Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements
|
|
- Gwendoline Bradford
- 6 years ago
- Views:
Transcription
1 1 Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements
2 2 COAL RESOURCE Indonesia has large resources of lower heating value subbituminous coal the resources are largely in South and East Kalimantan and South Sumatera the resource base is many billions of tonnes these resources have not been developed to date because production growth from existing deposits has been sufficient to meet domestic and export demand
3 3 COAL RESOURCES the coal resources in South and East Kalimantan are: close to the surface suitable for low cost open pit mining close to the sea or close to rivers that give deep water access to the sea the Kalimantan coal resources in some locations are: low in ash low in sulphur give low NOx emissions have suitable trace element content however some of the coals are: relatively high in moisture relatively low in heat value relatively soft which will mean handling considerations
4 4 COAL RESOURCES a number of the deposits of the lower heating sub-bituminous coal are in areas currently being mined have had some exploration and development work are close to existing mine infrastructure in some cases the mines are already opened could be developed or expanded quickly with first or increased production in a matter of months need long term markets to justify full development
5 5 WARA COAL DEPOSIT once such lower heating value subbituminous coal resource is the Wara deposit in PT Adaro Indonesia s Coal Cooperation Agreement area in South Kalimantan the Wara resource base is estimated at over 1 billion tonnes of surface minable coal with a low strip ratio the Wara deposit lies 5 kilometers west of Adaro s existing mining operations at Tutupan the Wara area is already connected to the road infrastructure of the Tutupan operations the coal resources of Wara are the second largest in Adaro s area after the Tutupan resources
6 6 PT ADARO INDONESIA Adaro commenced mining in its resource area in Adaro's Production Since 1992 its production has climbed steadily from less than 1 million tonnes in its first year of production to a planned 34 million tonnes this year Million Tonnes the area contains sub-bituminous coal resources in exceess of 3 billion tonnes in three deposits known as Paringin, Tutupan and Wara all the coal in these deposits is typified by medium to low calorific value, medium to high moisture and low sulphur and ash
7 7 PT ADARO INDONESIA the Adaro deposits are characterized by thick seams of surface mineable coal with low stripping ratios and favourable mining conditions the development of the coal resource was based on the construction of a 75 km coal haul road from the deposits to a crushing, stockpiling and barge loading site built at Kelanis on the Barito river the Barito river provides deep water access to the sea at Kelanis, coal is loaded on to barges for transport either direct to domestic customers or for transshipment into bulk carriers
8 8 PT ADARO INDONESIA Adaro is a major exporter with sales to 17 countries in Asia, Europe and North America Adaro is the largest supplier to the domestic market with approximately 35% of its output being supplied to PLN and private power producers, the cement industry and general industries such as paper and pulp a 36 million tonnes per year output from Tutupan, which will be achieved in 2007, is considered optimum for this deposit any additional production output above this level will come from the Wara deposit
9 9 WARA COAL DEPOSIT the Wara deposit has been drilled and a large resource base has been delineated mining operations were carried out in 1995 and 1996 as a European customer was using a blend of Wara and Tutupan coal in a power station that had been previously using high sulphur lignite the Wara blend, with its ultra low sulphur and ash, was used to allow the station to keep generating and meet EU emission standards without installation of flue gas desulphurisation equipment however it was found that the station could accept the Tutupan coal which was already under large scale mining and the mining at Wara was subsequently stopped since then there has been no mining at Wara as Adaro has sufficient reserves in its Tutupan deposit to meet its current domestic and export markets
10 10 WARA COAL GEOLOGY exploration work carried out at Wara includes geological and coal outcrop mapping, trenching, drilling, geophysical downhole logging and coal sampling and analysis A geotechnical analysis and aerial photogrammetric topographic mapping has also been undertaken exploration work identified two separate deposits, named Wara 1 and Wara 2, each with multiple seams the Wara 1 deposit has three major coal seams with some splits in the seams
11 11 WARA COAL GEOLOGY the Wara 1 coal strikes in a general north-east / south-west direction, and the coal seams dip to the south east at approximately 45 degrees the average coal thickness for the seams is 12 meters, with a range of between 4 to 30 meters the Wara 2 deposit, northwest of Wara 1 deposit, does not outcrop and was discovered by drilling the Wara 2 coal appears to be shallow, flat lying and may be of a higher moisture than Wara 1 only limited work has been done on Wara 2 Map of the cross sections
12 12 WARA COAL QUALITY a total of 25 quality holes have been drilled in Wara 1, intersecting the three major seams the total moisture of the Wara 1 coal is relatively high and varies from 39% to 41% Inherent moisture is 26% to 31%. Run of mine moisture percentage will depend on the mining method and coal handling ash is low at 2% and sulphur is low at 0.15% the average calorific value of Wara 1 is 4,850 kcal/kg (adb basis) the coal quality of the Wara 2 deposit has not been defined. The ash and sulphur contents appear to be similar to Wara 1 TYPICAL SPECIFICATIONS Proximate Analysis Total Moisture (a.r) 40 % Inh Moisture (a.d.b.) 27 Ash (a.d.b.) 2 Volatile Matter (a.d.b.) 37 Fixed Carbon (a.d.b.) 34 Calorific Value (a.d.b.) 4850 Calorific Value (g.a.r.) 4000 Total Sulphur (a.a) 0.15 H.G.I. 60 Ultimate Analysis (Dry Ash Free Basis) % Carbon 69 Hydrogen 5 Nitrogen 1.4 Oxygen 23 Sulphur 0.1 Ash Fusion (Reducing Atmosphere) Temperature Initial Deformation 1300 o C Spherical 1370 Hemispherical 1450 Flow 1490
