1 Alcoa Mosjøen Harbor Remediation Project Information and Fender Design Trygve Isaksen and Maiken Eng, Norconsult 1

2 Content Short presentation of Norconsult, Port and Coastal Engineering and Trygve Introduction to the Alcoa Mosjøen Harbour Remediation Project Design challenges regarding fenders with focus on: Sheet pile structures without backfill Maneuvering Protecting the sheet pile structure filled with contaminated sediments LNG vessels Rubber quality

3 Trygve Isaksen, Head of Port and Coastal Engineering MS, NTNU years In Norconsult Head of Port and Coastal Engineering the last 15 years Experience with Design of offshore structures, bridges and quays, both design, project management and company responsible Member of Executive Council in the Norwegian Concrete Association in the period from 1992 to 1998 and present. Member of several technical committees for design and repair of concrete structures, focus on marine concrete structures and CP E18 Highway in Vestfold 3

4 Short about Norconsult ,2 Employees Projects Sales MRD NOK 52 Countries with projects E18 Highway in Vestfold 4

5 Market Architecture Buildings Energy Environment Industry IT Oil and Gas Planning Risk Management Transport Water 5

6 Port and Coastal Engineering Norconsult has Norway s largest base of knowledge within Port and Coastal Engineering, with between 25 and 30 employees working full time on port and coastal planning and design. We have completed more than 1000 port and coastal projects. The projects are both domestic and international, and within the following main fields: Pre-engineering and feasibility studies Detail design of all sorts of quay structures Condition analysis, rehabilitation and strengthening Wave analysis Breakwaters Mooring analysis Etc. 6

7 The Port and Coastal Engineering Team Picture from our Annual Technical Seminar 7

8 Alcoa Mosjøen Harbor Remediation 80 m 96 m 38 m 278 m 8

9 Alcoa Mosjøen Harbor Remediation 9

10 Alcoa Mosjøen Harbor Remediation 10

11 Alcoa Mosjøen Harbor Remediation LNG Berth? Intermediate Quays 11

12 Wharf Mitigation Structures New sheet pile wall with soil anchors. Dredged sea bottom in front of wharf. New depth at Alcoa Quay: - 11,0 m (LAT) - 12,8 m (MSL) 12

13 CDF (Confined Disposal Facility) 6 sheet pile cells with diameter 23 m 13

14 Alcoa Mosjøen Fender Solutions 14

15 Design vessels 15

16 Fender Solution Mitigation Structure Before After 16

17 Solution to accomodate for the Pitch Vessel 17

18 Fender Solution Mitigation Structure 18

19 Fender Solution Mitigation Structure 19

20 Fender solution CDF 20

21 Fender solution CDF 21

22 Fender Solution LNG Berth 22

23 Rubber Sample Analysis All fenders specified as Trelleborg fenders or equivalent Recommended specifications regarding rubber was discussed but not implemented due to commercial issues Contractor ordered fenders from supplier X Analyses of rubber samples showed that supplier X did not meet the recommendations from Trelleborg regarding carbon black and ash content Test Trelleborg Recommendation Result Supplier X Polymer % Min. 45% 47,6/49,3 Carbon Black % Min 30% 27,5/27,8 Ash % Max 5% 17,0/15,9 23

24 Rubber Quality in PIANC Recommendations In order to ensure sufficient rubber quality we believe compund composition should be included in recommendations from a neutral party such as PIANC Status? WG 145 Berthing Velocities and Fender Design (Expected for publication in 2016) 24

25 Conclusions Good dialogue with the Client is very important To define design vessels To understad how the vessels are mauvering in the port Fender solutions on sheet pile wall with no backfill requires complicated and costly strengthening. From a consultant s point of view it would have been better if requirements to rubber quality was recommended by a neutral party such as PIANC. 25

26 Thank you

Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101

Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101 Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101 Guidelines for environmental impacts of vessels InCom

More information

PIANC Commission Working Group Report Reviews

PIANC Commission Working Group Report Reviews PIANC Commission Working Group Report Reviews EnviCom Working Group report details Initial review: conclusion * If identified as potentially sensitive, please highlight the particular areas of potential

More information

PIANC/Marine Civil Engineering Day 27. May 2017 Marine Civil Engineering specialization - courses. by Øivind Arntsen NTNU

PIANC/Marine Civil Engineering Day 27. May 2017 Marine Civil Engineering specialization - courses. by Øivind Arntsen NTNU PIANC/Marine Civil Engineering Day 27. May 2017 Marine Civil Engineering specialization - courses by Øivind Arntsen NTNU 1 Contents Marine Civil Engineering brief Two fields of study and three fields of

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2011

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2011 Evaluating the effect of penetration depth of a previous sheet pile quay wall on the seismic behavior of newly installed open type wharf Reza Dezvareh 1, Khosrow Bargi 2 1 Student of Master of Science,

