1 Introduction Eska Creek Preliminary Feasibility Analysis This report examines the feasibility issues of energy and economics for a 1.8 MW hydroelectric project on Eska Creek (project). The Project is located near Sutton, AK and would use Eska Creek as a source for energy production. The preliminary analysis includes Site reconnaissance to identify locations for the intake, pipeline, and powerhouse in conjunction with mapping, Discussion of environmental, land use, and permitting, Collection of hydrology data and an estimation of the available water for power production, Conceptual project configuration and size, and Preliminary opinion of project cost and economic viability Project Location and Description Figure 1, at the end of the report, shows the location of the project and watershed basin based on USGS 63k quad maps. The project is generally located in the Matanuska Susitna Borough on state owned mental health trust land with existing mining and geological exploration activities underway related to coal extraction. The area is also a significant resource for recreation and subsistence activities with established motorized trails. The selection of the intake site was determined from on the ground reconnaissance efforts that identified pipeline and access routing resulting in the intake location shown in Figure 1. The location for the powerhouse was chosen based on the limits of anadromous fish habitat, land ownership, location of exiting power transmission lines, and general topography. An alternative powerhouse location, at a higher elevation with a shorter pipeline, was also examined but eliminated after evaluation. Photos showing the proposed location of the intake, the general pipeline area, and Eska Creek near the powerhouse site are included at the end of the report. Compatibility with Existing Use The project is located above mapped anadromous fish habitat. Eska Creek is cataloged as stream number by ADF&G with coho salmon present and chum salmon spawning identified as the species and use. The original nomination states that the fish presence extends up to rail grade indicating that the steeper stream gradient precludes further access. Culverts exist in the vicinity of the upper limit that do not appear to present a barrier (see attached photos). The presence of resident species is unknown. Also, there are no water rights filings related to the conservation of habitat. The initial analysis adopts the optimal assumption that no environmental flow releases would be required at the intake to support aquatic life in the bypassed reach of Eska Creek. 1/10/2013 Page 1 of 11
2 The project is located in an area designated as a moose range. The area is also utilized extensively for recreation. Neither of these uses would be incompatible with the project. The most significant existing land use activity is the existing and proposed coal mining operations. Usibelli has an existing lease for coal mining and exploration that covers most of the project footprint. Specific development plans were not investigated at this time. The impact of coal resource extraction can range from completely prohibiting project development to enhancing the project the prospect for development. Identifying the compatibility of the project with existing coal mining authorizations and planned developments must be investigated should further feasibility efforts continue. Permitting the project would require leasing or easement applications with the State of Alaska. The state land use noticing and permitting process would be the forum for public review and comment for any proposed development. The project would also require additional stream gaging to satisfy state water rights permitting. Additional aquatic habitat investigations would also be required to initiate the state fish habitat permitting. The project is not likely to require significant federal permits although a FERC jurisdictional determination and corps of engineers permit will be needed. Hydrology This investigation included performing hydrology data collection at the Eska gage site established just downstream of the culverts for the lower road crossing (see Figure 1). The purpose of the data collection was to provide a preliminary assessment of Eska Creek hydrology in relation to nearby drainages with extensive gaging records. The location was chosen for the ease of access and a stream cross section with good low flow resolution. On December 18, 2011, a Campbell Scientific pressure transducer and data logger were installed at the Eska gage site. The installation utilized a conduit to submerge the pressure transducer in the stream under the ice and snow. The Eska gage was set to log at 15 minute intervals and the first reading averaged 1.15 feet of water over the gage with a temperature of 33.1 degrees F. Flow measurements were taken using a dye tracer method. The figure below shows the flow readings, corresponding gage depths, and the derivation of the stage discharge relationship. 1/10/2013 Page 2 of 11
