WASTEWATER TREATMENT DURING TUNNEL CONSTRUCTION ON BUREAU OF RECLAMATION PROJECTS. By Dr. John C. Peters* INTRODUCTION

Size: px
Start display at page:

Download "WASTEWATER TREATMENT DURING TUNNEL CONSTRUCTION ON BUREAU OF RECLAMATION PROJECTS. By Dr. John C. Peters* INTRODUCTION"

Transcription

1 WASTEWATER TREATMENT DURING TUNNEL CONSTRUCTION ON BUREAU OF RECLAMATION PROJECTS By Dr. John C. Peters* INTRODUCTION In recent years, a number of papers have been written concerned with water pollution control during dam construction (McCullough and Nicklen, 1971; Sciandrone, 1974; Peters, 1975). These papers described treatment measures undertaken to minimize water pollution from point and nonpoint sources during dam construction. They suggest ways to avoid pollution problems related to haul roads, borrow areas, stream diversion, foundation excavation, aggregate processing, hatching of concrete, and reservoir clearing. Often tunnel construction results in water pollution problems quite different from dam construction. This paper describes wastewater treatment used during tunnel construction on Bureau of Reclamation projects and discusses its effectiveness. Further, it discusses legal requirements to meet State and Federal water pollution laws and regulations. LEGAL RESPONSIBILITIES The Federal water pollution law was amended in 1972 (Federal Water Pollution Control Act Amendments of 1972) and requires permits for all wastewater discharges from point sources into receiving waters. * Environmental Specialist, Bureau of Reclamation, Office of Design and Construction, Engineering and Research Center, Denver, Colorado 106

2 WASTEWATER TREATMENT 107 These permits are part of the National Pollutant Discharge Elimination System and are referred to as NPDES or Section 402 permits. According to the regulations (40 CFR 125) promulgated to carry out the Act, a point source is defined as "any discernible, confined, discrete conveyance including but not limited to a pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal-feeding operation, or vessel or other floating craft from which pollutants are or may be discharged." NPDES permits are required for all facilities that exceed a discharge of 50,000 gallons on any day of the year. An NPDES permit is obtained either from the U.S. Environmental Protection Agency or a state water pollution agency. EPA has turned the administration of the NPDES program over to those states who have received legislative authority and who have demonstrated technical competence. Upon application for an NPDES permit, the administrative agency must publish in the local newspapers a notice of an application for a permit to discharge wastes. This gives the public sector an opportunity to request a public hearing and formally comment on the conditions of the permit regarding the treatment of wastewater. An NPDES permit is issued specifying the amount of wastes that can be discharged into a water body. Contract specifications must provide the prospective bidders information on water quality standards for a particular water body impacted by construction. Specifications may define methods that are acceptable to the Government to treat wastewater to meet existing water quality standards. Records must be kept on the wastewater discharge and

3 108 SHOTCRETE FOR GROUND SUPPORT regularly transmitted to either the Environmental Protection Agency, the state water pollution agency, or both agencies. Because of public notice requirements and appeal procedures, it may take 180 days to process the permit application. For construction activities, Short or Standard Form C must be used to apply for an NPDES permit. The maximum civil penalty for failure to have an NPDES permit to discharge wastewater is $10,000 per day. When time limits require action on Reclamation construction projects, we have applied for an NPDES permit for an unnamed contractor. The permit is then transferred over to the successful bidder for that project. In conclusion, a contractor must have an NPDES permit to discharge construction wastewater from a point source into a receiving water body to be in compliance with the law. An NPDES permit must be obtained either from a state water pollution agency or a regional office of the Environmental Protection Agency, depending on who has jurisdiction. In the future, the permit program will be administered entirely by the states. Typically, Reclamation tunnel projects discharge a sufficient quantity of wastewater to require NPDES permits. WATER POLLUTION CONTROL METHODS During the construction of a tunnel, the most significant water pollution problem arises from the discharge of turbid or sedimentladen tunnel water. In addition to turbidity, tunnel water may also carry other pollutants such as oil and grease from a tunneling