13 13 WARA COAL RESOURCES the Wara coal deposit is classified in the measured, indicated or inferred resource categories the total insitu coal resources have been calculated at 1,086 million tonnes of which 850 million tonnes is in the Wara 1 deposit WARA I & II RESOURCES Deposit Resources Measured Indicated Inferred Total Wara I Wara II Total ( million mt )
14 14 WARA COAL COMBUSTION TESTING a 5 tonne sample of Wara 1 coal was tested at the Energy Technology Laboratory (UPT- LSDE, BPPT) Puspiptek, Serpong, Tangerang the report, including all the results of the tests, showed the suitability of the use of the coal in existing power plants in Indonesia the results were similar to that obtained from the combustion testing of Adaro s Tutupan coal, a coal now widely used in power plants around the world
15 15 WARA MINING and TRANSPORT the mining method will be by conventional truck and shovel mining similar to Adaro s current operation this system best suits the proposed multi bench pit layout, and gives maximum scheduling flexibility equipment size will be as large as possible to lower the unit production cost. However the philosophy of larger size equipment will be balanced with what equipment size can be maintained under Kalimantan conditions at the Barito river a new coal crushing, stockpiling and barge loading facility would be constructed at Kelanis beside the one currently in use
16 16 WARA HANDLING AND SHIPPING the Kelanis system would receive the coal delivered by haul trucks. After crushing, the system would convey the coal to a stockpile area or convey directly to barges the facility at Kelanis for Wara coal would have a planned capacity of 20 million tonnes per year and would take 9 to 12 months to design and construct before that time up to 2 million tonnes a year of Wara coal could go through the current system transportation from Kelanis to power plants on Java would be by direct barging in barges up to 14,000 tonne capacity this transport method is commonly used in domestic supply of coal and is well able to expand to meet increased demand
17 17 MARKETING STRATEGY the first stage will be to identify the markets for the Wara coal the best markets would be new power plants designed for the coal quality with: facilities of a size to handle the tonnage mills of a suitable type (beater mills?) large fan capacity boilers designed for such coal markets could be in: Indonesia new power plants China coastal power plants India planned new power plants South-East Asia
18 18 MARKETING STRATEGY the optimum market for the Wara coal is the one with the shortest transport distance given the low heat value of the coal optimum markets in order of priority are: on-site power plants new power plants in Kalimantan new power plants in Indonesia target markets are the 10,000 MW of new power plants to be built under the Indonesian Government program of which 5,000 MW will be on Java the Java plants will require 20 million tonnes a year: Adaro can deliver in barges up to 14,000 tonnes direct from barge loading at Kelanis 4 to 5 days delivery time can provide competitive delivered price per unit of heat value
19 19 MARKETING PROGRAM the marketing program will be to provide Wara coal information to possible power plant developers provide trial samples as needed from 5 kg up to 500 tonnes from the present trial mine make test burn results available have Adaro s coal combustion consultant available to provide technical advice arrange inspection visits to operating power plants using similar coals
20 20 GOVERNMENT POLICIES adjustments to some Government policies would assist in the development of the large energy resource of lower heat value subbituminous coals in Indonesia Government promotion of the use of this type of coal in new power plants would bring it to the planned developers consideration reduction of the royalty in Coal Cooperation Agreements and Coal Contracts of Work from the current 13.5% would allow more of this type of coal to become economically viable new power plants require long term coal supply contracts if the plant is built to use particular types of coal. Many of the current Coal Cooperation Agreement s come up for renewal from Early renewal of these Agreements would promote long term planning and development of this national energy resource
21 21 WARA COAL CONCLUSIONS the Wara deposit is a large resource of lower heat value subbituminous coal in South Kalimantan part of the deposit has been drilled and the coal quality and the resource base defined the coal resource outlined to date is over 1 billion tonnes the coal is close to the surface and amendable to low cost open pit mining. It is also close to a large scale mining operation with which it can share infrastructure a new mining operation at Wara would only require construction of a crushing, stockpiling and barge loading system at Kelanis on the Barito river, a project that could be completed in less than a year
22 22 WARA COAL CONCLUSIONS coal combustion testing has established that the Wara coal will perform similar to other sub-bituminous coals of its type in commercial power plants the Wara deposit has not been developed to date because production growth from existing deposits has been sufficient to meet domestic and export demand the Wara coal is environmentally friendly and is a deposit whose characteristics make it suitable for use in the growing domestic power plant market.
