Appendix B HYDROLOGIC AND HYDRAULIC MODELING

Size: px
Start display at page:

Download "Appendix B HYDROLOGIC AND HYDRAULIC MODELING"

Transcription

1 Appendix B HYDROLOGIC AND HYDRAULIC MODELING

2 Memo To: George Hudson, PE and Jeff Robinson, PE, GEC, Inc. From: Stephen Sanborn, PE, Dynamic Solutions, LLC Date: 4/25/ /2014 CC: Chris Wallen, Vice President, Dynamic Solutions, LLC. Re: Hydrologic and Hydraulic Modeling of Ravine Aux Coquilles and Little Bayou Castine, Mandeville, LA OBJECTIVE AND APPROACH The objective of this effort was to determine if adverse flooding impacts will occur from the construction and operation of flood swing gates with flap-gate openings att the termini of Little Bayou Castine (LBC) and Ravine Aux Coquilles (RAC) at Lake Pontchartrain along the Old Mandeville coastline. The approach was to create representative one-dimensional These models weree then utilized to simulate the following scenarios: hydraulic models of LBC and RAC, using the USACE HEC-RAS (USACE, 2010) software. 1. Actual events using actual data for lake stages and rainfall events for Tropical Storm (TS) Bill, TS Lee, and Hurricane Gustav events. Each of these storm events were analyzed for existing conditions and with the flood control gates in place assuming no sea-wall overtopping. 2. A series of hypothetical cases to evaluate how the timing of the rainfall relative to the lake stage time series impacts interior drainage. The combination of the TS Leee Lake Pontchartrain stage time series and runoff from a 10-yr rain event was analyzed for cases where the peak storm surge occurred between 24 hours before to 24 hours after the peak runoff. These events were run for a) existing conditions, b) with gates, and c) with gates and pumps. These scenarios were analyzed to understand the effects of the proposed gate structure under a variety of runoff and storm surge conditions. It also provides planning-level information concerning pumping rates. 1 P age

3 SITE DESCRIPTION The city of Mandeville, LA lies on the north shore of Lake Pontchartrain (Figure 1). The areas adjacent to the lake are low-lying with elevations typically below 4.0 feet and are prone to flooding. Tropical storms often induce high stages in the lake which can overtop the existing seawall and flow into Ravine Aux Coquilles and Little Bayou Castine. Each is channelized in their lower reaches and passes under bridges near their termini at Lake Pontchartrain. The basins consist of largely residential areas with some vegetated low-lying areas. Notable rainfall events are typically the result of either the strong frontal storms that occur over the winter and spring or tropical systems which may deposit over 20 inches of rain in a single event. In order to protect Mandeville s low-lying areas from flooding the threat from high stages in Lake Pontchartrain, rainfall events, and the combination thereof must be evaluated. Figure 1 - Project area location in Louisiana and the watersheds for Ravine Aux Coquilles and Little Bayou Castine. 2 P age

4 HYDROLOGIC ANALYSES Hydrologic analyses were necessary to generate runoff hydrographs for LBC and RAC resulting from the tropical storm rainfall events and the 10-yr storm event. Basin Data A digital elevation model (DEM) from the LSU Atlas LiDAR dataset provided topographic data for the region. The watersheds for LBC and RAC were delineated from the DEM using ArcHydro (ArcHydro, 2013) Tools package for ArcGIS. The watersheds are shown on Figure 1. Rainfall Data For the tropical storm events hourly rainfall data were acquired from the NOAA National Climatic Data Center (NCDC). There are stations on the north side of Lake Pontchartrain in Hammond (30 miles WNW of Mandeville) and Slidell (20 miles ESE of Mandeville). For both TS Bill and TS Lee rainfall amounts in Hammond were greater than those in Slidell and were used to provide a conservative (larger) estimate of rainfall in Mandeville. There were no data available at Hammond or Slidell for TS Gustav so rainfall data from New Orleans Airport (35 miles SSW of Mandeville) were utilized. The hyetographs for each event are shown on Figures 2 4 (below, shown with the resultant hydrographs). The 10-year event was for a storm of duration of 24 hours with rainfall intensity maximum at 12 hours. The rainfall data was derived from the NOAA Atlas 14 Precipitation-Frequency (Perica et al., 2013) dataset. HEC-HMS modeling The USACE HEC-HMS (Scharffenberg, 2013) was used to generate runoff hydrographs for each basin. The Clark unit hydrograph transformation was utilized with the Time of Concentration (TC) and Storage Coefficient (SC) parameters computed using the Espy-Huston formula. This formula also takes into account development so the percent impervious for the HEC-HMS model was set to zero. The loss set up with an initial value and a constant loss. A constant baseflow was used for both basins. A summary of the HEC-HMS parameters for each basin is listed in Table 1. The storm events were run in HEC-HMS with 15-minute time steps. The resulting hydrographs, with the input hyetographs, are shown in Figures 2 through 5. Table 1 - Watershed modeling parameters Parameter Ravine Aux Coquilles Little Bayou Castine Watershed Area (sq. mi.) Baseflow (cfs) 1 1 Initial Loss (in) Constant Loss (in/hr) Trasformation Clark Unit Hyd. Clark Unit Hyd. TC (hr) SC (hr) P age

