1 Summary of the Preliminary Study for Grant Aid Project 1. Title of the Cooperation Project The Project for Extension of Selabam Hydropower Plant in Lao People's Democratic Republic 2. Categorization and its Reason 2.1 Categorization: Category B 2.2 Reason: (1) As a result of the Preliminary Study, it was reconfirmed that no involuntary resettlement is occurred, and the proposed project site is not in and around the National Biodiversity Conservation Area. (2) In the course of the Preliminary Study, a consultation meeting initiated by the Electricite du Laos (EDL) was held. Individual hearings from communities were conducted by EDL and the Preliminary Study Team. Judging from the voices from communities, the proposed project was confirmed to be accepted by communities around the proposed project site. (3) Change of river flows both upstream and downstream of Sedon River is not expected, because the existing weir is kept on same level. (4) The proposed project is required an IEE (Initial Environment Examination) in accordance with the Regulation on Environment Assessment in the Lao PDR. (The regulation is under the process of revision as of November 2008). 3. Outline of the Location The Project site is located in Selabam, Sanasomboun District, Champasak Province. 3.1 Topography Champasak Province is situated in the southern part of the Lao PDR, sharing borders with Thailand to the west, Salavan, Sekong and Attapeu provinces to its north and east, and Cambodia to the south. The province has ten districts (Bachieng, Champasak, Khong, Mounlapmok, Pakse, Paksong, Pathoumphone, Phonthong, Sanasomboun, and Sukhuma) and the total land area of 15,415 square kilometers. Champasak is the largest province in the Lao PDR. (Source: A guide to Champasak, LNTA-ADB, Mekong Tourism Development Project, 2006). 3.2 Population The Population of Champasak Province in 2005 was 607,370, or some 39.4 people per square kilometer. Most people in Champasak live in small rural villages and practice agriculture, livestock raising, and fishing as their main occupations. The main ethnic makeup of the province is Lao Loum or Lowland Lao, with Lao as their main language and paddy rice farming and fishing as their traditional livelihoods. In addition to this main group, there are an estimated 17 ethnic minority groups in the province that are mostly classified as Mon-Khmer, known for living in hilly regions of the country and practicing rotating agriculture. (Source: A guide to Champasak, LNTA-ADB, Mekong Tourism Development Project, 2006).

2 3.3 Meteorology In Laos, there are three distinct seasons; rainy (May to October), cool (November to February) and hot (March to April). During the rainy season, the country is very green and cool, with emerald rice paddies and forested mountains stretching as far as the eye can see. In November, the rains give way to the cool season and it gets quite hot in March and April. The climate in Champasak Province is typically warmer than that of Vientiane, with temperatures ranging from 16 degrees to 35 degrees. However, the Bolaven Plateau, in particular, is known for its relatively mild climate due to its high elevation, with temperatures 2-3 degrees cooler than Pakse. The Bolaven Plateau is also the most rained on area of Laos, getting up to 3,700mm per year. (Source: A guide to Champasak, LNTA-ADB, Mekong Tourism Development Project, 2006). 3.4 Nature There are two main forest types in Champasak Province. First are the dry deciduous forests, which are located mainly in the province s northern region, in the Phou Xieng Thong National Protected Area (NPA) and parts of the Bolaven Plateau, and its south-western corner bordering Thailand. These forests have rather tall, straight trees with large leaves, which typically lose their foliage during the dry season (November to April). On the edges of the Bolaven Plateau and in the province s south-eastern region, mainly Xe Pian NPA, are large tracts of evergreen jungles, which stay green all year and are valued for their rich biodiversity in both plant and animals species. (Source: A guide to Champasak, LNTA-ADB, Mekong Tourism Development Project, 2006). 4. Legal Framework of Environmental and Social Considerations 4.1 Law Relative laws, framework and regulations refer to Annex Projects subject to Environmental Impact Assessment (EIA) The Article 8 of Environment Protection Law ( NO.02-99/NA, April 1999) stipulates that development projects with potential environmental impact shall submit environmental assessment report in accordance with the regulations by the responsible agencies for those projects. 4.3 Procedure of EIA Regulation on Implementing Environmental Assessment for Electricity Projects in Lao PDR (NO.447/MIH, November 2001) refers to implement environmental assessment requirements and procedures. This regulation stipulates the procedure of IEE and EIA. All projects are subject to environmental screening and then proceed for IEE that examines whether or not it is necessary to conduct EIA. Public consultation is held 2 or 3 times during the preparation of IEE and EIA. Environmental Standard Management for Electricity Project (NO.0366 MIH.DOE, June 2003) refers to details of environmental Screening.

