New Zealand Steel Mining Ltd TAHAROA REHABILITATION PROGRAM PRESENTATION. Reihana Chadwick & Greg Brown

Size: px
Start display at page:

Download "New Zealand Steel Mining Ltd TAHAROA REHABILITATION PROGRAM PRESENTATION. Reihana Chadwick & Greg Brown"

Transcription

1 New Zealand Steel Mining Ltd TAHAROA REHABILITATION PROGRAM PRESENTATION Reihana Chadwick & Greg Brown Introduction by Greg Brown Taharoa Ironsand is mined, concentrated and exported from NZ Steel Mining Ltd Taharoa minesite located on the west coast of the north island of New Zealand 1

2 Introduction NZ Steel Mining Ltd is a wholly owned subsidiary of NZ Steel Ltd, which operates the Glenbrook steel mill. The Taharoa minesite is solely focussed on the export market into predominantly China and Japan. Mining began in 1972 and peaked in the mid 1980 s exporting 2.0 mtpa. Introduction Currently NZ Steel Mining Ltd exports are 1.0mtpa. 2

3 Mining & Concentration By Greg Brown The mining plant consists of a floating dredge which is an electro-hydraulically powered cutter suction unit, able to dredge to a depth of five metres below the surface at a rate of 750tph. 3

4 Mining and Concentration and Concentration plant (Wet Plant). 4

5 Mining & Concentration Mining is carried out by traversing the dredge across the pond using a system of hydraulic winches and wire ropes and spuds. Sand is then pumped 95m via pontoon monitor 15 hoses into the Wet Plant for concentration. Mining & Concentration The concentration plant consists of 4 separation processes. - Oversize removal (Trommell( > 2.5mm) - Primary gravity separation (cones) - Secondary gravity separation (cones & spirals) - magnetic separation 5

6 Mining & Concentration Concentrate slurry (Fe% %) is then pumped approx. 1 5 kms to the stockpiling area (Reihana will explain this in greater depth shortly). Tailings are disposed of using mobile stackers to re-contour mined land. 6

7 Shiploading By Greg Brown Concentrate is loaded onto the Taharoa Express through two parallel pipelines moored to a single bouy mooring (SBM) approximately 2.5kms off shore. It is fed from the conveyor into constant density tanks where it is mixed with fresh water to form a slurry (adjusted to 50% solids by weight). 7

8 Shiploading 127,000t is then loaded at a rate of 2700tph through the two underwater pipelines. Bulldozers push the concentrate onto a belt feeder and conveyor system under each stockpile. 8

9 Rehabilitation By Greg Brown The mining lease consists of approximately 1600 hectares divided into three distinct mining regions. Rehabilitation Mining began in the Southern region in 1972 and the resource was exhausted using the current plant configuration in late Mining commenced in the Central region in Feb 2001 with a current mine plan for 20 years. Mining was completed in the Southern most part of the mining lease approx. three kilometres from the Central region. 9

10 Plant Relocation A number of options were considered, the following was chosen. - To relocate the Dredge 250t - To relocate the Wet Plant 1000t Overland by truck. 10

11 Hand Over By Greg Brown Rehabilitation and handing back of Southern region to Taharoa C Block Corporation land owners. 11

12 By Reihana Chadwick Rehabilitation Of Southern Region Approx. 3mt of sand, dry mined from from the Rototapu dune. Production ceased in December 2000 and rehabilitation commenced. 12

13 Issues We Were Faced With by Reihana Chadwick No rehabilitation had been carried out since Approx. 150ha of land required contouring and planting. Three decant ponds behind the main pond had filled up with three metres of slime. The main pond, canal, dismantling pond, dry docks from the Plant relocation project also had to be filled in. 13

14 Issues We Were Faced With Required sand, had to be transported some metres to infill ponds. 14

15 Process by Reihana Chadwick Rototapu dune had been previously stripped of vegetation. Vegetation was stockpiled for approx. 12 months. Once dry mining of the area was completed, vegetation was redistributed over the land using dump trucks and then harrowed and bulldozed in (see photos) Process Stabilising tailings and decant ponds. Difficulty arose with in filling due to extent of slimes in all three ponds. Ponds were small in area by large in volume. Ponds were opened up in summer to allow to dry (left approx. one month prior to xmas). Areas similar to quicksand were common. 15

16 16

17 Process Grass growth very good in areas with slimes. No planting was possible due to danger of sinking. 17

18 Infilling of Dredge Pond, Canal & Dry Docks by Reihana Chadwick Contractors on site using truck and shovel until dredge pond and canal half finished. Canal was filled with slimes settling out prior to use, causing difficulties. The southern region was re-contoured, ponds infilled and ready for planting of maram within nine months. 18

19 Infilling of Dredge Pond, Canal & Dry Docks Bund wall erected along seaward side of canal was used as infill. Large volume of sand left unused and pushed from up to 100 metres in places. Long pushes in most instances. A Windrow was left along seaward bund to provide shelter for shelter break when planting of pines commences. 19