5 Figure 2- Hyetograph and resulting hydrographs for the 10-year, 24-hour rainfall event Figure 3 - Hyetograph and resulting hydrographs for Tropical Storm Bill 4 P age

6 Figure 4- Hyetograph and resulting hydrographs for Tropical Storm Lee Figure 5- Hyetograph and resulting hydrographs for Tropical Storm Gustav 5 P age

7 HYDRAULIC ANALYSES The objective of the hydraulic analyses was to simulate existing and proposed (with flood gate) water surface elevation and flow conditions in LBC and RAC. This requires understanding the interaction of processes driving flow and water level in these channels. Potential energy, which is manifested as stage (or elevation), is the driving force in the lake-channel systems evaluated herein. If lake stages are higher than the water level in the basin due to tidal, tropical, or frontal events, water will flow into the basin until the basin fills to reach that water surface, or until the lake stage drops sufficiently. Water will flow out of the basin when interior water levels exceed those in the lake and the difference in water surface elevation between the basin and the lake is proportional to the amount of water flowing (discharge) out of the system. The lake stage serves as a baseline water surface elevation for the system meaning that for the same outflow discharge, a higher lake stage will result in a higher interior stage. Computational hydraulic analyses were performed using the USACE s one-dimensional hydraulic model HEC-RAS (Brunner, 2013). This model is capable of simulating stage and velocity in waterways and allows the user to simulate flow constrictions such as bridges and hydraulic structures, in this case the flood control gate structure. It is the standard analyses package for simple hydraulic analyses of open channel flows. For this analysis the lower reaches of each channel were modeled explicitly while the rest of the basin was simulated as a storage area. A storage area is described by a curve relating the volume to stage, which was simulated with the watershed model, and can be used to store a volume of water that may enter back into the system. This is sufficient to model events where water flows from the lake to the basin, filling it, and then draining as the lake stage subsides. Elevation Data Elevation data for the model came from a combination of channel surveys and the LiDAR data described above. GEC staff performed detailed surveys of the lower reaches of LBC and RAC. The survey data was output in coordinates of Louisiana State Plane South, vertical datum of NAVD88. The surveys included channel cross-sections, high and low chord of the bridges, bridge decks, and floodplain elevations. The RAC survey extended from the floodwall 280 feet upstream, past the Lakeshore Drive bridge. The LBC survey extended from 60 feet into Lake Pontchartrain to 170 feet upstream of the floodwall, including the series of bridges at the bottom end of the reach. Boundary Conditions The upstream boundary condition for each system is the hydrograph generated from the hydrologic analysis (see above), which is simulated as a lateral inflow into the storage area. This is then routed through the storage area and enters the upstream end of the channel reach. The downstream boundary condition is the observed stage in Lake Pontchartrain. Stage values from the Lake Pontchartrain at Mandeville USACE gage (USACE gage number 85575) were used for TS Lee and Hurricane Gustav. The stage time series oscillate so a best fit line was used in the model to aid with stability. This gage did not have data for TS Bill so the stage value from the Rigolets (USACE Gage 85700) 6 P age

8 was used. The lake stage time series for each tropical storm event are shown in the Model Results and Analyses section of this report. The proposed conditions models also require an internal boundary condition time series for gate openings. Since the flap gates are designed to only allow flow from the basin to the lake, they should be open anytime the interior stage exceeds the lake stage by some nominal amount (to overcome sticking, friction, and other losses). A Rule boundary condition was used to specify the gate opening to be 5- feet when interior stage was 0.05 feet greater than the lake stage, and zero otherwise. This allows the gate to automatically open and close depending on hydraulic conditions in the system. HEC-RAS Model Setup Model geometry for HEC-RAS was setup using the HEC-GeoRAS software (Ackerman, 2012). GeoRAS allows the user to utilize the ArcGIS (ESRI, 2011) mapping software to create and derive data for the channel centerline, cross-sections, and storage areas and easily export it to HEC-RAS. Model cross-sections were set in reference to any hydraulic controls in each channel and at a reasonable distance apart to ensure model stability. Station-elevation data at each cross-section was derived from the combination of survey and LiDAR data. Figures 6 and 7 show longitudinal profiles of RAC and LBC, including cross-sections and structures. Storage area stage-volume curves for the RAC and LBC basins were computed from the DEM using the Storage Area tools in HEC-GeoRAS and are shown in Figure 8. Manning s n coefficient, a key component to energy losses in the models, was set to value of in each of the models. RAC_ Flood Control Gate (when utilized) Legend Ground 4 Elevation (ft) Walkway Bridge Lakeshore Drive Bridge Main Channel Distance (ft) Figure 6 - Ravine Aux Coquilles bed elevation profile with cross-section locations and structures. Interpolated cross-sections are noted by an asterisk. 7 P age

