Improvements in bi-metal production at the Brunswick plant, Costerfield.
|
|
- Gerald Harris
- 6 years ago
- Views:
Transcription
1 1 Improvements in bi-metal production at the Brunswick plant, Costerfield. D Buchanan 1, V Cullinan 2 1. MAusIMM, Processing Plant Manager, Mandalay Resources Costerfield Operations, 1024 Heathcote Nagambie Rd Costerfield 3523, d.buchanan@mandalayresources.com.au 2. MAusIMM, Senior Metallurgist, Mandalay Resources Costerfield Operations, 1024 Heathcote Nagambie Rd Costerfield 3523, v.cullinan@mandalayresources.com.au ABSTRACT The Brunswick plant is located in Costerfield, approximately 40km east of Bendigo in central Victoria. Crushing, grinding, gravity gold concentration and flotation methods are used to produce a saleable gold concentrate and an antimony-gold flotation concentrate. This paper discusses the improvements made within the processing plant which have resulted in a 99% increase in throughput over nameplate capacity of average tonnes per month to average tonnes per month and increases of 12% gold (from 2007 average of 78% to 2014 average of 90%) and 16% antimony recovery (from 2007 average of 79% to 2015 average of 95%). This combined effort has resulted in an increase of equivalent gold ounces (AuEq oz) produced from of to a increase. AuEq oz = Au oz + Sb t Sb (US$/t) Au (US$/oz) INTRODUCTION History Mining in the Costerfield area dates back to mid In between that period and the current day mining operations have existed periodically. In 1995 a processing plant was constructed to retreat the old tailings and oxide material from the Brunswick pit. While the plant processed the material, exploration work discovered a new vein, the Augusta ore body. In 2006 development of the underground mine commenced. In 2007 the processing plant was redesigned to treat the new Augusta ore body. In 2014 mining of the new Cuffley ore body commenced via the existing Augusta decline. Processing of the Cuffley ore started in The mining lease is solely owned by Mandalay Resources. Geology The valuable metal/metalloids in the deposit are gold and antimony. Antimony is found in the most common sulphide form of stibnite (Sb 2S 3). The deposit formed in the Palaeozoic age approximately 340 to 450 million years ago in the Tasman orogenic system which lies approximately 1000 km in width down the eastern side of Australia. The deposits are located in quartz-sulphide veins and are low grade metamorphic. The veins averaging 30cm in width range up to 1.6m in width, with some traceable for up to 400m. Veins are said to generally run north-north-west (NNW) south-south-east (SSE) and there are two main types of veins, the older containing more coarse gold (high grade), while the younger veins contain less grade and more massive antimony. Process summary The Brunswick plant processes a sulphide gold antimony ore through a conventional comminution and flotation style concentrator. The concentrator operates 24 hours per day, seven days per week. Ore is delivered to the plant via road registered dump trucks due to location of the mine and the plant which are separated by a main road. The plant feed contains approximately 4% antimony and 10 grams per
2 2 tonne (g/t) gold (2014 operational data). Crushing is done during day shift and operates under noise restriction guidelines. The surface mobile crushing and screening system processes at 80 tonnes per hour (t/h) plant feed passing 16mm, suitable for milling at a rate of 18 to 19 t/h through a two stage, closed circuit ball milling circuit. A Knelson XD30 concentrator is used on the second stage of milling to recover a gold rich gravity concentrate which is upgraded using Gemeni GT1000 and GT250 tables in series to produce a gold concentrate which is sent to an independent refinery. Secondary milled products are classified on size to 80% passing (p80) of 54 microns (µm) and processed through a simple flotation circuit. The flotation circuit consists of two upfront tank cells installed in The rougher cells are four Denver DR100 cells in series with four DR100 scavenger cells. The combined rougher and scavenger concentrate reports to the cleaners, comprised of six DR15 cells, two of which were reinstalled in August The final antimony-gold concentrate reporting to the thickener prior to filtration is comprised of both the tank cells and cleaner concentrates. This is bagged for shipment to customers overseas, via the port of Melbourne. The tailings are thickened before being pumped to a tailings storage facility (TSF) adjacent to the Brunswick plant. A summary processing flow sheet is provided in Figure 1. Figure 1. Brunswick plant flow sheet THROUGHPUT INCREASE The original crushing plant consisted of a two stage jaw crushing circuit. The primary jaw crusher had a closed side setting of 45mm, with all the discharge fed over a scalping screen of 19mm with oversize being fed to the secondary jaw crusher set with intermeshing teeth to crush the material as fine as possible. This delivered a product of approximately 80% passing 16mm. Utilising this crushing circuit, the nameplate capacity was tonnes per month (t/m). Figure 2 below shows the dry tonnes per month processed from Data prior to this has not been used as ore supply was limited. Nameplate capacity of t/m was reached in March The work index of the Costerfield ore is 16 kwh/t with an abrasion index of 0.3 (Rayner S, Ore characterisation test on new Cuffley ore samples. ALS Ammtec).