4 WASTEWATER TREATMENT 109 machine and high ph from concrete hatching and/or tunnel lining. The discharge of untreated wastewater from a tunnel into a watercourse can significantly affect a municipal drinking water supply, disrupt irrigation activities, impact commercial or sport fisheries, and impair recreational uses such as fishing or boating. From a legal viewpoint, unauthorized or untreated wastewater can affect state water quality standards placed on a watercourse to protect water quality, natural resources, and other uses. Thus far, Reclamation has used two methods to treat tunnel wastewater: (l) settling ponds, and (2) filters. Typically, chemical precipitating agents have been used in conjunction with both methods to facilitate the treatment process. The following is a brief discussion of the technology used and the effectiveness of each method. Settling Ponds. One or more ponds approximately one-quarter acre in size have been used on Reclamation projects to settle out suspended particles from tunnel water. Typically, small earth dikes are built near the construction site in intermittent tributaries to impound water. Sedimentation occurs in these ponds when the action of turbulent flow is reduced in magnitude until suspended particles settle out by gravitational pull and are not resuspended by scour. The settled substances are known as sludge and must be periodically removed from the ponds for disposal. These settling ponds have not been particularly effective for

5 110 SHOTCRETE FOR GROUND SUPPORT several reasons. First, sludge must be removed frequently to maintain pond capacity so that suspended particles are given sufficient time to settle out. Second, the dikes built to impound water often do not withstand freezing and thawing and will breech periodically. Third, they do not effectively treat finely suspended material unless large quantities of chemical precipitating agents are used. Finally, they require a sizeable amount of land area for their layout. Effective use of settling ponds during construction is more an art than a science. A rather substantial amount of labor often is required to properly operate and maintain settling ponds. Also, precipitating agents must be carefully controlled to work effectively. Filters. Multimedia pressure filters have been used on Reclamation projects to separate suspended material from tunnel water by passing it through porous media. These pressure filters have anthracite and sand media and underdrains installed in a closed steel tank (Figure 1). Wastewater is pumped through the filter under pressure and the media washed by reversing flow through the bed, flushing out impurities. The filtration operation involves straining by interfacial contact combining to transfer suspended matter onto grains of coal and sand. The accumulated sediment is flushed from the filter media singly or in combination by water and air mechanical rakes. At high elevations in temperate latitudes such as the Fryingpan Arkansas Project's collection system, the filter is h6used

6 WASTEWATER TREATMENT Ill in a heated metal building in the winter so that the equipment operates under extremely harsh climatic conditions. The filter can be installed on a relatively small amount of land. Site preparation for the treatment plant can be accommodated in steep terrain. The wash water is a by-product of water filtration and must be disposed of properly. The wash water can be discharged_ into a sludge pond. The filter can be moved from job to job and can be reused. DISCUSSION Typically, Reclamation specifications have required treatment of 1,000 gallons of water per minute (approximately 2 ft 3 /s) for a tunnel project. There is no way of accurately predicting the volume of wastewater that may be discharged from a tunnel. Thus far, tunnels have not discharged more water than the specifications estimated. Oil and grease discharged from tunnel wastewater can be controlled by using skimmers as a first step of the treatment process. High ph can be controlled by use of concentrated hydrochloric or sulphuric acid to buffer water close to neutral. Most treatment methods require the use of chemical precipitating agents to facilitate the wastewater treatment process. These precipitating agents must be selected so that they do not contaminate drinking water supplies or impair aquatic life. Only nontoxic

