1 Mr. Daniel Tse Gasification Expert GE Holding a B.S. degree in Electrical Engineering from the University of Houston, Mr. Daniel has 17 years of experience in the gasification industry including roles such as Pricing Leader and Commercial Leader for GE s gasification business. Mr. Daniel has authored a gasification patent and represents GE on the Gasification Technologies Council. Prior to the start of his GE career, he worked for Texaco and ChevronTexaco in various commercial, project management, and technical roles wherein he directly managed projects related to gasifiers, refineries, and petrochemical plants.
2 GE Power & Water GE s Petcoke Gasification Technology Ready to meet today s feedstock challenge Daniel Tse, Manager Gasification Solutions Petroleum Conclave l March 2013 GE s Gasification Technology Chemicals Synthetic Natural Gas Transportation Fuels Refinery Polygen Electricity
3 Natural gas historical pricing 2
4 LNG prices expected to remain above $15 in the foreseeable future Source: Credit Rating and Information Services of India Ltd. (CRISIL) India s gas utilization policy will not allow domestic gas to flow into industry NG demand growing at 19% compound annual growth rate (CAGR); 10 LNG terminals planned currently only 2 Naptha when used for power generation translates to very high costs per unit of power produced ($1000/t translates to $26/mmbtu) 3
5 Steam Methane Reformer (SMR) economics Source: US DOE/NETL, Current (2005) Hydrogen from Natural Gas without CO2 Capture and Sequestration, updated by NREL 2008 and GE Internal Calculations 4
6 Gasification technology Power (IGCC) Greenfield Polygen Refueling Site repowering Syngas out (H 2 + CO) Feedstock in Coal Pet coke Asphalt Heavy Oil Vacuum Residue Natural Gas Process gas Refineries Chemicals Methanation Coal to liquids Hydrogen Steam Power Formaldehyde MTBE Methanol Acetic acid Amine DME Ammonia Urea Ammonia nitrate/sulfate Oxochemicals: Butanol, Ethylhexanol Substitute natural gas Transportation fuels 5
7 Radiant cooler Gasifier Chamber Two configurations Quench Quench Quench Radiant Syngas Cooler Partial Quench (RSC/PQ) Hot syngas immediately quenched by direct water contact Syngas is warm and saturated with water ideal for sour CO shift Commercial application 12 to 86 bar Proven gasifier sizes up to nominal 900ft 3 Typical applications: chemicals, hydrogen, refinery polygen for heat recovery Gasifier Chamber Hot syngas first cooled by radiant cooling before quenching Generates high pressure steam to ~135 bar Limits pressures to ~45bar Proven up to nominal 1800ft 3 Typical applications: power generation, refinery polygen Better efficiency than quench Lower capital cost than RSC Shorter construction cycles than RSC Construction cycle more complex than quench 6
8 Installed fleet by the numbers GE has 155 gasifiers in commercial operation the largest fleet in the industry with additional gasifiers in development, engineering, or construction at 95 and a global presence in different countries plants 7
9 Petroleum Coke Gasification
10 GE s Petroleum coke gasification history 1970s Research, pilot study & semi-commercial testing began 1980s Early industrial scale test at Eastman/Ube % petroleum coke to power industrial demo unit built within the El Dorado, KS. Refinery More industrial applications: Coffeyville: Urea/Refinery H 2 & Delaware: IGCC 9
11 GE s Petroleum coke experience GE has licensed (7) 100% petroleum coke gasification plants since 1982 USA: (4) plants with (2) in operation, (1) shut down & the other one in EPC phase Asia: (2) built in Japan with (1) still operating Euro: (1) in Russia in EPC phase GE has licensed multiple partial petroleum coke mixing with coal plants around the world including refineries in China Gasified cokes from both fluid coking & delayed coking process High sulfur shot coke was the feed in Delaware IGCC units 10
12 Case Study: Coal to Petroleum Coke
13 Original IGCC configuration 5 Year U.S. Department of Energy (DOE) obligation: Only coal feedstock (no petroleum coke) Slag stored on-site for later disposition 12
14 Petroleum coke introduction 1999 Petroleum coke was blended offsite (port of New Orleans) & shipped as a blend to Tampa Petcoke blend limits Recycle fines Sulfur & chlorides in feedstock Ash fusion temperature/refractory life 13
15 Coke blend variations Current blend; 60% petroleum coke 40% coal Demonstrated petroleum coke/coal blends up to 100% petroleum coke % blend depends on several factors: Cost of fuels Available fuels % Sulfur & ppm chlorides in fuel 14
16 Case Study: Plant Relocation Conversion to Petroleum Coke
17 Barstow, California Coolwater IGCC Location: Barstow, California, USA Startup: 1984 Feedstock: Coal Capacity: 1,150t/d Operation Pressure: 41bar Gasifiers: 1 900ft³ Radiant Syngas Cooler/Convective Syngas Cooler; 1 600ft³ Quench Gas Turbines: 107E; 110MW Plant mothballed after 5-year Department of Energy demonstration Combined cycle plant repurposed to natural gas Gasification equipment sat idle until mid 90 s 16