3 5. Outline of Relevant Agency and Institution which implement Project, EIA and so on 5.1 Responsible and Implementing Agencies of the Project The responsible agency is Department of Electricity (DOE), the Ministry of Energy and Mines (MEM). The implementing agency is Electricite du Laos (EDL). 5.2 Agency setting the principles and procedures for Environmental Impact Assessment Environmental control of the Lao RPD is executed by Department of Environment and Social Impact Assessment of Water Resources and Environment Administration (WREA) (previously Science Technology and Environment Agency STEA and renamed WREA in November 2007) of the Prime Minister s Office. In July 2007, Water Resources and Environment Agency (WREA) was established as EIA approval entity, taking over the department which is responsible to environmental issues under Science and Technology and Environmental Agency. Accordingly, EIA related regulation established by STEA was under the process of revision as of November, Outline of the Project 6.1 Proposed Project The objective of the Project is to extend the capacity of Selabam Hydropower Plant (HPP) to enhance the domestic electricity supply and promote electrification in the southern area of Lao PDR. Items finally requested by GOL are as table 1. Table 1 Finally requested items by GOL Facilities Items Civil Engineering - Newly installed headrace channel. Facilities - Penstock. - Tailrace. Indoor generating facilities arrangement - A semi-underground structure for the new power house besides existing unit No. 1-3 power house. in unit No. 5 Turbine and Generator - Installation of new generator unit (No. 5) with output of 9.7 MW (12.1 MVA) and turbine output 10.1 MW. Switchyard equipment and transmission line - Switchgears for the unit No.1-3 and for the unit No.4 will be completely replaced and equipment arrangement will be planned together with the installation of new switching equipment for unit No Analysis of Alternatives Alternatives including 1) Original request, 2) Finally requested plan, 3) Plan written in Feasibility Study, and 4) Do nothing were compared. As a result of the Preliminary Study, above 2) Finally requested plan was selected because of less environmental and social impacts. 7. Adverse Environmental and Social Impacts

4 7.1 Adverse Impacts The possible adverse impacts that may be caused by the proposed project are as the following table. Table 2 Possible Adverse Impacts No Impacts Rati Brief Description ng 1 Involuntary Resettlement No resettlement is expected since the proposed project is implemented in the existing Hydropower Plant. 2 Local economy such as No impact is expected since the existing weir is kept on same employment and livelihood, etc. level. Therefore, water level of upstream is not changed. No impact on navigation and fishing activity of downstream are expected since no excessive water intake from Sedon River is planned. 3 Land use and utilization of local resources 4 Social institutions such as social infrastructure and local decision-making institutions 5 Existing social infrastructures and services 6 The poor, indigenous and ethnic people No impact is expected since land change for civil work is minimum. Loss of farming area is not expected since the existing weir is kept on same level. No impact on navigation of downstream is expected since no excessive water intake from Sedon River is planned. No impact on ferry and irrigation facilities of downstream are expected since no excessive water intake from Sedon River is planned. No impact is expected since minority people dose not live in and around proposed construction site. 7 Misdistribution of benefit and damage No possible misdistribution of benefit and damage occur. 8 Cultural heritage No impact is expected since no cultural and historical heritage exists in and around proposed construction sites. 9 Local conflict of interests No possible local conflict of interests occurs. 10 Water Usage or Water Rights and Rights of Common No impact is expected since water rights, fishery right and rights of common are not established in and around proposed construction sites. 11 Sanitation B Sanitary condition around construction site likely to be unfavorable during construction if proper sanitary facilities such as temporally toilet and waste bin are not prepared. 12 Hazards (Risk) Infectious diseases such as HIV/AIDS Natural Environment 13 Topography and Geographical features B Possible infectious diseases at the construction phase due to increase of construction workers, if proper awareness program for preventing infectious diseases is not implemented. No impact is expected since land change for civil work is minimum. 14 Soil Erosion B Possible soil erosion during rainy season if improper land cut and land mound is conducted. 15 Groundwater No impact is expected since groundwater is not utilized in the course of construction. 16 Hydrological Situation No impact is expected to downstream of Sedon River since no excessive water intake from Sedon River is planned. 17 Coastal Zone (Mangroves, Coral reefs, Tidal flats, etc.) No impact is expected since proposed project is not planned along coastal zone. 18 Flora, Fauna and Biodiversity B Serious impact on flora is not expected since land change for civil

5 work is minimum. No impact is expected on fish habitats since no excessive water intake from Sedon River is planned. However, possible negative impact on fishes if turbidity is excessive due to effluent from civil work during dry season. 19 Meteorology Change of micro-meteorology is not expected since construction structure is small scale. 20 Landscape No considerable change of landscape is expected since construction structure is small scale. 21 Global Warming C Extent of impact is unknown at present stage. However, CO2 emission likely to increase due to operation of construction vehicles during construction phase. Pollution 22 Air Pollution B Atmospheric pollutant likely to increase during construction phase. 23 Water Pollution B Possible water pollution by accidental oil spillage during construction phase. 24 Soil Contamination B Possible water pollution by accidental oil spillage during construction phase. Soil contamination likely to have due to usage of improper construction equipments and vehicles. 25 Waste B Increased litter during construction period due to increase of construction workers. Generation of soil and sand, and construction waste likely to increase during construction phase. 26 Noise and Vibration B Noise and vibration occur during construction period due to increase of traffic volume for construction, and occasionally blasting work. 27 Ground Subsidence No impact is expected since ground in and around proposed site is firm. 28 Offensive Odor B Possible offensive odor by emissions from construction vehicles during construction phase. 29 Bottom sediment B Possible bottom sediment deterioration by accidental oil spillage and inflow of soil from construction site during construction phase. 30 Accidents B Possible traffic accidents due to increase of construction vehicles during construction phase. Rating: A: Serious impact is expected. B: Some impact is expected. C: Extent of impact is unknown (Impacts may become clear as study progresses.) No Mark: No impact is expected. 7.2 Adverse Impacts at each phase Adverse Impacts that may be caused by the proposed project at each phase are as the following table. Table3 Matrix of adverse impacts at each phase Planning Phase Construction Phase Operation Phase No. Likely Impacts Overall Rating Land acquisition Change of Land use plan, Control of Rights on Fishing and Navigation, and Water Use. Removal of existing facility Cutting trees and change of vegetation Operation of Construction Equipment and Vehicles Construction of new facilities Restriction of the economic and other activities such as fishing, navigation, and etc. around river Increase number of construction workers Water Sharing of Sedon River In taking excessive water from Sedon River Appearance/ Occupancy of facility and related structures

