NaturEner Wild Rose 1 Energy Inc.

Size: px
Start display at page:

Download "NaturEner Wild Rose 1 Energy Inc."

Transcription

1 Decision Amendment to Wild Rose 1 Wind Power Plant September 13, 2013

2 The Alberta Utilities Commission Decision : Amendment to Wild Rose 1 Wind Power Plant Application No Proceeding ID No September 13, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: Fax: Website:

3 The Alberta Utilities Commission Calgary, Alberta Decision Application No Amendment to Wild Rose 1 Wind Power Plant Proceeding ID No Introduction 1. NaturEner Energy Canada Inc., pursuant to Approval No. U , 1 has approval from the Alberta Utilities Commission (AUC or the Commission) to construct and operate the Wild Rose 1 wind power plant in Cypress County. NaturEner Energy Canada Inc., pursuant to Permit and Licence No. U , 2 has approval from the Commission to construct and operate the Wild Rose 1 substation. 2. NaturEner Energy Canada Inc., by Application No (the application), registered on June 18, 2013, filed a letter of enquiry with the AUC under Section 11 of the Hydro and Electric Energy Regulation to alter the Wild Rose 1 wind power plant. NaturEner Energy Canada Inc. also requested a one-year extension from December 31, 2014, to December 31, 2015, to complete the power plant. 3. On July 8, 2013, the Commission issued information requests to NaturEner Energy Canada Inc. On July 16, 2013, NaturEner Energy Canada Inc. provided responses to the information requests. 4. On July 23, 2013, the Commission issued a notice of application with a deadline for submissions of August 15, 2013, for objections, concerns or support for the application. The notice was sent to all occupants, residents and landowners within 2,000 metres of the power plant project area as well as to industry stakeholders. Four submissions were received by the August 15, 2013 submission deadline. 5. On August 30, 2013, NaturEner Energy Canada Inc. requested an extension from December 31, 2014, to December 31, 2015, for the construction of the substation. NaturEner Energy Canada Inc. further requested that the amended approvals be issued to (NaturEner), which is the Wild Rose 1 project entity. 2 Discussion 6. The Wild Rose 1 wind power plant was approved in AUC Decision and Approval No. U , and will consist of 136 wind turbines; each rated at 1.5 megawatts (MW), with a total generating capacity of 204 MW. The location of the power plant is in Cypress County, approximately 45 kilometres southeast of the city of Medicine Hat, Alberta Approval No. U , Application No , Proceeding ID No. 268, October 19, Permit and Licence No. U , Application No , Proceeding ID No. 268, October 19, Decision : NaturEner Energy Canada Inc. - Wild Rose 1 Wind Power Plant, Application No , Proceeding ID No. 268, October 19, AUC Decision (September 13, 2013) 1

4 The turbines will be installed at the coordinates specified in Application No and at the following land locations: sections 17, 18, 19, 30, 31, 32 and 33, Township 9, Range 1, west of the Fourth Meridian sections 13, 23, 24, 25, 26 and 36, Township 9, Range 2, west of the Fourth Meridian sections 4, 5, 6, 7, 16, 17, 18, 19 and 21, Township 10, Range 1, west of the Fourth Meridian sections 1, 2, 11, 12 and 13, Township 10, Range 2, west of the Fourth Meridian 7. The power plant also consists of a 34.5-kilovolt gathering system for collecting the electric energy generated by each turbine and transmitting that electric energy to the Wild Rose 1 substation, where the electric energy generated by the power plant will be delivered to the Alberta Interconnected Electric System. 8. The proposed alteration to the approved wind power plant as set out in Application No consists of a change of wind turbine model, from the approved Acciona AW MW model to the Alstom ECO MW model. NaturEner stated that the Acciona turbines, approved under Approval No. U , are no longer available. Accordingly, since constructing the power plant with Acciona turbines is not possible, NaturEner had to acquire different turbines for the Wild Rose 1 power plant. 9. NaturEner stated that approval of the Alstom turbines for the project would result in a reduction in the number of turbines from 136 to 70, a reduction in turbines located on native pasture from 43 to 20, a reduction in the project area from 75 quarter sections to 56 quarter sections and a reduction in the noise levels at previously modelled receptors. 10. NaturEner stated that the proposed change in turbine would increase the projected annual energy production for the power plant and would increase the nameplate rated capacity from 204 MW to 210 MW. 11. The proposed turbine change would increase the rotor diameter from 77 metres to metres and would increase the hub height from 80 metres to 90 metres. 12. NaturEner requested amendments to five of the 136 locations previously approved by the Commission. The five turbine location changes are between 90 and 210 metres from the previous turbine locations approved by the Commission. NaturEner submitted that due to the reduction in the number of turbines, 66 of the 136 approved turbine locations would no longer be required. 13. The proposed amended turbines would be installed at the following land locations: sections 17, 18, 19, 30, 31 and 32, Township 9, Range 1, west of the Fourth Meridian sections 13, 23, 24, 25, 26 and 36, Township 9, Range 2, west of the Fourth Meridian sections 5, 7, 17, 18 and 19, Township 10, Range 1, west of the Fourth Meridian sections 1, 2, 11, 12 and 13, Township 10, Range 2, west of the Fourth Meridian 2 AUC Decision (September 13, 2013)

