[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]
|
|
- Victor Barton
- 6 years ago
- Views:
Transcription
1 2-06 SUBGRADE PREPARATION (******) Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer, prir t placement f getextile fabric (Nte t Engineer: if required include, if nt delete) r permeable ballast base curse. All csts fr prtecting the subgrade frm siltatin r ver-cmpactin, including replacing all material that becmes unsuitable while the subgrade is expsed, shall be cnsidered incidental t the Wrk and shall nt be measured fr separate payment. While the subgrade is expsed it shall be graded t drain t ensure that water des nt pnd. Preparatin and cmpactin f the subgrade, bth fr permeable and dense pavement, shall be cnsidered as essential t the cnstructin and all csts theref shall be incidental t the Wrk. Preparatin, cmpactin, maintenance, and all ther wrk related t subgrade shall nt be measured fr payment. The subgrade shall be shaped and maintained t drain at all times during cnstructin, including temprary ditches and mdificatins t drainage structures necessary t eliminate standing water n the subgrade. Add the fllwing new sectin: (3) Subgrade fr Permeable Pavement [Nte t Engineer: Chse ne belw. Cnfirm with yur getech if yu need further cmpactin.] a) Subgrade shall be cmpacted t 90-92% f maximum dry density accrding t standard prctr (ASTM D698) and shall be firm and unyielding prir t placing pavement sectin material. Subgrade preparatin density tests shall be cnducted at a rate f 2 tests per 5000 square feet, and 4 tests per 200 lineal feet f radway. Density tests shall als be cmpleted at and near each infiltratin test lcatin (sectin (4)). Density tests at infiltratin test lcatins shall be cmpleted at distances f 5, 10, and 15 feet frm the infiltratin test, parallel and perpendicular t and within the prject alignment. The test results shuld then be averaged t represent the density at the infiltratin test lcatin, t which ther subgrade density tests may be cmpared. Engineer shall review test results and lcatins fr acceptance. The subgrade preparatin density tests results shall be within + 2 percent f the average density recrded at the nearest infiltratin test lcatin. If exceeded scarify the subgrade and cmpact. Density tests shall be crrelated t tests taken in the Subgrade Infiltratin Test sectin (4). Percent cmpactin shall be within + 2 percent f the average density recrded at the infiltratin test lcatins. b) Subgrade shall be in a firm and unyielding cnditin prir t placing pavement sectin material.
2 Cntractr shall prtect the subgrade as necessary t maintain precnstructin infiltratin rates. A ptential prcedure t prevent excessive subgrade cmpactin is as fllws: Excavatin t final subgrade elevatin shall ccur immediately prir t placing pavement sectin materials and paving. If necessary, Cntractr may excavate t an intermediate subgrade elevatin established at 12-inches abve the final subgrade elevatin. Grading t final subgrade elevatin shall be cmpleted by machinery perating n the intermediate subgrade level r the adjacent nn-pervius pavement subgrade. T prevent excessive cmpactin f subgrade during placement f pavement sectin material the fllwing steps shuld be fllwed: Excavate t subgrade elevatin using methd by which equipment, including trucks, are nt perated n the final subgrade elevatin. Scarify subgrade during excavatin as stated belw. Cmpact subgrade t density specified herein r as directed by the Engineer. Install getextile fabric (Nte t Engineer: if required include, if nt delete)). Back dump the material nt the subgrade frm the edge f the installatin and push it ut nt the subgrade using lw grund pressure equipment. Trucks then back dump subsequent lads n tp f the previusly dumped/pushed material as the installatin prgresses. Avid subgrade preparatin during wet cnditins. Cntractr shall phase the wrk s as t nt cmprmise r verly cmpact the subgrade. Shuld it be necessary fr machinery r trucks t access the final subgrade in certain areas, Cntractr shall prtect said areas frm ver-cmpactin by placing steel sheets n the areas access t diffuse pint lading. Areas determined t be verly cmpacted, in the sle pinin f the Engineer, shall be scarified by the Cntractr t a depth specified by the Engineer and re-cmpacted, and all csts theref shall nt be measured fr separate payment. [Nte t Engineer: Chse ne belw. Cnfirm with yur getech if yu need cmpact.] a) Prir t installatin f the getextile fabric ((Nte t Engineer: if required include, if nt delete)) and permeable ballast, the cntractr shall cmplete subgrade infiltratin tests in cnfrmance with sectin (4). If testing indicates that the infiltratin rate is in cnfrmance with the design lng term infiltratin rate and the remaining subgrade areas are similarly prepared scarificatin will be at the Engineers discretin. b) Prir t installatin f the getextile fabric ((Nte t Engineer: if required include, if nt delete)) and permeable ballast, the cntractr shall scarify the subgrade t a minimum depth f 4-inches t ensure that subgrade is nt sealed, cmpact the subgrade t 90-92% maximum dry density cnditin, and prf-rll by the Cntractr and/r prbe by the Engineer t check fr areas nt in a firm, unyielding cnditin. c) Prir t installatin f the getextile fabric ((Nte t Engineer: if required include, if nt delete)) and permeable ballast, the cntractr shall scarify the subgrade t a minimum depth f 4 inches t ensure that subgrade is nt sealed, cmpact the subgrade t a unifrm firm and unyielding cnditin, and prf-rll by a fully laded dump truck the Cntractr and/r prbe by the Engineer t check fr areas nt in a firm, unyielding cnditin. Lse r disturbed areas identified during prf-rlling shall be ver-excavated t firm bearing and replaced with Gravel Brrw. The Cntractr shall ntify the Engineer a minimum f 2 wrking days prir t scarifying the surface t schedule an inspectin.
