Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

Size: px
Start display at page:

Download "Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012"

Transcription

1 Hong Kong International Airport Medium & Long Term Development Plans The British Chamber of Commerce 18 July 2012

2 Connecting HK with the World More than 100 airlines serving 160 destinations worldwide (including 40 mainland cities); over 900 flight movements daily Hong Kong 2

3 HKIA: Solid & Robust Growth World s busiest cargo airport in total tonnage 3 rd largest international passenger airport Passenger Traffic millions of passengers 90% 53.9 millions of tonnes 4 Cargo Air Traffic Traffic Movement 100% 150% 3.9 thousands

4 Far-sighted Planning implemented in the 90 s Western Harbour Crossing Tsing Ma Bridge Airport Express Tung Chung Town 4

5 Total Investments: HK$168 B Investment on infrastructure by HK Government Investment by Airport Authority Investment by airlines and other airport companies Western Harbour Crossing Lantau Link West Kowloon Expressway Airport Railway North Lantau Expressway Route 3 Terminal 1 Land (reclamation) Runway Public Facilities Others 20.0 b 11.6 b 6.7 b 8.5 b 7.7 b Air cargo Catering Aircraft Maintenance Aviation Fuel Airlines & hotels Others 9.0 b 2.7 b 1.7 b 1.8 b 7.3 b 1.0 b HK$90 billion HK$54.5 billion HK$23.5 billion 5

6 Investments by AAHK since 98: $30.7 B Midfield Development West Apron North Satellite Concourse SkyPier Terminal 2 System Enhancement 6

7 Dividends & Capital Repayment: $22.1 B Fiscal Year Dividends (HK$ million) 2003/ /05 7,000* 2010/11 Turnover: $10.6 B ROE: 11.1% 2005/06 1, /07 1, /08 2, /09 2, /10 4,500^ 2010/11 3,100 Other Terminal Commercial Revenue $794M (7%) Real Estate Revenue $183M (2%) Other Income $98M (1%) Aviation Security Services $158M (1%) Airside Support Services Franchises $1,695M (16%) Security Charges $833M (8%) Retail Licenses & Advertising Revenue $3,583M (34%) Airport charges $3,239M (31%) * Inclusive of repayment of capital: HK$6,000 million ^ Inclusive of special dividend: HK$2,200 million

8 3-Year Rejuvenation Programme HK$ 500 million investment to rejuvenate airport facilities and enhance system reliability: Building refurbishment Airfield ground lighting system overhaul E&M systems overhaul Airbridge overhaul APM/ Apron bus/ BHS overhaul Renovation of public toilets 8

9 Hong Kong International Airport Midfield Development

10 Location Plan T1 Line Extension

11 Midfield Concourse

12 The Departures Experience

13 APM Departures Platform

14 Level 6 Node Retail Looking East

15 Level 6 Node Retail Area

16 The Arrivals Experience

17 Arrivals Main Corridor

18 APM Arrivals Platform View

19 Midfield Development Green Features

20 Green Initiatives Energy Passive Energy Active Waste & Resources Construction Waste Transportation Materials Water Reduced window to wall ratio Water cooling Reduction Compliance with airport guidelines Regenerative APM power 10% by weight recycled content Grey water recycled for chillers High performance glazing Variable Air Volume Source segregation + space Source segregation Efficient vertical transport 20% materials from 800km radius Condensate water recycled for chillers Solar shading Variable primary loop Interim and centralized stores Min 60% construction waste recycled 50% timber from FSC sources rain water collection for chillers North lights Free Cooling & variable volume intake On site organic treatment No virgin timber for temporary works Low VOC Low/zero use fixtures & fittings Optimized facade Daylight sensors for lights Waste signage Materials Logistics Plan Low pollution chillers Sea water flushing Low energy lighting Same standards applied to tenant fit out PV Panels No Bamboo

21 Passive Features Optimized Facade Optimized East/West Facade Height Ratio of 3:2

22 Passive Features Optimized Facade

23 Passive Features North Lights True North True-North Facing Skylights Provide 250 Lux of Daylight

24 Passive Features North Lights

25 Renewables - Mono-crystalline photovoltaic panels m2 produces 120kWp of power True South

26 Active Systems Water Cooling & Recycling First Priority A/C Condensate Water Second Priority Grey Water from MFC Grey Water Treatment System Water Cooled Chillers 400 m 3 /day Third Priority Rain Water from Chiller Building Vol. varies Filtering System Excess rainwater discharged Back Up Potable Water

27 Active Systems Power Usage System Regenerative Power from APM system Regenerative Power from Lifts Occupant Load Sensing for Escalators & Walkways Demand-controlled ventilation Vehicles Electric Cars used on Airfield Charging Points Integrated in Concourse Aircrafts Fixed Ground Power provided for Parked Aircraft

28 BEAM Plus Certification Targets Site Aspect - Platinum Material Aspect - Gold Energy Use - Platinum Water Use - Platinum Indoor Env. Quality - Platinum Innovation - Gold Overall - Platinum