9 8 6 Flood Control Gate (when utilized) LBC_0411 Legend Ground 4 2 Elevation (ft) Lakeshoree Drive Bridge and Walkway * * * * * * * * * Main Channel Distance (ft) Figure 7 Little Bayou Castine bed elevation profile with cross-section locations and structures. Interpolated cross-sections are noted by an asterisk. Figure 8 - Elevation-Volume curves for each watershed 8 P age

10 For proposed conditions model geometry at RAC, an inline structure was added 15 feet upstream of the floodwall with a swing gate with three 5 x 5-ft flap gate openings with inverts of -2.5 feet. At LBC, there is not room for a gate structure at the end of the existing channel. The proposed scenario extends the channel, and high ground, 55 feet into the lake with the inline swing gate structure with four 5 x 5-ft flap gates, invert elevation -4.0 feet, inserted at the terminus of the channel. The models were then checked for a variety of stage, flow, and gate conditions to ensure they performed reasonably. Model calibration was not performed as the necessary data does not exist. MODEL RESULTS AND ANALYSES The LBC and RAC models were run for the following events: 1. TS Bill existing and proposed conditions, 2. TS Lee existing and proposed conditions, 3. Hurricane Gustav existing and proposed conditions, 4. TS Lee stage time series and a 10-yr runoff event, where the storm surge peak was: coincident with the runoff peak 2, 4, 6, 12, 24, and 36 hours before the runoff peak, and 2, 4, 6, 12, 24, and 36 hours after the runoff peak These events were run for existing and proposed conditions. Pumping rates were estimated for the worst-case (coincident peaks) scenario. This analysis shows the impacts of gate operations subject to the timing of storm surge and runoff. 1. Tropical Storm Bill TS Bill impacted Mandeville from June 29, 2003 to July 3, The peak storm surge was at Mandeville was 4.2 feet (from the best fit curve) and it produced 9.0 inches of rainfall in Hammond. This led to a peak runoff of 476 cfs in RAC and 649 cfs in LBC. The boundary conditions for the LBC and RAC models are shown in Figure 9. The peak storm surge and runoff are nearly aligned, with a lag between the peaks of -0.5 hours for RAC and -2.0 hours for LBC (storm surge peak relative to runoff peak). 9 P age

11 Figure 9 - Lake stage and watershed runoff boundary conditions for TS Billl In RAC, TS Bill results in a maximumm interior water surface elevation of 4.23 feet under existing conditions and 4.74 feet with the proposed flood control gatee in place (Figure 10). Under proposed conditions the gates restrict conveyance causing a 0.5-foot increase in interior water levels. The maximumm flows were 592 cfs and 560 cfs under existing and proposed conditions, respectively. For LBC, the maximumm water surface elevation was 4.19 feet under existing conditions and 4.26 feet with the proposed flood gate in place (Figure 11). The gates in LBC provide enough conveyance that there is only a nominal increase in maximum interior water level. The maximum flows were 2012 cfs and 718 cfs under existing and proposed conditions, respectively. The very large flow under existing conditions is due to the rapid decline in stage from the peak, setting up a large gradient between the watershed and lake. 10 P age

12 Figure 10- Interior maximum water surface elevation in RAC for existing and proposed (gate) conditions Figure 11 - Interior maximum water surface elevation in LBC for existing and proposed (gate) conditions 11 P age

13 2. Tropical Storm Lee TS Lee impacted Mandeville from September 2 to Septemberr 6, The peak storm surge was at Mandeville was 5.0 feet (from the best fit curve) and it produced 10.3 inches of rainfall in Hammond. This led to a peak runoff of 288 cfs in RAC and 391 cfs in LBC. The boundary conditions for the LBC and RAC models are shown in Figure 12. The peak storm surge occurred 14.5 hours after the peak runoff at RAC and hours after the peak runoff at LBC. Figure 12 - Lake stage and watershed runoff boundary conditions for TS Lee In RAC, TS Lee results in a maximumm interior water surface elevation of 5.00 feet under existing conditions and 5.05 feet with the proposed flood control gatee in place (Figure 13). The maximum flows were 267 cfs and 256 cfs under existing and proposed conditions, respectively. For LBC, the maximumm water surface elevation was 5.00 feet under existing conditions and 5.10 feet with the proposed flood gate in place (Figure 14). The maximum flows were 326 cfs and 315 cfs under existing and proposed conditions, respectively. The gates provide enough conveyance for both RAC and LBC under the lower discharges generated by this event that there is only a nominal increase in maximum interior water level. 12 P age