3 Cntractr shall submit a Subgrade Preparatin Plan t the Engineer fr review and apprval prir t beginning excavatin wrk. The Subgrade Preparatin Plan shall include methd(s) by which the Cntractr plans n treating ver-cmpacted subgrade areas and methds by which access t private driveways will be maintained. [Nte t Engineer: Add SPP t the ROM. Delete private driveways if nt applicable. If applicable WARN the residents that there will be a steep ramp built and that cars with lw clearance may have issues] Add the fllwing new sectin: (4) Subgrade Infiltratin Tests Cntractr shall cnduct infiltratin tests immediately fllwing final subgrade preparatin t verify that the subgrade is nt ver-cmpacted. Infiltratin tests shall be cnducted at a rate f 1 test per 5000 square feet, and 1 test per 200 lineal feet f radway. One test per lt fr residential sites, fr a minimum f 5 and a maximum f 10. Subgrade infiltratin tests shall be cnducted at the discretin f the Engineer. Engineer shall chse the lcatins f the infiltratin tests. The tests shall be cnducted using the: [Nte t Engineer: Select preferred test methd] Small scale Pilt Infiltratin Test ring The small-scale and large-scale PITs shall be cmpleted at the planned subgrade elevatin as fllws: Excavate t and prepare the subgrade in accrdance with the specificatins. Excavate a shallw test pit t minimum dimensins f 2 feet wide by 6 feet in length. Depth f the trench shuld be at r within 6 inches f the planned subgrade elevatin. The side slpes may be laid back sufficiently t avid caving and ersin during the test. Hwever, the side slpes fr the depth f pnding during the test (6-12 ) shuld be vertical. The hrizntal surface area f the bttm f the test pit shuld be 12 t 32 square feet. The pit may be circular r rectangular, but accurately dcument the size and gemetry f the test pit. Install a vertical measuring rd adequate t measure the water depth and it in half-inch r centimeter increments and install in the center f the pit bttm. Alternatively, a self-lgging pressure sensr may als be used t determine water depth and drain-dwn. Use a rigid pipe with a splash plate n the bttm t cnvey water t the pit and reduce side-wall ersin r excessive disturbance f the expsed subgrade. Pre-sak perid: add water t the pit s there is standing water fr at least 6 hurs. Maintain the pre-sak water level at least 6 inches abve the bttm f the pit. At the end f the pre-sak perid, add water t the pit at a rate that will maintain a minimum 6-inch and maximum 12-inch water level abve the bttm f the pit ver a full hur. The specific depth shuld be the abut the same as the maximum designed pnding depth.