29 Three-Runway System 29

30 OPTION 1 HKIA will Saturate Between 2019 and 2022 Capacity of Two Runways

31 Tentative Layout of the Three Runway System

32 3 rd Runway Project Scope Land formation of about 650 hectares Construction of a 3.8km third runway and related taxiway systems Construction of passenger concourses with about 60 air bridges and apron to accommodate 100 parking stands Extension of the Automated People Mover network to the new concourses with 10km of trackwork Extension of the Baggage Handling System with 32km of conveyors Expansion of supporting infrastructure and landside road network

33 Three-runway System: A Three-phase Process Project Planning Project Approval Project Implementation EIA studies Associated design details Funding options Statutory and Government approvals Environmental permit Foreshore and seabed gazettal Financial arrangement Land reclamation Detailed designs Construction of related facilities Commissioning of a three-runway system ~2 years* ~1 year* ~8 years* It will take about 3 more years before actual project implementation * Indicative timeline that is subject to changes

34 Project Planning Environmental Impact Assessment To access the likely impacts of a three runway system on the environment and find ways to avoid, minimize/mitigate and control such impacts About 2 years to complete Stakeholders Engagement Stakeholders including experts, academics, members of the public, Green NGOs, fishermen, residents etc. will be engaged throughout the entire EIA process. Scheme Design To verify and further develop the preliminary designs and refine the project scope To provide supporting technical and construction details to the EIA process To come up with a final cost estimate to develop funding options

35 Key EIA Elements Air Quality While acting in full compliance with the EIA requirements, we will also adopt the new AQOs when assessing air quality under EIA. Noise We will undertake very thorough studies on the potential noise impacts during the EIA, including a comprehensive assessment of the Noise Exposure Forecast or NEF contour, a measure of aircraft noise on the surrounding area. Water Quality We will continue to explore methods of design, construction and control measures which will avoid or minimize impact such as by adopting non-dredging and specialist techniques such as Deep Cement Mixing. Marine Ecology We will continue to explore methods of design, construction and control measures which will avoid or minimize such impacts.

36 Key EIA Elements Fisheries A detailed fisheries impact assessment will be conducted to further inform the AFCD survey as a basis for any appropriate compensation measures. Landscape and Visual Potential minor impact on water landscape and visual disturbance to sensitive receivers. Cultural Heritage No impact on built heritage is expected. Waste Management Waste management implications will be from generation, handling and disposal of construction and operational waste and refuse. Hazard to Life The Project does not include any Potentially Hazardous Installations and is not expected to pose significant safety issues of concern.

37 EIA Current Progress Project Profile submitted 28 May 2012 EPD requested further information and clarification under Section 5(4) EIAO (Cap. 499) on subjects including marine ecology, noise, health & hazards. Further information/clarification provided 29 June Public comment received on both Project Profile and further information Study Brief anticipated mid August 2012.

38 Technical Briefing Groups Purpose: Facilitate technical views exchange; Keep relevant stakeholders abreast of the development of the EIA studies; and Possible environmental impact and mitigation measures to be discussed in an engaging and interactive manner. Four Technical Briefing Groups identified: Air Quality Dolphin Marine Ecology & Fisheries Noise

39 Thank you 39

Airport visit for HKIE Environmental Division 11 January 2014

Airport visit for HKIE Environmental Division 11 January 2014 Airport visit for HKIE Environmental Division 11 January 2014 1 Corporate Video 2 Agenda 1. HKIA Overview 2. Short-, medium- and long-term plan of HKIA 3. EIA for the Three-Runway System 4. Environmental

More information

Presentation to LSCM Logistics Summit An Update on the Developments of the Three-Runway System of Hong Kong International Airport

Presentation to LSCM Logistics Summit An Update on the Developments of the Three-Runway System of Hong Kong International Airport Presentation to LSCM Logistics Summit 2014 An Update on the Developments of the Three-Runway System of Hong Kong International Airport 18 September 2014 0 Overview of Hong Kong International Airport Open

More information

Future Development of HKIA. Planning of the Three-Runway System. Presentation to Hong Kong Air Cargo Forum. 19 June 2013

Future Development of HKIA. Planning of the Three-Runway System. Presentation to Hong Kong Air Cargo Forum. 19 June 2013 Future Development of HKIA Planning of the Three-Runway System Presentation to Hong Kong Air Cargo Forum 19 June 2013 1 Three-runway System: A Three-phase Process Planning Approval Implementation Environmental

More information

PowerPoint Presentation Outline (for internal ref)

PowerPoint Presentation Outline (for internal ref) PowerPoint Presentation Outline (for internal ref) Date Event 27 April 2018 (Fri) HKIE Environmental Division Annual Forum Topic Focus Developing Intelligent Resource Preservation Strategies for Hong Kong:

More information

Sustainable Airport in a Desert Environment. Christine Eid Airports Going Green 2015 Long-term Sustainability Planning October 27 th, 2015

Sustainable Airport in a Desert Environment. Christine Eid Airports Going Green 2015 Long-term Sustainability Planning October 27 th, 2015 Sustainable Airport in a Desert Environment Christine Eid Airports Going Green 2015 Long-term Sustainability Planning October 27 th, 2015 1 Abu Dhabi Plan 2030 We cherish our environment because it is

More information

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES 6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES The projected activity levels at Sacramento International Airport as described in Chapter 3 are the basis for determining the terminal facilities that will be

More information

Sustainable Construction Practices OMP Case Studies

Sustainable Construction Practices OMP Case Studies Sustainable Construction Practices OMP Case Studies Tenant Relocation Andres Garcia, O'Hare Modernization Program, Program Management Office Frank Grimaldi, Assistant Commissioner, Design and Construction,

More information

Expansion of Hong Kong International Airport into a Three-Runway System Second Meeting of Professional Liaison Group.