5 14. NaturEner contracted Golder Associates Ltd. (Golder) to evaluate the potential environmental effects due to the proposed turbine changes. Golder concluded that the potential adverse environmental effects predicted for the project are expected to be less due to the lower number of turbines required. 15. On May 30, 2013, NaturEner submitted a request for an updated clearance letter from Alberta Culture which was expected to be received by August NaturEner submitted a noise impact assessment for the proposed amendment which concluded that the predicted sound level produced by the power plant, combined with ambient sound levels, is lower than the permissible sound level of 40 dba at all noise receptors in the area. The noise impact assessment predicted a reduction of the noise level at some of the receptors in the project area. 17. NaturEner conducted a participant involvement program that included all stakeholders who were previously included in the participant involvement program for the project. The participant involvement program included the mailing of the project update notification information package on March 26, The package included a cover letter explaining the change in turbines and included the proposed amended layout. NaturEner also met with all landowners and residents within 800 metres of the power plant boundary. 18. NaturEner stated that three people expressed concerns regarding the proposed change and follow up consultation was conducted with these landowners. 19. NaturEner stated that all relevant government and non-government organizations, and agencies previously consulted with were again consulted regarding the proposed amendment. Correspondence of support or non-objection was received from Alberta Environment and Sustainable Resource Development, the Fish and Wildlife Division (of Alberta Environment and Sustainable Resource Development), the Alberta Electric System Operator, Cypress County, the Economic Development Alliance of Southeast Alberta, Telus, Forty Mile Gas Co-op Ltd., FortisAlberta Inc. and Elkwater Water Co-op Ltd. 20. Four submissions were received in response to the notice of application. Statements of intent to participate were received from Paul and Twyla von Huene, Nature Alberta (Federation of Alberta Naturalists), Henry Binder and Clark Walker. 21. On August 28, 2013, the Commission determined that that none of the four parties who filed a statement of intention to participate have standing in the proceeding. 22. Paul and Twyla von Huene, Henry Binder and Clark Walker all own property at least 2,000 metres from the boundary of the project. The Commission stated the fact that the properties are at some distance from the wind project has a direct bearing on whether there is a direct and adverse impact on them. The Commission found that there would be no direct and adverse impact. AUC Decision (September 13, 2013) 3

6 23. The Commission found that the Nature Alberta (Federation of Alberta Naturalists) did not demonstrate that it has a legal right or interest, one which is known to law, with respect to the project area. 24. Accordingly, the Commission determined that it would not hold a hearing for the proceeding as the Commission determined that there are no parties that filed submissions whose rights may be directly and adversely affected by its decision. 3 Findings 25. The Commission considered the application pursuant to sections 11 and 12 of the Hydro and Electric Energy Regulation, AR 409/83, which provide in part: 11 Unless the Commission directs otherwise, if a person proposes to make minor alterations to a power plant, transmission line or electric distribution system other than minor alterations to which section 18.2 applies, the person may apply for an approval or permit or an amendment to an approval or permit referred to in section 11, 14 or 25 of the Act, as the case may be, by submitting a Letter of Enquiry to the Commission in accordance with AUC Rule 007, Rules Respecting Applications for Power Plants, Substations, Transmission Lines, and Industrial System Designations as published by the Commission and amended from time to time. 12 A letter of enquiry shall contain information respecting the following, where applicable: (a) the need for the proposed work; (b) the nature and extent of the proposed work; (c) the land affected by the proposed work, and its ownership; (d) the timing of the proposed work; (e) any environmental impact that may result from the proposed work. 26. In accordance with the requirements of Section 12 of the Hydro and Electric Energy Regulation, NaturEner has provided information respecting the need, nature, extent, land affected, land ownership and the timing of the work. NaturEner also stated that no adverse additional environmental impacts would be caused by the proposed alterations to the project. 27. Based upon the information provided, NaturEner demonstrated that the proposal is of a minor nature, no other person is directly and adversely affected by the proposal, and no adverse environmental impact will be caused by the proposed alterations, thereby meeting the requirements of Section 11 of the Hydro and Electric Energy Regulation. 28. The Commission finds that NaturEner conducted a satisfactory participant involvement program for the application. 29. The Commission has reviewed the application and has determined that the technical, siting, environmental and noise aspects of the power plant alteration have been met. 4 AUC Decision (September 13, 2013)