20 20

21 21

22 Maram Planting by Reihana Chadwick Grass is cut by hand taking roots to 0.5m under surface (cut from nursery). Bundled in 15kg bundles. Stockpiled in areas to be planted. Sand placed around edges to keep moist and encourage growth. 22

23 Maram Planting Four person team seated on a planter attached to the back of a tractor, plant two rows at a time. One tonne of grass planted per hectare. 70 tonnes planted in the southern region 23

24 24

25 Maram Planting Historically, other plant types have been tried such as:- - Lupin to increase nitrogen content in soil, however these died due to disease. 25

26 Maram Planting Urea drops also used up until Now no fertiliser at all is applied. Once maram has established itself, other grasses and vegetation types can grown (usually within 12 months). Maram provides wind protection for other plant types. 26

27 Maram Planting Sand movement is also prevented by maram (up to 0.5 metres/week due to extreme winds. Pine trees are planted on reclaimed areas within two years. Re-distribution of the top 1 1.5m, removed prior to mining has also proved to be very successful. 27

28 28

For personal use only. Amazon Bay Ironsands Project

For personal use only. Amazon Bay Ironsands Project Amazon Bay Ironsands Project April 2013 Overview Nearly 200 km stretch of coast line, 150 km south east of Port Moresby, PNG Focus on 30 km long Threadfin area, which has exploration target of 630 million

More information

For personal use only

For personal use only ACN. 000 317 251 MARKET RELEASE 4 th March 2013 ROCKLANDS COPPER PROJECT (CDU 100%) DEVELOPMENT UPDATE PICTORIAL UPDATE 10 Development of the Rocklands Group Copper Project, located just outside the major

More information

Cristal Australia Pty Ltd

Cristal Australia Pty Ltd ENERGY EFFICIENCY OPPORTUNITIES PUBLIC REPORT 2013 Cristal Australia Pty Ltd is a wholly owned subsidiary of The National Titanium Dioxide Company Limited (Cristal), a private company with headquarters

More information

Crushing. Comminution

Crushing. Comminution Comminution In order to separate the minerals from gangue (the waste minerals), it is necessary to crush and grind the rock to unlock, or liberate, valuable minerals so that they are partially or fully

More information

MAKING A DIFFERENCE FROM THE GROUND UP

MAKING A DIFFERENCE FROM THE GROUND UP MAKING A DIFFERENCE FROM THE GROUND UP OUR VALUES A WORLD-CLASS BUSINESS CARE TRUST TOGETHERNESS EXCELLENCE We are about people, the communities we are a part of and the world we depend on. We deliver

More information

Dredging and Land Spirals For Alluvial HM Deposits

Dredging and Land Spirals For Alluvial HM Deposits Dredging and Land Spirals For Alluvial HM Deposits & Hydraulic Mining for Virgin Soil HM Deposits Hong Kong office address: Suite 915, 9 th Floor, Ocean Centre, 5 Canton Road, Tsim Sha Tsui, Hong Kong

More information

ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE

ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE Beadell Resources Limited (ASX: BDR) ( Beadell ) is pleased to provide an update on the construction of

More information

Rehabilitation Management

Rehabilitation Management Rehabilitation Management Andrea Sutton Chief Executive 27 August 2015 www.energyres.com.au Forward-looking statements This presentation has been prepared by Energy Resources of Australia Ltd ( ERA ) and

More information

Ultimate efficiency INDUSTRY

Ultimate efficiency INDUSTRY Ultimate efficiency INDUSTRY 2 Ultimate efficiency We have a deep attitude 3 Nearly two-thirds of the non-fuel minerals mined each year are aggregates. Dragflow has been involved in the design and manufacture

More information

Daily Mercury (Mackay), Mackay QLD 09 Apr CQ Industry, page 1-2, cm² Regional - circulation 9,928 (MTWTFS-)

Daily Mercury (Mackay), Mackay QLD 09 Apr CQ Industry, page 1-2, cm² Regional - circulation 9,928 (MTWTFS-) ID 392525071 BRIEF WICET, WICETMSO INDEX 1 PAGE 1 of 6 LOCAL MINING AND RESOURCE SECTOR MAGAZINE APRIL 2015 CQIndustry WOMEN IN RESOURCES AWARDS CELEBRATE SUCCESS STUDENTS TURN TO ENGINEERING HANDS-ON

More information

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates Ltd., Canada I. Bin Ahmed Golder Associates Ltd., Canada

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD December 8 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD Construction at Gascoyne s

More information

HPC-30 Specifications

HPC-30 Specifications HPC-30 Specifications For additional information please email us at info@extrac-tec.com Applications Capacity Drive System Electrical Supply Requirements Water Supply Requirements Feed material Trommel

More information

A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA

A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA THE CUSTOMER A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA The Ok Tedi mine, owned and