18 Equipment relocated to new fertilizer project site 1,900 km Coffeyville Site: Co-located at delayed coking refinery In middle of farm country Located far enough away from NOLA to benefit from transportation costs Barstow, CA Coffeyville, KS 1,000km 800km 600km 400km 200km New Orleans, LA 17
19 Coffeyville, Kansas, USA Location: Coffeyville, Kansas, USA Startup: 2000 Feedstock: Petroleum Coke Capacity: 1,180t/d (per gasifier) Operation Pressure: 43bar Gasifier Size: 2 900ft³ Quench Oxygen >90% availability (no spare) CO 2 Separation Petcoke 1300 t/d GE Gasification & Syngas Scrubbing CO Shift & Cooling Acid Gas Removal Pressure Swing Absorption Ammonia Synthesis Ash / Slag Handling Sulfur Recovery CO 2 Purification NH₃ Product 1,100 stpd 18
20 Syngas & high H 2 capable turbines 19
21 Syngas turbines: fuel applications 6B (50/60 Hz) 7E (60 Hz) 9E (50 Hz) 6F (50/60 Hz) 7F (60 Hz) 9F (50 Hz) Low Air IGCC Syngas Blast Furnace Gas Fuel Heating Value Medium O 2 IGCC Syngas GTL Off-gas High High H 2 for CCS High H 2 for EOR 20
22 Low-BTU gas turbines 6B 42 MW 46 MW 7E 85 MW 85 MW Simple cycle output (MW) Natural Gas Syngas 6F 77 MW 92 MW 9E 126 MW 140 MW 7F 187 MW 232 MW 9F 256 MW natural gas 285 MW syngas 21
23 Syngas turbine controls & accessories Inlet bleed heat system Inlet filter house Inlet duct & plenum Ventilation modifications Syngas fuel skid with N2 purge Static starter Gas fuel module Optional air extraction skid 1 IGCC Controls with added I/O Enclosure modifications: Piping for syngas, diluent, etc. Explosion proofing Hazardous gas detection Fire protection Controls hardware & software Accessory module Liquid fuel and atomizing air Water injection skid Exhaust system N2/Steam injection skid 1 1 Fuel and diluent skids/modules may need to be customized for specific fuel/plant configurations 22
24 Achieving RAM Targets with Polygeneration
25 Plant configurations Traditional Quench Produces only H 2 Spares for availability (either 1+1 or 2+1) Can achieve H 2 availability up to 98.8% Polygeneration Produces H 2 for refinery Produces power & steam No unused spares Can achieve H 2 availability up to 99.9% Higher efficiency than traditional quench with RSC configuration Coke Grind ASU Coke Grind ASU Gas Turbine HRSG Steam Turbine SLURRY OXYGEN SLURRY OXYGEN HP Steam SYNGAS TAIL GAS Gasification (Quench Gasifier) Shift/ LTGC AGR PSA Gasification (Quench or RSC Gasifiers) Shift/ LTGC AGR PSA SLAG WATER BLOWDOWN ACID GAS MP and LP Steam SLAG WATER BLOWDOWN ACID GAS MP and LP Steam Slag Crusher Fines Handle Sulfur Recovery Slag Crusher Fines Handle Sulfur Recovery Slag/ Fines Handle Waste Water Treat Sulfur Handling Slag/ Fines Handle Waste Water Treat Sulfur Handling 24
26 Availability Availability Economics of reliability/availability CCF - Yr 1-5 NPV CCF - Yr 1-5 NPV Poor time to maturity can result in 60% decrease in early year cash flow and 35% decrease in project NPV 25
27 RAM expertise GE Reliability Centers of Excellence Warsaw, Poland Schenectady, NY Greenville, SC Capabilities Analysis of reliability, availability, streams throughput, configuration of process units, streams & critical equipment, enhancing planned maintenance strategy & sparing philosophy 26
28 Typical availability (no spare) Chinese coal plants benchmarked for equivalent availability over 3 years Equivalent availability was for the total syngas plant not just the gasifiers 27
29 Planned maintenance Best-in-class petroleum coke 900 ft³ maintenance schedule Refractory Repair cone/throat: 7 days, every 18 months Repair neck/dome/sidewall: 17.5 days, every 24 months Replacement: 25 days, every 72 months Other Gasification 2.5 days, every 6 months 5 days, every 12 months Leveled annual maintenance: 16.8 days Total availability impact: 4.6% 28
30 Availability comparisons Typical Best Planned Maintenance -7% -5% Unreliability -4% -4% Equivalent Availability 89% 91% Polygeneration typically includes hydrogen, power & steam production Very high hydrogen availability can be achieved Equivalent Availability Typical Best 1+0 (1 100%) 89.0% 91.0% 1+1 (2 100%) 98.8% 99.3% 2+1 (3 50%) 98.2% 98.9% 3+0 (3x33⅓%) H % 99.9% 3+0 (3x33⅓%) Coke/MW 83.5% 90.8% Calculated from single train availability using a binomial distribution Syngas turbines are backed up with back-up fuels, power availability will be higher 29
31 A Perspective on Capital Expenditures from China
32 Background Primary Objective: Assess technical & economic viability of China IGCC using GE technology Joint study w/ China Power Engineering Consulting Group Corporation (CPECC) Technology selections enhance efficiency while reducing capital expenditure Create plan for future efficiency & cost improvements 31