7 30. The Commission approves the request for an extension of the construction of the power plant and substation from December 31, 2014, to December 31, In Decision , the Commission directed, as a condition of its approval, that NaturEner conduct a post-construction monitoring program in accordance with the recommendations of Alberta Environment and Sustainable Resource Development, as specifically described in the Wind Energy Referral Report. The Commission included in its direction the commitments made by NaturEner as noted in the Alberta Environment and Sustainable Resource Development Wind Energy Referral Report. 32. The Commission expects NaturEner to conduct a post-construction monitoring program as previously directed by the Commission. 33. Should the results of post-construction wildlife monitoring differ significantly from the information upon which Alberta Environment and Sustainable Resource Development Wildlife Management provided its Wind Energy Referral Report, the Commission may review the power plant approval pursuant to Section 41 of the Hydro and Electric Energy Act. The purpose of such a review would be to address any unanticipated environmental impacts resulting from the project. 34. The Commission finds that the maximum predicted nighttime sound level at the nearest residence in the study area (receptor ID NR001 in the noise impact assessment) is 38.5 dba L eq, which is below the permissible nighttime sound level of 40 dba L eq set out in AUC Rule 012: Noise Control (AUC Rule 012). The Commission recognizes that the accuracy of the modelling based on the standard ISO 9613 has a tolerance of ±3 db. In light of this accuracy tolerance, it is possible that the predicted sound levels may exceed the nighttime permissible sound level at some dwellings. Accordingly, the Commission directs NaturEner to conduct a post-construction comprehensive noise study at receptor NR001 under the representative conditions in AUC Rule 012 to verify and ensure that the facility complies with the permissible sound level as determined in accordance with AUC Rule For the foregoing reasons and subject to the conditions and directions herein, the Commission considers that the approval of the amendment to the Wild Rose 1 wind power plant is in the public interest. 4 Decision 36. The Commission approves Application No pursuant to sections 11 and 12 of the Hydro and Electric Energy Regulation. 37. The Commission, pursuant to Section 11 of the Hydro and Electric Energy Act, grants Approval No. U to alter the power plant and to extend the completion date of the power plant, as set out in Appendix 1 (Appendix 1 will be distributed separately). AUC Decision (September 13, 2013) 5

8 38. The Commission, pursuant to sections 14, 15, and 19 of the Hydro and Electric Energy Act, grants Permit and Licence No. U to extend the completion date of the substation, as set out in Appendix 2 (Appendix 2 will be distributed separately). Dated on September 13, The Alberta Utilities Commission (original signed by) Neil Jamieson Commission Member 6 AUC Decision (September 13, 2013)

Pteragen Canada Inc.

Pteragen Canada Inc. Decision 2013-171 May 7, 2013 The Alberta Utilities Commission Decision 2013-171: Application No. 1608907 Proceeding ID No. 2181 May 7, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place,

More information

Pembina NGL Corporation

Pembina NGL Corporation Decision 22928-D01-2018 45-Megawatt Cogeneration Power Plant, Alteration to Scoria 318S Substation and Amendment to the Redwater Industrial System Designation January 9, 2018 Alberta Utilities Commission

More information

NOVA Chemicals Corporation

NOVA Chemicals Corporation Decision 2013-426 NOVA Chemicals Corporation Industrial System Designation Amendment November 29, 2013 The Alberta Utilities Commission Decision 2013-426: NOVA Chemicals Corporation Industrial System Designation

More information

Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013

Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013 Decision 2013-027 Brooks Solar Power Plant January 31, 2013 The Alberta Utilities Commission Decision 2013-027: Brooks Solar Power Plant Application No. 1608532 Proceeding ID No. 1938 January 31, 2013

More information

Harvest Operations Corp.

Harvest Operations Corp. Decision 2014-214 Six-MW Power Plant Exemption July 21, 2014 The Alberta Utilities Commission Decision 2014-214: Six-MW Power Plant Exemption Application No. 1610444 Proceeding No. 3153 July 21, 2014 Published

More information

Greengate Power Corporation

Greengate Power Corporation Decision 2011-085 Blackspring Ridge Wind Project March 9, 2011 The Alberta Utilities Commission Decision 2011-085: Blackspring Ridge Wind Project Application No. 1604777 Proceeding ID No. 190 March 9,

More information

SunEEarth Alberta Solar Development Inc.

SunEEarth Alberta Solar Development Inc. Decision 22422-D01-2017 Yellow Lake Solar Project September 26, 2017 Alberta Utilities Commission Decision 22422-D01-2017 Yellow Lake Solar Project Proceeding 22422 Application 22422-A001 September 26,

More information

Grande Prairie Generation, Inc.

Grande Prairie Generation, Inc. Decision 20292-D01-2015 Northern Prairie Power Plant November 27, 2015 Alberta Utilities Commission Decision 20292-D01-2015 Northern Prairie Power Plant Proceeding 20292 Application 20292-A001 November

More information

Seven Generations Energy Ltd.

Seven Generations Energy Ltd. Decision 22976-D01-2018 Power Plant Exemption at Gold Creek Gas Plant January 17, 2018 Alberta Utilities Commission Decision 22976-D01-2018 Power Plant Exemption at Gold Creek Gas Plant Proceeding 22976

More information

Aquatera Utilities Inc.