3 Date Stage (ft) Discharge Measurement Temperature (deg F) 12/18/11 16: /7/12 15: /14/12 14: /28/12 13: Eska Creek Stage Discharge Curve (ft) g e0.80 S ta 0.60 y = ln(x) R² = Discharge Measurement (cfs) 0.40 Excluded Discharge Measurements 0.20 Stage Discharge Equation Discharge (cfs) The discharge measurement of 12/18/2011 was left out of the stage discharge calculation due to suspected errors in the flow measurement. The discharge calculations are presumed valid within a stage range of 0.7 to 1.5 feet. In order to perform an average annual energy production estimate for the project a synthesized annual hydrograph was developed using the gaged data and the median daily flows for the Little Susitna River which has a 63 year gaging record performed by the USGS (USGS site number ). Adjustments to the Little Susitna River median daily values to arrive at a synthesized hydrograph for the project included proportioning based on the basin area, averaging with the Eska gaged flows, and flattening of the summer runoff profile to account for the generally higher elevation of the project basin versus the Little Susitna basin. The hydrograph below shows the synthesized result for the Eska gage site location. The actual hydrograph used for the project used this hydrograph scaled by the basin area of the intake versus the basin area of the Eska gage site. 1/10/2013 Page 3 of 11
4 140 Eska Gage Avg Daily Measured Discharge Little Su Median Scaled to Eska Gage Basin Area Eska Gage Site Estimated Median Hydrology Flow (cfs) Date Future hydrology data collection should be done near the intake if at all possible to identify whether the high altitude sub basin area may exhibit significantly different runoff characteristics than the lower basin and with those of nearby comparison basins. The intake site would be accessible during the summer by ATV and hiking about 1/4 mile. Winter access will likely require helicopter use although snow machines are capable of reaching the intake site under favorable snow conditions. Project Concept The conceptual project configuration used in this analysis consists of a small concrete diversion structure for the intake, a combination of buried HDPE and steel pipeline located in a constructed access trail, a small powerhouse with a single turbine, switchgear, and a transformer connected directly to the existing distribution line. Not included in the cost, and likely a project requirement, is upgrading the existing transmission to three phases. A number of different hydraulic capacities and pipeline sizes were evaluated in the project concept. The sizing analysis settled on a project with a hydraulic capacity of 22 cfs and nominal pipeline diameters of 22 and 20 with a peak output of 1.8 MW as the baseline size for the cost estimate and economic analysis. With a single turbine most of the project sizes would not be operational during the lowest flows of late winter and spring. The sizing analysis is shown in the table and chart below. 1/10/2013 Page 4 of 11
5 Hydraulic Annual Energy Pipe wt Nominal Pipe Velocity Capacity (cfs) (kwh) (tons) Dia (inches) (fps) Headloss E E E E E E E E E E E E+07 Annual Energy (kwh) Pipe wt (tons) 450 Annual Energy Output (kwh) 9.0E E E E E Pipe Weight (tons) 4.0E Hydraulic Capacity (cfs) 1/10/2013 Page 5 of 11
6 The daily project output based on the information from above is shown in the following chart Power (kw) Cost Estimate Date A preliminary opinion of cost for the project is included in this analysis and is based on existing cost estimates for similar projects and is shown in the table below. Item Labor Labor Cost Equip Cost Materials Cost Ship Cost Total Cost CONSTRUCTION SUPPORT 3,750 $ 356,000 $ 360,000 MOBILIZATION $ 250,000 $ 250,000 POWERHOUSE 1,350 $ 110,000 $ 250,000 $ 360,000 INTAKE 2,400 $ 190,000 $ 88,000 $ 280,000 PIPELINE 2,400 $ 190,000 $ 992,000 $ 1,180,000 ACCESS TRAILS 1,980 $ 152,000 $ 321,000 $ 470,000 TURBINE AND GENERATOR 540 $ 51,000 $ 950,000 $ 1,000,000 TRANSMISSION EQUIPMENT $ 403,000 $ 120,000 $ 520,000 SUBTOTAL, Direct Costs 12,400 $ 1,049,000 $ 403,000 $ 2,721,000 $ 250,000 $ 4,420,000 Contingency 25% $ 1,110,000 Contractor profit 15% $ 660,000 SUBTOTAL, Construction $ 6,190,000 SUBTOTAL, Construction $ 6,190,000 Construction interest $ 140,000 Feasibility and Permitting 6% $ 350,000 Engineering 4% $ 250,000 Inspection and testing 3% $ 180,000 Owner admin 2% $ 100,000 TOTAL PROJECT $ 7,210,000 1/10/2013 Page 6 of 11
