1 FULL PAPER FP_A.5_CLP_CCGT Upgrade Major 9FA Combined Cycle Upgrade Works at Black Point Power Station for Improved Efficiency and Lower Emissions David Yip, Senior Project Manager, Generation Business Group, CLP Power Hong Kong Limited (Telephone: , ABSTRACT Black Point Power Station is one of the largest combined cycle gas turbine (CCGT) power stations in the world consisting of 8 units of 9FA single-shaft generating units with a total capacity of 2500MW. To further improve thermal efficiency and reduce nitrogen oxides (NO x ) emission from the CCGT, a Gas Turbine Upgrade Project was put forward commencing in Besides these performance improvements, the Project could also reduce maintenance costs and contribute to the reliability of the units in the longer term. This Paper is written to describe changes to the thermodynamic cycle and the new design features that account for the upgrade performance in efficiency, NO x emission and generating output outline the approach and process to define the scope of works and boundary conditions based on the examination of physical parameters, operating conditions and cycle performance parameters present a summary of the execution pathway of the Project and the initial performance results [Key Word] Combined cycle gas turbine, gas turbine, compressor, efficiency, NO x Emission, thermodynamic cycle, combustion system 1. INTRODUCTION Black Point Power Station (BPPS) is one of the largest combined cycle gas turbine (CCGT) power stations in the world consisting of 8 units of 9FA single-shaft generating units with a total capacity of 2500MW. To further improve thermal efficiency and reduce nitrogen oxides (NO x ) emission from the CCGT, a Gas Turbine Upgrade Project was put forward commencing in The major scope of works in the Project includes the complete replacement of the gas turbine and compressor, hot gas path components, combustion system, etc., and the associated modifications to other plants including the heat recovery steam generator (HRSG) and generator transformer in the same singleshaft configuration that are necessary to cope with the changes in operating conditions from the gas turbine. 2. PROJECT DESCRIPTIONS 2.1 DESIGN CHANGES TO THE THERMAL CYCLE Configuration at Black Point Power Station (BPPS) Each of the combined cycle units (CCGT) at BPPS is an identical configuration, where the Frame 9FA gas turbine and the two-cylinder steam turbine drive one single generator, in a single-shaft line arrangement. The HRSG is located at the axial exhaust of the gas turbine, in a vertical arrangement, i.e. flue gas flows in a vertical direction through the HRSG, perpendicular to the arrangement of most of the pressure piping in the HRSG. Page 1

2 Figure Descriptions of the Steam Cycle in the BPPS CCGT Arrangement The gas turbine inlet duct connects the air filters located on the turbine hall roof to the compressor inlet plenum and incorporates a silencer. The generating shaft line is supported on an elevated reinforced concrete foundation. The shaft line auxiliaries are located either in the turbine hall (below the generating shaft line) or in the mechanical annex alongside the unit. The gas turbine shaft line comprises the following major equipment:- Air inlet Inlet guide vanes Compressor (rotor and casing) Combustor Turbine (rotor and casing) Exhaust frame Exhaust diffuser Load coupling Bearings journal and thrust Support frame Instrumentation On-base pipe-works The Unit electrical and control equipment is located in an electrical annex within the turbine hall alongside the generator. Page 2

3 The physical space and footprint below the HRSG are fully utilized to accommodate the feed-water pumps, chemical dosing, and sampling equipment and the condensate polishing plant Thermal Cycle Descriptions The gas turbine operates in a thermal cycle that could be categorized by the Brayton cycle of which the ideal cycle could be described in typical P-V & T-S diagrams. Efficiency η brayton = Ideal Brayton Cycle (thermal) efficiency Rp = pressure ratio = k = specific heat ratio and Maximum Work NET when Rp where Tmax (i.e. T 3 limited by metallurgy) and Tmin (i.e. T 1 set by air temperature at inlet) Figure Description of Ideal Brayton Cycle for the Gas Turbine To produce higher cycle efficiency and generation output from the gas turbine, increasing the compressor compression ratio and the turbine firing temperature are the typical approaches adopted which are obvious from the Brayton cycle. But due to thermal fixation process, a higher turbine firing temperature would favor the formation of nitrogen oxides (NOx) which is the key control emission parameter from gas turbine of today. Therefore the selection of the new combustion system that would provide a higher turbine temperature will have to strike a delicate balance between output, efficiency, combustion dynamics, carbon monoxide, and NOx emission. Finally a new type of dry low-nox combustion system is adopted which is designed to offer the dual benefits of higher turbine firing temperature and lower NOx emission. The extended use of pre-mix fuel combustion was an important design and operation principle of the new dry-nox combustion system which would reduce the overall formation of NOx. Page 3

4 2.2 ENGINEERNIG Holistic Engineering Approach An overall holistic engineering approach was taken and is depicted in Figure for illustration. This comprises the following elements and objectives. a) Thermal loading to the HRSG and Steam Turbine should be within the original design margin of the installed equipment as modifications to these existing equipment could make the project more costly and not commercial viable, and impose additional project execution risks b) The above approach also applied to electrical loading on other equipment, including the Generator and the Generator Transformer. c) Capacity assessments were to be carried out on all the equipment to make sure that there is no bottom-neck and cost of modifications, if any, were factored in the overall cost-benefit evaluation of the Project d) All new equipment and modifications had to be fitted into the existing footprint of the CCGT, and constructability review was to be carried out together with engineering e) Potential exchangeability of new equipment for use in other CCGT units in the same BPPS was required to be evaluated. Figure Overall Holistic Engineering Approach Front-end Engineering Gas Turbine Engineering Gas turbine unit rotor, compressor discharge casing and turbine casing will be engineered by the gas turbine supplier. The existing compressor will be redesigned for robustness, increased pressure ratio and improved surge margin. The new compressor rotor upgrade involves an incremental increase in rotor wheel diameters in the heavy pressure stages with a corresponding decrease in the length of the rotor blades and the stator vanes on these stages. The turbine rotor will be of a new design that has the special cooling slot design on the wheels. Gas Turbine Auxiliary Systems Engineering The major change involves the conversion of the existing dry low-nox combustion system to a new type combustion system. The new dry low-nox combustion system will provide improved combustor operability, reduced emissions levels, extended turndown capability and extended interval hardware. This new dry low-nox system has more number of nozzles that improve flame stability and involve changes in mode transition. Generator and Generator Auxiliary Systems Engineering Page 4