23 Terimakasih, Maturnuwun. 23
Adaro Energy Quarterly Activities Report Second Quarter of 2015 For the Three Months Ending June 30, 2015
Our Floating Transfer Unit (FTU) is loading Envirocoal into customer s vessel at Taboneo offshore anchorage. The use of FTU has improved our logistics operation at Taboneo. Adaro Energy Quarterly Activities
More information23 September 2010 CHL: AIM. Churchill Mining PLC
23 September 2010 CHL: AIM Churchill Mining PLC 30 Million Tonnes per Annum East Kutai Coal Project Feasibility Study Returns Pre-Tax NPV of US$1.8 Billion Highlights: Study confirms the technical and
More informationAdaro Energy Quarterly Activities Report Third Quarter of 2014
Adaro Energy Quarterly Activities Report Third Quarter of 2014 For the Three Months Ending September 30, 2014 For further information please contact: Cameron Tough, Head of Investor Relations & Corporate
More informationBUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA
16 December 2009 The Manager Company Announcements Platform Australian Securities Exchange Exchange Plaza, 2 The Esplanade PERTH WA 6000 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8
More informationFor personal use only
ASX / MEDIA ANNOUNCEMENT 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 5 September 2012 INVESTOR PRESENTATION SEPTEMBER 2012 Pan Asia Corporation Ltd (the
More informationENERGY FOR CHANGE September
ENERGY FOR CHANGE September 2017 1 Key questions: What is the outlook of the coal industry? How was Adaro Energy s performance in 1H17 and what is the view for FY17? What is the progress of Adaro Energy
More informationMAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationUnited States. Coal Resource Development and Overseas Supply Potential
United States Coal Resource Development and Overseas Supply Potential Current Import Levels from the U.S. are Insignificant 2 Increasing Challenges to Demand & Supply Demand Coal will remain base load
More informationENERGY FOR CHANGE November
ENERGY FOR CHANGE November 2017 1 Key questions: What is the outlook for coal industry? How was Adaro Energy s performance in 9M17 and what is the view for FY17 and FY18? What is the progress of Adaro
More informationDRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationSupplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION
Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Thermal Coal: Indonesia - Kalimantan In Major Coal Provinces South and East Kalimantan Close to Asian Markets # 1 thermal coal
More informationFor personal use only
NEWS RELEASE October 17, 2011 SIGNIFICANT INCREASE IN CLEAN COAL YIELD CONFIRMED BY COAL QUALITY TEST PROGRAM AT VISTA Highlights: Overall clean coal yield increases substantially to 56%, up from previous
More informationMinerals North Conference Smithers, B.C. MOUNT KLAPPAN COAL PROJECT Robin E. Goad
FORTUNE MINERALS LIMITED Minerals North Conference Smithers, B.C. MOUNT KLAPPAN COAL PROJECT Robin E. Goad 148 Fullarton Street, Suite 1508 London, Ontario, Canada N6A 5P3 Tel. (519) 858-8188 Fax (519)
More informationMCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE
ASX ANNOUNCEMENT 8 June 2016 MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE Open pit mining optimisation results demonstrate the potential for multiple low strip ratio, open pit operations across a range
More informationAdaro Energy Quarterly Activities Report Second Quarter of 2014
We are pleased with the commercial operations of Balangan Coal. The close proximity to our existing infrastructure, good quality of coal and low capex allow us to develop this asset within one year. This
More informationEco-Friendly Coal for China Value for the Environment and Value for the Power Generator
Eco-Friendly Coal for China Value for the Environment and Value for the Power Generator by Lindsay Juniper 1 INTRODUCTION OBJECTIVE Increasingly, over recent years the relative availability of low ash,
More informationInitial Coal Quality Testing Indicates Metallurgical Coal Potential
ASX RELEASE 31 October 2013 Initial Coal Quality Testing Indicates Metallurgical Coal Potential Highlights: Initial coal quality test results conducted on the recent drill cores from the Company s 100%
More informationWhat we need to know about Coal : the view of a Utility Ian Wright, Fuel Procurement Officer Robert Ghent, Performance Engineer