14 Figure 13 - Interior maximum water surface elevation in RAC for existing and proposed (gate) conditions Figure 14 - Interior maximum water surface elevation in LBC for existing and proposed (gate) conditions 13 P age

15 3. Tropical Storm Gustav TS Gustav impacted Mandeville from September 1 to September 4, The peak storm surge was at Mandeville was 5.71 feet (from the best fit curve) and it produced 6.4 inches of rainfall in New Orleans. The runoff hydrographh had three peaks, two of which had very similar peak discharges. The peak discharge for RAC was 207 cfs and for LBC was 273 cfs. The boundary conditions for the LBC and RAC models are shown in Figure 15. The peak storm surge occurred 3.75 and hours before the two distinct runoff peaks at RAC and 2.5 and hours before those at LBC. Figure 15 - Lake stage and watershed runoff boundary conditions for Tropical Storm Lee In RAC, TS Gustav results in a maximum interior water surfacee elevation of 5.72 feet under existing conditions and 5.82 feet with the proposed flood control gatee in place (Figure 16). The gates provide enough conveyance that only a nominal increasee in water surface elevation, but offer no added protection under thesee specific conditions. The maximum flows were 228 cfs and 217 cfs under existing and proposed conditions, respectively. For LBC, the maximumm water surface elevation was 5.72 feet under existing conditions and 5.41 feet with the proposed flood gate in place (Figure 17). For these conditions, where the storm surge peaks first and the peak runoff discharge is modest, the gates provide additional protection. The gates initially hold back storm surge and the watershed has the volume to capture the initial peak before water levels rise to their peak due to the second runoff spike. The maximum flows were 346 cfs and 309 cfs under existing and proposed conditions, respectively. 14 P age

16 Figure 16 - Interior maximum water surface elevation in RAC for existing and proposed (gate) conditions Figure 17 - Interior maximum water surface elevation in LBC for existing and proposed (gate) conditions 15 P age

17 4. Storm surge and Runoff Timing Scenarios A series of hypothetical cases to evaluate how the timing of the rainfall relative to the lake stage time series impacts interior drainage. The combination of the TS Lee Lake Pontchartrain stage time series and runoff from a 10-yr rain event was analyzed for cases where the peak storm surge occurs: coincident with the runoff peak 2, 4, 6, 12, and 24 hours before the runoff peak, and 2, 4, 6, 12, and 24 hours after the runoff peak Examples of a -12-hour lag, +12-hour lag and coincident peaks are shown in Figure 18. The convention used is storm surge peak relative to runoff peak so negative lags indicate the storm surge peak occurs first. It is assumed that rainfall begins on 1/1/2014 at midnight. Figure 18 Lake stage and watershed runoff boundary conditions for timing lags of -12, 0, and 12 hours For RAC, the maximumm stage occurs when the runoff and storm surge peaks coincide ( Figure 19). This is also when the greatestt difference in stage, a difference of 1.24 feet, between existing and gated conditions occurs. Table 2 details the maximumm elevation and flow for different time lags. There is less differencee in maximumm stage as the absolute lag time increases. For this gate configuration, they are beneficial when the lag between the runoff and storm surge peak is more than approximately 20 hours ahead of the runoff peak, and 25 hours after. 16 P age

18 Table 2 Values of maximum interior water surface elevationn and maximum flow in RAC, existing and proposed (gate) conditions, for timing lags between -36 and hours. Maximum Elevation Lag (hrs) Existing Gated Maximumm Flow Existing Gated Improved Stage YES YES NO NO NO NO NO NO NO NO NO NO YES Figure 19 Maximum interior stages as a function of the timee lag in storm surge to runoff peak for Ravine Aux Coquilles, existing and proposed (gated) conditions. The point at which the gated curve drops below the existing curve indicates the timing lag at which thee gates improve maximum stage. 17 P age

19 For LBC, the maximum stage again occurs when the runoff and storm surge peaks coincide (Figure 20). This is also when the greatest difference in stage, a difference of 1.24 feet, between existing and gated conditions occurs. Table 3 details the maximum elevation and flow for different time lags. There is less difference in maximum stage as the absolute lag time increases. For this gate configuration, they are beneficial when the lag between the runoff and storm surge peak is more than approximately 16 hours ahead of the runoff peak, and approximately 26 hours after. Table 3 - Values of maximum interior water surface elevation and maximum flow in LBC, existing and proposed (gate) conditions, for timing lags between -36 and +36 hours. Maximum Elevation Maximum Flow Lag (hrs) Existing Gated Existing Gated Improved Stage YES YES NO NO NO NO NO NO NO NO NO NO YES 18 P age