3 3 In September 2012 a diesel powered mobile crushing plant was purchased (Finlay T-REX I-130RS). This resulted in a step change in the ability to mill at increased rates from a nameplate capacity of t/m milled to average t/m milled for all of Due to the old open circuit jaw crushing system, there was little control over the top size reporting to the primary mill circuit. The mobile crusher employs a closed circuit crushing circuit with a 16mm screen. The only exit from this crushing circuit is once the material is minus 16mm. This, combined with the impact design of the crusher resulted in a significantly finer product reporting to the existing milling circuit, 80% passing 10mm from the original circuit of 80% passing of 16mm. The percentage of fine material has significantly increased, from 30% passing 5mm to 52% passing 5mm. A diesel powered crusher was also chosen as the plant is at the limits of the existing power supply and taking the jaw crushers off this supply allowed additional equipment to be installed in the plant. The mobile crusher also prevented significant downtime that would have been a consequence of constructing a traditional fixed crushing circuit at a significant saving over the fixed plant in purchase price. A scope definition study report was completed in 2012 with the directive to increase throughput to tonnes per month. This report estimated $ for the project and a four month construction period. Instead, the mobile crusher was purchased and put into immediate use by utilising the existing conveyor circuit to fill the fine ore bins with the finer crushed material. Considering the cost of the fixed plant upgrade with the loss of revenue from the construction downtime, the initial purchase price of the crusher in 2012 and accounting for the running costs for mobile crushing at $5.83 per tonne, with purchasing a new mobile crusher every second year, it will be approximately 20 years before mobile crushing becomes a more expensive option. Figure 2. Historic monthly dry tonnes throughput from January 2012 to December 2014 The increase in throughput has continued to trend upward after the step change in September This is due to a number of smaller factors: redesigned ball mill feed chute to assist with flow of feed and reduced time to clear blockages in October 2012
4 4 installation of redundant pumps on all critical units by June 2013 which increased availability from an average of 85% in 2012 to 94% in 2013 and 2014 combined a reduction of the mobile crusher screen from 19mm to 16mm in May 2014 increase in crushing hours from August RECOVERY INCREASE Data used for recoveries dates back to April 2007, as this is from the time the existing plant was restarted in the basic layout it is today. There were only seven operational months in 2007 (April, then July to December). In April 2009 the plant was not operated. All data is reconciled recovery data. Gold recovery Gold recovery at the Brunswick plant is a combination of gravity gold and flotation gold. Figure 3 shows the trend from April 2007 to December Figure 3. Historic monthly gold recoveries from April 2007 to December 2014 Improvements in gold recovery at the Brunswick plant has been a culmination of numerous small changes. The significant notes and improvements are listed in chronological order: There is a marked change in recovery from 2010 to 2011with similar head grades of 7.41 g/t and 7.31 g/t respectively The entire flotation circuit is manually operated. For 2011 the operators were specifically targeted with on the job training to ensure operations were consistent between crews. This change made a bigger difference to overall recovery than any other change made to the plant In June 2011 the pulp depth of the rougher, scavengers and cleaners were increased using weir bar installation on the existing Denver cells
5 5 August 2011 a new Knelson XD30 was installed. This replaced an old, manually controlled Knelson that relied on operators to stop and clean for every cycle For December 2012 the old cyclones (Warman 10032C) were replaced with a bank of three 250CVX cyclones and new reagent pumps were also added at this time to give finer control Many small operational changes were made in 2011 and 2012, resulting in a year on year recovery increase from 86% in 2011 to 89% in 2012 Early 2013, reagent control was still quite varied from operator to operator so greater direction over reagent flow was given, specifically for lead nitrate addition in relation to the PAX addition, as test work had shown excessive lead nitrate addition had detrimental effects on recovery A purpose built gravity gold recovery circuit was built in November and December 2013 and commissioned in January This enabled constant collection of Knelson concentrates on one hour cycles. For 2014 the average gravity gold recovery was 43%. Prior to this