7 Economic Analysis The economic analysis evaluates future revenue and costs by estimating those costs and calculating present day values using estimated economic trends. For this analysis a schedule of cash flows has been generated over the economic term. Future cash flows are discounted to determine their Present Value for comparison. It should be understood that the high variability of the economic factors coupled with the uncertainty of the necessary assumptions for future estimations makes accurate economic analysis difficult in the early stages of project development. For this analysis the major economic factors of concern are: The present day capital cost and financing terms including the economic term of the analysis, the loan term, the project life, cost of capital, and discount rate. The estimates for these factors are presented in the economic summary table. A weighted cost of capital is used based on a 5% borrowing rate for 75% of the capital cost and an 8.5% rate of return for the remaining 25%. Pre construction costs are not included in the project financing. The actual annual revenue generated by the project is dependent on competing generation sources, climate and hydrology, and project reliability. This has been estimated using the annual average energy generation, as shown in the hydrology section, and a fixed rate for energy. The project would deliver power to Matanuska Electric Association, a southcentral utility, at wholesale rates equal to the avoided cost of existing generation which is currently $0.067/kWh. The actual annual costs incurred to operate and maintain the project (parts, labor, taxes, fees, insurance, credits, etc) are estimated throughout the project life in accordance with the schedule below. Construction start is assumed to occur after 5 years of predevelopment work. Project Operation Cost Schedule Description Interval Cost Taxes, insurance, fees Annual $40,000 Parts, labor, and administration Annual $60,000 Turbine and Generator Overhaul 15 years $260,000 Intake and power transmission replacement 20 years $580,000 Pipeline 50 years $1,200,000 The results of the economic evaluation are shown in the summary table below. The negative Net Present Value (NPV) incidates the project is not viable given the current set of assumptions. Project Cost Estimate $7,210,000 Financed Construction Cost $6,510,000 Construction Cost Financing Term 20 years Construction Cost Weighted Finance Rate 5.88% Annual Finance Payment $562,000 Annual Energy Production 7,720,000 kwh Energy Rate $0.067 /kwh Annual Revenue $517,000 Annual Operation Cost $100,000 Economic Life 30 years Economic Discount Rate 5.0% Net Present Value (NPV) -$1,630,000 1/10/2013 Page 7 of 11
8 Conclusion The initial analysis indicates that the project is not economically viable at this time. However, this could change in the next several years if the cost of natural gas (avoided cost of energy) rises as is likely the case for alternative fuel or energy sources that will be needed to replace dwindling Cook Inlet natural gas supplies. Analysis shows that an avoided cost rate of $0.0875/kWh would result in a NPV of 0. Higher sales rates have already been agreed upon with the Fire Island wind farm obtaining approximately $0.10/kWh, a rate that would make this project potentially beneficial. It is concluded that the project is not recommended at this time. If energy rates rise significantly and additional investigation is pursued, the following areas require further analysis: Investigate compatibility with mining operations, Perform additional hydrology data collection and analysis focusing on establishing flows at the intake, Investigate aquatic habitat concerns, Improve on the project concept and cost estimate, and Investigate transmission connection requirements. 1/10/2013 Page 8 of 11
9 Bering Pacific Engineering Figure 1 Project Location 1/10/2013 Page 9 of 11
10 Bering Pacific Engineering Photos Photo of culverts taken from Eska gage site. Photo of Eska Creek near powerhouse site. 1/10/2013 Page 10 of 11
11 Bering Pacific Engineering Photo showing pipeline terrain taken from near intake site looking towards powerhouse site. Photo looking down on intake site. 1/10/2013 Page 11 of 11
Takatz Lake Project - Alaska
BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION APPLICATION FOR PRELIMINARY PERMIT SUBMITTED BY: City and Borough of Sitka Electric Department 105 Jarvis Street Sitka, Alaska 99835 June, 2008 Initial Statement
More informationChapter 6 Erosion & Stormwater Study Team
