1 Technical Development Program COMMERCIAL HVAC APPLICATIONS Life Cycle Costing for HVAC Systems PRESENTED BY: Colby Fischer Copyright Carrier Corp. 2005
2 Objectives 1. Understand why Life Cycle Cost studies are often required and valuable 2. Gain new perspective on the difference/importance of energy modeling vs equipment ratings 3. Understand the time value of money and its role in life cycle costing 4. Learn about various analysis tools available and the basic differences between them
3 Menu Section 1 Section 2 Section 3 Section 4 Introduction Procedure Break Energy Modeling & Equipment Ratings Summary
4 SECTION 1 LIFE CYCLE COSTING FOR HVAC SYSTEMS Introduction
5 Life Cycle Costing Life Cycle Cost Analysis (LCC) - An economic technique used to compare various design alternatives by projecting (discounting or compounding) all initial and incremental associated costs over the economic life of the project, (also called the "Life Cycle Period"), to a common period of time.
6 True Costs ALL THE COSTS OVER THE LIFE OF THE SYSTEM Life Cycle Cost
7 Time Value of Money Discounting ò
8 Bringing Cost To the Present Study Period Operating Cost Investment Cost First Cost Replacement Cost Replacement Cost Operating Cost + OM&R Cost Residual Value
9 Time Value of Money MARR (Minimum Attractive Rate of Return) Example: 10% MARR, 2% annual Escalation 5,000/ YR in initial energy costs 5 Year Life Cycle Period Year Energy Costs Present Value 1 5,000 4, ,100 4, ,202 4, ,306 3, ,412 3,490 Total: 26,020 20,251
10 Life Cycle Cost of Systems Two Approaches: Compare to the base Difference from the base Energy Operating, Maintenance & Repair First Cost System
11 Key Points: Used as comparative technique Does not determine absolute costs in the future Life Cycle Studies Not all costs need to be included
12 Why Life Cycle Cost Analysis? Mandates by Federal and State Governments ASHRAE Energy Code directs users to evaluate the impacts and optimize the options Trends toward sustainable building design Even private corporations seek to make the best decision based on more than first cost Can be used to determine profit potential or ROI
13 Why Life Cycle Cost Analysis? The building market today view buildings as profit potential NOI - Net Operating Income = Rents all costs to operate the building (vacancy, operation, energy, taxes) NOI influences building value Most of all: A tool to demonstrate value
14 SECTION 2 LIFE CYCLE COSTING FOR HVAC SYSTEMS Procedure
15 Life Cycle Cost Analysis Steps Define the project (goal) Determine Analysis Method Determine Life Cycle Period Collect Data Analyze Recommendation Section 2 Life Cycle Costing Procedure
16 Define the Project What is the goal? Describe the project New construction, renovation, repair Determine the design goals Comfort, occupancy, energy sources, cost, etc. What are the alternatives? Different types of systems? Different types of efficiency tiers? Repair or replace? List all the feasible alternatives Section 2 Life Cycle Costing Procedure
17 Determining the Life Cycle The first big step = Not too long Not too short Just right Consider: How long will the owner keep the asset? What study periods are required by owners? What is the life of the investment? Do alternatives have different life cycles?
18 Choosing Equipment Life Table 1, Estimated Service Life of Various System Components Equipment Median Equipment Median Equipment Median Years Years Years Air Conditioners Air Terminals Air-cooled condensers 20 Window 10 Diffusers, grills, and registers 27 Evaporative condensers 20 Residential single or split package 15 Induction and fan-coil units 20 Insulation Commercial through the wall 15 VAV and double-duct boxes 20 Molded 20 Water cooled package 15 Air washers 17 Blanket 24 Heat Pumps Ductwork 30 Pumps Residential air-to-air 15 Dampers 20 Base-mounded 20 Commercial air-to-air 15 Fans Pipe-mounted 10 Commercial water-to-air 19 Centrifugal 25 Sump and well 10 Rooftop air conditioners Axial 20 Condensate 15 Single-zone 15 Propeller 15 Reciprocating engines 20 Multi-zone 15 Ventilating roof-mounted 20 Steam turbines 30 Boilers, Hot water (steam) Coils Electric motors 18 Steel water tube 24(30) DX, water, steam 20 Motor starters 17 Steel fire tube 25(25) Electric 15 Electric transformers 30 Cast iron 35(30) Heat Exchangers Controls Electric 15 Shell-and-tube 24 Pneumatic 20 Burners 21 Reciprocating compressors 20 Electric 16 Furnaces Package chillers Electronic 15 Gas or oil fired 18 Reciprocating 20 Valve actuators Unit heaters Centrifugal 23 Hydraulic 15 Gas or electric 13 Absorption 23 Pneumatic 20 Hot water or steam 20 Cooling towers Self-contained 10 Radiant heaters Galvanized metal 20 Electric 10 Wood 20 Hot water or steam 25 Ceramic 34 Data extracted from ASHRAE Handbook, 1999 HVAC Applications, Table 3 chapter 35
19 Determine Analysis Method Factors: Income Based or Cost Based? Private or Public Sector? Level of Analysis Needed? Section 2 Life Cycle Costing Procedure
20 Income vs. Cost Based Analysis Income based How much will the asset grow over time Best choice is highest present value Savings for the future is an example Cost based Looking at all the costs associated with a asset choice, at a common period of time Lowest overall cost is best choice Most HVAC decisions are cost based
21 Public vs. Private Analysis Public sector analysis Money raised through taxes or bonds Tax impacts not included Government agencies set rates Private sector Analysis Money is borrowed and competes with other alternatives Tax impacts included if required Borrowing rates and MARR set rates Government Building Office Building
22 Types of Tools Available Today Name Difficulty Detail Functions Simple Payback Spreadsheets HAP Hourly Analysis Easy Formal Training High Varies Peak Load Calcs Block Load Easy/ Medium Medium Peak Load Calcs Building System Optimizer (powered by HAP) Engineering Economics Commercial Invest (powered by HAP) Chiller System Optimizer (powered by HAP) Easy/ Medium Medium Energy Modeling Easy/ Medium Medium Life Cycle Costs Easy/ Medium Medium Air Cooled DX Energy Modeling Easy/ Medium High Air Cooled / Water Cooled Chiller System Energy Modeling System Sizing System Sizing System Selection Life Cycle Costs Life Cycle Costs Energy Modeling
23 Effort Select the right tools Pick a level and method that fit the goal Example: A 10 hp motor for an AHU Use a standard 80% efficiency or a high efficiency 95% that costs more Motor operates 1800 hr/year at 0.10/ kw Which should you select? How Detailed a Study is required? LCC Analysis Operating hours with simple payback Only include cost items that are significant and different Section 2 Life Cycle Costing Procedure
24 Collect Data Rates for time value of money First Costs Equipment Costs Installation Costs Design/Planning Costs Recurring Operating Costs Maintenance Energy Repair Other Rebates Taxes Financing