installation, gravity gold recovery was 15% for This was due to limited capacity in the old gold room. This had surprisingly little impact on overall gold recovery In mid 2014 additional cleaner cells were added. These resulted in not only increased recovery, but additionally 2% increase in final concentrate grade. Antimony recovery Antimony recovery at the Brunswick plant is shown in figure 4 from April 2007 to December Figure 4. Historic monthly antimony recoveries from April 2007 to December 2014 Improvements in antimony recovery at the Brunswick plant has been a culmination of numerous small changes. The significant changes are listed in chronological order: In 2009 additional tank cells were added to the front end of the flotation circuit to take the antimony load off the rougher and scavenger circuits
6 6 There were significant differences in operational philosophy for each crew. Training consistent operational behaviour started in 2011 with specific on the job training. This is ongoing In June 2011 the pulp depths of the rougher, scavengers and cleaners were increased using weir bar installation on the existing Denver cells For December 2011 o the old cyclones (Warman model 10032C) were replaced with a bank of three 250CVX cyclones o The reagent pumping system was upgraded Many small operational changes were made in 2011 and Following the same trend as gold recovery antimony recovery had a year on year increase from 92% in 2011 to 96% in The operational changes combined with the cyclone installation smoothed out recovery significantly The reagent control and additional cleaner cell changes in 2013 and 2014 have helped maintain recoveries at increased throughput levels at similar head grades. CONCLUSIONS Critical equipment purchases have made increases to throughputs and recoveries, numerous and incremental improvements are also very important and have a huge impact over time. As the Brunswick plant is manually controlled, good training, operational discipline, good communication and supervision are critical for optimal plant performance. In addition to this, there must be a developed level of trust and cooperation between operators and the metallurgical team so changes requested are properly executed in the plant. All the small things add up to massive gains in throughput and recovery. ACKNOWLEDGEMENTS The authors wish to acknowledge Mandalay Resources for permission to publish and present this paper and contributions made by all present and past personnel in advancing the plant over the years. Special thanks to Sam Madin Costerfield Metallurgist and Toni Streczynski Mandalay Resources Vice President of Metallurgy and Processing for their input. Rayner S, Private Communication. REFERENCES
The TMAC Resources Inc. Hope Bay Project An Innovative Approach. Gerhard Bezuidenhout
The TMAC Resources Inc. Hope Bay Project An Innovative Approach Gerhard Bezuidenhout Gekko s mission Global Footprint Global & Gold/Silver Focused - increasing coal/polymetallic focus Total 150 staff Team
More informationSAG Page 1. Page 2
Page 1 Page 2 SAG 2 0 0 6 DEPARTMENT OF MINING ENGINEERING UNIVERSITY OF BRITISH COLUMBIA Vancouver, B. C., Canada grade Cannington resource is classified at 42 million tonnes, 551ppm silver, 12.1% lead
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 5th September, 2012 Old Pirate Metallurgical Test-Work delivers Exceptional Gold Recovery (up to 97.3%) from Two Different Gravity Methods ABM Resources NL ( ABM
More informationAccelerated Exploration
Mandalay Resources Corporation Increases Mineral Resources and Replaces Reserves in Augusta East & West Lodes and Accelerates Drilling at its Costerfield Gold-Antimony Mine, Australia TORONTO, ON, April
More informationGRAVITY CIRCUIT Knelson Performance, Maintenance, Back to Basics. Drissa ARAMA, Plant Manager
GRAVITY CIRCUIT Knelson Performance, Maintenance, Back to Basics Drissa ARAMA, Plant Manager Morila Mine locality Data for the record Commissioning Oct 2000 Official opening Feb 2001 First bullion bar
More informationABM Hits 3000 Ounce Target from Trial Mining
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 12 th December 2013 ABM Hits 3000 Ounce Target from Trial Mining ABM Resources NL ( ABM or The Company ) presents an update on the Trial Mining and Processing at
More informationSustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE
Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE Making the big difference to our customers Mining Industry
More informationPYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN
PYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN S Gray 1 ABSTRACT The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash
More informationThe Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker
The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR Authors: A Hoyle, D Bennett, and P Walker IRP Presentation Summary 1. Phu Kham mineralogy and implications for process design
