AREAS BY 2015 INVESTMENT TO MANAGE TAILINGS

50% $3 BILLION CAPTURE 3.5 TAILINGS MANAGEMENT OF TAILINGS FINE PARTICLES IN DEDICATED DISPOSAL AREAS BY 2015 INVESTMENT TO MANAGE TAILINGS 34 Environment Tailings Management SYNCRUDE SUSTAINABILITY REPORT 3.5 TAILINGS MANAGEMENT CONTEXT Both stakeholders and regulators have expressed concerns regarding the growth of tailings volumes and potential

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

APPENDIX B RESPONSE TO ROUND 1 INFORMATION REQUEST DFO&EC_26, SUBMITTED TO THE BOARD ON APRIL 6, 2012

APPENDIX B RESPONSE TO ROUND 1 INFORMATION REQUEST DFO&EC_26, SUBMITTED TO THE BOARD ON APRIL 6, 2012 Veronica Chisholm 11-1365-0012/DCN-104 De Beers Canada Inc. October 2, 2012 APPENDIX B RESPONSE TO ROUND 1 INFORMATION REQUEST DFO&EC_26, SUBMITTED TO THE BOARD ON APRIL 6, 2012 48/48 TECHNICAL MEMO ISSUED

More information

EKS Technology Introduction Process developed for in situ FFT densification Uses unique electrical field management [EKS IP] orders of magnitude lower electrical energy than previous electrophoresis methods

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM FOR INTERNAL DISCUSSION PURPOSES ONLY TECHNICAL MEMORANDUM TO: Augusta Resource Corp. ATTENTION: Jamie Sturgess FROM: Troy Meyer Project Manager, Vector Colorado LLC (Vector) DATE: June 5, 2006 SUBJECT:

More information

Fluid Tailings Management for Oil Sands Mining Projects. 1 Introduction Purpose of This Directive AER Requirements...

Fluid Tailings Management for Oil Sands Mining Projects. 1 Introduction Purpose of This Directive AER Requirements... Directive [XXX] Release date: [Month XX, 20XX] Effective date: [Month XX, 20XX] Fluid Tailings Management for Oil Sands Mining Projects The Alberta Energy Regulator has approved this directive on [Month

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001

More information

Operating and Reclamation Plan

Operating and Reclamation Plan Operating and Reclamation Plan For sites in sensitive locations, additional information may be required. If more space is needed, attach additional sheets or use the blank sheet provided at the end of

More information

Fort Hills Energy Corporation

Fort Hills Energy Corporation 20190225A Fort Hills Energy Corporation Application for Fort Hills Tailings Management Plan February 25, 2019 Alberta Energy Regulator Decision 20190225A: Fort Hills Energy Corporation; Application for

More information

5 TAILINGS MANAGEMENT FRAMEWORK. 5.1 Introduction Draft Tailings Management Framework (TMF) Components

5 TAILINGS MANAGEMENT FRAMEWORK. 5.1 Introduction Draft Tailings Management Framework (TMF) Components 5 TAILINGS MANAGEMENT FRAMEWORK 5.1 Introduction The Tailings Management (TM) Framework represents a significant policy and regulatory tool under the Lower Athabasca Regional Plan (LARP) that aims to manage

More information

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES MINNESOTA WETLAND RESTORATION GUIDE BLOCKING AND FILLING SURFACE DRAINAGE DITCHES TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-1 Publication Date: 10/14/2015 Table of Contents Introduction Application

More information

Appendix E: Bridge Site Information Summary

Appendix E: Bridge Site Information Summary BRIDGE MANUAL E - 1 APPENDIX E: BRIDGE SITE INFORMATION SUMMARY Appendix E: Bridge Site Information Summary Table of Contents Notes..E 3 Section 1: Basic Information..E 4 Section 2: River Data..E 8 Section

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Plant Hammond Site Location: Site Address:

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Diversion Channels DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent

More information

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient.

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient. Level Spreaders DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Level spreaders can release

More information

In-pit tailings disposal at Langer Heinrich TSFs in a unique hydrogeological setting

In-pit tailings disposal at Langer Heinrich TSFs in a unique hydrogeological setting In-pit tailings disposal at Langer Heinrich TSFs in a unique hydrogeological setting Tailings and Mine Waste Management for the 21 st Century 2015 Page number 373 in proceedings Prepared by: Cameron Hore

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Excavating Ltd. Engineering Consultant: GHD Limited Presentation Agenda Project Background Site

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO.