20 Figure 20 - Maximum interior stages as a function of the timee lag in storm surge to runoff peak for Little Bayou Castine, existing and proposed (gated) conditions. Thee point at which the gated curve drops below the existing curve indicates the timing lag at which thee gates improve maximum stage. PUMPING REQUIREMENTS The zero lag timing scenario was run with the addition of pumps for RAC and LBC to evaluate a planning- below 3.0 feet. level understanding of the pumping requirements necessary to hold interior water surface elevations For each channel, a pumping station was added just upstream of the flood control structure and discharged to Lake Pontchartrain. It was assumed the pumpss have zero startup and shutdown times and that the capacity is not affected by the head difference (a vertical pump efficiency curve). A series of three pumps was used to avoid constant cycling. The pumping requirements are summarized in Table 4. The first two pumps were made constant and the third determined by increasing the capacity in 25 cfs increments until a maximum interior stage below 3.0 feet was achieved. The maximumm interior stage for RAC was 2.89 feet, and was 2.94 feet for LBC for these conditions. Figures 21 and 22 show the headwater, tailwater, and pumping rate for the pumping scenarios in RAC and LBC. Table 4 Pumping requirements for RAC and LBC given the zero time lag scenario. Pump #1 Pump #2 Pump #3 RAC Capacity (cfs) LBC Capacity (cfs) On/Off Stage (ft) P age

21 Figure 21 Stage and pumping rate informationn for the RAC pumping scenario Figure 22 - Stage and pumping rate information for the LBC pumping scenario 20 P age

22 DISCUSSION OF MODEL RESULTS The critical factors in determining whether the flood control gates provided benefit are the peak runoff discharge and its timing relative to the peak storm surge. The TS Lee and TS Bill events lead to nominal increases in, and in one case a decrease, interior stage occur due to the implementation of the flood control gates. The peak runoff discharge for these storms is moderate, considerably less than TS Bill or the 10-year runoff event. TS Bill results in a significant interior stage increase in RAC because of the higher runoff volume and coincident timing of the runoff and storm surge peaks. The runoff peak in LBC is 36% higher while the increase in conveyance through the gates is 33%. The increase is less in LBC because, as seen in Figure 8, the watershed is able to store considerably more volume than RAC. This is evident examining the results from TS Gustav. RAC has a nominal increase in stage under proposed conditions (Figure 16) while the stage in LBC decreases by 0.31 feet (Figure 17). The gates repel the peak storm surge and the watershed is able to store much of the first runoff peak. The second runoff peak further drives up the interior stage but the lake (downstream) stage has decreased enough to allow gravity flow through the flood control structure. Analysis of the timing scenarios (bullet point 4, above) shows at what time lag of peak runoff and storm surge the gates begin to positively affect interior water levels (Figures 19 and 20). The critical lag time is shorter when the storm surge precedes the runoff peak as the gates can repel the peak and gravity flow can allow runoff to flow out of the system as the downstream stage decreases. The relative increase in stage for the zero lag scenario is greater for RAC because of lower watershed storage capacity. Increases in interior stage due to the addition of flood control gates could be averted if the channel cross-section were modified to support an increase in conveyance through the gate structure. CONCLUSIONS Ravine Aux Coquilles and Little Bayou Castine, draining the city of Mandeville, LA along the north shore of Lake Pontchartrain, were modeled to understand the effects of adding flood control gates at the terminus of each channel. The flood control gates are intended to restrain storm surge events from Lake Pontchartrain while allowing gravity flow of watershed runoff to the lake. The results indicate that the gates, constructed as proposed and studied in this report, caused increased interior water surface elevations in cases where there is greater peak runoff and when the runoff peak is closer in time to the storm surge peak. These increases in stage could be ameliorated by increasing the conveyance of the flap gates. The gates do, however, show benefits when there is a greater lag between the peak storm surge and peak runoff. A planning-level analysis of the pumping rates required to keep interior water surface elevations below 3.0 feet was performed with a hypothetical scenario of the TS Lee storm surge combined with a 10-year, 24-hour rainfall event peaking simultaneously. The models indicated that essentially the peak volume of the hydrograph would need to be pumped, with a requirement of 500 cfs for Ravine Aux Coquilles and 550 cfs for Little Bayou Castine. It is recommended that a stochastic analysis of rainfall and storm surge 21 P age

23 events be performed to construct a design event used for pumping analysis and a more detailed analysis of pump station design be performed to achieve better estimates of pumping requirements. References Ackerman, Cameron (2012) HEC-GeoRAS (Version 10) [Software], US Army Corps of Engineers. Software available at: ArcHydro (Version 2.1) [Software] (2013), ESRI, Software available at: Brunner, Gary (2010) HEC-RAS (Version 4.1) [Software], US Army Corps of Engineers. Software available at: ESRI (2011) ArcGIS Desktop: Release 10. Redlands, CA, Environmental Systems Research Institute. Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffrey Bonnin (2013). NOAA Atlas 14 Volume 8 Version 2, Precipitation- Frequency Atlas of the United States, Midwestern States. NOAA, National Weather Service, Silver Spring, MD. Scharffenberg, William (2013) HEC-HMS (Version 4.0) [Software], US Army Corps of Engineers. Software available at: 22 P age