7 112 SHOTCRETE FOR GROUND SUPPORT chemicals that are listed safe by the Environmental Protection Agency should be used. The methods available to treat tunnel wastewater must consider topographic features of the job site. The amount of space available in a canyon, an urban environment, or the rugged relief of a hillside can limit the choices available for wastewater treatment. Further, the proximity of the job site to a municipal water supply, a blue ribbon fishing stream, or a high-use recreation area, might warrant additional safeguards so that the water treatment system can operate under extreme conditions. Monitoring wastewater discharge is a requirement of an NPDES permit. Instruments should be used that monitor treated tunnel water instantaneously at the treatment unit outfall such as a recording turbidimeter. Most permits are issued with maximum and average allowable discharges of wastes based on state classification for existing water uses for each water body. The maintenance and care of equipment is important. After start-up and establishment of operating procedures, dual-media filters require only routine inspection by an operator. Alarms can be installed and automatic shutoff devices used if the equipment fails to operate properly. Generally, settling ponds require considerably.more time and labor to keep them operating properly than filters. Sludge must be removed periodically. It is important to locate

8 WASTEWATER TREATMENT 113 AOL'L t ~;. IBYO>E 5) FIGURE I Cunning hem Tunnel Water Treatment System

9 114 SHOTCRETE FOR GROUND SUPPORT waste areas for sludge and wash water so that they do not result in water pollution. Reclamation specifications are written with two or more acceptable Governmental methods for wastewater treatment with a provision for accepting a contractor's treatment method. Bidders are required to bid on a line item basis for water treatment. Recently, contractors working through consultants have submitted treatment techniques other than Governmental methods listed in the specifications. After review by the contracting officer, the contractor's method is either accepted or rejected. Whether a contractor selects a Government method or adapts one of his own, he is required to present a detailed layout describing his water treatment facility before being allowed to proceed with construction. REFERENCES 1. Federal Water Pollution Control Act Amendments of Public Law , 86 STAT McCullough, C. A. and R. R. Nicklen. Control of Water Pollution During Dam Construction. Journal of the Sanitary Engineering Division, ASCE, Vol 97, No. SAl, Proc. Paper 7927, February 1971, pp Peters, J. C. Water Pollution Control During Dam and Tunnel Construction. Proc. Second World Congress, International Water Resources Association, New Delhi, Vol V, December 1975, pp Sciandrone, J. C. Environmental Protection Measures at Martis Creek Lake, California. Civil Engineering-ASCE, March 1974, pp

DENR Statutes and Rules Relating to Aquatic Weed Control

DENR Statutes and Rules Relating to Aquatic Weed Control DENR Statutes and Rules Relating to Aquatic Weed Control 34A-2-1. Legislative findings and policy. Whereas the pollution of the waters of this state constitutes a menace to public health and welfare, creates

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

(5) "EPA" means environmental protection agency.

(5) EPA means environmental protection agency. ACTION: Original DATE: 11/01/2018 11:38 AM 3745-39-01 Applicability of rules of procedure and definitions. (A) Except where otherwise provided, this chapter shall be administered in accordance with provisions

More information

Compliance Guide for the Concentrated Aquatic Animal Production Point Source Category

Compliance Guide for the Concentrated Aquatic Animal Production Point Source Category EPA 821-B-05-001 Compliance Guide for the Concentrated Aquatic Animal Production Point Source Category : Glossary Full document available at http://www.epa.gov/waterscience/guide/aquaculture Engineering

More information

Water Is Not a Pollutant

Water Is Not a Pollutant Water Is Not a Pollutant Jeff R. Bowman, MSPH, CHMM Texas A&M Engineering Extension Service September 17, 2013 What is Stormwater Runoff? Texas Definition: Rainfall runoff, snow melt runoff, and surface

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS

More information

Federal and State Regulation of Stormwater Discharges From Construction Sites

Federal and State Regulation of Stormwater Discharges From Construction Sites Federal and State Regulation of Stormwater Discharges From Construction Sites Andrew W. Lord 860.240.6180 alord@murthalaw.com Gregory A. Sharp 860.240.6046 gsharp@murthalaw.com February 4, 2010 Home Builders

More information

Wastewater Treatment Works... The Basics

Wastewater Treatment Works... The Basics United States EPA 833-F-98-002 Environmental Protection May 1998 Agency Office of Water (4204) Wastewater Treatment Works... The Basics O ne of the most common forms of pollution control in the United