Chapter 6 Erosion & Stormwater Study Team Objective How do we stabilize the Las Vegas Wash environment to most effectively reduce erosion and enhance wetlands? Introduction The Las Vegas Wash (Wash) has
More informationTechnical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction
Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the
More informationSusitna Hydro Evaluation Project
Susitna Hydro Evaluation Project Seminar on the Development of Large Hydroelectric Projects with a Focus on the Susitna Project presented to Alaska Energy Authority November 2008 Project History Presentation
More informationEXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan
EXECUTIVE SUMMARY The consultative process was initiated in April 2000 and completed in November 2001. The consultative process follows the steps outlined in the 1996 provincial government Water Use Plan
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationMore Creek Hydroelectric Project Prefeasibility Study
Alaska Hydro Corporation More Creek Hydroelectric Project June 2015 E6348 SIGMA ENGINEERING LTD 1444 Alberni Street, 4th Floor, Vancouver, BC, Canada V6G 2Z4 Phone: (604) 688-8271 Fax: (604) 688-1286 TABLE
More information4. Present Activities and Roles
4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified
More informationCHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section
More informationAlaska LNG Concept Information. Alaska LNG. Overview. October
Overview October December 3, 2013 Project Overview Project Team BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an project: 300+ people involved in project planning and
More informationSTUDY 7.0 FISH PASSAGE
STUDY 7.0 FISH PASSAGE STUDY 7.0 FISH PASSAGE... 7-1 1. GOALS AND OBJECTIVES OF STUDY... 7-1 2. RELEVANT RESOURCE MANAGEMENT GOALS... 7-2 3. BACKGROUND AND EXISTING INFORMATION... 7-2 4. PROJECT NEXUS...
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationAppendix B Stormwater Site Plan Submittal Requirements Checklist
Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following
More informationUPRR criteria for sizing waterway openings under bridges and through culverts are as follows:
UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed
More informationMonitoring Networks for Assessing Small Stream Hydropower Potential, Cosmos Hills, Alaska
Monitoring Networks for Assessing Small Stream Hydropower Potential, Cosmos Hills, Alaska Michael Lilly, Jeffrey Derry, Austin McHugh, Jeff Murray Geo-Watersheds Scientific David Brailey Brailey Hydrologic
More informationDraft Application for New License for Major Water Power Project Existing Dam
Draft Application for New License for Major Water Power Project Existing Dam Northfield Project Northfield Mountain Pumped Storage Project (FERC Project Number 2485) Turners Falls Hydroelectric Project
More informationSECTION III: WATERSHED TECHNICAL ANALYSIS
Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater
More informationEXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION
EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION TABLE OF CONTENTS PAGE LIST OF FIGURES... i 1.0 PLANT OPERATION AND RESOURCES UTILIZATION... 1 1.1 PLANT OPERATION... 1 1.1.1 Adverse Flow... 1 1.1.2
More information4. FISH PASSAGE CONCEPTS
Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group 4. FISH PASSAGE CONCEPTS Fish passage could be improved by rehabilitating the existing fish passage,
More informationChakachamna Hydro. AEA Geothermal Conference
Chakachamna Hydro AEA Geothermal Conference August 2007 Chakachamna Hydro 300+ MW hydro opportunity identified Preliminary FERC License application filed in May 2006 Initial scoping/informational meetings
More informationMore Creek Hydroelectric Project Prefeasibility Study
Alaska Hydro Corporation More Creek Hydroelectric Project March 2018 E6348 SIGMA ENGINEERING LTD 1444 Alberni Street, 4th Floor, Vancouver, BC, Canada V6G 2Z4 Phone: (604) 688-8271 Fax: (604) 688-1286
More informationPublic Meeting, November 3, /3/11
Public Meeting, November 3, 2011 1 Power Resources needs, direction, investigations Projects Selection Projects Engineering Environmental Baseline existing environment, anticipated impacts and PM&Es Licensing
More informationHydrologic Study Report for Single Lot Detention Basin Analysis
Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page
More information2 FINDING OF THE POTENTIAL SITES
EXECUTIVE SUMMARY 1 Background S-1 2 User of Manual S-1 3 Applicable Range of Micro-hydro power in the Indonesia S-2 4 How to use this Manual S-2 Chapter 1 INTRODUCTION 1-1 1.1 Purpose of the Manual
More informationSusitna-Watana Hydroelectric Project (FERC No ) Open Water HEC-RAS Flow Routing Model. Prepared for. Alaska Energy Authority.