25 Discount Rate Compounding Rate depends on: Public Set Rates OMB Bonding Rate Financing Method Discounting Private MARR Profit objectives Tax Impacts Risk Financing Method Use a realistic rate If not sure ASK! A wrong rate will discredit the study Account for inflation if it may influence the outcome Use the same rate for all alternatives UNLESS there is a good reason to do otherwise
26 Discount Rate Minimum Attractive Rate of Return (MARR) Owners typically make capital budgeting decisions based on a fixed amount of available capital This fixed amount of available capital is competed for by various alternative investments The building owner must decide the MARR for any proposed capital expenditure Proposals which meet or exceed this minimum required return are deemed acceptable Rate may change depending on sensitivity and risk Required MARR may be set as is typical with government projects
27 Inflation Rates Inflation is the overall change in the value of goods and services in the economy, generally caused by the laws of supply and demand. When demand is greater than supply the costs tend to rise. This changes the actual discount rate Nominal rate is the discount rate before inflation Dollars are constant dollars Real rate is the discount rate accounting for inflation Dollars are current dollars This is different than escalation of price for a given commodity or service Values are published by Office of Management and Budget, and NIST annual supplement In 2005 average projected 10 year rate was 2.3%
28 Cost Escalation Escalation Rate (e) Increase in the price of goods and services over time A difficult decision because we are predicting the future Use historical values and government guideline - if they make sense Typical escalation rates Electricity 1.5 to 2.5 %/ year Natural gas 3.0 to 4.0 %/ year Service Labor 1.0 to 2.0 %/ year
29 Determining First Cost Installation and Design Costs can vary significantly between alternatives Evaluate the impact on: Building structure: Both for the operation and installation. Examples Cutting entry door, structural support Electrical, water, gas or other services may need to be added or increased in size or be different with alternatives Include costs associated with all the required subsystems when the impact is different
30 Determining First Cost Differences in types & amount of installation labor Include all the miscellaneous supplies to the extent they impact the analysis. Don t forget: Pipe Wire Structural support Hardware Expendable supplies Remember if it is significant enough to influence the decision be sure to include it every job situation may be different
31 Determining Operating Costs Energy Rates Electricity Gas Other Utilities Oil, steam, water Type of Rates Time of Use Tiered Demand Charges Flat
32 Building Load & Operating Hours Climate Index Annual hours spent at different temperatures and wetbulbs for project location Operating Hours Of each tenant
33 Some government projects require analysis of water usage Water usage may be associated with : Condenser water make-up Boiler make-up Once through condenser systems Evaporative condensers Swamp coolers Flooded roof systems Humidifiers Determining Water Cost Section 4 Collecting Data
34 Charges are normally based on gallons or cubic feet used Charges for Water may be in several way Single flat rate Determining Water Step scale based on volume Base rate and a step sale When charges are a step scale it is necessary to estimate total building usage for other items (bathroom, kitchen or process requirements) to determine realistic cost impacts Sewer charges may be included as a function of water usage
35 Determining Operating Costs Operating Expense Operating labor or services Maintenance Expense Servicing, expendable supplies Repair Costs
36 Determining Operating Expense System alternatives may have very different costs of operation For example: Local requirements may require a full time system operator for one type of system and not for another One system type may require special operating services such as water treatment
37 Maintenance Expense All systems require some amount of regular maintenance which should be accounted for in the analysis Filter changing requirements may be different for different alternatives and may have both material and labor implications
38 Repair Costs Repair type service contracts such as extended warranties may be included in this category Alternatives may have different levels of reliability and different types of repair possibilities Repair vs Replace Analysis
39 Collecting data Other Considerations
40 Utility Rebates Utility companies sometimes offer an incentive for systems which help reduce their costs either by being more efficient or shifting and level loading the demand. Incentives are normally a financial credit provided for: Installing equipment that is more efficient Limiting demand at the utilities option Switching to an alternate fuel source Using some form of storage to shift demand to off-hours times
41 Tax Incentives To help promote the use of alternative energy sources and improved energy efficiency products, government agencies may offer a tax incentive or credit to help defray a part of the additional first cost When evaluating high efficiency and alternative energy products, which will usually have higher costs, with more conventional project alternatives including the impact of these credits in the analysis may influence the economic decision Both Federal and State governments have energy tax credits
42 Finding Residual Value Residual or salvage value can be based on: Value in place at the end of the life cycle Book value based on the allowed deprecation Resale value Scrap value It should be adjusted for any costs involved: For selling expenses For any required conversion or disposal costs When refrigerant containing decisions are made disposal cost may be significant
43 Finding Residual Value As a rule of thumb: One quick method of setting a value is to prorate the initial cost For example a 10,000 unit with a 20 year life at the end of 15 years would be: 10, = 500/year 500/year * 5 years left = 2,500 residual value Another method is to assume double declining depreciation for the IRS allowed years and then use the book value at the end of the study period
44 Non-economic Costs Not every cost associated with implementing a project is a direct project-related cost. Some projects impact the value or performance of the building in an indirect way Rent charged for office space and tenant turnover can be influenced by building decisions Document all assumptions in an analysis that includes these costs or credits. Since these costs are often considered soft they can be controversial if not documented
45 Non-economic Costs Typical impacts to consider: Comfort impacts Acoustics Safety Security Flexibility Environmental impacts Productivity improvements Ability to demand higher rents Building having a higher resale value This is an area of continuing study - small improvements in areas like productivity can result in very large savings. More on this at the end of this program.