More information

The Purpose and Scope of this Guidance

The Purpose and Scope of this Guidance Introduction The nation s aquatic resources are among its most valuable assets. While environmental protection programs in the United States have successfully improved water quality during the past 25

More information

POTABLE WATER SUPPLY DEFINITIONS

POTABLE WATER SUPPLY DEFINITIONS Definitions POTABLE WATER SUPPLY DEFINITIONS AQUIFER. A porous, water-bearing geologic formation. Generally restricted to materials capable of yielding an appreciable supply of water. BASIN. A natural

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency INDUSTRIAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/

More information

City of Daphne, Alabama Water Quality Monitoring Plan For Phase II MS4

City of Daphne, Alabama Water Quality Monitoring Plan For Phase II MS4 City of Daphne, Alabama Water Quality Monitoring Plan For Phase II MS4 2016-2021 Permit # ALR 040039, Expiration Date: September 30, 2021 I. Introduction This document presents the City of Daphne s Stormwater

More information

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

SECTION TEMPORARY ENVIRONMENTAL CONTROLS SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall provide environmental controls consistent with regulatory requirements throughout the duration

More information

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018 Georgia Power Plant McManus NPDES Permit No. GA0003794 Revised April 2018 Purpose This (Plan) describes the procedures, safeguards and enhanced wastewater treatment measures that Georgia Power Company

More information

CE 370. Filtration. Overview of the Process Location in the Treatment Plant

CE 370. Filtration. Overview of the Process Location in the Treatment Plant CE 370 Filtration 1 Overview of the Process Location in the Treatment Plant After the water has been settled, some fine solids/flocs may still be in suspension, therefore, removal of these fine solids

More information

OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE. January 24, 2008 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE NEOSHO RIVER BASIN

OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE. January 24, 2008 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE NEOSHO RIVER BASIN Steve Thompson Executive Director OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY Brad Henry Governor PUBLIC NOTICE January 24, 2008 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE NEOSHO RIVER BASIN REQUEST

More information

SNOW REMOVAL & DISPOSAL POLICY

SNOW REMOVAL & DISPOSAL POLICY PHILIP D. MURPHY Governor SHEILA Y. OLIVER Lt. Governor DEPARTMENT OF ENVIRONMENTAL PROTECTION Mail Code 401-02B Division of Water Quality 401 E State St P.O. Box 420 Trenton, NJ 08625-0420 CATHERINE R.

More information

OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE. June 24, 2010 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE BIRD CREEK AREA WATERSHED

OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE. June 24, 2010 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE BIRD CREEK AREA WATERSHED Steve Thompson Executive Director OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY Brad Henry Governor PUBLIC NOTICE June 24, 2010 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE BIRD CREEK AREA WATERSHED REQUEST

More information

NPDES Storm Water Enforcement & Compliance at Federal Facilities

NPDES Storm Water Enforcement & Compliance at Federal Facilities US EPA-Region 4 NPDES Storm Water Enforcement & Compliance at Federal Facilities Daryl Shoemake, P. G., WPEB/CES June 30, 2005 Storm Water Regulations? What s New? Regulated Storm Water Discharges Enforcement

More information

Pennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning

Pennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning The strategy outlined in this guidance document is intended to supplement existing requirements. Nothing in the strategy shall affect regulatory requirements. The information herein is not an adjudication

More information

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018 Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures

More information

THE USED WATER MYSTERY

THE USED WATER MYSTERY THE USED WATER MYSTERY Objectives: The student will be able to: The student will be able to demonstrate the process that water treatment plants use to purify water for drinking by conducting a water purification

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT FRIENDS OF THE EARTH AND SIERRA CLUB S MOTION TO INTERVENE AS PARTIES RESPONDENT

UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT FRIENDS OF THE EARTH AND SIERRA CLUB S MOTION TO INTERVENE AS PARTIES RESPONDENT UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT D.C. Water and Sewer Authority, Petitioner, v. No. 08-1251 Stephen L. Johnson, Administrator, EPA, et al., Respondents. FRIENDS OF THE