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO. MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO. VA101-001/08-1) Rev. No. Revision Date Approved 0 Issued for Report March 14, 2005

More information

Imperial Oil Resources Limited

Imperial Oil Resources Limited 20180716A Imperial Oil Resources Limited Application for Kearl Mine s Tailings Management Plan July 16, 2018 Alberta Energy Regulator Decision 20180716A: Imperial Oil Resources Limited; Application for

More information

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals

More information

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT Nonmetallic Mining Reclamation & Operation Plan Amendment No. 1 (Includes modifications for Wash Plant construction) Mondovi Mine Town of Mondovi, Wisconsin Prepared for: Buffalo White Sand, LLC PO Box

More information

CCR Rule Operating Criteria Closure Plan

CCR Rule Operating Criteria Closure Plan CCR Rule Operating Criteria 257.102 Closure Plan FGD Pond 2 Jim Bridger Plant Point of Rocks, Wyoming PREPARED FOR PacifiCorp 1407 West North Temple Salt Lake City, UT 84116 (801) 521-0376 Fax (801) 220-4748

More information

APPENDIX A.4A: Tailings Management Facility Construction Material Alternatives

APPENDIX A.4A: Tailings Management Facility Construction Material Alternatives APPENDIX A.4A: Tailings Management Facility Construction Material Alternatives Volume VOLUME A.ii: A.II: Project PROJECT introduction INTRODUCTION & overview OVERVIEW A.1 Introduction A.4A Tailings Management

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS

More information

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY Phong Vo, Manager - Engineering/Gypsum, Mosaic Fertilizer, LLC. 13830 Circa Crossing Drive Lithia, Florida 33547, USA and Ashraf H. Riad, Ph.D., P.E.,

More information

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Prepared for TransAlta Centralia Mining LLC December 5 East Front Street Suite Boise, Idaho 87 /6/5 This document was prepared under direct

More information

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 217 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 2-S3N-R2 AFIN: 32-42 JANUARY 17, 218 217 Landfill Inspection Report Entergy Independence Plant Class 3N

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

State of Alaska Department of Natural Resources Division of Mining, Land and Water Northern Regional Office. Preliminary Finding and Decision

State of Alaska Department of Natural Resources Division of Mining, Land and Water Northern Regional Office. Preliminary Finding and Decision Proposed Action State of Alaska Department of Natural Resources Division of Mining, Land and Water Northern Regional Office Preliminary Finding and Decision ADL 416092 Designated Material Site Milne Point

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

Phone (604) Local 233 Fax (604) RGC REPORT NO /7

Phone (604) Local 233 Fax (604) RGC REPORT NO /7 ROBERTSON GEOCONSULTANTS INC. A Robertson Group Company Consulting Geotechnical and Environmental Engineers Suite 640, 580 Hornby St., Vancouver BC, Canada V6C 3B6 Phone (604) 684-8072 Local 233 Fax (604)

More information

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11 Appendix 11 Erosion and Sediment Control Management Plan Appendix 11 OTAIKA QUARRY - PROPOSED OVERBURDEN DISPOSAL AREA Application for Land Use Consent and Assessment of Environmental Effects Otaika Quarry

More information

Canadian Natural Resources Limited

Canadian Natural Resources Limited 20171218A Canadian Natural Resources Limited Application for Horizon Oil Sands Processing Plant and Mine Tailings Management Plan December 18, 2017 Alberta Energy Regulator Decision 20171218A: Canadian

More information

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2015 LANDFILL INSPECTION REPORT GERS-15-021 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

Geotechnical Performance of ATA -Treated Fluid Fine Tailings

Geotechnical Performance of ATA -Treated Fluid Fine Tailings Geotechnical Performance of ATA -Treated Fluid Fine Tailings T. Moore, Thurber Engineering Ltd., Canada C. Zhang, Thurber Engineering Ltd., Canada M. Pinheiro, Thurber Engineering Ltd., Canada Outline

More information

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016 ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT January 15, 2016 EXECUTIVE SUMMARY This annual inspection report has been prepared in accordance

More information

A Screening Study. Oil Sand Tailings Technologies and Practices. Alberta Energy Research Institute

A Screening Study. Oil Sand Tailings Technologies and Practices. Alberta Energy Research Institute A Screening Study of Oil Sand Tailings Technologies and Practices Prepared for Alberta Energy Research Institute AERI Contract 2008 0326 REVISION I. March 2010 By David W. Devenny PhD P Eng P Geol The

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

APPENDIX A SUMMARY OF MULTIPLE ACCOUNTS ANALYSIS (MAA) FOR THE GAHCHO KUÉ PROJECT

APPENDIX A SUMMARY OF MULTIPLE ACCOUNTS ANALYSIS (MAA) FOR THE GAHCHO KUÉ PROJECT APPENDIX A SUMMARY OF MULTIPLE ACCOUNTS ANALYSIS (MAA) FOR THE GAHCHO KUÉ PROJECT SUMMARY OF MAA FOR GAHCHO KUE PROJECT 2012 EBA FILE: E14101208 JUNE 14, 2012 ISSUED FOR USE APPENDIX A SUMMARY OF MULTIPLE

More information

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report Green CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138B Big Rivers

More information

SRK Consulting Sukulu Phosphate Project Scoping Report. 6 Tailings Dams Introduction Tailings behaviour...