33 IGCC study results Study Parameter Target Result 41-43% LHV Efficiency 42.2% LHV Output 800MW net Cost RMB/KW (Gross Output Basis) Meet IGCC Emissions Standards Water Consumption at a Maximum of 0.6 m 3 /GWs 870 MW net 8928 RMB/KW (~$1380/KW) Key Area Standard met Maximum met 32
34 Gasifier economics Source: Internal GE calculation 33
35 Thank you 34
36
GE Metals Solutions. Solutions for Steel
GE Metals Solutions Solutions for Steel 1 Global Challenges What if you could reduce operational energy costs? 20-40% of the cost of steel comes from energy costs 2 Global Challenges What if you could
More informationEvaluation of Hydrogen Production at Refineries in China. The new UOP SeparALL TM Process. Bart Beuckels, UOP NV
Evaluation of Hydrogen Production at Refineries in China The new UOP SeparALL TM Process Bart Beuckels, UOP NV IChemE Gasification Conference March 12, 2014 Rotterdam, the Netherlands 1914-2014 A Century
More informationGE Energy. Advancements in Gasification Technology Allan Connolly, General Manager of Gasification Technology October 12, 2005
GE Energy Advancements in Gasification Technology Allan Connolly, General Manager of Gasification Technology October 12, 2005 GE s IGCC Technology A Total Package Gasification Technology World class commercial
More informationGTC Tour. Coffeyville Resources Nitrogen Fertilizer. June 17, 2008
GTC Tour of Coffeyville Resources Nitrogen Fertilizer Facility June 17, 2008 Coolwater Demonstration Project Coffeyville Nitrogen Plant Block Flow Diagram NH 3 Product ASU Nitrogen Ammonia Synthesis UAN
More informationWorkshop on Gasification Technologies March 2-3, 2006 Tampa, Florida
Workshop on Gasification Technologies March 2-3, 2006 Tampa, Florida Getting off the Natural Gas Habit Coal to Nitrogen Fertilizers Neal Barkley, P.E. Plant Manager Coolwater Demonstration Project Coffeyville
More informationProjects on 3 continents
Projects on 3 continents Keith White, General Manager, Gasification Gasification leader Over 65 facilities and 145 gasifiers operating worldwide Experience First coal gasification plant in 1978 First pet
More informationGE Energy. Advances in IGCC projects & Technology for the next generation of IGCC & Carbon Capture CC(+S) plants. Marcus Scholz 2010
GE Energy Advances in IGCC projects & Technology for the next generation of IGCC & Carbon Capture CC(+S) plants Marcus Scholz 2010 Agenda IGCC Project experience & current activity Lessons learnt & technology
More informationReducing CO 2 Emission by Hydrogen IGCC Power Plants. Hydrogen IGCC
2002 Gasification Technology Conference Reducing CO 2 Emission by Power Plants Robert M. Jones, Joachim Wolff, Uhde GmbH (Speaker) Increasing Environmental Benefit of IGCC 1. Carbon Sequestration 2. Design
More informationPolk Power Key Lessons for IGCC Gasification Technologies Conference October 15, 2015
Polk Power Key Lessons for IGCC Gasification Technologies Conference October 15, 2015 Mark Hornick Tampa Electric Company Tampa Electric Company Investor owned - NYSE Regulated rates FL PSC $2.4b Revenue
More informationRepowering Conventional Coal Plants with Texaco Gasification: The Environmental and Economic Solution
Repowering Conventional Coal Plants with Texaco Gasification: The Environmental and Economic Solution INTRODUCTION Coal fired power plants have been producing a significant amount of power in the United
More informationAnalysis of flexibility options for electricity generating projects with pre-combustion capture of CO 2
IC 4 S Imperial College Centre for Carbon Capture and Storage Workshop on Operating Flexibility of Power Plants with CCS Imperial College, London, 11 th 12 th November 2009 Analysis of flexibility options
More informationRectisol Wash Units Acid Gas Removal for Polygeneration Concepts downstream Gasification
Rectisol Wash Units Acid Gas Removal for Polygeneration Concepts downstream Gasification Ulvi Kerestecioğlu, Thomas Haberle GTC Conference, Washington DC, USA, November 3rd, 2010 Agenda of the Presentation
More informationLUMMUS TECHNOLOGY. Lummus E-Gas Gasification Technology
Lummus E-Gas Gasification Technology AGENDA E-Gas Technology Overview E-Gas Global Projects E-GAS BACKGROUND Bench- Scale, Mini Plant, Pilot Plant 1975 1982 36 TPD Proto 1 1979-1983 400 TPD Proto 2 1983-1987
More informationGE Energy. Commercial Experience in. GE s Gasification Technology. Qianlin Zhuang, Ph.D. Eng Commercialization Manager, China. GTC 2006 October 2006
GE Energy Commercial Experience in China GE s Gasification Technology Qianlin Zhuang, Ph.D. Eng Commercialization Manager, China GTC 2006 October 2006 Energy Status in China Economy heavily dependent on
More informationPerspective on Coal Utilization Technology
Perspective on Coal Utilization Technology 21st Annual International Pittsburgh Coal Conference on 14-16 September, 2004 Naokazu Kimura Director, Wakamatsu Research Institute J-Power/EPDC Agenda - About