More information

COFFERDAM (no.) CODE 803

COFFERDAM (no.) CODE 803 ILLINOIS URBAN MANUAL PRACTICE STANDARD COFFERDAM (no.) CODE 803 Source: Kane-DuPage Soil and Water Conservation District DEFINITION A cofferdam is a temporary structure within a waterway or body of water

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

The Total Maximum Daily Load (TMDL) Program in Illinois. Trevor Sample Planning Unit Watershed Management Section Bureau of Water

The Total Maximum Daily Load (TMDL) Program in Illinois. Trevor Sample Planning Unit Watershed Management Section Bureau of Water The Total Maximum Daily Load (TMDL) Program in Illinois Trevor Sample Planning Unit Watershed Management Section Bureau of Water Illinois EPA TMDL Program What is a TMDL The TMDL Process in Illinois 3

More information

Water Quality in Kansas: The Backstory & the Basics

Water Quality in Kansas: The Backstory & the Basics Water Quality in Kansas: The Backstory & the Basics Tom Stiles, KDHE-BOW Kansas State Water Quality Professional Development October 4, 2016 Water Quality is Framed by Federal & State Statutes, Regulation

More information

City of Grand Junction Illicit Discharge Detection and Elimination Manual

City of Grand Junction Illicit Discharge Detection and Elimination Manual City of Grand Junction Illicit Discharge Detection and Elimination Manual A. IDDE Program Goals The goal of the Illicit Discharge Detection and Elimination (IDDE) Program is, to the maximum extent practicable,

More information

EXISTING FACILITIES DESCRIPTION

EXISTING FACILITIES DESCRIPTION CHAPTER 4 EXISTING FACILITIES DESCRIPTION DISTRICT NO. 14 WASTEWATER TREATMENT FACILITIES District No. 14 provides conveyance, treatment, and effluent management services for residential, commercial, and

More information

SECTION STORMWATER POLLUTION PREVENTION

SECTION STORMWATER POLLUTION PREVENTION PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02133 STORMWATER POLLUTION PREVENTION A. Prohibit illicit discharge (non-rainwater) into the storm drain system. B. Construct any and all necessary systems to

More information

The Construction General Permit and Erosion Prevention and Sedimentation Control

The Construction General Permit and Erosion Prevention and Sedimentation Control The Construction General Permit and Erosion Prevention and Sedimentation Control Presented at the Tennessee Gas Association Conference April 23, 2008 More than thirty years ago, two-third of the nation's

More information

Storm Water Run-off. Applicability. Background Storm water run-off from paved parking areas, Existing Federal and State Laws

Storm Water Run-off. Applicability. Background Storm water run-off from paved parking areas, Existing Federal and State Laws Applicability This section applies to new, expanding, or existing marinas. Background Storm water run-off from paved parking areas, maintenance buildings, hull maintenance areas, and other impermeable

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

6.5 Filtration General

6.5 Filtration General 6.5 Filtration 6.5.1 General Turbidity and algae are removed from raw waters by screens, gravel filters and slow sand or rapid gravity filters. The difference between slow and rapid sand filtration is

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements ORDINANCE # 854 Stormwater Management / Operation and Maintenance Requirements Section 1. Purpose and Authority In accordance with the provisions of Chapters 98, 124, 126, 440, 444, and 446h of the General

More information

RE: AFIN: Permit No.: 5024-W

RE: AFIN: Permit No.: 5024-W November 30, 2009 Marcus Devine, President Poseidon Energy Services, LLC 900 S. Shackleford Suite 300 Little Rock, AR 72211 RE: AFIN: 73-01031 Permit No.: 5024-W Dear Mr. Devine: On November 5, 2009, I

More information

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information

More information

Monthly Report July 2017

Monthly Report July 2017 Monthly Report July 2017 Function Environmental Services objective is to assist in making the City of Burleson a great place to live, work and play. We are committed to providing prompt, accurate, consistent