More information

MINING & QUARRY PROJECT EXPERIENCE

MINING & QUARRY PROJECT EXPERIENCE Page 1 of 12 MINING & QUARRY PROJECT EXPERIENCE CORTEX ENGINEERING RESOURCES PTY LTD Suite 102, 254 Bay Road, Sandringham, Vic. 3191 ichamberlain@cortex.com.au fax +61 3 9543 5223 ph +61 3 9543 5225 www.cortex.com.au

More information

NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT

NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT SYDNEY CONSTRUCTION MATERIALS NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT QUARRY PLAN MineConsult mine management consultants May, 2004 Job No. 1864 CONFIDENTIALITY AND USE OF INTELLECTUAL PROPERTY

More information

ENVIRONMENTAL REVIEW AND MANAGEMENT PROGRAMME WAGERUP REFINERY UNIT THREE. for Alcoa World Alumina Australia ( Alcoa ) 1.

ENVIRONMENTAL REVIEW AND MANAGEMENT PROGRAMME WAGERUP REFINERY UNIT THREE. for Alcoa World Alumina Australia ( Alcoa ) 1. Page 32 MENTAL REVIEW AND MANAGEMENT PROGRAMME WAGERUP REFINERY UNIT THREE for ( Alcoa ) 1. INTRODUCTION 1.1 BACKGROUND Alcoa s Wagerup Alumina Refinery (the refinery) is located 120 kilometres (kms) south

More information

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD November 3 rd 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD Construction work at Gascoyne s 100%

More information

Soo River Hydro Intake Sediment Management

Soo River Hydro Intake Sediment Management Intake Sediment Management GENERATE 2014 Operators Workshop 15 October 2014 by Stuart Croft Vice President A brief background Soo River Project: 14 MW run-of-river development 15 km north of Whistler on

More information

Teck s Coal Export Ports. Brad Johnston General Manager, Marketing & Logistics, Coal

Teck s Coal Export Ports. Brad Johnston General Manager, Marketing & Logistics, Coal Teck s Coal Export Ports Brad Johnston General Manager, Marketing & Logistics, Coal September 27 29, 2011 Forward-looking Information Both these slides and the accompanying oral presentation contain certain

More information

Dredging Mining Industry. Dredges. The Ultimate Efficiency in Dredging Technology!

Dredging Mining Industry. Dredges. The Ultimate Efficiency in Dredging Technology! Dredging Mining Industry Dredges The Ultimate Efficiency in Dredging Technology! Remote Controlled Mini Electric Dredge Dragflow versatile electric dredge. Fully wireless remote controlled Design to fit

More information

Barry Woodbine, Schade Lagertechnik GmbH, Germany, celebrates over half a century in stacking and reclaiming.

Barry Woodbine, Schade Lagertechnik GmbH, Germany, celebrates over half a century in stacking and reclaiming. Schade's history in the design of reclaimers extends back to 1949. In 1970, the company supplied the first cantilevered boom reclaimer to a power plant in Germany, now part of the E.ON group, for the continuous

More information

Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine

Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine Charles Murphy, Alpha Natural Resources, Logan County, West Virginia, USA Christopher Bennett,

More information

Decreasing the Environmental Impact of Treating Slurry Waste Onsite by Mechanical Separation

Decreasing the Environmental Impact of Treating Slurry Waste Onsite by Mechanical Separation Decreasing the Environmental Impact of Treating Slurry Waste Onsite by Mechanical Separation Craig Jones Applications Engineer Peter Bradshaw Account Manager Agenda BOS Solutions Overview Equipment Overview

More information

The groundwater study is relevant to both the MLP and EIS.

The groundwater study is relevant to both the MLP and EIS. 1 2 3 Iron Road has been engaging with the community for a number of years now and water, particularly water security, has been a common theme raised by Eyre Peninsula residents in many forums. Rather

More information

Life Cycle Assessment Analysis of Various Active and Passive Acid Mine Drainage Treatment Options

Life Cycle Assessment Analysis of Various Active and Passive Acid Mine Drainage Treatment Options Life Cycle Assessment Analysis of Various Active and Passive Acid Mine Drainage Treatment Options Dr. James Stone Tyler Hengen & Maria Squillace South Dakota School of Mines & Technology Department of

More information

Jeremy s Construction Ltd.