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

San Luis Obispo Creek Watershed Hydrologic Model Inputs

San Luis Obispo Creek Watershed Hydrologic Model Inputs Jeff Werst San Luis Obispo County Department of Public Works 1050 Monterey Street San Luis Obispo CA 93408 December 14, 2007 Subject: San Luis Obispo Creek Watershed Hydrology and Hydraulic Model Dear

More information

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models... TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Integrating HEC HMS generated flow hydrographs with FLO-2D. Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM

Integrating HEC HMS generated flow hydrographs with FLO-2D. Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM Integrating HEC HMS generated flow hydrographs with FLO-2D Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM Focus of this Presentation Introduction Methodology Challenges & Solutions

More information

Inflow Design Flood Control System Plan Plant McDonough-Atkinson Ash Pond 3 (AP-3) and Ash Pond 4 (AP-4)

Inflow Design Flood Control System Plan Plant McDonough-Atkinson Ash Pond 3 (AP-3) and Ash Pond 4 (AP-4) Inflow Design Flood Control System Plan Plant McDonough-Atkinson Ash Pond 3 (AP-3) and Ash Pond 4 (AP-4) Prepared for: Georgia Power Company Prepared by: Golder Associates Inc. 3730 Chamblee Tucker Road

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

North Omaha Ash Landfill Run-on and Run-off Control System Plan

North Omaha Ash Landfill Run-on and Run-off Control System Plan North Omaha Ash Landfill Run-on and Run-off Control System Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 17, 216 OPPD North Omaha Ash Landfill Run-On and Run-Off Control

More information

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS 1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN

More information

A Hydrologic Study of the. Ryerson Creek Watershed

A Hydrologic Study of the. Ryerson Creek Watershed A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

NC2 Ash Disposal Area Run-on and Run-off Control System Plan

NC2 Ash Disposal Area Run-on and Run-off Control System Plan NC2 Ash Disposal Area Run-on and Run-off Control System Plan Omaha Public Power District Nebraska City Station Nebraska City, Nebraska October 17, 2016 OPPD NC2 Ash Disposal Area Run-On and Run-Off Control

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models

APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models Introduction Technical Report on Airport Drainage Appendix J-3:

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

Hydrologic Calibration:

Hydrologic Calibration: Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA American Journal of Water Resources, 2014, Vol. 2, No. 4, 99-105 Available online at http://pubs.sciepub.com/ajwr/2/4/3 Science and Education Publishing DOI:10.12691/ajwr-2-4-3 Estimating the 100-year

More information

Beaver Brook Flood Study

Beaver Brook Flood Study Alternatives Analysis Beaver Brook Flood Study Pelham, New Hampshire PREPARED FOR Town of Pelham 6 Village Green Pelham, NH 03076 PREPARED BY 101 Walnut Street PO Box 9151 Watertown, MA 02471 617.924.1770

More information

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL Horry County, South Carolina July 15, 2016 CONTENTS 1 Introduction... 2 2 Hydrology... 3 3 HEC-RAS Model... 7 3.1 Cross

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 2012 MIDAS CREEK PROJECT FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 Executive Summary... 1 Section 1 Introduction... 1 Background Information... 1 Purpose of Study... 1 Scope of Work... 1 Section 2 Description

More information

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado. November 4, Project No.

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado. November 4, Project No. DRAINAGE STUDY 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado November 4, 2014 Project No. 14-2953 Prepared for Mr. Robert Myers Caribbean Group P.O. Box N 1968

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps

5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps City of Corpus Christi Downtown 2D Mapping Effort Brandon Hilbrich, PE, CFM Jake Fisher, PE, CFM Curtis Beitel, PE, CFM 2016 HDR, Inc., all rights reserved. Overview Project Background Information Modeling

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation Airport Master Plan Floodplain Report Prepared by: Prepared for: Illinois Department of Transportation July 10, 2013 Table of Contents Topic Page Number Cover Sheet... Cover Sheet Table of Contents...

More information

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH Diversion Channel Outlet Hydraulic Modeling RAS and ADH 11 June 2012 1 Contents Introduction... 3 HEC-RAS modeling of Outlet... 3 Transition Structure Geometry... 3 ADH Modeling of Outlet and Floodplain...

More information

Bear Creek Dam and Reservoir NID# OR Douglas County, Oregon

Bear Creek Dam and Reservoir NID# OR Douglas County, Oregon Bear Creek Dam and Reservoir NID# OR00614 Douglas County, Oregon FINAL Dam Breach Study and Flood Inundation Mapping March, 2009 Prepared for: The City of Drain, Oregon 129 West C Avenue Drain, OR 97435

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Valmont Station - CCR Surface Impoundments Public Service Company of Colorado Denver, Colorado

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No Urban Study Rocky Branch Watershed Columbia, South Carolina Prepared for: City of Columbia 1136 Washington Street Columbia, SC 29217 Prepared by: AMEC Environment & Infrastructure, Inc. 720 Gracern Road

More information

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Project Summary: - Hydrologic Models Phase 2 Underway Nearly Completed (Park/Pembina EOY) - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Phase

More information

CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_

CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_ CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_20161017 This Inflow Design Flood Control System Plan (Plan) document has been prepared specifically for the

More information

2

2 1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.