Expansion of Hong Kong International Airport into a Three-Runway System Second Meeting of Professional Liaison Group. Expansion of Hong Kong International Airport into a Three-Runway System Second Meeting of Professional Liaison Group Notes of Meeting The Professional Liaison Group (PLG) held their second meeting on 11

More information

OBJECTIVES AND TARGETS

OBJECTIVES AND TARGETS OBJECTIVES AND TARGETS Airport Authority Hong Kong (AAHK) has a business planning process in place to address the short- to long-term needs of Hong Kong International Airport (HKIA). The process includes

More information

Abu Dhabi Airport: Sustainable Airport in a Desert Environment

Abu Dhabi Airport: Sustainable Airport in a Desert Environment Abu Dhabi Airport: Sustainable Airport in a Desert Environment Hana Saad Senior Manager Development Corporate Strategy & Planning Abu Dhabi Plan 2030 We cherish our environment because it is an integral

More information

LAX INTERNATIONAL AIRPORT

LAX INTERNATIONAL AIRPORT LAX INTERNATIONAL AIRPORT ACHIEVING OPERATIONAL EXCELLENCE Dominic Nessi Deputy Executive Director/CIO 06.24.2015 WELCOME/INTRODUCTION Los Angeles International Airport 5 th busiest airport in the world

More information

DESTINATION: LA MERCY

DESTINATION: LA MERCY Vacant land DESTINATION: LA MERCY In 2002, the government approved the creation of a new airport at La Mercy, kick-starting negotiations around a public-private partnership between the state and private

More information

PART K SECTION 2 TRAINING STRATEGY

PART K SECTION 2 TRAINING STRATEGY K-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART K SECTION 2 TRAINING STRATEGY 1. for Ground Handling s 1.1 The aircraft ground handling are primarily responsible for the training

More information

Airport GHG and Other Environmental Management. ICAO Environment Seminar and State Action Plan Workshop 11 to 13 June 2014 Yaoundé, Cameroon

Airport GHG and Other Environmental Management. ICAO Environment Seminar and State Action Plan Workshop 11 to 13 June 2014 Yaoundé, Cameroon Airport GHG and Other Environmental Management ICAO Environment Seminar and State Action Plan Workshop 11 to 13 June 2014 Yaoundé, Cameroon 1 1. Airport Greenhouse Gas Emissions and State Action Plans

More information

Internet of Things (IoT) Applications at Hong Kong International Airport

Internet of Things (IoT) Applications at Hong Kong International Airport Internet of Things (IoT) Applications at Hong Kong International Airport Ir Alex Kwan, Executive Director Engineering and Technology, HK Airport Authority Smart Airport Vision Primary Goals are better

More information

EMISSION REDUCTION PROJECTS AND INFRASTRUCTURES AT IGIA. 19 th Feb, 2014

EMISSION REDUCTION PROJECTS AND INFRASTRUCTURES AT IGIA. 19 th Feb, 2014 EMISSION REDUCTION PROJECTS AND INFRASTRUCTURES AT IGIA 19 th Feb, 2014 1 Sustainable Environment Management Functions at IGIA Environment Management System ISO 14001 & ISO 14064 Collaborative Environment

More information

Expansion of Hong Kong International Airport into a Three-Runway System

Expansion of Hong Kong International Airport into a Three-Runway System Expansion of Hong Kong International Airport into a Three-Runway November 2015 Airport Authority Hong Kong Expansion of Hong Kong International Airport into a Three-Runway 350708 ENP ENL 06/05/02 F P:\Hong

More information

Raleigh Executive Jetport Master Plan Update SEPT 27, 2017

Raleigh Executive Jetport Master Plan Update SEPT 27, 2017 Raleigh Executive Jetport Master Plan Update SEPT 27, 2017 Presentation Outline 1. Master Plan Purpose 2. Master Plan Process 3. Public Involvement Plan 4. Project Schedule Presentation Outline 1. Master

More information

LEED Rated Government Buildings. Government Sector Construction. CPWD Construction Work Load

LEED Rated Government Buildings. Government Sector Construction. CPWD Construction Work Load LEED Rated Government Buildings Green Building Congress Delhi October 21 2011 Tanmay Tathagat Government Sector Construction Environmental Design Solutions Pvt. Ltd Delhi Mumbai Pune Bangalore Chennai

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

Update on GBI Malaysia

Update on GBI Malaysia Update on GBI Malaysia 22 nd April 2010 Significant Developments since 21/5/09 launch of GBI Over 1,000 GBI Facilitators trained 7 GBIF courses conducted to-date 123 Registered Facilitators listed on website

More information

How MTR Builds and Connects Communities in Hong Kong

How MTR Builds and Connects Communities in Hong Kong How MTR Builds and Connects Communities in Hong Kong David Tang Property Director, Hong Kong 21 June 2018 27/6/18 Page 1 Introduction 27/6/18 Page 2 Where is Hong Kong? MTR s projects outside of Hong Kong