More informationThe Cost of Mercury Removal in an IGCC Plant
The Cost of Mercury Removal in an IGCC Plant M.D. Rutkowski, M.G. Klett, R.C. Maxwell October 1, 2002 Washington, D.C. Acknowledgments Gary J. Stiegel James R. Longanbach David L. Denton U.S. DOE/NETL
More informationAn Update On Shell Licensed Gasification Projects and the Performance of Pernis IGCC
An Update On Shell Licensed Gasification Projects and the Performance of Pernis IGCC 2000 Gasification Technologies Conference 8-11 October, San Francisco J.D. de Graaf Summary Introduction Shell Gasification
More informationRonald L. Schoff Parsons Corporation George Booras Electric Power Research Institute
Pre-Investment of IGCC for CO 2 Capture with the Potential for Hydrogen Co-Production Gasification Technologies 2003 - San Francisco, California - October 12-15, 2003 Michael D. Rutkowski, PE Parsons Corporation
More informationCustomizing Syngas Specifications with E-Gas Technology Gasifier
Customizing Syngas Specifications with E-Gas Technology Gasifier Arnold Keller, David Breton, Chancelor Williams and Graham Poulter, ConocoPhillips, Houston, Texas Gasification Technology Conference San
More informationGasification to meet refinery hydrogen, electricity and steam demands: Availability vs Costs
Gasification to meet refinery hydrogen, electricity and steam demands: Availability vs Costs GTC Annual Conference 4-7 October 2009 Colorado Springs S. Arienti Process Director Foster Wheeler Italiana
More informationIGCC & Gasification for a Changing Marketplace
IGCC & Gasification for a Changing Marketplace Neville Holt - EPRI Technical Fellow, Advanced Coal Generation Technology MIT Carbon Sequestration Forum V11 Cambridge, MA October 31, 2006 1 Options for
More informationROYAL SOCIETY OF CHEMISTRY TECHNOLOGY IN THE USE OF COAL
ROYAL SOCIETY OF CHEMISTRY TECHNOLOGY IN THE USE OF COAL Professor James Harrison FRSC FEng 1 National Coal Board 1947 Mines 958 Manpower 718000 Use electricity 28 -domestic 37 -steel 43 -other 80 Total
More information2014 Gasification Technologies Conference Washington, DC Oct UOP LLC. All rights reserved.
Techno-economic economic analysis of acid gas removal solutions for SNG applications Ganesh Nayak 2014 Gasification Technologies Conference Washington, DC Oct 26-29 2014 UOP LLC. All rights reserved. Criteria
More information2013 Instituto Petroquímico Argentino (IPA) Conference 09 October 2013 Buenos Aires, Argentina
The UOP Selexol Process: Efficient Acid Gas Removal in Gasification Value Chain Henry Traylor UOP LLC, A Honeywell Company 2013 Instituto Petroquímico Argentino (IPA) Conference 09 October 2013 Buenos
More informationCeramic Membranes for Oxygen Production in Vision 21 Gasification Systems
Ceramic Membranes for Oxygen Production in Vision 21 Gasification Systems VanEric Stein and Ted Foster Gasification Technologies 2001 San Francisco, CA October 10, 2001 Acknowledgments Gary Stiegel Arun
More information- The Osaki CoolGen Project -
Realization of Innovative High Efficiency and Low Emission Coal Fired Power Plant - The Osaki CoolGen Project - Kenji Aiso Osaki Coolgen Corporation Outline 1. Background 2. Gasification Technology 3.
More informationLurgi s MPG Gasification plus Rectisol Gas Purification Advanced Process Combination for Reliable Syngas Production
Lurgi s MPG Gasification plus Rectisol Gas Purification Advanced Process Combination for Reliable Syngas Production Ulrich Koss, Holger Schlichting Gasification Technologies 2005 San Francisco, 9. 12.
More informationEnabling a Brighter Tomorrow: E-Gas TM Gasification
Enabling a Brighter Tomorrow: E-Gas TM Gasification U.S. China Oil & Gas Industry Forum September 11, 2007 San Francisco, CA Doug Sauer Manager, Asia Business Development, E-Gas Gasification Doug.b.sauer@conocophillips.com
More informationCarson Hydrogen Power
alternativenergy Carson Hydrogen Power Gasification Technologies Council Annual Meeting Washington, DC October 4, 2006 Carson Hydrogen Power Outline of Presentation Project Participants Project Goals and
More informationProduction of Electric Power and Chemicals in a Carbon Constrained Environment
Production of Electric Power and Chemicals in a Carbon Constrained Environment Guido Collodi, Luca Mancuso, Federico Fazi Foster Wheeler Italiana SpA Via Caboto 1, 20094 Corsico Milan - Italy The Chemical
More informationCo-Production of Fuel Alcohols & Electricity via Refinery Coke Gasification Ravi Ravikumar & Paul Shepard
Co-Production of Fuel Alcohols & Electricity via Refinery Coke Gasification Ravi Ravikumar & Paul Shepard October 15, 2003 Gasification Technologies 2003 Conference San Francisco, CA Study Objectives Evaluate
More informationFossil Energy. Fossil Energy Technologies. Chapter 12, #1. Access (clean HH fuel) Coal. Air quality (outdoor)
Fossil Energy Technologies Coal steam power Gasification Power Access (clean HH fuel) Coal Direct Liquefaction Gasification liquids Air quality (outdoor) Natural Gas Biomass Power/liquids Co-production