Jeremy s Construction Ltd. Jeremy s Construction Ltd. Environmental Assessment Registration Document Proposed Doyles Quarry Extension Submitted by: Jeremy s Construction Limited P.O. Box 137 Doyles, NL A0N 1J0 March 2017 Table of

More information

System-50 Material Flow

System-50 Material Flow System-50 Material Flow 1) Run of Mine material (-600mm) is dumped onto the VF-50 Grizzly positioned above the HPC-50 Trommel Feed Chute. (*) HPC-50 Screen sizes are selected to suit each operation. Typical

More information

Washington County Landfill Reconstruction Project: Progress Updates

Washington County Landfill Reconstruction Project: Progress Updates Home Site Index Glossary What's New Ask MPCA Visitor Center MPCA Home > Clean Up > Perfluorochemicals > Perfluorochemical (PFC) Waste Sites > Washington County Site Progress Updates Washington County Landfill

More information

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT ASX RELEASE 30 DECEMBER 2016 STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT HIGHLIGHTS Independent Pre-Feasibility Study (PFS) supports development of the Urquhart Bauxite

More information

Duvha Power Station. Fugitive Emission Management Plan. March 2015

Duvha Power Station. Fugitive Emission Management Plan. March 2015 Duvha Power Station Fugitive Emission Management Plan March 2015 1 INTRODUCTION Most releases into the atmosphere from power stations are from tall stacks. These stacks aid in the dispersion of pollutants

More information

Bulk Raw Materials Storage Selection MR. J. H. ERASMUS KRUPP MINING AND MATERIALS HANDLING

Bulk Raw Materials Storage Selection MR. J. H. ERASMUS KRUPP MINING AND MATERIALS HANDLING Bulk Raw Materials Storage Selection MR. J. H. ERASMUS KRUPP MINING AND MATERIALS HANDLING INTRODUCTION The processing of mineral ores to useable minerals in their commercial forms are produced in stages

More information

For personal use only

For personal use only For personal use only Iron Ore Holdings Ltd Investor Presentation March 2013 Corporate Overview A stable corporate structure with a proven track record of completing transactions Background Capital Structure

More information

THE CHANGUINOLA DAM & HYDRO ELECTRICAL POWER PLANT

THE CHANGUINOLA DAM & HYDRO ELECTRICAL POWER PLANT THE CHANGUINOLA DAM & HYDRO ELECTRICAL POWER PLANT A large construction project with its own cement and fly ash import operation Ad Ligthart 12-12-2012 2c2i Club des Carriers Industriels Indépendants CONTENTS

More information

Sukari revise Gold production in Egypt

Sukari revise Gold production in Egypt Sukari revise Gold production in Egypt 1 2 Sukari Gold mines is located in the eastern desert of Egypt, 800 Km south of Cairo and about 25 Km west of The Red sea town Marsa Alam. Sukari gold is well located

More information

Gum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011

Gum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011 Gum Flat Iron Ore Potential to Export from Port Lincoln in 2 years Dr A. John Parker Managing Director Port Lincoln Council 17 January 2011 Disclaimer & Competent Person s Statement This presentation has

More information

Australia s leading magnetite producer Southdown Magnetite Project. Russell Clark Managing Director & CEO February 2012

Australia s leading magnetite producer Southdown Magnetite Project. Russell Clark Managing Director & CEO February 2012 Australia s leading magnetite producer Southdown Magnetite Project Russell Clark Managing Director & CEO February 2012 Disclaimer The material in this presentation ( material ) is not and does not constitute

More information

RESOURCE GOLD PTY. LTD.

RESOURCE GOLD PTY. LTD. Copyright RESOURCE GOLD PTY. LTD. Gold Recovery From Processing Of - Mill Site Materials - Alluvial Gold Deposits - Hard Rock Resources NOVEMBER, 2009 REVISION 3 1 Disclaimer! This presentation contains

More information

CCE AWARD SUBMISSION BARRIE LANDFILL RECLAMATION AND RE-ENGINEERING

CCE AWARD SUBMISSION BARRIE LANDFILL RECLAMATION AND RE-ENGINEERING CCE AWARD SUBMISSION BARRIE LANDFILL RECLAMATION AND RE-ENGINEERING 2 CCE AWARD SUBMISSION GOLDER ASSOCIATES LTD. SUMMARY The City of Barrie landfill was impacting water resources and required remediation.

More information

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co.

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co. Lignite Mining and Reclamation Process Kayla Torgerson The Coteau Properties Co. 1 Presentation Overview History of Regulation The Process of Mining and Reclamation Harmony Lake 2 1 2 3 4 5 6 7 8 Which

More information

ANNO. d silica. Minerals. Cape Bedford. process testwork ASX. grid wheree high grade silica. sand.

ANNO. d silica. Minerals. Cape Bedford. process testwork ASX. grid wheree high grade silica. sand. ASX ANNO UNCEMENT 2 October 218 High tech markets eyed for Cape Bedford d silica 2,m in fill resource drilling program planned to commence during October at Cape Bedford Silica/Heavy Minerals Project,

More information

APPENDIX 2. Austar Coal Mine Current Operations and Approvals

APPENDIX 2. Austar Coal Mine Current Operations and Approvals APPENDIX 2 Austar Coal Mine Current Operations and Approvals Appendix 2 Current Austar Coal Mine Operations 1.0 Ellalong Drift and Pit Top Facilities The location of the existing Ellalong Drift and Pit