More information

Washington Dulles International Airport EXECUTIVE SUMMARY

Washington Dulles International Airport EXECUTIVE SUMMARY EXECUTIVE SUMMARY The events of September 11, 2001 and the economic uncertainties facing commercial aviation have affected the timing of the Proposed Action. The Metropolitan Washington Airports Authority

More information

6/29/2017. Carbon Neutral Approach of Delhi Airport. GreenCo Platinum Certified Company. 23 rd June, 2017

6/29/2017. Carbon Neutral Approach of Delhi Airport. GreenCo Platinum Certified Company. 23 rd June, 2017 Carbon Neutral Approach of Delhi Airport 23 rd June, 2017 GreenCo Platinum Certified Company 1 1 6/29/2017 Sustainability of Airports & Commitment We represented the International Aviation community at

More information

The Hong Kong Airport Railway

The Hong Kong Airport Railway eature Railways and Air Transport The Hong Kong Airport Railway Alastair J. Budge-Reid Background The Beginning This article describes the principal challenges and responses developed by the Mass Transit

More information

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009 Dallas/Fort Worth International Airport ASCE Presentation Terminal Development Program November, 2009 ASCE PRESENTATION, NOVEMBER 2009 Background Objective The objective of today s presentation 1. Review

More information

Presentation for Business Opportunities & Entrepreneurial Training Summit

Presentation for Business Opportunities & Entrepreneurial Training Summit Welcome to the Presentation for Business Opportunities & Entrepreneurial Training Summit October 9, 2018 Ned Carey, C.M. Chief - Division of Administration & Performance Management Safety Management System

More information

REQUEST FOR PROPOSAL RFP: CVB CHUUK VISITOR BUREAU

REQUEST FOR PROPOSAL RFP: CVB CHUUK VISITOR BUREAU REQUEST FOR PROPOSAL RFP: CVB 2019-19-01 CHUUK VISITOR BUREAU I. Brief Project Overview: The Chuuk State Government and Chuuk Visitor Bureau are requesting proposals from qualified entities to provide

More information

ABOUT AIRPORT AUTHORITY HONG KONG

ABOUT AIRPORT AUTHORITY HONG KONG ABOUT AIRPORT AUTHORITY HONG KONG Established in, Airport Authority Hong Kong (AAHK) is a statutory body that is wholly owned by the HKSAR Government and governed by the Airport Authority Ordinance (Chapter

More information

AL-AMEEN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

AL-AMEEN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK AL-AMEEN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE 6604 - RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK UNIT 1 RAILWAY PLANNING PART A 1. Define Permanent way. 2. List out the elements

More information

The Business Case for Reducing HKIA's Carbon Footprint through Multi-Stakeholder Engagement

The Business Case for Reducing HKIA's Carbon Footprint through Multi-Stakeholder Engagement AIS Smart Cities Conference 23 September 2015 The Business Case for Reducing HKIA's Carbon Footprint through Multi-Stakeholder Engagement Mike Kilburn Senior Manager, Environment Airport Authority Hong

More information

Mr. D.N Ngigi. 3 rd Meeting of CAPSCA Africa Project. Corporate Affairs Manager Jomo Kenyatta International Airport

Mr. D.N Ngigi. 3 rd Meeting of CAPSCA Africa Project. Corporate Affairs Manager Jomo Kenyatta International Airport 3 rd Meeting of CAPSCA Africa Project Updates on Public Health Preparedness Guidelines Nairobi Kenya 26 June 2012 Mr. D.N Ngigi Corporate Affairs Manager Jomo Kenyatta International Airport On behalf of

More information

Expansion of Hong Kong International Airport into a Three-Runway System

Expansion of Hong Kong International Airport into a Three-Runway System Expansion of Hong Kong International Airport into a Three-Runway System 3 rd PLG Meeting 7 September 2016 Airport Authority Hong Kong 1 Agenda 1. Latest Progress of the 3RS Project 2. Route diversion for

More information

KIX Early Recovery Plan. September 12, 2018

KIX Early Recovery Plan. September 12, 2018 KIX Early Recovery Plan September 12, 2018 Our Early Recovery Plan Recovery status (1) Emergency (2) Tentative (3) Full scale Time Sept 7, 2018 (3 days after the typhoon damage) After 1 week TBD Goal Operation

More information

Airport Environmental System Challenges of Creating an Airport Sustainability. Mr.Jakrapop Charatsri Airports of Thailand Public Company Limited

Airport Environmental System Challenges of Creating an Airport Sustainability. Mr.Jakrapop Charatsri Airports of Thailand Public Company Limited Airport Environmental System Challenges of Creating an Airport Sustainability Mr.Jakrapop Charatsri Airports in Thailand 2 Aircraft Movements All Aircrafts LCCs 3 Passenger Movements All Passengers LCC

More information

LET THERE BE LIGHT THE STORY OF CEMENT HOUSE ACC A GREEN APPROACH THIS IS THE STORY OF CEMENT HOUSE THE HEADQUARTERS OF ACC CEMENT