More information

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE by James C.Y. Guo. Professor, Civil Engineering, U. Of Colorado at Denver, James.Guo@cudenver.edu.. And Eric Hsu, Project Engineer, Parson

More information

Engineering Hydrology Class 3

Engineering Hydrology Class 3 Engineering Hydrology Class 3 Topics and Goals: I.Develop s (estimate precipitation) II.Develop simple constant intensity design storm III.Develop SCS design storm Ocean s Why do we want to derive the?

More information

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..

More information

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for Dam Failure Analysis (Final) Olivotti Lake Dam Lincoln County, Wisconsin Report prepared for Houle Enterprises, LLC Oshkosh, Wisconsin Report prepared by www.meadhunt.com July 2012 Table of Contents Table

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo

More information

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES C. Landon Erickson, P.E.,CFM Water Resources Engineer USACE, Fort Worth District April 27 th, 2017 US Army Corps of Engineers Overview Flood

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

Reservoir on the Rio Boba

Reservoir on the Rio Boba Reservoir on the Rio Boba Michael J. Burns II Guillermo Bustamante J. James Peterson Executive Summary The National Institute of Water Resources in the Dominican Republic (INDRHI) plans to construct a

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

GISHYDRO: Developing Discharges and Watershed Parameters

GISHYDRO: Developing Discharges and Watershed Parameters GISHYDRO: Developing Discharges and Watershed Parameters A Case Study with Baltimore City Watersheds by Mathini Sreetharan, Ph.D., P.E., CFM, Dewberry, VA Kim Dunn, P.E., CFM, Dewberry, PA Baltimore City

More information

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado. November 25, Project No.

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado. November 25, Project No. DRAINAGE STUDY 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado November 25, 2014 Project No. 14-2953 Prepared for Mr. Robert Myers Caribbean Group P.O. Box N 1968

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED Agenda Background Hydro-Geomorphic Modeling Methodology HEC-HMS Modeling How is the Model Used Background Proposition 50 Grant Funding

More information

MEMORANDUM 1 INTRODUCTION. Comox Road Dyke Slough Tide Gate Modifications Numerical Modelling and Conceptual Design Report (DRAFT)

MEMORANDUM 1 INTRODUCTION. Comox Road Dyke Slough Tide Gate Modifications Numerical Modelling and Conceptual Design Report (DRAFT) 3 100 Wallace St Nanaimo, BC V9R 5B1 250.754.6425 www.nhcweb.com MEMORANDUM TO: Craig Wightman, R.P.Bio. (BCCF) DATE: October 14, 2013 FROM: Graham Hill, P.Eng. NO. PAGES: 13 CC: Esther Guimond, R.P.Bio

More information

TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS

TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS Marcus M. Quigley, P.E., Project Engineer, GeoSyntec Consultants Steven P. Roy, Associate, GeoSyntec Consultants Lawrence Gil, North

More information

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS Proceedings of the 4 th International Conference on Civil Engineering for Sustainable Development (ICCESD 2018), 9~11 February 2018, KUET, Khulna, Bangladesh (ISBN-978-984-34-3502-6) ASSESSMENT OF DRAINAGE

More information

Autumn semester of Prof. Kim, Joong Hoon

Autumn semester of Prof. Kim, Joong Hoon 1 Autumn semester of 2010 Prof. Kim, Joong Hoon Water Resources Hydrosystems System Engineering Laboratory Laboratory 2 A. HEC (Hydrologic Engineering Center) 1 Established in the U.S. Army Corps of Engineers(USACE)

More information

APPENDIX 4 ARROYO MODELING

APPENDIX 4 ARROYO MODELING APPENDIX 4 ARROYO MODELING The existing HEC-HMS model can serve as a baseline for further development and analysis of major arroyos in the city. The model would need to be updated and expanded to consider

More information

SOUTHEAST TEXAS CONTINUING EDUCATION

SOUTHEAST TEXAS CONTINUING EDUCATION EXAM No. 118 FLOOD - RUNOFF ANALYSIS 1. Information gained from flood - runoff analysis includes which one: A. Stage, discharge, volume. B. Measure depth, volume. C. Velocity, depth, storm occurrence.

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

D.E. KARN GENERATING FACILITY BOTTOM ASH POND HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT. Assessment Report. Pursuant to 40 CFR 257.