4 Every 15 minutes, recrd the cumulative vlume and instantaneus flw rate in gallns per minute necessary t maintain the water level at the same pint n the measuring rd. After ne hur, turn ff the water and recrd the rate f infiltratin in inches per hur frm the measuring rd data until the pit is empty. Fill and repeat the drain dwn prtin f the test. Prvide the test results t the Engineer fr review and acceptance. Large Ring Infiltratin Test The large ring infiltratin test shall be cmpleted at the planned subgrade elevatin as fllws: Excavate t and prepare the subgrade in accrdance with the specificatins. Install a large (steel, cncrete, r plastic ring) with a minimum internal diameter f 3-feet and a minimum height f 12-inches. Press the ring int the sil t firmly seat it and backfill arund it with native excavatin spils. Install a vertical measuring rd adequate t measure the full pnded water depth and marked in half-inch r centimeter increments in the center f the pit bttm. Alternatively. a self-lgging pressure sensr may als be used t determine water depth and drain-dwn. Use a rigid pipe with a splash plate n the bttm t cnvey ver the expsed subgrade t reduce ersin r excessive disturbance f the subgrade. Pre-sak perid: add water inside the ring s there is standing water fr at least 6 hurs. Maintain the pre-sak water level at least 6 inches abve the bttm f the pit. At the end f the pre-sak perid, add water inside the ring at a rate that will maintain a minimum 6-inch and maximum 12-inch water level abve the subgrade. The specific depth shuld be the abut the same as the maximum designed pnding depth. Every 15 minutes, recrd the cumulative vlume and instantaneus flw rate in gallns per minute necessary t maintain the water level at the same pint n the measuring rd. After ne hur, turn ff the water and recrd the rate f infiltratin in inches per hur frm the measuring rd data until the water has infiltrated Fill and repeat the drain dwn prtin f the test. Prvide the test results t the Engineer fr review and acceptance. [Nte t Engineer: Amend the testing t fit yur prject and prvide directin n what t d with the infiltratin test results (such as Cnvert it t a lng term rate and cmpare it t the design lng term rate). Prvide a remedy if the lng term infiltratin rate determined frm the subgrade infiltratin rate is less than the design lng term infiltratin rate. Identify an allwable tlerance between the cnstructin measured rate and the rate the design lng term infiltratin rate. (why is it different scarificatin. Prvide fr design engineer t review testing and results fr cnfrmance with the design.]
5 Add the fllwing new sectin Measurement Preparing, maintaining, testing, and restring (as necessary) subgrade shall nt be measured fr payment. END OF SECTION
WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE
METHOD STATEMENT Wetland and River Crssings METHOD STATEMENT WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE 0 02.07.2012 Issued fr Review Semane Jnes & Wagener Rev. Date Reasn fr Issue Prepared
More informationCM-10/PT SP1 Screw Pile Specification
Piletech Supplementary Prcedure CM-10/PT SP1 CM-10/PT SP1 Screw Pile Specificatin Screw Pile Specificatin 1.0 INTRODUCTION 1.1 PURPOSE/SCOPE This specificatin cvers the prcurement, design, installatin
More informationMemo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen
Mem Date: Mnday, January 05, 2015 Prject: T: Frm: Subject: Suth Rchfrd Rad Type recipient(s) here HDR, Inc. Radway Optins fr Prtectin f Irn Fen Wetlands Backgrund Sphagnum angustiflium a U.S. Frest Service
More informationNew Product Approval Process
New Prduct Apprval Prcess 1. Scpe T prvide an assessment f the suitability f a new prduct fr prcurement and use by Manitba Infrastructure (MI). Manitba Infrastructure may require updates, resubmissin f
More informationMONOPOUR PREFAB SYSTEM
Enter Prject Name Enter Prject Number (Nte t Specifier: This dcument has been prepared fr Fab-Frm Industries Ltd. (Fastft prduct) in accrdance with the Cnstructin Specificatins Institute (CSI) Sectin Frmat.
More informationCITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist
Page 1 f 6 CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Prcess and Checklist Submittals: Tree Permit Prcess 1. Cmpleted tree permit applicatins, alng with the required supprting dcumentatin, must
More informationBuilding Permit Application Accessory Buildings/ Detached Garages
Parkland Cunty 53109A Hwy 779 Parkland Cunty, Alberta T7Z 1R1 Phne: (780) 968-8888 Fax: (780) 968-3225 Tll Free: 1-888-880-0858 Email: safetycdest@parklandcunty.cm Building Permit Applicatin Accessry Buildings/
More informationEID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ]
Plicy Guidelines: The District has established criteria and guidelines t assist staff in evaluating and administering, and the directrs in apprving and/r rejecting, applicatins fr increases in irrigatin
More informationCleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012
Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website
More informationInstructions Fee Schedule
City f Lndn Tree Prtectin By-Law C.P.-1515-228 Tree Prtectin Area Permit Applicatin Frestry Management Planning Services - Urban Frestry 267 Dundas Street, 3rd Flr Lndn, Ontari N6A 1H2 Telephne: 519-661-CITY
More informationProject: Sydney Metro - Utility in stigations, Application Title:
Sydney Metr Integrated Management System (IMS) (Uncntrlled when printed) Iv' sydney METRO Pre-Cnstructin Minr Wrks Apprval Frm Minr Wrks are defined as any lw impact activities that are undertaken prir
More informationFoot Protection Standard
Ft Prtectin Standard Safety and Envirnment Systems Management System Dcumentatin Ft Prtectin Standard 1.0 PURPOSE This standard specifies the selectin, use, inspectin and care f ft prtectin at SaskPwer.