6 Social Environment: Natural Environment Pollution 1 Involuntary Resettlement 2 Local economy such as employment and livelihood, etc. 3 Land use and utilization of local resources 4 Social institutions such as social infrastructure and local decision-making institutions 5 Existing social infrastructures and services 6 The poor, indigenous and ethnic people 7 Misdistribution of benefit and damage 8 Cultural heritage 9 Local conflict of interests 10 Water Usage or Water Rights and Rights of Common 11 Sanitation B B 12 Hazards (Risk) B B Infectious diseases such as HIV/AIDS 13 Topography and Geographical features 14 Soil Erosion B B 15 Groundwater 16 Hydrological Situation 17 Coastal Zone 18 Flora, Fauna and Biodiversity B B 19 Meteorology 20 Landscape 21 Global Warming C C 22 Air Pollution B B 23 Water Pollution B B B 24 Soil Contamination B B 25 Waste B B 26 Noise and Vibration B B 27 Ground Subsidence 28 Offensive Odor B B 29 Bottom sediment B B 30 Accidents B B Rating: A: Serious impact is expected. B: Some impact is expected. C: Extent of impact is unknown (Impacts may become clear as study progresses.) No Mark: No impact is expected. 8. Mitigation and Monitoring for Key Impacts The mitigation measures for the key impacts show in table 4. Table 4 Assumed Mitigation Measures Likely Rating Impact severity (e.g. Assumed mitigation measures Impacts magnitude, area extent, duration, frequency, reversibility, likelihood of occurrence) Sanitation B Sanitary condition around To install temporary toilet facilities for

7 Infectious diseases such as HIV/AIDS B construction site likely to be unfavorable during construction if proper sanitary facilities such as temporally toilet and waste bin are not prepared. Possible infectious diseases at the construction phase due to increase of construction workers, if proper awareness program for preventing infectious diseases is not implemented. Soil Erosion B Possible soil erosion during rainy season if improper land cut and land mound is conducted. Flora, Fauna and Biodiversity B Serious impact on flora is not expected since land change for civil work is minimum. No impact is expected on fish habitats since no excessive water intake from Sedon River is planned. However, possible negative impact on fishes if turbidity is excessive due to effluent from civil work during dry season. Air Pollution B Atmospheric pollutant likely to increase during construction phase. Water Pollution Soil Contamination B Possible water pollution by accidental oil spillage during construction phase. B Possible water pollution by accidental oil spillage during construction phase. Soil contamination likely to have due to usage of improper construction equipments and vehicles. Waste B Increased litter during construction period due to increase of construction workers. Generation of soil and sand, and construction waste likely to increase during construction phase. Noise and Vibration Offensive Odor B Noise and vibration occur during construction period due to increase of traffic volume for construction, and occasionally blasting work. B Possible offensive odor by emissions from construction construction workers by contractor. To implement awareness activities to construction workers to promote sound solid waste management such as proper segregation and disposal. To implement proper guidance to construction workers by contractor to prevent infectious diseases. To adopt the existing best practice by contractor to avoid soil erosion from construction site during rainy season. To adopt the existing best practice by contractor to reduce soil run off from construction site during dry season. Degree of turbidity needs to be under tolerance level for fishes. To provide proper construction and heavy vehicles in order to reduce the volume of emission gas by contractor. To maintain construction and heavy vehicles properly. Regular watering on unpaved access road to prevent dust. Good practice such as lower speed driving and stopping unnecessary idling of construction vehicles. To provide proper construction and heavy vehicles in order to prevent water pollution by contractor. To maintain construction and heavy vehicles properly. To adopt the best practice to minimize soil run off from construction site. To prevent run off from concrete effluent to Sedon River. To provide proper construction and heavy vehicles in order to prevent soil contamination by contractor. To maintain construction and heavy vehicles properly. To prepare proper construction plan to minimize waste from construction works. To implement awareness activities to construction workers to promote sound solid waste management such as proper segregation and disposal. To inform construction schedule to residents. To use construction and heavy vehicles with low noise type. No construction works at night. To provide proper construction and heavy vehicles in order to prevent soil