Susitna-Watana Hydroelectric Project (FERC No. 14241) Open Water HEC-RAS Flow Routing Model Prepared for Alaska Energy Authority Prepared by R2 Resource Consultants, Inc. GW Scientific Brailey Hydrologic
More informationFINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.
EXECUTIVE SUMMARY FINDINGS: Based on the results of this feasibility study, the Platte Republican Diversion Project would be cost-effective. With minimal improvements to the channel, and the existing bridge
More informationHydrokinetic Project Development
Hydrokinetic Project Development Presented at the Alaska Rural Energy Conference, Fairbanks, AK April 29,2010 Monty Worthington, Director of Project Development Ocean Renewable Power Company Overview Developer
More informationMINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM
MINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM Instructions & Background Information (This page to be completed by Township personnel) The purpose of this form is to provide a means
More informationThe Power of Water. January 2010
The Power of Water January 2010 The Power of Water January 2010 Existing Hydroelectric Facility Locations with Hydroelectric Potential KEY FACTORS Elevation Drop Amount of Flow kwh Pricing Cost of Project
More informationAppendix I. Dworshak Operations
Appendix I Dworshak Operations I. Introduction The 2008 Biological Opinion requires annual progress reports that describe actions taken to implement certain reasonable and prudent actions (RPA) for the
More informationSnow, and Glacier Ice: Streamflow Drivers in the Susitna River Basin, Alaska
Rain, Snow, and Glacier Ice: Streamflow Drivers in the Susitna River Basin, Alaska and The Floods of September 2012 Janet Curran USGS Alaska Science Center In cooperation with Alaska Department of Transportation
More informationOutline. Regional Overview Mine Study Area. Transportation Corridor Study Area. Streamflow Low Flow Peak Flow Snow Small Pools.
Environmental Baseline Document Surface Water Hydrology Agency Meetings, January 31 to February 3, 2012 Anchorage, Alaska Jaime Cathcart, P.Eng., Ph.D. Outline 2 Regional Overview Mine Study Area Streamflow
More informationNew Hydro without a new Dam NWHA FEBRUARY 16, 2016
New Hydro without a new Dam NWHA FEBRUARY 16, 2016 Agenda Background Perceptions & Misconceptions about Hydro Legislative Environment Snohomish PUD s search for new Hydro resources Sunset Project Overview
More information3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationFeasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park
Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Prepared for: City of Bellingham Public Works Department Environmental Resource Division 210 Lottie St.
More informationAppendix D - Evaluation of Interim Solutions
Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner
More informationSusitna-Watana Hydroelectric Project (FERC No )
(FERC No. 14241) Analysis of Fish Harvest in and Downstream of the Area Study Plan Section 9.15 Initial Study Report Prepared for Prepared by R2 Resource Consultants, Inc. February 2014 Draft TABLE OF
More informationInterlake Tunnel Project
Interlake Tunnel Project February 26,2015 Updated 3/19/15 Presentation at the Heritage Ranch Rec Barn 1 Agenda Introductions Project description and background Feasibility and hydraulic modeling San Antonio
More informationTurbidity Changes During Culvert to Bridge Upgrades at Carmen Creek, Idaho
Turbidity Changes During Culvert to Bridge Upgrades at Carmen Creek, Idaho Randy B. Foltz 1, Breann Westfall 2, and Ben Kopyscianski 3 Abstract: Carmen Creek, a tributary to the Salmon River in Idaho,
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationClean Water SRF WATER RESOURCE RESTORATION Sponsored Projects. APPLICATION COMPLETENESS CHECKLIST September 2014
Clean Water SRF WATER RESOURCE RESTORATION Sponsored Projects APPLICATION COMPLETENESS CHECKLIST September 2014 Pre-application consultation held _January 15 th, 2015_ (date) Hard copy and CD containing
More informationA World of Solutions
Project Goals Engineering, Economics, & Environmental Principles Minimization of execution risks Construction industry s highest standards Cost savings vs. conventional methods Consistency with Master
More informationFERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO )
Brookfield Renewable Energy Group Focusing on Renewable Power Generation FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO. 14439) October 2012 HAWKS NEST PROJECT (FERC
More informationMemo. Matanuska Susitna Borough LRTP. Alaska Stand Alone Pipeline (ASAP) Project details still being researched
To: Denali National Park Long Range Transportation Plan Team From: ATKINS Email: Steve.Hoover@AtkinsGlobal.com Phone: 720-841-2956 Date: Sep 19, 2014 Ref: Subject: cc: Foreseeable Projects/Plans near Denali