More informationFoot Protection Standard
Ft Prtectin Standard Safety and Envirnment Systems Management System Dcumentatin Ft Prtectin Standard 1.0 PURPOSE This standard specifies the selectin, use, inspectin and care f ft prtectin at SaskPwer.
More informationPS ACID SULPHATE MATERIALS
PS ACID SULPHATE MATERIALS PURPOSE AND SCOPE The purpse f this primary standard is t eliminate r minimise risk f envirnmental harm caused by acid sulphate materials including acid sulphate sils and acid
More informationFREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP
FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP Objectives Q1. What are the bjectives f the Remediatin Technlgies prjects? A1. Kuwait Oil Cmpany is cmmitted t a sustainable remediatin slutin
More information#G X With Bonus Storage By SDS-CAD Specialized Design Systems
12'-" 3'-0" 3030 12'-" 30 year dimensinal shingles and virticle structural panel siding. Nailing schedule is " n ends 12" n centers d nails. Trusses are engineered attic trusses n 2".c. and framing is
More informationThe BLOOM Performance Review Decision Guide
The BLOOM Perfrmance Review Decisin Guide Intrductin Planning yur perfrmance review prcess needs careful cnsideratin. Sme questins yu might be cnsidering are: 1. Hw ften will the rganizatin cmplete frmal
More informationBROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?
BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? Overview Building cnstructin has becme increasingly cmplex during the last tw decades. Buildings are larger and use new materials and cnstructin
More informationerosion&sedimentcontrol
Auckland Reginal Cuncil Ersin Cntrl: 1 15 ersin&sedimentcntrl Guidelines fr Land Disturbing Activities in the Auckland Regin 1.6.4 Turfing Plate 1.6.4 Turfing Definitin The establishment and permanent
More informationNBN Co. Pit Lid Descriptor
Technical Infrmatin Bulletin (TIB) Dcument Number: TIB-017 Dcument Type TIB Status: Final Issue Date: 16 May 2013 Versin Number: 1.0 Classificatin Public Disclaimer This dcument is prvided fr infrmatin
More information2. Fill Out All the Fields Including: Account Number ( ) A) The Drop Down Menu (It holds the last 15 receivers you ve shipped to.
Find Webship 1. G t www.dhl.ca 2. Chse Ship Online > Ship Nw 3. Bkmark Page Register 1. Chse Register Yur User Prfile 2. Fill Out All the Fields Including: Accunt Number (970674553) Reference Field Yu
More informationInstructions for Conducting Sampling During Underground Storage Tank Closure
Instructins fr Cnducting Sampling During Undergrund Strage Tank Clsure Permitting and Cmpliance Assistance Prgram Divisin f Waste Management Flrida Department f Envirnmental Prtectin April 2016 [Incrprated
More informationOWNER S MANUAL. MODEL FE (ALL) Serial number
VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm www.vestil.cm Rutine Maintenance & Safety Checks 2 Operatin Instructins... 2 10/05
More informationHIGHLAND CITY ENGINEERING DESIGN REQUIREMENTS FOR PLAN REVIEW AND PRECONSTRUCTION INFORMATION OCTOBER 2008
HIGHLAND CITY ENGINEERING DESIGN REQUIREMENTS FOR PLAN REVIEW AND PRECONSTRUCTION INFORMATION OCTOBER 2008 HIGHLAND CITY PUBLIC WORKS AND ENGINEERING 5400 WEST CIVIC CENTER DRIVE, SUITE 1 HIGHLAND CITY,
More informationOLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shown in italics)
RHB Cpl OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shwn in italics) Date and Time: Tuesday June 19, 2018 10:00 AM Lcatin: DCMWTP
More informationDraper City SWPPP Checklist
Draper City SWPPP Checklist FOR PROJECTS LESS THAN 1 ACRE AND NOT PART OF A COMMON PLAN OF DEVELOPMENT TABLE OF CONTENTS I. Submittal requirements II. Review/Prvide at time f initial SWPPP Inspectin: III.