46 Non-economic Impacts Non-economic factors can have major economic effects Comfort BOMA rated this as number one reason tenants move Top 5 reasons tenants move: 1. Rental rates 2. Comfortable temperatures 3. Indoor Air Quality 4. Acoustics/Noise 5. Building Maintenance and Management
47 Life Cycle Cost of Systems Two Approaches: Compare to the base Difference from the base Energy Operating, Maintenance & Repair First Cost System
48 Economic Evaluation Criteria Acceptance or rejection of one alternative Optimize a design, efficiency, component or system Determine the optimum system between multiple alternatives Determine the optimum combination of independent systems Rank the order of independent options to maximize funding
49 SECTION 3 LIFE CYCLE COSTING FOR HVAC SYSTEMS Energy Modeling & Equipment Efficency Ratings
50 AHRI Equipment Ratings: Ratings Vs Modeling Designed to describe the efficiency of equipment with a wide array of different features made by different manufactures that will be used in various types of applications and climates and put them on a level playing field of comparison. Energy Modeling: In its fullest form, it incorporates the location ambient climate index, space load analaysis at various hours, and the operating hours of the specific space the hvac system is serving and compares them to the efficiency of the hvac system at dozens of points of space load vs. ambient conditions. The result is a project specific efficiency analysis of the HVAC system.
51 Air Cooled DX System Ratings EER Energy Efficiency Ratio SEER Seasonal Energy Efficiency Ratio (5 Tons and Under) IEER Integrated Energy Efficiency Ratio (6 Tons and Up)
52 AHRI Ratings (EER) EER = NetCapacity (Btuh) TotalPowerInput (Watts) Compressor(s) Watts + Indoor Fan Watts + Outdoor Fan Watts For AHRI this is given at 95F Ambient Conditions and full cooling capacity with 80/67 mixed air conditions. This was the sole rating given on most home and commercial dx air conditioners for many decades.
53 AHRI Ratings Example EER Calculation: EER = Net Capacity (Btuh) Total Power Input (Watts) 7.5 ton RTU Net Capacity 89,000 Btuh EER = 89,000 (Btuh) 5, (2) + 1,400 Compressor Power Condenser Fan (each) Evaporator Fan 5.66 kw.5 kw 1.4 kw EER = 89,000 8,060 = 11.0
54 AHRI Ratings (SEER) Test for Systems with Single Stage Compressor & Constant Speed Fan
55 AHRI Ratings (SEER) Test for Systems with Two Stage Compressor & Two Speed Fan
56 AHRI Ratings (SEER) Test for Systems with Variable Speed Compressor & Multi-Speed Fan
57 AHRI Ratings (SEER) Calculated SEER rating: Based on the laboratory tests required in the previous slides (depending on compressor & fan type) The 3-6 test points are weighted based on average house hold conditions in the median U.S. Climate.
58 AHRI Ratings (IEER)
59 Air Cooled DX System Energy Modeling
60 Air Cooled Dx Offering Tiers Section 5 Rating and Efficiency Terms
61 Payback Factors of Higher Tier Equipment Climate Building Load Profile & Operating Hours Building Design / Direction Facing Occupancy Type Office School Church Warehouse/Storage Retail Medical Unit Efficiency & Staging Capabilities Electricity / Gas Rates & Demand Charges Section 5 Rating and Efficiency Terms
62 Air Cooled Dx Climate Zones Section 5 Rating and Efficiency Terms
63 Air Cooled Dx Climate Zones Section 5 Rating and Efficiency Terms
64 Air Cooled Dx Climate Zones Note: data shown is for a 2-speed 10 Ton standard pkg unit vs single speed standard pkg unit Section 5 Rating and Efficiency Terms
65 Scenarios This scenario was generated with Carrier Commercial Invest Software. A software program powered by the HAP (Hourly Analysis Program) that calculates energy use of Air Cooled Dx Systems by modeling building & equipment loads while accounting for equipment fan & staging capability. Section 5 Rating and Efficiency Terms
66 Scenario 1 A For-Profit College is replacing (20) 5 Ton Gas Electric Rooftop Package units at each of three different campuses around the country and it is trying to decide whether to go with standard efficiency, mid efficiency or high efficiency equipment Other Info: Electricity Rate: 0.15 all locations Locations: Long Beach, Riverside, Miami Equipment Life: 15 Years Section 5 Rating and Efficiency Terms
67 Scenario 1 Tier Std Mid High Compressor Stgs Fan Speeds EER SEER Economizer Yes Yes Yes Installed Cost 180, , ,000 Difference - 12,000 32,000 Section 5 Rating and Efficiency Terms
68 Scenario 1 Results Using Energy Modeling Software - Riverside Tiers Std Mid High Energy Usage (/Year) 37,060 36,660 29,060 Energy Savings (/Year) N/A 400 8,020 Payback Years N/A Section 5 Rating and Efficiency Terms
69 Scenario 1 Yearly Energy Savings 12,000 10,000 8,000 6,000 4,000 2,000 - Riverside Long Beach Miami Mid High Section 5 Rating and Efficiency Terms
70 Scenario 1 6 Years to Payback High Efficiency Units Riverside Long Beach Miami Section 5 Rating and Efficiency Terms
71 Watercooled Chiller Ratings Full Load EER or kw/ton Energy Consumed per Ton at Full Capacity and Design Condenser Water IPLV Integrated Part Load Value in EER or AHRI Standard Conditions NPLV Integrated Part Load Value in EER or Custom Full load conditions but AHRI part load Conditions
72 Chiller Efficiency Compressor Input (kw) = Mass Flow X Lift Compressor Efficiency
73 IPLV/NPLV Ratings Weightings & ECWT are based on a single chiller plant operation characteristics & average climate in America
74 IPLV/NPLV Ratings All AHRI chiller factories receive independent random audit tests. During the audit they must be within the tolerances below:
75 IPLV With only these 4 points there is a lot you don t know of rebates & project incentives are based on these 4 points
76 10 Point Load Line
77 # of Chillers AHRI 550/590 section D2 states, The equation (IPLV) was derived to provide a representation of the average part load efficiency for a single chiller only. However, it is best to use a comprehensive analysis that reflects the actual weather data, building load characteristics, operational hours, economizer capabilities and energy drawn by auxiliaries such as pumps and cooling towers, when calculating the chiller and system efficiency. This becomes increasingly important with multiple chiller systems because individual chillers operating within multiple chiller systems are more heavily loaded than single chillers within single chiller systems.