Aquatera Utilities Inc. Decision 2014-194 Aquatera Utilities Inc. 2.85-MW Power Plant June 26, 2014 The Alberta Utilities Commission Decision 2014-194: Aquatera Utilities Inc. 2.85-MW Power Plant Application No. 1610366 Proceeding

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017

More information

Suncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment

Suncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment Decision 2011-523 (Errata) Errata to Decision 2011-523 Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment January 10, 2012 The Alberta Utilities Commission Decision

More information

Signalta Resources Limited

Signalta Resources Limited Decision 22388-D01-2017 Coaldale 6.4-Megawatt Cogeneration Station June 1, 2017 Alberta Utilities Commission Decision 22388-D01-2017 Coaldale 6.4-Megawatt Cogeneration Station Proceeding 22388 Application

More information

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011 Decision 2011-496 December 15, 2011 The Alberta Utilities Commission Decision 2011-496: Application No. 1607774 Proceeding ID No. 1505 December 15, 2011 Published by The Alberta Utilities Commission Fifth

More information

Decision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018

Decision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018 Decision 22711-D01-2018 Bonnybrook Cogeneration Expansion Project May 17, 2018 Alberta Utilities Commission Decision 22711-D01-2018 Bonnybrook Cogeneration Expansion Project Proceeding 22711 Application

More information

Burdett Solar GP Corp.

Burdett Solar GP Corp. Decision 23364-D01-2018 Burdett Solar Project Time Extension October 3, 2018 Alberta Utilities Commission Decision 23364-D01-2018 Burdett Solar Project Time Extension Proceeding 23364 Application 23364-A001

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22499-D01-2017 June 7, 2017 Decision 22499-D01-2017 Proceeding 22499 Application 22499-A001 June 7, 2017 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta

More information

Decision Cenovus FCCL Ltd.

Decision Cenovus FCCL Ltd. Decision 2012-196 Construct and Operate a 95-MW Cogeneration Power Plant, Construct and Operate Sunday Creek 539S Substation, Industrial System Designation and Interconnection of the Christina Lake Industrial

More information

EPCOR Distribution & Transmission Inc.

EPCOR Distribution & Transmission Inc. Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions December 19, 2016 Alberta Utilities Commission Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions Proceeding 22229 Application

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22562-D01-2017 ENMAX No. 31 Substation Alteration May 25, 2017 Alberta Utilities Commission Decision 22562-D01-2017 ENMAX No. 31 Substation Alteration Proceeding 22562 Application 22562-A001 May

More information

Nexen Inc. OPTI Canada Inc.

Nexen Inc. OPTI Canada Inc. Decision 2010-006 Nexen Inc. OPTI Canada Inc. Long Lake South Phase 1 Cogeneration Power Plant January 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-006: Nexen Inc. and OPTI Canada Inc. Long Lake

More information

Alberta Electric System Operator Needs Identification Document Application

Alberta Electric System Operator Needs Identification Document Application Decision 22618-D01-2017 Alberta Electric System Operator Needs Identification Document Application Facility Applications June 22, 2017 Alberta Utilities Commission Decision 22618-D01-2017: Alberta Electric

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by

More information

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document Decision 3476-D01-2015 Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document ATCO Electric Ltd. Yeo Substation Project Facility Application February 18, 2015 Alberta Utilities

More information

Oldman 2 Wind Farm Limited

Oldman 2 Wind Farm Limited Decision 2010-461 Oldman 2 Wind Farm Project September 24, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-461: Oldman 2 Wind Farm Project Application No. 1605398 Proceeding ID. 293 September 24, 2010

More information

Canadian Natural Resources Limited

Canadian Natural Resources Limited Decision 23468-D01-2018 Margie 1034S Substation May 28, 2018 Alberta Utilities Commission Decision 23468-D01-2018 Margie 1034S Substation Proceeding 23468 Application 23468-A001 May 28, 2018 Published

More information

Grizzly Oil Sands ULC

Grizzly Oil Sands ULC Decision 2013-124 Algar Lake Project Distribution System Exemption March 28, 2013 The Alberta Utilities Commission Decision 2013-124: Algar Lake Project Distribution System Exemption Application No. 1609370

More information

Alberta Power (2000) Ltd.

Alberta Power (2000) Ltd. Decision 23558-D01-2018 Battle River Power Plant Alterations August 27, 2018 Alberta Utilities Commission Decision 23558-D01-2018 Battle River Power Plant Alterations Proceeding 23558 Application 23558-A001

More information

Solar Krafte Utilities Inc.