5 The equipment supplier has conducted a review on the engineering and design changes required on the generator and generator auxiliary systems. As the original generator capacity is adequate to cover the increase in unit output after the gas turbine upgrade, no change is required for the generator and generator auxiliary systems. HRSG Engineering The equipment supplier was engaged to identify necessary enhancement required on the HRSG to cope with the increase in exhaust energy from the gas turbine exhaust. The following areas/issues were reviewed by the equipment supplier: Flow induced tube vibration Attemperator Flow accelerated corrosion Inlet duct casing HRSG casing Expansion joint Pressure parts Sling system Steam Turbine Engineering The equipment supplier was engaged to identify necessary enhancement required on the steam turbines and associated equipment to cope with the increase in steam flow. The following equipment were reviewed by the equipment supplier to identify design modifications: High Pressure (HP) steam chests HP turbine pipework HP valve actuators HP rotor HP inner and outer cylinders HP inlet and cylinder bolting HP blading HP diaphragms Low Pressure (LP) rotor HP-LP crossover pipework LP cylinder LP cylinder bolting LP blading LP diaphragms LP steam supply HP & LP bypass systems LP spray cooling system Gland steam system Turbine drains Control fluid system Lube oil system Balance of Plant Engineering The equipment supplier was engaged to identify necessary enhancement required on the BOP equipment to cope with the increase in system demand. The following equipment were reviewed by the equipment supplier to identify design modifications: Condenser Condensate extraction pump HP boiler feed pump LP boiler feed pump Main cooling water pump Condensate line to deaerator Deaerator and feed water tank Main control valves Page 5

6 Electrical System Engineering The equipment supplier was engaged to identify necessary enhancement on the Load Commutated Inverter (LCI) equipment to cope with the Project. As a result of the higher LCI torque required after the upgrade, the maximum current rating of the LCI needs to be increased. The existing AC reactor and heat exchanger will be replaced. Engineering review and design changes required on the 415V system to cope with increase in electrical loading of the equipment after the Project were carried out. The Generator supplier was engaged to identify necessary enhancement required on the generator transformer cooling system to cope with the increase in unit output. Civil Engineering The potential civil work includes: Furnish and construct fuel gas module support structure. Modify gas turbine pedestals, if necessary. Flash and weatherproof penetrations (pipe, structural steel, equipment, duct, and other miscellaneous) in Turbine Hall, if any. Control Philosophy All systems shall be designed such that no single failure of any control component will cause a trip of the unit. All transmitters and plant sensors which could directly leading to tripping of a unit shall be triplicated and their signals shall be used in a 2 out of 3 voting logic. 2.3 SCOPE DEFINITION AND DESIGN BASIS By adopting this holistic engineering approach, the following definition of scope of work was defined at the closure of front-end engineering as the design basis:- i. Replace the existing compressor rotor with a new more robust design with a slight increase in compression ratio ii. Complete the upgrade of all hot-gas path components (i.e. stationary and rotating blades, etc) to the new and robust design iii. Replace the existing dry low-nox combustion system to a new design that promote pre-mix combustion and enable a higher firing temperature iv. Complete the full replacement of fuel gas control system v. Complete necessary upgrade of all GT auxiliary systems (more than 10 systems are required to be upgraded or modified) vi. Complete necessary upgrade of the Load Commutated Inverter (part of the excitation system) vii. Complete some flow measuring and control devices in the fuel quality management system viii. Complete some modifications of steam turbine (mostly on low-pressure steam turbine cylinder) ix. Complete some minor modifications on the HRSG (mostly some flow control devices) x. Complete some modifications of the Generator Transformer (mostly on the cooling system and control) Also as part of the design basis, the upgrade unit should be able to run on gas fuels with a wider range of composition (and Modified Wobbe Index) without the need of hardware changes. The following table is a typical requirement of potential variability of gas fuels. Table 2.3 Typical Requirement of Potential Variability of Gas Fuels Potential Gas Fuel Gas Fuel 1 Gas Fuel 2 Composition Methane mol% ~85 ~93 Carbon Dioxide mol% ~10 ~2 Nitrogen mol% ~1 ~1 Air mol% 0 0 Total Page 6

7 LHV (60 o F, 1 atm.) Btu/scf MWI at 55 o C Btu/scf.R 1/ MWI at 120 o C Btu/scf.R 1/ BOUNDARY LIMITS AND CONDITIONS The Front-end Engineering had identified all the boundary limits and conditions for the Project. In particular to boundary limits, the techniques of 3-D laser scanning and modeling were used extensively. This technique had provided numerous inputs for physical dimensional analysis and general arrangement design of various systems. As a specific application of this technique, physical clash and interference of new equipment with the existing equipment had been effectively avoided. 3-D design model with laser scanning input Existing equipment 3-D design iterative modeling Laser scan of existing equipment to avoid interference for permanent use Constructability review to devise installation sequence and fine-tune final assembly part design Figure 2.4 Application of 3-D Modeling, Laser Scanning and Constructability Review to avoid interference both during installation and for permanent use 2.5 FINAL DETAILED DESIGN AND ENGINEERING To meet the stringent reliability requirement of CLP, some rigorous studies were also carried out as part of the final detailed design and engineering. These include the following studies:- - Tuning of the Power System Stabilizer (PSS) of the upgrade CCGT unit - Final bearing stress analysis based on the definitive design of the new gas turbine - Structural and bearing capacity analysis of all new and modified plant and equipment The PSS is a supplementary control that acts through the Automatic Voltage Regulator (AVR) of the excitation system, and provides positive damping to generator rotor angle swings. These swings are in a broad range of frequencies in a power system. Single-shaft CCGT such as the BPPS units have low frequency torsional modes, which would more likely to interact with the PSS. This interaction was therefore required to be assessed to determine whether there exists the need for torsional filters in the PSS to mitigate the level of interaction to acceptable levels. 3. PROJECT EXECUTION Page 7