LET THERE BE LIGHT THE STORY OF CEMENT HOUSE ACC A GREEN APPROACH THIS IS THE STORY OF CEMENT HOUSE THE HEADQUARTERS OF ACC CEMENT LET THERE BE LIGHT THE STORY OF CEMENT HOUSE THIS IS THE STORY OF CEMENT HOUSE THE HEADQUARTERS OF ACC CEMENT A MAJESTIC BUILDING STEEPED IN HISTORY, WHERE EVERY BUILDING ELEMENT HAS A STORY TO TELL THIS

More information

Annual Sustainability Performance Report Card

Annual Sustainability Performance Report Card NAVIGATION Click on a category or scroll through document Waste/ Recycling Energy Water Business Procedures Planning, Design and Construction Alternative Transportation Environment Annual Sustainability

More information

Airport Development Plan Update

Airport Development Plan Update Airport Development Plan Update Prepared by: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY SDIA Planning Timeline 2 Where Is SDIA Today? The Airport is implementing the recommendations from the 2008 master

More information

1st Floor. The Hunt Library Sustainability Tour

1st Floor. The Hunt Library Sustainability Tour 1st Floor Reduced Building Footprint The bookbot system provides a 40% reduction in building square footage. Recycled materials as aluminum window mullions, contribute to a total sum of 31% recycled content.

More information

2016 Environmental Benchmarking Survey

2016 Environmental Benchmarking Survey 2016 Environmental Benchmarking Survey General Environmental Questions 1. Contact information: * Airport 3 letter identifier Organization full name First name of survey respondent Last name Title Email

More information

The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015

The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015 The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015 1. The Plans 1.1 What are you doing and why? Demand for rail travel between Sheffield and Manchester is increasing,

More information

Comprehensive Certificate Course for BEAM Plus on Energy Use (EU) 2016

Comprehensive Certificate Course for BEAM Plus on Energy Use (EU) 2016 Comprehensive Certificate Course for BEAM Plus on Energy Use (EU) 2016 Session 2 Energy Simulation & Modelling Honorable Speaker Mr Antony Ho ARUP Methodology and data analysis of building energy simulation

More information

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES Project Category Project Proponent Location Expansion of Lucknow Airport in Respect of Construction of New Integrated Terminal Building at Amausi, Lucknow, Uttar Pradesh. A [7 (a): Development of an Airport]

More information

KIX Early Recovery Plan. September 10, 2018

KIX Early Recovery Plan. September 10, 2018 KIX Early Recovery Plan September 10, 2018 Our Early Recovery Plan Recovery status (1) Emergency (2) Tentative (3) Full scale Time Sept 7, 2018 (3 days after the typhoon damage) After 1 week TBD Goal Operation

More information

Green Charrette BANCROFT ELEMENTARY SCHOOL GREEN CHARRETTE

Green Charrette BANCROFT ELEMENTARY SCHOOL GREEN CHARRETTE Green Charrette Bancroft Elementary School Andover, Massachusetts June 9, 2010 Green Charrette To familiarize and educate stakeholders on general sustainable design principles and the MA- CHPS or LEED

More information

PROJECT CLEAN AIR. Certification Scheme for Clean Air Charter. Final Report. For. Airport Authority Hong Kong (AA) Prepared by

PROJECT CLEAN AIR. Certification Scheme for Clean Air Charter. Final Report. For. Airport Authority Hong Kong (AA) Prepared by PROJECT CLEAN AIR Final Report For Airport Authority Hong Kong (AA) Prepared by March 2014 1. INTRODUCTION Airport Authority Hong Kong (AA) is a statutory body wholly owned by the Hong Kong SAR Government.

More information

A PLEASANT FLIGHT BEGINS AND ENDS AT THE AIRPORT. KONE solutions for airports

A PLEASANT FLIGHT BEGINS AND ENDS AT THE AIRPORT. KONE solutions for airports A PLEASANT FLIGHT BEGINS AND ENDS AT THE AIRPORT KONE solutions for airports 1 MANAGING THE FLOW OF PEOPLE AND GOODS THROUGH AIRPORTS SMOOTHLY AND EFFICIENTLY 5 7 3 8 11 KONE SOLUTIONS FOR AIRPORTS 1.

More information

Environmental Policy and Guide December 2010

Environmental Policy and Guide December 2010 Environmental Policy and Guide December 2010 Page 1 of 11 ENVIRONMENTAL POLICY A responsible and forward-looking approach to environmental issues is an important factor in Intu Properties plc s continuing

More information

Swire Properties Green Bond Framework serves as the documented Environmental Method Statement for this application. It states the SPL s method to

Swire Properties Green Bond Framework serves as the documented Environmental Method Statement for this application. It states the SPL s method to Swire Properties Green Bond Framework serves as the documented Environmental Method Statement for this application. It states the SPL s method to achieve the intended positive environmental effect of the

More information

Public Workshop #9. October 11, 2016

Public Workshop #9. October 11, 2016 Public Workshop #9 October 11, 2016 Agenda Master Plan Status Preferred Alternative Environmental Considerations Vision 2040 Next Steps Master Plan Status Alternatives exploration and evaluation Environmental

More information

Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013

Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013 Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013 Richard Larivée, ing. P.Eng. Chair RP-37 IESNA RP-37 - Update Recommended Practice for Outdoor Lighting for the Airport Environment IESALC