More informationFamily Support Service Provider Quick Reference Guide to CYBER
Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving
More informationFacilities Study Report
Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager
More informationABC Business Magazines Reporting Standards (UK)
September 2016 ABC Business Magazines Reprting Standards (UK) Changes have been agreed t the ABC Business Magazine and Multi-Platfrm Reprting Standards. We have updated the latest Reprting Standards t
More informationDRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version)
DRAFT Sampling Prtcl Fr the LEED Canada fr Hmes Prgram Applicable t prductin builders (Ballted Versin) This dcument prvides guidance n using the Sampling Prtcl t verify LEED Hmes. It includes infrmatin
More informationDNP Student Exxat Training Guide
DNP Student Exxat Training Guide Versin Date Descriptin f Change 1.0 5/11/2018 Original student guide; apprved by specialty crdinatrs 1.1 6/6/2018 Added clarifying language fr patient lg s 7 day entry
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater
More informationRedeployment Due to Ill Health
Redeplyment Due t Ill Health Guide fr managers This guide utlines steps t fllw when managing an emplyee thrugh the redeplyment prcess due t ill health Main tpic areas Overview General principles The prcess
More informationerosion&sedimentcontrol
Auckland Reginal Cuncil Wrks Within a Watercurse: 3 1 Wrks within watercurses have very high ptential fr ersin and discharge f sediment. This is because such wrk is undertaken in r near flwing water the
More informationHeat Pump KEYMARK. Date Description of modification Revision number Initial version 1
Page: 1 f 26 Date Descriptin f mdificatin Revisin number 14-12-2015 Initial versin 1 10/03/2017 Additin f air/air Editrial changes Annex E included in reference t pren12102-2 suppressed Reference t EN
More informationCMG GardenNotes #268 Irrigation Management Worksheet: Lawn In-Ground Sprinkler System Check-Up
CMG GardenNtes #268 Irrigatin Management Wrksheet: Lawn In-Grund Sprinkler System Check-Up Name: This activity is a check-up n an in-grund lawn sprinkler system. If yu dn t have access t an in-grund sprinkler
More informationLRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL
MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesta Department f Transprtatin 3485 Hadley Avenue Nrth Mail
More informationICP Linking and Fusing Service Enquiry Procedure
UK Pwer Netwrks ICP Linking and Fusing Service Enquiry Prcedure Owner Name Title Neil Clarke Head f Highway Services Signature Date 03 April 2018 Authriser Name Title Kevin Newnham Majr Prgrammes & ICP
More informationStandard Operating Procedure Secchi Depth
Standard Operating Prcedure revised January 8, 2017 Secchi Depth Page 1 f 5 Standard Operating Prcedure Secchi Depth Table f Cntents 1 POINT OF CONTACT... 1 2 OBJECTIVE... 1 3 DEFINITIONS AND ABBREVIATIONS...
More informationCHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS
CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS 11 LIQUID AND EMULSIFIED ASPHALT ITEMS 1 1 OVERV IEW All Liquid and emulsified asphalt items have a unit f measure (UOM) f tns r square yards. All liquid
More informationVENDOR DISPLAY SERVICE LEVEL AGREEMENT
OBJECTIVE: T ensure Vendr prvided displays are maintained in a fully functinal state by the Vendr fr life f display in Best Buy retail stres. It is in the best interest f bth Vendrs and Best Buy t ensure
More informationFire resistance of Blazebrake 201 Sealant Applied to Pipe Penetrations in Concrete Floors. R. W. Causer Fire Testing Engineer
FAR 3318 Fire resistance f Blazebrake 201 Sealant Applied t Pipe Penetratins in Cncrete Flrs Authr: R. W. Causer Fire Testing Engineer Reviewer: P. Ban-Chapman Senir Fire Testing Engineer Cntact: BRANZ
More informationVersion 4.0 LineDesign Engineering 11/1/04
Ple Lading Prgram (Transverse, Vertical, Guying & Buckling) User's Guide Versin 4.0 LineDesign Engineering 11/1/04 Cntents Intrductin 3 Descriptin f Tabs 4-7 Ple Data 7 Wire Data 8-9 Inputs, Drives & Flders.....
More informationPSI Cementitious Patching Guide
PSI Cementitius Patching Guide Material Use TuffPatch VOH fr Vertical and Overhead Repairs and TuffPatch DOT fr any Hrizntal r frm and pur applicatins. Use neat materials fr applicatins up t 2 inches thick.
More informationPremium-6 Hexagonal Wire Netting for roofing applications
CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 4 Technical Data... 4 Installatin infrmatin... 4 Size Range
More informationThe Basics of Polk County s Impervious Surface Regulations
The Basics f Plk Cunty s Impervius Surface Regulatins Plk Cunty Land Infrmatin Department Plk Cunty Gvernment Center 100 Plk Cunty Plaza, Suite 130 Balsam Lake, WI 54810 715-485-9111 715-485-9246 Fax www.c.plk.wi.us/landinf/zning
More informationAppendix A outlines what Bankline can offer to schools, in terms of online payments.