8 3.1 ENGINEERING MANAGEMENT Site engineering reports were used to provide feedback from the Project Team to the respective Contractor of engineering problems, suggested improvements, defects and omissions which are found during construction and commissioning. The formal reports were issued by CLP and the Contractor would have to reply by a formal response within a short period. These report will cover though not necessarily be limited to the following types of problems: Interfaces Incompatibility of Equipment and civil works Inappropriate Equipment supplied for a required duty Omissions and shortfalls in the design and extent of supply Inadequacies in shipping, packing and protection Equipment failing to fulfill design requirements Equipment failing during construction or commissioning tests Where CLP wishes to make modifications to the Equipment as supplied which require comment from the Contractor or which need to be incorporated in the Contractor s drawings. 3.2 DOCUMENT MANAGEMENT A specific document and drawing management software system was used to manage all the technical submissions and correspondences between the Project Team, the equipment suppliers and contractors. This software system served as a hub with security features to control the incoming and outgoing information, tracked changes and version control of documents, and as a central database. 3.3 MATERIAL MANAGEMENT Discrepancy reports were used to notify the Contractor of items were damaged in transit or short shipped. Following receipting a discrepancy report, the Contractor shall supply replacement parts or make good the omission as soon as possible. 3.4 CONSRUCTION PLANNING AND EXECUTION All the Contractors were required to submit their site execution programme. The programme had to indicate the erection and commissioning logic and duration of all activities and had to be coordinated with the delivery programme and the design submission programme. The site execution programme was required to be expanded to a level of details that could reasonably be used by CLP to control the relevant activities on Site. CLP developed an overall Project s schedule that integrated all Contractor s site execution programmes altogether. Technical Advisors are personnel and specialists supplied by the Contractor to support the execution of the Project on Site, including but not limited to equipment transportation, equipment preservation, engineering, materials coordination, quality management, installation, cold commissioning, hot commissioning, tuning, testing, start-up and tests on completion. In this Project, technical advisors were required to ensure Technical Compliance during the execution of work on Site, including provision of services in areas including site handling, quality assurance, quality compliance during installation, cold commissioning, hot commissioning start-up, tuning and testing work. In addition, Technical Advisors shall prepare, validate and counter-sign completion statements during installation, and prior to cold and hot commissioning. CLP also required the contractor to make the Technical Advisors available promptly at CLP s request. Technical Advisors with valid work permits shall be nominated a few months prior to the start of mobilization for confirmation by CLP. Page 8

9 Figure A Bird-eye View of the Site Showing Ongoing Major Construction Activities Aerial view showing gas turbine systems installation Internal view showing the installation of new combustion system Installation of spaghetti-like pipe-work / piping serving each of the dual-fuel combustor Modification works on the Fuel Gas Supply Page 9

10 Associated works on the Steam Turbine Associated works on the Generator Transformer Figure Photos Showing Other Construction Activities 3.5 COMMISSIONING PLANNING AND EXECUTION A clear stage-by-stage commissioning programme covering construction completion, cold commissioning, hot commissioning until handover of the facilities custodianship from project execution to operations was developed. Check-sheets, transfer of project document custodianship, and facility walk-down were typically used to signify the completion of different stages of commissioning. Figure depicts the overall process of this stage-by-stage commissioning programme. Figure Overall Stage-by-Stage Commissioning Programme Also a clear division of responsibility was agreed between CLP and Contractors through the respective contracts. Page 10

11 Table Example of Division of Responsibility between CLP and Contractors Contractor Activity / Responsibility (Examples only) 1. Mechanical Acceptance Package Provide CLP with the Turnover Certification Package for each system 2. Tie-Ins at Battery Limits (Interface Points) Provide complete tie-in list, including the location and method of each tie-in. Provide a method statement for each tie-in point. Coordinate schedule of tie-in work with CLP 3.6 TRAINING PRIOR TO OPERATION CLP Activity (Examples only) Review issue comments back to the Contractor and distribute to other parties. Review / Verify / Approve / Coordinate Approve Coordinate The equipment suppliers were required to make available training services for CLP s staff for any item of Equipment supplied under the Contract, prior to commencement of operation. A training needs analysis was carried out to match the overall operation and maintenance (O&M) needs as well as the competency requirement of individual O&M personnel. Venue of classroom and simulator training sessions were arranged local in Hong Kong to facilitate involvement and participation of O&M personnel. More than 200 training man-days were recorded prior to O&M personnel took over the facilities. 4. RESULTS AND DISCUSSIONS The first CCGT generating unit upgrade was completed in early 2016, in a safety manner and ahead of schedule. More about 250,000 man-hours were recorded for the first unit upgrade from project inception to close-out without a lost-time injury, medical case or environmental incident. The post-upgrade machine performance was satisfactory with test results generally better than the plan. For example, the emission levels of NO x were consistently maintained to below 15 ppm (parts per million) with an extended turndown ratio, hence allows a wider operability range for the upgraded CCGT unit to suit system demand. Moreover, a higher level of adaptability to gas fuel with different Modified Wobbe Index (MWI) has also been successfully tested, without any need for hardware and software changes. Project Performance and Benefits Realization Turndown Safety 150% 140% 130% 120% 110% 100% 90% 80% 70% 60% 50% Schedule Plan Actual NOx Emission Efficiency Output Notes: Due to commercially sensitive information, only indicative figures on a comparative basis were shown. Figures > 100% depict actual results better than planned (i.e. 100%). Figure 4 Overview of the Project Performance and Benefits Realization Page 11

12 5. CONCLUSIONS The Project has been successfully implemented in one of the CCGT generating unit in the Black Point Power Station in a safe manner, slightly ahead of original schedule and with good machine performance results after upgrade. Hence upgrading existing CCGT generating units provides a feasible and sustainable way to uprate thermal and emission performance of the entire combined cycle fleet. REFERENCE Nil Page 12

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 CO-GENERTATION POWER PLANT CONCEPT For dimensioning, design

More information

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+,

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+, Power Plant Overview Training Module ALSTOM (Switzerland) Ltd )*+, We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without

More information

Course 0101 Combined Cycle Power Plant Fundamentals

Course 0101 Combined Cycle Power Plant Fundamentals Course 0101 Combined Cycle Power Plant Fundamentals Fossil Training 0101 CC Power Plant Fundamentals All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any

More information

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013 Hitachi H-25 & H-80 Gas Turbine Bucharest, Apr.23, 2013 Doc No. : GKKP-13-009 Rev.0 Hitachi, Ltd. 2013. All rights reserved. 1 Table of Contents Hitachi Gas Turbine Business H-25 Performance and Applications

More information

2. TECHNICAL DESCRIPTION OF THE PROJECT

2. TECHNICAL DESCRIPTION OF THE PROJECT 2. TECHNICAL DESCRIPTION OF THE PROJECT 2.1. What is a Combined Cycle Gas Turbine (CCGT) Plant? A CCGT power plant uses a cycle configuration of gas turbines, heat recovery steam generators (HRSGs) and