8 Bottom sediment vehicles during construction phase. B Possible bottom sediment deterioration by accidental oil spillage and inflow of soil from construction site during construction phase. Accidents B Possible traffic accidents due to increase of construction vehicles during construction phase. contamination by contractor. To maintain construction and heavy vehicles properly. To provide proper construction and heavy vehicles in order to prevent soil contamination by contractor. To maintain construction and heavy vehicles properly. To consult with communities and police station to avoid traffic accidents. To disseminate right information related to construction schedule for communities along road side, schools, and hospital. To assign traffic conductor at schools to avoid traffic accidents. 9. Whether another Environmental and Social Considerations Studies is required at this stage or not? Responsible and implementing agencies (Department of Electricity DOE, the Ministry of Energy and Mines MEM, and Electricite du Laos EDL ) will start necessary action such as conducting an Initial Environment Examination (IEE) based on the Regulation on Environment Assessment in the Lao PDR and obtain license of environmental certificate. Basic Design Study Team shall confirm the progress of above action to meet requirements of JICA Guidelines for Environmental and Social Considerations. 10. Consultation Meeting for discussion on the Project for Extension of Selabam Hydropower Plant organized at Selabam Hydropower Plant Meeting Room in 23, October 2008, during 9 11:30 am with participation of representatives of Selabam Hydropower Plant surrounding upstream and downstream Villages, Sanasomboun District Administration official, representative of Division of Electricity, Energy and Mines Department of Champasack Province, project related EDL staff, as well as the JICA preliminary study team were attended. The villagers were encouraged to raise their opinion and concern about the extension of Selabam Hydropower Plant. There were not significant issues or negative impacts that villagers aware off and raised at this meeting, but they requested some assistance programs for their communities as for return for some small impacts mostly deemed to occur during construction phase such as: The representative of the project villages have requested to the project for improving village access road to better condition to prevent dust during construction and transportation of construction materials so that villagers and children do not suffer health risk. These villages are Na Nai, Houa Xe, Keng Kok, Donxe and Xelabam. Women representative from Xelabam village and other village representatives requested for bridge construction program to facilitate the transportation and community use. The following village representatives have raised their request to the project for electrification program for their villages: Village Nong No, Kengmaihia, Thonghi Gnai, Thonghi Noy, Thong Theung, Lao, and as well as Keng Kok.

9 One participant requested to improve school facilities so that the children also could get benefit from the extension project. Xelabam Village leader has raised a request to improve existing health facility for community use. Official from Sanasomboun District commented as follow. The irrigation system will be a good assistance from the project in terms of improving rice production of project villagers. Because some villages along Sedon river side have suffered from flooding in high river flow season and damage to their rice production, and this is not sure whether this was occurred from the Sedon Hydropower plant activity. End

10 Relative laws, regulations and framework Annex -1 -The Article 8 of Environment Protection Law ( NO.02-99/NA, April 1999) -Regulation on Environmental Assessment in the Lao PDR (2002) -Regulation on Environmental Assessment in the Lao PDR (2008, the regulation is under the process of revision as of November 2008) -Regulation on Implementing Environmental Assessment for Electricity Projects in Lao PDR (NO.447/MIH, November 2001) -Environmental Standard Management for Electricity Project (NO.0366 MIH.DOE, June 2003)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

4. Agency (or Institution) Responsible for Implementing the Project

4. Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study 1. Full Title of the Project Urban Transport Policy and System Development Master Plan for the ity of Dar es Salaam 2. Type of Study Master Plan 3. ategorisation and Its Reason

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Summary of Preliminary Study Result for Technical Cooperation Project

Summary of Preliminary Study Result for Technical Cooperation Project Summary of Preliminary Study Result for Technical Cooperation Project 1. Title of the Cooperation Project, Relevant Project Report The Project for Bridge Construction in Southeast Sulawesi Province Project

More information

Summary Report on the Preparatory Study for Environmental and Social Considerations

Summary Report on the Preparatory Study for Environmental and Social Considerations Summary Report on the Preparatory Study for Environmental and Social Considerations October 25, 2007 1. Title of the Cooperation Project, Relevant Project Report 1-1 Title of the cooperation project Feasibility

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project Project for Updating Dakar Urbanization Master Plan by

More information

Summary of Preliminary Study

Summary of Preliminary Study Summary of Preliminary Study 1. Title of the Cooperation Project ridge Construction Project for Expanded Agrarian Reform Communities Development in the Republic of the Philippines 2. Categorization and

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Agency (or Institution) Responsible for Implementing the Project

Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study Full Title of the Project The Study on Integrated Flood Management for Nyando River asin in the Republic of Kenya Type of Study Master Plan ategorisation and Its Reason 3.1

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco Summary of Environmental and Social Considerations in Detailed Planning Survey on the Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Feasibility Study on Development of Toamasina Port in the Republic of Madagascar 2. Type

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 10 December 2007 Summary of and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Study on Bheramara 450MW Combined Cycle Power Station in Bangladesh 2. Type of the study:

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

Appendix 3 The World Bank s New Operational Manual

Appendix 3 The World Bank s New Operational Manual Appendix 3 The World Bank s New Operational Manual Appendix 4 Environmental Consideration in JICA Outline of Environmental Consideration in JICA 1Introduction Various studies

More information

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations al Checklist: 5. Non-Ferrous Metals Smelting and Refining(1) (1) ESIA and al Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official language or a language

More information

Summary of Preparatory Study for Development Study

Summary of Preparatory Study for Development Study Summary of Preparatory Study for Development Study Creation Date: 30 March 2007 1. Full title of the Project The Study for Sustainable Rural Drinking Water Supply in the Southern Khatlon Oblast in the