More informationFor personal use only
Positive Scoping Study: Aphrodite Gold Project 9 February 2012 Company Announcements Office Australian Securities Exchange Limited Positive Scoping Study for Aphrodite Gold Project Potential to Become
More informationDALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD
December 8 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD Construction at Gascoyne s
More informationFor personal use only
Mutiny makes substantial metallurgical performance gains Forecast copper recoveries increased from 58.5% to 64% in the oxide zone and copper concentrate grade increased from 21.5% Cu to 35% Cu Forecast
More informationFor personal use only
RDM ASX Announcement 23 October 2013 ACN 103 367 684 ASX ANNOUNCEMENT 8 MARCH 2016 ASX Code: RDM Red Metal Limited is a minerals exploration company focused on the exploration, evaluation and development
More informationMinto Mine. Mill Operations Plan
Minto Mine Mill Operations Plan 2018-01 Prepared by: Minto Explorations Ltd. Minto Mine January 2018 Minto Explorations Ltd. Minto Mine 2018 Mill Operations Plan Table of Contents 1 Introduction...1 1.1
More informationHigh pressure grinding rolls applications for the platinum industry
KNECHT, J. and PATZELT, N. High pressure grinding rolls applications for the platinum industry. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy,
More informationResource Efficient Mining Processes of Tomorrow
Metso Process Technology & Innovation (PTI) Resource Efficient Mining Processes of Tomorrow R&D Project Authors: K Duffy W Valery A Jankovic P Holtham www.metso.com General PTI presentation 2014 2015 A
More informationGRAVITY CONCENTRATION AND FLOTATION OF SPANISH MOUNTAIN COMPOSITES
GRAVITY CONCENTRATION AND FLOTATION OF SPANISH MOUNTAIN COMPOSITES SEPTEMBER 2010 2 1.0 SUMMARY 3 Gravity concentration and flotation testwork has been carried out on three composite samples from the Spanish
More informationForward-looking Statements
Forward-looking Statements The information given in this presentation and during Mandalay Resources Corporation s September 12, 2016 Investor Day contain "forwardlooking statements" within the meaning
More informationRavenswood Expansion Project Update
11 July 2018 Ravenswood Expansion Project Update Highlights AISC down, mine life extended, all required approvals received Significant enhancements have been made to Ravenswood Expansion Project All required
More informationMalachite Resources AGM. November For personal use only. Malachite Resources Limited
Malachite Resources AGM November 2013 1 Malachite Resources Limited Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk
More informationBan Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum
ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors
More informationDALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD
November 3 rd 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD Construction work at Gascoyne s 100%
More informationTaranis Proves Bulk Grade of SIF Zone Pilot Plant Sample 600 mt at 6.5 g/t Gold
FOR IMMEDIATE RELEASE Taranis Resources Inc. 681 Conifer Lane Estes Park, Colorado 80517 www.taranisresources.com Taranis Proves Bulk Grade of SIF Zone Pilot Plant Sample 600 mt at 6.5 g/t Gold Estes Park,
More informationSAG Page 2. Page 1
Page 1 SAG 2 0 0 6 DEPARTMENT OF MINING ENGINEERING UNIVERSITY OF BRITISH COLUMBIA Vancouver, B. C., Canada CURRENT TRENDS IN SAG AND AG MILL OPERABILITY AND CONTROL By John Karageorgos 1, Paul Genovese
More informationKanowna Belle Pre-Oxidation Project
Kanowna Belle Pre-Oxidation Project Kanowna Belle Processing Kanowna Belle treats both free milling and refractory ores with the free milling material being sourced predominantly from the East Kundana
More informationFor personal use only
ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical
More informationSukari revise Gold production in Egypt
Sukari revise Gold production in Egypt 1 2 Sukari Gold mines is located in the eastern desert of Egypt, 800 Km south of Cairo and about 25 Km west of The Red sea town Marsa Alam. Sukari gold is well located
More informationPositive Metallurgical and Drill results from the Bondi Project
Positive Metallurgical and Drill results from the Bondi Project June 4, 2013 - Orezone Gold Corporation (ORE:TSX) is pleased to provide an update on a recently completed metallurgical study and the latest
More informationASX ANNOUNCEMENT 12 MAY 2016
ASX ANNOUNCEMENT 12 MAY 2016 FÄBOLIDEN METALLURGICAL TEST WORK IMPROVES RECOVERY LEVELS Dragon Mining Limited (ASX:DRA) ( Dragon Mining or the Company ) is pleased to announce that the second phase of
More informationEMC FLOTATION TEST PROCEDURE 2 LABORATORY FLOTATION TEST PROCEDURE FOR MF1 AND MF2 TESTS AND REGRINDING OF CLEANER TAILINGS