More informationCarson Hydrogen Power
alternativenergy Carson Hydrogen Power Seventh annual MIT Carbon Sequestration Forum Cambridge, MA 31 st Oct & 4 th Nov, 2006 Carson Hydrogen Power Outline of Presentation Project Participants Project
More informationTHE NOVELEDGE IGCC REFERENCE PLANT: COST AND EMISSIONS REDUCTION POTENTIAL. Gasification Technologies 2004, Washington, DC, October 6, 2004
THE NOVELEDGE IGCC REFERENCE PLANT: COST AND EMISSIONS REDUCTION POTENTIAL Gasification Technologies 2004, Washington, DC, October 6, 2004 Dave Heaven, Fluor; William S. Rollins, NovelEdge Technologies,
More informationTony Alderson & Steve Mabey Jacobs Consultancy
GASIFICATION TECHNOLOGIES CONFERENCE 2008 Optimizing Capex and Reliability on Gasification Facilities Tony Alderson & Steve Mabey Jacobs Consultancy 1 Agenda Who we are Gasification business drivers Delivering
More informationAn Opportunity for Methanol; the Production Starting from Coal
An Opportunity for Methanol; the Production Starting from Coal by Luigi Bressan and Luca Mancuso Foster Wheeler Italiana and Ermanno Filippi, Methanol Casale S.A. presented at the 2008 WORLD METHANOL CONFERENCE
More informationTRONDHEIM CCS CONFERENCE
TRONDHEIM CCS CONFERENCE June 15, 2011 6th Trondheim Conference on CO 2 Capture, Transport and Storage Pedro Casero Cabezón (pcasero@elcogas.es) ELCOGAS S.A (www.elcogas.es) 1 SCOPE IGCC & ELCOGAS, S.A
More informationUltra-Heavy Oil Production and Upgrading with Gasification
Ultra-Heavy Oil Production and Upgrading with Gasification Gasification Technologies 2004 Alma Rodarte Manager North America Licensing GE Energy Oil Sands Reserves Source: Overview of Canada s Oil Sands,
More informationEfficient Technologies for Down Stream Gasification Process and Integration with IGCC Power Production
Efficient Technologies for Down Stream Gasification Process and Integration with IGCC Power Production Research I Technology I Catalysts Jens Perregaard, Per Bakkerud and Poul Erik Højlund Nielsen Haldor
More informationAbstract Process Economics Program Report 274 FUEL ALCOHOLS AND ELECTRICITY COGENERATION FROM PETROLEUM COKE GASIFICATION (December 2010)
Abstract Process Economics Program Report 274 FUEL ALCOHOLS AND ELECTRICITY COGENERATION FROM PETROLEUM COKE GASIFICATION (December 2010) Increasing use of heavy crude oil in refineries in recent years
More informationCommercial Development of the SES U-GAS Gasification Technology
Commercial Development of the SES U-GAS Gasification Technology Francis Lau 2009 Gasification Technologies Conference Colorado Springs, Colorado October 4-7, 2009 Forward Looking Statements This presentation
More informationShell Coal Gasification Process for Power
Shell Coal Gasification Process for Power and CO 2 capture Gasification Conference Freiberg, June 2005 Rik van der Ploeg Rob van den Berg Ico van den Born Shell Coal Gasification Process for Power and
More informationValorisation of Synthesis Gas from Biomass - the Piteå DME pilot. Esben Lauge Sørensen, May 2009
Valorisation of Synthesis Gas from Biomass - the Piteå DME pilot Esben Lauge Sørensen, May 2009 Contents Presentation of Haldor Topsøe A/S Presentation of Chemrec AB The BioDME Project Lay-out of DME pilot
More informationThe Use of MPG Gasification for Upgrading Canadian Oil Sands"
The Use of MPG Gasification for Upgrading Canadian Oil Sands" Ulrich Wolf, Holger Schlichting, Stefan Walter, Lurgi AG Jim Quinn, North West Upgrading Inc. 2006 Gasification Technology Conference JW Marriott,
More informationTHE SARLUX IGCC PROJECT AN OUTLINE OF THE CONSTRUCTION AND COMMISSIONING ACTIVITIES
THE SARLUX IGCC PROJECT AN OUTLINE OF THE CONSTRUCTION AND COMMISSIONING ACTIVITIES 1999 Gasification Technologies Conference San Francisco, California October 17-20,1999 Guido Collodi - Snamprogetti -
More informationEngineers India Limited Multi product generation from Coal via gasification
Engineers India Limited Multi product generation from Coal via gasification 16 th February, 2017, New Delhi Future Energy Scenario - India Energy Hungry Nation (a) Growth Vs Energy Demand Trend India Imports
More informationPre-Combustion Technology for Coal-fired Power Plants
Pre-Combustion Technology for Coal-fired Power Plants Thomas F. Edgar University of Texas-Austin IEAGHG International CCS Summer School July, 2014 1 Introduction 2 CO 2 Absorption/Stripping of Power Plant
More informationTHE WABASH RIVER IGCC PROJECT REPOWERING COAL FIRED POWER PLANTS
THE WABASH RIVER IGCC PROJECT REPOWERING COAL FIRED POWER PLANTS PHIL AMICK VICE PRESIDENT, COMMERCIAL DEVELOPMENT GLOBAL ENERGY, INC. 1 2 Our company: Project Developer for Gasification Facilities Environmentally
More informationGasification & Water Nexus