Access fr Schls t Make Online Payments by Bankline A number f maintained schls have requested that the LA makes a prcess fr undertaking nline payments available t them (currently they undertake payments
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership
EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules
More informationMats Inc. Installation and Maintenance Instructions
Mats Inc. Installatin Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 These
More informationMats Inc. Installation and Maintenance Instructions for 3M Nomad Carpet Matting 4000, 5000, 6500, 8850
Mats Inc. Installatin Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 These instructins
More informationSEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION
SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION Incmplete applicatins will nt be prcessed. Accepted applicatins must include the fllwing cmpleted frms: Prvincial Frms: Applicatin t Cnstruct
More informationCity of Vancouver Planning By-law Administration Bulletins
City f Vancuver Planning By-law Administratin Bulletins Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancuver, BC V5Y 1V4 tel: 3-1-1, utside Vancuver 604.873.7000 fax: 604.873.7100
More informationJuly 2013 and Paralympic games 2012 Policy 0.2 Title change and tracked changes removed
EAST f ENGLAND AMBULANCE SERVICE NHS TRUST Dcument title First Draft Authrs: Additinal authrs/cntributrs: Jint Cllective Agreement: HR Respnse t Majr Organisatinal Change Tracey Leghrn, Barry Jarvis Ann
More informationSOURCE INSPECTION QUALITY MANAGEMENT PLAN
SOURCE INSPECTION QUALITY MANAGEMENT PLAN Campus Parkway / State Rute 140 Prject BAR REINFORCEMENT APPENDIX I Table f Cntents 1 GENERAL... 3 1.1 Certificatins... 3 1.1.1 Black Bar Reinfrcement... 3 1.1.2
More informationDigital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap
Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware
More informationPRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION
ENVIRONMENTAL PROTECTION AGENCY AER / PRTR GUIDANCE DOCUMENT N. 1: PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION Fr use in reprting f: 1 PRTR Emissins and Waste Transfers infrmatin
More informationFREELANCE FORESTER S PROFESSIONAL FIELD IN GREECE. By Lagkas & Zagkas
FREELANCE FORESTER S PROFESSIONAL FIELD IN GREECE By Lagkas & Zagkas Legal requirements Private & Public Sectr When the client depicts frm the Private sectr r any Legal Entity f Private Law Frestry university
More informationTechnical Welding. Course Design EASTERN ARIZONA COLLEGE Industrial Technology Education. Technical Welding
Curse Infrmatin Organizatin Divisin Curse Number MSP 210 Title Credits 2 Develped by Lecture/Lab Rati Transfer Status Activity Curse Technical Welding Curse Design 2005-2006 EASTERN ARIZONA COLLEGE Industrial
More informationManual 11: Energy & Ancillary Services Market Operations Revision History
2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required
More informationFLOOD HAZARD ZONE DEVELOPMENT PERMIT
COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FORT BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650
More informationMAINTENENCE COVENANT PROPERTY OWNER REQUIRED TO MAINTAIN STORMWATER FACILITIES AND MEASURES (REPRESENTATIVE VERSION)
MAINTENENCE COVENANT PROPERTY OWNER REQUIRED TO MAINTAIN STORMWATER FACILITIES AND MEASURES (REPRESENTATIVE VERSION) INSTRUCTIONS FOR APPLICANTS AND STAFF When d I have t cmplete this cvenant fr my prperty?