More information

Barometer Report 4 FOR CONTRACTORS AND CONSULTANTS

Barometer Report 4 FOR CONTRACTORS AND CONSULTANTS Trelleborg MARINE SYSTEMS Barometer Report 4 FOR CONTRACTORS AND CONSULTANTS A Port Performance Report For this year s Barometer Report, we surveyed 200 port owners, operators, contractors and consultants

More information

SHIP TO SHORE PORT INTERFACE

SHIP TO SHORE PORT INTERFACE SHIP TO SHORE PORT INTERFACE Report on the PIANC Technical Seminar held at the Institution of Civil Engineers on Friday 27th November 2009 This afternoon seminar was organised by the PIANC UK Section and

More information

Kinetic Energy: E= ½. M. V2 10/5/2017. A simple and an effective tool. Presented by Rolf Dahlqvist Trelleborg Marine Systems (Sweden)

Kinetic Energy: E= ½. M. V2 10/5/2017. A simple and an effective tool. Presented by Rolf Dahlqvist Trelleborg Marine Systems (Sweden) 10/5/2017 A simple and an effective tool Presented by Rolf Dahlqvist Trelleborg Marine ystems (weden) Kinetic Energy: E= ½. M. V2 M = Mass of the object V = Velocity of moving object Increasing trend in

More information

V International Seminar on Port Engineering, Concepción, Chile. Site Selection & Design of Marine Terminals

V International Seminar on Port Engineering, Concepción, Chile. Site Selection & Design of Marine Terminals V International Seminar on Port Engineering, Concepción, Chile Site Selection & Design of Marine Terminals by Dr C. Skipper 1, Captain Stephen Gyi 2 ABSTRACT This paper considers the site selection and

More information

A new Port Facility at Waitangi

A new Port Facility at Waitangi A new Port Facility at Waitangi Context Chatham Islands key facts Chatham Islands are a group of 10 islands situated 800km east of Christchurch. Waitangi and Pitt Island are the only habited islands in

More information

Preparing for the Impacts of Climate Change on Facilities and Channels

Preparing for the Impacts of Climate Change on Facilities and Channels Preparing for the Impacts of Climate Change on Facilities and Channels Martin Mannion Maritime Project Director Halcrow Houston, TX AAPA Climate Change Workshop, Houston TX November 12 2008 1 Outline Sustainability

More information

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures Arbeitsausschuß "Ufereinfassungen" der Hafentechnischen Gesellschaft e.v. Recommendations of the Committee for Waterfront Structures Harbours and Waterways 9., completely revised Edition TABLE OF CONTENTS

More information

Global Reach. Local Benefits. AAPA 2018 CAPITAL PROJECTS SEMINAR

Global Reach. Local Benefits. AAPA 2018 CAPITAL PROJECTS SEMINAR Global Reach. Local Benefits. AAPA 2018 CAPITAL PROJECTS SEMINAR Cleveland Harbor Beneficial Reuse & Bedload Interceptor MAY 9, 2018 CLEVELAND HARBOR 20,000+ Jobs $3.5B Economic Activity 13 Million Tons

More information

I213. Westhaven Tamaki Herenga Waka Precinct

I213. Westhaven Tamaki Herenga Waka Precinct I213. Westhaven Tamaki Herenga Waka Precinct I213.1. Precinct description The Westhaven Tamaki Herenga Waka Precinct is located at the western edge of the city centre and comprises the land and coastal

More information

BS 6349:Part 1.1: 1: General Code of practice for planning and design for operations. David Veale

BS 6349:Part 1.1: 1: General Code of practice for planning and design for operations. David Veale : 1: Principal Technical Expert for Marine Facilities Engineering Shell Projects and Technology OCIMF Representative on CB502 OCIMF The Oil Companies OCIMF mission is to be the International Marine Forum

More information

Local sediment management - always the best economical solution? Jens Laugesen 8 April 2011

Local sediment management - always the best economical solution? Jens Laugesen 8 April 2011 Local sediment management - always the best economical solution? Jens Laugesen Introduction When there is a project involving management of contaminated sediments a common problem is: Should they be disposed

More information

Where the Ocean Meets Land. Coastal Engineering

Where the Ocean Meets Land. Coastal Engineering Where the Ocean Meets Land Coastal Engineering Photo credit : Rio Tinto Alcan Our Expertise MARINAS AND HARBOURS Design and repair of breakwaters Sedimentation and dredging studies Navigation guidelines

More information

Effect of ULCVs on Cranes and Infrastructure

Effect of ULCVs on Cranes and Infrastructure Effect of ULCVs on Cranes and Infrastructure AAPA Facilities Engineering Seminar, Miami, Florida Erik Soderberg, SE Structural Engineer, President Liftech Consultants Inc. www.liftech.net 1of 28 Erik Soderberg