Gasification & Water Nexus GTC Workshop on Gasification Technologies Denver, Colorado March 14, 2007 Richard D. Boardman, Ph.D. INL R&D Lead for Gasification & Alternative Fuels (208) 526-3083; Richard.Boardman@inl.gov
More informationPower Generation and Utility Fuels Group. Reynolds Frimpong Andy Placido Director: Kunlei Liu
Power Generation and Utility Fuels Group Reynolds Frimpong Andy Placido Director: Kunlei Liu Gasification Background and Process Description Combustion vs. Gasification Combustion with oxygen Partial combustion
More informationPower Generation PG CTET-Han
V94.2 Buggenum Experience and Improved Concepts for Syngas Applications F. Hannemann, U.Schiffers, J. Karg, Siemens AG Power Generation M. Kanaar, Nuon Power Generation PG CTET-Han Content Buggenum Plant
More informationCoal based IGCC technology
Coal based IGCC technology Ola Maurstad, post doc Based on work during stay at Massachusetts Institute of Technology 2004-2005 1 Gasification Gasification is the conversion of a solid fuel to a combustible
More informationThe BGL Commercial Plants and Pilot Testing
The BGL Commercial Plants and Pilot Testing M. Olschar, O. Schulze (IEC) 5th International Freiberg Conference on IGCC & XtL Technologies, May 21-24, 2012, Leipzig, Germany Introduction The improved slagging
More informationThe Progress of Osaki CoolGen Project
The Progress of Osaki CoolGen Project ~ Oxygen-blown Integrated Coal Gasification Fuel Cell Combined Cycle Demonstration Project ~ September, 2017 Osaki Coolgen Corporation 1 Outline 1. Background and
More informationLatest Development of Lurgi s MPG-technology Update on Hydrogen Unit for NWU Project
Latest Development of Lurgi s MPG-technology Update on Unit for NWU Project U. Wolf, H. Schlichting, S. Walter, Lurgi AG J. Quinn, North West Upgrading Inc. Gasification Technologies Conference 2007 October
More informationTPRI. GreenGen. -Near Zero Emission Coal Based Power Demonstration Project in China. Dr. Xu Shisen. GreenGen Ltd. Co.
TPRI GreenGen -Near Zero Emission Coal Based Power Demonstration Project in China Dr. Xu Shisen Thermal Power Research Institute GreenGen Ltd. Co. 5 Oct. 2009 Contents TPRI The Road Map of GreenGen Implementation
More informationPRENFLO: PSG and PDQ
1 PRENFLO: PSG and PDQ Latest Developments based on 10 years Operating Experience at Elcogas IGCC, Puertollano, Spain Karsten Radtke, Max Heinritz-Adrian; Uhde, Germany Max Hooper, Bill Richards; Uhde
More informationAdvanced Coal Technology 101
Advanced Coal Technology 101 National Conference of State Legislators Conference November 1, 2007 Dr. Jeffrey N. Phillips Program Manager Advanced Coal Generation Options CO 2 Capture in Coal Power Systems
More informationProduction of Biofuels using thyssenkrupp Gasification Technologies
Production of Biofuels using thyssenkrupp Gasification Technologies 12 th Feb, 2016 Dr. Dobrin Toporov Mathias Sonntag (presenter) thyssenkrupp Industrial Solutions 1. The Company Profile 2. The Gasification
More informationUSE AND ELIMINATION OF METHANE IN COALMINE VENTILATION AIR (Cummings,D,R) DUT Pty Ltd
USE AND ELIMINATION OF METHANE IN COALMINE VENTILATION AIR (Cummings,D,R) DUT Pty Ltd ABSTRACT The paper covers development work on a Fuel Ingested Gas Turbine (FIGT) system specifically designed to ingest
More informationRefinery Residue Based IGCC Power Plants and Market Potential
10/17/2001 page 1 Gasification Technologies 2001 Refinery Residue Based IGCC Power Plants and Market Potential Joachim Wolff (Speaker), Karsten Radtke GmbH Jürgen Karg, Werner Günster Siemens AG Power
More informationNOx CONTROL FOR IGCC FACILITIES STEAM vs. NITROGEN
NOx CONTROL FOR IGCC FACILITIES STEAM vs. NITROGEN GASIFICATION TECHNOLOGIES CONFERENCE SAN FRANCISCO, CALIFORNIA OCT. 27-30, 2002 Phil Amick, Global Energy Inc. Ron Herbanek, Global Energy Inc. Robert
More informationPetroleum Coke Gasification Sweeny E-GasE. Gas Project
Petroleum Coke Gasification Sweeny E-GasE Gas Project Michael Culligan Manager, Sweeny Gasification Project Development October 7, 2008 1 Key Points ConocoPhillips believes gasification technology and
More informationSiemens Gasification and IGCC Update
Siemens Gasification and IGCC Update Harry Morehead Manager, IGCC and Gasification Sales and Marketing, Americas Presented at PowerGEN International Orlando, FL December 3, 2008 Siemens Energy Renewable
More informationWhat s in the Pipeline? New Projects and Opportunities
What s in the Pipeline? New Projects and Opportunities 1999 Gasification Technologies Conference October 18-20, 1999 The Westin St. Francis Hotel San Francisco, CA Neville Holt - EPRI Gasification Markets
More informationThe Hydrogen Energy California (HECA) Project
The Hydrogen Energy California (HECA) Project N Maha Mahasenan Principal Advisor International Advanced Coal Conference Laramie, WY June 23, 2010 1 Presentation Outline (1) Introduction to the Project
More informationMinimizing associated gas flaring with smaller scale methanol production