More informationABLE Commission Q&A Q&A Regarding Licensing and Application
ABLE Cmmissin Q&A Q&A Regarding Licensing and Applicatin When can the interim licenses applicatins be submitted? They can be submitted between nw and September 30, 2018, hwever; the Able Cmmissin wuld
More informationProBench Infiltration Workstation. User Guide
PrBench Infiltratin Wrkstatin User Guide Symbls The fllwing symbls are used n the PrBench and in this manual. General Cautin: User shuld use care t avid pssible damage t equipment. 1 Intrductin The PrBench
More informationSouthwestern Region 3 Carson National Forest Jicarilla Ranger District
United States Department f Agriculture Frest Service Suthwestern Regin 3 Carsn Natinal Frest Jicarilla Ranger District 664 East Bradway Blmfield, New Mexic 87413 (505) 632-2956 FAX (505) 632-3173 File
More informationGuidance notes for completing the International Start-up Form
Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm
More informationFACT SHEET Assessing the Feasibility of a Geoexchange System for your Agricultural or Agri-Food Operation
FACT SHEET Assessing the Feasibility f a Geexchange System fr yur Agricultural r Agri-Fd Operatin Geexchange systems are an increasingly cmmn technlgy used t prvide efficient, renewable heating and cling
More informationTroubleshooting TAC GradeBook Averages
The Department f Student Infrmatin Trubleshting TAC GradeBk Averages Teacher Access center v2.5 The fllwing prcedures steps yu thrugh checking student averages, lading t the grade bk, and verriding grade
More informationCDM Plan Submission and Review Criteria Rules
Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan
More informationSelling and Purchasing Items
Selling and Purchasing Items Selling t custmers invlves the fllwing dcuments: Dcument Qute Invice Custmer Credit Ntes Definitin Qutes are ptinal. A qute is an ffer t sell ne r mre items t a custmer at
More informationFlexible Working Hours (Flexi-time) and Attendance Recording for Administrative, IS and Library Staff
Flexible Wrking Hurs (Flexi-time) and Attendance Recrding fr Administrative, IS and Library Staff HRP032 Flexible Wrking Hurs (Flexi-time) and Attendance Recrding fr Administrative, IS and Library Staff
More informationOracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes
Oracle Prject Prtfli Management Integratin Pack fr Primavera P6 and Oracle E-Business Suite 3.1 - Release Ntes Release 3.1 Part N. E20583-03 January 2012 Oracle Prject Prtfli Management Integratin Pack
More informationGuidance on Calculation of Outdoor Water Use Reductions for LEED Canada for Homes Credits SS 2.5 and/or WE 2.3
Guidance n Calculatin f Outdr Water Use Reductins fr LEED Canada fr Hmes Credits SS 2.5 and/r WE 2.3 This guidance dcument prvides an verview f the calculatin prcedures fr estimating the reductin in utdr
More informationWater Body and Riparian Area Boundary Delineation Course
Water Bdy and Riparian Area Bundary Delineatin Curse This training prvides an eclgical perspective n the delineatin f water bdies, with a specific fcus n riparian habitat adjacent t streams, rivers, lakes,
More informationPayroll Quarter Balancing in efinanceplus Calendar Year-End
Payrll Quarter Balancing in efinanceplus Calendar Year-End Reprts used t balance 1. Quarterly Wage Reprt (ODJFS quarter reprt) 2. Quarterly Salary Data Reprt 3. Calendar YTD (HR/Reprts/Peridic/Calendar
More informationRE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report
March 6, 2018 Ministry f the Envirnment 70 Fster Drive, Suite 110 Sault Ste. Marie, ON P6A 6V4 ATTENTION: Safe Drinking Water Branch RE: ELLIOT LAKE Wastewater Treatment Plant Annual Perfrmance Reprt -
More informationDisaster Recovery Planning Guide
Disaster Recvery Planning Guide Disaster Recvery Planning Guide A Business Cntinuity Plan (BCP) is a written strategy which ensures that persnnel and assets are prtected and able t functin in the event
More informationM. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.
M. Cnner Name: EA2: Truss Design Assignment Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must
More informationGUIDELINES CHECKLIST FOR BUILDING APPROVAL
Frm B Versin 3 GUIDELINES CHECKLIST FOR BUILDING APPROVAL Nte: This checklist serves as a guide as t the infrmatin that the aesthetics cmmittee requires and will assist the applicant and the aesthetics
More informationChapter 7 Construction BMPs
Cnstructin BMPs Cntents 1.0 Intrductin... 1 2.0 Fundamental Ersin and Sediment Cntrl Principles... 2 2.1 Ersin... 2 2.2 Sedimentatin... 3 2.3 Effective Ersin and Sediment Cntrl... 3 3.0 Lcal and State
More informationDECK PERMIT INFORMATION
DECK PERMIT INFORMATION REQUIRED INFORMATION: 1) A Plt Plan shwing the prpsed deck with the distances t the side rear and frnt f prperty lines. Als, shw lcatins f existing structures and septic system
More informationMEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT
MEVION SOURCING STRATEGY The MEVION S250, while being the mst cmpact prtn therapy system in the wrld, is still a relatively large and cmplex prduct. As such, ur supply chain utilizes a high-mix, lw vlume
More informationESH Standard Corporate. VA Lockout/Tagout
Page 1/5 Lckut/Tagut 1 Objective 2 Scpe 3 Validity 4 Definitin f terms Lckut/tagut (LOTO) is an essential safety-regulatin fr the wrk n r arund equipment with the gal f reducing any hazards t emplyees
More informationYour available balance is displayed on the lower left-hand side of the myprintcenter, as highlighted below.