More information

Odd E. Gjørv. Norwegian University of Science and Technology, Trondheim, NORWAY

Odd E. Gjørv. Norwegian University of Science and Technology, Trondheim, NORWAY Odd E. Gjørv Norwegian University of Science and Technology, NTNU, Trondheim, NORWAY odd.gjorv@ntnu.no http://folk.ntnu.no/gjorv/ 1 Durability and Service Life of Major Concrete Infrastructure 2 HISTORICAL

More information

CONSTRUCTING MODERN PORTS WITHOUT STEPPING ON WATER by

CONSTRUCTING MODERN PORTS WITHOUT STEPPING ON WATER by CONSTRUCTING MODERN PORTS WITHOUT STEPPING ON WATER by Sabino, Leandro Mendes 1 and Filho, Rubens da Costa Sabino 2 ABSTRACT When the decision for the construction of a new port is taken, investors and

More information

Conversion of Kurnell refinery to a fuel import terminal

Conversion of Kurnell refinery to a fuel import terminal Conversion of Kurnell refinery to a fuel import terminal Dr Jos Kusters 1 May 2014 AGENDA Background Kurnell site conversion Management of environmental and community impacts Operation as a terminal 2

More information

EU Policy framework and what BPO is doing concerning LNG bunkering infrastructure LNG Training for Port Communities LNG in Baltic Sea Ports II Project

EU Policy framework and what BPO is doing concerning LNG bunkering infrastructure LNG Training for Port Communities LNG in Baltic Sea Ports II Project EU Policy framework and what BPO is doing concerning LNG bunkering infrastructure LNG Training for Port Communities LNG in Baltic Sea Ports II Project 22 nd April 2015 Klaipeda, Lithuania Bogdan Ołdakowski

More information

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA)

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) Siegmund Schlie*, Bernd Opfermann** and Torsten Retzlaff*** * Heinrich Hirdes GmbH, Rostock ** b & o - Ingenieure, Hamburg ***

More information

Improvement of Technological Solutions for Sheet Piling Walls Made of U-Shape Piles

Improvement of Technological Solutions for Sheet Piling Walls Made of U-Shape Piles Journal of Civil Engineering and Architecture 11 (2017) 335-341 doi: 10.17265/1934-7359/2017.04.003 D DAVID PUBLISHING Improvement of Technological Solutions for Sheet Piling Walls Made of U-Shape Piles

More information

Massachusetts Port Authority Subordinated Obligations, Crane Financing and Commercial Paper Notes

Massachusetts Port Authority Subordinated Obligations, Crane Financing and Commercial Paper Notes Massachusetts Port Authority Subordinated Obligations, Crane Financing and Commercial Paper Notes TEFRA Hearing April 11, 2018 1. Overview of Conley Terminal Berth 10 & Cranes and other Maritime improvements

More information

F5. Coastal Minor Port Zone

F5. Coastal Minor Port Zone F5. Coastal Minor ort Zone F5.1. Zone description Auckland has a range of water transport facilities in addition to the city centre port that are important for business and industry. Maintaining such sites

More information

The general design of a LNG-terminal. Background

The general design of a LNG-terminal. Background The general design of a LNG-terminal Project MAGALOG (Marin Gas Logistics) is a contribution to addressing port emission problems in Europe, with a special focus on the Baltic Sea, through the establishment

More information

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry On Board Regasification for LNG Ships 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry New Greenfield U.S. Terminals Will Be Almost Impossible to Site Key opportunity is to solve U.S. terminalling

More information

Cai Mep International Terminal (CMIT)

Cai Mep International Terminal (CMIT) Cai Mep International Terminal (CMIT) Cai Mep International Terminal (CMIT) Client: JV of APMT (APMT is part of the Danish-based Maersk Group), Vinalines and Saigon Port Total area: 48ha, Container berths:

More information

Statement of evidence of Stephen Lee (wharf design and construction methods)

Statement of evidence of Stephen Lee (wharf design and construction methods) Before Hearing Commissioners at Christchurch under: the Resource Management Act 1991 in the matter of: applications CRC175507, CRC176030, CRC175508, CRC175509, CRC175510 to reclaim land and construct a

More information

Case study seismic design and soil-structure interaction of a critical wharf facility in soft soils

Case study seismic design and soil-structure interaction of a critical wharf facility in soft soils Proc. 20 th NZGS Geotechnical Symposium. Eds. GJ Alexander & CY Chin, Napier Case study seismic design and soil-structure interaction of a critical wharf facility in soft soils H J Bowen Tonkin & Taylor

More information

I202. Central Wharves Precinct

I202. Central Wharves Precinct I202. Central Wharves Precinct I202.1. Precinct description The zoning of the land within the Central Wharves Precinct is the Business City Centre Zone and the underlying zoning of the part of the Central

More information

SOLUTIONS FOR THE BUILT WORLD. Assess & Prioritize. Keys to Asset Management. Carl J. Larosche, PE.