Minimizing associated gas flaring with smaller scale methanol production Esben Sorensen, Haldor Topsoe Inc. EFI Gas Flare Reduction & Monetization Forum; Denver Marriott City Center Denver, Colorado; 15
More information2013 GASIFICATION TECHNOLOGIES CONFERENCE
2013 GASIFICATION TECHNOLOGIES CONFERENCE SYSTEM INTEGRATION AND WATER BALANCE ISSUES IN POLYGENERATION GASIFICATION PLANTS TOM MARAMBA STEVE JANDA JASON YONG KILDONG HWANG BHASKAR ROY JACK KLINGER ASHOKA
More informationProduction of Electricity and/or Fuels from Biomass by Thermochemical Conversion
Production of Electricity and/or Fuels from Biomass by Thermochemical Conversion Eric D. Larson* Haiming Jin** Fuat Celik* RBAEF Meeting Washington, DC 23 February 2004 * Princeton Environmental Institute
More informationConocoPhillips Gasification Outlook. Gasification Technology and IGCC Programs & Progress
ConocoPhillips Gasification Outlook Gasification Technology and IGCC Programs & Progress McIlvaine Company Hot Topic Hour August 19, 2010 Phil Amick Commercialization Manager ConocoPhillips # 6 on Fortune
More informationGE Energy. IGCC vs. Carbon
GE Energy IGCC vs. Carbon Increasing Difficulty for New PC Plants Cancellations & postponements at record levels coal moratorium NOW! For Immediate Release January 17, 2008 Progress Towards a Coal Moratorium
More informationThermodynamic performance of IGCC with oxycombustion
Thermodynamic performance of IGCC with oxycombustion CO 2 capture G.Lozza, M. Romano, A. Giuffrida Dip. Energia, Politecnico di Milano, Italy Purpose of the study CO 2 capture from coal power plant. Configurations
More informationOPERATIONAL EXPERIENCE AND CURRENT DEVELOPMENTS.
PUERTOLLANO Puertollano IGCC IGCC Power Plant POWER - ELCOGAS PLANT. OPERATIONAL EXPERIENCE AND CURRENT DEVELOPMENTS. International Freiberg Conference on IGCC & XtL Technologies 8-12 May, 2007 Freiberg,
More informationProblematica e Tecnologie per la cattura di CO 2 Stefano Consonni Dipartimento di Energetica - Politecnico di Milano
Pianeta 3000 La ricerca scientifica per l'ambiente e il Territorio Problematica e Tecnologie per la cattura di CO 2 Stefano Consonni Dipartimento di Energetica - Politecnico di Milano Milano, 12 novembre
More informationThe CCG Technology of CHOREN
The CCG Technology of CHOREN Entrained flow carbon gasification concepts of CHOREN Industries Dr. Christoph Kiener Dresden, 18 May 2009 CHOREN Industries GmbH Business Development Phone: +49 3731 266 220
More informationGASIFICATION for COMBINED PRODUCTION OF ELECTRIC POWER AND CHEMICALS
GASIFICATION for COMBINED PRODUCTION OF ELECTRIC POWER AND CHEMICALS R. Domenichini Foster Wheeler Italiana Power Division Gasification Technology Conference, October 2008 Washington (USA) A G E N D A
More informationNPRC Negishi IGCC Startup and Operation
NPRC Negishi IGCC Startup and Operation Gasification Technologies 2003 San Francisco, California October 12-15, 2003 JGC Corporation Takuya Ono 1 Contents 1. Outline of Negishi IGCC Block Flow Process
More informationCommercial Application of BGL Gasifiers M. Olschar, H. Hirschfelder, W. F. Staab, A. R. Williams (GL)
Commercial Application of BGL Gasifiers M. Olschar, H. Hirschfelder, W. F. Staab, A. R. Williams (GL) 4th International Freiberg Conference on IGCC & XtL Technologies, 3-5th May, 2010, Dresden, Germany
More informationGASIFICATION FOR COMBINED PRODUCTION OF
GASIFICATION FOR COMBINED PRODUCTION OF ELECTRIC POWER AND CHEMICALS R. Domenichini - Technical Director Foster Wheeler Italiana - Power Division Gasification Technology Conference, October 2008 Washington
More informationIntegrated processes for converting coal to chemicals and fuels. Maninder Jit Singh Haldor Topsøe
Integrated processes for converting coal to chemicals and fuels Maninder Jit Singh Haldor Topsøe Converting coal to chemicals and fuels Sulfuric acid SNG Coal Coal gasification Syngas conditioning Ammonia
More informationSasol-Lurgi Fixed Bed Dry Bottom Gasification for Fuels and Chemicals
Sasol-Lurgi Fixed Bed Dry Bottom Gasification for Fuels and Chemicals Sasol-Lurgi Technology Company (Pty) Ltd 2 nd International Freiberg Conference on IGCC & XtL Technologies, 8-12th May 2007, Freiberg
More informationThe ARK Reformer. Animal Litter. Synthetic Crude Oil Synthesis Gas (SynGas) Fertilizer Biomass. Solid Waste. Waste to Fuel
ARK Power Dynamics The ARK Reformer Waste is a Resource in the Wrong Place. Input: Output: Animal Litter Solid Waste Synthetic Crude Oil Synthesis Gas (SynGas) Fertilizer Biomass Waste to Fuel ARK Produces
More informationProcess Economics Program
IHS Chemical Process Economics Program Report 148C Synthesis Gas Production from Coal and Petroleum Coke Gasification By Jamie Lacson IHS Chemical agrees to assign professionally qualified personnel to
More informationPre-Commercial Demonstration of High Efficiency, Low Cost Syngas Cleanup Technology for Chemical, Fuel, and Power Applications