More informationLow Impact Hydro Workshop Bend Oregon 23 September. 2010
Low Impact Hydro Workshop Bend Oregon 23 September. 2010 FRUITS FROM THE EFFORT Siphon Power Plant Fully owned by COID On line producing revenue since 1989 Funded through ODOE SELP Debt obligation paid
More information2. SCOPE OF WORK Evolution of Plan of Study Hydrology ALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT
2. SCOPE OF WORK 2.1. Evolution of Plan of Study The purpose of this feasibility study is to define all aspects of the Project in sufficient detail to support the State s decision process regarding project
More informationCalapooia River Fish Passage Analysis and Culvert Removal Proposal
Calapooia River Fish Passage Analysis and Culvert Removal Proposal Submitted to: Calapooia Watershed Council P.O. Box 844 Brownsville, OR 97327 Prepared by: Oregon State University Department of Biological
More informationOFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES
OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES April 28, 2016 Table of Contents 3.1 Introduction... 2 3.1.1 Purpose of Chapter 3... 2 3.1.2 Policy vs. Design
More informationConceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California
Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,
More informationBrannen Lake Storage Feasibility Potential Effects on Water Levels
Brannen Lake Storage Feasibility Potential Effects on Water Levels Brannen Lake Storage Feasibility Potential Effects on Water Levels Prepared for: BC Conservation Foundation #3, 1200 Princess Royal Avenue
More information9.11. Study of Fish Passage Feasibility at Watana Dam
9.11.1.1. Study 9.11. Study of Fish Passage Feasibility at Watana Dam 9.11.1. General Description of the Proposed Study The proposed Watana Dam would create a fish passage barrier on the Susitna River.
More informationState will answer most of FERC s questions by June; last items Aug. 1
State will answer most of FERC s questions by June; last items Aug. 1 By Larry Persily paper@alaskan.com April 13, 2018 The Alaska Gasline Development Corp. (AGDC) advised federal regulators on April 6
More informationDawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228
Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationOVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT
OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 COLUMBIA RIVER BASIN 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59
More informationFlow-ecology relationships. Flow-ecology relationships Susitna case study
Flow-ecology relationships Flow-ecology relationships Susitna case study Flow regime Ecologically-Relevant Flow Regime Characteristics Seasonal or typical conditions Annual extreme conditions High and
More informationThe Instream Flow Incremental Methodology
The Instream Flow Incremental Methodology Introduction to IFIM Scientific support for complex management decisions involving water use and impacts to aquatic systems requires a better understanding of
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment
More informationPEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION
US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK
More informationProspect No. 3 Hydroelectric Project FERC Project No. P-2337 Initial Study Report: Ramping May 2015
Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Initial Study Report: Ramping May 2015 Prepared by: PacifiCorp Hydro Resources 925 South Grape Street Medford, OR 97501 For Public Review TABLE
More informationSHORELINE INVENTORY AND RESTORATION PLANNING
CHAPTER 3 SHORELINE INVENTORY AND RESTORATION PLANNING A. PURPOSE OF THE SHORELINE INVENTORY AND CHARACTERIZATION A first step in the comprehensive Master Program update process is development of a shoreline
More informationMEMORANDUM. The general findings of the assessment are as follows:
November 28, 2006 MEMORANDUM Project No.: 030009-002-01 To: From: Re: WRIA 31 Planning Unit Steve Germiat, LHG, CGWP, and Timothy J. Flynn, LHG, CWGP Evaluation of Winterizing Existing River Pump/Conveyance
More informationTypes of Hydropower Facilities
Types of Hydropower Facilities 1 Impoundment Hydropower- uses a dam to store water. Water may be released either to meet changing electricity needs or to maintain a constant water level. 2 Run-of-River
More informationDrainage Report. New Braunfels Municipal Airport. Master Plan Update 2005
Drainage Report Master Plan Update 2005 General The Texas Department of Transportation (TxDOT), Aviation Division, retained the consulting engineering team of Parkhill, Smith & Cooper, Inc. (PSC), to prepare
More informationSusitna-Watana Hydroelectric Project (FERC No ) River Recreation Flow and Access Study Study Plan Section 12.7