SOLUTIONS FOR THE BUILT WORLD. Assess & Prioritize. Keys to Asset Management. Carl J. Larosche, PE. SOLUTIONS FOR THE BUILT WORLD Assess & Prioritize Keys to Asset Management Carl J. Larosche, PE www.wje.com Presentation Outline The Case for Asset Management Executive Decision-making Element-based Inspection

More information

Louisiana Transportation Research Center Seminar Series Bridge Structures

Louisiana Transportation Research Center Seminar Series Bridge Structures Louisiana Transportation Research Center 2008 Seminar Series Bridge Structures Session 5 Innovative Bridge Research Projects at LTRC / LA DOTD In The Beginning... Here They Come 1. LTRC 01-1ST P.I. Dr.

More information

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet: 8C Noise Design Assumptions and Source Data 8C.1 Construction Predicted noise levels at the nearest noise sensitive receptors from construction activities have been modelled and presented as noise contours,

More information

The Effect of Ultra Large Container Vessels on Cranes and Infrastructure

The Effect of Ultra Large Container Vessels on Cranes and Infrastructure The Effect of Ultra Large Container Vessels on Cranes and Infrastructure Port and Terminal Technology Conference April 2017, Norfolk, Virginia Erik Soderberg, SE Structural Engineer, President Liftech

More information

HANDBOOK OF PORT AND HARBOR ENGINEERING

HANDBOOK OF PORT AND HARBOR ENGINEERING HANDBOOK OF PORT AND HARBOR ENGINEERING GEOTECHNCAL AND STRUCTURAL ASPECTS Gregory P. Tsinker, Ph.D., RE. E3 CHAPMAN & HALL International Thomson Publishing New \ork Albany Bonn ^Boston Cincinnati Detroit

More information

Enabling LNG Infrastructure

Enabling LNG Infrastructure Enabling LNG Infrastructure Ship Efficiency Webinar Morten A Christophersen CEO, Connect LNG AS Connect LNG at a Glance Turn-Key Transfer Systems Services Head Office: Slemdalsveien 70 Oslo, Norway Branch

More information

APP 100 th Annual Conference, Redwood City, CA. Presented by Bill Partridge, Manson Construction Co. and Erik Soderberg, Liftech Consultants Inc.

APP 100 th Annual Conference, Redwood City, CA. Presented by Bill Partridge, Manson Construction Co. and Erik Soderberg, Liftech Consultants Inc. APP 100 th Annual Conference, Redwood City, CA Presented by Bill Partridge, Manson Construction Co. and 1 2 Manson is a marine contractor based in Seattle, Washington, with over 100 years of experience.

More information

Analysis and Design of Dock Berth Structure

Analysis and Design of Dock Berth Structure IJSART - Volume Issue 3 MARCH 016 ISSN [ONLINE]: 395-105 Analysis and Design of Dock Berth Structure B. Santosh Kumar 1, S. Ashok Kumar 1, Department of Civil Engineering 1, KITS DIVILI, Andhra Pradesh,

More information

Safety of LNG-Shipping around Ports and Terminals

Safety of LNG-Shipping around Ports and Terminals Safety of LNG-Shipping around Ports and Terminals Jos T.M. van Doorn and Johan H. de Jong, MARIN Introduction The design of port lay-outs and terminals suitable for LNG-carriers has to meet exceptionally

More information

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017. Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design

More information

CHALLENGES AND CONSIDERATIONS IN SELECTION, ANCHORAGE DESIGN, AND INSTALLATION OF QUICK-RELEASE MOORING HOOKS ON EXISTING STRUCTURES by

CHALLENGES AND CONSIDERATIONS IN SELECTION, ANCHORAGE DESIGN, AND INSTALLATION OF QUICK-RELEASE MOORING HOOKS ON EXISTING STRUCTURES by CHALLENGES AND CONSIDERATIONS IN SELECTION, ANCHORAGE DESIGN, AND INSTALLATION OF QUICK-RELEASE MOORING HOOKS ON EXISTING STRUCTURES by William M. Bruin PE, D.PE 1, Rune Iversen, PE 2 and Julie A. Galbraith,

More information

proserve Berth Scour Protection - Using Concrete Mattress MARINE CONSTRUCTION ENGINEERS Berth Scour Aprons

proserve Berth Scour Protection - Using Concrete Mattress   MARINE CONSTRUCTION ENGINEERS Berth Scour Aprons Berth Scour Protection - Using Berth Scour Aprons These provide protection to quay structures against: Propeller Scour Ro Ro Fast Ferry Jet Scour Bow Thrusters Wave and Current Action The System Mattress