EMC FLOTATION TEST PROCEDURE 2 LABORATORY FLOTATION TEST PROCEDURE FOR MF1 AND MF2 TESTS AND REGRINDING OF CLEANER TAILINGS SYNOPSIS Performing a flotation rate test characterises the ore. The results
More informationNew project in Russia with semiautogenous mill selected according to the results of SAGDesign testing
New project in Russia with semiautogenous mill selected according to the results of SAGDesign testing ABSTRACT 507 Yury V. Kulikov, Arkady Y. Senchenko* John Starkey TOMS institute, Ltd., Russia TOMS institute,
More informationGravity Gold Recovery at President Steyn Mine. P. F. Van den Steen
Gravity Gold Recovery at President Steyn Mine P. F. Van den Steen Knelson Concentrators Africa (Pty) Ltd July 2000 Introduction President Steyn Gold Mine (Freestate) (Pty) Ltd (PSGM) is a privately owned
More informationCrushing. Comminution
Comminution In order to separate the minerals from gangue (the waste minerals), it is necessary to crush and grind the rock to unlock, or liberate, valuable minerals so that they are partially or fully
More informationMOUNT CARLTON COMMINUTION CIRCUIT DESIGN, START-UP AND OPTIMISATION
MOUNT CARLTON COMMINUTION CIRCUIT DESIGN, START-UP AND OPTIMISATION Brian Putland1, Ivka Lovatt2, Andrew Cervellin3 and Daniel Schwann4 Paper Number: 53 1. FAusIMM, Principal Metallurgist, Orway Mineral
More informationIsaMill Design Improvements and Operational Performance at Anglo Platinum
IsaMill Design Improvements and Operational Performance at Anglo Platinum C Rule 1 and H de Waal 2 1. Head of Concentrators Technology, Anglo American Platinum, 55 Marshall Street, Marshall Town, Johannesburg,
More informationDevelopment of an Innovative Copper Flowsheet at Phu Kham. M F Young and I Crnkovic
Development of an Innovative Copper Flowsheet at Phu Kham M F Young and I Crnkovic Phu Kham Location in Laos Phu Kham Plant Layout Plant Layout showing Primary Grinding Rougher Flotation IsaMill Regrinding
More informationMintek, a national resource of minerals processing expertise for platinum ores
DEEPLAUL, V and BRYSON, M. Mintek, a national resource of minerals processing expertise for platinum ores. International Platinum Conference Platinum Adding Value, The South African Institute of Mining
More informationCadia Expansion The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-Autogenous Grinding Mill
Cadia Expansion The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-Autogenous Grinding Mill Andy Apfel Maintenance Foreman Tom Waters Plant Metallurgist Outline About Cadia Valley Operations
More informationEvaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood
Evaluation of Grade Engineering using Enterprise Optimization Michael Scott, Nick Redwood Who we are Not for Profit Research Organization Site implementation of stepchange innovation Grade Engineering
More informationKoka Project Stands to be a Highly Profitable Gold Mine: Scoping Study
Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Chalice Gold Mines Limited ABN 47 116 648 956 30 October 2009 Highlights Scoping Study finds Koka deposit at the Zara Project in Eritrea
More informationFor personal use only
ASX Release 20 March 2012 PANTON REVIEW STUDY RESULTS (ASX:PLA) is pleased to advise that the results from the recently completed Panton Review Study ( PRS ) showed that the Project could achieve and Internal
More informationFIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET
May 30 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET First Gold poured from Dalgaranga
More informationDEVELOPMENTS IN GRAVITY CONCENTRATION CIRCUIT IN ASHANTI GOLDFIELDS COMPANY, OBUASI
DEVELOPMENTS IN GRAVITY CONCENTRATION CIRCUIT IN ASHANTI GOLDFIELDS COMPANY, OBUASI By: George M. Potter 1, Samuel Oti-Atakorah 2, and Casper Dzomeku 3 ABSTRACT The Ashanti ore deposit at Obuasi can be
More informationEMC FLOTATION TEST PROCEDURE 2 LABORATORY FLOTATION TEST PROCEDURE FOR MF1 AND MF2 TESTS AND REGRINDING OF CLEANER TAILINGS
EMC FLOTATION TEST PROCEDURE 2 LABORATORY FLOTATION TEST PROCEDURE FOR MF1 AND MF2 TESTS AND REGRINDING OF CLEANER TAILINGS SYNOPSIS Performing a flotation rate test characterises the ore. The results
More informationDALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES
July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process
More informationTechnologies for Small Scale Mining
Technologies for Small Scale Mining Examples of traditional and alternative mining and processing methods Part 1, Department of Mineral Processing RWTH Aachen University of Technology Aachen, Germany Content
More informationBertil Norén. Processing Manager, Björkdalsgruvan. Euromine Expo, Skellefteå June 15, 2016
Bertil Norén Processing Manager, Björkdalsgruvan Euromine Expo, Skellefteå June 15, 2016 A Values-Based and Value-Focused Company Profitable and Dividend Paying: (3.3% yield)* We create exceptional shareholder
More informationOrezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion
Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion November 19, 2018, Orezone Gold Corporation (TSXV: ORE) ( Orezone or the Company ) is pleased to provide
More informationHummingbird Resources plc. Increased Metallurgical Recoveries for Tuzon Deposit
Increased Metallurgical Recoveries RNS Number : 7150F Hummingbird Resources PLC 29 April 2014 Hummingbird Resources plc ("Hummingbird" or the "Company") (AIM: HUM) Increased Metallurgical Recoveries for
More informationFor personal use only
9 December 2011 Bass Metals Confirms Commercial Robustness of Hellyer Gold Project (HGP) HIGHLIGHTS: A study on tailings treatment options confirms HGP as a robust project utilising the Albion Process
More informationCOMMINUTION CIRCUIT OPTIMISATION
COMMINUTION CIRCUIT OPTIMISATION Maximising Cash Flow for the Existing Asset WHITE PAPER Introduction Orway Mineral Consultants (OMC) is a Perth and Toronto based metallurgical consultancy established
More informationFor personal use only
ABN 79 106 879 690 30 August 2016 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (11 pages by email) Updated Internal Scoping Study Delivers Positive Results (ASX: AUK) The Directors
More informationOlympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began
Olympias Olympias: Highlights 2011 2012 2013 2016 Q3 2017 EIA approved Acquired from European Goldfields in February Phase 1 Retreatment began Phase 1 Retreatment complete Planned Phase 2 Commercial Production
More informationFlowsheet development for the Sukari gold project in Egypt
RHODES, M. and PENNA, F. Flowsheet development for the Sukari gold project in Egypt. World Gold Conference 2009, The Southern African Institute of Mining and Metallurgy, 2009. Flowsheet development for
More informationFor personal use only
ACN. 000 317 251 MARKET RELEASE 4 th March 2013 ROCKLANDS COPPER PROJECT (CDU 100%) DEVELOPMENT UPDATE PICTORIAL UPDATE 10 Development of the Rocklands Group Copper Project, located just outside the major
More informationIvanhoe Mines giant Kamoa copper discovery in the DRC a metallurgical perspective
http://dx.doi.org/10.17159/2411-9717/2016/v116n6a9 Ivanhoe Mines giant Kamoa copper discovery in the DRC a metallurgical perspective by V.L. Nkuna*, T. Naidoo*, and S.R. Amos* Ivanhoe Mines Kamoa copper
More informationOptimisation Study Yanfolila Gold Project Mali
Optimisation Study Yanfolila Gold Project Mali RNS Number : 1737G Hummingbird Resources PLC 02 March 2015 Hummingbird Resources plc ("Hummingbird Resources" or "the Company") Optimisation Study Completed
More informationFor personal use only
25 January 2013 EXCELLENT RECOVERIES IN HEAP LEACH TESTS AT MELROSE PROJECT HIGHLIGHTS Excellent gold recoveries in column leach tests with 94%+ Au extracted after 32 days of leaching from Bungarra deposit
More informationFor personal use only
ASX/Media Announcement 6 September 2016 PILBARA COMPLETES KEY METALLURGICAL TESTWORK PROGRAM AHEAD OF PILGANGOORA DEFINITIVE FEASIBILITY STUDY Phase 2 metallurgical testwork and process design completed
More informationIMPROVEMENTS IN SAG MILL THROUGHPUT FROM FINER FEED SIZE AT THE NEWMONT AHAFO OPERATION
IMPROVEMENTS IN SAG MILL THROUGHPUT FROM FINER FEED SIZE AT THE NEWMONT AHAFO OPERATION *Adrian Dance 1, Sonny Mwansa 2, Walter Valery 2, George Amonoo 3 and Bryon Bisiaux 3 1 SRK Consulting (Canada) Inc
More informationInLine Pressure Jig Pre-Concentration Plant at the Pirquitas Mine
1 InLine Pressure Jig Pre-Concentration Plant at the Pirquitas Mine A H Gray 1, G Delemontex 2, N Grigg 3 and T Yeomans 4 1. A H (Sandy) Gray Technical Director Gekko Systems Pty Ltd. 321 Learmonth Road,
More informationDevelopment and Implementation of the new 2240 kw (3000 HP) VERTIMILL Grinding Mill for Newcrest
Development and Implementation of the new 2240 kw (3000 HP) VERTIMILL Grinding Mill for Newcrest Cadia Valley Operations Jonathan Allen and Brian Knorr Presenter: Raul Noriega Previous Scale Up Previous
More informationIMPROVING EFFICIENCIES: THE ROLE OF PROCESS AUDITS
IMPROVING EFFICIENCIES: THE ROLE OF PROCESS AUDITS MINE AFRICA BREAKFAST, PDAC 2015 Mike Hallewell B.Sc., C.Eng. Business Development Manager COMMITMENT TO SERVICING AFRICA s NEEDS Mines in Africa SGS
More informationGum Creek Gold Project Free Milling Scoping Study
18 March 2016 ASX: PAN Highlights Gum Creek Gold Project Free Milling Scoping Study Mining Inventory of 4.9Mt at 1.94g/t Au for 309koz gold based on material from Swan, Swift and Howards Resources Average
More informationIntegration and Optimisation of Blasting, Crushing and Grinding at the Newmont Ahafo Operation
Integration and Optimisation of Blasting, Crushing and Grinding at the Newmont Ahafo Operation S. Mwansa 1, A. Dance 1, D. Annandale 2, D. Kok 2 and B. Bisiaux 2 1 Metso Process Technology & Innovation,
More informationRESOURCE GOLD PTY. LTD.