SRK Consulting Sukulu Phosphate Project Scoping Report. 6 Tailings Dams Introduction Tailings behaviour... Sukulu Phosphate Project Scoping Report Page i Table of Contents 6 Tailings Dams... 6-1 6.1 Introduction... 6-1 6.2 Tailings behaviour... 6-1 6.2.1 Magnetics tailings... 6-1 6.2.2 Flotation tailings...

More information

2017 Annual Inspection Report

2017 Annual Inspection Report 2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Hayden Station 13125 U.S. Highway 40 Hayden, Colorado 81638 January 18, 2018 Table of Contents Certification...

More information

Attributes of silica treatment on strength, physical properties and consolidation rates of fluid fine tailings

Attributes of silica treatment on strength, physical properties and consolidation rates of fluid fine tailings Paste 2015 RJ Jewell and AB Fourie (eds) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-1-8 https://papers.acg.uwa.edu.au/p/1504_07_moffett/ Attributes of silica treatment on strength,

More information

Appendix D. Hatch Report

Appendix D. Hatch Report Appendix D Hatch Report Building 14, Harrowdene Office Park, Woodmead, Johannesburg Phone: +2711 239 5300 H338512 Kangra Coal Feasibility - FEL3 - Study Transmittal: H338512-RV-00132-ZA01 Date: 2012-01-03

More information

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) #47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology

More information

Modified Centreline Construction of Tailings Embankn1ents

Modified Centreline Construction of Tailings Embankn1ents Modified Centreline Construction of Tailings Embankn1ents J.P. Haile & K.J. Brouwer Knight Piesold Ltd. Consulting Engineers Suite 1400-750 West Pender Street Vancouver, B.C., Canada V6C 2T8 Abstract:

More information

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station)

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station) Inspection Report To: From: David Burton, Facility Manager (NRG Indian River Generating Station) Richard Southorn, P.E., P.G., CPSWQ Re: Indian River Landfill Annual CCR Unit Inspection Report No. 2 Inspection

More information

Dankoe Mine. Report on 2014 Dam Safety Inspection of Tailings Storage Facility

Dankoe Mine. Report on 2014 Dam Safety Inspection of Tailings Storage Facility Peter Lighthall, P.Eng Consulting Geotechnical Engineer Dankoe Mine Report on of Tailings Storage Facility Report prepared for 439813 BC Ltd. December 4, 2014 Peter Lighthall, P.Eng. Consulting Geotechnical

More information

Dewatering Fly Ash for Remediation: Two Approaches

Dewatering Fly Ash for Remediation: Two Approaches 2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ Dewatering Fly Ash for Remediation: Two Approaches Gregory M. Landry, P.E. Moretrench American Corporation,

More information

Dewatered Tailings Management ARD Aspects. Todd Martin, P.Eng., P.Geo. AMEC Vancouver

Dewatered Tailings Management ARD Aspects. Todd Martin, P.Eng., P.Geo. AMEC Vancouver Dewatered Tailings Management ARD Aspects Todd Martin, P.Eng., P.Geo. AMEC Vancouver Overview This presentation will more introduce the tailings continuum and nature of dewatered tailings Expectation is

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Ronson Chee Company: Rosemont Copper Company Date: January

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

Fort McKay Specific Assessment

Fort McKay Specific Assessment SURFACE WATER HYDROLOGY Fort McKay Specific Assessment Fort McKay Industry Relations Corporation March 2010 Contents 4.0... 1 4.1 Fort McKay s Key Concerns Related to Surface Water... 1 4.2 Fort McKay

More information

SOUTH BRANCH SUBWATERSHED

SOUTH BRANCH SUBWATERSHED SOUTH BRANCH SOUTH BRANCH SUBWATERSHED The South Branch Subwatershed includes the South Branch drainage area plus all the drainage area along the main stream to the south from the mouth of Surrena Run

More information

14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring

14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring 14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring An effective monitoring program provides results to: indicate whether the facility is working as expected and that the assumptions used in the assessment