More information

SOLUTIONS SOLUTIONS BROCHUREPORT

SOLUTIONS SOLUTIONS BROCHUREPORT SOLUTIONS SOLUTIONS BROCHUREPORT 2 BOSKALIS IS A LEADING GLOBAL DREDGING AND MARINE EXPERT A PROVEN NAME IN THE PORTS MARKET 3 A PROVEN NAME IN THE PORTS MARKET With safety as our core value we provide

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Honolulu District Guam Field Office Regulatory Office (1145) PSC 455, Box 188 FPO AP 96540 Public Notice of Application for Permit PUBLIC NOTICE DATE: 10 February 2015 EXPIRATION

More information

PORT OF FUJAIRAH, UNITED ARAB EMIRATES

PORT OF FUJAIRAH, UNITED ARAB EMIRATES Liquid South Bulk Breakwater Terminal Berths Rubis NAME OF PROJECT: LOCATION: SOUTH BREAKWATER BERTHS PORT OF FUJAIRAH, UNITED ARAB EMIRATES Project Description ESC was asked to look into the alternative

More information

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

Berth 9 Quay Extension Environmental Statement Non-Technical Summary Berth 9 Quay Extension Hutchison Ports UK Ltd July 2013 Final Report 9Y0150 CONTENTS Page 1 PROJECT BACKGROUND 1 2 NEED FOR THE PROPOSED SCHEME 4 3 DESCRIPTION OF THE CONSTRUCTION PHASE 4 4 DESCRIPTION

More information

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project

More information

The effectiveness of sustainable floating structures in the Gulf Region (Middle East)

The effectiveness of sustainable floating structures in the Gulf Region (Middle East) High Performance and Optimum Design of Structures and Materials 653 The effectiveness of sustainable floating structures in the Gulf Region (Middle East) A. Ghafooripour 1, E. Nezamifar 1, O. Ogwuda 1

More information

DUNLOP GRG Flexible Containment Solutions LP PNEUMATIC FENDERS

DUNLOP GRG Flexible Containment Solutions LP PNEUMATIC FENDERS Flexible Containment Solutions LP PNEUMATIC FENDERS Dunlop GRG design, develop and manufacture a large range of fabricated, rubber coated textile products, for many applications. From our facility in Manchester,

More information

Growth In Container Volumes

Growth In Container Volumes US GDP and TEU Trade: 1980-2005 600 Recession Total US TEUs 500 US GDP 400 300 200 100 0 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002

More information

PortMiami Wharves Strengthening Program AAPA 2013 Facilities Eng. Seminar & Expo

PortMiami Wharves Strengthening Program AAPA 2013 Facilities Eng. Seminar & Expo AAPA 2013 Facilities Eng. Seminar & Expo Alf Neumann Engineering and Construction Odebrecht Industrial Engineering Odebrecht Infrastructure Real Estate Development The Odebrecht Organization Founded in

More information

Panama City Marina City of Panama City, Florida

Panama City Marina City of Panama City, Florida Panama City Marina City of Panama City, Florida MARINA BULKHEAD ASSESSMENT October 3, 2011 Prepared For: Prepared By: 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 DRAFT - 12/19/2011 Panama City

More information

Paper 153 Renovation of the liquid bulk terminals La Plata Port

Paper 153 Renovation of the liquid bulk terminals La Plata Port Paper 153 Renovation of the liquid bulk terminals La Plata Port PINEDO SANTIAGO M.; SLEIMEN GABRIEL A. General Ports Administration S.E (Buenos aires port), Buenos Aires, Argentina Email (1 st author):

More information

Fender Application Design Manual

Fender Application Design Manual Trelleborg MARINE SYSTEMS Fender Application Design Manual DESIGN MANUAL Performance People The demanding nature of commercial ports and terminals means you need to connect with a partner that provides

More information

I208. Port Precinct I Precinct description

I208. Port Precinct I Precinct description I208. ort recinct I208.1. recinct description The purpose of the ort recinct is to provide for a nationally and regionally significant component of Auckland and New Zealand s transport infrastructure and

More information

40 YEARS OF MARINE OPERATIONS & ENGINEERING IN HAWAII. Makai Research Pier, Waimanalo, Hawaii. 863 N. Nimitz Hwy, Honolulu Harbor

40 YEARS OF MARINE OPERATIONS & ENGINEERING IN HAWAII. Makai Research Pier, Waimanalo, Hawaii. 863 N. Nimitz Hwy, Honolulu Harbor 40 YEARS OF MARINE OPERATIONS & ENGINEERING IN HAWAII Makai Research Pier, Waimanalo, Hawaii 863 N. Nimitz Hwy, Honolulu Harbor Santa Cruz, California www.seaengineering.com ABOUT US Sea Engineering, Inc.