More information

Monthly Report September 2017

Monthly Report September 2017 Monthly Report September 2017 Function Environmental Services objective is to assist in making the City of Burleson a great place to live, work and play. We are committed to providing prompt, accurate,

More information

May 19, Lewie Lawrence Acting-Executive Director Middle Peninsula Planning District Commission P.O. Box 286 Saluda, Va 23149

May 19, Lewie Lawrence Acting-Executive Director Middle Peninsula Planning District Commission P.O. Box 286 Saluda, Va 23149 May 19, 2011 Lewie Lawrence Acting-Executive Director Middle Peninsula Planning District Commission P.O. Box 286 Saluda, Va 23149 Re: Local Government and Water Quality Regulation (NSGLC-11-04-03) This

More information

Chemical Treatment. Batch treatment required, flow through continuous treatment not allowed

Chemical Treatment. Batch treatment required, flow through continuous treatment not allowed Chemical Treatment SE-11 Objectives EC SE TR WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control

More information

Paving and Grinding Operations

Paving and Grinding Operations Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONSDALE WASTEWATER TREATMENT FACILITY EXPANSION,

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018 City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting June 11, 2018 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history,

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 CBBEL PROJECT NO. 02-0065.H0226 ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 Modification No. 1 In regards to the COBBLESTONE PAVERS specification,

More information

SUDAS Revision Submittal Form

SUDAS Revision Submittal Form SUDAS Revision Submittal Form Status Date: As of 3/15/2018 Topic: General Permit No. 2 updates Manual: Design Manual Location: Sections 7A-1 and 7B-1 Requested Revision: Section 7A-1 (General Information),

More information

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018 ES-301-4.08 Inspection and Maintenance of MS4 Structural Controls* Document Identification Number ES-301-4.08 Date: March 14, 2018 Document Owner: Kim Ohlson 1) Activity Description: MS4 Maintenance and

More information

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

HYDRO-CLEAR FILTERS: COUNT ON THEM 24/7/365 REACTION TANKS

HYDRO-CLEAR FILTERS: COUNT ON THEM 24/7/365 REACTION TANKS HYDRO-CLEAR FILTERS: COUNT ON THEM 24/7/365 REACTION TANKS HYDRO-CLEAR FILTERS EXPERIENCE TO GET THE JOB DONE The Hydro-Clear sand filter was first installed in a small Ohio subdivision in 1967. We ve

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity

More information

o o o o o HAZARDOUS MATERIALS - Handling ID-WR_01 Material Examples Engine oils, oil filters, lead-acid batteries, hydraulic fluid, fuels, solvents, coolants, pesticides, soil and water impacted

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

DRAFT. DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Standards and Facility Regulation

DRAFT. DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Standards and Facility Regulation DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Standards and Facility Regulation DOCUMENT ID: 362-2206-002 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: PAGE LENGTH:

More information

Permitting Animal Feeding Operations in Maryland

Permitting Animal Feeding Operations in Maryland Permitting Animal Feeding Operations in Maryland Presented by Gary F. Kelman, MS, CEP Chief, Animal Feeding Operation Division Maryland Department of the Environment May 10, 2017 Topics MDE and MDA; Watershed

More information

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary

More information

aeration: to expose to circulating air; adds oxygen to the water and allows gases trapped in the water to escape; the first step in water treatment.

aeration: to expose to circulating air; adds oxygen to the water and allows gases trapped in the water to escape; the first step in water treatment. WATER WORKS OBJECTIVES The student will do the following: 1. Demonstrate the process that water treatment plants use to purify water for drinking by conducting a water purification experiment. 2. Describe

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

Coal Combustion Residuals (CCRs)

Coal Combustion Residuals (CCRs) Coal Combustion Residuals (CCRs) Overview of 40 CFR Part 257 & Relationship with Florida Requirements October 26, 2016 Introduction 40 CFR Part 257 under RCRA Subtitle D Establishes national criteria for