78 # of Chillers 4 Chillers 3.3% 3 Chillers 15.4% 43.3% 14.3% 1 Chiller 2 Chillers 23.7% 1 Chiller into existing multi chiller installation 85% Are In Multiples On Jobs
79 Multiple Chiller Plants Buildings with multiple chillers generally do not turn on their chillers till the building has reached 20-25% load and ambient air/economizer air will no longer meet their needs
80 Multiple Chiller Plants What about Equal Unloading?
81 Multiple Chiller Plants
82 IPLV/NPLV Summary Measures just 4 points Weights the 4 points to represent single chiller plant Designed for the average U.S. Climate 10% average tolerance allowed
83 Water Cooled Chiller Energy Modeling
84 Typical Real World Operating Maps Office Building w/ Airside Econo
85 Typical Real World Operating Maps Data Center / Process Load
86 Climate Zones
87 Climate Zones
88 Building Load Profile Based on: Operating Hours of Tenants Building Type Weather Bin Data With Economizer Without Economizer
89 Chiller Performance Map
90 Recap Data Inputed: Building Bin Load Profile Chiller Performance Map Staging Type Sequenced or Equal Unloading Pumping Scheme Contant, VPF, Primary/Seconday Section 5 Rating and Efficiency Terms
91 Scenario 2 15 Story office building in Los Angeles is debating whether to repair existing (2) 400 Ton 25 year old centrifugal chillers or replace. The building has 600 Tons of load Operates M-F during typical business hours Uses Airside Economizer Has Constant Speed Pumps
92 Scenario 2 We are proposing, replacing with (2) variable speed centrifugal rated at 0.33 IPLV, and new pumps operating in variable primary flow
93 Input Data
94 Input Data
95 Costs Existing Chiller Costs New Chiller Costs Note: leaving maintenance cost out of it and assuming to be similar
96 Economic Data
97 Input Data New Chiller performance map Existing (interpolated)
98 Results
99 Results
100 Results
101 Summary LIFE CYCLE COSTING FOR HVAC SYSTEMS Things to Remember!
102 Summary Life Cycle Costing is used as a decision tool between different options With HVAC systems this means taking the first costs of design, materials, installation & any rebates, then incorporating the present value of future incremental costs such as energy, maintenance and repair. The result is an overall present value for each option. Generally, the option with the highest annual rate of return is chosen unless a noneconomic decision outweighs this AHRI ratings provide a limited outlook on the efficiency of the equipment and are often not in sync with the local climate and application. Energy modeling of equipment provides the best outlook of what kind of real life efficiency you will experience
103 Technical Development Program Thank You This completes the presentation. TDP 903 Life Cycle Costing Artwork from Symbol Library used by permission of Software Toolbox
Intelligent System Design
Intelligent System Design Justin Wieman Chiller Systems Engineer Trane, A Division of Ingersoll-Rand Member AHRI Systems Committes ASHRAE Member since 2000 When you buy a HVAC System would you rather buy:
More informationWhat products are eligible for the rebate? < 149 tons > 150 tons
If you have questions while completing this form, please contact Energy Management Solutions, Inc. weekdays during business hours for assistance. Phone: 952-767-7450 Fax: 952-556-9171 Send your completed
More informationCustomer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available?
Why an Energy Efficiency Program? Business Solutions Energy Efficiency Incentive Program MPSC 21st Century Electric Energy Plan More electricity is needed as soon as practicable. One way of achieving this
More informationEnergy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System)
Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat VRF System) (* Source: http://kr.lgeaircon.com/) Commercial Air-Conditioning Engineering Study ES-MultiVWaterIV_EnergyAnalysis-08-14
More informationashrae) VENTILATING PRINCIPLES AIR CONDITIONING OF HEATING AND 7th Edition A Textbook with Design Data Based on the 2013 ASHRAE Handbook Fundamentals
PRINCIPLES OF HEATING VENTILATING AND AIR CONDITIONING 7th Edition A Textbook with Design Data Based on the 2013 ASHRAE Handbook Fundamentals William J. Coad Harry J. Sauer, Jr. ashrae) Contents Part I
More informationA GUIDE TO REACH SYSTEM RELIABILITY. Commercial HVAC Buyers Guide
A GUIDE TO REACH SYSTEM RELIABILITY Commercial HVAC Buyers Guide How to confidently select your HVAC contractor, compare options and quotes, and enjoy system reliability. If you are reading this document,
More informationERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD (I-P edition) Energy Standard for Buildings Except Low-Rise Residential Buildings.
ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD 90.1-2010 (I-P edition) Energy Standard for Buildings Except Low-Rise Residential Buildings March 8, 2018 The corrections listed in this errata sheet apply to
More informationERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD (I-P edition) Energy Standard for Buildings Except Low-Rise Residential Buildings.
ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD 90.1-2010 (I-P edition) Energy Standard for Buildings Except Low-Rise Residential Buildings April 17, 2013 The corrections listed in this errata sheet apply to
More informationChanges to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE
Changes to the Minnesota Commercial Energy Code Presented by: Andy Thielen, PE Warning! The following is an outline of proposed code changes. There is no guarantee that the final code adopted by the State
More informationAir Source Heat Pumps in the Commercial Market. Thursday, February 5, :00-10:30 a.m.
Air Source Heat Pumps in the Commercial Market Thursday, February 5, 2015 9:00-10:30 a.m. 1. Commercial Equipment Applications, Benefits, Limitations 2. Case Studies 3. Efficiency Vermont Technical & Financial
More informationMechanical Systems Project Proposal
Mechanical Systems Project Proposal December 15, 2006 Table of Contents 1.0 Executive Summary... 2 2.0 Building Background... 3 3.0 Proposal Objectives... 5 4.0 Initial Considerations... 6 5.0 Proposed
More informationEnergy Savers: Air-Source Heat Pumps
1 of 5 4/25/2009 8:55 AM U.S. Department of Energy - Energy Efficiency and Renewable Energy Energy Savers Air-Source Heat Pumps An air-source heat pump can provide efficient heating and cooling for your
More informationDeep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013
Deep Energy Retrofit Modeling and Effectiveness Study: A Technical Policy Brief January 2013 Table of Contents EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 BUILDING 1... 7 BUILDING 2... 9 BUILDING 3... 11
More informationEnergyPro Building Energy Analysis. Nine-story Office Building
EnergyPro Building Energy Analysis Nine-story Office Building EnergyPro Building Energy Analysis for an office building Project Scope The purpose of the EnergyPro energy model was to evaluate the energy
More information1 Project Information. 2 Building Type. 3 Trade Ally/Contractor Information. HVAC Rebate Worksheet. Retrofit New Construction
HVAC Rebate Worksheet Before you start Instructions: Complete all relevant information for your project. Include with complete application package. The HVAC Worksheet should be completed for new construction
More informationCOPs, EERs, and SEERs
Power Knot LLC 501 Valley Way Milpitas CA 95035 COPs, EERs, and SEERs How Efficient is Your Air Conditioning System? USA +1-408-889-8433 www.powerknot.com 1 Introduction This note discusses performances
More informationImplementing Low-Cost Energy Savings Projects & Conducting Energy Audits
AEP Ohio Customer Seminar Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits Presented by: Julie Birchfield Customer Manager Energy Optimizers, USA May, 2018 Test your Energy IQ 11
More informationTDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify,
TDP Catalog TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, sell, and apply HVAC equipment in commercial
More informationINCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM
INCENTIVE ESTIMATOR HVAC USER GUIDE FLORIDA CUSTOM INCENTIVE PROGRAM CONTENTS 1. Getting Started... 2 2. Measure Tool Description... 3 2.1. Appropriate Use of the Tool... 3 2.2. Applicable Types of Air
More informationLevel 1 Modules tdp-101 hvac industry overview tdp-103 concepts of air conditioning tdp-102 abcs of comfort
TDP-101 HVAC Industry Overview This TDP provides a general overview of the commercial HVAC industry and provides an awareness of the design process and construction. The documents involved in construction,
More informationTechnical Development Program
TDP Catalog TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, sell, and apply HVAC equipment in commercial
More informationhow to read an energy model
how to read an energy model Kohler Ronan, LLC is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported
More informationMinnesota Conservation
Program Information MN Minnesota Conservation Programs Summary We offer solutions for business customers in a suite of energy conservation and energy management products that will help you increase your
More informationLarge University Central Chiller Plant Design Considerations
Carrier Engineering Newsletter Volume 5, Issue 3 Large University Central Chiller Plant Design Considerations Large campus chilled water plants have unique constraints and need careful evaluation for successful
More informationWakulla Chamber of Commerce July Place your cover photo here. Size and crop it to 4 high x 9.6 wide. Presented by Derick Farfan
Wakulla Chamber of Commerce July 2017 Commercial Energy Efficiency Programs Place your cover photo here. Size and crop it to 4 high x 9.6 wide. Presented by Derick Farfan Energy Efficiency Incentives Question:
More informationEnergyPro Building Energy Analysis. Single-story School Building
EnergyPro Building Energy Analysis Single-story School Building EnergyPro Building Energy Analysis for a single-story school bulding Project Scope The purpose of the EnergyPro energy model was to evaluate
More informationSMART HVAC & LIGHTING SYSTEMS. Savings From Two Major C&I End Uses
SMART HVAC & LIGHTING SYSTEMS Savings From Two Major C&I End Uses September 21, 2016 PRESENTATION OVERVIEW Why this focus? Significant savings potential Smart controls coupled with more efficient technologies
More informationProposal: Mechanical System Redesign
Proposal: Mechanical System Redesign The 959 Eighth Avenue 10019 Faculty Advisor: Dr. James Freihaut December 12, 2005 Table of Contents 1.0 Executive Summary 2.0 3.0 Proposal Obectives 4.0 Preliminary
More informationBuilding Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System)
Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Residential-Building Energy-Modeling Engineering Study VRF-ES-BH-001-US 012E03 Executive Summary Contents