More information

F3. Coastal Marina Zone

F3. Coastal Marina Zone F3. Coastal Marina Zone F3.1. Zone description The Coastal Marina Zone provides for the development and operation of various established marinas, including both land and water components. The zone covers

More information

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Capability Statement Ports and Harbours Delta Marine Consultants

Capability Statement Ports and Harbours Delta Marine Consultants Capability Statement Ports and Harbours Delta Marine Consultants Delta Marine Consultants Delta Marine Consultants (DMC) was founded in 1978 for the purpose of providing consultancy, project management

More information

About Viadukt. Our vision. Our mission

About Viadukt. Our vision. Our mission About Viadukt Viadukt d.d. is the largest construction company in Croatia and in the South East Europe. It was founded in 1947, it employs more than 1 800 employees and is specialized in the execution

More information

DRAFT. Point Hudson. Marina Breakwater Rehabilitation Task 1 Design Refinement. Port of Port Townsend. August 30, 2017

DRAFT. Point Hudson. Marina Breakwater Rehabilitation Task 1 Design Refinement. Port of Port Townsend. August 30, 2017 DRAFT Point Hudson Marina Breakwater Rehabilitation Task 1 Design Refinement Port of Port Townsend August 30, 2017 Task 1 - Design Refinement Overview Contractor/ Supplier Outreach Information on cost

More information

PORTS INTEGRAL TO A STRONG ECONOMY

PORTS INTEGRAL TO A STRONG ECONOMY PORTS INTEGRAL TO A STRONG ECONOMY Port of New Orleans, USA; Strategic Advisory Service 2 Ports are busy, dynamic transportation centers that constantly require technical enhancements to meet the needs

More information

Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse

Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse Mike Crystal Sevenson Environmental Services Kurt Paschl Beazer East Inc. Alan Fowler ARCADIS Presentation

More information

Description. Need Statement

Description. Need Statement Description Brief description of the proposed project: Create an online Certificate of Financial Responsibility (COFR) Database and Web front end to make it more self-service and to free up DFG technical

More information

ADB BRIEFS. Sustaining Harbor Operation and Maintenance in Maldives NO. 105 INTRODUCTION KEY POINTS DECEMBER 2018

ADB BRIEFS. Sustaining Harbor Operation and Maintenance in Maldives NO. 105 INTRODUCTION KEY POINTS DECEMBER 2018 NO. 105 DECEMBER 2018 ADB BRIEFS KEY POINTS Improved interisland connectivity and accessibility to services and economic centers play important roles in achieving inclusive economic growth in Maldives,

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-D Regulation No. 1110-2-1404 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDRAULIC DESIGN OF DEEP-DRAFT NAVIGATION PROJECTS Distribution

More information

South Quay. hayle harbour : : regeneration. Development Proposal for South Quay/Foundry Yard Hayle Harbour. Quay Walls Restoration Method Statement

South Quay. hayle harbour : : regeneration. Development Proposal for South Quay/Foundry Yard Hayle Harbour. Quay Walls Restoration Method Statement hayle harbour : : regeneration South Quay Development Proposal for South Quay/Foundry Yard Hayle Harbour December 2010 Quay Walls Restoration Method Statement 027802 Hayle Harbour, South Quay/Foundry

More information

Appendix 8: Best Practicable Environmental Option (BPEO) Assessment

Appendix 8: Best Practicable Environmental Option (BPEO) Assessment Appendix 8: Best Practicable Environmental Option (BPEO) Assessment ABERDEEN HARBOUR EXPANSION PROJECT BEST PRACTICABLE ENVIRONMENTAL OPTION (BPEO) ASSESSMENT October 2015 Updated April 2016 TABLE OF CONTENTS

More information

15.8 Multipurpose Terminal Project Preparing Alternative Terminal Plans

15.8 Multipurpose Terminal Project Preparing Alternative Terminal Plans 15.8 Multipurpose Terminal Project 15.8.1 Preparing Alternative Terminal Plans As mentioned in Section 15.4, it is required to build a multipurpose terminal with six (6) 14-meter-deep berths and spacious

More information

BS 6349: Maritime Works Moving into the New Era

BS 6349: Maritime Works Moving into the New Era BS 6349: Maritime Works Moving into the New Era On Monday 18th February 2013 10:00hrs until 16:15hrs Registration from 09:30hrs To be held in the Godfrey Mitchell Theatre at the Institution of Civil Engineers,

More information

Performance verification of marine fenders USER GUIDE

Performance verification of marine fenders USER GUIDE TRELLEBORG MARINE SYSTEMS Performance verification of marine fenders USER GUIDE Introduction Marine rubber fenders play a critical role in the operations of ports. They enable vessels that weigh several

More information

LOCATION: At 12 Port of Everett locations in Port Gardner at Everett, Washington.