Solar Krafte Utilities Inc. Decision 23323-D01-2018 August 21, 2018 Alberta Utilities Commission Decision 23323-D01-2018 Proceeding 23323 Application 23323-A001 August 21, 2018 Published by the: Alberta Utilities Commission Eau Claire

More information

Decision B. St. Pierre kW Photovoltaic Micro-Generation System. May 15, 2013

Decision B. St. Pierre kW Photovoltaic Micro-Generation System. May 15, 2013 Decision 2013-180 13.05-kW Photovoltaic Micro-Generation System May 15, 2013 The Alberta Utilities Commission Decision 2013-180: 13.05-kW Photovoltaic Micro-Generation System Application No. 1609500 Proceeding

More information

TransAlta Corporation

TransAlta Corporation Decision 23808-D01-2018 Coal-to-Gas Conversion of Keephills Power Plant Units 1 and 2 December 21, 2018 Alberta Utilities Commission Decision 23808-D01-2018 Coal-to-Gas Conversion of Keephills Power Plant

More information

Connacher Oil and Gas Limited

Connacher Oil and Gas Limited Decision 2010-094 Cogeneration Plant and Industrial System Designation March 2, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-094: Cogeneration Plant and Industrial System Designation Application No.

More information

Pengrowth Energy Corporation

Pengrowth Energy Corporation Decision 2013-308 Lindberg SAGD Industrial System Designation August 20, 2013 The Alberta Utilities Commission Decision 2013-308: Lindberg SAGD Industrial System Designation Application No. 1609200 Proceeding

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 23918-D01-2018 Paddle Prairie Compressor Station Installation Mackenzie County October 11, 2018 Alberta Utilities Commission Decision 23918-D01-2018 Paddle Prairie Compressor Station Installation

More information

Renewable Energy Services Ltd.

Renewable Energy Services Ltd. Decision 1976-D01-2018 McLaughlin Wind Power Plant and Substation February 23, 2018 Alberta Utilities Commission Decision 1976-D01-2018 McLaughlin Wind Power Plant and Substation Proceeding 1976 Applications

More information

The City of Red Deer

The City of Red Deer Decision 2010-148 The City of Red Deer 15-kW Solar Power Plant for City of Red Deer Civic Yards Building April 5, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-148: The City of Red Deer 15-kW Solar Power

More information

Nexen Inc. and CNOOC Canada Inc.

Nexen Inc. and CNOOC Canada Inc. Decision 2012-330 Long Lake Project December 6, 2012 The Alberta Utilities Commission Decision 2012-330: Long Lake Project Application No. 1608729 Proceeding ID No. 2074 December 6, 2012 Published by The

More information

EDF EN Canada Development Inc.

EDF EN Canada Development Inc. Decision 21203-D01-2016 Blackspring Ridge Wind Power Plant March 2, 2016 Alberta Utilities Commission Decision 21203-D01-2016 Blackspring Ridge Wind Power Plant Proceeding 21203 Application 21203-A001

More information

Decision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018

Decision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018 Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and Salvage November 8, 2018 Alberta Utilities Commission Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and

More information

Oldman 2 Wind Farm Limited

Oldman 2 Wind Farm Limited Decision 22706-D01-2017 Spring 2017 Comprehensive Sound Survey at Receptors R and S August 25, 2017 Alberta Utilities Commission Decision 22706-D01-2017 Proceeding 22706 Application 22706-A001 August 25,

More information

Notice of Technical Meeting

Notice of Technical Meeting Notice of Technical Meeting Amendments to three wind energy projects in the Pincher Creek area proposed by Welsch Wind Power Inc., Windy Point Wind Park Ltd. and NextEra Canada Development & Acquisitions,

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on December

More information

COMMUNITY FUND AND INVOLVEMENT

COMMUNITY FUND AND INVOLVEMENT ENNER WIND POWER ANUARY 2018 NEWSLETTER INTRODUCTION enner Wind Limited Partnership (WLP), a subsidiary of Potentia Renewables Inc. (PRI), would like to thank you for your continued support and interest

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on March

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 23713-D01-2018 August 28, 2018 Alberta Utilities Commission Decision 23713-D01-2018 Proceeding 23713 Application 23713-A001 August 28, 2018 Published by the: Alberta Utilities Commission Eau Claire

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22447-D01-2017 Vauxhall Solar Power Plant July 4, 2017 Alberta Utilities Commission Decision 22447-D01-2017 Vauxhall Solar Power Plant Proceeding 22447 Application 22447-A001 July 4, 2017 Published

More information

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017 FALL 2017 PROJECT OVERVIEW EDF EN Canada is proposing to develop, construct, and operate the Cypress Wind Power Project with 243.6 megawatts (MW) of generating capacity. The Project is south of Dunmore,

More information

Decision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014

Decision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014 Decision 2014-212 Syncrude Canada Ltd. Mildred Lake Power Plant July 17, 2014 Decision 2014-212: Syncrude Canada Ltd. Mildred Lake Power Plant Application No. 1610311 Proceeding No. 3068 July 17, 2014

More information

Decision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints

Decision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints Decision 22493-D01-2018 1646658 Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints January 17, 2018 Alberta Utilities Commission Decision 22493-D01-2018 1646658 Alberta Ltd. (BluEarth)

More information

Decision FortisAlberta Inc. Micro-Generation Determination. December 16, 2008

Decision FortisAlberta Inc. Micro-Generation Determination. December 16, 2008 Decision 2008-132 FortisAlberta Inc. Micro-Generation Determination December 16, 2008 ALBERTA UTILITIES COMMISSION Decision 2008-132: FortisAlberta Inc. Micro-Generation Determination Application No. 1594619

More information

HYDRO AND ELECTRIC ENERGY REGULATION

HYDRO AND ELECTRIC ENERGY REGULATION Province of Alberta HYDRO AND ELECTRIC ENERGY ACT HYDRO AND ELECTRIC ENERGY REGULATION Alberta Regulation 409/1983 With amendments up to and including Alberta Regulation 136/2015 Office Consolidation Published

More information

Welcome to our Open House!