More information

High Bridge Combined Cycle Plant

High Bridge Combined Cycle Plant High Bridge Combined Cycle Plant Location: Down town St. Paul, on the Mississippi River Plant Description: High Bridge is a combined cycle generating facility. A combined cycle plant produces electricity

More information

Matching of a Gas Turbine and an Upgraded Supercritical Steam Turbine in Off-Design Operation

Matching of a Gas Turbine and an Upgraded Supercritical Steam Turbine in Off-Design Operation Open Access Journal Journal of Power Technologies 95 (1) (2015) 90 96 journal homepage:papers.itc.pw.edu.pl Matching of a Gas Turbine and an Upgraded Supercritical Steam Turbine in Off-Design Operation

More information

GAS-FIRED COMBINED-CYCLE POWER PLANTS HOW DO THEY WORK? A company of

GAS-FIRED COMBINED-CYCLE POWER PLANTS HOW DO THEY WORK? A company of GAS-FIRED COMBINED-CYCLE POWER PLANTS HOW DO THEY WORK? A company of Cover picture: Gas turbine compressor with combustion chamber CONTENTS At a glance.................................................

More information

Unit No.4-1 Higashi Niigata Thermal Power Station Operating Status O C Class Gas Turbine Operation -

Unit No.4-1 Higashi Niigata Thermal Power Station Operating Status O C Class Gas Turbine Operation - 101 Unit No.4-1 Higashi Niigata Thermal Power Station Operating Status - 1450 O C Class Gas Turbine Operation - Yoshiaki Tsukuda *1 Eiji Akita *1 Yoichi Iwasaki *1 Koichiro Yanou *1 Yutaka Kawata *2 Toshihide

More information

Appendix B. Glossary of Steam Turbine Terms

Appendix B. Glossary of Steam Turbine Terms Operator s Guide to General Purpose Steam Turbines: An Overview of Operating Principles, Construction, Best Practices, and Troubleshooting. Robert X. Perez and David W. Lawhon. 2016 Scrivener Publishing

More information

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

The H-25/H-15 Gas Turbine A Product of Hitachi Quality DMLieferant www.dmliefer.ru The H-25/H-15 Gas Turbine A Product of Hitachi Quality The H-25 s fuel savings will repay your investment within a few years while allowing you a range of fuels from distillate

More information

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING COURSE COURSE 134 1 - Level 3 - Equipment & System Principles 4 - TURBINE, GENERATOR & AUXILIARIES Index 134.00-0 Objectives

More information

Contents. Part I Design: Theory and Practice 1

Contents. Part I Design: Theory and Practice 1 Contents Preface to the Fourth Edition Preface to the Third Edition Preface to the Second Edition Preface to the First Edition Foreword to the First Edition About the Author xix xxiii xxvii xxix xxxi xxxiii

More information

CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS

CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS Training Title CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS Training Duration 5 days Training Dates & Venue Centrifugal Compressors Maintenance & Failure Analysis 5 14 18 Apr $3,750 Riyadh, KSA

More information

Fuji Electric s Medium-capacity Steam Turbines FET Series

Fuji Electric s Medium-capacity Steam Turbines FET Series Fuji Electric s Medium-capacity Steam Turbines FET Series Koya Yoshie Michio Abe Hiroyuki Kojima 1. Introduction Recently, de-regulation of the electric power industry and rising needs for advanced solutions

More information

POWER-GEN MIDDLE EAST DOHA, QATAR FEBRUARY 4th -6th 2013

POWER-GEN MIDDLE EAST DOHA, QATAR FEBRUARY 4th -6th 2013 POWER-GEN MIDDLE EAST DOHA, QATAR FEBRUARY 4th -6th 2013 Siemens Expands Footprint in the Middle East with SGT6-5000F Power Plant Solutions and New Gas Turbine Manufacturing Facility Adam Foust Siemens

More information

Pre-owned 240 MW Combined Cycle Gas Turbine Power Plant

Pre-owned 240 MW Combined Cycle Gas Turbine Power Plant P.O.Box 130571 20105 Hamburg/Germany For Sale: Ref.-No: Tel. +49 40 33441944 Fax +49 40 33441945 Pre-owned 240 MW www.lohrmann.com info@lohrmann.com Combined Cycle Gas Turbine Power Plant GT-CC-045 (short)

More information

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

The H-25/H-15 Gas Turbine A Product of Hitachi Quality GKKP-08-012 Rev.0 The H-25/H-15 Gas Turbine A Product of Hitachi Quality The H-25 s fuel savings will repay your investment within a few years while allowing you a range of fuels from distillate to natural

More information

Combined Heat and Power

Combined Heat and Power Lecture 12 Combined Heat and Power Combustion Turbines and Co-generation Combustion Turbines and Combined Heat and Power (CHP) Systems See B. K. Hodge, Chapter 5 and Chapter 11. ISBN: 978-0-470-14250-9

More information

Turbine Island. Nhan Huynh Project Manager, Turbine and its auxiliary systems

Turbine Island. Nhan Huynh Project Manager, Turbine and its auxiliary systems Turbine Island Nhan Huynh Project Manager, Turbine and its auxiliary systems 1 Content 1 Fennovoima in brief 2 Project development roadmap 3 Main sub-suppliers 4 Scope of supply 5 Turbine and auxiliaries

More information

Preface to the First Edition Preface to the Second Edition. Acknowledgment

Preface to the First Edition Preface to the Second Edition. Acknowledgment Dedication Preface to the First Edition Preface to the Second Edition Forewords Acknowledgment iii xiii xv xvii xix Chapter 1 Introduction to Pipeline Systems 1 1.1 Introduction 1 1.2 Liquid Pipelines

More information

Development and performance analysis of a hybrid solar gas turbine. Lars-Uno Axelsson and Darsini Kathirgamanathan, OPRA Turbines, the Netherlands

Development and performance analysis of a hybrid solar gas turbine. Lars-Uno Axelsson and Darsini Kathirgamanathan, OPRA Turbines, the Netherlands Development and performance analysis of a hybrid solar gas turbine Lars-Uno Axelsson and Darsini Kathirgamanathan, OPRA Turbines, the Netherlands With the increased amount of non-controllable renewables

More information

Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits

Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits POWER-GEN Asia 2011 Kuala-Lumpur, Malaysia September 27-29, 2011 Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits Leonid Moroz, Kirill Grebennik 15 New England Executive Park,