Copyright RESOURCE GOLD PTY. LTD. Gold Recovery From Processing Of - Mill Site Materials - Alluvial Gold Deposits - Hard Rock Resources NOVEMBER, 2009 REVISION 3 1 Disclaimer! This presentation contains
More informationENGINEERING SERVICES
ENGINEERING SERVICES www.elb.co.za Processing Solutions ABOUT ELB ENGINEERING SERVICES ELB Engineering Services (ELB) is an internationally recognised technology driven holistic solutions provider to the
More informationAwak Mas DFS Optimisation - Metallurgical Breakthrough
10 October 2017 Awak Mas DFS Optimisation - Metallurgical Breakthrough Whole of Ore leach testwork delivers improved metallurgical recoveries. Gold recoveries range from 92% - 98% vs previous flotation-leach
More informationWelcome to a world class operation
Boliden Garpenberg Welcome to a world class operation Boliden Garpenberg in Hedemora municipality is now one of the world s most modern mines. At the same time, it is Sweden s oldest mining area that
More informationAGM - Lorena Gold Project
AGM - Lorena Gold Project For personal use onlynovember 2015 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors
More informationCommunition Abstract. Fine grind attritional mills; can they or should they go coarser. D Capstick and B Currie
Communition 2012 Abstract Fine grind attritional mills; can they or should they go coarser D Capstick and B Currie Since the introduction of fine grind attritional mills a number of years ago they have
More informationFor personal use only
21 November 2011 Kentor Gold (ASX: KGL) is an Australian-based, emerging midadvanced tier gold company with projects in Australia and the Kyrgyz Republic. Formed in 1998 and listed on the ASX in 2005,
More informationSelection of Tailings Paste Thickener. 17 February Norris September / Rebecca Kirkwood
Clermont Coal Mine Project Selection of Tailings Paste Thickener AusIMM Technical Meeting 17 February 2010 Norris September / Rebecca Kirkwood Topics > Project Overview > Metallurgical Design Considerations
More informationForward-looking Statements
Forward-looking Statements The information given in this presentation and during Mandalay Resources Corporation s September 12, 2016 Investor Day contain "forwardlooking statements" within the meaning
More informationGreat Western Scoping Study Update & Onsite Gold Processing
ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its
More informationASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington
ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX Code: WRM Issued Securities Shares: 441.3 million Options: 100.5 million
More informationMEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES
15 June 2011 MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) ( the Company )
More informationFigure 1: Schematic block-diagram of the project test work
METHODOLOGY A brief schematic diagram for the project test work is presented in Figure 1 and comprises the following main steps: sample collection, sample preparation, chemical characterization, grinding
More informationWaste Liberation: Improving mill feed from a miner s perspective. Bob McCarthy, SRK Consulting Dr. Bern Klein, University of British Columbia
Waste Liberation: Improving mill feed from a miner s perspective Bob McCarthy, SRK Consulting Dr. Bern Klein, University of British Columbia Outline Introduction Ore Deposit Heterogeneity Impacts of Mining
More informationRecent Gravity Improvements at the Porcupine Joint Venture
Recent Gravity Improvements at the Porcupine Joint Venture Tony Y. Chong 1, B.Sc., ARSM, Chief Metallurgist, PJV Don Strickland 1, B. A. Sc., Project Metallurgist, PJV J.A. Folinsbee 1, P.Eng., Plant Manager,
More informationKumtor Gold Company 2018
Kumtor Gold Company 2018 Kumtor Gold Company Kumtor is one of the highest gold deposits in the world. The deposit was discovered in the Central Tien Shan at an altitude of 4,200 meters in 1978. The Kumtor
More informationGOLD RESOURCE CORPORATION UPDATES PROVEN & PROBABLE RESERVES, BOOSTING GLOBAL TONNES BY 16%, GOLD OUNCES BY 18% AND SILVER OUNCES BY 14%
FOR IMMEDIATE RELEASE February 26, 2019 NEWS NYSE American: GORO GOLD RESOURCE CORPORATION UPDATES PROVEN & PROBABLE RESERVES, BOOSTING GLOBAL TONNES BY 16, GOLD OUNCES BY 18 AND SILVER OUNCES BY 14 COLORADO
More informationCopyright in this document is wholly reserved to Ausenco Services Pty Ltd.