More information

Fresh concrete can be lifted from the ground level to the upper floor level by

Fresh concrete can be lifted from the ground level to the upper floor level by 3a Concreting Operation 1. Concrete lifting 1.1 Hoists Fresh concrete can be lifted from the ground level to the upper floor level by hoists. However, the further distribution from the hoist to placing

More information

Delivering more value in a challenging environment

Delivering more value in a challenging environment Beijing, China 1 3 of March, 2016 Delivering more value in a challenging environment Metal Bulletin China Iron Ore 2016 João Mendes de Faria Sales and Business Development Director, Chinese Market Ferrous

More information

For personal use only

For personal use only BALAMA PROJECT UPDATE AS AT MID MARCH 2017 BALAMA GRAPHITE PROJECT (100%) OPERATIONS UPDATE Commissioning remains on schedule for Q2 2017 Capital budget remains unchanged at US$193 million (plus US$7 million

More information

COMMUNITY OVERVIEW MARCH Overburden Management Project Environmental Impact Statement (EIS)

COMMUNITY OVERVIEW MARCH Overburden Management Project Environmental Impact Statement (EIS) COMMUNITY OVERVIEW MARCH 2017 Overburden Management Project Environmental Impact Statement (EIS) About McArthur River Mine McArthur River Mining Pty Ltd (MRM) is wholly owned by Glencore and is the operator

More information

Ecoengineering 3 PROJECT DESCRIPTION

Ecoengineering 3 PROJECT DESCRIPTION BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA 3 PROJECT DESCRIPTION This chapter describes the proposed mining of sand and gravel (pitrun) by Bestcrete Aggregates

More information

FEASIBILITY STUDY FOR A PROPOSED FLAT WATER RACING FACILITY AT BOTTLE LAKE FOREST

FEASIBILITY STUDY FOR A PROPOSED FLAT WATER RACING FACILITY AT BOTTLE LAKE FOREST CHRISTCHURCH CITY COUNCIL FEASIBILITY STUDY FOR A PROPOSED FLAT WATER RACING FACILITY AT BOTTLE LAKE FOREST June 2004 by CONSULTANTS NZ LIMITED 49 Crownhill Street PO Box 151 New Plymouth Telephone 06

More information

NEW CENTURY SELECTS PREFERRED HYDRAULIC MINING CONTRACTORS FOR CENTURY TAILINGS OPERATIONS

NEW CENTURY SELECTS PREFERRED HYDRAULIC MINING CONTRACTORS FOR CENTURY TAILINGS OPERATIONS ASX / MEDIA ANNOUNCEMENT ASX: NCZ 22 February 2018 NEW CENTURY SELECTS PREFERRED HYDRAULIC MINING CONTRACTORS FOR CENTURY TAILINGS OPERATIONS National Pump & Energy Ltd, partnered with Paragon Tailings

More information

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Malachite Resources AGM. November For personal use only. Malachite Resources Limited Malachite Resources AGM November 2013 1 Malachite Resources Limited Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk

More information

CONTENTS. Cellular Confinement System INTRODUCTION MATERIALS Multi-Cell Fill... 2

CONTENTS. Cellular Confinement System INTRODUCTION MATERIALS Multi-Cell Fill... 2 Johannesburg +27 (0)11 922 3300 Pinetown +27 (0)31 717 2300 Cape Town +27 (0)21 531 8110 East London +27 (0)43 727 1055 www.kaytech.co.za Cellular Confinement System CONTENTS INTRODUCTION... 2 1. MATERIALS...

More information

Market Update Southdown Magnetite Project

Market Update Southdown Magnetite Project MEDIA RELEASE 23 February 2018 Market Update Southdown Magnetite Project Grange Resources Limited (ASX:GRR) (Grange) is pleased to announce that, in conjunction with its joint venture participant, SRT

More information

ACQUISITION OF CROYDON COAL LTD

ACQUISITION OF CROYDON COAL LTD Registered Office: Level 2, 395 Collins Street Melbourne, Victoria 3000 Telephone (03)8611 5320 4th December 2013 ACQUISITION OF CROYDON COAL LTD 3D Resources Ltd. ( 3D Resources or the company ) is pleased

More information

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally

More information

Environmental Monitoring Results Summary

Environmental Monitoring Results Summary Environmental Monitoring Results Summary Quarter 1 2016 Name of Mine: CSA Mine Environment Protection Licence: EPL 1864 Licensee Name and Operator: Cobar Management Pty Ltd Licensee Address: PO Box 31,

More information

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet: 8C Noise Design Assumptions and Source Data 8C.1 Construction Predicted noise levels at the nearest noise sensitive receptors from construction activities have been modelled and presented as noise contours,

More information

Australia s most experienced magnetite producer. UBS Iron Ore and Coal Conference Sydney, Australia November 2013

Australia s most experienced magnetite producer. UBS Iron Ore and Coal Conference Sydney, Australia November 2013 Australia s most experienced magnetite producer UBS Iron Ore and Coal Conference Sydney, Australia 27-28 November 2013 Disclaimer The material in this presentation ( material ) is not and does not constitute