What we need to know about Coal : the view of a Utility Ian Wright, Fuel Procurement Officer Robert Ghent, Performance Engineer Presentation to Coal Research Forum, Nottingham, 13 th April 2011 Drax Today
More informationINDONESIA LOWER RANK COAL RESOURCES DEVELOPMENT POLICY GEOLOGICAL AGENCY MINISTRY OF ENERGY AND MINERAL RESOURCES 2006
INDONESIA LOWER RANK COAL RESOURCES DEVELOPMENT POLICY GEOLOGICAL AGENCY MINISTRY OF ENERGY AND MINERAL RESOURCES 2006 Outline Status of Energy Resources Current and Targeted Primary Energy Mix Coal Resources
More informationSingapore November 2011
On Track to Build a Bigger and Better Adaro Energy ------------------------------------------------------------Morgan Stanley Annual Asia Pacific Summit Singapore 15-17 November 2011 Disclaimer These materials
More informationEnsuring Sustainable Coal Supply. Power Generation
Ensuring Sustainable Coal Supply for Power Generation By Pauk Kyaing Sahm Assistant Engineer (Electrical) Ministry of Electric Power Yangon, Myanmar January, 2013 Contents 1.Introduction 2.Electric Power
More informationFor personal use only
GROSVENOR WEST CONCEPT STUDY COMPLETED HIGHLIGHTS Study concludes strong development potential for either open cut or underground operations at Grosvenor West: Production of 5Mtpa (ROM) and 3.5Mtpa saleable
More informationti.orco RESOURCES LTD. VANCOUVER, B. C. THE PROPOSED.NORCO COAL MINE DOU.GLASS, P. ENG. DIRECTOR, ENGINEERING SERVICES
I ti.orco RESOURCES LTD. VANCOUVER, B. C. THE PROPOSED / I.NORCO COAL MINE i - -K. DOU.GLASS, P. ENG. DIRECTOR, ENGINEERING SERVICES p Id,Y OCTOBER,LW79" THE PROPOSED NORCO COAL MINE 1. Location and Licenced
More informationFor personal use only
Initial JORC Reserves Estimate for Bluff Project HIGHLIGHTS Initial JORC Reserves Estimate of 11 Mt mineable for Bluff Project In-fill drilling program completed to support further Resources and Reserves
More informationA single trial order value has USD$5.00 per MT added to the price which is discounted on the(if) second plus order prevails.
PLEASE NOTE SOME ARE GCV which pertains to actual thermal qualities some as GAD Gross Air Dried values which pertains to calorific value once such coal has been taken form the mine and dried naturally.the
More informationAmania Mining Company Bakhud Fluorite Project
Amania Mining Company Bakhud Fluorite Project Introduction Amania Mining Company, an Afghan mining company established in 2010, has quickly established itself with a proven track record of performance
More informationOptimization of Coal Blend proportions for sustained improvements in generation & efficiency
Optimization of Coal Blend proportions for sustained improvements in generation & efficiency A.K. Arora & D.Banerjee CenPEEP NTPC LTD Coal Blending in Power Sector Coal Blending is a compulsion for some
More informationDELIVERING ENERGY TO BUILD THE NATION. December 2016
DELIVERING ENERGY TO BUILD THE NATION December 2016 www.adaro.com Disclaimer These materials have been prepared by PT Adaro Energy (the Company ) and have not been independently verified. No representation
More informationDELIVERING ENERGY TO BUILD THE NATION. March 2017
DELIVERING ENERGY TO BUILD THE NATION March 2017 www.adaro.com Disclaimer These materials have been prepared by PT Adaro Energy (the Company ) and have not been independently verified. No representation
More informationACQUISITION OF CROYDON COAL LTD
Registered Office: Level 2, 395 Collins Street Melbourne, Victoria 3000 Telephone (03)8611 5320 4th December 2013 ACQUISITION OF CROYDON COAL LTD 3D Resources Ltd. ( 3D Resources or the company ) is pleased
More informationCOAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA
ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate
More informationDECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1
DECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1 Abubakar Lubis Agus Sugiyono Agency for the Assessment and Application of Technology (BPPT) Indonesia 1. Introduction
More informationQUARTERLY REPORT March 2011
QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The
More information15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes
ASX/Media Announcement 10 September 2012 Level 12, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3337 9944 fax + 61 (0) 7 3337 9945 Carbon
More information2001 Question 28 Organic Geology A Non-renewable Resource (25 marks) (a) (i) Identify ONE property of coal that changes with increasing coal rank.