More informationENERGY MODELING TOOLS: SOLUTIONS FOR CREATING A HIGH PERFORMANCE BUILDING. Presented by Neil Maldeis Energy Solutions Engineering Leader, Trane
ENERGY MODELING TOOLS: SOLUTIONS FOR CREATING A HIGH PERFORMANCE BUILDING Presented by Neil Maldeis Energy Solutions Engineering Leader, Trane LEARNING OBJECTIVES Learn how to use and apply modeling tools,
More informationHeating, Ventilation & Air Conditioning Systems ( Member Information Page )
2017 Commercial Program Heating, Ventilation & Air Conditioning Systems ( Member Information Page ) WrightHennepin Cooperative Electric Assn., P.O. Box 330, Rockford, MN 55373 Ph: 7634773000 Business Member
More informationENERGY AS SERVICES COMPANY ESCO. Jamal E. Alostaz. Projects Engineer Al-Salem Johnson Controls
ENERGY AS SERVICES COMPANY ESCO Jamal E. Alostaz Projects Engineer Al-Salem Johnson Controls AGENDA About Johnson Controls Introduction to ESCO Case Study: Empire State Building, USA Project Information
More informationCREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected)
(Responsible Individual) (Company Name) I,, from verify that the information provided below is accurate, to the best of my knowledge. CREDIT COMPLIANCE (Please complete the color coded criteria(s) based
More informationOUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION
OUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION Christopher S. Smith, E.I.T. and Thomas A. Bartlett, P.E. JCPenney Company, Inc. Construction Services Mechanical Engineering
More informationSouth Carolina Society for Hospital Engineers
South Carolina Society for Hospital Engineers Selecting Energy Partners: Criteria & Pitfalls and the Top 10 Ways to Reduce Energy in a Hospital Presented by Jon Dierking, PE, CEM, LEED AP Director of Energy
More informationLOGO. Trivium Level II Energy Audit
LOGO Trivium Level II Energy Audit Submission Date: 9/16/2016 Table of Contents 1.0 EXECUTIVE SUMMARY 3 2.0 SITE ENERGY CONSUMPTION 5 3.0 BACKGROUND INFORMATION 6 3.1 Description of the Client 6 3.2 Description
More informationCOMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program
COMMERCIAL LOAD ESTIMATING Load Estimating Level 3: Block and Zone Loads Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design,
More informationHeating and Cooling Incentive Application for Business Customers
2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is
More informationCentral Chiller Plants
Central Chiller Plants Institute for Facilities Management New Orleans, LA January 18,2016 Course 319 Presenter: John Vucci Associate Director HVAC Systems University of Maryland College Park, Maryland
More informationHeating and Cooling Incentive Application for Business Customers
2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is
More informationHeating and Cooling Incentive Application for Business Customers
2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is
More informationCan You Afford Not To Retro-Commission Your Facility In These Lean Times? Wednesday, October 3, :00pm 2:15pm
Can You Afford Not To Retro-Commission Your Facility In These Lean Times? Wednesday, October 3, 2012 1:00pm 2:15pm Presenters Bruce Pitts bpitts@woodharbinger.com Len Rozek lrozek@ecube.com Mark Howe cmarkhowe@yahoo.com
More informationOptimized System for Your Bottom Line. Trane Training Class 1 Dec, 2017
Optimized System for Your Bottom Line Trane Training Class 1 Dec, 2017 Total Cost of Ownership Setting your system for great payback Where is money spent over a 30 year lifetime? First Cost 4.9% Service
More informationHeating and Cooling Incentive Application for Business Customers
2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is
More informationApplication Center Equipment Guide. Product Type Category Name Product. Heating & Cooling Equipment Unitary Packaged Heating & Cooling Air Conditioner
HVAC TECHNICAL SHEET GENERAL INFORMATION SMECO s Business Solutions program is designed to help commercial and industrial customers maximize energy efficiency and manage energy costs. With cost-saving
More informationSound HVAC Choices for Sustainable Design. Julian de Bullet
PLEASE MUTE CELL PHONES Sound HVAC Choices for Sustainable Design Julian de Bullet Director of Industry Relations McQuay International ASHRAE Distinguished Lecturer 703-395-5054 1 2 Rising?? What Is Sustainability?
More informationHeating and Cooling Incentive Application for Business Customers
2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is
More informationRebel commercial packaged rooftop systems
Rebel commercial packaged rooftop systems Advanced technologies propel performance and energy savings to uncommon levels 3-28 tons Capitalize with 43% more energy savings If you are a commercial building
More informationRebel commercial packaged rooftop systems
Rebel commercial packaged rooftop systems Advanced technologies propel performance and energy savings to uncommon levels 3-28 tons Rebel features and benefits 18 13 6 5 3 6 4 43% Energy Savings 5 11 12
More informationApplication of Advanced Energy Technologies
GLOBALCON 2002 Philadelphia, Pennsylvania March 27, 2002 Application of Advanced Energy Technologies Michael K. West, Ph.D., P.E. Building Systems Scientist Advantek Consulting, Inc. www.advantekinc.com
More informationEnergy Efficiency Programs
Program Overviews Efficiency Programs Description Delivery Model Audit Requirement/ Multifamily - Existing Building Efficiency Alliant Services include free energy assessments, rebates for property owners
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/06/2013 BUILDING SURVEY DATE
0067 1110 WEST GREEN STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.810 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 18,640,900 OFFICE BUILDING GROSS SQUARE FEET 175,513
More informationApplication of Steam Turbine Driven Chillers in CHP/DES System
Application of Steam Turbine Driven Chillers in CHP/DES System Bradley Cochrane, M. Eng., P. Eng., CEM, Director, Energy Management, York University. Edy Chiarotto, HVAC Equipment Sales Manager, Johnson
More information3/6/2017 Past president & currently on the board of directors for the Wisconsin Geothermal Association