(FERC No. 14241) River Recreation Flow and Access Study Study Plan Section 12.7 Initial Study Report Part C: Executive Summary and Section 7 Prepared for Prepared by ERM June 2014 TABLE OF CONTENTS Executive
More informationPRELIMINARY DRAINAGE STUDY
PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,
More informationENGINEERING REPORT. Blair Lane to Blairmont Drive Drainage Improvements. PREPARED FOR: City of Lebanon Engineering Department
engineers planners surveyors environmental scientists landscape architects ENGINEERING REPORT Blair Lane to Blairmont Drive Drainage Improvements PREPARED FOR: City of Lebanon Engineering Department PREPARED
More informationMr. Rob Matthews Manager, Water Use Licensing Manitoba Conservation and Water Stewardship Box Saulteaux Crescent Winnipeg MANITOBA R3J 3W3
360 Portage Ave (16) Winnipeg Manitoba Canada R3C 0G8 Telephone / N o de téléphone : 204-360-3018 Fax / N o de télécopieur : 204-360-6136 wpenner@hydro.mb.ca 2014 10 30 Mr. Rob Matthews Manager, Water
More information31. SURFACE WATER HYDROLOGY
Surface Water Hydrology Cook Inlet Drainages 31. SURFACE WATER HYDROLOGY 31.1 Introduction Chapter 31 of the environmental baseline document presents the findings of the baseline surface water hydrology
More informationWhat is Run-of-river hydro?
The Project: The Corporation of the Village of Slocan submitted a waterpower project application on Springer Creek in May 2010 Engineering & Environmental studies were performed on the project site to
More informationHydrologic Calibration:
Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions
More informationEagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing
Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing Palm Desert, California Submitted to: Federal Energy Regulatory Commission Submitted by: Eagle Crest
More informationCalifornia Department of Toxic Substances Control
Prepared for: California Department of Toxic Substances Control Prepared by: March, 2017 Note: URS Corporation Americas (URS) is under contract with the California Department of Toxic Substances Control.
More informationSt. Marys River Little Rapids Ecosystem Restoration. July 31, th Annual Conference on Ecosystem Restoration July 29 August 2, 2013
St. Marys River Little Rapids Ecosystem Restoration July 31, 2013 5 th Annual Conference on Ecosystem Restoration July 29 August 2, 2013 The Spirit of Cooperation Bi-National Public Advisory Council For
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction
More informationPrepared by: PacifiCorp 825 NE Multnomah Street Portland, OR 97232
Wallowa Falls Hydroelectric Project (FERC No. P-308) Grande Ronde River Basin Wallowa County, Oregon June 2, 2017 Prepared by: PacifiCorp 825 NE Multnomah Street Portland, OR 97232 Table of Contents 1.0
More informationE. STORMWATER MANAGEMENT
E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson
More informationNANEUM, WILSON, AND CHERRY CREEK WATERSHED ASSESSMENT
NANEUM, WILSON, AND CHERRY CREEK WATERSHED ASSESSMENT Presentation for Voluntary Stewardship Program November 9, 2016 Watershed Assessment This Watershed Assessment is intended to develop a partnership
More informationHenderson Watershed WRIA 13. Chapter Includes: Tanglewilde Stormwater Outfall Woodard Creek Woodland Creek
Henderson Watershed WRIA 13 Chapter Includes: Tanglewilde Stormwater Outfall Woodard Creek Woodland Creek 146 Tanglewilde Stormwater Outfall PART OF HENDERSON WATERSHED PRIMARY LAND USES: Urban residential
More informationPARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012
PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello
More informationFreight Street Development Strategy
Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed
More informationAlaska Sustainable Salmon Fund Statement of Work
Alaska Sustainable Salmon Fund Statement of Work I. Project Title: Instream Flow Protection: Southeast Phase 13 II. Project Number: III. Principal Investigator Jarrod Sowa, Habitat Biologist III Statewide
More informationHYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT
Relicensing Study 3.2.2 HYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT Initial Study Report Summary Northfield Mountain Pumped Storage Project (No. 2485) and Turners Falls Hydroelectric
More informationHydropower and Fish. Considerations & Case Studies for Sustainable Development. Megan Marie Habitat Biologist ADF&G Division of Habitat Anchorage, AK
Hydropower and Fish Considerations & Case Studies for Sustainable Development USSD Cold Climate Workshop September 20, 2017 Girdwood, AK Photo by CVEA Megan Marie Habitat Biologist ADF&G Division of Habitat
More informationIf any questions arise concerning this application, please contact us.