More information

Abstract. 1 Introduction. Golder Associates Ltd, Canada

Abstract. 1 Introduction. Golder Associates Ltd, Canada https://papers.acg.uwa.edu.au/p/1752_05_gu/ Challenges associated with the design of a dewatering plant that will undergo a large increase in tailings throughput during the initial years of the project

More information

Global Coal Preparation and Materials Handling Overview/Technology Development

Global Coal Preparation and Materials Handling Overview/Technology Development Global Coal Preparation and Materials Handling Overview/Technology Development Contents Market Scenario for Coal Global Trends in Materials Handling Global Trends in Coal Preparation Australia RSA/Southern

More information

Welcome to. Kendal Power Station

Welcome to. Kendal Power Station Welcome to Kendal Power Station Technical Overview of the power station Scope General Overview Coal Handling Milling Plant Boiler Plant Turbine Train Steam Flow Path Ash Handling Generator HV Yard Cooling

More information

! Our Reclamation Process

! Our Reclamation Process ! RPM Solutions is a reclamation, ash management, and environmental services company using proprietary equipment technology and refined operating skills to provide an innovative approach to coal yard reclamation

More information

Background Information Document

Background Information Document Environmental Impact Assessment (EIA) of the Proposed Development of Phosphate Deposits off the Coast of Namibia Background Information Document Note 1. This BID addresses the proposed activities within

More information

TRANS-SIBERIAN GOLD PLC

TRANS-SIBERIAN GOLD PLC PLC June 2011 Asacha Gold Project ASACHA Project Status Construction Mine development proceeds steadily and stoping started in June 2011 Plant building construction is complete, plant equipment is installed

More information

INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT SCOPE... 2

INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT SCOPE... 2 February 2017 No. 920(I) INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT 920. 1 SCOPE... 2 920. 3 MATERIALS 3.1 Source of Supply... 2 3.2 Aggregate Requirements... 2 3.3 Mix Design... 3

More information

TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES APPENDIX B NOISE TABLE OF CONTENTS SECTION PAGE 1.1 INTRODUCTION...1 1.2 METHODS...1 1.2.1 Study Area Boundaries...1 1.2.2 Baseline Case...6 1.2.3 Facility Noise Modelling...7 1.2.4 Noise at 1.5 km From

More information

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011 Windimurra Vanadium Plant Project Update Investor Presentation August 2011 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation

More information

PORTAL AND BRIDGE SCRAPER RECLAIMERS - A COMPARISON. AUTHOR: MR. J R McTURK

PORTAL AND BRIDGE SCRAPER RECLAIMERS - A COMPARISON. AUTHOR: MR. J R McTURK PORTAL AND BRIDGE SCRAPER RECLAIMERS - A COMPARISON INTRODUCTION AUTHOR: MR. J R McTURK In the short period available, this presentation will try to identify the main features of the machines, their similarities,

More information

Environment Incident Identification & Response (Mining Areas)

Environment Incident Identification & Response (Mining Areas) Environment Incident Identification & Response (Mining Areas) Environment / Sustainability Toolbox Presentation Environment Management Series: EMS004 Key Information: Environment Incident Identification

More information

For personal use only

For personal use only ASX Announcement November 2013 PORT SPENCER General Manager 21 st November 2013 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam CENTREX COMPLETES

More information

Solutions for wet material recycling using water-based separation technology

Solutions for wet material recycling using water-based separation technology Solutions for wet material recycling using water-based separation technology Doppstadt Water Separation Systems Separate, Wash, Dewater: enhance your recycling process with our Gritbuster solutions innovative

More information

Selection of Tailings Paste Thickener. 17 February Norris September / Rebecca Kirkwood

Selection of Tailings Paste Thickener. 17 February Norris September / Rebecca Kirkwood Clermont Coal Mine Project Selection of Tailings Paste Thickener AusIMM Technical Meeting 17 February 2010 Norris September / Rebecca Kirkwood Topics > Project Overview > Metallurgical Design Considerations

More information

Alpha Coal Project Supplementary Environmental Impact Statement. Coal Mine IPCC Functional Description

Alpha Coal Project Supplementary Environmental Impact Statement. Coal Mine IPCC Functional Description Alpha Coal Project Supplementary Environmental Impact Statement H Coal Mine IPCC Functional Description IPCC Functional Description HC-SKM-12000-RPT-5000 REVISION APPROVALS BOX NAME POSITION SIGNATURE

More information

Certificate III in Surface Extraction Operations (RII30115)

Certificate III in Surface Extraction Operations (RII30115) Certificate III in Surface Extraction Operations (RII30115) Qualification Status Current Qualification Descriptor This course is designed to provide new participants with the theoretical and practical

More information

1. Focus: Bharinto and Tandung Mayang

1. Focus: Bharinto and Tandung Mayang 1. Focus: Bharinto and Tandung Mayang 4 New integrated operations groups ITM operations in Kalimantan 1 2 Palangkaraya Kitadin Td.Mayang Bunyut Port Trubaindo 1 Bharinto 2 Samarinda Balikpapan Indominco

More information

Swift River Pit No. 1500

Swift River Pit No. 1500 Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops, BC, V2C-2T3 Telephone: (250) 371-3789 Fax: (250) 828-4083

More information

CONSERVATION OF SCARCE WATER RESOURCES AT RÖSSING URANIUM MINE Rainer Schneeweiss and Sandra Müller Rössing Uranium Ltd.