More information

Field Technology Services

Field Technology Services All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document

More information

Recent Technologies for Steam Turbines

Recent Technologies for Steam Turbines Recent Technologies for Steam Turbines Kenji Nakamura Takahiro Tabei Tetsu Takano A B S T R A C T In response to global environmental issues, higher efficiency and improved operational reliability are

More information

MEC-MOS-E-2004 Gas Turbine Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

MEC-MOS-E-2004 Gas Turbine Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 100771-MEC-MOS-E-2004 Gas Turbine Maintenance Engineer Holds a B. Sc. and M. Sc. in Mechanical Power Engineering. Has about 11 years hands-on experience in power plant projects including installation for

More information

Understand boiler performance characteristics. Use these suggestions when buying, designing or optimizing steam generators

Understand boiler performance characteristics. Use these suggestions when buying, designing or optimizing steam generators Understand boiler performance characteristics Use these suggestions when buying, designing or optimizing steam generators V Ganapathy, ABCO Industries, Abilene, An understanding of the major differences

More information

Turbine Replacement by electric drive train

Turbine Replacement by electric drive train Turbine Replacement by electric drive train Discover a solution that electrifies your business with rapid success Abstract Stricter emission regulations, higher process availability, improved fuel utilization

More information

Introduction to the mechanical design of aircraft engines

Introduction to the mechanical design of aircraft engines Introduction to the mechanical design of aircraft engines Reference : AERO0015-1 - MECHANICAL DESIGN OF TURBOMACHINERY - 5 ECTS - J.-C. GOLINVAL 2 Principles of jet propulsion Comparison between the working

More information

Large Frame Gas Turbines, The Leading Technology of Power Generation Industries

Large Frame Gas Turbines, The Leading Technology of Power Generation Industries Large Frame Gas Turbines, The Leading Technology of Power Generation Industries YASUSHI FUKUIZUMI*1 AKIMASA MUYAMA*2 SHIGEHIRO SHIOZAKI*1 SUMIU UCHIDA*3 In developing large-capacity turbines for use in

More information

Thermodynamic Analysis on Gas Turbine Unit

Thermodynamic Analysis on Gas Turbine Unit Gas Turbine Exhaust Super Heater Economiser HRB Exhaust IJIRST International Journal for Innovative Research in Science & Technology Volume 2 Issue 02 July 2015 ISSN (online): 2349-6010 Thermodynamic Analysis

More information

UC Davis - Facilities O&M Cogeneration Plant Bid Package October, 2007

UC Davis - Facilities O&M Cogeneration Plant Bid Package October, 2007 UC Davis - Facilities O&M Cogeneration Plant Bid Package October, 2007 I. Cogeneration Plant Overview The University has owned and operated a cogeneration system since 1981, though nearly all of the original

More information

The Prescriptive Promise

The Prescriptive Promise Next Generation Asset Management Turning industrial trends and patterns from noise into action Industrial Data What Is It? 1 Definition 2 Example data sources Time series Sensor devices High velocity Temperature

More information

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW.

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW. Steam Turbines Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW Power Generation A comprehensive product line with proven experience Proven modular

More information

PEMP RMD & Cycle Performance. M.S.Ramaiah School of Advanced Studies

PEMP RMD & Cycle Performance. M.S.Ramaiah School of Advanced Studies Steam Se Turbine ub ecyces Cycles & Cycle Performance Session delivered by: Prof. Q.H. Nagpurwala 1 Session Objectives This session is intended to discuss the following: Basic construction and classification

More information

TCN 02, Dated: WITH REFERENCE TO ABOVE FOLLOWING CHANGES MAY PLEASE BE NOTED AND COMPLIED WHILE SUBMITTING THE OFFER FOR THE SUBJECT JOB:

TCN 02, Dated: WITH REFERENCE TO ABOVE FOLLOWING CHANGES MAY PLEASE BE NOTED AND COMPLIED WHILE SUBMITTING THE OFFER FOR THE SUBJECT JOB: Bharat Heavy Electricals Limited (A Government of India Undertaking) Power Sector Eastern Region Plot No. 9/, Block-DJ, Salt Lake City, Kolkata 700 09 (INDIA) Phone no. 033-232 69 Fax : 033-232 960 Web

More information

Carrington Power Station

Carrington Power Station Carrington Power Station INTRODUCTION 01 Welcome to Carrington Power Station Carrington Power Station is a 884.2MW plant that generates enough electricity to power more than one million homes and businesses.

More information

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat - Doc. : 08C00031_e Date : 02.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e

More information

ANSALDO ENERGIA STEAM TURBINE OPERATION IN FLEXIBLE COMBINED CYCLE. Authors:

ANSALDO ENERGIA STEAM TURBINE OPERATION IN FLEXIBLE COMBINED CYCLE. Authors: ANSALDO ENERGIA STEAM TURBINE OPERATION IN FLEXIBLE COMBINED CYCLE Authors: Carlo Bima Sandro Zanier (Ansaldo Energia) (Ansaldo Energia) 1 INDEX SCENARIO PLANT FLEXIBILITY FLEXIBLE STEAM TURBINE MECHANICAL

More information

Low Emissions gas turbine solutions

Low Emissions gas turbine solutions Turbomachinery and Process Solutions Low Emissions gas turbine solutions M.Santini/ M.Baldini 22 March, 2018 Green strategy beyond GT Flange to Flange NOx and CO Emissions reduction CO2 footprint reduction

More information

by Osamu Isumi Turbine Designing Section Manager Takashi Niiyama Design Engineer Mitsubishi Heavy Industries, Ltd. Hiroshima, Japan Kazushi Mori

by Osamu Isumi Turbine Designing Section Manager Takashi Niiyama Design Engineer Mitsubishi Heavy Industries, Ltd. Hiroshima, Japan Kazushi Mori VERIFICATION FULL LOAD TEST OF 900 T/H (1,980,000 LB/H) LARGE MECHANICAL DRIVE STEAM TURBINE FOR ASU UP TO 200 MW (268,000 HP) BASED ON THE PRINCIPLE OF HIGH SCALE MODEL SIMILARITY by Osamu Isumi Turbine

More information

Main Steam & T/G Systems, Safety

Main Steam & T/G Systems, Safety Main Steam & T/G Systems, Safety Page 1 This steam generator, built for the Wolsong station in Korea, was manufactured in Canada by the Babcock and Wilcox company. In Wolsong 2,3, and 4 a joint venture