More information

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda Summary of Preparatory Study 1. Full Title of the Project The Development Study on Water Resources Development and Management for Lake Kyoga asin in the Republic of Uganda 2. Type of Study Master plan

More information

ENVIRONMENTAL SCOPING PLAN

ENVIRONMENTAL SCOPING PLAN APPENDIX F ENVIRONMENTAL SCOPING PLAN F.1 DATA OF EXAMINATION Table F.1.1 Data of Examination No. Items Description 1 Full title of the Project and relevant report 2 Type of the study Development Study

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study ate: September 9, 2008 1. Title of the Cooperation Project Waste Minimization and Recycling Promotion Project 2. Categorization and its reason Environmental Category: B The

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Full title of the Project The Study for the Development of an Integrated Solution Related to Industrial Waste Management in the Industrial Pole of Manaus 2. Type of the

More information

5.4 Initial Environmental Examination

5.4 Initial Environmental Examination 5.4 Initial Environmental Examination The objectives of Initial Environmental Examination (IEE) are to examine and identify the necessity of Environmental Impact Assessment (EIA), and to identify potentially

More information

Participants of the Stakeholder Meeting for Preliminary Results (Jan.2011)

Participants of the Stakeholder Meeting for Preliminary Results (Jan.2011) 7.8 Results of Public Consultation -2 (Discussion on the Results of SEA) In the process of evaluating the development options, two stakeholder meetings were held in order to inform the results and discuss

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project The Project for the Study on Strengthening Competitiveness

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Date: March 16, 2015 Environmental and Social onsiderations in Detailed Planning Survey (Technical ooperation for Development Planning) 1. Full title of the Project THE PROJET ON THE ORRIDOR DEVELOPMENT

More information

Summary of Preliminary Study Result for Grant Aid Project. Date: 2008/02/12

Summary of Preliminary Study Result for Grant Aid Project. Date: 2008/02/12 Summary of Preliminary Study Result for Grant Aid Project Date: 2008/02/12 1. Title of the Cooperation Project, Relevant Project Report The Project for Construction of Bridges in the Province of Nusa Tenggara

More information

Nam Theun 2. TNC workshop April 2014

Nam Theun 2. TNC workshop April 2014 Nam Theun 2 1 TNC workshop April 2014 The Hydropower Project Build, Operate, Transfer 25 year concession for Nam Theun Power Co. US$1.3 Billion cost, financed by 27 parties (1/3 Equity; 2/3 debt) Generating

More information

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Category Environmental Item Main Check Items Confirmation of Environmental Considerations al Checklist: 2. Oil and Natural Gas Development 1 1 Permits and Explanation 2 Mitigation (1) EIA and al Permits (2) Explanation to the Public (1) Air Quality (2) Water Quality (3) Wastes Have EIA reports

More information

LAMPIRAN 12. Pertimbangan Lingkungan dan Sosial

LAMPIRAN 12. Pertimbangan Lingkungan dan Sosial LAMPIRAN 12 Pertimbangan Lingkungan dan Sosial APPENDIX 12. ENVIRONEMENTL AND SOCIAL CONSIDERATION 12.1 Relevant Laws and Procedures for Environmental and Social Considerations 12.1.1 Environmental Impact

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

Summary of the Preliminary Study for Grant Aid Project

Summary of the Preliminary Study for Grant Aid Project Summary of the Preliminary Study for Grant Aid Project 1. Title of the Cooperation Project The Project for Water Supply Development in Itay El-Barud Markaz, Beheira Governorate in the Arab Republic of

More information

Summary of Preparatory Study Report for Technical Cooperation Project (draft) Dated 2007/04/16

Summary of Preparatory Study Report for Technical Cooperation Project (draft) Dated 2007/04/16 Summary of Preparatory Study Report for Technical Cooperation Project (draft) Dated 2007/04/16 1. Title of the Cooperation Project, and Names of Project Proponent and Consultants 1.1 Title of the Cooperation

More information

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8 Summary of Preliminary Study Result for Technical Cooperation Project Date: 2008/10/8 1. Full title of the Project The Project on Integrated UMRT and Urban Development for Hanoi 2. Type of the study Feasibility

More information

Summary of Preparatory Study for Development Study (M/P)

Summary of Preparatory Study for Development Study (M/P) Summary of Preparatory Study for Development Study (M/P) 1. Title of the Cooperation Project The Study on Integrated Water Resources Management for Poverty Alleviation and Economic Development in the Pampanga

More information

REPORT ON ENVIRONMENTAL ASPECTS COMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA

REPORT ON ENVIRONMENTAL ASPECTS COMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA REPORT ON ENVIRONMENTAL ASPETS OMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA 1. TITLE OF THE OOPERATION PROJET AND NAME OF THE PROJET PROPONENT 1.1 Project Title omprehensive study on Disaster

More information

REQUEST FOR PROPOSALS FOR CONSULTANCY SERVICES FOR THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR NAMPULA-CUAMBA ROAD PROJECT (ROADS 3)