2001 Question 28 Organic Geology A Non-renewable Resource (25 marks) (a) (i) Identify ONE property of coal that changes with increasing coal rank. 1 (ii) Coal mined from a coal seam contains mineral matter
More informationTNB FUEL SERVICES SDN. BHD. (a wholly owned subsidiary of Tenaga Nasional Berhad)
TNB FUEL SERVICES SDN. BHD. (a wholly owned subsidiary of Tenaga Nasional Berhad) PRE-QUALIFICATION OF COAL BLEND / COAL BRAND FOR TNB FUEL SERVICES SDN. BHD. MALAYSIA DOCUMENT SUBMISSION PRE-QUALIFICATION
More informationTNB FUEL SERVICES SDN. BHD. (a wholly owned subsidiary of Tenaga Nasional Berhad)
TNB FUEL SERVICES SDN. BHD. (a wholly owned subsidiary of Tenaga Nasional Berhad) PRE-QUALIFICATION OF COAL BLEND / COAL BRAND FOR TNB FUEL SERVICES SDN. BHD. MALAYSIA DOCUMENT SUBMISSION PRE-QUALIFICATION
More informationTNB FUEL SERVICES SDN. BHD. (a wholly owned subsidiary of Tenaga Nasional Berhad)
TNB FUEL SERVICES SDN. BHD. (a wholly owned subsidiary of Tenaga Nasional Berhad) PRE-QUALIFICATION OF COAL BLEND / COAL BRAND FOR TNB FUEL SERVICES SDN. BHD. MALAYSIA TNBF NO. PQ 01/18 RFP SUBMISSION
More informationEnefit s oil shale projects in Jordan
Enefit s oil shale projects in Jordan October 2010 Andres Anijalg Project Manager Business Development Department Enefit Contents Enefit Overview Enefit in Jordan Oil and Power Projects Development Plan
More informationPT ADARO ENERGY TBK March 2019
PT ADARO ENERGY TBK March 2019 Disclaimer These materials have been prepared by PT Adaro Energy (the Company ) and have not been independently verified. No representation or warranty, expressed or implied,
More informationCoal Quality & Boiler Efficiency
Coal Quality & Boiler Efficiency Introduction Kelvin Power currently consists only of the B-Station plant which is fitted with seven 60MW units. On the north side of B-Station, four Babcock/Wilcox PF boilers
More information5.1.1 Mining methdds. o,apter V 29/ ).
o,apter V 29/138 Coal is the most abundant fossil fuel in the world. It is mined in more than 50 countries. Such abundant reserves ensure consumers a guaranteed supply at competitive prices. Coal is also
More informationPT ADARO ENERGY TBK February 2019
PT ADARO ENERGY TBK February 2019 Disclaimer These materials have been prepared by PT Adaro Energy (the Company ) and have not been independently verified. No representation or warranty, expressed or implied,
More informationCompany Overview. August 2011
Company Overview August 2011 Capital Structure Market Capitalisation approx $130 million Undervalued against peers ASX Code: IDO 229.8m shares on issue 30.5m unlisted options Up to 35m performance shares
More informationFor personal use only
ABN 64 123 993 233 ASX Announcement 21 March ABN 2016 64 123 993 233 Leigh Creek Magnesite - Project Study Highlights The Study examines possible open pit mining and processing options and provides a strong
More informationInvestor Presentation
November 2016 1 Disclaimer This presentation has been prepared by the management of Cokal Limited (the Company) in connection with meetings with institutional investors, for the benefit of brokers and
More informationRESEARCH AND DEVELOPMENT OF INDONESIA LOW RANK COAL
RESEARCH AND DEVELOPMENT OF INDONESIA LOW RANK COAL Head of ARDEMR Ministry of Energy and Mineral Resources Bandung, September 2006 INTRODUCTION Indonesia has been strongly affected by economic crises
More informationDual-stage Drying Process of Lignite Using Pilot Scale Coal Rotary Dryer
Research Center for Coal and Minerals (tekmira) Ministry of Energy and Minerals Resources of Indonesia Dual-stage Drying Process of Lignite Using Pilot Scale Coal Rotary Dryer Energy and Mineral Resources
More information1. Focus: Bharinto and Tandung Mayang
1. Focus: Bharinto and Tandung Mayang 4 New integrated operations groups ITM operations in Kalimantan 1 2 Palangkaraya Kitadin Td.Mayang Bunyut Port Trubaindo 1 Bharinto 2 Samarinda Balikpapan Indominco
More informationENTERPRISE OPTIMIZATION Case Study: ITM Coal Operations, Indonesia
Cash Flow ($) ENTERPRISE OPTIMIZATION Case Study: ITM Coal Operations, Indonesia INTRODUCTION Whittle Consulting s (WCL) Enterprise Optimization (EO) solution is an integrated approach to maximizing the
More informationFoSSIl FUElS Coal COAL. Nazrul Islam Coal Expert & Former Managing Director Infrastructure Investment Facilitation Company (IIFC) Dhaka, Bangladesh
COAL NATURAL GAS OIL Learning about FoSSIl FUElS Coal 85% of the world s commercial energy SAARC Dissemination Workshop Assess the Present Situation, Gaps in Capacity, Technology and Policy & Regulatory
More informationUpdated JORC Statement of Coal Resources and Reserves for PT Katingan Ria Thermal Coal Project, Indonesia
Company Announcements ASX Limited By Electronic Lodgement 9 May 2017 Updated JORC Statement of Coal Resources and Reserves for PT Katingan Ria Thermal Coal Project, Indonesia Highlights Coal Resources
More informationCase Study Indonesian sugar industry : PRODUCTIVITY GAINS FROM EFFICIENT WASTE TO ENERGY SCHEMES
Case Study Indonesian sugar industry : PRODUCTIVITY GAINS FROM EFFICIENT WASTE TO ENERGY SCHEMES Hariyanto Energy Technology Center, Agency for The Assessment and Application of Technology (BPPT) Intercontinental