More information

Operating Status of Uprating Gas Turbines and Future Trend of Gas Turbine Development

Operating Status of Uprating Gas Turbines and Future Trend of Gas Turbine Development Operating Status of Uprating Gas Turbines and Future Trend of Gas Turbine Development KEIZO TSUKAGOSHI* 1 JUNICHIRO MASADA* 1 AKIMASA MUYAMA*1 YOICHI IWASAKI* 1 EISAKU ITO* 2 Large frame gas turbines for

More information

Completion of Hitachi Rinkai Power Station Unit-2

Completion of Hitachi Rinkai Power Station Unit-2 Completion of Hitachi Rinkai Power Station Unit-2 94 Completion of Hitachi Rinkai Power Station Unit-2 Hidekazu Takai Fumiharu Moriwaki Tsutomu Tanakadate Makoto Funaki OVERVIEW: In recent years, thanks

More information

"Leveraging Cross-Industry Know-How for Thermodynamic Cycles & Turbomachinery Component Innovation"

Leveraging Cross-Industry Know-How for Thermodynamic Cycles & Turbomachinery Component Innovation "Leveraging Cross-Industry Know-How for Thermodynamic Cycles & Turbomachinery Component Innovation" Wednesday, June 17, 2015 Stage Presentation ASME TURBOEXPO 2015 1 About SoftInWay Founded in 1999, we

More information

Fuel Savings for Gas Power Plants. Using Digital Efficiency and Flexibility Optimization

Fuel Savings for Gas Power Plants. Using Digital Efficiency and Flexibility Optimization Fuel Savings for Gas Power Plants Using Digital Efficiency and Flexibility Optimization High Fuel Impact Gas Plant Operations Utilities and power generators today face the difficult task of servicing their

More information

Design Optimisation of the Graz Cycle Prototype Plant

Design Optimisation of the Graz Cycle Prototype Plant Institute for Thermal Turbomaschinery and Machine Dynamics Graz University of Technology Erzherzog-Johann-University Design Optimisation of the Graz Cycle Prototype Plant Presentation at the ASME Turbo

More information

Experimental Campaign on a Hydrogen Fuelled Combustor for a 10 MW Class Gas Turbine with Reduced NOx Emissions

Experimental Campaign on a Hydrogen Fuelled Combustor for a 10 MW Class Gas Turbine with Reduced NOx Emissions Experimental Campaign on a Hydrogen Fuelled Combustor for a 10 MW Class Gas Turbine with Reduced NOx Emissions S. Cocchi 1, M. Provenzale 1, S. Sigali 2, L. Carrai 2 1. GE Oil&Gas NUOVO PIGNONE SpA, Firenze

More information

SECTION FUEL-FIRED UNIT HEATERS

SECTION FUEL-FIRED UNIT HEATERS SECTION 23 55 33 PART 1 - GENERAL 1.1 DESCRIPTION A. This Section includes gas-fired unit heaters. SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable

More information

Largo & Allegro. Air Compressors. Largo & Allegro

Largo & Allegro. Air Compressors. Largo & Allegro Largo & Allegro Air Compressors Largo 110-160 & Allegro 110-180 ALUP Driven by technology. Designed by experience. ALUP Kompressoren has over 85 years of industrial experience. It is our ambition to offer

More information

MLNG DUA DEBOTTLENECKING PROJECT

MLNG DUA DEBOTTLENECKING PROJECT MLNG DUA DEBOTTLENECKING PROJECT Yahya Ibrahim Senior General Manager Malaysia LNG Malaysia yahyai@petronas.com.my Tariq Shukri LNG Consultant Foster Wheeler Energy Limited Reading, U.K. Tariq_shukri@fwuk.fwc.com

More information

PRODUCT DESCRIPTION PARAMETERS

PRODUCT DESCRIPTION PARAMETERS PRODUCT SHEET PRODUCT DESCRIPTION PARAMETERS Steam boilers PB-P PB-PP PB-NP Moderated-pressure three-pass steam boilers combusting gaseous and liquid fuels in the saturated steam and superheated steam

More information

Flexible Operation. Integrating thermal power with Renewable Energy & Challenges. Y M Babu Technical Services, Noida

Flexible Operation. Integrating thermal power with Renewable Energy & Challenges. Y M Babu Technical Services, Noida Flexible Operation Integrating thermal power with Renewable Energy & Challenges 1 Y M Babu Technical Services, Noida Why Flexible Operation? Limitations with Renewable generation has called for flexible

More information

DONGFANG ELECTRIC CORPORATION LIMITED. Dr. Harry Chen, Vice President April 20 th, 2012

DONGFANG ELECTRIC CORPORATION LIMITED. Dr. Harry Chen, Vice President April 20 th, 2012 DONGFANG ELECTRIC CORPORATION LIMITED Dr. Harry Chen, Vice President April 20 th, 2012 General Introduction China Central Government 100% 50.03% Listed in Shanghai Stock Exchange Code: 600875 Hong Kong

More information

A RATIONAL APPROACH TO EVALUATE A STEAM TURBINE ROTOR GRABBING AND LOCKING EVENT

A RATIONAL APPROACH TO EVALUATE A STEAM TURBINE ROTOR GRABBING AND LOCKING EVENT Proceedings of PVP2007 2007 ASME Pressure Vessels and Piping Division Conference July 22-26, 2007, San Antonio, Texas PVP2007-26598 Proceedings of PVP2007 2007 ASME Pressure Vessels and Piping Division

More information

Ten glorious years of service to industry & customers ENGINEERING SERVICE OVER VIEW & IMPORTANT PROJECT- CASE STUDY

Ten glorious years of service to industry & customers ENGINEERING SERVICE OVER VIEW & IMPORTANT PROJECT- CASE STUDY ENGINEERING SERVICE OVER VIEW & IMPORTANT PROJECT- CASE STUDY STRESS ANALYSIS Structural Strength of Turbine Casing Client : Hydro Power sector Scope of work: To analyse the given structure to bear the

More information

GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY

GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY World s Most Advanced Combined Cycle Gas Turbine Technology GE s H System the world s most advanced combined cycle system and the first

More information

14th International Conference on Greenhouse Gas Control Technologies, GHGT-14

14th International Conference on Greenhouse Gas Control Technologies, GHGT-14 14th International Conference on Greenhouse Gas Control Technologies, GHGT-14 21 st -25 th October 2018, Melbourne, Australia Flexibility and efficiency of a steam turbine extraction vs gas fired generation

More information

VVER-440/213 - The reactor core

VVER-440/213 - The reactor core VVER-440/213 - The reactor core The fuel of the reactor is uranium dioxide (UO2), which is compacted to cylindrical pellets of about 9 height and 7.6 mm diameter. In the centreline of the pellets there

More information

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng.