REQUEST FOR PROPOSALS FOR CONSULTANCY SERVICES FOR THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR NAMPULA-CUAMBA ROAD PROJECT (ROADS 3) GABINETE DO DIRECTOR GERAL REQUEST FOR PROPOSALS FOR CONSULTANCY SERVICES FOR THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR NAMPULA-CUAMBA ROAD PROJECT (ROADS ) RFP No 5/DG/07 Roads and Bridges Management

More information

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI 220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TERMS OF REFERENCE Transmission line Akhalsikhe-Batumi Georgia Terms of Reference for Tender docs and ESIA 2 1 PROJECT

More information

Preparatory Study for Development Study (M/P or F/S)

Preparatory Study for Development Study (M/P or F/S) Preparatory Study for Development Study (M/P or F/S) 1. Title of the Cooperation Project and Name of the Project Proponent (1) Title of the Cooperation Project The Study for Groundwater Development in

More information

Greater Monrovia, Liberia

Greater Monrovia, Liberia 1. Title the ooperation Project, Relevant Project Report The preparatory study on the Project for Reconstruction ommunity ridge in Greater Monrovia in the Republic Liberia. 2. Environmental ategorization

More information

Laos Country Report on Environmental Management in the Lao PDR Mining Sector. International Conference A Greater Mekong?

Laos Country Report on Environmental Management in the Lao PDR Mining Sector. International Conference A Greater Mekong? Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Laos Country Report on Environmental Management in the Lao PDR Mining Sector International Conference A Greater Mekong? Poverty,

More information

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Greater Mekong Subregion Nam Ngum 3 Hydropower Project (RRP LAO 41385) Supplementary Appendix 5 TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Strengthening Biodiversity

More information

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized -4L&-~~A>f Technical Support Staff Basic Training Training Documents (English Translations)

More information

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010 Board Meeting on Nam Theun 2 Project: Briefing Summary November 22, 2010 Introduction The World Bank and Asian Development Bank (ADB) circulated a written Update on project progress to their respective

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management Transboundary Cooperation Workshop # 3 20-22 January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management Responses form civil society on stakeholder views on benefit and cost

More information

2.29 XE KONG 5 HYDROPOWER PROJECT

2.29 XE KONG 5 HYDROPOWER PROJECT 2.29 XE KONG 5 HYDROPOWER PROJECT The Xe Kong 5 Hydropower Project is located in Kaleum District, Xe Kong Province on the upper reaches of the Xe Kong, immediately upstream of the proposed Xe Kong 4 Hydropower

More information

1. EIA Procedure in Pakistan

1. EIA Procedure in Pakistan APPENDIX-5 CURRENT ENVIRONMENTAL CONDITIONS, SCOPING AND THE METHOD OF ENVIRONMENTAL EXAMINATION 1. EIA Procedure in Pakistan Project Proposal Screening Process EIA Required Ferrer Schedule II IEE Required

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

CUSO-VSO Lao PDR Strategy Lao People s Democratic Republic. CUSO-VSO Lao PDR Strategy

CUSO-VSO Lao PDR Strategy Lao People s Democratic Republic. CUSO-VSO Lao PDR Strategy Lao People s Democratic Republic Foreword Welcome to the CUSO-VSO strategy for Lao People s Democratic Republic, 2012-15. CUSO-VSO is VSO international s representative organisation in Lao People s Democratic

More information

Clean Development Mechanism CDM

Clean Development Mechanism CDM Workshop on Improving the Regional Distribution of CDM Projects in Asia and the Pacific 8-9 September 2010, ADB Headquarters, Manila, Philippines Clean Development Mechanism CDM Xeset 2 Hydropower Project

More information

Country Analysis Paper. < Lao PDR>

Country Analysis Paper. < Lao PDR> Fourth Regional 3R Forum in Asia 3Rs in the Context of Rio+20 Outcomes The Future We Want Ha Noi, Viet Nam, 18-20 March 2013 Country Analysis Paper (Draft) < Lao PDR> -------------------------------------

More information

A CITIZEN S GUIDE. Awareness Raising on Hydropower Project Development and EIA for Citizens (part I)

A CITIZEN S GUIDE. Awareness Raising on Hydropower Project Development and EIA for Citizens (part I) A CITIZEN S GUIDE Awareness Raising on Hydropower Project Development and EIA for Citizens (part I) Prepared by Lasha Gurgenidze and Tamar Mtvarelidze with Dr. Shivcharn S. Dhillion May, 2014 Content of

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study Date: February, 2011 1. Title of the Cooperation Project, Relevant Project Report Project for the Rehabilitation of the Trunk Road, Phase IV (Dejen Debre Markos Section) 2.

More information

Nam Theun 2 Hydropower Project, Lao P.D.R.