Cherokee Rivers Company, LLC 390 Timber Laurel Lane Lawrenceville, GA 30043 Office of the Secretary Federal Energy Regulatory Commission Mail Code: DHAC, PJ-12 888 First Street, N.E. Washington, D.C. 20426
More informationKenai Hydro, LLC 2525 C Street, Suite 500 Anchorage, AK 99503
June 30, 2008 Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 for - Ptarmigan Lake / Creek Project (FERC No. 13210-000) Dear Secretary
More informationCOTTON CREEK CULVERT REPLACMENT
COTTON CREEK CULVERT REPLACMENT Integrating Mobility with Environmental Innovation Located along a scenic section of Highway 3/95 in British Columbia, Moyie Bluffs, a 6.5 km stretch of inland highway had
More informationProject: Developer/Designer: Reviewer:
City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;
More information5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview
WinTR-55 for Plan Reviews Small Watershed Hydrology Overview 1 Overview Course Outline Historical Background Program Description Model Capabilities and Limitations This is the Overview portion of the training.
More informationApplication for a Dam Permit Ash Basin No. 1
Application for a Dam Permit Ash Basin No. 1 for the Sunbury Generating Station Shamokin Dam, Pennsylvania submitted to Commonwealth of Pennsylvania Department of Environmental Protection Bureau of Waterways
More informationIntroduction, HYDROGRAPHS
HYDROGRAPHS Sequence of lecture Introduction Types of Hydrograph Components of Hydrograph Effective Rainfall Basin Lag or Time Lag Parts of Hydrograph Hydrograph Analysis Factors Affecting Hydrograph Shape
More informationJacobi, Toombs, and Lanz, Inc.
Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations
More informationLDS Technical Guidance
May 21, 2008 The following was provided to County staff as internal guidance for reviewers in applying the adequate outfall requirements of the Public Facilities Manual (PFM). A number of private sector
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationChapter 3 Stream Discharge
Chapter 3 Stream Discharge - Introductory Level Volunteer Water Quality Monitoring Training Notebook - What is Discharge (Flow)? Discharge, also called flow, is the amount of water that flows past a given
More informationPackwood Lake Hydroelectric Project Meeting July 19, 2007 Lacey, Washington USFWS Office. Meeting Summary 1. US Forest Service (by conference line)
Packwood Lake Hydroelectric Project Meeting July 19, 2007 Lacey, Washington USFWS Office Meeting Summary 1 ATTENDANCE Name Laura Schinnell Dan Ross Bill Kiel Bernice Kasko Robert Nielson John Blum Cory
More informationReport. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationForest Practices and the Hummingbird Creek Debris Flow
Forest Practices and the Hummingbird Creek Debris Flow Complaint Investigation 990189 FPB/IRC/50 August 2001 Table of Contents The Investigation...1 Background...1 Relevant Legislation...3 Discussion...3
More informationIntroduction to Storm Sewer Design
A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream
More informationTABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...
TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5
More information