Saving energy and money with Geothermal technology Presented By Mark Flock President Flock s Heating & Air Conditioning WaterFurnace GeoPro Master Dealer Nate Certified Ground Source Loop Installer Member
More informationSustainable Building Operations & Upgrades
Sustainable Building Operations & Upgrades LEED for Existing Buildings 2010 Energy / Facilities Connections Conference Brightworks & Glumac Eric Baxter and Todd McGuire 12 May, 2010 The Value Proposition
More information2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives
2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives P a g e 2 The Massachusetts Program Administrators (PAs) offer their business customers a wide array of financial incentives (1)
More informationGreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview
GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview Mike Meyers, Xcel Energy Commitment from Leadership Our energy conservation programs are especially valuable because they give
More informationGeothermal Comfort Systems
Frequently Asked Questions Q: How efficient are geothermal heat pump systems? A: Actual efficiencies will depend on a number of factors, but generally speaking a geothermal heat pump can be three to five
More informationThe Financial Side of Energy Efficiency: How to Develop an Energy Management Plan for Your Hospital or Medical Center
The Financial Side of Energy Efficiency: How to Develop an Energy Management Plan for Your Hospital or Medical Center June 25, 2015 Presented by Dan Doyle, P.E., LEED AP Chairman, Grumman/Butkus Associates
More informationNEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.40
NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.40 By: Carrier Software Systems Carrier Corporation Syracuse, New York rev August 11, 2008 Copyright 2008 Carrier Corporation, All Rights Reserved
More informationSUMMARY OF SERVICES & INCENTIVES
SMALL BUSINESS PROGRAM 2017 SUMMARY OF SERVICES & INCENTIVES Effective through December 31, 2017 Last updated February 1, 2017 EFFICIENCY INCENTIVES SUMMARY The Focus on Energy Small Business Program offers
More informationRebates for Improvements Home Efficiency Program Fort Collins Utilities
Rebates for Improvements Home Efficiency Program Fort Collins Utilities Revised 03/04/2013 This matrix summarizes information regarding Home Efficiency Program rebates for improving homes in Fort Collins.
More informationBuilding Energy Efficiency Analysis for a High School
Building Energy Efficiency Analysis for a High School (LG Multi V III VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BH-002-US 013A30 Executive Summary Contents Executive Summary...2
More informationInstant discount of 33% off improvement cost, up to $1,250 Plus, potential savings bonus of up to $250 (**)
RESIDENTIAL PROGRAM HOME PERFORMANCE with ENERGY STAR IMPROVE YOUR HOME'S COMFORT. SAVE MONEY. REDUCE ENERGY. EARN S. Home Performance with ENERGY STAR offers homeowners instant discounts for making recommended
More informationASHRAE 90.1 The evolution continues
ASHRAE 90.1 The evolution continues 4 March 2009 Mick Schwedler, PE ASHRAE SSPC 90.1 Chair Manager, Trane Applications Engineering Historical Timeline 90.1-1980 updated 90.1-1999 major rewrite 90.1-2001
More informationSection 2: Estimating Energy Savings and Incentives
Section 2: Estimating Energy and Incentives 2.1 Estimating Energy and Incentives... 2 2.2 Customized Measures - Estimation Software... 2 2.2.1 AC&R I - High Efficiency Chiller... 4 2.2.2 AC&R I - Split/Packaged
More informationPARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68%
Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Address 666 Burrard St, Vancouver Management QuadReal Property Group Type of Building Office Year of Construction 1984 Number
More informationAAON. Energy and Economics
Energy and Economics AAON Analysis Program AAON Energy and Economics Analysis Program The AAON Energy and Economics Analysis Program (AAON EEAP) is a tool for AAON sales representatives, consulting engineers,
More informationChilled Beams. The new system of choice?
Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams
More informationProject Proposal Proposal for Investigation of Alternative Systems
Project Proposal Proposal for Investigation of Alternative Systems 01.15.2010 Defense Media Activity Building Fort George G. Meade Penn State University Architectural Engineering Faculty Advisor: Dr. Treado
More information2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity
Energy Accounting & Education Energy Managers Kermit King School District of La Crosse John Daily School District of Holmen 1 Topics (Electricity) Creating electricity Defining degree days Customer charges
More informationOptimizing Chilled Water Systems for Energy Efficiency and Occupant Comfort
AABC Commissioning Group AIA Provider Number 50111116 Optimizing Chilled Water Systems for Energy Efficiency and Occupant Comfort Course Number: CXENERGY1709 Mark Benevides Siemens April 26, 2017 Page
More informationIESVE Compliance for ASHRAE IES Virtual Environment
IESVE Compliance for ASHRAE 90.1 - IES Virtual Environment July 2018 IES Virtual Environment and Compliance with ASHRAE 90.1-2004, 2007, 2010 & 2013; Appendix G, Performance Rating Method and Chapter 11,
More informationB. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More information2018 Commercial Rebate Program
Black Hills Energy offers Colorado Commercial and Industrial electric customer rebates for some of the most commonly installed efficiency projects. Follow the checklist below to determine if you are eligible
More informationThe American Council for an Energy-Efficient Economy Emerging Technologies Report. Residential Ground-Source Heat Pumps July, 2007
The American Council for an Energy-Efficient Economy Emerging Technologies Report Residential Ground-Source Heat Pumps July, 2007 Summary Definition Basecase New Measure: Residential heat pumps that use
More informationBuilding Energy Efficiency Analysis for a High School
Building Energy Efficiency Analysis for a High School (LG Multi V Water II VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BF-002-US 013A16 Contents Executive Summary...3 Introduction...4
More informationTuesday September 26 th Main Program: Overview and Discussion of VRF Technology