More information

Appendix A. Definitions, Abbreviations and Acronyms

Appendix A. Definitions, Abbreviations and Acronyms Page 109 of 146 Appendix A Definitions, Abbreviations and Acronyms Page 110 of 146 Appendix A. Definitions, Abbreviations, and Acronyms (for the purposes of this permit). Action Area all areas to be affected

More information

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout )

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout ) THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout - 2018) PLANT HISTORY The Bossier City Water Treatment Plant was built in 1958. The original plant had a treatment capacity

More information

Stormwater: The Good, the Bad, and the Polluted

Stormwater: The Good, the Bad, and the Polluted Stormwater: The Good, the Bad, and the Polluted Presented by: David Ubaldi 5/8/2012 1 History of Stormwater Regulation Stormwater: stormwater runoff, snow melt runoff, and surface runoff and drainage.

More information

11/1/2011. Annual Employee Training

11/1/2011. Annual Employee Training MS4 Address activities at WWTP in SWMP 1987 CWA Amendments Storm Water NPDES Industrial WWTP Design Flow 1 MGD WWTP Required to have approved Pretreatment Program Lynette Hablitzel, PE Ohio EPA Division

More information

A.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA (757) A Homeowner s Guide to Septic Systems

A.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA (757) A Homeowner s Guide to Septic Systems A.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA 23866 (757) 859-9494 A Homeowner s Guide to Septic Systems The Main Components of a Septic System Septic Tank The septic tank is a buried, watertight

More information

Tackling Non-point Source Water Pollution in British Columbia

Tackling Non-point Source Water Pollution in British Columbia Water Quality Clean Water Tackling Non-point Source Water Pollution in British Columbia Our well-being depends on sustainable supplies of clean water for our physical health and for a healthy environment

More information

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL.

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL. 1482.09 ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL. (a) Purpose and Scope. The purpose of this regulation is to provide for the health, safety, and general welfare

More information

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS These conditions ensure that activities carried out under Nationwide Permits (NWPs) do not

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

IOWA ADMINISTRATIVE CODE SUMMARY

IOWA ADMINISTRATIVE CODE SUMMARY IOWA ADMINISTRATIVE CODE SUMMARY To explain and define details of legislation, departments in the executive branch of Iowa government adopt and publish rules. After prescribed public review and comments,

More information

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL Greg Diehl DFW Region Office Wastewater Work Leader QUALITY OVERVIEW: The TCEQ s SSO Initiative What is it and how does it work? The data

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Environmental Engineering-I

Environmental Engineering-I Environmental Engineering-I Prof. Dr. Muhammad Zulfiqar Ali Khan Engr. Muhammad Aboubakar Farooq Department of Civil Engineering The University of Lahore 1 Sources of Water Rain Water Surface Water Ground

More information

Where does drinking water come from?

Where does drinking water come from? Water Quality Where does drinking water come from? When you think about where your drinking water comes from, it's important to consider not just the part of the river or lake that you can see, but the

More information

The waste water treatment plant will treat

The waste water treatment plant will treat Waste Water Treatment Plant The waste water treatment plant will treat groundwater and surface water pumped from the existing Port Granby Waste Management Facility during excavation of the waste and continue

More information

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE I. SCOPE This guide has been prepared to inform the residential property owner of the permitting process

More information

The Regulatory Framework

The Regulatory Framework The Regulatory Framework Water reuse project objectives How Do MN Agencies Currently Manage Water Reuse? Agency Roles Regulation by Source What Have We Heard? Agency roles and responsibilities Department

More information

Enforcement Sensitive Deliberative Document

Enforcement Sensitive Deliberative Document EPA s Interim Significant Noncompliance Policy for Clean Water Act Violations Associated with CSOs, SSOs, CAFOs, and Storm Water Point Sources I. Scope and Intent This policy addresses significant noncompliance

More information

Septic Systems. A Complete Guide To Understanding How They Work and How To Keep Them Healthy

Septic Systems. A Complete Guide To Understanding How They Work and How To Keep Them Healthy Septic Systems A Complete Guide To Understanding How They Work and How To Keep Them Healthy What Is A Septic System? Wastewater from a home, which includes the water from toilets, laundry, showers, sinks

More information

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution.