More information

INTRODUCTION TO GREEN PROPERTY MANAGEMENT PRACTICES

INTRODUCTION TO GREEN PROPERTY MANAGEMENT PRACTICES INTRODUCTION TO GREEN PROPERTY MANAGEMENT PRACTICES KENNETH CHAN Chairman, Property and Facility Management Division The Hong Kong Institute of Surveyors 1301 Connaught Commercial Building,185 Wanchai

More information

Task Force on Kai Tak Harbourfront Development

Task Force on Kai Tak Harbourfront Development Task Force on Kai Tak Harbourfront Development For discussion on 4 October 2016 TFKT/13/2016 Central Kowloon Route Proposed Temporary Government Land Allocation for Works Area at Kai Tak PURPOSE To brief

More information

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best CASE STUDY #3 A SUSTAINABLE SITE & BUILDING Macy Brannan, Kiana Fannin, & Chase Muchow MCALLEN MAIN LIBRARY Located in McAllen, TX Architects: MSR Design 120,000 sq. ft. Completed in 2011 Largest single

More information

Overview. Alberta Investment Management Corporation (AIMCo) ONE Properties

Overview. Alberta Investment Management Corporation (AIMCo) ONE Properties Overview Built with transport and access in mind, StoneGate Industrial caters to the needs of the distribution and logistics industry as well as light manufacturing and commercial service users. With a

More information

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis Appendix H SUPPORT FACILITIES PRELIMINARY AND INTERMEDIATE ALTERNATIVES ANALYSIS H TABLE OF CONTENTS EXHIBITS TABLES H.1 Evaluation Criteria... 1 H.1.1 Meeting the Base Constrained Demand Level... 1 H.1.2

More information

6.1 Climate change / carbon reduction Energy saving Green procurement and retailing Air quality...

6.1 Climate change / carbon reduction Energy saving Green procurement and retailing Air quality... Contents 1. INTRODUCTION: MANAGING HKIA S ENVIRONMENTAL FOOTPRINT... 4 2. SCOPE OF THE ENVIRONMENTAL PLAN... 6 3. IMPLEMENTATION AND ONGOING MONITORING... 6 4. CO-BENEFITS OF ENVIRONMENTAL INITIATIVES...

More information

Insight into Green Airport

Insight into Green Airport Insight into Green Airport Moonkyu Park Republic of Korea National GHG Reduction Policy Emission Trading Scheme ( 15~) Negotiated Assignment ( 10~ 14) - Contract with government (14. Apr. 2010) - Period

More information

3/20/2013. Project logo

3/20/2013. Project logo Melbourne Markets Relocation Presentation to the Melbourne Forum 19 th March 2013 By Jeff Robinson Sustainability Competency Leader Aurecon and Colin Geisler Senior Project Manager Lend Lease Project logo

More information

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016 City of Kansas City AIRPORT COMMITTEE BRIEFING New Terminal Evaluation for Kansas City International Airport March 15, 2016 1 Agenda Process Overview Establishing Requirements & Identifying Issues Forecast

More information

Environmental & Sustainability Policy Statement

Environmental & Sustainability Policy Statement Environmental & Sustainability Policy Statement Design Engine Architects understand the impacts that the practice could have upon the environment during the course of our work. We are committed to achieving

More information

6.0 OTHER ENVIRONMENTAL CONSIDERATIONS 6.1 Significant Unavoidable Impacts

6.0 OTHER ENVIRONMENTAL CONSIDERATIONS 6.1 Significant Unavoidable Impacts 6.0 OTHER ENVIRONMENTAL CONSIDERATIONS 6.1 Significant Unavoidable Impacts Section 15126.2(b) of the California Environmental Quality Act (CEQA) Guidelines requires that an Environmental Impact Report

More information

Finding The Right Balance

Finding The Right Balance Finding The Right Balance Integrated Sustainable Design for ` Varied Projects and Budgets Sathiaram Ram Director, About Engineering Environment Energy Co-located in Los Angeles, California and Chennai,

More information

BARANGAROO SUSTAINABILITY IN PRACTICE

BARANGAROO SUSTAINABILITY IN PRACTICE BARANGAROO SUSTAINABILITY IN PRACTICE Barangaroo is one of the most exciting urban renewal projects in the world today. Barangaroo aims to be sustainable today and for future generations. Its commitment

More information

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE 6604 - RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK UNIT 1 RAILWAY PLANNING 1. Define Permanent way. 2. List out the elements

More information

Urban Noise Management in Singapore

Urban Noise Management in Singapore Urban Noise Management in Singapore Chee Kwan BIN 1, Charles LEE 1 1 National Environment Agency, Singapore ABSTRACT Noise is an important factor in determining the quality of life in Singapore. With rising

More information

LAWA Update Ground Transportation Planning and Metro Coordination

LAWA Update Ground Transportation Planning and Metro Coordination LAWA Update Ground Transportation Planning and Metro Coordination SPAS Approved LAX Ground Transportation Projects The Specific Plan Amendment Study (SPAS) includes LAX Ground Transportation Projects:

More information

Design Standard Sustainability

Design Standard Sustainability Design Standard Sustainability Purpose Educational institutions have the ability to influence the ideals and principles of our future decision makers; as such, East Side Union High School District (ESUHSD)

More information

AIRCRAFT JOURNEY 00 THROUGHOUT THE JOURNEY NEXTT AIRCRAFT SITUATIONAL AWARENESS

AIRCRAFT JOURNEY 00 THROUGHOUT THE JOURNEY NEXTT AIRCRAFT SITUATIONAL AWARENESS AIRCRAFT NEXTT AIRCRAFT JOURNEY Our vision: fully coordinated aircraft turnaround processes, using the latest in automation, safety and environmentally friendly technologies to increase predictability.