Welcome to our Open House! Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If

More information

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion

More information

Welcome to Capital Power s Halkirk 2 Project Open House #2

Welcome to Capital Power s Halkirk 2 Project Open House #2 Welcome to Capital Power s Halkirk 2 Project Open House #2 ABOUT US BC AB RESPECTED, RELIABLE, COMPETITIVE ON Capital Power is a growth-oriented North American power producer headquartered in Edmonton,

More information

Wind Power Regulatory Process Review

Wind Power Regulatory Process Review Wind Power Regulatory Process Review Stakeholder Consultation Summary of Discussion September 28, 2012 The Alberta Utilities Commission Wind Power Regulatory Process Review Stakeholder Consultation Summary

More information

Ellerslie Substation Expansion

Ellerslie Substation Expansion Ellerslie Substation Expansion Volume 2 UV 2 North Saskatchewan River EDMONTON UV 216 UV 14 ") ELLERSLIE 89S Bretona!! Trevithick March 2010 Why are you receiving this newsletter? You are receiving this

More information

stirling wind PROJECT

stirling wind PROJECT stirling win PROECT FEBRARY 0 NEWSLETTER INTROCTION Thank you to everyone who has provided feedback on the Stirling Wind Project the Project We value our relationships with local communities and appreciate

More information

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4 Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4 Prepared for: Windlectric Inc. 2845 Bristol Circle Oakville ON L9H 7H7 Prepared by: Stantec Consulting Ltd.

More information

SUNDANCE 7 January 2014

SUNDANCE 7 January 2014 Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location

More information

Accordingly, the AESO now invites market participants and other interested parties to attend the technical work group session, as follows:

Accordingly, the AESO now invites market participants and other interested parties to attend the technical work group session, as follows: April 10, 2018 To: Market Participants and Other Interested Parties Re: Invitation to Participate in AESO Technical Work Group Session Regarding Draft Proposed New Alberta Reliability Standard, Coordination

More information

ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc.

ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc. Regulatory Audit Report #2008-001 ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc. Inter-Affiliate Code

More information

Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc.

Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc. Decision 2010-612 Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc. Needs Identification Document, Transmission Line, Substation and Power Plant Al-Pac Pulp

More information

CUP APPLICATION WIND ENERGY CONVERSION SYSTEMS (WECS) Commercial or Non-Commercial

CUP APPLICATION WIND ENERGY CONVERSION SYSTEMS (WECS) Commercial or Non-Commercial Application Fee $ 500.00 Dodge County Environmental Services Recorder Fee $46.00 721 Main St N, Dept. 123 Date Received Mantorville, MN 55955 Received by Phone 507-635-6272 www.co.dodge.mn.us CUP APPLICATION

More information

May 1, To: Parties currently registered on Proceeding Distributed Generation Review Proceeding Application A001

May 1, To: Parties currently registered on Proceeding Distributed Generation Review Proceeding Application A001 May 1, 2017 To: Parties currently registered on Proceeding 22534 Distributed Generation Review Proceeding 22534 Application 22534-A001 Process for Proceeding 22534 1. On March 31, 2017, the Alberta Utilities

More information

October 30, 2012 Our File:

October 30, 2012 Our File: October 30, 2012 Our File: 5000-510-5120 Minister of Environment and Sustainable Resource Development 204 Legislature Building 10800 97 Avenue Edmonton, AB T5K 2B6 Attention: Honourable Diana McQueen at

More information

Article 18 Wind Energy Conversion System Regulations

Article 18 Wind Energy Conversion System Regulations Article 18 Wind Energy Conversion System Regulations SECTION 1. PURPOSE Purpose This ordinance is established to regulate the installation and operation of Wind Energy Conversion Systems (WECS) within

More information

Capital Power Generation Services Inc.

Capital Power Generation Services Inc. Decision 22563-D01-2018 Halkirk 2 Wind Power Project April 11, 2018 Alberta Utilities Commission Decision 22563-D01-2018 Halkirk 2 Wind Power Project Proceeding 22563 Applications 22563-A001 and 22563-A002

More information

Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!

Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming! Welcome to the Community Meeting for the Niagara Region Wind Project Thank you for coming! In early September we will host the first Public Open House under We are happy to share information about this

More information

EDP Renewables SH Project GP Ltd.