More information

MINISTRY STAFF SUMMARY REVIEW

MINISTRY STAFF SUMMARY REVIEW MINISTRY STAFF SUMMARY REVIEW Prepared by: For: Allan Leuschen Senior Environmental Protection Officer, Authorizations-South A.J. Downie Director, Authorizations-South Date: 23-Jun-2017 1. Purpose Summary

More information

Bond Schedule for the Calculation of Bond Amounts on Noncoal Mining Operations

Bond Schedule for the Calculation of Bond Amounts on Noncoal Mining Operations Bond Schedule for the Calculation of Bond Amounts on Noncoal Mining Operations [Saturday, December, 2016] The Department of Environmental Protection (Department) announces the bond schedule for noncoal

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Flow Diversion Banks: On grassed slopes

Flow Diversion Banks: On grassed slopes Flow Diversion Banks: On grassed slopes DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Oil Sands Performance. Muskeg River Mine & Scotford Upgrader

Oil Sands Performance. Muskeg River Mine & Scotford Upgrader Oil Sands Performance Report Muskeg River Mine & Scotford Upgrader ABOUT THIS REPORT 01 This document is a report to our stakeholders and is an important part of Shell s continuing dialogue with governments,

More information

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan Magino Project Environmental Impact Statement Technical Support Document 20-14 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION 1.0 INTRODUCTION... 1 SECTION 2.0 BACKGROUND...

More information

(No. of pages excluding this page = 10)

(No. of pages excluding this page = 10) SPECIALIST CONSULTANT STUDIES 3-65 BIG ISLAND MINING PTY LTD (No. of pages excluding this page = 10) Ltd BIG ISLAND MINING PTY LTD 3-66 SPECIALIST CONSULTANT STUDIES This page has intentionally been left

More information

CHAPTER 13 STRIP MINE RECLAMATION AND SOLID WASTE LANDFILL

CHAPTER 13 STRIP MINE RECLAMATION AND SOLID WASTE LANDFILL CHAPTER 13 STRIP MINE RECLAMATION AND SOLID WASTE LANDFILL 13-1. General. Two beneficial uses of dredged material that are still fairly new concepts have proven to be feasible in laboratory, field, and

More information

June 30, 2015 Project No.: C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited PO Box 3000 Houston BC, V0J 1Z0

June 30, 2015 Project No.: C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited PO Box 3000 Houston BC, V0J 1Z0 Suite 500-980 Howe Street Vancouver, BC Canada V6Z 0C8 Telephone (604) 684-5900 Fax (604) 684-5909 June 30, 2015 Project No.: 1193-005-C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited

More information

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan EIS Techni cal Support Document 20-12 Magino Project Environmental Impact Statement Technical Support Document 20-12 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION

More information

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally

More information

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company POST CLOSURE PLAN CFR 257.104(d) Pond 1 Clinch Power Plant Russell County, West Virginia November 2016 Prepared for: Appalachian Power Company Prepared by: Amec Foster Wheeler Environment & Infrastructure,

More information

Material properties of Tailings from Swedish mines

Material properties of Tailings from Swedish mines Material properties of Tailings from Swedish mines I. Jantzer Luleå University of Technology, Sweden, Isabel.Jantzer@ltu.se A. Bjelkevik Sweco AB, Sweden, Annika.Bjelkevik@sweco.se K. Pousette Luleå University

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS 8-1. General. All earth and rock-fill dams are subject to seepage through the embankment, foundation, and abutments. Seepage control is necessary to prevent excessive

More information

THE ABATEMENT PLAN. beneficial abatement plan. For the purpose of defining the pollution potential of surface waters

THE ABATEMENT PLAN. beneficial abatement plan. For the purpose of defining the pollution potential of surface waters THE ABATEMENT PLAN GENERAL PLAN Preventing surface waters from entering deep mine workings apparently offers the most beneficial abatement plan. For the purpose of defining the pollution potential of surface

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan SWEPCO John W. Turk, Jr. Power Plant Fulton, Arkansas Permit No. 0311-S3N-R1 AFIN: 29-00506 October 2016 Terracon Project No. 35167133 Prepared for: SWEPCO 3711 Highway

More information

Understanding of foundation conditions, water balance adequacy and filter adequacy at the closed Nickel Plate tailings impoundment near Hedley, BC

Understanding of foundation conditions, water balance adequacy and filter adequacy at the closed Nickel Plate tailings impoundment near Hedley, BC Barrick Gold Corporation 460 West 50 North, Suite 500 Salt Lake City, Utah 84101 27 June 2015 Al Hoffman, P.Eng. Chief Inspector and Executive Director, Health & Safety British Columbia Ministry of Energy

More information