CONSERVATION OF SCARCE WATER RESOURCES AT RÖSSING URANIUM MINE Rainer Schneeweiss and Sandra Müller Rössing Uranium Ltd. CONSERVATION OF SCARCE WATER RESOURCES AT RÖSSING URANIUM MINE Rainer Schneeweiss and Sandra Müller Rössing Uranium Ltd. Introduction The Rössing Uranium Mine is located approximately 65 km inland from

More information

Year 4-7 Teacher Resource

Year 4-7 Teacher Resource Year 4-7 Teacher Resource Introduction Alcoa s Australian operations form an integrated aluminium industry which includes bauxite mines and alumina refineries in Western Australia and an aluminium smelter

More information

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20.

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20. The land required for the Sydney Park construction compound would be used temporarily throughout construction only. The construction compound site would be rehabilitated at the completion of construction,

More information

A Division of River Sands Pty Ltd. Concrete Accelerators, Admixtures, Dry Shotcrete and Grouts for Mining and Tunnelling Applications

A Division of River Sands Pty Ltd. Concrete Accelerators, Admixtures, Dry Shotcrete and Grouts for Mining and Tunnelling Applications A Division of River Sands Pty Ltd Concrete Accelerators, Admixtures, Dry Shotcrete and Grouts for Mining and Tunnelling Applications High Performance Accelerators New Generation Accelerators for Shotcrete

More information

2013 AGM. Managing Director s Presentation November 2013

2013 AGM. Managing Director s Presentation November 2013 2013 AGM Managing Director s Presentation November 2013 Disclaimer This material contains certain forecasts and forward-looking information, including regarding possible or assumed future performance,

More information

3. MINING SYSTEM AND RESOURCE RECOVERY

3. MINING SYSTEM AND RESOURCE RECOVERY 3. MINING SYSTEM AND RESOURCE RECOVERY (SMP Guideline Section 6.1) 3.1. MINING METHOD Longwalls 705 to 710 will be extracted using a longwall retreating system of mining, an established method of coal

More information

From copper ore to pure copper with the power of TAKRAF and ABB equipment

From copper ore to pure copper with the power of TAKRAF and ABB equipment From copper ore to pure copper with the power of TAKRAF and ABB equipment Dr. Mario Dilefeld Head of Belt Conveyor Systems Stockholm, 2017-05-03 Copper 2 3 Agenda 1. Introduction Copper used in construction

More information

In-Pit Tailing Storage Facility Management Plan

In-Pit Tailing Storage Facility Management Plan J.1 In-Pit Tailing Storage Facility Management Plan IN-PIT TAILINGS STORAGE FACILITY MANAGEMENT PLAN New Acland Coal Mine Stage 3 Project JANUARY 2014 Contents 1. Introduction 2 1.1. Overview 2 1.2. Purpose

More information

Southern Ionics Mining to Support the American Zirconium OxyChloride (ZOC) Business

Southern Ionics Mining to Support the American Zirconium OxyChloride (ZOC) Business Southern Ionics Mining to Support the American Zirconium OxyChloride (ZOC) Business Southern Ionics Business Overview Privately held chemical manufacturer Founded in 1980 by owner - Milton Sundbeck 285

More information

Monorail Beam Installation and Salvage System Glencore Oaky Creek Coal: Oaky No 1 Underground Mine

Monorail Beam Installation and Salvage System Glencore Oaky Creek Coal: Oaky No 1 Underground Mine Monorail Beam Installation and Salvage System Glencore Oaky Creek Coal: Oaky No 1 Underground Mine The Problem Oaky No. 1 uses a monorail system to safely and efficiently manage the services required to

More information

Gum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director

Gum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director Gum Flat Iron Ore Potential to Export from Port Lincoln in 2 years Dr A. John Parker Managing Director 7 th SA Explorers Conference 26 November 2010 Disclaimer & Competent Person s Statement This presentation

More information

Stakeholder Briefing Workshop. October 2017

Stakeholder Briefing Workshop. October 2017 Stakeholder Briefing Workshop October 2017 COMPANY OVERVIEW GREENLAND Exploring a number of high grade & high tonnage polymetallic assets throughout Greenland and the Nordic Region Dundas Titanium Project

More information

Contents. Before you begin. Introduction: Installing trench support 1. Element 1: Planning and preparing 3