Pre-Commercial Demonstration of High Efficiency, Low Cost Syngas Cleanup Technology for Chemical, Fuel, and Power Applications 2012 Gasification Technologies Conference October 30, 2012 David Denton (speaker)
More informationSyngas/Methanol to Olefins
Petrochemical Technology Renaissance Syngas/Methanol to Olefins R. J. Chang, Global Managing Director IHS Chemical Process Economics Program March 27 & 28, 2014 Houston, TX USA The Rise of Syngas - the
More informationAPPLICATION OF BGL GASIFICATION OF SOLID HYDROCARBONS FOR IGCC POWER GENERATION
APPLICATION OF BGL GASIFICATION OF SOLID HYDROCARBONS FOR IGCC POWER GENERATION 2000 Gasification Technologies Conference San Francisco, California October 8-11, 2000 Presented by: GLOBAL ENERGY INC. Richard
More informationCB&I E-Gas Technology Progress on All Fronts
A World of Solutions CB&I E-Gas Technology 2016-2017 Progress on All Fronts Gasification & Syngas Technologies Conference 2016 October 17, 2016 Jayesh Shah, Commercial Development Manager Safe Harbor Statement
More informationChevronTexaco Worldwide Gasification Technology, Inc. Transitions And Vision Going Forward. Presented by William E. Preston
ChevronTexaco, Inc. Transitions And Vision Going Forward Presented by William E. Preston October 13, 2004 Gasification Technology Council San Francisco, California ChevronTexaco 2002 Status of the Gasification
More informationR & D plan results and experience in the Puertollano IGCC
The 4th International Freiberg Conference on IGCC & XtL Technologies 3-5 May 2010- Dresden, Germany R & D plan results and experience in the Puertollano IGCC Francisco García Peña fgarcia@elcogas.es ELCOGAS,
More informationTable 1: Coal polygeneration with CCS (Scheme A) process specification in ASPEN Plus simulation... 2
Table 1: Coal polygeneration with CCS (Scheme A) process specification in ASPEN Plus simulation.... 2 Table 2: Data extraction and classification for coal polygeneration system (Scheme A).... 3 Table 3:
More informationAbstract Process Economics Program Report 229 REFINERY RESIDUE GASIFICATION (June 2001)
Abstract Process Economics Program Report 229 REFINERY RESIDUE GASIFICATION (June 2001) Following an episode of intensive interest during the late 1970s and early 1980s as a means to converting coal to
More informationHydrogen for the NWR Upgrader by Lurgi MPG Technology A challenging Project
Hydrogen for the NWR Upgrader by Lurgi MPG Technology A challenging Project Washington DC 29.10.2014 l Max-Michael Weiss, Stefan Walter l Air Liquide Global E&C Solutions Germany GmbH, Frankfurt General
More informationThe Cost of CO 2 Capture and Storage
The Cost of Capture and Storage Edward S. Rubin Department of Engineering and Public Policy Department of Mechanical Engineering Carnegie Mellon University Pittsburgh, Pennsylvania Presentation to the
More informationEPRI Advanced Coal with CCS Industry Technology Demonstration Projects
EPRI Advanced Coal with CCS Industry Technology Demonstration Projects CCT2009 Conference Dresden, Germany 20 May 2009 Jack Parkes Director, Industry Technology Demonstration Projects Electric Power Research
More informationS y n t h e s i s E n e r g y S y s t e m s
S y n t h e s i s E n e r g y S y s t e m s A Global Industrial Gasification Company Timothy Vail, President & CEO 2007 Gasification Technologies Conference San Francisco, CA October 16, 2007 C l e a n
More informationIGCC Development Program. Dr. Ahn, Dal-Hong Korea IGCC RDD&D Organization
1 Introduction to Korea IGCC Development Program Dr. Ahn, Dal-Hong 2 IGCC Overview m Integrated Gasification Combined Cycle (IGCC) - Power plant combining a Gasification system with a CC - Coal is converted
More informationGasification...Meeting the Challenges of Oil Sands
GE Energy Gasification...Meeting the Challenges of Oil Sands Alma Rodarte Manager, Gasification Licensing GTC 2006 October 2006 Expected Oil Sands Projects Current production: ~1,000 barrels bitumen per
More informationIMPROVED PERFORMANCE OF THE DESTEC GASIFIER Gasification Technologies Conference
IMPROVED PERFORMANCE OF THE DESTEC GASIFIER 1999 Gasification Technologies Conference Dr. David L. Breton Dynegy, Inc. 1000 Louisiana Street, Suite 5800 Houston, Texas 77002 ABSTRACT The DESTEC gasification
More informationAir Products Pressure Swing Adsorption at the National Carbon Capture Center
Air Products Pressure Swing Adsorption at the National Carbon Capture Center Project Objectives Gasification is a promising alternative to traditional coal-fired combustion that can be adapted to CO 2
More informationFirst Year of Operational Experience with the Negishi IGCC
First Year of Operational Experience with the Negishi IGCC Gasification Technologies 2004 October 3-6, 2004 JW Marriott Hotel Washington, DC Makoto Yamaguchi Group Manager IPP Group Negishi Refinery Nippon