More informationCoal Quality & Combustion
Coal Quality & Combustion Member: American Society of Mechanical Engineers American Chemical Society Society for Mining, Metallurgy, and Exploration North Carolina Coal Institute sponsor Contacts: Rod
More informationKATINGAN RIA COAL PROJECT FOB CASH COST AND VALUATION REVISION. FOB cash cost forecasts reduced by $8/t or 20% to US$31/t before royalties
Company Announcements ASX Limited 20 Bridge Street Sydney NSW 2000 By Electronic Lodgement 11 December 2014 Dear Sir/Madam KATINGAN RIA COAL PROJECT FOB CASH COST AND VALUATION REVISION FOB cash cost forecasts
More informationABN Lublin Coal Project. Company Presentation. March 2013 ASX: PDZ
ABN 23 008 677 852 Lublin Coal Project Company Presentation March 2013 ASX: PDZ Investment Highlights Massive, Untapped, First World Resource Base 1.6Bt Inferred JORC Resource 1.6Bt Inferred Maiden Coal
More informationIndonesian Coal Production and Exploration. Investor Presentation March 2012
Indonesian Coal Production and Exploration Investor Presentation March 2012 Disclaimer Certain statements contained in this presentation, including information as to the future financial or operating performance
More informationTENAS METALLURGICAL COAL PROJECT DESCRIPTION AND PRODUCTION TARGET FINALISED FOR DEFINITIVE FEASIBILITY STUDY AND PERMITTING
3 July 2018 TENAS METALLURGICAL COAL PROJECT DESCRIPTION AND PRODUCTION TARGET FINALISED FOR DEFINITIVE FEASIBILITY STUDY AND PERMITTING SUMMARY OF KEY COMPONENTS OF THE TENAS PROJECT DESCRIPTION Total
More information(SINDH COAL AUTHORITY)
Oil & Gas Conference February 18-20, 2007 Harnessing of Indigenous Coal Resources Generation : HOFRPHWR 2IILFLDO: HEVLWHRI *RYHUQPHQWRI 6LQGK GOVERNMENT OF SINDH MINES & MINERAL DEVELOPMENT DEPARTMENT
More informationFor personal use only
Tuesday, 11 December 2012 ASX release Cape Alumina completes Pre-Feasibility Study for Bauxite Hills Highlights Cape Alumina Limited (ASX Code: CBX) engaged GHD in April 2012 to carry out a pre-feasibility
More informationINITIAL DEVELOPMENT PLAN
JELLINBAH GROUP PTY LTD ACN 010 754 793 PLAINS EAST PROJECT MINING LEASE APPLICATION over Mineral Development Licence 185 INITIAL DEVELOPMENT PLAN CHECKLIST OF LEGISLATIVE REQUIREMENTS Document Section
More informationSiberian Coal Energy Company
Siberian Coal Energy Company Positioned for Asian growth Head of Strategy, Corporate Development and Risk-Management Department Oleg Pertsovskiy May 13 th, SUEK at glance A leading global coal producer
More informationENERGY FOR CHANGE October
ENERGY FOR CHANGE October 2018 1 Key questions: Why has coal price remain high and will it stay high for longer? What is Adaro s rationale for venturing overseas? Should investors expect more M&A activities?
More information5 th Asian Bauxite & Alumina Conference
5 th Asian Bauxite & Alumina Conference October 2015 Bauxite Hills Project Deliberate Focus ASX : MMI CORPORATE SNAPSHOT Shareholders 0.140 0.120 MMI Share Price (A$) Other 47% NetWealth Investments 5%
More informationJune 2009 quarterly report
June 2009 quarterly report HIGHLIGHTS Canning Basin Coal Projects, WA Resource at Duchess-Paradise upgraded to over 500Mt thermal coal Pre feasibility study on coal export project underway Myroodah Underground
More informationFor personal use only
24 August 2015 PROPOSED COAL SEAM ACCESS AT BUCK CREEK NO.2 MINE CONFIRMS LOW CAPITAL COST HIGHLIGHTS: Shallow depth of coal seam (100 to 125 feet / 30 to 38 metres) at proposed Buck Creek No. 2 Mine allows
More informationFor personal use only
23 September 2015 ILLINOIS BASIN: EXPECTED FUTURE DEMAND GROWTH HIGHLIGHTS: Illinois Coal Basin ( ILB ) market fundamentals continue to show potential for strong future demand growth and a need for additional
More informationTABLE OF CONTENTS 6 MEDIUM-TERM COAL MARKET REPORT 2016
TABLE OF CONTENTS Foreword... 3 Acknowledgements... 5 Executive Summary... 12 Is the glass half full or half empty?... 12 The world is splitting apart... 12 A relieved industry... 13 Coal is still a Chinese
More informationFOSSIL FUELS III. Coal
FOSSIL FUELS III Coal Formed from ancient plants. Coal beds were prehistoric swamps. Can be considered to be stored solar energy. Photosynthesis: CO2 + H20 + solar energy carbohydrates + O2 We can also
More informationMINE DESIGN AND PLANNING
TE KUHA PROJECT STEVENSON MINING LIMITED AUGUST 2016 V13 MINE DESIGN AND PLANNING MINE DESIGN PIT DESIGN DESIGN Pit Slope Design is based on 10m high horizontal benches to allow for steep dipping coal
More informationEuropean UCG Case Study
European UCG Case Study March 2011 Michael Green The UCG Engineering Ltd Outline of Presentation Background to the European Trial Objectives, Planning & Site Selection Drilling and Completion of Wells
More informationPresentation Outline. Performance Highlights. Operational and Financial Highlights. Outlook & Growth Strategies Q & A
1Q2017 Results Briefing May 2017 Presentation Outline 1 Performance Highlights 2 Operational and Financial Highlights 3 Outlook & Growth Strategies 4 Q & A PRIVATE AND CONFIDENTIAL. NOT FOR EXTERNAL CIRCULATION.