D.E. KARN GENERATING FACILITY BOTTOM ASH POND HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT. Assessment Report. Pursuant to 40 CFR 257. Hazard Potential Classification Assessment Report D.E. KARN GENERATING FACILITY BOTTOM ASH POND HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT Essexville, Michigan Pursuant to 40 CFR 257.73 Submitted

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

The Beckett s Run Experience. Fort Wayne, Indiana

The Beckett s Run Experience. Fort Wayne, Indiana The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan B.C. COBB GENERATING FACILITY BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Muskegon, Michigan Pursuant to 40 CFR 257.82 Submitted To: Consumers Energy

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

Recent Activities of the Maryland Hydrology Panel

Recent Activities of the Maryland Hydrology Panel Recent Activities of the Maryland Hydrology Panel Kaye L. Brubaker, University of Maryland, College Park Wilbert O. Thomas, Jr., Michael Baker International MAFSM 12 th Annual Conference Linthicum, Maryland

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

Modeling Infiltration BMPs

Modeling Infiltration BMPs Modeling Infiltration BMPs CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Design Goals for Calculations 1. Mitigate Peak Rates 2-Year to 100-Year 2. No Volume

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

Figure 1: Overview of all AutoCAD generated cross-sections.

Figure 1: Overview of all AutoCAD generated cross-sections. RocScience Slope Stability Modeling Software RocScience s Slide is a program that was used to evaluate Odell Dam slope stability conditions. Slide is a 2D limit equilibrium slope stability program that

More information

Initial Inflow Design Flood Control System Plan Holding Pond

Initial Inflow Design Flood Control System Plan Holding Pond Submitted to: Submitted by: Marquette Board of Light and Power AECOM Shiras Steam Plant Marquette, Michigan Marquette, Michigan Project No. 60445171 October 2016 Initial Inflow Design Flood Control System

More information

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1.1 Introduction The Hydrologic Model of the Upper Cosumnes River Basin (HMCRB) under the USGS Modular Modeling System (MMS) uses a

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

LIST OF TABLES.II LIST OF FIGURES.II LIST OF ATTACHMENTS.II I. INTRODUCTION.1 II. STUDY AREA.3 III

LIST OF TABLES.II LIST OF FIGURES.II LIST OF ATTACHMENTS.II I. INTRODUCTION.1 II. STUDY AREA.3 III Table of Contents LIST OF TABLES...II LIST OF FIGURES...II LIST OF ATTACHMENTS...II I. INTRODUCTION...1 II. STUDY AREA...3 III. PRECIPITATION-RUNOFF PROCESSES AND FLOW ROUTING SIMULATION WITH HEC-HMS 4

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

Introduction to HEC HMS. Daene C. McKinney

Introduction to HEC HMS. Daene C. McKinney CE 374 K Hydrology Introduction to HEC HMS Daene C. McKinney Hydrologic Engineering Center U.S. Army Corps ofengineers (USACE) Hydrologic Engineering Center (HEC) Formed 1964 to institutionalize the technical

More information

Hydrologic evaluation of flood flows from a burned watershed

Hydrologic evaluation of flood flows from a burned watershed Flood Recovery, Innovation and Response II 257 Hydrologic evaluation of flood flows from a burned watershed A. W. Miller & E. J. Nelson Department of Civil & Environmental Engineering, Brigham Young University,

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan J.H. CAMPBELL GENERATING FACILITY DRY ASH LANDFILL RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN West Olive, Michigan Pursuant to 4 CFR 257.81 Submitted To: Consumers Energy

More information

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Dead River Prepared By AECOM Brian A.

More information

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b* The Effect of Land Changes Towards in Sg. Pandan Perwira Bin Khusairi Rahman 1,a* and Kamarul Azlan bin Mohd Nasir 1,b 1 Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia a * wirakhusairirahman@gmail.com,

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr.

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr. December 7, 2012 Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE 2042 Salt Lake City, UT 84112 Dear Dr. Pomeroy, The following document is the final report of the Red Butte

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of

More information

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF Factors Affecting Stormwater Runoff: Rainfall intensity % Impervious surfaces Watershed size Slope Soil type, soil compaction

More information

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS U.S. Army Corps of Engineers, Chicago District Hydraulics and Environmental Engineering Section 17 March

More information

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax TECHNICAL MEMORANDUM 5930 Summerhill Rd Texarkana, Texas 75503 903 838 8533 fax 903 832 4700 TO: Becky Griffith, Jon Jarvis FROM Spandana Tummuri SUBJECT: Technical Memorandum on IP Analysis PROJECT: Sulphur

More information

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9. 2011 Hydraulic Report County Road 595 Bridge over Mulligan Creek Prepared By AECOM Brian

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

Master Watershed Study Final Report Volume 1

Master Watershed Study Final Report Volume 1 City of DEL RIO Master Watershed Study Final Report Volume 1 SEPTEMBER 2012 TABLE OF CONTENTS VOLUME I Page 1. Introduction 1.1 Background 1-1 1.2 Authorization 1-1 1.3 Scope of Study 1-2 1.4 Study Limits

More information