DISCLAIMER This document is for the private information and benefit only of the client for whom it was prepared and the particular purpose previously advised to Ausenco Services Pty Ltd. The contents of
More informationFEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT. Highlights
FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT Havilah Resources Havilah Resources NL aims to become a significant producer of copper, gold, cobalt and molybdenum from its 100% owned Kalkaroo,
More informationForward Looking Statement
Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation
More informationRENISON TAILINGS RETREATMENT PROJECT ( RENTAILS ) UPDATED DFS CONFIRMS HIGH MARGIN PROJECT
4 JULY 2017 RENISON TAILINGS RETREATMENT PROJECT ( RENTAILS ) UPDATED DFS CONFIRMS HIGH MARGIN PROJECT HIGHLIGHTS Robust economics: NPV 8% of A$260M (pre-tax) and IRR of 37% 1 ; Cash operating cost of
More informationVertiMill Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP-B
VertiMill Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP-B Sam Palaniandy, Malcolm Powell and Marko Hilden (JKMRC) Jonathan Allen and Kamran Kermanshahi (Metso Minerals) Bill
More informationPHOSPHATE PRODUCERS IMPROVE PLANT PERFORMANCE USING C.P.T. INC FLOTATION TECHNOLOGY
PHOSPHATE PRODUCERS IMPROVE PLANT PERFORMANCE USING C.P.T. INC FLOTATION TECHNOLOGY Harold E. Wyslouzil - P.Eng President Canadian Process Technologies Inc. Vancouver, B.C. CANADA Column flotation cells
More informationRecent Studies on the Application of Fluidised-Bed Flotation for Treating Sulphide Ores at a Coarser Grind
Recent Studies on the Application of Fluidised-Bed Flotation for Treating Sulphide Ores at a Coarser Grind Massimiliano Zanin 1, Bellson Awatey 1 and Jaisen Kohmuench 2 1. University of South Australia
More informationPILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING
8 October 2015 ASX Release ASX Code: CXX Highlights PILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING Tremont has paid the final tranche of US$5 million Integrated pilot plant testing confirms
More informationEastern Finland Office C/MT/2011/13 Outokumpu. Beneficiation Tests. Taivaljärvi Ore
Eastern Finland Office C/MT/2011/13 Outokumpu Beneficiation Tests on Taivaljärvi Ore C/MT/2011/13 GEOLOGICAL SURVEY OF FINLAND DOCUMENTATION PAGE Date / Rec. no. 2 nd May 2011 C/MT/2011/13 Authors Satu
More informationHarte Gold Announces Positive PEA For the Sugar Zone Project
HARTE GOLD CORP. 8 King Street East, Suite 1700 Toronto, Ontario, M5C 1B5 Tel: 416-368-0999 Fax: 416-368-5146 Harte Gold Announces Positive PEA For the Sugar Zone Project Toronto May 3, 2018 - HARTE GOLD
More informationSAGDesign TM Using Open Technology for Mill Design and Performance Assessments
SAGDesign TM Using Open Technology for Mill Design and Performance Assessments John Starkey and Kingsley Larbi Starkey & Associates Inc., Oakville, Ontario, Canada ABSTRACT The advent of direct measurement
More informationFor personal use only
% U 2 November 2015 ASX ANNOUNCEMENT PILGANGOORA LITHIUM UPDATE TESTWORK RETURNS REMARKABLE RESULTS PRODUCING HIGH GRADE SPODUMENE CONCENTRATES CONTAINING UP TO 97% SPODUMENE Heavy Liquid Separation (HLS)
More informationAeon Metals Limited HIGHLIGHTS
ASX Announcement 15 February 2017 WALFORD CREEK PRELIMINARY ECONOMIC ASSESSMENT Early start up Copper-Zinc-Cobalt project indicated for Vardy Zone 2017 drill program focused on significant mine life extension
More informationMinerals Enduron HPGR High Pressure Grinding Roll
Minerals Enduron HPGR High Pressure Grinding Roll *First choice for energy efficient grinding 1 High Pressure Grinding - proven technology High Pressure grinding has become the go to technology for size
More informationNullagine Gold Project
Nullagine Gold Project ABN 85 003 257 556 Construction Update June 2012 Construction of the gold process plant and associated infrastructure remains on schedule and within the capital cost estimate of
More informationTechnologies for Small Scale Mining
Technologies for Small Scale Mining Examples of traditional and alternative mining and processing methods Part 2, Department of Mineral Processing RWTH Aachen University of Technology Aachen, Germany Concentration
More informationTHE USE OF COLUMN FLOTATION FOR THE RECOVERY OF ULTRA-FINE PHOSPHATES
THE USE OF COLUMN FLOTATION FOR THE RECOVERY OF ULTRA-FINE PHOSPHATES Abstract Harold E. Wyslouzil President - Canadian Process Technologies Inc. Vancouver BC, Canada Brazil currently produces around 4.0
More informationASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold
ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2
More information