Tuesday September 26 th 2017 Main Program: Overview and Discussion of VRF Technology JS Rancourt DXS New England [Daikin] Greg Hosselbarth Mitsubishi Electric AGENDA Introduction - Global VRF 101 Energy
More informationHeat Pumps Community Workshop Manchester Library, Manchester
Heat Pumps Community Workshop Manchester Library, Manchester Jake Marin Program Manager HVAC/R Efficiency Vermont April 14, 2015 1 Our Roadmap Brief Technology Overview Heat Pump Economics Successful Applications
More informationEnergy Efficiency in Building Active Design Part II
Energy Efficiency in Building Active Design Part II Presented by: CK Tang BSEEP Component 4 Manager Veritas Enviornment Sdn Bhd ck.tang@veritas.com.my Air Conditioning System System Sizing 1 Current Industry
More informationUniversity of Minnesota Duluth Civil Engineering Building
Energy Data Attachment University of Minnesota Duluth Civil Engineering Building LEED Energy Modeling The energy modeling for LEED NC 2.2 was performed against ASHRAE 9.1-24 Appendix using equest version
More informationFundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619
AABC Commissioning Group AIA Provider Number 50111116 Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 Jim Hall, PE, TBE, CxA Systems Management & Balancing,
More informationCool Smart Incremental Cost Study: Final Report
Cool Smart Cost Study: Final Report July 2015 Prepared for: The Electric and Gas Program Administrators of Massachusetts Part of the Residential Evaluation Program Area This page left blank. Prepared by:
More informationSmall Oil-Less Centrifugal Compressors: Bringing Energy Efficiency and Reduced Costs to Chiller Plants
Small Oil-Less Centrifugal Compressors: Bringing Energy Efficiency and Reduced Costs to Chiller Plants Ben Erpelding and Annika Moman, San Diego Regional Energy Office ABSTRACT According the U.S. Department
More information(For ASllRAE Staff Use Only)
ASHRAE TECHNOLOGY AWARDS APPLICATION FORM (Page 1) APPLICATION MUST BE COMPLETE TO BE CONSIDERED FOR JUDGING (Required for Society-Level Competition) 18 (For ASllRAE Staff Use Only) I. Identification (0
More informationBUILDING AND PLANT ENERGY ANALYSIS REPORT
BUILDING AND PLANT ENERGY ANALYSIS REPORT Alicia Carbin Longwood University s New Science Building in Farmville, VA 10-27-04 TABLE OF CONTENTS. 1.0 Executive Summary.........1 2.0 LEED Green Building Certification........2
More informationFlorida Business Markets Commercial Energy Efficiency Programs. Place your cover photo here. Size and crop it to 4 high x 9.6 wide.
Florida Business Markets 2016 Commercial Energy Efficiency Programs Place your cover photo here. Size and crop it to 4 high x 9.6 wide. Who is Duke Energy? Largest power company in USA 28,000 employees
More informationFirstEnergy s Pennsylvania Utilities. Energy Efficiency Programs for Business
FirstEnergy s Pennsylvania Utilities Energy Efficiency Programs for Business 2018 TODAY S AGENDA Introduction to Sodexo Summary of Pennsylvania Act 129 Overview of program website Overview of Application
More informationRetrocommissioning Investigation Study of the Sheraton Chicago Hotel
Retrocommissioning Investigation Study of the Sheraton Chicago Hotel & Towers Cityfront Center Tracy Phillips May 4, 2007 May 4, 2007 You can go anywhere you want, if you look serious and carry a clip
More informationCoppin State University Physical Education Complex - Technical Report 2
Coppin State University Physical Education Complex - Technical Report 2 Building and Plant Energy Analysis Report Kaylee M Damico Advisor: Dr. Jelena Srebric Location: Baltimore, MD Table of Contents Contents
More informationThesis Final Presentation
Acoustical lanalysis Thesis Final Presentation Facility Information Mechanical Information Goals Facility Information Location: Total Cost: $56,000,000 Occupancy: Office, Media Center Delivery Method:
More informationThesis Proposal. Park. Findlay 12/10/2010. Connor Blood
1 Park Place Corporate Center One Mechanical Senior Thesis Project Thesis Proposal Park Place Corporate Center One Findlay Township,, PA 12/10/2010 Proposal Connor Blood 2 Park Place Corporate Center One
More informationUniversity of Southern California Main Campus Plant Energy use reduction of 49% compared to previous plants and control strategies.
Foreword Most chiller based systems save energy when compared to packaged cooling equipment, but they waste a substantial amount of energy compared to their optimized state of operation. On an annual basis,
More informationWhat s My Baseline? ASHRAE
2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116,part 2). For personal use only. Additional reproduction,
More informationABSTRACT I. INTRODUCTION II. METHODS AND MATERIAL
2017 IJSRSET Volume 3 Issue 2 Print ISSN: 2395-1990 Online ISSN : 2394-4099 Themed Section: Engineering and Technology Chiller and AHU Design for A commercial Usage S M Azfar Hashmi, Mirza Muneer Baig,
More informationENERGY CONSERVATION STRATEGIES FOR HVAC SYSTEMS
ENERGY CONSERVATION STRATEGIES FOR HVAC SYSTEMS Heating ventilation and airconditioning systems consumes nearly 50 to 60% of the total power consumption in any building and thus, offers huge potential
More informationEnergy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007
Energy Auditing for Schools Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Schools Consumption breakdown 19% 6% 9% Space Heating 46% Water Heating Lighting Cooling 20%
More informationMechanical Project Proposal
Mechanical Project Proposal Miller Children s Hospital Prepared for: Dr. James Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared by: Stephen Haines December 18
More informationIntegrated Design. Architectural Design v/s HVAC Design. HVAC Design after Architectural design
Integrated Design A necessity for sustainable buildings Architectural Design v/s HVAC Design or HVAC Design after Architectural design or Integration of Concept, Location, Esthetic and Technical Design
More informationAlcan Packaging Neenah Plant
Managing Energy Use / Consumption Case Study Alcan Packaging Neenah Plant Alcan Neenah Plant Products and Processes Blown Film Cast Film Sheet Extrusion Thermoforming Adhesive Lamination Rewinding / Finishing
More information