EDP Renewables SH Project GP Ltd. Decision 22665-D01-2018 September 21, 2018 Alberta Utilities Commission Decision 22665-D01-2018 Proceeding 22665 Applications 22665-A001 to 22665-A004 September 21, 2018 Published by the: Alberta Utilities

More information

Project siting. Lanfine. Wind resource assessment. Wind Power Project

Project siting. Lanfine. Wind resource assessment. Wind Power Project Project siting Wind resource assessment This assessment determines how much electrical energy can be extracted from the wind Meteorological towers are installed on site to measure wind speed and direction

More information

Cassadaga Wind Project Exhibit 6. Wind Power Facilities

Cassadaga Wind Project Exhibit 6. Wind Power Facilities Case No. 14-F-0490 1001.6 Exhibit 6 Wind Power Facilities WIND POWER FACILITIES (a) Factors Considered During Placement of Wind Turbines (Setback Requirements/Recommendations/Fall-Down Distances) The primary

More information

Noise Impact Assessment

Noise Impact Assessment APPENDIX C Noise Impact Assessment CBCL Limited Appendices NOISE IMPACT ASSESSMENT PUGWASH WIND FARM, NOVA SCOTIA Client Pugwash Wind Farm Inc. Contact Charles Demond Document No Issue B Status Classification

More information

Humboldt County Ordinance #68 Commercial/Utility Grade Wind Energy Conversion Systems (WECS) PURPOSE DEFINITIONS

Humboldt County Ordinance #68 Commercial/Utility Grade Wind Energy Conversion Systems (WECS) PURPOSE DEFINITIONS Humboldt County Ordinance #68 Commercial/Utility Grade Wind Energy Conversion Systems (WECS) PURPOSE The purpose of this Ordinance is to provide an orderly process for regulating the development and operation

More information

AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT. Appendix C. Project Notices

AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT. Appendix C. Project Notices AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT Appendix C Project Notices AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT Appendix C1 Notice of Proposal to Engage in a Renewable Energy Project

More information

SMALL WIND ENERGY FACILITIES ORDINANCE. Ordinance No

SMALL WIND ENERGY FACILITIES ORDINANCE. Ordinance No SMALL WIND ENERGY FACILITIES ORDINANCE Ordinance No. 070806.1 1. PURPOSE The purpose of this Ordinance is to provide a regulatory scheme for the construction and operation of Small Wind Energy Facilities

More information

SECTION 25: WIND ENERGY CONVERSION SYSTEMS (WECS)

SECTION 25: WIND ENERGY CONVERSION SYSTEMS (WECS) SECTION 25: WIND ENERGY CONVERSION SYSTEMS (WECS) This Ordinance is established to regulate the installation and operation of Wind Energy Conversion Systems (WECS) within Cottonwood County not otherwise

More information

Up to 9.5MW AC solar project located near Burdett, Alberta

Up to 9.5MW AC solar project located near Burdett, Alberta PROJECT OVERVIEW Up to 9.5MW AC solar project located near Burdett, Alberta Located on agricultural land within the quarter section NE-21-010-12-W4M near the intersection of Range Road 123 and Township

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 6620-AKAPRA

More information

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity.

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity. ORDINANCE NO. AN ORDINANCE AMENDING ORDINANCE NO. 1060 KNOWN AS THE WILLMAR ZONING ORDINANCE BY ADDING SECTION 11 RELATING TO WIND ENERGY CONVERSION SYSTEMS (WECS) The City of Willmar does ordain as follows:

More information

EXCERPT FROM EMMET COUNTY ZONING ORDINANCE. A. Definitions For purposes of this section, the following definitions shall apply:

EXCERPT FROM EMMET COUNTY ZONING ORDINANCE. A. Definitions For purposes of this section, the following definitions shall apply: EXCERPT FROM EMMET COUNTY ZONING ORDINANCE SECTION 2102-16 WIND ENERGY SYSTEMS (WES S) 16. WIND ENERGY SYSTEMS (WES S) A. Definitions For purposes of this section, the following definitions shall apply:

More information

Cheshire, MA SMALL WIND ENERGY SYSTEMS 12.0 SMALL WIND ENERGY SYSTEMS

Cheshire, MA SMALL WIND ENERGY SYSTEMS 12.0 SMALL WIND ENERGY SYSTEMS 12.0 12.1 Purpose The purpose of this section is to provide a permitting process for small wind energy systems (SWES) for individual homeowners so that they may be utilized in a cost-effective, efficient,

More information

Decision (Errata) Alberta Ltd. Errata to Decision Bull Creek Wind Project. March 10, 2014

Decision (Errata) Alberta Ltd. Errata to Decision Bull Creek Wind Project. March 10, 2014 Decision 2014-040 (Errata) Errata to Decision 2014-040 Bull Creek Wind Project March 10, 2014 The Alberta Utilities Commission Decision 2014-040 (Errata): Bull Creek Wind Project Application No. 1608556

More information

6.6 RESIDENTIALLY-SCALED, LAND-BASED WIND ENERGY CONVERSION FACILITIES

6.6 RESIDENTIALLY-SCALED, LAND-BASED WIND ENERGY CONVERSION FACILITIES 6.6 RESIDENTIALLY-SCALED, LAND-BASED WIND ENERGY CONVERSION FACILITIES 6.6.1 Purpose and Intent It is the express purpose of this Section to accommodate residentially-scaled, land-based wind energy conversion

More information

March 20, Mr. Corey Juhl Juhl Energy Development Inc th Street SE Pipestone, MN 56164

March 20, Mr. Corey Juhl Juhl Energy Development Inc th Street SE Pipestone, MN 56164 March 20, 2018 Mr. Corey Juhl Juhl Energy Development Inc. 1502 17 th Street SE Pipestone, MN 56164 Re: Acoustic and Shadow Flicker Studies Davison County Wind, LLC Dear Corey: Tech Environmental, Inc.