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution. Water Pollution Objective: Name, describe, and cite examples of the eight major types of water pollution. Types of Water Pollution Water pollutants are divided into eight categories: 1. Sediment pollution

More information

Prepared by Kris Roberts Environmental Response Team North Dakota Department of Health, Environmental Health Section

Prepared by Kris Roberts Environmental Response Team North Dakota Department of Health, Environmental Health Section Prepared by Kris Roberts Environmental Response Team North Dakota Department of Health, Environmental Health Section 1 2 3 4 5 6 7 8 9 10 11 Division of Water Quality and Waste Management 12 ND Century

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS C3.1 Purpose... C3-1 C3.2 Responsibility of Implementation... C3-2 C3.3

More information

Case 1:12-cv Document 1 Filed 10/03/12 Page 1 of 15 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

Case 1:12-cv Document 1 Filed 10/03/12 Page 1 of 15 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA Case 1:12-cv-01639 Document 1 Filed 10/03/12 Page 1 of 15 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA FOOD AND WATER WATCH 1616 P Street, NW, Suite 300 Washington, DC 20036, and FRIENDS

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

APPENDIX C ADEQ CHECKLIST FOR 208 PLAN AMENDMENTS

APPENDIX C ADEQ CHECKLIST FOR 208 PLAN AMENDMENTS APPENDIX C ADEQ CHECKLIST FOR 208 PLAN AMENDMENTS 203 208 AMENDMENT CHECKLIST Section 208 Clean Water Act 40 CFR Part 130.6 REQUIREMENT AUTHORITY PROVIDE BRIEF SUMMARY OF HOW REQUIREMENTS ARE ADDRESSED

More information

FACT SHEET. Owners/Operators of Potable Water Treatment Plants located in the State of Oklahoma

FACT SHEET. Owners/Operators of Potable Water Treatment Plants located in the State of Oklahoma FACT SHEET FOR THE GENERAL PERMIT TO DISCHARGE WASTEWATER FROM FILTER BACKWASH OPERATION AT POTABLE WATER TREATMENT PLANTS TO WATERS OF THE UNITED STATES UNDER THE OKLAHOMA POLLUTANT DISCHARGE ELIMINATION

More information

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP #33 NWP #36 NWP #37 NWP #39 NWP #42 NWP #45 NWP #46

More information

WHY Opportunity? Intro to Precast Product Opportunities in Stormwater Management. REGULATORS: It s the LAW! It s the LAW! It s the LAW!

WHY Opportunity? Intro to Precast Product Opportunities in Stormwater Management. REGULATORS: It s the LAW! It s the LAW! It s the LAW! Intro to Precast Product Opportunities in Stormwater Management Forging Alliances with a Common Goal: COMPLIANCE REGULATORS E P A State Regulators Counties, Cities, Other MS4s Non-Profit Environmentalists

More information

LAWS AND RULES FOR SEWAGE TREATMENT, AND DISPOSAL SYSTEMS

LAWS AND RULES FOR SEWAGE TREATMENT, AND DISPOSAL SYSTEMS LAWS AND RULES FOR SEWAGE TREATMENT, AND DISPOSAL SYSTEMS 15A NCAC 18A.1900 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION Law

More information

Managing Salt Impacted Water at Maintenance Yards

Managing Salt Impacted Water at Maintenance Yards Managing Salt Impacted Water at Maintenance Yards Presented to the: Transportation Association of Canada Calgary 2005 Abstract Managing Salt Impacted Water at Maintenance Yards The Code of Practice for

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

(b) Water Engineering Basics

(b) Water Engineering Basics NRRI Training for the Oklahoma Corporation Commission March 14-16, 2017 Topic 3 (b) Water Engineering Basics Kathryn J. Kline Research Associate National Regulatory Research Institute kkline@nrri.org Industry

More information