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng. QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT Cosmos M. Voutsinos, P.Eng. 1638 Scenic Heights South, Lethbridge, Alberta, Canada 403-331-2212,

More information

Power cycle development

Power cycle development Power cycle development Steam cycles dominant for >300 yrs, mostly Rankine Gas Brayton cycles catching up last 50 years Organic Rankine Cycles (ORC) relatively recent 2 Why a new power cycle? Steam Good

More information

Experience and Examples of Optimization of Axial Turbines Flow Paths

Experience and Examples of Optimization of Axial Turbines Flow Paths 7 Experience and Examples of Optimization of Axial Turbines Flow Paths In this chapter, as an example of practical use of the developed theory of optimal design of axial turbines flow paths, the results

More information

Talwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke

Talwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke Techno commercial offers are invited from the competitive bidders for the EPC contract i.e. Design, Engineering, Manufacture/Supply, Civil and Structural, Erection, Testing, Commissioning, Demonstration

More information

Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING

Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING Training Duration 5 days Training Duration & Venue REF ME032 Pumps & Compressors- Design, Operation, Maintenance

More information

Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING

Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING Training Duration 5 days Training Duration & Venue REF ME035 Pumps & Compressors- Design, Operation, Maintenance

More information

Development of Large-Capacity Single-Casing Reheat Steam Turbines for Single-Shaft Combined Cycle Plant

Development of Large-Capacity Single-Casing Reheat Steam Turbines for Single-Shaft Combined Cycle Plant Development of Large-Capacity Single-Casing Reheat Steam Turbines for Single-Shaft Combined Cycle Plant TAKASHI NAKANO*1 TAMIAKI NAKAZAWA*1 KENYU TAKEDA*1 KEIZO TANAKA*1 SHIN NISHIMOTO*1 TOSHIHIRO MIYAWAKI*2

More information

DISCLAIMER. Portions of this document may be illegible electronic image products. Images are produced from the best available original document.

DISCLAIMER. Portions of this document may be illegible electronic image products. Images are produced from the best available original document. 3 rn -I 0 ZLS TL-s DISCLAIMER Portions of this document may be illegible electronic image products. Images are produced from the best available original document. INDIRECT-FIRED GAS TURBINE DUAL FUEL CELL

More information

Steam Cycle Chemistry in Air-Cooled Condensers. NV Energy ACC User s Group * November 12-13, 2009 Andrew Howell * Xcel Energy

Steam Cycle Chemistry in Air-Cooled Condensers. NV Energy ACC User s Group * November 12-13, 2009 Andrew Howell * Xcel Energy Steam Cycle Chemistry in Air-Cooled Condensers NV Energy ACC User s Group * November 12-13, 2009 Andrew Howell * Xcel Energy Steam Cycle Chemistry Goal for ACC: minimize corrosion of carbon steel Resulting

More information

Rollair. Air Compressors ROLLAIR 150E AND ROLLAIR 150V-180V-240V

Rollair. Air Compressors ROLLAIR 150E AND ROLLAIR 150V-180V-240V Rollair Air Compressors ROLLAIR 150E-150-180-220 AND ROLLAIR 150V-180V-240V Worthington Creyssensac Driven by technology. Designed by experience. Worthington Creyssensac has over 145 years of industrial

More information

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

NOTICE CONCERNING COPYRIGHT RESTRICTIONS NOTICE CONCERNING COPYRIGHT RESTRICTIONS This document may contain copyrighted materials. These materials have been made available for use in research, teaching, and private study, but may not be used

More information

Increasing hydro-equipment value with field measurements. P. Weibel, J. Contreras, S. Lais, E. Parkinson. ANDRITZ HYDRO Switzerland

Increasing hydro-equipment value with field measurements. P. Weibel, J. Contreras, S. Lais, E. Parkinson. ANDRITZ HYDRO Switzerland IGHEM 2016, August 25 th to 26 th 2016, LINZ, AUSTRIA Increasing hydro-equipment value with field measurements P. Weibel, J. Contreras, S. Lais, E. Parkinson ANDRITZ HYDRO Switzerland INTRODUCTION The

More information

Managing the Catalysts of a Combustion Turbine Fleet

Managing the Catalysts of a Combustion Turbine Fleet Managing the Catalysts of a Combustion Turbine Fleet 05/01/2012 Terry McTernan, PE, Cormetech Inc. Natural gas fired fleets comprising diverse turbine unit types are operating their units more these days

More information

SUMMER 15 EXAMINATION

SUMMER 15 EXAMINATION SUMMER 15 EXAMINATION Subject Code: 17413 ( EME ) Model Answer Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme.

More information

FlexEfficiency* 60 Portfolio

FlexEfficiency* 60 Portfolio FlexEfficiency* 60 Portfolio A new standard of high efficiency and operational flexibility * Trademark of General Electric Company All Rights Reserved. No part of this document may be reproduced, transmitted,

More information

T.E. (Mech., Mech. S/W) (Semester II) Examination, 2011 TURBOMACHINES (New) (2008 Pattern)

T.E. (Mech., Mech. S/W) (Semester II) Examination, 2011 TURBOMACHINES (New) (2008 Pattern) *4063218* [4063] 218 T.E. (Mech., Mech. S/W) (Semester II) Examination, 2011 TURBOMACHINES (New) (2008 Pattern) Time : 3 Hours Marks : 100 Instructions : 1) Answer any three questions from each Section.

More information

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs 1 October 1 November 2006 Royal Sonesta Hotel, Cambridge, MA Oxyfuel Pathways Rodney Allam Consultant Air Products PLC, UK Oxyfuel Technology

More information

Combined Cycle Power

Combined Cycle Power POWER GENERATION Combined Cycle Power Combined cycle power utilizing the gas turbine (Brayton Cycle) and the steam system (Rankine Cycle) are a lethal weapon against news worthy coal fired emissions worldwide.