More information

AMHERST ISLAND WIND ENERGY PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT. File No April Prepared for:

AMHERST ISLAND WIND ENERGY PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT. File No April Prepared for: PROPERTY LINE SETBACK ASSESSMENT REPORT File No. 160960595 April 2013 Prepared for: Windlectric Inc. 2845 Bristol Circle Oakville ON L6H 7H7 Prepared by: Stantec Consulting Ltd. Suite 1 70 Southgate Drive

More information

Janine Sullivan Vice President, Finance and Chief Financial Officer

Janine Sullivan Vice President, Finance and Chief Financial Officer Janine Sullivan Vice President, Finance and Chief Financial Officer FortisAlberta Inc 320 17 th Avenue SW Calgary, Alberta T2S 2V1 Telephone: 403-514-4992 (direct) Fax: 403-514-5992 Janine.sullivan@fortisalberta.com

More information

STATE OF MINNESOTA BEFORE THE PUBLIC UTILITIES COMMISSION

STATE OF MINNESOTA BEFORE THE PUBLIC UTILITIES COMMISSION STATE OF MINNESOTA BEFORE THE PUBLIC UTILITIES COMMISSION Nancy Lange Dan Lipschultz Matthew Schuerger John Tuma Katie Sieben Chair Commissioner Commissioner Commissioner Commissioner In the Matter of

More information

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Novus Reference No. 16-0173 Version No. 1.0 (Final) September 30, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng.

More information

Town of Rensselaerville LOCAL LAW NO. 2 OF THE YEAR 2009

Town of Rensselaerville LOCAL LAW NO. 2 OF THE YEAR 2009 LOCAL LAW FILING NEW YORK STATE DEPARTMENT OF STATE 41 State Street, Albany NY 12231 Town of Rensselaerville LOCAL LAW NO. 2 OF THE YEAR 2009 A Local Law entitled Non-Commercial Wind Power Facilities Law

More information

Wind Energy Ordinances

Wind Energy Ordinances INFORMATION GUIDE: Wind Energy Ordinances Wind turbines are multiplying across the U.S., and most are installed in rural areas overlooking crops, cattle, timber, and lakes. Rural communities have experienced

More information

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND APPROVAL FOR THE CONSTRUCTION AND MAINTENANCE OF WIND ENERGY

More information

3. "Acoustic Audit Report" means a report presenting the results of an Acoustic Audit, prepared in accordance with Publication NPC-233;

3. Acoustic Audit Report means a report presenting the results of an Acoustic Audit, prepared in accordance with Publication NPC-233; Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique RENEWABLE ENERGY APPROVAL NUMBER 1885-A78K3D Issue Date: February 8, 2017

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Hydro One Networks Inc. 483 Bay St, South, 14th Floor

More information

SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment

SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT Attachment D Property Line Setback Assessment SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT

More information

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY (ADD TO ARTICLE 2) WIND ENERGY DEFINITIONS: Ambient: Ambient is defined as the sound pressure level exceeded ninety (90) percent of the time. Anemometer:

More information

ALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT

ALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT Notice NOTICE OF APPLICATIONS SHELL CANADA LIMITED QUEST CARBON CAPTURE AND STORAGE RADWAY FIELD ENERGY RESOURCES CONSERVATION BOARD APPLICATIONS NO. 1689376, 1670112, AND 1671615 ALBERTA ENVIRONMENT ENVIRONMENTAL

More information

South Branch Wind Farm Acoustic Audit - Emission Summary for Public Distribution

South Branch Wind Farm Acoustic Audit - Emission Summary for Public Distribution South Branch Wind Farm Acoustic Audit - Emission Summary for Public Distribution Introduction The South Branch Wind Farm (project) operates 10 Siemens SWT-3.0-113 wind turbines located within the Township

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Tractebel Management Inc. 4375 Sandwich Street Windsor,

More information

1. Description of and Rationale for Proposed Change

1. Description of and Rationale for Proposed Change Suite 500, 4342 Queen Street Niagara Falls, Ontario, Canada L2E 7J7 Tel. 905 374 5200 Fax: 905 374 1157 www.hatch.ca Nick Colella 2 St. Clair Avenue West Floor 12A Toronto, ON M4V 1L5 Dear Mr. Colella:

More information