More information

Shatin to Central Link (SCL) Cross Harbour Section. Professional Forum II 4 th December 2009

Shatin to Central Link (SCL) Cross Harbour Section. Professional Forum II 4 th December 2009 Shatin to Central Link (SCL) Cross Harbour Section Professional Forum II 4 th December 2009 22/06/2010 Page 1 Agenda Public Views To summarize the views sought in the consultation activities throughout

More information

Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program

Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program Agenda EWaS Overview History Who is EWaS? Mission EWaS Standards & Tools Energy Efficiency HVAC equipment

More information

GreenCo BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU

GreenCo BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU GreenCo Experience @ BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU ABOUT BIAL Public limited company under Indian Companies Act Private Public Partnership BOOT project transferred after 60 years (30

More information

Critic. WE Credit Code WEp1 WEp2 WEp3 WEc1 WEc2 WEc3 WEc4 WEc4.1 WEc5. Possible credit Required. Credit Title. metering Enhanced Enhanced

Critic. WE Credit Code WEp1 WEp2 WEp3 WEc1 WEc2 WEc3 WEc4 WEc4.1 WEc5. Possible credit Required. Credit Title. metering Enhanced Enhanced Water Efficiency 26 Critic Arlington is located in the Chesapeake Bay Watershed area and uses a sanitary sewer system to carry wastewater from buildings to the treatment facility. In order to reduce loads

More information

Taylor Institute. LEED Certification : GOLD

Taylor Institute. LEED Certification : GOLD Taylor Institute LEED Certification : GOLD Native Landscaping Vegetation surrounding the Taylor Institute for Teaching and Learning is naturally suited to the Calgary climate. Native and adaptive plant

More information

New Passenger Terminal Zagreb International Airport October 2014

New Passenger Terminal Zagreb International Airport October 2014 New Passenger Terminal Zagreb International Airport October 2014 Contents: 1. Project Overview 2. Zagreb Airport Presentation 3. Work Progress & Site Photos 4. NPT Key Dates Project Overview 1 Introduction

More information

Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending Response April 2017

Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending Response April 2017 Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending 2030 Response April 2017 Table of contents 1. Objectives 2. Our views on existing challenges 3. Our recommendations 4. Conclusion 1.

More information

Stansted Airport Sustainability Report Data Table ( )

Stansted Airport Sustainability Report Data Table ( ) Stansted Airport Sustainability Report Data Table (2008-2012) Measure Measure unit 2008 2009 2010 2011 2012 Climate change STAL Direct CO 2 Emissions (Energy consumption and vehicles) Aircraft in Landing

More information

Expansion of Hong Kong International Airport into a Three-Runway System 3RS Project and EIA Updates

Expansion of Hong Kong International Airport into a Three-Runway System 3RS Project and EIA Updates Expansion of Hong Kong International Airport into a Three-Runway System 3RS Project and EIA Updates Talk for HKIE Environmental Division 19 December 2013 1 Agenda 3RS project progress update EIA update

More information

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions Airport Construction Project Risk Management Presented by: Mindy Price- Direct Effect Solutions Topics ACRP 01-22 Research Background Research Findings and Conclusions Project Risk Management Recommendations

More information

eastmidlandsairport.com

eastmidlandsairport.com SUSTAINABLE DEVELOPMENT PLAN 2015 eastmidlandsairport.com AIRPORT INTRODUCTION We will make the best use of natural resources and minimise the environmental impact of our operations. We will also continue

More information

Sustainability Initiatives in Airport Buildings. Peter Koulos Director, Transport

Sustainability Initiatives in Airport Buildings. Peter Koulos Director, Transport Sustainability Initiatives in Airport Buildings Peter Koulos Director, Transport With an increased focus on energy performance, system life and operational management in airport buildings, this presentation

More information

Briefing for Britcham POLICY ADDRESS Environment Bureau 27 January 2015

Briefing for Britcham POLICY ADDRESS Environment Bureau 27 January 2015 Briefing for Britcham POLICY ADDRESS 2015 Environment Bureau 27 January 2015 Britcham s Areas of Interest WASTE-to-RESOURCES 1. Dealing with waste disposal crisis; 2. Choice of technologies going forward;

More information

The Application of LEED Green Building Rating System in Indonesia

The Application of LEED Green Building Rating System in Indonesia The Application of LEED Green Building Rating System in Indonesia Baharuddin Hasanuddin University, Faculty of Engineering, Department of Architecture, Makassar-Indonesia baharsyah@yahoo.com Abstract:

More information

terms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the

terms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the 325 National Environmental Management Act (107/1998): Amendment of the Environmental Impact Assessment Regulations Listing Notice 2 of 2014 40772 194 No. 40772 GOVERNMENT GAZETTE, 7 APRIL 2017 DEPARTMENT

More information

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS 2016 1 PROJECT OUTLINE The Union Pearson Express is a significant urban transportation project that

More information

Chapter 7. Conclusion

Chapter 7. Conclusion CHAPTER VII Chapter 7 Conclusion Urban congestion has been a major issue for many years. Many metropolitan areas have been facing the negatives of this problem on their transportation systems. Given the

More information

Achieving Zero Carbon for Buildings in a Densely Populated City and a Subtropical Climate. Guiyi LI Construction Industry Council

Achieving Zero Carbon for Buildings in a Densely Populated City and a Subtropical Climate. Guiyi LI Construction Industry Council Achieving Zero Carbon for Buildings in a Densely Populated City and a Subtropical Climate Guiyi LI Construction Industry Council Construction Industry Council Set up under the Construction Industry Council

More information

Zero Carbon Building. Christopher TO Construction Industry Council

Zero Carbon Building. Christopher TO Construction Industry Council Zero Carbon Building Christopher TO Construction Industry Council Construction Industry Council Set up under the Construction Industry Council Ordinance (Cap.587) Functions of the CIC are stipulated in

More information

Rashid Kizhakkayil Quality & Environment Controller Sharjah International Airport

Rashid Kizhakkayil Quality & Environment Controller Sharjah International Airport Rashid Kizhakkayil Quality & Environment Controller Sharjah International Airport Sharjah International Airport The first Airfield in the region opened in 1932 Moved to the new location in 1979 New 4060

More information

TECHNOLOGY ON ENERGY SAVING

TECHNOLOGY ON ENERGY SAVING Leonardo da Vinci Fiumicino Airport 1 SUMMARY 1. Introduction of the Airport 2. The Environmental Management System 3. Energy Consumption 4. Actions for Saving Energy 5. Actions for Renewable Energy 6.

More information

Highway 19 Twinning and Realignment Open House: Edmonton Airports Questions and Answers from March 19, 2013

Highway 19 Twinning and Realignment Open House: Edmonton Airports Questions and Answers from March 19, 2013 Highway 19 Twinning and Realignment Open House: Edmonton Airports Questions and Answers from March 19, 2013 Q. EIA indicates that part of the need for the new runway is because of increased traffic due

More information

PLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT

PLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT PLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGMENT 2 FACILITY SERVICES Facility Development Capital Projects Management

More information

Sonoma County Energy Independence Program APPENDIX A ELIGIBLE IMPROVEMENTS

Sonoma County Energy Independence Program APPENDIX A ELIGIBLE IMPROVEMENTS Sonoma County Energy Independence Program APPENDIX A ELIGIBLE IMPROVEMENTS The Sonoma County Energy Independence Program offers SCEIP funds for a number of equipment types, including water conservation

More information

3 rd Meeting of CAPSCA Middle East Project. Adel Ramlawi, RO/AGA & CAPSCA Reg. Coordinator ICAO MID Regional Office

3 rd Meeting of CAPSCA Middle East Project. Adel Ramlawi, RO/AGA & CAPSCA Reg. Coordinator ICAO MID Regional Office 3 rd Meeting of CAPSCA Middle East Project Updates on Public Health Preparedness Guidelines for Airport Operators Cairo Egypt 19 November 2013 Adel Ramlawi, RO/AGA & CAPSCA Reg. Coordinator ICAO MID Regional

More information

MOBILITY MEETS BIG DATA

MOBILITY MEETS BIG DATA MOBILITY MEETS BIG DATA www.transformingtransport.eu The future of transport for Europe Europe s ever-growing mobility and logistics sector currently represents 15 % of GDP and employs 11.2 million people

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE APPLICATION

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE APPLICATION NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE APPLICATION The Houston Airport System (HAS) is providing an opportunity for public comment until November 2, 2015 related

More information

Sustainable Master Planning

Sustainable Master Planning Sustainable Master Planning Charlie McDermott, LEED AP Courtney Armbruster, LEED AP C&S Companies Agenda Growth of sustainability Sustainable planning process Case study Ithaca Tompkins County Regional

More information

Airports in the Region Case Study

Airports in the Region Case Study DESTINATION LINDBERGH: COLLABORATION AND VISION TO MEET SAN DIEGO S MOBILITY NEEDS By Bob Leiter, FAICP, Keith Wilschetz, and Tait Galloway INTRODuCTION Destination Lindbergh was a year-long, comprehensive

More information

Airport of the Future. Air Cargo Conference June 2017

Airport of the Future. Air Cargo Conference June 2017 Airport of the Future Air Cargo Conference June 2017 How CVG landed its biggest deal in history. The deal at $1.49 billion is the largest ever one-time capital investment by a company in Northern Kentucky,

More information

P WER OF DESIGN. by SANDEEP SHIKRE, leed AP

P WER OF DESIGN. by SANDEEP SHIKRE, leed AP P WER OF DESIGN by SANDEEP SHIKRE, leed AP Green Architecture is an intelligent and integrated solution of providing the Content of functional requirements respecting the Context. architecture engineering

More information