Nam Theun 2 Hydropower Project, Lao P.D.R. Mekong Watch Nam Theun 2 Hydropower Project, Lao P.D.R. Field Report: 6-9 February 2018 The Nam Theun 2 Hydropower Project (NT2) is a dam that was constructed in central Laos Khammouane Province to acquire

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

SUMMARY 2013 EDITION

SUMMARY 2013 EDITION SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014. EXECUTIVE SUMMARY E1 Introduction The proponent is SOLAR FIELD LTD, a consortium between 1. Dhamma Energy, a company based in Spain, specialised in photovoltaic projects 2. Harel Mallac & Co. Ltd, a company

More information

TRANSBOUNDARY DIALOGUE

TRANSBOUNDARY DIALOGUE Joint Actions, Joint Solutions TRANSBOUNDARY DIALOGUE under Mekong Integrated Water Resources Management Project Joint Actions, Joint Solutions Mekong Basin China Transboundary Projects Xe Bang Hieng and

More information

CCAI Demonstration Projects in Viet Nam. Dr. Nguyen Anh Duc National CCAI Coordinator, Viet Nam National Mekong Committee

CCAI Demonstration Projects in Viet Nam. Dr. Nguyen Anh Duc National CCAI Coordinator, Viet Nam National Mekong Committee 1 CCAI Demonstration Projects in Viet Nam Dr. Nguyen Anh Duc National CCAI Coordinator, Viet Nam National Mekong Committee Outline Project: Preliminary Study on Climate Change Adaptation Plan in Kien Giang

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

COUNTRY REPORT ENVIRONMENTAL IMPACT ASSESSMENT MAY 02 TO JUNE 02 YEAR 2000

COUNTRY REPORT ENVIRONMENTAL IMPACT ASSESSMENT MAY 02 TO JUNE 02 YEAR 2000 Page 1 of 8 KINGDOM OF CAMBODIA NATION RELIGION KING COUNTRY REPORT ON ENVIRONMENTAL IMPACT ASSESSMENT ON MAY 02 TO JUNE 02 YEAR 2000 Prepared by Srun Im Ministry of Environment # 48, Samdech Preah Sihanouk,

More information

SCOPING SUMMARY [DRAFT] THE PROJECT FOR THE UPGRADING AND REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA

SCOPING SUMMARY [DRAFT] THE PROJECT FOR THE UPGRADING AND REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA 1. Title of the Project: SCOPING SUMMARY [RAFT] THE PROJECT FOR THE UPGRAING AN REFURBISHMENT OF CEMASTEA TRAINING FACILITIES IN KAREN IN KENYA The Project for the Upgrading and Refurbishment of CEMASTEA

More information

The Living Mekong Programme Goal :

The Living Mekong Programme Goal : The Living Mekong Programme Goal : The biological integrity of the Mekong basin is maintained and natural resources are managed sustainably for the benefit of local communities, national states, and the

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

Implications of climate change on watershed management in the Mekong basin

Implications of climate change on watershed management in the Mekong basin International Conference on Watershed Management 9-11 March 2011, Chiang Mai, Thailand Implications of climate change on watershed management in the Mekong basin Dr. KIEN Tran-Mai & Dr. VITHET Srinetr,

More information

CONCLUDING REPORT. Roadmap toward Effective flood Hazard Mapping in. Lao PDR. By: Mr. Anousone SISA-AD. Lao PDR

CONCLUDING REPORT. Roadmap toward Effective flood Hazard Mapping in. Lao PDR. By: Mr. Anousone SISA-AD. Lao PDR CONCLUDING REPORT IN Roadmap toward Effective flood Hazard Mapping in Lao PDR By: Mr. Anousone SISA-AD Lao PDR JICA TRAINING COURSE ON FLOOD HAZARD MAPPING 31/Nov-02/Dec/2005 0 Title: Roadmap toward Effective

More information

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS UNRAVELING THE MYRAID OF STANDARDS AND TOOLS HYDRO POWER DEVELOPMENT IN MEKONG REGION: CYCLING THROUGH FROM POLICY TO IMPLEMENTATION WORKSHOP SEPTEMBER 12-13, 2013 Basin Wide National regulations Project

More information

Amisk Hydroelectric Project Update

Amisk Hydroelectric Project Update Amisk Hydroelectric Project Update AHP Development Corporation (AHP) is providing an update on the Amisk Hydroelectric Project ( Amisk /the Project ). Amisk is a proposed run-of-river hydroelectric project,

More information

Session: For more information:

Session: For more information: Session: For more information: www.hydropower.org/congress VALUE CREATION AT HYDROPOWER PROJECTS IHA World Congress 2015 Session : Macroeconomic Benefits Emmanuel Branche, EDF Senior Economist EDF Project

More information

Project/Program Concept Paper

Project/Program Concept Paper Logo of your organization Project Title (Duration/ Budget) Name of Partner Country Project/Program Concept Paper DD, MM, YYYY, Applicant Information Name Position Organization Telephone E-mail Address

More information

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Energy and Mines Electricite Du Laos LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE

More information

Sri: Sustainable Power Sector Support Project

Sri: Sustainable Power Sector Support Project Environmental Monitoring Report June 2015 Sri: Sustainable Power Sector Support Project Prepared by Ceylon Electricity Board for the Asian Development Bank. This environmental monitoring report is a document

More information

10 Project Cost Estimation

10 Project Cost Estimation 10 Project Cost Estimation Contents 10 Project Cost Estimation... 1 10.1 Project Overview... 1 10.2 Principles of Project Cost Estimation... 2 10.3 Data Basis and Assumptions for Project Cost Estimation...