More informationFor personal use only
Mt Ruby DSO Project Acquired High Grade DSO Project in Queensland Mining planned to commence in Q4, 2013 Infrastructure accessible and ready ACN 146 455 576 ASX Release 8 February 2013 Suite 2, 12 Parliament
More informationCardero Provides Update on Metallurgical Coal Quality at the Carbon Creek Deposit, Northeast British Columbia
NR13-20 August 15, 2013 Cardero Provides Update on Metallurgical Coal Quality at the Carbon Creek Deposit, Northeast British Columbia Wood Mackenzie Completes Positive Project Benchmarking Study Vancouver,
More informationMining Update - Mongolia
Suite C1, 1 Honeysuckle Drive, The Boardwalk Newcastle NSW 2300 PO Box 509, Newcastle NSW 2300 Telephone: 02 4914 5910 Facsimile: 02 4925 3505 www.guildfordcoal.com.au 15 October 2012 Company Announcements
More informationInvestor Series : Nickel Day Presentation
Investor Series : Nickel Day Presentation February 2008 Stonehenge Metals Limited, Level 24, St Martins Tower, 44 St Georges Terrace, Perth WA 6000, www.stonehengemetals.com.au Summary Corporate Overview
More informationPre-Feasibility Study on Titiribi coal project completed - highlights relatively low capital and operating cost profile to support fasttracking
Perth Office: Ascot Resources Ltd 512 Hay Street Subiaco WA 6008 T: + 61 8 9381 4534 F: + 61 8 9380 6440 E: info@ascotresources.com W: www.ascotresourcs.com ASX ANNOUNCEMENT 26 August 2013 The Manager
More informationEngr. HABIB UDDIN AHMED
PRESENTATED BY Engr. HABIB UDDIN AHMED MANAGING DIRECTOR BARAPUKURIA COAL MINING COMPANY LIMITED BANGLADESH Prime Source of Energy in Bangladesh The Prime source of energy in Bangladesh is Natural gas
More informationCapture of CO 2 from industrial sources. Professor Dianne Wiley School of Chemical Engineering, UNSW Australia
Capture of CO 2 from industrial sources Professor Dianne Wiley School of Chemical Engineering, UNSW Australia IEAGHG Summer School 2015 University of Western Australia Perth AUSTRALIA 6-12 December 2015
More informationFor personal use only. Company Overview. 30 May 2011
Company Overview 30 May 2011 Capital Structure Market Capitalisation approx $145 million Undervalued against peers ASX Code: IDO 211.1m shares on issue (100% tradeable) 29.6m unlisted options (incl 28.6m
More informationPOWER ENGINEERING IN POLAND BEFORE ENTERING EUROPEAN UNION: EXPERIENCES AND FORECASTS
POWER ENGINEERING IN POLAND BEFORE ENTERING EUROPEAN UNION: EXPERIENCES AND FORECASTS Zbigniew Bicki Chairman of the Polish Member Committee of the World Energy Council ZBIGNIEW BICKI CONSULTING ul. Wiejska
More informationLeading PCI coal producer with significant reserves and resources
1 Leading PCI coal producer with significant reserves and resources Overview T he deposit was founded in 2009 for mining and export of high quality PCI coal that goes into coking mix It owns 224 hectares
More informationThe means of future energy production in Scotland must meet the following criteria:
SUBMISSION FROM BCG ENERY LTD BCG Energy Ltd is a clean energy company which is focusing on the development of deep coal reserves by means of Underground Coal Gasification (UCG). By incorporating carbon
More informationIndonesian Coal Production and Exploration
Indonesian Coal Production and Exploration Investor Presentation May 2012 Disclaimer Certain statements contained in this presentation, including information as to the future financial or operating performance
More informationMARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES
ASX Release: 9 September 2010 MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES Definitive Mining Studies confirm continuity, quality and quantum of Ore body at MARILLANA Detrital Ore Reserves
More informationEstimating and Reporting of
AUSTRALIAN GUIDELINES FOR Estimating and Reporting of Inventory Coal, Coal Resources and Coal Reserves 2003 EDITION PREPARED BY THE COALFIELDS GEOLOGY COUNCIL OF NEW SOUTH WALES AND THE QUEENSLAND MINING