More information

Development of Measurement Method for Verification of Multi-Stage Axial Compressor with Improved Performance

Development of Measurement Method for Verification of Multi-Stage Axial Compressor with Improved Performance Development of Measurement Method for Verification of Multi-Stage Axial Compressor with Improved Performance 108 SATOSHI YAMASHITA *1 RYOSUKE MITO *2 MASAMITSU OKUZONO *3 SHINJI UENO *1 Gas turbine power

More information

September 10, Megan Huang* & Dr. Chandrashekhar Sonwane

September 10, Megan Huang* & Dr. Chandrashekhar Sonwane THERMODYNAMICS OF CONVENTIONAL AND NON- CONVENTIONAL SCO 2 RECOMPRESSION BRAYTON CYCLES WITH DIRECT AND INDIRECT HEATING September 10, 2014 Megan Huang* & Dr. Chandrashekhar Sonwane Agenda Efficiency of

More information

Boundary Dam Integrated Carbon Capture Storage Project

Boundary Dam Integrated Carbon Capture Storage Project Canadian Consulting Engineering Awards Boundary Dam Integrated Carbon Capture Storage Project Category: Natural Resources, Mining, Industry, Energy April 21, 2016 I Executive Summary SaskPower s ambitious

More information

Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design

Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design Dr. Edwin Lerch Principal Expert Power System Dynamics Siemens AG Erlangen, Germany edwin.lerch@siemens.com

More information

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION Power plant Asset Integrity Management Thermal power Hydro power Geothermal power QuestIntegrity.com CHALLENGE CONVENTION Effective Asset Integrity Management in Power Plants Effective asset integrity

More information

AP1000 European 15. Accident Analysis Design Control Document

AP1000 European 15. Accident Analysis Design Control Document 15.2 Decrease in Heat Removal by the Secondary System A number of transients and accidents that could result in a reduction of the capacity of the secondary system to remove heat generated in the reactor

More information

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

NOTICE CONCERNING COPYRIGHT RESTRICTIONS NOTICE CONCERNING COPYRIGHT RESTRICTIONS This document may contain copyrighted materials. These materials have been made available for use in research, teaching, and private study, but may not be used

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11938 - Progressing Cavity Pump C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL... 1 1.02 RELATED SPECIFICATION SECTIONS... 1 1.03 MANUFACTURERS... 1 PART

More information

CIP 2019 Project Outline ~ Mechanical Engineering

CIP 2019 Project Outline ~ Mechanical Engineering Project Code ME_SAND_1 Project Details Internship Category Sandwich Internship Period June 2019 to May 2020 Mechanical and Automation Engineering Engineering Science Project Name Data Analytics for Power

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

CIP 2017 Project Outline

CIP 2017 Project Outline Outline ME_SUM_1 Summer 1 Jun 2017 31 Aug 2017 Mechanical Engineering 4. Name: Technical Performance & Safety Enhancement for China Assets 6. 7. Development of mechanism for technical & safety best practices

More information

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines A Copper-Plated Thief: The Problem of Copper Deposits in Turbines By Dave Daniels and John Latcovich, The Hartford Steam Boiler Introduction Operators at a coal-fired, 2,600 PSI power plant performed monthly

More information

PROJECT MONITORING ENGINEERING RISK SPECIALISTS. Introduction. Project Delay In Start Up Monitoring

PROJECT MONITORING ENGINEERING RISK SPECIALISTS. Introduction. Project Delay In Start Up Monitoring ENGINEERING RISK SPECIALISTS PROJECT MONITORING Introduction Project Delay In Start Up M onitoring Potential Exposure Schedule/Construction Sequence Claims Critical Equipment/Materials Critical Equipment

More information

Benefits. Reduced transportation time and cost. Limited on-site inventory. Minimal installation time. Efficient commissioning

Benefits. Reduced transportation time and cost. Limited on-site inventory. Minimal installation time. Efficient commissioning Gas Turbine Package Gas Turbine Package Gas turbine package is available in both single- and twinengine configurations, which offer greater than 41 percent simple-cycle efficiency and a nominal 60 to 140

More information

Trial Operation Results of Steam Cooled M501H Type Gas Turbine

Trial Operation Results of Steam Cooled M501H Type Gas Turbine Trial Operation Results of Steam Cooled M501H Type Gas Turbine 85 Keizo Tsukagoshi Atsushi Maekawa Eisaku Ito Yoshinori Hyakutake Yutaka Kawata The H series gas turbine is a high efficiency and high power

More information

Heat Recovery Steam Generators for Flexibility

Heat Recovery Steam Generators for Flexibility Heat Recovery Steam Generators for Flexibility Landon Tessmer IAGT October 2016 Overview The grids needs flexible power HRSG and OTSG Designs Supplementary Firing Fresh Air Firing Case Study Balance of

More information

Products and customer service

Products and customer service Products and customer service Supplier of Equipment and Services for Power Generation Technology quality products / our people / smart solutions / advanced technology Doosan Škoda Power Part of Doosan

More information

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013 NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power Plants Speaker Name; Tufani Ram 13-14/02/2013 Introduction Water is a vital Resource Irrigation Potable

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

Design Details of a 600 MW Graz Cycle Thermal Power Plant for CO 2

Design Details of a 600 MW Graz Cycle Thermal Power Plant for CO 2 Institute for Thermal Turbomaschinery and Machine Dynamics Graz University of Technology Erzherzog-Johann-University Design Details of a 600 MW Graz Cycle Thermal Power Plant for CO 2 Capture Presentation

More information

Prohibition of Boiler Feed Water Pump Failure in Power Plant

Prohibition of Boiler Feed Water Pump Failure in Power Plant Int J Advanced Design and Manufacturing Technology, Vol. 5/ No. 5/ December - 2012 77 Prohibition of Boiler Feed Water Pump Failure in Power Plant B. Soleimani Roody Bandar Abbas Power Plant, Iran E-mail:

More information

Chapter 8. Vapor Power Systems

Chapter 8. Vapor Power Systems Chapter 8 Vapor Power Systems Introducing Power Generation To meet our national power needs there are challenges related to Declining economically recoverable supplies of nonrenewable energy resources.

More information

SIMPACK - MODEL DEVELOPMENT PACKAGE FOR POWER PLANTS

SIMPACK - MODEL DEVELOPMENT PACKAGE FOR POWER PLANTS SIMPACK - MODEL DEVELOPMENT PACKAGE FOR POWER PLANTS 1.0 OVERVIEW SIMPACK is a totally integrated set of simulation software development modules for power plants. It is template based modeling tool and

More information