LOCATION: At 12 Port of Everett locations in Port Gardner at Everett, Washington. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Dredging for Climate Change and Transport in the Netherlands

Dredging for Climate Change and Transport in the Netherlands Dredging for Climate Change and Transport in the Netherlands Dredging to survive Polite Laboyrie (Chairman of CEC and Head of Hydr&Env Eng RWS) Organisation Ministry of Transport Dredging for Climate Change

More information

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program February 2012 Executive Summary Overview This summary report documents concept design and planning

More information

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Notice of Intent to Prepare a Draft Environmental Impact Statement for the Proposed Jasper Ocean Terminal in Jasper County,

More information

Canaport Energy East Marine Terminal Presentation Carlos Pardo September 26 & 28, 2016

Canaport Energy East Marine Terminal Presentation Carlos Pardo September 26 & 28, 2016 Canaport Energy East Marine Terminal Presentation Carlos Pardo September 26 & 28, 2016 Document Number Energy East Protected UNCONTROLLED IF PRINTED Canaport Marine Terminal Berths and Platforms 2 Project

More information

PORT OF PORT TOWNSEND. Point Hudson Marina Breakwater Preliminary Design

PORT OF PORT TOWNSEND. Point Hudson Marina Breakwater Preliminary Design PORT OF PORT TOWNSEND Point Hudson Marina Breakwater Preliminary Design December 5, 2014 1 Outline Project Status (Scopes of Work, To-Do List from Conceptual Design) Existing Conditions Alternative Evaluation

More information

APPENDIX E. Project Description Detailed Elements

APPENDIX E. Project Description Detailed Elements APPENDIX E Project Description Detailed Elements E PROJECT DESCRIPTION DETAILED ELEMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 E.1 Codes, Standards, and

More information

Onshore terminal plants

Onshore terminal plants Onshore terminal plants Norconsult experience covers engineering consultancy services within development of new facilities (Green plants) and live plant modifications (Brown plants) For Green terminal

More information

SLOPE PROTECTION UNDER PILED QUAYS M. Hawkswood 1 and M. King 2

SLOPE PROTECTION UNDER PILED QUAYS M. Hawkswood 1 and M. King 2 ASCE COPRI PORTS 16 CONFERENCE 216 SLOPE PROTECTION UNDER PILED QUAYS M. Hawkswood 1 and M. King 2 1 Martin G. Hawkswood, B.Sc. C.Eng. M.I.C.E. M.I.Struct.E. A.M. ASCE. Proserve Ltd, Princes Drive, Kenilworth

More information

APPENDIX 8-A. Valued Component Selection Rationale

APPENDIX 8-A. Valued Component Selection Rationale APPENDIX 8-A Valued Component Selection Rationale This page is intentionally left blank A list of candidate s was compiled based on issues identified through the scoping process described in Section 8.1.2

More information

PUBLIC NOTICE for Permit Application

PUBLIC NOTICE for Permit Application PUBLIC NOTICE for Permit Application 30-Day Notice Issue Date: January 13, 2016 Expiration Date: February 12, 2016 US Army Corps of Engineers No: NWP-2005-426 Oregon Department of State Lands No: 58607-RF

More information

Managing Extreme Sea Level Rise Scenarios Tony Gioiello Chief Harbor Engineer

Managing Extreme Sea Level Rise Scenarios Tony Gioiello Chief Harbor Engineer Managing Extreme Sea Level Rise Scenarios Tony Gioiello Chief Harbor Engineer AAPA Facilities Engineering Seminar New Orleans, LA November 8, 2011 Goals of the Port of Los Angeles RAND Collaboration Help

More information

SOLUTIONS BROCHURE INFRA SOLUTIONS

SOLUTIONS BROCHURE INFRA SOLUTIONS SOLUTIONS BROCHURE INFRA SOLUTIONS 2 BOSKALIS IS A LEADING GLOBAL DREDGING AND MARINE EXPERT A PROVEN NAME IN THE INFRA MARKET A PROVEN NAME IN THE INFRA MARKET 3 With safety as our core value we provide

More information

AAPA Facilities and Engineering Seminar. Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015

AAPA Facilities and Engineering Seminar. Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015 AAPA Facilities and Engineering Seminar Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015 Realizing the Value of Port Infrastructure Reinvestment Through Life

More information

For personal use only

For personal use only ASX Announcement November 2013 PORT SPENCER General Manager 21 st November 2013 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam CENTREX COMPLETES

More information

General Santos, PHILIPPINES

General Santos, PHILIPPINES General Santos, PHILIPPINES Fishing quay expansion project General Santos City in the southern part of the Philippines, 1,000 km south of the islands capital Manila, was founded in July 1968. Some 26 years