More information

COUNTRY PROGRESS REPORT: LAO PDR

COUNTRY PROGRESS REPORT: LAO PDR COUNTRY PROGRESS REPORT: LAO PDR PSC MEETING OF THE GEF/UNDP/PEMSEA PROJECT ON SCALING UP IMPLEMENTATION OF THE SDS-SEA JULY 24, 2017 1 LAO PDR Summary of Major Achievements/Outputs in 2016 2017 National

More information

1. Title of the Cooperation Project and Name of the Project Proponent

1. Title of the Cooperation Project and Name of the Project Proponent Preparatory Study for Development Study Date: 6 April 2006 1. Title of the ooperation Project and Name of the Project Proponent 1-1 Title of the ooperation Project The Study on Integrated Basin Management

More information

Lao People s Democratic Republic

Lao People s Democratic Republic Climate Change Country Profile: Lao People s Democratic Republic 1. Country description 1.1 Geography Area: 236 800 km 2 Borders China, Viet Nam, Cambodia, Thailand and Myanmar Consists of northern region

More information

Concept of WSM Country Status on Watershed Management Planning Institution and Legislation relevant to WSM in Laos Application of Watershed Management

Concept of WSM Country Status on Watershed Management Planning Institution and Legislation relevant to WSM in Laos Application of Watershed Management Watershed Management in the Lao PDR Dr. Khamla Phanvilay Assoc. Prof. Dr. Sithong Thongmanivong Faculty of Forestry National University of Laos 1 Outlines of Presentation Concept of WSM Country Status

More information

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012 Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012 In April 2011, the four governments of the Mekong River Commission (MRC) Cambodia, Laos, Thailand, and Vietnam met to discuss

More information

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA Communication and Hydropower EIA September, 2014 Dhillion, S.S. and Bakhtadze, M. 2014. A Citizen s Awareness Guide: Communication and Hydropower EIA. Sustainable Hydropower Development in Georgia. Report

More information

National context NATIONAL CONTEXT. Agriculture and the Sustainable Development Goals in the Lao PDR

National context NATIONAL CONTEXT. Agriculture and the Sustainable Development Goals in the Lao PDR National context Agriculture and the Sustainable Development Goals in the Lao PDR Agriculture plays a central role as a foundation of the Lao PDR s overall national economy and development, particularly

More information

Aquanova Nyzhniy Bystryi small hydropower plant project non-technical summary

Aquanova Nyzhniy Bystryi small hydropower plant project non-technical summary Aquanova Nyzhniy Bystryi small hydropower plant project non-technical summary 1 Introduction This document provides a non-technical overview of Aquanova Development Nyzhniy Bystryi Hydropower Plant project

More information

NATIONAL STANDARDS TECHNICAL SPECIFICATION FOR RIVER WORKS IN LAO PDR

NATIONAL STANDARDS TECHNICAL SPECIFICATION FOR RIVER WORKS IN LAO PDR NATIONAL STANDARDS TECHNICAL SPECIFICATION FOR RIVER WORKS IN LAO PDR BOUNPHET PHOMACHANH Ministry of Communication Transport Post and Construction, Department of Roads, Waterways Administration Division,

More information

Thai-Lao Hydro Projects Should Meet International Standards

Thai-Lao Hydro Projects Should Meet International Standards Thai-Lao Hydro Projects Should Meet International Standards Shannon Lawrence, Lao Program Director, International Rivers Statement given at Media briefing on Thai-Lai Hydropower Projects Thursday December

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: North-South Expressway Construction Project (Da Nang Quang Ngai Section) (I) (II) (III) L/A signed

More information

Hongsa Health Surveillance Start-up and Approaches

Hongsa Health Surveillance Start-up and Approaches Hongsa Health Surveillance Start-up and Approaches Suranee Phusuwan Introduction Lao People's Democratic Republic is committed to graduate from the list of Least Developed Countries by 2020 and to be the

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Mozambique Project: Mandimba Lichinga Road Upgrading Project Loan Agreement: November 29, 2013

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Agriculture and Forestry No 0538/MAF Vientiane, Date 09/02/2011 Agreement of the Minister on Good Agriculture

More information

Ex-Ante evaluation 1. Name of the Project 2. Background and Necessity of the Project

Ex-Ante evaluation 1. Name of the Project 2. Background and Necessity of the Project Ex-Ante evaluation 1. Name of the Project Country: Democratic Socialist Republic of Sri Lanka Name of the Project: National Transmission and Distribution Network Development and Efficiency Improvement

More information

Izmir Bayrakli Integrated Health Campus Turkey

Izmir Bayrakli Integrated Health Campus Turkey Izmir Bayrakli Integrated Health Campus Turkey Basic Information Project name: Izmir Bayrakli Integrated Health Campus Project. Borrower: İzmir Bayraklı Hastane Yatırım ve Sağlık Hizmetleri Anonim Şirketi

More information

Chapter 6: Executing the EIA Process

Chapter 6: Executing the EIA Process ENVS402 Environmental Impact Assessment Chapter 6: Executing the EIA Process 6.3 Methods of Identifying Impacts 1 Methods of identifying impacts (Ref. Lary W Canter, 1996, Environmental Impact Assessment.

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Appendix-4 Environmental and Social Considerations

Appendix-4 Environmental and Social Considerations Appendix-4 Environmental and Social Considerations Master Plan Study Appendix 4-1 Legal Framework of Environmental and Social Considerations in Philippines Appendix 4-1 Legal Framework of Environmental

More information