Using the LSC Pay-t-Print myprintcenter Website LSC Students, Faculty and Staff and HCPL r MCML Library Card hlders What can I d with the myprintcenter? With myprintcenter (Standard) yu can: Check available
More informationProject Completion by PIMS
Prject Cmpletin by PIMS Systematic Cmpletin and Object Based Fllw-up The Fll Line Prject Arne-M. Hansen, Cmpletin Manager The Fll Line Cmpletin Histry The Fll Line Prject decided t intrduce Cmpletin late
More informationNotice to all Participants, 9 March 2017
Ntice t all s, 9 March 2017 Ntice t s n AEMO decisin t apprve amendments t the Cnnectivity Testing and Technical Certificatin (SA and WA), Gas FRC B2B Cnnectivity Testing and Sys Certificatin (Vic, QLD
More informationTOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE
TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON Backflw Preventin Prgram Develpers, Cntractrs and Paysn Residents: An apprved backflw preventin assembly
More informationYou can also click Jobs in the left hand navigation bar and then select Create Job toward the right hand corner.
T pst a jb n Handshake: 1. Start by clicking Pst a Jb frm yur hme dashbard: Yu can als click Jbs in the left hand navigatin bar and then select Create Jb tward the right hand crner. Yu will nw be asked
More informationetime Sheet Setup and Processing
etime Sheet Setup and Prcessing Updated: 10/3/16 PC and CY Belw are instructins n hw t setup and prcess etime Sheets. 1. Setup the Optins needed in the SDS Web Office Settings fr etime Sheet Prcessing
More informationFiber Reinforced Polymer Upgrades for Large Pipelines. Anna Pridmore, PhD Vice President- Pipeline Solutions Structural Technologies
Fiber Reinfrced Plymer Upgrades fr Large Pipelines Anna Pridmre, PhD Vice President- Pipeline Slutins Structural Technlgies Agenda Inspectin Methds evlutin Repair Optins analysis Carbn Fiber technical
More informationDEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW
DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW SUBMITTAL REQUIREMENTS ONE & TWO FAMILY RESIDENTIAL I. General 1. Cmplete plans- All plans submitted fr permit review must be cmplete and
More informationHIGHWAYS AGENCY. Safe roads, reliable journeys, informed travellers
RWS Strategic Target N.1: achieve a substantial reductin in the need fr rad wrkers t crss live carriageways n ft by the end f December 2011. RWS Strategic Target N.2: aim t eliminate the need fr rad wrkers
More informationFrom: Christopher Tomlinson, GRTA Executive Director
NOTICE OF DECISION T: (via electrnic Dug Hker, ARC Snny Deris, GRTA Bb Vyles, GRTA Dick Andersn, GRTA Al Nash, GRTA T: (via electrnic mail and certified DeKalb Cunty Chris Kapper, Sterling Organizatin
More informationErosion and Sediment Control Plan (ESCP) Review Checklist
Ersin and Sediment Cntrl Plan (ESCP) Review Checklist General Infrmatin: Review Date: Prject Name: Prject Address: Legal Respnsible Persn: Persn Perfrming the Review: Reviewer s Certificatin: QSD N. Wrking
More informationVEHICLE MILES TRAVELED (VMT)
DATE: April 13, 2017 TO: FROM: RE: San Francisc Planning Department Transprtatin Cnsultants Wade Wietgrefe, Senir Planner In September 2016, a memrandum was sent t the transprtatin cnsultant pl regarding
More informationCompleting a 90 Day Evaluation Review Using the Online Performance Appraisal System Standard Form
Cmpleting a 90 Day Evaluatin Review Using the Online Perfrmance Appraisal System Standard Frm Step One: Cmpleting Perfrmance Expectatins Standard Frm Yu will receive an email frm HR Manager alerting yu
More informationHow it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.
Integrating MYOB with TimePr With TimePr s MYOB Integratin Mdule, yu can imprt TimePr time recrds int MYOB fr invice prcessing r payrll integratin. These recrds are then used t generate: Sales Invices,
More informationM. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.
M. Cnner Name: Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must be a truss with a ttal span
More informationNEW LAWS REGARDING BUILDING PRODUCTS (QLD)
BUILDING SERVICES Ref: LEG 17-05 Current at Nvember 2017 NEW LAWS REGARDING BUILDING PRODUCTS (QLD) Frm 1 Nvember new laws regarding nn-cnfrming building prducts apply t all building prjects in Queensland.
More informationNJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES
NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES NJDEP has prpsed far-reaching regulatins which culd effect stream encrachment wetlands and buffers alng streams and tidal areas. Key highlights
More informationALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL
ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL PROFESSIONAL SERVICE CONTRACT PIER B SOUTH REHABILITATION RFQ Number: ASPA-TS-2018-02 MARCH 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEER DESIGN &
More information