More informationTELKWA METALLURGICAL COAL PROJECT INVESTOR PRESENTATION ALLEGIANCE COAL LIMITED (ASX:AHQ)
TELKWA METALLURGICAL COAL PROJECT INVESTOR PRESENTATION I N V E S T O R U P D AT E O C T O B E R 2 0 1 7 ALLEGIANCE COAL LIMITED (ASX:AHQ) Important Information Forward Looking Statements This Presentation
More informationPREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST
For electronic distribution 12 th May 2014 Highlights PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST A Prefeasibility Study for an underground coal mine based on a 200Mt portion of the A Seam within
More informationNTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh
NTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh Unit Capacity Year of Comml Power Share AP TN Kar Ker Pud Unit-1 500 MW Sep 2002 100% X X X X Unit-2 500 MW Mar 2003 100% X X X X Unit-3 500 MW Sep
More informationEngineering Excellence 3
Engineering Excellence has now become Engineering Excellence 3 Business Areas Key indicators fiscal year 2012/2013 * Business Areas Components Technology Elevator Technology Industrial Solutions Materials
More informationmetals temperature limits.
9:41 Page 39 Richard F. Storm, Stephen K. Storm and Sammy Tuzenew, Storm Technologies, Inc., US, consider how to conduct a comprehensive diagnostic test on a pulverised coal-fuelled boiler. T Tuning of
More informationTHE LAKE SUPERIOR IRON RANGES: GEOLOGY AND MINING. William F. Cannon, U.S. Geological Survey, Reston, VA 20192
THE LAKE SUPERIOR IRON RANGES: GEOLOGY AND MINING William F. Cannon, U.S. Geological Survey, Reston, VA 20192 ECONOMIC AND STRATEGIC SIGNIFICANCE OF LAKE SUPERIOR IRON Currently the only source of domestic
More informationThe Development of. in Hong Kong. Ir. Edward Chow 25 June 2015
The Development of CLP s Pulverized Fuel Ash (PFA) in Hong Kong Ir. Edward Chow 25 June 2015 Agenda CLP Overview Castle Peak Power Station (CPPS) CLP s PFA Studies PFA Applications and Advantages Coal
More informationCompany Profile June PT Multi Harapan Utama
Company Profile June 2015 PT Multi Harapan Utama 1 Table of Content MHU Brief Profile Mining Operations Production History & Life of Mine Plan Coal Specifications Quality Control Processes Facilities Human
More informationPRESENTATION TO THE CONFEDERATION OF INDIAN INDUSTRIES DELEGATION
07 September 2009 The Manager Company Announcements Office ASX Limited Via: www.asx.online.com PRESENTATION TO THE CONFEDERATION OF INDIAN INDUSTRIES DELEGATION Coalworks presented to the Confederation
More informationColdry Technology in the Latrobe Valley Presentation: CoalTech 2010 Ashley Moore, Coldry Business Manager
Coldry Technology in the Latrobe Valley Presentation: CoalTech 2010 Ashley Moore, Coldry Business Manager ECT Overview Commercialising and selling disruptive technologies in the energy and resources sector.
More informationGHGT 13, 11th November 2016 Lausanne, Switzerland. Kemper County Energy Facility
GHGT 13, 11th November 2016 Lausanne, Switzerland Kemper County Energy Facility Richard A. Esposito Southern Company Research & Environmental Affairs America s Premier Energy Company Our Regulated Utility
More information(Incorporated in the Republic of Singapore on 24 May 2010) (Company Registration Number Z) Qualified Person s Report
(Incorporated in the Republic of Singapore on 24 May 2010) (Company Registration Number 201011034Z) Qualified Person s Report Section 1: Section 2: SDJ Mine Concession BEK Mine Concession Section 1: Qualified
More informationPRESENTED BY RICHARD WERMUTH OF KARBON SERVICES
PRESENTED BY RICHARD WERMUTH OF KARBON SERVICES IN ORDER TO UNDERSTAND HOW COAL QUALITY EFFECTS EFFICIENCY WE FIRST NEED TO LOOK AT COAL S PROPERTIES. IT S BLACK IT S DIRTY IT S DUSTY IT BURNS SOMETIMES
More informationASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold
ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2
More information