More information

Perspectives from the Beneficial Use Working Group. Nick Buhbe, M.S., Mission Environmental LLC Rebecca Gardner, P.E., Anchor QEA

Perspectives from the Beneficial Use Working Group. Nick Buhbe, M.S., Mission Environmental LLC Rebecca Gardner, P.E., Anchor QEA An Update from CEDA: Perspectives from the Beneficial Use Working Group Nick Buhbe, M.S., Mission Environmental LLC Rebecca Gardner, P.E., Anchor QEA WGBU Members Name Organization Country Eldert Besseling

More information

Capability Statement: Materials Technology for Marine Structures Jon Knights Materials Consulting Ltd

Capability Statement: Materials Technology for Marine Structures Jon Knights Materials Consulting Ltd Capability Statement: Materials Technology for Marine Structures Jon Knights Materials Consulting Ltd DOC Ref: CSMTM01/2013 Introduction A vital step in the design of any structure or the repair and rehabilitation

More information

OPEN CELL. (800) SWC 120. SWC Weld-on. Charts and Pictures courtesy of: 120 o

OPEN CELL. (800) SWC 120. SWC Weld-on. Charts and Pictures courtesy of: 120 o OPEN CELL The OPEN CELL bulkhead, used primarily on docks and similar structures, is a cellular flat sheet pile structure in which each cell s sheet piles are driven in the shape of a U when viewed from

More information

EARTHQUAKE DAMAGE INVESTIGATION OF GRAVITY-TYPE QUAY WALLS IN IBARAKI PORT

EARTHQUAKE DAMAGE INVESTIGATION OF GRAVITY-TYPE QUAY WALLS IN IBARAKI PORT Proceedings of the International Symposium on Engineering Lessons Learned from the 211 Great East Japan Earthquake, March 1-4, 212, Tokyo, Japan EARTHQUAKE DAMAGE INVESTIGATION OF GRAVITY-TYPE QUAY WALLS

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2018-0567-46 September 20, 2018 Application

More information

MARINA PHASING AND COSTS

MARINA PHASING AND COSTS WATERFRONT PLACE IMPLEMENTATION STRATEGY Prepared for Port of Everett TEAM Reid Middleton BST Associates RMC Architects MARINA PHASING AND COSTS This section Prepared by: Reid Middleton September 2014

More information

Determining the Capacity of Aged Assets. Scott Branlund, SE Senior Project Manager/Diving Officer BergerABAM Inc.

Determining the Capacity of Aged Assets. Scott Branlund, SE Senior Project Manager/Diving Officer BergerABAM Inc. Determining the Capacity of Aged Assets Scott Branlund, SE Senior Project Manager/Diving Officer BergerABAM Inc. 1 Focus of Presentation Develop assessment methodology Discuss how to determine structural

More information

Capability Statement Gas and liquid bulk terminals Delta Marine Consultants

Capability Statement Gas and liquid bulk terminals Delta Marine Consultants Capability Statement Gas and liquid bulk terminals Delta Marine Consultants Delta Marine Consultants Delta Marine Consultants provides comprehensive maritime engineering services for gas and liquid bulk

More information

Sustainable Port Development: Summary of Environmental Initiatives at Seaports Worldwide. Tim Van Wormer Port of Portland

Sustainable Port Development: Summary of Environmental Initiatives at Seaports Worldwide. Tim Van Wormer Port of Portland Sustainable Port Development: Summary of Environmental Initiatives at Seaports Worldwide Tim Van Wormer Port of Portland I2S2 The I2S2 is the Institute for Sustainable Seaports: Non-profit Center of Excellence

More information

Focused area. Strategy on environmental management and CSR at IØT. Relevant issues. Overall research challenges

Focused area. Strategy on environmental management and CSR at IØT. Relevant issues. Overall research challenges 1 2 Focused area Strategy on environmental management and CSR at IØT Ottar Michelsen Department of Industrial Economics and Technology Management, NTNU 1 February 2008 Environmental Management (EM), Supply

More information

BOSKALIS OFFSHORE MINING

BOSKALIS OFFSHORE MINING BOSKALIS OFFSHORE MINING GERTJAN GRUNDLEHNER SANDER STEENBRINK UNDERWATER MINING INSTITUTE 2012 SHANGHAI, CHINA 16 17 OCTOBER 2012 27 september 2012 1 INDEX 01 BOSKALIS INTRODUCTION 02 ONSHORE MINING EXAMPLE

More information

TrelleBorg MArINe SYSTeMS Corporate Overview

TrelleBorg MArINe SYSTeMS Corporate Overview Trelleborg MARINE SYSTEMS Corporate Overview The Smarter Approach Transferring know-how for smarter LNG The smarter approach for a more efficient port Materials best practice for a smarter port Take The

More information