Contents. Before you begin. Introduction: Installing trench support 1. Element 1: Planning and preparing 3 Contents Contents Before you begin v Introduction: Installing trench support 1 Element 1: Planning and preparing 3 Section 1.1 Accessing, interpreting and applying compliance documentation 4 to the work

More information

Environmental Assessment Approval

Environmental Assessment Approval Environmental Assessment Approval Approval Date: Original Dated April 20, 2012 Trimper Sand and Gravel Pit Expansion Ivan H. Trimper Construction Ltd., Proponent Annapolis County, Nova Scotia The Trimper

More information

LAS BAMBAS. December 2016

LAS BAMBAS. December 2016 LAS BAMBAS December 2016 1 Important Information The information contained in this presentation is intended solely for your personal reference and may not be reproduced, redistributed or passed on, directly

More information

MOBILE CRUSHING AND SCREENING PLANTS REMAX RCL RESCREEN

MOBILE CRUSHING AND SCREENING PLANTS REMAX RCL RESCREEN MOBILE CRUSHING AND SCREENING PLANTS REMAX RCL RESCREEN SBM mobile plants with quality to mobile success SBM s history starts with the construction of the first swing beam mill by Franz Wageneder in 1950.

More information

1.0 Name of Undertaking: CRANBERRY CREEK. 2.0 Proponent: Mr. Robert McFatridge. (i) 143 West Street Stephenville, NL A2N 1E7. (ii)

1.0 Name of Undertaking: CRANBERRY CREEK. 2.0 Proponent: Mr. Robert McFatridge. (i) 143 West Street Stephenville, NL A2N 1E7. (ii) 1.0 Name of Undertaking: CRANBERRY CREEK 2.0 Proponent: (i) (ii) (iii) (iv) Owner/Grower Telephone: 709-643-6364 email: nl10213@hotmail.com Owner/Grower Telephone: 709-643-6364 email: nl10213@hotmail.com

More information

Manufacturing-Engineering

Manufacturing-Engineering Manufacturing-Engineering BAGASSE STORAGE AND HANDLING IN QUEENSLAND D. J. Muir The Australian Estates Co. Ltd. Kalamia Estate Ayr, North Queensland ABSTRACT Previous methods of bagasse handling in Queensland,

More information

DREDGING THE ONE STOP FOR ALL YOUR DREDGING SOLUTIONS

DREDGING THE ONE STOP FOR ALL YOUR DREDGING SOLUTIONS DREDGING THE ONE STOP FOR ALL YOUR DREDGING SOLUTIONS EDITION 2017 1 INDEX INTRODUCTION page 3 The Dutch know dredging State of the art dredge design AMPHIBIOUS EXCAVATORS page 5 Applications Features

More information

HPGR in the Iron Ore Industry

HPGR in the Iron Ore Industry Insights Session HPGR in the Iron Ore Industry Presented by Karri Dorrington, Process Engineer Mineral Engineering Technical Services Pty Ltd PO Box 5778 St Georges Tce WA 6831 P: (+61 8) 9421 9000 F:

More information

Trommel 830 INTRODUCING THE

Trommel 830 INTRODUCING THE Powerscreen Ltd. Lower Main St.,Kilbeggan, Co. Westmeath Tel: 00 353 506 32178 Fax: 00 353 506 32443 Email: mail@powerscreen.ie INTRODUCING THE Page 2 FEATURES Total weight 33,000kgs (36.3 US tons) Height

More information

INVESTMENT POTENTIAL INVEST IN PORT TERMINALS AT THE PORT OF WALVIS BAY NORTH PORT PROGRAM DATE: 29 AUGUST 2016 REVISION: 1

INVESTMENT POTENTIAL INVEST IN PORT TERMINALS AT THE PORT OF WALVIS BAY NORTH PORT PROGRAM DATE: 29 AUGUST 2016 REVISION: 1 INVESTMENT POTENTIAL INVEST IN PORT TERMINALS AT THE PORT OF WALVIS BAY NORTH PORT PROGRAM DATE: 29 AUGUST 2016 REVISION: 1 CONTENTS 1 Port of Walvis Bay North Port Development Program Overview 1.1 Brief

More information

LIQUEFIED NATURAL GAS LIMITED

LIQUEFIED NATURAL GAS LIMITED LIQUEFIED NATURAL GAS LIMITED ASX: LNG CNPC HQCEC: Company Making Transaction Liquefied Natural Gas Limited 5 Ord Street West Perth WA 6005 +61 8 9366 3700 www.lnglimited.com.au LNG Limited An Overview

More information

Innovative Closure Concepts for Xstrata Nickel Onaping Operations

Innovative Closure Concepts for Xstrata Nickel Onaping Operations Innovative Closure Concepts for Xstrata Nickel Onaping Operations Joe Fyfe - Superintendent Environment & HSEC Systems Xstrata Nickel Sudbury Jeff Martin P Eng Senes Consultants Richmond Hill 14 th Annual

More information